AT Assessments:
Adonis M. Amparo
Sr. Systems Engineer
September 2014
Ceragon Networks
Background:
Completion of site data, commissioning information and
supporting photos during AT is the first step for the customer to
evaluate the link acceptance. It is necessary that all information
satisfies the quality requirement of customer CTO to proceed
with site verification and approval of each link.
Notes:
- Team need to login into TAB with
internet access before visiting site
for ATP (Site will be downloaded
once FE login's)
- Use ATP engineer login for doing
ATP on site.
Account will be provided by RJIL .
Proprietary and Confidential
3. Select the site for AT
AT Status:
AT completed by
Field Engineers/For
Review
Ongoing Review
Review Completed/
Submitted
Site A
Site B
Should be Yes
Should be Yes
Should be Yes
Check port 2 since we use
ETH2 port of the RFU.
Click Save button. And
Next to go to page 4.
Proprietary and Confidential
5. Review of Page 4 (Traffic Cable)
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Should be Yes
Click Save button. And
Next to go to page 5.
Proprietary and Confidential
5. Review of Page 6 (Power Cable)
Fill out with actual length
of DC cable.
RJIL uses Outdoor
DC cable.
Select DC type of
power supply
Should be Yes.
Type the NE ID
(not the SAP ID)
Site Coordinates.
Actual Longitude and
Latitude value.
Ensure that bolts and nuts are properly tightened and complete
Proprietary and Confidential
Antenna make and Model
or
Admin: Enable