Comit Diretor do CERPCH

Director Committee
CEMIG / FAPEPE / IEE-USP / FURNAS /
IME / ELETROBRAS / ANEEL / MME

Comit Editorial
Editorial Committee
Presidente - President
Geraldo Lcio Tiago Filho - CERPCH/UNIFEI

03
Editores Associados - Associated Publishers
Adair Matins - UNCOMA - Argentina
Alexander Gajic - University of Serbia Editorial
Alexandre Kepler Soares - UFMT Editorial
ngelo Rezek - ISEE/UNIFEI
Antnio Brasil Jr. - UnB

Entrevista 04
Artur de Souza Moret - UNIR
Augusto Nelson Carvalho Viana - IRN/UNIFEI
Bernhard Pelikan - Bodenkultur Wien - ustria
Carlos Barreira Martines - UFMG Interview
Clio Bermann - IEE/USP Aneel reestrutura procedimentos
Edmar Luiz Fagundes de Almeira - UFRJ para acelerar processo para PCHs
Fernando Monteiro Figueiredo - UnB Aneel restructures procedures to
Frederico Mauad - USP
Helder Queiroz Pinto Jr. - UFRJ accelerate processing for SHPs

Regulao 06
Jaime Espinoza - USM - Chile
Jos Carlos Csar Amorim - IME
Marcelo Marques - IPH/UFRGS
Marcos Aurlio V. de Freitas - COPPE/UFRJ Regulation
Maria Ins Nogueira Alvarenga - IRN/UNIFEI
O Retorno das PCHs ao Mercado Regulado de Energia
Orlando Anbal Audisio - UNCOMA - Argentina
Eltrica e a Microgerao como paliativo crise energtica
Osvaldo Livio Soliano Pereira - UNIFACS
Regina Mambeli Barros - IRN/UNIFEI The return of SHPs in the Regulates Energy Market and
Zulcy de Souza - LHPCH/UNIFEI Micro-generation as a buffer for the energy crisis

Curtas
News
08
TECHNICAL COMMITTEE
Seminrio sobre recursos naturais realizado
Prof. Franois AVELLAN, EPFL cole Polytechnique Fdrale de Lausanne, pelo Instituto de Recursos Naturais da Unifei
Switzerland, francois.avellan@epfl.ch, Chair; Seminar on Natural Resources is held
Prof. Eduardo EGUSQUIZA, UPC Barcelona, Spain, egusquiza@mf.upc.es, Vice-Chair;
by the UNIFEIs Natural Resources Institute
Dr. Richard K. FISHER, VOITH Hydro Inc., USA, richard.fisher@voith.com, Past-Chair;
Mr. Fidel ARZOLA, EDELCA, Venezuela, farzola@edelca.com.ve;
Dr. Michel COUSTON, ALSTOM Hydro, France, michel.couston@power.alstom.com;
Dr. Niklas DAHLBCK, VATENFALL, Sweden, niklas.dahlback@vattenfall.se; Agenda 10
Mr. Normand DESY, ANDRITZ Hydro Ltd., Canada, normand.desy@andritz.com; Schedule
Prof. Chisachi KATO, University of Tokyo, Japan, ckato@iis.u-tokyo.ac.jp;
Prof. Jun Matsui, Yokohama National University, jmat@ynu.ac.jp;
Dr. Andrei LIPEJ, TURBOINSTITUT, Slovenija, andrej.lipej@turboinstitut.si; Ficha catalogrfica elaborada pela Biblioteca Mau
Prof. Torbjrn NIELSEN, Norwegian University of Science and Technology, Norway, Bibliotecria Margareth Ribeiro- CRB_6/1700
torbjorn.nielsen@ntnu.no;
Mr. Quing-Hua SHI, Dong Feng Electrical Machinery, P.R. China, qhshi@dfem.com.cn; R454
Prof. Romeo SUSAN-RESIGA, Politehnica University Timisoara, Romania, re-
siga@mh.mec.utt.ro;
Revista Hidro & Hydro PCH Notcias & Ship News, UNIFEI/CERPCH,
Prof. Geraldo TIAGO F, Universidade Federal de Itajub, Brazil, tiago@unifei.edu.br.
v.1, 1998 -- Itajub: CERPCH/IARH, 1998 v. 65, n. 2, abr./jun. 2015.
Expediente
Editorial Trimestral.
Editor chefe: Geraldo Lcio Tiago Filho.
Editor Geraldo Lcio Tiago Filho
Jornalista Responsvel: Adriana Barbosa MTb_MG 05984
Coord. Redao Camila Rocha Galhardo
Jornalista Resp. Adriana Barbosa MTb-MG 05984 ISSN 2359-6147 / ISSN 1676-0220
Redao Adriana Barbosa
Camila Rocha Galhardo 1. Energia renovvel. 2. PCH. 3. Energia elica e solar. 4. Usinas hi_
Projeto Grfico Net Design
Diagramao e Arte Lidiane Silva dreltricas. I. Universidade Federal de Itajub. II. Centro Nacional de Re_
Traduo Joana Sawaya de Almeida ferncia em Pequenas Centrais Hidreltricas. III. Ttulo.
Impresso Editora Acta Ltda

Hidro&Hydro - PCH Notcias & SHP News


uma publicao trimestral do CERPCH
The Hidro&Hydro - PCH Notcias & SHP News
is a three-month period publication made by CERPCH
Tiragem/Edition: 6.700 exemplares/issues
contato comercial: pchnoticias@cerpch.org.br / site: www.cerpch.org.br
Universidade Federal de Itajub

ISSN 2359614-7
Av. BPS, 1303 - Bairro Pinheirinho
Itajub - MG - Brasil - CEP: 37500-903
e-mail: pchcomunicacao@cerpch.org.br
pchnoticias@cerpch.org.br
Fax/Tel: +55 (35)3629 1443 9 772359 614009 00065

2
HIDRO&HYDRO | ISSN 2359-6147 TECHNICALEDITORIAL
ARTICLES
Prezado Leitor, Letter from the Editor,

Nos ltimos tempos o investimento do governo no setor eltrico tem Lately, governmental investments in the electric sector have fallen
ficado aqum das expectativas no mercado, porm algumas aes tm sido short of expectations in the market; however, some actions have been
feitas para modernizar tanto o setor de transmisso, gerao e distribuio. made to modernize the transmission, generation and distribution sectors.
Com esse cenrio nada animador, a Agncia Nacional de Energia With this less than appealing scenario, the National Energy Agency
Eltrica ANEEL est passando por uma reformulao interna, na qual se ANEEL is going through internal overhaul, where more agility is expected
espera uma maior agilidade na a provao de projetos ligados a pequenas in project trials connected to small hydropower plants SHPs, changes
centrais hidreltricas PCH, mudanas essas que sinalizam uma esperana that signal hope for investors and manufacturers.
para os investidores e fabricantes. Within these perspectives, this edition of Hidro&Hydro brings you
Dentro dessas perspectivas essa edio da Hidro&Hydro traz uma an interview with ANEEL Director, Engineer, Reive Barros do Santo, who
entrevista com o diretor da ANEEL, o engenheiro Reive Barros do Santo, points out the main directives that the agency is reformulating to better
que pontua as principais diretrizes que a agncia est reformulando para serve the sector.
melhor atender o setor. Another issue addressed in this edition is the return of the SHP market
Outro ponto abordado nessa edio o retorno das PCHs ao mercado energy regulator and the micro-generation with the momentary hope for
regulador de energia eltrica e a microgerao como uma esperana minimizing the Brazilian energy crisis.
momentnea para minimizar a crise energtica brasileira. In this article, center researchers make an analysis of this action and
Nessa matria, os pesquisadores do Centro fazem uma anlise dessa ao affirm that the growth of distributed energy is beneficial to the country
e afirmam que o crescimento da gerao distribuda salutar para o pas, uma since it promotes quick input of energy into the electric system, allowing
vez que promove a entrada rpida de energia no sistema eltrico, possibilita the decrease of the use of thermoelectric plants powered by diesel,
a diminuio do uso de termoeltricas movidas a diesel, gera empregos, creating jobs, technology and income to regions distant from large urban
tecnologia e renda em regies mais distantes dos grandes centros urbanos. cities.
Por fim, dentro dessas incertezas que cercam o setor essa publicao Finally, among these uncertainties that surround the sector, this
busca sempre trazer aos leitores os questionamentos e novidades para publication seeks to always bring our readers our concerns and new
lhes proporcionar uma opo de leitura. developments in order to provide you with a reading option.

Boa Leitura!
Enjoy reading!

Geraldo Lcio Tiago Filho Geraldo Lcio Tiago Filho

Apoio:

IAHR DIVISION I: HYDRAULICS


TECHNICAL COMMITTEE:
HYDRAULIC MACHINERY AND SYSTEMS

HIDRO&HYDRO: PCH NOTCIAS & SHP NEWS, 56 (1), JAN,MAR/2013, DA PG. 10-14 3
Entrevista HIDRO&HYDRO, 65, (2), ABR,MAI,JUN/2015

ANEEL REESTRUTURA PROCEDIMENTOS


PARA ACELERAR PROCESSO PARA PCHs

por Adriana Barbosa

notrio que a situao das pequenas centrais hidreltricas


PCHs tem sido questionada junto ANEEL j h algum tempo.

