This document is a checklist of requirements for the detailed engineering design of water projects. It includes requirements for engineering surveys, technical design, drawings, quantity and cost estimates, and documentation of community consultation. The technical design section specifies parameters that must be included like design period, minimum demand, average day demand calculations, and design standards for reservoirs, pipelines, and pumps. The drawings section lists plan and profile drawings as well as details that must be shown. The estimates section requires derivation of quantities, unit price analysis, and project schedule. Documentation of community consultation is also required.
This document is a checklist of requirements for the detailed engineering design of water projects. It includes requirements for engineering surveys, technical design, drawings, quantity and cost estimates, and documentation of community consultation. The technical design section specifies parameters that must be included like design period, minimum demand, average day demand calculations, and design standards for reservoirs, pipelines, and pumps. The drawings section lists plan and profile drawings as well as details that must be shown. The estimates section requires derivation of quantities, unit price analysis, and project schedule. Documentation of community consultation is also required.
This document is a checklist of requirements for the detailed engineering design of water projects. It includes requirements for engineering surveys, technical design, drawings, quantity and cost estimates, and documentation of community consultation. The technical design section specifies parameters that must be included like design period, minimum demand, average day demand calculations, and design standards for reservoirs, pipelines, and pumps. The drawings section lists plan and profile drawings as well as details that must be shown. The estimates section requires derivation of quantities, unit price analysis, and project schedule. Documentation of community consultation is also required.
DILG - NAPOLCOM Center, EDSA Corner Quezon Avenue, Quezon City www.dilg.gov.ph
CHECKLIST OF DOCUMENT FOR THE REVIEW DETAILED ENGINEERING DESIGN (FOR WATER PROJECTS) PROJECT PROFILE: REGION : ___________________ SOURCE OF FUND: SALINTUBIG ADM / BUB-WATER SUPPLY PROVINCE : ___________________ TYPE OF PROJECT: NEW CONSTRUCTION CITY/MUNICIPALITY/BRGY.: ___________________ EXPANSION / UPGRADING PROJECT TITLE : ___________________ REHABILITATION/ IMPROVEMENT PROJECT LOCATION : ___________________ LEVEL OF SERVICE: LEVEL I LEVEL II & III PROJECT YEAR : ___________________ LEVEL II FROM LEVEL II TO LEVEL III NO. OF HHs TO BE SERVED : ___________________ LEVEL III POPULATION TO BE SERVED : ___________________ TYPE OF SOURCE: SPRING TOTAL PROJECT ALLOCATION : ___________________ GROUND WATER (WELL) a. National Subsidy ___________________ SURFACE WATER b. LGU Counterpart ___________________ MANAGEMENT TYPE: LGU-MANAGED BWSA-MANAGED c. Others ___________________ WATER DISTRICTS OTHERS Submitted? Description Remarks/Comments Yes No 1. ENGINEERING SURVEY/ INVESTIGATION 1.1 Location Map 1.1.1 Geographic Location 1.1.1.1 Beginning of Project (BOP) 1.1.1.2 End of Project (EOP) 1.2 General Notes 1.3 Plan and Profile 1.3.1 Existing Centerline 1.3.2 Finish Grade 1.3.4 Elevation 1.3.6 Existing and Proposed Structure 1.3.6.1 Elevation 1.4 Typical Trench Details 1.5 Geo-Resistivity Survey 1.5.1 Geo-Resistivity Survey Report (signed and sealed) 2. TECHNICAL DESIGN 2.1 Design Notes and Parameters 2.1.1 Design Period : 5 10 years 2.1.2 Minimum Demand : 0.3 ADD 2.1.3 Average Day Demand : -Design Population x per capita consumption/1-NWR 2.1.4 Maximum Day Demand (MDD): - 1.3 ADD 2.1.5 Peak Hour Demand (PHD): - 3 x ADD for < 1,000 served population - 2.5 x ADD for > 1,000 served population 2.1.6 Non-Revenue Water : 15% for New System; 20% for old system 2.1.7 Household per Public Faucet: 4-6 HHs 2.1.8 Per Capita Water Consumption: Level II : 40 - 60 lpcd Level III : - Domestic : 80 100 lpcd - Institutional : 1.0 cu.m. /day or actual - Commercial : 0.80 cu.m. /day or actual 2.1.9 Design Pump: Pump TDH = Depth of Pumping Water Level + Maximum Reservoir High Water Level + Friction Losses Pump Capacity = Maximum Day Demand/Operating Hours 2.1.10 Design of Reservoirs Reservoir Capacity : 25% of ADD 2.1.11 Design of Distribution System (Distribution System Analysis) 1) Minimum Line Pressure = 3 meters 2) Maximum Line Pressure = 70 meters 3) Transmission Line = 3.0 m/s 4) Distribution Pipe = 1.5 m/s 2.2 Design of Transmission Pipelines 2.3 Design of Distribution Pipelines 2.4 Design of Ground Reservoir 2.5 Design of Elevated Water Tank 2.6 Design of Spring/Intake Box 2.7 Design of Pump 2.8 Design Report 3. DRAWINGS 3.1 General 3.1.1 Table of Contents 3.1.2 Lay-Out Plan, Location Map and Key Map 3.1.3 Legends, Abbreviations and Symbols 3.1.4 General Notes 3.1.5 Material Source Map 3.2 Master Plan 3.2.1 Plan and Profile 3.3 Detailed Drawings: 3.3.1 Trench Details 3.3.2 Spring/Intake Box Details 3.3.3 Ground Reservoir Details 3.3.4 Elevated Water Tank Details 3.3.5 Sump Tank Details 3.3.6 Appurtenances and Valves Details 3.3.7 Hydrant Details 3.3.8 Filtration Tank Details 3.3.9 Pump House Details 3.3.10 Well Source Details 3.3.11 Pipe Support Details 3.3.12 Bridge Crossing Details 3.3.13 Creek Crossing Details 3.3.14 Tapstand 3.4 Miscellaneous 3.4.1 Project Billboard ( COA Standard) 3.4.2 Construction Safety(PPEs) 4. QUANTITY AND COST ESTIMATE 4.1 Quantity Calculations/Derivations 4.2 Unit Price Analysis (including loading cycle analysis) 4.2.1 Distance of Material Source/Quarry from Project Site 4.2.2 Unit Prices of Commercial Materials 4.2.3 Unit Prices of Processed Materials 4.2.4 Labor & Equipment Rates 4.3 Project Schedule & S-Curve 4.4 PERT-CPM 4.5 List of Minimum Manpower and Equipment Crew 4.6 List of Minimum Equipment Requirement 5. COMMUNITY CONSULTATION DOCUMENTATION 5.1 Minures of the meeting 5.2 Attendance 5.3 Photos Prepared by: Checked by:
Printed Name & Signature : __________________________________________
Date : __________________________________________ Project Manger / PDMU Chief
Noted / Acknowledged by:
Printed Name & Signature : __________________________________________ Date : __________________________________________ Municipal Mayor / MPDC / ME