1. General Data
Grade Elevation = 1011.20 m
Foundation Level Elevation = 1007.30 m
Slab Thickness = 0.60 m
Unit weight of Concrete, gc = 24.00 KN/m
Unit weight of Masonry, gmasonry = 27.00 KN/m
Unit weight of Backfill , gbackfill = 19.00 KN/m
Allowable Bearing Capacity of foundation q_all = 250.00 KN/m
Span of Bridge = 10.40 m
Total Span of bridge from end of abutments = 10.80 m
Clear Roadway Width = 7.32 m
Number of Posts 14
Curb Width = 0.80 m
Rear Wheel Load = 72.00 KN
Number of Lanes = 2
2. Loads from Superstructure
I. Dead Load
Slab 1138.41 KN
Wearing Surface 86.96 KN
Curb 352.51 KN
Railing 38.88 KN
Posts 21.42 KN
Total = 1638.18 KN
Dead Load Per Abutment = 819.09 KN
4.267m X
P P
B
A
Effective Span L
4.267m 4.267m X
P P P/4
A
B
Effective Span L
X= 1.866 m
Reaction force at Support A = RA = 687.30 KN (Including Impact and other Effects)
III. Dead Load of Fill Over Culvert
3. Abutment Cross-Section
W7
W9
W5
W6
H1
P1 W1
W2
P2 W4
H2
W3
P3
300
W8 300
300 X2 400 X1
Resisting Force
F.S.= = 2.57 >1.5 ok!!
Sliding Force
8. Safety Against Bearing Capacity Failure
M StabilizingM Destabilizing
X= = 1.16 m
V
e = (B/2) - X = 0.281 m e<B/6 with in kern Ok!!
q=
V ( 1 6 e )
B B
q max=
V ( 1+ 6 e )= 214.83 KPa qmax<qall Ok!!
B B
q min=
V (1 6 e )= 56.01 Kpa
B B
Oromia Rural Roads Authority
Project Lepis River Bridge
Name of Bridge: Lepis
Designer Gebeyehu Aragaw
1. General Data
Number of Spans = 1
Number of Piers = 0
Bridge Clear Span Lc = 10.00 m
Roadway width w = 7.32 m
Sidewalk + Post on both ends = Sw 0.80 m
Assume:
Slab width b_s = 1.00 m
Slab thickness Df = 0.60 m
Dead Load
Slab = gC*Df = 14.40 KN/m
Wearing Surface = 1.10 KN/m
Total = 15.50 KN/m
Live Load
Use I = 0.31
Possible Location of Maximum Moment = (L/2-0.711)/L 0.4316 L
Longitudinal Wheel Spacing = 4.267 m
Influence Lines for Live Load
Depth Required, dreq = d Mu
req = = 393.77 mm
fy
(
fy b 1 0. 59
fc )
Cover = 50.00 mm
Use Rebars of diameter = 32 mm
davailable = 534.00 mm Ok!!!
Main Reinforcement
MU
Area of Reinforcement Required As = A S=
f y ( d( a / 2))
Assume a = 110.16 mm
As = 6790.18 mm
Check a :
AS f y
a=
0. 85 f 'C b
a= 110.16 mm ok!!!
As_req = 6790.18 mm
Area of One bar , as = 804.25 mm
100
Distribution Steel, As_dist = A S dist = 50 1197.24 mm
S
Spacing of Diameter 16 mm bars = 167.94 mm
Use diameter 16 mm bars c/c 165mm (Bottom)
For the curb reinforcement, extend the slab reinforcement in to the curb for flexural resistance.