Arquivo CERPCH
Desta maneira, desde que assumiu a diretoria da Aneel, o
engenheiro Reive Barros dos Santos vem se empenhando em
agilizar as etapas dos procedimentos pela agncia. Em entrevista
concedida a revista Hidro&Hydro, o diretor da ANEEL falou sobre
as aes implementadas para tornar o processo mais dinmico.
Logo no inicio do ano foi realizado, pela Aneel, um
seminrio com intuito de reunir representantes da Academia,
empreendedores, consultores, governo, Empresa de Pesquisa
Energtica (EPE) e ANEEL. O seminrio resultou em contribuies
que foram divididas em quatro macro questes: Preo teto, onde
a maioria dos agentes reivindicavam que o preo no era atraente;
Licenciamento Ambiental, devido a normatizao ser distinta
em cada estado da federao; Processo de anlise dos projetos
realizados pela ANEEL e Financiamento.
Com base nesses questionamentos a Agncia juntamente com
o Ministrio de Minas Energia -MME e EPE estabeleceu um plano
de ao para equalizar os problemas e criar uma metodologia para
calcular o preo teto para os leiles, assim o preo foi melhorado
com baixo impacto na tarifa. O aumento do preo teto para PCHs
de R$164,00 para R$ 210,00 deu uma nova dinmica ao setor.
Outro ponto foi de questo interna, onde a ANEEL entrou em Reive Barros dos Santos engenheiro eletricista
um processo de reestruturao, reduzindo trs superintendncias graduado pela Escola Politcnica de Pernambuco em
com objetivo de trabalhar por processo. Ao trabalhar por 1974. Especialista em administrao estratgica,
processos, no caso especfico de PCHs, podemos simplificar o atuou em grandes empresas do setor eltrico nas
processo e com ele agilizar os procedimentos para anlise dos reas de distribuio e transmisso de energia
projetos. Assim, conseguimos reduzir substancialmente os prazos eltrica. Tambm professor e ministra as disciplinas
e lanamos uma chamada de audincia pblica 057, que tem Distribuio e Transmisso de Energia Eltrica na
como objetivo simplificar todos os procedimentos. O que significa Escola Politcnica de Pernambuco, da Universidade de
que, se antes a anlise do projeto bsico era de responsabilidade Pernambuco (UPE), desde 1977.
da ANEEL, hoje isso passa a ser de responsabilidade do projetista,
do empreendedor. Reive Barros dos Santos is an electrical
A ANEEL vai analisar somente o sumrio executivo com as engineer who graduated from the Polytechnic School
informaes do projeto e verificar se est coerente com o estudo of Pernambuco in 1974. An expert in Strategic
de inventrio que j foi aprovado anteriormente pela prpria Management, he served in large power companies in
agncia. Com isso, os projetos que estavam na Agncia sero the areas of distribution and transmission of electricity.
aprovados com maior agilidade. He is also a professor and teaches disciplines on
Em relao questo ambiental, a ideia que por meio de Distribution and Transmission of Electrical Energy at
um P&D que ser lanado pela ANEEL, se tenha um termo de the Polytechnic School of Pernambuco, at the University
referncia nico e simplificado, que ser compactuado com esses of Pernambuco (UPE) since 1977.
Estados que possuem potenciais, para que a Agncia tenha uma
previsibilidade onde o empreendedor saiba o nvel de exigncia.
Nossa expectativa que tenhamos uma maior agilidade na adicionais de transmisso. Estamos trabalhando junto ao MME
aprovao do licenciamento ambiental, uma vez que as regies uma proposta para reviso do decreto que define o valor de
que tem um maior potencial de PCHs so as regies, centro-oeste, referencia (VR), porque da forma que est redigido atualmente o
sudeste e sul, salienta Reive. VR depende fundamentalmente dos ltimos leiles estruturantes
J a questo do financiamento, a ANEEL est avaliando todas o que levaria a valores muito baixos que no estimularia, afirma
as etapas do processo para verificar em cada etapa o que se pode Reive.
fazer para melhorar e assim caracterizar que PCH uma fonte A ideia que a Aneel possa, por meio de audincia publica,
que pode ser implementada em trs anos. A expectativa ampliar definir uma metodologia de clculo que leve a PCH a um valor
substancialmente a oferta de energia de uma fonte to importante compatvel e atrativo de mercado, estabelecendo que cada
como a PCH. distribuidora possa contratar 10% do seu mercado com gerao
distribuda: PCH, Biomassa, Solar, etc. Desta forma, o preo teto
Gerao distribuda no patamar que est, mais a possibilidade da contratao da
gerao distribuda, eu no tenho dvida nenhuma que teremos
A PCH tem uma caracterstica importante: primeiro como
uma perspectiva muito grande de aumentar, consideravelmente, a
gerao distribuda, segundo com uma fonte renovvel de baixo
fonte de PCH na matriz energtica brasileira, acredita Reive.
impacto ambiental e est prxima da carga, no gerando custos

4
HIDRO&HYDRO | ISSN 2359-6147 INTERVIEW

ANEEL RESTRUCTURES PROCEDURES TO


ACCELERATE PROCESSING FOR SHPS

Translation: Joana Sawaya de Almeida

It is notorious that the situation for small hydropower plants Regarding the environmental issues, the idea is that through
SHPs has been questioned by ANEEL for some time now. Thus, an R&D to be launched by ANEEL, there be a single reference term
since taking the board of ANEEL, the engineer Reive Barros dos to be condoned with those States that have potential for ANEEL
Santos has been making efforts to expedite the procedure stages to have predictability where the entrepreneur knows the level of
of the agency. In an interview with Hidro&Hydro, the director of requirements. Our expectation is that we have more agility in
ANEEL talked about the actions implemented to make the process approving environmental licensing, since the regions that have
more dynamic. more SHP potential are the Central-West, Southeast and Southern
At the beginning of the year, ANEEL held a seminar with the regions, says Reive.
purpose of reuniting academic representatives, entrepreneurs, With regard to financing, ANEEL is evaluating all of the
consultants, the government, the Energy Research Company processing stages to verify what can be done to improve each stage
(EPE) and ANEEL. The seminar resulted in contributions that and so, characterizing SHPs as a source that can be implemented
were divided into four macro issues: Cap Pricing, where most of within three years. The expectation is to substantially amplify the
the agents claimed the price was not attractive; Environmental supply of energy from a source as important as SHPs.
Licensing, since the standardization is distinct in each of the
federative states; the analysis of projects processed by ANEEL; Distributed Generation
and Financing.
Based on these issues, the Agency along with the Ministry of SHPs have an important characteristic: first it is distributed
Mines and Energy MME and EPE established an action plan to generation, and second is it is a renewable source with low
level out the problems and create a methodology for calculating environmental impact, is close to the charge, and does not
the cap prices at auctions, therefore improving the price with generate additional transmission costs. We are working together
low impact to the rate. The increase in cap price for SHPs from with MME on a proposal to review the decree that defines the
R$164.00 to R$210.00 gave the sector new dynamic. reference value (RV), because the way it is currently drafted, the
Another point was an internal question, where ANEEL began RV fundamentally depends on the last few structural auctions,
a restructuring process, reducing three superintendencies with making the values very low, that is not stimulating, affirms Reive.
the objective of working process by process. Working in this way, The idea is for ANEEL to be able to define, through public
especially with SHPs, can simplify the process and so, expedite audiences, a calculation methodology that brings SHPs to a
the project analysis procedures. In this way, it was possible to compatible and attractive market value, as well as by establishing
substantially reduce deadlines. Public hearing 057 was called with that each distributor can contract 10% of its market with
the objective of simplifying all of the procedures, meaning that distributed generation: SHP, Biomass, Solar, etc. Thus, with the
the responsibility of ANEEL to analyze the basic project is now the cap price on the plateau that it is the more chance of contracting
responsibility of the designer and the entrepreneur. distributed generation. I have no doubt that we will have a very
ANEEL will analyze the executive summary with information on great perspective of considerably increasing the source of SHP in
the project and verify if it is consistent with the inventory study the Brazilian energy matrix, believes Reive.
previously approved by the agency itself. With this, the projects
that were at the Agency will be
approved more quickly.

Internet

5
Regulao HIDRO&HYDRO, 65, (2), ABR,MAI,JUN/2015

O RETORNO DAS PCHs AO MERCADO REGULADO DE ENERGIA


ELTRICA E A MICROGERAO COMO PALIATIVO CRISE ENERGTICA

por Geraldo Lcio Tiago Filho*, Laura Campello**, Michele Oliveira**, Priscila Duarte**, Roberto Meira**, Luciano da Silva***

No primeiro leilo exclusivo para fontes


LEILO DE FONTES ALTERNATIVAS ALTERNATIVE SOURCES AUCTION
alternativas ocorrido em 27 de abril, apenas
10% da potncia habilitada foi contratada. A Projetos habilitados Projetos contratados
gerao elica que tem dominado os ltimos Qualified Projects Contracted Projects Preo
Preo
leiles foi a fonte que mais declinou das Capacidade mdio
Fonte Capacidade inicial
propostas, dos 173 projetos habilitados apenas Source Instalada Instalada Initial Price
Average
Quant. Installed Quant. Price
3 foram contratados. O principal motivo para Installed (R$/MWh)
Quantity Capacity Quantity Capacity (R$/MWh)
esta queda na oferta destas fontes de energia
(MW) (MW)
se deve as mudanas nas regras do leilo, que
desta vez negociou apenas empreendimentos Elica 2017
172 3931 3 90 179 177.47
em reas onde h subestaes e linhas de Wind 2017
transmisso para escoar a produo. Esta Biomassa 2016
23 57 8 389 215 209.91
mudana foi necessria depois que trs usinas Biomass 2016
elicas no Nordeste contratadas nos leiles Biomassa 2017
6 266 0 0 215 -
anteriores, com capacidade de 622MW, est Biomass 2017
h um ano sem gerar energia porque no Total 200 4253 11 479 199.97
h como escoar a produo. Isso mostra a
existncia de falhas de planejamento e de outras medidas de incentivos como a criao de linhas de crditos
coordenao na gesto do sistema eltrico no pas. No adianta para financiamento de painis fotovoltaicos, de microturbinas
apenas criar incentivos para esta ou outra fonte de energia, mas elicas e hidrulicas e investimentos no desenvolvimento de
preciso tambm garantir que a energia gerada chegar ao tecnologias nacionais, se fazem necessrias para que a gerao
consumidor, por meio de investimentos nos sistemas de transmisso distribuda tome corpo e comece a representar uma parcela
e distribuio, que h anos tm sido postergados, ou por falta de significativa da matriz energtica do Brasil, como j acontece em
leiles de linhas de transmisso ou por ausncia de interessados em pases da Europa. E este crescimento da gerao distribuda muito
constru-las, dado s regras impostas aos investidores. interessante para o pas, pois alm de promover a entrada rpida de
J no Leilo de Energia Eltrica A-5, realizado no dia 30 de energia no sistema eltrico, possibilitando a diminuio do uso de
abril, dos 50 projetos habilitados, de diferentes fontes, tais como: termoeltricas movidas a diesel, tambm gera emprego, tecnologia
pequenas, mdias e grandes centrais Hidreltricas e termoeltricas e renda em regies mais distantes dos grandes centros urbanos.
a biomassa, a carvo e a gs natural, tal como mostrado na Tambm h que se levar em conta que somente a desonerao
tabela 2, que somavam 6.743 MW de potncia instalada, foram destas fontes de energia renovveis pode no ser suficiente para se
comercializados somente 1.973 MW, sendo contratados 14 consolid-las como fontes de gerao descentralizadas, visto que
projetos que iro garantir o fornecimento de energia eltrica no frente aos altos custos dos investimentos dificilmente a simples troca
pas a partir de 2020. As PCHs tiveram maior destaque, com oito de energia com a concessionria seja possvel amortiza-las. O ideal
projetos contratados dos 25 habilitados, representando um total que no se limitasse a potncia do sistema auto-microgerador
de 164 MW. Apesar do aumento do teto do preo do MWh para as pela demanda contratada, de modo a lhe permitir gerar excedentes
PCHs, o leilo no obteve o xito que se esperava para contratao e injet-los na rede. O ressarcimento do excedente de energia seria
desta fonte de energia cujo preo mdio foi de R$ 205,74 o MWh. feito por uma tarifa intermediria entre o valor da gerao e tarifa
Os investidores desta fonte alegam que a diminuio do percentual da distribuidora. Uma maneira seria utilizar a mdia ponderada
de financiamento concedido pelo BNDES para o setor e aumento entre valor da auto-microgerao com peso 2 e o valor da tarifa
da taxa Selic impactaram na oferta de energia deste segmento. cheia da concessionria com peso 3, por exemplo. Isso propiciaria
Observa-se que nestes dois ltimos leiles houve um esforo um retorno do capital em um perodo muito mais curto e a obteno
do governo em adequar os valores de energia s atuais condies de indicadores econmicos atraentes que incentivaria o pequeno e
de mercado. Isso foi sentido tanto na desvalorizao do real que mdio consumidor a investir neste tipo de gerao.
encareceu a importao dos componentes dos aerogeradores
como a adequao dos custos da energia gerada pelas pequenas
centrais hidreltricas. Entretanto os resultados dos leiles foram
bem aqum do esperado. E as dificuldades em se garantir o
suprimento energtico no pas, face a crise hdrica, continuam.
Nesse contexto de falta de estrutura para grandes empre-
endimentos, a microgerao distribuda pode ser a alternativa mais
eficiente em curto prazo. Recentemente o Conselho da Fazenda
(ConFaz) editou um Convenio (16/2015) que permite a iseno do
ICMS para o cidado que gerar sua prpria energia. Porm, apenas
3 estados, So Paulo, Pernambuco e Gois aderiram ao convnio,
Minas Gerais j havia realizado esta desonerao em 2012. Mas

