ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

REVIEW COMMENTS ON:-


DOCUMENT TITLE: UTILITY FLOW SCHEME FUEL AND INSTRUMENT GAS SYSTEM

DOCUMENT NO: NTC-OB3-LOTA-X-DW-013 (A 04)

S. SHEE
N T FRAZIMEX RESPONSE IMPaC COMMENTS FRAZIMEX RESPONSE
COMMENTS
O NUM
. BER
1- Kindly write 1. Implemented 1. Implemented
flow rate instead
of design flow 2. Auto blow down 2. Not implemented 2. Implemented
rate in data valve already
panels. provided upstream of
2- Kindly provide the preheater. High
auto blow down pressure can NEVER

1. 1 of 1 valve at outlet of be trapped in the


pre-heater or preheater because
relocate / shift the there is nothing to 3. Implemented
auto-blow down trap the gas.
valve (10-BDV-
802) from
instrument gas
3. Implemented 10-
scrubber to outlet

FILE: Document1 Dated: 26-Jun-2015 SHEET 1 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

of pre-heater SDV-813 added 4. Not implemented 4. Implemented


because high
pressure gas will
trap in the section
of pre-heater. 4. This drawing
Kindly review it. representing the
3- Shut down valve instrument gas dryers
after 10-LCV-831 system are only
shall be provided indicative and should
in order to avoid be accepted as such.
gas-blow by in Fuel Gas Dryers are
case of stuck-open proprietary, therefore
of LCV or low each vendor has
5. Not implemented
level of liquid in specific drawing their 5. Implemented
instrument gas fuel gas dryer system. 6. Not Implemented 6. Implemented
scrubber. Please not that fuel
4- Both adsorption gas are not dried with
and regeneration dry gas but with
7. Implemented
lines after dryers desiccants both the
are routing adsorption and
towards regeneration
instrument gas processes.

FILE: Document1 Dated: 26-Jun-2015 SHEET 2 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

receiver.
Regeneration
cycle will be done
with dry gas and 5. Vendor to advise
regenerated gas 6. Please can you
will be wet gas provide the reasons
and it cannot be for the requesting
routed to NRV before the
instrument gas instrument gas
receiver and receiver.
therefore 7. It is a statutory
regenerated gas requirement for a
should be vessel operating at
recycled. Please more than 3bar. For
provide the inventory evacuation
process in case of emergency.
description of
dryer package.
Also provide the
flow rate for
regeneration cycle
in data panel of

FILE: Document1 Dated: 26-Jun-2015 SHEET 3 OF 4


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

dryers.
5- Column for Cycle
time with VTS
should be
provided in data
panel of
instrument gas
dryers.
6- NRV should be
provided before
instrument gas
receiver.
7- Review the
requirement of
auto-blow down
valve (10-BDV-
902) at instrument
gas receiver.

FILE: Document1 Dated: 26-Jun-2015 SHEET 4 OF 4