* Professor Titular da UNIFEI e Secretrio Executivo do CERPCH;


** Pesquisadores do CERPCH e Mestrandos em Engenharia da Energia pela UNIFEI;
*** Mestre em Engenharia da Energia pela UNIFEI e Doutorando em Energia pela USP

6
HIDRO&HYDRO | ISSN 2359-6147 REGULATION

THE RETURN OF SHPs IN THE REGULATES ENERGY MARKET AND


MICRO-GENERATION AS A BUFFER FOR THE ENERGY CRISIS

Translation: Joana Sawaya de Almeida

In the first exclusive auction for alternative energy sources results fell short of the expected. The difficulties in guaranteeing the
on April 27th, only 27% of the qualified power was contracted. energy supply in the country while facing a water crisis continue.
The generation of wind energy, which has dominated the last few Within this context of lack of structure for large ventures, the
auctions, is the one that has had the most decline in proposals. distributed micro-generation can be a more efficient short-term
In 173 qualified projects, only three were contracted. The main alternative. Recently, the Treasury Counsel (ConFaz) edited an
reason for this decline in supply of this source is due to the Agreement (16/2015) which allows for ICMS exemption for the
changes in auction rules, where only negotiated ventures in areas citizen who generates their own energy. However, only three states
with substations and transmission lines to transmit the production accepted the agreement: So Paulo, Pernambuco and Gois. Minas
are allowed. This change was necessary after three wind energy Gerais had already had this tax exemption in 2012. Nevertheless,
plants in the Northeast, contracted in previous auctions, with a other incentive measures, such as the creation of credit lines for
capacity of 622MW, have not generated energy in over a year financing photovoltaic panels, wind and water micro-turbines, and
because there is no way to transmit the energy. This shows there investments in national technological development, have made it
are failures in planning and coordinating in the country's electric necessary for the distributed generation to gain strength and begin
system management. Its not enough to create incentives for this to represent a significant parcel in the Brazilian energy matrix, as
or that source. It is necessary to also guarantee that the generated it already does in other countries in Europe. This growth in the
energy reach the consumer through investments in transmission distributed generation is also very appealing to Brazil, considering
and distribution. This has been procrastinated for years, due to that not only does it promote quick power input in the electric
lack of auctions for transmission lines or the lack of interest in system, it also allows for the reduction of the use of thermoelectric
constructing them, given the rules imposed by investors. plants powered by diesel. This also creates jobs, technology and
However, in the A-5 Energy Auction held on April 30th, of the income to regions distant from large urban centers.
50 qualified projects from different sources, there was only 1,973 One must also consider that the tax exemption alone for these
MW of installed capacity. The different sources were small, moderate renewable energy sources may not be enough to consolidate itself
and large hydropower and thermoelectric plants to biomass, coal and like decentralized sources, when facing high costs for investment;
natural gas, as shown in Table 2. These sources added up to 6,743 the simple exchange of energy with the local dealer is difficult to
MW of installed capacity with 14 contracted projects guaranteeing amortize. Ideally, there would be no limit to the power of the micro
the supply of electric power to the country starting in 2020. SHPs generation system for the contracted demand in way such as to
stood out with 8 project contracts of the 25 qualified, representing a permit the excess generation and inject it into the network. The
total of 164 MW. In spite of the rise in the cap price of MWh for SHPs, reimbursement of the excess energy would be done for a moderate
the auction was not as successful as expected for the contraction tariff from the distributor. One way to do this would be to use the
of this source, whose average price was R$205.74 per MWh. The weighted average between the auto-microgeneration value with
investors for this source claim that the supply of energy from this Weight 2 and the value of the full tariff from the dealer with Weight
sector was impacted by the decline in the financing percentage 3, for example. This allows a capital return in a much shorter period
granted by BNDES for the sector, along with the raise the Selic tax. and obtainment of attractive economic indicators, creating incentives
It is observed that in these last two auctions, there was an for small and medium consumers to invest in this type of generation.
effort made by the government to adequate the prices of energy Its worth a try, but we'd have to pay and see!
to the current market conditions. This was felt in the devaluation
of the Brazilian Real, which made the importation of aero-generator
* PHD Professor of UNIFEI and Executive Secretary of CERPCH;
components more expensive, such as with the adjustments of energy ** CERPCH Researchers and Masters Students in Energy Engineering at UNIFEI;
costs generated by small hydropower plants. However, the auction *** Master in Energy Engineering at UNIFEI and Doctorate Student in Energy at USP

LEILO A-5 Auction A-5

Projetos habilitados Projetos contratados


Qualified Projects Contracted Projects Preo
Preo
Capacidade Capacidade mdio
Fonte inicial
Instalada Instalada Average
Source Quant. Quant. Initial Price
Installed Installed Price
Quantity Quantity (R$/MWh)
Capacity Capacity (R$/MWh)
(MW) (MW)

PCHs SHPs 25 425.05 8 164.33 210.00 205.74


UHE < 50 MW UHE < 50 MW 2 81 1 32 210.00 209.50
UHE UHE 1 150 1 32 155.00 154.99
Termeltricas a Biomassa
13 538.40 3 111.4 281.00 274.17
Thermoelectric to Biomass
Termeltricas a Carvo
2 1200 0 0 281.00 -
Thermoelectric to Coal
Termeltricas a Gs Natural
7 4348.54 1 1515.64 281.00 279.00
Thermoelectric to Natural Gas
Total/Mdia Total/Average 50 6743 14 1973.37 259.19

7
Curtas/News HIDRO&HYDRO, 65, (2), ABR,MAI,JUN/2015

SEMINRIO SOBRE RECURSOS NATURAIS REALIZADO


PELO INSTITUTO DE RECURSOS NATURAIS DA UNIFEI
SEMINAR ON NATURAL RESOURCES IS HELD
BY THE UNIFEI'S NATURAL RESOURCES INSTITUTE

por Adriana Barbosa Translation: Joana Sawaya de Almeida

Em comemorao a semana mundial do Meio Ambiente a Uni- In commemoration of the Global Environment Week at
versidade Federal de Itajub (UNIFEI) por meio do Instituto de Re- the Federal University of Itajub (UNIFEI), the Institute for
cursos Naturais (IRN) realizou entre os dias 9 e 11 de junho o segun- Natural Resources (IRN) held the second Natural Resources,
do Seminrio de Recursos Naturais, Sustentabilidade e Tecnologias Sustainability and Environmental Technologies Seminar June
Ambientais, evento que concentrou as atividades realizadas pelos 9th-11th. The event concentrated the activities held by the
cursos de Engenharias: Civil, Hdrica, Ambiental; Bioprocessos, following engineering courses: Civil, Hydro, Environmental,
Qumica; Cincias Biolgicas e Cincias Atmosfricas por meio de Bioprocesses, Chemistry, Biological Sciences and Atmospheric
um evento unificado que reuniu os eventos j consolidados no meio Sciences. The event unified other events that were previously
Acadmico. Durante o Seminrio o pblico pode participar da d- held in the Academic field. During the Seminar, the public
cima edio do Seminrio de Meio Ambiente e Energias Renovveis participated in the Environmental Seminar's (SEMEAR)
(SEMEAR); dcima oitava edio do Seminrio de Gesto e Usos 10th edition; the 18th edition of the Renewable Energy and
da gua (SEGUS); terceiro Seminrio de Biologia (SEMBIO); quin- Management Seminar (SEGUS); the third edition of the Biology
to Seminrio de Cincias Atmosfricas (SCIAT); segunda Semana Seminar (SEMBIO); the Atmospheric Sciences Seminar's
de Bioprocessos (SEBIEN); oitavo Seminrio de Sustentabilidade (SCIAT) third edition; the second Bioprocesses Week (SEBIEN);
(SEMSU); quinto Seminrio de Tecnologias e Edificaes Susten- the 8th Sustainability Seminar (SETES); and the second
tveis (SETES) e segundo seminrio de Qumica (SEMEQ). Chemistry Seminar (SEMEQ).
O Seminrio reuniu um pblico em torno de 200 pessoas que The seminar reunited approximately 200 people who were able
puderam assistir a divulgao tcnico-cientfica dos trabalhos to watch the techno-scientific promotion of work developed by
desenvolvidos, sobretudo pelos estudantes e professores da rea especially students and professors in Environmental, Hydropower
Ambiental, hdrica e atmosfrica. and Atmospheric areas.
Durante a Cerimonia de abertura o secretrio municipal de At the opening ceremony, the Town Environmental Secretary,
Meio Ambiente, Ricardo Augusto Corra Ferreira, afirmou que a Ricardo Augusto Corra Ferreira affirmed that the event is a
realizao do evento uma ao muito importante, pois integra ao very important action since it integrates the work the Town
trabalho que a Secretaria Municipal de Meio Ambiente desenvolve Environmental Secretary develops in relation to the awareness
em relao conscientizao da populao no sentido de preservar of the population in terms of preserving renewable natural
os recursos naturais renovveis. Ele apontou ainda que o pas tem resources. He pointed out that the country is still going through
passado por uma crise hdrica na regio centro-sul e um dos maiores a water crisis in the South-Central region, and one of the greatest
fatores desta crise o desmatamento desenfreado. Prosseguiu factors of this crisis is unbridled deforestation. He continued on
salientando que o objetivo da Semana foi de conscientizar ainda to stress the objective of the Seminar was to make the population
mais a populao como um todo, para fazer com que cada um as a whole more aware in order for each and every person to
preserve os recursos naturais renovveis indispensveis vida da preserve renewable natural resources, so vital to the life of the
populao e que esto sendo to degradados. population, and yet is being so degraded.
O evento contou com palestras, curso de Legislao Ambiental, The event included lectures and an Environmental Law
alm das visitas tcnicas ao Horto Florestal e ao Parque Estadual de course, aside from technical visits to the Horto Florestal and the
Nova Baden, em Lambari MG. State Park of Novo Baden, in Lambari - MG.

Arquivo CERPCH

8
9
AGENDA/SCHEDULE NEWS HIDRO&HYDRO, 65, (2), ABR,MAI,JUN/2015

EVENTOS LIGADOS AO SETOR DE ENERGIA - 2015 OUTUBRO

AGOSTO Energy Expobusiness 2015


Data: 02 e 03 de outubro de 2015
IX Conferncia de Centrais Hidreltricas, Mercado e Meio Local: Natal-RN
Ambiente Site: http://energyexpobusiness.com/
Data: 11/08/15 a 12/08/15
Local: USP prdio da FEA 1 Auditrio da Congregao So Paulo - SP NOVEMBRO
Email: pchcomunicacao@cerpch.org.br
Site: http://centraishidreletricas.com/ CARTA DOS VENTOS: Frum Nacional Elico:
Data: 12/11/2015 a 13/11/2015
4 Seminrio de energias renovveis Local: Salvador - BA
Data: 19 e 20 de agosto de 2015 Site: http://viex-americas.com/carta-dos-ventos/
Local: Rio de Janeiro, RJ
Site: http://planejabrasil.wordpress.com/
ICEECE 2015: Conferncia Internacional sobre Energia, Meio
12 COBEE - Congresso Brasileiro de Eficincia Energtica Ambiente e Engenharia Qumica
Data: 25 e 26 de agosto de 2015 Data: 12/11/2015 a 13/11/2015
Local: Centro de Convenes Frei Caneca - So Paulo SP Local: Tokyo, Japo
Site: http://www.cobee.com.br Site: http://www.waset.org/conference/2015/11/kyoto/ICEECE/call-for-
papers
Fenasucro - 23 Feira Internacional de Tecnologia
Sucroenergtica DEZEMBRO
Data: 25 a 28 de agosto de 2015
Local: Sertozinho - So Paulo SP SOLARINVEST: Congresso de Polticas Pblicas e Incentivos
Site: http://www.fenasucro.com.br/ cadeia de gerao de energia solar
Data: 02/12/2015 a 03/12/2015
SETEMBRO Local: So Paulo - SP
Site: http://viex-americas.com/solarinvest/
Brazil Windpower 2015
1 a 3 de setembro de 2015
Rio de Janeiro RJ

Intersolar South America


Data: 01 a 03 de setembro de 2015
Local: Expo Center Norte - So Paulo SP
Site: http://www.intersolar.net.br/pt/intersolar-south-america.html

EU PVSEC
Data: 14 a 18 de setembro de 2015
Local: Hamburg - Deutschland
Site: http://www.photovoltaic-conference.com/

Anlise de viabilidade econmico-financeira


de empreendimentos de gerao
Data: 15 de setembro de 2015
Local: So Paulo - SP
Site: http://viex-americas.com/viabilidade-de-geracao/

10
<Destaque>

Technical Articles Seccion

Comit Diretor do CERPCH EXACT ZERO DETERMINATION AND INTEGRATION


Director Committee TERMINATION FOR PRESSURE TIME METHOD............................................3

TECHNICAL ARTICLES

CEMIG / FAPEPE / IEE-USP / FURNAS / Petr Sevck
IME / ELETROBRAS / ANEEL / MME
PERFORMANCE AND NEAR WAKE ANALYSIS OF A HYDROKINETIC
Comit Editorial
Editorial Committee ROTOR FOR MULTISTAGE PURPOSES USING CFD..........................................6
G.A. Ibarra, G.L. Tiago, R.G. Ramirez
Presidente - President
Geraldo Lcio Tiago Filho - CERPCH/UNIFEI
Editores Associados - Associated Publishers DISCHARGE AND EFFICIENCY MEASUREMENTS IN BASSI
Adair Matins - UNCOMA - Argentina HYDRO POWER STATION IN INDIA ......................................................... 10
Alexander Gajic - University of Serbia B.K. Gandhi, A. Kumar, H.K. Verma
Alexandre Kepler Soares - UFMT
ngelo Rezek - ISEE/UNIFEI
Antnio Brasil Jr. - UnB DATA ACQUISITION AND DATA ANALYSIS TOOLS
Artur de Souza Moret - UNIR FOR HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS ................ 15
Augusto Nelson Carvalho Viana - IRN/UNIFEI Diego H. Kawasaka, Joo Gomes Pereira Jr., Paulo E. Noce
Bernhard Pelikan - Bodenkultur Wien - ustria
Carlos Barreira Martines - UFMG
Clio Bermann - IEE/USP
Edmar Luiz Fagundes de Almeira - UFRJ
Fernando Monteiro Figueiredo - UnB
Frederico Mauad - USP
Helder Queiroz Pinto Jr. - UFRJ
Jaime Espinoza - USM - Chile
Jos Carlos Csar Amorim - IME
Marcelo Marques - IPH/UFRGS
Marcos Aurlio V. de Freitas - COPPE/UFRJ
Maria Ins Nogueira Alvarenga - IRN/UNIFEI
Orlando Anbal Audisio - UNCOMA - Argentina
Osvaldo Livio Soliano Pereira - UNIFACS
Regina Mambeli Barros - IRN/UNIFEI
Zulcy de Souza - LHPCH/UNIFEI

ARTIGOS TCNICOS

IAHR DIVISION I: HYDRAULICS


TECHNICAL COMMITTEE:
HYDRAULIC MACHINERY AND SYSTEMS

Classificao Qualis/Capes

B5 ENGENHARIAS I; III e IV reas de: Recursos Hdricos ISSN 1676022-0


Biodiversidade Meio Ambiente

B4
Energias Renovveis
Interdisciplinar
e no Renovveis
A revista est indexada no DOI sob o prefixo 10.14268

ISSN 1676-0220 9 771676 022009 00065


TECHNICAL ARTICLES
EXACT ZERO DETERMINATION AND INTEGRATION
TERMINATION FOR PRESSURE TIME METHOD

PCHNotcias&SHPNews
Publisher: Acta Editora/CERPCH EXACT ZERO DETERMINATION AND INTEGRATION
DOI:10.14268/pchn.2015.00020
ISSN: 1676-0220 TERMINATION FOR PRESSURE TIME METHOD
Subject Collection: Engineering
Subject: Engineering, measurement
1
Petr Sevck

ABSTRACT

This paper presents engineering approach to exact pressure difference zero determination and termination of integration which is
based on following physical facts:
The person performing the flow measurement usually knows, which flow rate can be expected after unit shut down. The discharge
cant grow or drop, if the valve in front of turbine is closed and tight, because in this case the flow rate is zero. Similar situation occurs
if small leakage through guide vanes or other closing apparatus remains after unit shut down. In this case the final leakage is almost
constant and it can change with pressure / head oscillation. The mean value of leakage Q0 has to be determined other way than
pressure time procedure. But the water mass oscillation in penstock after guide vane closing is presented as small flow oscillations
with constant mean value Q0.
Algorithm based on mentioned phenomenon evaluates the pressure difference part after guide vane or main intake valve closing.

KEYWORDS: turbine, valve, measurement.

1. INTRODUCTION 2.3 End of integration

Two types of experts perform usually the site tests, scientific The mean value of final residual flow after closing of all closing
oriented research workers and practically oriented engineers. elements has to be set by integration termination to zero or to
Engineering approach to solving any problem is based on residual flow determined by other method.
knowledge of tested device and on feedback. I.e. the test result
plausibility is compared with the real possibility. Scheme of such 3. ASSESSMENT OF PARTICULAR EFFECTS
test evaluation procedure is presented in Fig. 1.
Calculation procedure used by author and his measuring
group is based on formulas presented in standards IEC 60041
and IEC 62006.

where
cpst = geometrical penstock factor
p = pressure difference on the penstock section used for
measurement during abrupt maneuver
= sum of pressure loss by friction and speed head difference
between both sections G1 and G2; (t) = kG * Q(t)2
Q0 = residual flow
Fig. 1: Scheme of evaluation procedure based on feedback.

2. MAIN FEEDBACK PHENOMENA

The person performing the flow measurement usually knows,


which flow rate can be expected after unit shut down. Following
phenomena have to be taken into consideration by evaluating of
flow waveform plausibility:

2.1 Trend of flow rate after valve closing

The flow rate after closing of tight valve (e.g. nozzles of


Pelton turbines, butterfly valves, spherical valves) is zero. The
calculated flow rate can oscillate symmetrically around zero, but
the trend of mean value has to be zero.
Fig. 2: Impact of poffset and integration termination on final flow waveform.

2.2 Trend of flow rate with residual flow


Differential pressure p can be measured directly by
The residual flow is usually caused by leakage through guide differential pressure transducer or by separately installed sensors
vanes of Francis or Kaplan turbine. Its mean value is usually in cross sections G1 and G2 at the beginning and end of the
almost constant, but the influence of slow waves on the lake measuring section. In both the mentioned cases the differential
surface or oscillation of pendulum lake surge tank can cause pressure p used for flow rate calculation is calculated according
the changes of residual flow. to following formulas:

Hydro Power Group Leading Engineer, OSC, a.s., Brno, Czech Republic, e-mail: sevcikp@osc.cz
1

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 3-5 3
ARTIGOS TCNICOS
EXACT ZERO DETERMINATION AND INTEGRATION
TERMINATION FOR PRESSURE TIME METHOD

p = p2G p1G poffset for separate sensors Table1: Comparison of flow rate calculation with correct and
p = pmeas poffset for differential pressure sensor wrong poffset determination.

poffset
Value poffset performs the correction of differential sensors Q Q
Case deviation
position for separately installed sensors and also correction of
% of dpmax m3/s %
sensors zero offsets in both the cases. This value proves to be
principal variable for correct flow determination. Correct poffset 0.00 70.280 0.0

Wrong poffset -0.18 71.351 1.5

Evaluation of wrong determined poffset value is presented in


Tab. 1. Deviation corresponding with sensor accuracy class causes
approximately ten times higher flow rate error. That means it
is necessary to devote maximum effort to establish the poffset
value correctly. The error based on integration of small deviation
is proportional to the integration time.
On the other hand the end of integration determination is
easier comparing with poffset adjusting. It is also based on the
oscillation symmetry but the potential error is independent on
integration interval see Fig. 2.

4. DESCRIPTION OF THE CALCULATION PROCEDURE

As mentioned above the calculation procedure is based on


Fig. 3: Detail of flow waveform oscillation. the equation from standards [7] and [8]. The procedure works
as several mutually nested iterative loops see Fig. 5. The
Schematic explanation of pressure offset poffset impact and internal basic calculation loop works automatically, loop runs for
also integration termination on flow waveform is presented in Fig. integration error minimizing (adjusting of poffset) and integration
2. Detail of flow stabilization after guide vane and also spherical end determination are started manually.
valve closing is presented in Fig. 3. The auxiliary envelope curves
of oscillating flow rate signal are inserted into this graph. Such
curves have usually following equations:

where
Qe+ / Qe- = upper / bottom envelope curve
Q0 = residual flow
A = initial amplitude of flow rate signal oscillation (for t 0)
t = time
= damping time constant

No leakage through spherical valve after closing (Q0 = 0)


was in the case presented in Fig. 3. Sometimes is possible to
substitute the exponential function by a simpler curve. Important
is the symmetry of oscillation. Impact of wrong determined
poffset is presented in Fig. 4.

Fig. 5: Principal scheme of calculation procedure

5. COMPARISON WITH OTHER CALCULATION


PROCEDURES

Many measurements (over 100) were evaluated using above


Fig. 4: Impact of wrong determined poffset. described procedure. Statistic evaluation of deviation between

4 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 3-5
TECHNICAL ARTICLES
EXACT ZERO DETERMINATION AND INTEGRATION
TERMINATION FOR PRESSURE TIME METHOD

guaranteed and measured turbine efficiency [1] was presented on performed exactly according to IEC 60041 / 1991 code. Above
last IGHEM session in 2012 in Trondheim. Couple of comparative described engineering procedure provides almost identical
tests of pressure time method with other physical methods results as calculation procedure improvements prepared by well
was carried out during last years see [2], [3]. Some of such known above mentioned authors. Here described procedure is
experiments were performed recently and the results can be easy to perform and has regards to real behaviour of tested
presented in the future. equipment. High number of tests performed using this procedure
Very interesting is comparison of flow rate evaluation and experience with mutual comparison with other physical
performed by 4 different procedures from identical record. Data methods and also with other experts for pressure time method
was provided through the kindness of Mr. Adam Adamkowski from guarantee high plausibility of here presented algorithm.
his test and it was evaluated according to differential procedures
see Tab. 2. 7. REFERENCES

Sevcik Petr, 2012, Conference IGHEM 2012, Statistic


evaluation of deviation between guaranteed and measured
turbine efficiency
REEB Bertrand, CANDEL Ion, SEVCIK Petr, LAMPA Josef,
2013, Conference HYDRO 2013, Intercomparison of acoustic
scintillation and pressure-time methods in a typical mid-head
HPP
Sevcik Petr, 2009, Conference HYDRO 2009, Verification of
Gibson flow measurement
Adam Adamkowski, Waldemar Janicki, Konference IGHEM
Roorkee, India, Oct. 2010, Selected problems in calculation
procedures for the Gibson measurement method
Jrgen Ramdal, Pontus P. Jonsson, Ole Gunnar Dahlhaug,
Torbjrn K.Nielsen,Michel Cervantes, Conference IGHEM
2010, UNCERTAINTIES FOR PRESSURE TIME EFFICIENCY
Fig. 6: Flow waveform calculation based on data provided by Mr.
MEASUREMENTS
Adamkowski Jrgen Ramdal, Pontus P. Jonsson, Ole Gunnar Dahlhaug,
Torbjrn K.Nielsen,Michel Cervantes, Conference IGHEM
Table2: Comparison of different calculation procedures. 2010, THE PRESSURE - TIME MEASUREMENTS PROJECT AT
LTU AND NTNU
Author Calc. procedure Q [m3/s] Deviation
By Mr. Sevcik, OSC Q_GIB-SEV: 171.998 -
Standard IEC 41: Field acceptance tests to determine the
By Mr. Adamkowski,
hydraulic performance of hydraulic turbines, storage pumps
Q_GIB-ADAM: 171.868 0.08% and pump turbines, standard issued by CEI, 1991
IMP PAN
By Mr. Jonson, NTNU Q_GIB-MOC: 171.904 0.05% Standard IEC 62006, Hydraulic machines Acceptance tests
According to IEC of small hydroelectric installations, CEI, 2010
Q_GIB-IEC: 172.365 -0.21%
60041/1991
Acknowledgments
6. SUMMARY
The author would like to thank Mr. Adamkowski for providing
Nowadays it exists couple of advanced algorithms for pressure of recorded data and also for the results evaluated by other
time method which seems to be better than the procedure procedures.

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 3-5 5
ARTIGOS TCNICOS
PERFORMANCE AND NEAR WAKE ANALYSIS OF A HYDROKINETIC
ROTOR FOR MULTISTAGE PURPOSES USING CFD

PCHNotcias&SHPNews
Publisher: Acta Editora/CERPCH
DOI:10.14268/pchn.2015.00021
PERFORMANCE AND NEAR WAKE ANALYSIS
ISSN: 1676-0220 OF A HYDROKINETIC ROTOR FOR MULTISTAGE
Subject Collection: Engineering
Subject: Engineering, measurement PURPOSES USING CFD
1
G.A. IBARRA, G.L. 2TIAGO, 3R.G. RAMIREZ

ABSTRACT

Tidal, wave and In-stream power are new applications of renewable energy, mainly developed in advanced countries and almost
unknown (or not considered) in developing countries due to high costs; the main barrier to explore and harness its potential. However,
some researchers are proposing low-cost systems, as the one presented in this work called Poraqu. This hydrokinetic system
includes several low-cost axial-flow rotors in a common shaft to harness more energy from the stream. Computational Fluid Dynamics
(CFD) is used to analyze its performance and near wake characteristics, in order to understand the behavior of the velocity recovery
downstream of the first rotor to define a suitable separation between consecutive rotors. Results for this high-solidity rotor are
in agreement with literature, besides, it was found that velocity recovers independently of the upstream velocity magnitude, i.e.
separation distance to the second rotor can be defined based on velocity recovery.

KEYWORDS: Hydrokinetic energy, low-cost turbines, efficiency gain.

1. INTRODUCTION the modeling of the Reynolds-Averaged Navier-Stokes (RANS)


equations using one turbulence model, to obtain the rotor
Currently, renewable energy sources are in different stages
performance and flow field in the near wake in order to analyze
of development, since many natural resources can be used in a
the conditions for a second rotor placement. Commercial
sustainable form in each country or region. Hydraulic energy is
software ANSYS was employed for model meshing (ICEM) and
represented normally by conventional hydroelectric power plants
Set up (FLUENT). The system under analysis, the performance
based on water head, available depending the hydrological and
parameters and CFD aspects are described as follows.
geographical conditions of some regions in the world. However,
hydraulic energy has also significant potential in water streams
2.1 The Poraqu hydrokinetic system
such as rivers, oceans and channels to extract energy. In the
same way, some countries have more access to this resource In theory, only 59.3% of the zero-head free-stream energy
and have more interest to produce large amounts of energy for could be harnessed by some type of turbine (Betz, 1926). Most
attend future demand, such as the United States, China, United of existing systems use only one rotor, conditioning design and
Kingdom (Jacobson, 2012) (OES, 2014). fabrication to a detailed and expensive process. The Poraqu
Research, development and market issues have been encou- hydrokinetic system was conceived to simplify this situation
raged with incentive policies in advanced countries, but high turnkey using rotors of simple geometry, placed in a common shaft. That
costs still remain in comparison to other renewables. Water streams, configuration (in-series) would allow producing more energy with
especially rivers, are spread worldwide and represent a real option to efficiency comparable to a more sophisticated one-rotor system.
support current electricity generation: this energy is a non-polluting This was found during previous experimental tests (Tiago et al,
option with few environmental impacts (Amaral et al, 2012). For de- 2010), conducted on a 0.4m-width water channel where results
veloping countries, this source is far to be harnessed in a large scale, showed an efficiency of 0.78 with 3 rotors. That efficiency exceeds
then it can be used to provide lower but important electricity for Betz limit due to the blockage area ratio of 43.1% in the tests,
population in regions without access to modern energy (GEA, 2012). i.e. it is known that under near-field conditions or wall effects, the
Technology development is carried out from all approaches performance increases (Stelzenmuller, 2013). The rotors used on
with advances in theoretical, numerical and experimental activities. tests were equal in geometry with four flat-blades and sharp corners.
Optimization and CFD (Computational Fluid Dynamics) tools are being No hub was used. Now, it is intended to study the system performance
used for rapid improvement of hydrokinetic, tidal and wave systems. on far-field conditions, beginning with one rotor (Fig. 1).
In general the pursuit of higher efficiencies is one of the goals, mainly
for large-scale applications (due to its high investments), because
low-cost nature influences efficiency for small-scale systems. The
latter is the case of South America, where some experiences deals
with the creation of small turbines for riverine applications, principally
in Brazil (Anyi & Kirke, 2010). Here, we examine one of those
hydrokinetic systems using CFD: a multistage turbine conceived
with low-cost axial-flow rotors. One-rotor performance and near
wake characteristics are analyzed to identify suitable conditions for a
second rotor placement to get and efficiency gain.

2. METHODOLOGY
Figure 1: Poraqu hydrokinetic system. (a) Experimental tests, (b) rotor
In this work, Computational Fluid Dynamics (CFD) involves placement during tests and (c) Flat-bladed rotor.

1
Study Group in Renewable Energies, Federal University of Itajub, Itajub, Brazil, e-mail: german.ibarra@unifei.edu.br
2
CERPCH Executive Secretary, Federal University of Itajub, Itajub, Brazil, e-mail: tiago@unifei.edu.br
3
Virtual Hydrodynamics Lab., Federal University of Itajub, Itajub, Brazil, e-mail: ramirez@unifei.edu.br

6 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 6-9
TECHNICAL ARTICLES
PERFORMANCE AND NEAR WAKE ANALYSIS OF A HYDROKINETIC
ROTOR FOR MULTISTAGE PURPOSES USING CFD

2.2 Performance parameters 2.4 CFD boundary conditions and modeling

Free-stream rotors, as used in wind and hydrokinetic energy, Fluid domain is a cylindrical Far-field whose dimensions are
have similar design philosophy and performance characteristics based on rotor diameters (D) to be: 3D of radius and 11D of total
(Sale et al, 2009). For those turbines, there are several non- length. The rotor has a 3D distance upstream and 8D downstream
dimensional coefficients to describe rotor/blade performance. for wake development. In this work, as in some others (Lee et al,
Three of them, are the Tip Speed Ratio, the power coefficient and 2012) (Javaherchi et al, 2013), this fluid domain is divided due
the torque coefficient, respectively (Bahaj et al, 2007): to the symmetry in geometry and boundary conditions. Thus,
the periodic boundary condition is set on the two dividing planes
(1) (Fig. 4). These features are employed to reduce processing time
and computational resource.

(2)

(3)

Solidity, defined as the ratio of total rotor blade area to the


area swept by the rotor blades, relates inversely with influencing
performance, torque and rotation speed. For low- rotors ( <1-
2), blade profile is large but makes the power coefficient to reduce
because of rotational wake originated by drag losses and high torque
(Fernandez, 1993). However, they can operate at constant CP for Figure 4: Fluid domain and boundary conditions. (a) General view and (b)
a large range of with a high torque coefficient (Fig. 2). This is the rotor details.
reason for which these rotors are preferred for direct applications
of shaft power (such as water pumps), and high- rotors for energy Other boundary conditions on surfaces were defined as
generation because gearbox costs decreases (Vries, 1979). follows: a uniform velocity profile at the inlet, zero gage pressure
at the outlet, an outer surface with translation speed (inlet
value), and no-slip condition at rotor surfaces. The rotation was
set on the rotor surfaces by means of the Single Reference Frame
approach, convergence to 1E-05 and the y+<120 (since SST -
model works with wall functions).
Turbulence model is the SST - adding a curvature correction
for streamlines, which allows capturing behavior of the free-
stream (- model), the viscous effects near walls (- model)
and a more realistic near wake (Smirnov & Menter, 2009). The
corresponding transporting equations in index notation for the
Figure 2: Performance of free-stream turbines with different solidity. (a) turbulence kinetic energy and the specific dissipation rate are,
Power coefficient and (b).torque coefficient.
respectively (Menter, 1994):

2.3 Wake behind a free-stream rotor


(4)
Free-stream turbines have some general wake characteristics
and can be divided in three regions as described by Lissaman (Hau,
2006) and shown in Fig. 3. The first is the core region, just behind
the rotor, where vortex structures are generated by the interaction (5)
between flow and rotor blades. Wake spin is opposite to the rotor
torque to maintain the angular momentum, and the pressure begins Initial values for these two turbulence variables are part of
to equalize causing wake decrease and velocity reaches its lower the inlet condition, which include turbulence intensity and the
value between 1D and 2D. In the intermediate region, velocity rises turbulence length scale based on rotor diameter (Minin & Minin,
and rotor vortices disappear gradually but significant turbulence
2011):
remains after the boundary layer of the rotor wake.
In the far wake, the velocity profile turns into a Gaussian-
type distribution and velocity recovers determined by turbulence (6)
intensity in the surrounding fluid. Besides of the rotational wake,
the vortex structure include: the bound lift-generating vortices at
the blades, the central vortex and the free-tip vortices. (7)

2.3 Validation

Validation is to be made over Best efficiency point when


comparing experimental with CFD results. However, in tests
conditions the blockage area ratio of 43.1% is larger than
recommended (Ibarra & Palacios, 2013) and generates wall
effects over results. Therefore, these values must be equalized to
Figure 3: Rotor wake. (a) Model representation and (b) vortex system. the same conditions in order to make the comparison possible.

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 6-9 7
ARTIGOS TCNICOS
PERFORMANCE AND NEAR WAKE ANALYSIS OF A HYDROKINETIC
ROTOR FOR MULTISTAGE PURPOSES USING CFD

To overcome this situation, the experimental coefficient (CP,ch) is during tests, i.e. the non-uniform velocity profile upstream rotor
transformed to its far-field equivalent (CP,f) using the following due to the asymmetric converging section and rotor placement
equation (Bahaj et al, 2007): from it. Similitude laws (Eq.11, Eq.12) were verified using CFD
results assuming constant efficiency in Table 1. The values for
lowest velocity were considered reference for the rest (Fig. 6).
(8)

Additionally, CFD results can be verified using similitude laws


for turbomachines considering constant efficiency data for the
following variables (Dixon, 1998):

(9)

(10)

With equal diameters, they are finally simplified to, Figure 6: Similitude laws verified for the rotor. (a) Linear relation in Eq.11
with R2=0.9935, and (b).quadratic relation in Eq.12 with R2=0.9987.

(11)
3.2 Rotor wake

Velocity contours at midplane in Fig. 7 show the wake


(12) development with a gradual velocity recovery, taking more than
8D as in other works in literature (Bahaj, 2011) (Tedds et al,
2014). This can be quantified at centerline (y/D = 0) in Fig. 8a
3. RESULTS AND DISCUSSION for each velocity. If these data is non-dimensionalized, it can be
noted that velocity recovers quantitatively 24.4% at 1D, 10.1%
3.1 Rotor performance at 2D, 31.4% at 3D, 48.9% at 4D, 57.9% at 5D, 64.5% at 6D,
67.8% at 7D and 70.2% at 8D (Fig. 8b).
Rotors with high-solidity, as in this case (85.87%), show
a relative low performance and higher torque coefficient as a
function of Tip speed ratio. CFD results present maximum values
of 0.222 ( = 1.230) and 0.335 ( = 0.291) for power and
torque coefficients, respectively (these values do not correspond
to maximum of regression curves). Besides, power coefficient
remains almost constant for several inflow velocities and rotation
speeds (Table 1) as mentioned in section 2.

Figure 7: Contours of velocity magnitude at midplane (Dashed line:


Centerline)

Figure 5: Rotor performance. Curves of (a) CP and (b) CQ .

Table1: Conditions assuming constant efficiency (CP).

V [m/s] n [rpm] CP CP P [W]


Figure 8: Velocity recovery at centerline. (a) Dimensional and (b) non-
1,17 90,39 0,214 0,003 12.44 dimensional values.
1,50 114,64 0,217 - 25.81
From Figure 8b, it can be seen two main aspects: first, the
1,75 137,07 0,216 0,001 42.11
minimum velocity is between 1D and 2D as mentioned in theory
2,00 151,03 0,208 0,009 60.67 (section 2.3); second, velocity recovery is practically independent
of flow velocity upstream rotor. This means, second rotor can be
For results validation, values for maximum power coefficient placed at some distance depending on the percentage of velocity
in experimental and numerical results are compared. Using Eq.8, recovery. Differences for the higher velocity could be related to
the corresponding far-field equivalent for water channel test Reynolds number effects.
(0.340) is 0.168 (Tiago et al, 2010). The difference with numerical For other hand, the turbulence structures described in theory
value of 0.222 can be explained by the instabilities conditions are represented by the streamlines: the rotor wake, tip vortices

8 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 6-9
TECHNICAL ARTICLES
PERFORMANCE AND NEAR WAKE ANALYSIS OF A HYDROKINETIC
ROTOR FOR MULTISTAGE PURPOSES USING CFD

and central vortex are represented using SST - and curvature States: Tech. Report EPRI (Palo Alto, USA: EPRI) (EPRI
correction (Fig. 9). These vortex structures are influenced by Electric Power Research Institute)
rotor solidity and the poor rotor/blade hydrodynamics, i.e. blades Javaherchi T, Stelzenmuller N and Aliseda A 2013 Experimental
with sharp corners and without a proper profile, as well as the and Numerical Analysis of the Doe Reference Model 1
absence of a nacelle (nose/ogive). Horizontal Axis Hydrokinetic Turbine: Proc. of the 1stMarine
Energy Technology Symposium METS13 (Washington, D.C.,
EEUU, 10-11 April 2013).
Lee J H, Park S, Kim D H, Rhee S H and Kim M C 2012
Computational methods for performance analysis of horizontal
axis tidal stream turbines Appl.Energy 98 512-23
Menter F R 1994 Two-Equation Eddy-Viscosity Turbulence
Models for Engineering Applications AIAA Journal 32 1598-605
Minin I and Minin O 2011 Computational Fluid Dynamics
Technologies and applications (Croatia: InTech).
Figure 9: Streamlines released from rotor showing main vortex structures
in the wake. Ocean Energy Systems 2014 Worldwide Database for Ocean
energy: GIS mapping application http://www.ocean-energy-
systems.org/ocean_energy_in_the_world/gis_map/
4. CONCLUSSIONS
Sale D, Jonkman J and Musial W 2009 Hydrodynamic optimization
This work presents some results from the CFD modeling of a method and design code for stall-regulated hydrokinetic turbine
hydrokinetic turbine. The fluid domain was simplified, using just rotors: ASME 28 Int. Conf. on Ocean, Offshore and Artic Eng.
one-quarter of the cylindrical Far-field. Performance, described (Honolulu, USA, 11 May 5 June 2009) (National Renewable
here with power and torque coefficient, is according with literature Energy Laboratory, NREL/CP-500-45021) pp 117.
based on the solidity (85.87% for this rotor), i.e. low- curves (0.291 Smirnov P E and Menter F R 2009 Sensitization of the SST Turbulence
< < 2.35) for CP (0.222 max.) and CQ (0.335 max.). However, Model to Rotation and Curvature by Applying the Spalart-Shur
these values are generated by not suitable hydrodynamics: a rotor Correction Term J. Turbomach T ASME 131(4) 040410
without a blade profile and a complete nacelle/ogive. Tiago G L, Silva F G B, Barros R M, Silva F das G B 2010
Wake was also analyzed. Velocity contours show the field Poraqu hydrokinetic turbine IOP Conf. Series Earth Environ.
recovery along downstream distance, which is gradual except for the Sci. 12 (2010) 012094.
minimum velocity region between 1D and 2D as described in theory. Tedds S C, Owen I and Poole R J 2014 Near-wake characteristics
Non-dimensionalized results for velocity recovery at centerline of a model horizontal axis tidal stream turbine Renew. Energy
(shaft) present a behavior independent from upstream velocity: 63 222-35
this means that second rotor separation would not be changed with Vries O de 1979 Fluid Dynamic Aspects of Wind Energy
that velocity, just with the velocity recovery to be harnessed. For Conversion (Amsterdm: Advisoroy Group for Aerospace
other hand, streamlines represent the main vortex structures in the Research and Development AGARD)
wake, derived from de use of the SST - turbulence model with
the curvature correction factor available in the software.
ACKNOWLEDGMENTS

5. REFERENCES The authors would like to thank Brazilian institution CAPES


for funding the main research, from which this works is part of.
Amaral S V, Castro-Santos T, Giza D, Haro A J, Hecker G,
McMahon B, Perkins N and Pioppi N 2012 Environmental NOMENCLATURE
Effects fo Hydrokinetic Turbines on Fish: Desktop and
Ar Rotor swept area m2
Laboratory Flume Studies: Tech. Report EPRI (Palo Alto, USA:
CP Power coefficient ---
EPRI) (EPRI Electric Power Research Institute)
CQ Torque coefficient ---
Anyi M and Kirke B 2010 Evaluation of small axial flow
C Constant ---
hydrokinetic turbines for remote communities Energy Sustain.
D Rotor diameter m
Dev. 14 110-6.
D Cross diffusion term Kg/m3s2
Bahaj A S 2011 Generating Electricity from the oceans Renew.
Gk , G Production terms of and Kg/m.s3 , Kg/m3s2
Sustain. Energy Rev. 15 3399-416
I Turbulence intensity %
Bahaj A S, Molland A F, Chaplin J R and Batten W M j 2006
P Shaft power W
Power and thrust measurements of marine current turbines
Q Rotor Flow rate m3/s
under various hydrodynamic flow conditions in a cavitation
R Rotor radius m
tunnel and a towing tank Renew. Energy 32 407-26
Sk , S Source terms of and Kg/m.s3 , Kg/m3s2
Betz A 1926 Windenergie und ihre Ausnutzung durch
T Shaft torque N.m
Windmuhlen (Gttingen: Vandenhoeck und Ruprecht).
Vo mean upstream velocity m/s
Dixon S L 1998 Fluid mechanics and thermodynamics of
turbomachinery (Sidney: Elsevier Butterworth-Heinemann) Vf Velocity in free-stream condition m/s

Fernandez P 1993 Energia Eolica (Santander, Espanha: Vch Velocity in water channel tests m/s

Servicio Publicaciones E.T.S.I. Industriales y T.) Yk , Y Dissipation terms of and Kg/m.s3 , Kg/m3s2

GEA 2012 Global Energy Assessment: Toward a Sustainable l Turbulence length scale m

Future (Cambridge: Cambridge Univ. Press, USA). , Effective diffusivity of and Kg/m.s , Kg/m2s

Hau E 2006 Wind Turbines: Fundamentals, Technologies, Tip Speed Ratio ---

Applications, Economics (Berlin: Springer) Turbulence kinetic energy m2/s2

Jacobson P 2012 Assesment and Mapping of the Riverine water density Kg/m3

Hydrokinetic Energy Resource in the Continental United Angular velocity, specific dissipation rate rad/s, 1/s

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 6-9 9
ARTIGOS TCNICOS
DISCHARGE AND EFFICIENCY MEASUREMENTS
IN BASSI HYDRO POWER STATION IN INDIA

PCHNotcias&SHPNews
Publisher: Acta Editora/CERPCH
DOI:10.14268/pchn.2015.00022
DISCHARGE AND EFFICIENCY MEASUREMENTS
ISSN: 1676-0220 IN BASSI HYDRO POWER STATION IN INDIA
Subject Collection: Engineering
Subject: Engineering, measurement
1
B.K. GANDHI, G.L. 2A. KUMAR, 3H.K. VERMA

ABSTRACT

Bassi Hydro Power station with vertical-shaft Pelton-turbine generating units gets its water from the tail-race discharge of Shanan
Hydro Power Station in the state of Himachal Pradesh, India. The four generating units were commissioned during the period of
1970-1981. Reduced generation and excessive vibrations of machines let the station owner to consider its renovation. Possibility of
uprating the generating units was also explored. For arriving at a rational decision, the station owner requested the Indian Institute of
Technology Roorkee (IITR) to measure the available discharge in the power channel and to evaluate the efficiency of each generating
unit. These measurements were made by the authors from IITR. Subsequently, renovation and modernization were carried out by an
equipment manufacturer, India. The four units were also uprated from 15 MW to 16.5 MW each. After renovation, efficiency test was
repeated by the authors on one of the generating units. This paper presents the details of the methods and instruments used, along
with summary of results, of the measurements made before and after renovation works. Uncertainty of both, discharge measurement
in the open channel and unit efficiency measurement, are also assessed. As an outcome of renovation, uprating and modernization,
the power output of Bassi Hydro Power Station has increased from less than 60 MW to 66 MW. The efficiency of the generating units
has gone up by an average of 12.66%. The plant load factor has also improved accordingly.

KEYWORDS: Hydro power, generation, measurement

1. INTRODUCTION

Bassi Hydro Power Station (BHPS), consisting of four


generating units of 15 MW each, is located at Joginder Nagar
in Himachal Pradesh, a hilly State of India, and owned by State
government Himachal Pradesh State Electricity Board (HPSEB).
The source of water to the power station is the tail-race discharge
of Shanan Hydro Power Station owned by Punjab State Electricity
Board (PSEB). The discharge from Shanan Hydro Power Station,
which is around 20 m3/s, is conveyed through a water conductor
system and stores in a small balancing reservoir of about
2500 m3 capacity. The reservoir is used for balancing of the inflow
from Shanan Hydro Power Station tailrace and the outflow to
BHPS and also works as the forebay tank for the latter. The water
conductor system of BHPS, as shown in Figure 1, comprises a
cup-shaped (trapezoidal-section) open channel with a total
length of 228 m and bottom width of 4.0 m, tunnels (total length
3883 m and internal diameter 3.36 m) and circular pressed RCC
ducts (internal diameter 3.36 m). Figure 2: Two penstocks for Units-1 and 2 and Units-3 and 4

Figure 1: Schematic of Water Conductor System

The water from the reservoir is fed to the 4 turbines through


two penstocks of internal diameter of 1.72 m each; see Figure 2.
Each penstock bifurcates into two individual penstocks of internal
diameter of 1.226 m each to feed the two turbines each. These
4 individual penstocks at the point of their entry to the power
house are shown in Figure 3. Figure 3: Individual penstocks for the four Turbines

1
Indian Institute of Technology Roorkee Roorkee -247 667, India, e-mail: bkgmefme@iitr.ac.in
2
Indian Institute of Technology Roorkee Roorkee -247 667, India
3
Sharda University, Greater Noida, India

10 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 10-14
TECHNICAL ARTICLES
DISCHARGE AND EFFICIENCY MEASUREMENTS
IN BASSI HYDRO POWER STATION IN INDIA

The four generating units of BHPS, which use vertical-shaft (a) To avoid puncturing of the old penstocks to install intrusion-
Pelton turbines, were commissioned between 1970 and 1981. type ultrasonic transducers.
By the year 2007, these units were 26 to 37 years old and (b) To save the time and cost of drilling holes and installing
were not able to generate rated power output; their efficiency intrusion-type transducers.
was low and had the problem of excessive vibrations. So the (c) Lower cost of clamp-on type UTTF as compared to intrusion-
option of renovating these machines was considered by the type UTTF.
station owner, HPSEB, who decided to evaluate the efficiency of It was decided to fix a high-precision gauge-pressure
the generating units and to measure the conveying capacity of transmitter at the turbine intake for pressure head measurement
water conductor system. Since the four generating units were and connect a precision-class digital wattmeter at the generator
not identical and had worked for different lengths of time under relay and metering panel in parallel to the existing digital multi
different conditions, it was considered necessary to test the function meter for power measurement.
efficiency of each individual unit. Further, HPSEB also decided In July 2007, all arrangements for fixing instruments were
to ascertain the actual value of discharge available from Shanan made under the supervision of IITR. Thereafter, discharge
Hydro Power Station with a view to examine the possibility of measurement in the open channel and efficiency test on the four
enhancing the station capacity of BHPS. Accordingly, a request old generating units at rated load were carried out.
was made in 2007 by HPSEB to Indian Institute of Technology After the completion of renovation and modernization work,
Roorkee (IITR) for the followings: one of the renovated generating unit was tested by using the
(a) To measure the discharge in the power channel (water earlier (2007) agreed procedure by IITR in March 2013. The
conductor system). testing was witnessed by the engineers of the owner as well as
(b) To measure the efficiency of each of the four generating units the equipment manufacturer.
at rated load.
A visit to the BHPS was undertaken, and the methods and 3. DISCHARGE MEASUREMENT IN POWER CHANNEL
locations of various measurements were mutually agreed to by
The open power channel alignment is straight from RD of 840
HPSEB and IITR. Measurements were carried out in the year
m to 870 m and the flow was reasonably free from disturbances
2007 by the experts (faculty) and technicians of IITR, which were
in this channel reach. Therefore, this was considered as the
witnessed by the engineers of HPSEB. Based on the results of
best possible location for discharge measurement in the open
these measurements and the poor health of the machines, the
channel and a current-meter mounting frame was installed at
owner decided to get the four generating units of 15 MW rating
RD 855 m.
each renovated and uprated to 16.5 MW each. The major scope
of supply and services under the renovation contract included
3.1 Simultaneous Measurement of Flow Velocities using
runners, nozzles and deflectors, bearings, shaft, main inlet valve,
Current-Meters
governing system, new stator core and windings, pole coils, new
static excitation system, control and protection system (Hydro Six propeller current meters were used for simultaneous
News, 2012). Since all the units after renovation were almost measurement of flow velocity in the measurement section. As
identical, it was decided in the year 2013 to test (past renovation the channel is trapezoidal section, the current meters were
and uprating) only one unit to save resources. placed at equidistance from the centerline of the channel. Two
This paper describes the measurements carried out by current meters were fixed to a fixed platform near the banks of
the authors from IITR before and after the renovation of the the channel, while another four current meters were fixed to a
power station. The plans, techniques and results of these movable frame as per dimensional drawing shown in Figure 4.
measurements are presented. The benefits of the renovation,
uprating and modernization of the power plant are also briefly
discussed.

2. MEASUREMENT PLAN

In order to determine suitable locations for carrying out various


measurements, appropriate method of each measurement and
site preparation required for the measurements, an advance
visit was made in May 2007. The entire water conductor system
was meticulously inspected and thence a location on the open
channel portion of the power channel was identified for discharge
measurement. It was decided to use a battery of propeller current
meters (PCMs) fixed to a mounting frame (Gandhi and Verma, Figure 4: Mounting Frame for Current Meters
2007). The mounting frame was later designed, fabricated and
installed. The movable portion of the frame was moved vertically to
The efficiency test of turbine-generator units by head-discharge measure the velocities at different water levels. It resulted in
measurement method involves simultaneous measurement of measurement of velocity at 22 points in the measurement section
three major quantities, namely discharge through the turbine, of the channel. The flow velocities were observed to vary in the
net water head availed by the turbine and electric power output range of 1.6-2.8 m/s. It can be noted from the Figure 4 that
of the generator (IEC-60041, 1991). For the measurement of the two current meters at the center were moved to 6 different
discharge in the individual penstocks, it was mutually agreed to depths and the other two were moved to only 4 depths because
use an ultrasonic transit-time flow-meter (UTTF) with clamp-on of the trapezoidal cross section of the channel. A photo view of
type ultrasonic transducers for the following reasons: the current-meter structure is shown in Figure 5.

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 10-14 11
ARTIGOS TCNICOS
DISCHARGE AND EFFICIENCY MEASUREMENTS
IN BASSI HYDRO POWER STATION IN INDIA

4.1 Discharge Measurement

For the reasons stated earlier, a portable ultrasonic transit-


time flow-meter (UTTF) with clamp-on transducers (GE-Sensing
System-PT878) was used in reflection mode. A pair of transducers
was fixed (clamped) on the individual penstock upstream of the
power house. Readings of the UTTF averaged over 60-second
periods by the instrument itself were taken every minute during
the 20-minute duration of the efficiency test. Average flow over
this 20-minute duration was used in calculating the unit efficiency
of the generating unit.

4.2 Pressure Head Measurement

A high-precision high-resolution gauge pressure transmitter


(SMAR LD-301, 0.075% basic accuracy, 0-5 MPa range) was
installed at the intake to the turbine for the pressure head
measurement. Readings were taken every minute during the
period of the efficiency test and their average value was used in
Figure 5: Current Meter Mounting Structure used at Power Channel for efficiency calculation.
Discharge Measurement

4.3 Electrical Power Measurement


The readings (number of revolutions) of the current meters
were recorded simultaneously on a microcontroller-based data The electrical power output of the generating unit was
logger. The data logger was fed with the calibration equation of measured by connecting a precisionclass 3phase digital
each current meter. At the end of each 120-second integration wattmeter (Yokogawa WT-230) as shown in Figure 6. It was
period, the data logger computes average velocity of water during connected in parallel to the digital multifunction meter installed
that period at each point along a horizontal plane and stores the on the Generator Relay and Metering Panel, as shown in Figure
same in its memory. Several records were taken at each depth 6. Power output was measured by using the digital wattmeter
during the measurement process for the purpose of averaging in integration mode so that any fluctuations in the power about
out any random error. the set-point of the governor are averaged out. The ratios of
the current transformer (CT) and voltage transformer (VT) of
the generator are 200A/1A and 11kV/110V, respectively. The
3.2 Result of Discharge Measurement
multiplying factor for the wattmeter reading is the product of
At the end of the velocity measurement process, the average- CT ratio and VT ratio, which comes out as 20,000 in this case.
velocity data was downloaded from the data logger to a computer. Therefore, the average electrical power output of the generator
Based on this data, the discharge was calculated by velocity-area over the test duration, Pe, in watts is given by,
segmentation method (IEC 60041, 1991). The value of discharge
through the power channel was found to be 24.193 m3/s.
The discharge in the power channel was also measured
simultaneously by using ultrasonic/ acoustic instruments, namely
a Horizontal-beam and a Vertical-beam acoustic Doppler current
profiler (ADCP). The result of discharge measurement using
currentmeters as above was found in good agreement with that
of the ADCPs (Patnaik et al., 2011).

3.3 Assessment of Uncertainty of Discharge Measurement

Uncertainty of velocity measurement by a PCM = 1.0 %


Uncertainty of velocity-area segmentation method = 1.5 %
Uncertainty of cross-sectional area and geometry of channel
section = 1.5 %

Therefore, total uncertainty of discharge measurement is


Figure 6: Precision digital Wattmeter connected for measurement of
electrical power output

4.4 Efficiency Calculation


4. PRE-RENOVATION EFFICIENCY TEST ON
GENERATING UNITS The hydraulic power input to the turbine, Ph, in watts is
calculated from the equation
The efficiency test was conducted before renovation on all the
Ph= g HQ
generating units at the rated load of 15 MW. The methods and
instruments used for measuring the relevant quantities, namely, where
discharge rate through the turbine, net water head availed by the = actual density of water in kg/m3 at actual temperature
turbine and electrical power output of the generator, are briefly and pressure
described below. g = actual acceleration due to gravity in m/s2 at the project site

12 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 10-14
TECHNICAL ARTICLES
DISCHARGE AND EFFICIENCY MEASUREMENTS
IN BASSI HYDRO POWER STATION IN INDIA

Q = discharge of water through the turbine is m3/s 5.2 Assessment of Uncertainty of Unit Efficiency
H = net head of water in m Measurement
5.2.1 Uncertainty of Discharge Measurement: Uncertainty
of average velocity measurement by UTTF

under the prevailing conditions = 2.0 %


hp = pressure head in m Uncertainty of cross-sectional area and geometry of pipe = 1.5 %
Z = mean elevation of gauge pressure transmitter above the
point of contact of all jets (centre line of the main inlet Therefore, total uncertainty of discharge measurement is
valve) at the Pelton wheel in m
V = average velocity of water flow at the inlet (measuring
section) in m/s (Discharge Q/ area of cross-section of
= 2.5 %
measuring section)
5.2.2 Uncertainty of Head Measurement:
Finally, the efficiency of the turbine-generator unit in
percentage is given by the following equation Uncertainty of gauge pressure transmitter = 0.075 % of 500 m
= 375 mm
Uncertainty of measurement of elevation
of pressure transmitter = 10 mm
Uncertainty of velocity head measurement = 10 mm

4.5 Results of Unit Efficiency Test Therefore, total uncertainty of net head measurement is
The measured values of major parameters and the calculated
values of efficiency of the four generating units before renovation
are summarized in Table 1.
= 0.110 %
Table1: Summary of measurement results for efficiency test on
generating units before renovation. 5.2.3 Uncertainty of Electrical Power Measurement:
Average Unit Uncertainty of wattmeter = 0.2 %
Generating Net head Power
discharge efficiency
Unit (m) output (kW) Uncertainty of CT = 0.2 %
(m3/s) (%)
Uncertainty of VT = 0.2 %
1 338.787 6.010 14431.8 72.41
2 341.007 6.044 15598.2 77.31
Therefore, total uncertainty of electrical power measurement is
3 339.238 6.112 14368.2 70.74
4 336.683 5.523 14568.0 79.98

5. POST-RENOVATION UNIT EFFICIENCY TEST = 0.346 %

After renovation, the efficiency test was carried out in March 5.2.4 Overall Uncertainty of Unit Efficiency Measurement:
2013 using the same methodology and instruments as used
Finally, the overall uncertainty of unit
earlier. But the test was conducted only on one of the four
generating units at 100%, 80% and 60% of the rated load, which
is 16.5 MW for the renovated machines.
efficiency measurement is = 2.526 %
5.1 Results of Efficiency Test
6. CONCLUDING REMARKS
The average values of discharge, pressure head and electrical
power output, measured as per earlier description, are used for The result of measurement of discharge in the open channel
calculating the unit efficiency at each load. Subsequently, the revealed that the water conductor system was able to carry more
efficiency of the turbine is also calculated by dividing the unit water (24.193 m3/s) than the tail-race discharge of Shanan Hydro
efficiency with the generator efficiency, which had been evaluated Power Station, viz. 20 m3/s.
earlier based on factory tests on the generator and is taken here During the efficiency test on the four generating units before
as a given data. The results are summarized in Table 2. renovation, attempt was made to conduct the test on each unit
at the same head and discharge. However the head varied from
Table2: Summary of measurement results for efficiency test on 336.6 to 339.0 m and discharge varied from 5.5 to 6.1m3/s for
one generating unit after renovation. different units. It is seen that unit efficiency of the four units
before renovation was in the range of 70-80%. The mini-
Load on unit
Quantity mum efficiency was observed as 70.74% for unit-3 and the
100% 80% 60%
maximum efficiency was observed as 79.98% for unit-4, which
Averaged discharge (m3/s) 5.634 4.504 3.380
was the youngest unit (commissioned in 1981).
Net head (m) 341.470 343.146 344.509
The results of post-renovation testing show that the unit
Electrical power output (kW) 16560.3 13302.9 9986.7
efficiency has substantially improved and is 87.77% at rated load.
Unit Efficiency (%) 87.77 87.76 87.46
Assuming that after renovation all the generating units have this
Generator efficiency as evaluated earlier (%) 98.43 98.28 97.96
efficiency value, the average gain in unit efficiency is 12.66%,
Turbine Efficiency (%) 89.17 89.30 89.28
with the minimum and maximum improvements being 7.79%

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 10-14 13
ARTIGOS TCNICOS
DISCHARGE AND EFFICIENCY MEASUREMENTS
IN BASSI HYDRO POWER STATION IN INDIA

(unit-4) and 17.03% (unit-3), respectively. The renovation has Hydro News, 2012, Bassi: Success Story of Service and
resulted in generation of more than 66 MW from the 4 units (now Rehabilitation in India, Hydro News Magazine of Andritz
rated as 16.5 MW each) as compared to a power output of less Hydro, No. 21, 04-2012, pp. 12-13.
than 60 MW before renovation, because even with full availability IEC: 60041, 1991, Field Acceptance Tests to Determine the
of discharge, some units could not generate the pre-renovation Hydraulic Performance of and Pump Turbines, Third edition.
rated output of 15 MW. The plant load factor, which had fallen Patnaik, S.S., Verma, H.K. and Gandhi, B.K., 2011, New
because of frequent maintenance, has now substantially technology for discharge measurement at small hydro
improved due to all-time availability of the machines and running stations, Hydropower & Dams, vol. 5, p. 103-108.
of the machines at full capacity due to modernization of controls.
ACKNOWLEDGEMENT
7. REFERENCES
The authors acknowledge the financial support provided
Gandhi, B.K. and Verma, H.K., 2007, Simultaneous Multi- by Ministry of New and Renewable Energy, Govt. of India for
point Velocity Measurement using Propeller Current Meters field testing equipment at IIT Roorkee, HPSEB for sponsoring
for Discharge Evaluation in Small Hydropower Stations, Proc. testing before renovation and M/s Andriz Hydro for testing after
Intl. Conference on Small Hydro, Kandy, Sri Lanka, 22-24 renovation. The support of Technical staff of AHEC is also duly
December 2007, pp. 215-223. acknowledged.

14 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 10-14
TECHNICAL ARTICLES
DATA ACQUISITION AND DATA ANALYSIS TOOLS FOR
HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS

PCHNotcias&SHPNews
Publisher: Acta Editora/CERPCH DATA ACQUISITION AND DATA ANALYSIS TOOLS FOR
DOI:10.14268/pchn.2015.00023
ISSN: 1676-0220 HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS
Subject Collection: Engineering
Subject: Engineering, measurement
1
Diego H. Kawasaka, 2Joo Gomes Pereira Jr., 3Paulo E. Noce

ABSTRACT

This paper presents some software used by the Alstoms Special Measurements Team to perform on site tests such as index tests,
vibration tests, Gibson discharge measurements and make possible to measure and process data real-time.
With this paper, Alstom intends to show its expertise and capability to deliver high quality tests to its clients while providing machine
diagnosis and performance measurements in hydro generation units.

KEYWORDS: Turbines, hydraulic, generators.

1. INTRODUCTION Before starting the tests, all sensors are calibrated in the
field using a standard sensor. For this step, a program was
The demand for on-site tests in Brazil has grown significantly
developed in order to make this process faster, to enable quick
motivated by the ANEEL Resolution 420 (ANEEL, Resoluo
analysis of error between the measured value and the value
420, 2010), recently revoked by ANEEL Resolution 583 (ANEEL,
indicated by the standard instrument and, finally, it prepares a
Resoluo 583, 2013), and a new market trend that aims for the
calibration report.
best usage of the Brazilian hydraulic resources.
The coefficients of the best trend line between physical and
Many field tests are carried out to prove that the units
engineering quantities are then incorporated in the system data
performance is in agreement with the guarantees provided by
acquisition. The Figure 1 shows an example during the calibration
a manufacturer. The turbines efficiency can be measured by
and the Figure 2 shows the calibration report.
relative discharge measurements, using the method of Winter-
Kennedy, or by absolute methods such as the thermodynamic or
the Gibson discharge measurement method. Those procedures
are described by the IEC60041 standard (IEC:60041, 1993).
Regarding the dynamic behavior, bearings vibration (ISO:10816-
5, 2001) and shaft displacement measurements (ISO:7919-5,
2005) are frequently required to follow ISO standards as well.
As the time passes and the technology evolves, the capability
to perform more complex tests with reduced time of stopped
machine is a market requirement. Looking for optimizing the test
procedures, Alstoms Special Measurements Team uses commercial
software for data logging and real-time analysis and also develops
software for specifics on-site tests and post-treatments.
This document intends to show these actual technologies,
allowing the delivery of high quality measurements reports with
a reduced amount of work time.

2. PROCEDURES AND RESULTS

2.1 Calibration

Fig. 1: Softwares screen during calibration. Fig. 2:Example of calibration report.

1
Alstom Hydro, Taubat, Brazil, e-mail: diego.kawasaka@power.alstom.com
2
Alstom Hydro, Taubat, Brazil, e-mail: joao.gomes@power.alstom.com
3
Alstom Hydro, Taubat, Brazil, e-mail: paulo.noce@power.alstom.com

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 15-18 15
ARTIGOS TCNICOS
DATA ACQUISITION AND DATA ANALYSIS TOOLS FOR
HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS

2.2 Index test and verification of cam curves

The index test follows the procedure established by the


standard IEC60041 (IEC:60041, 1993).
The verification of the cam curves is performed by fixing
the blades position and varying the guide vanes. For each
position of blades and guide vanes, an acquisition is carried
out to determine the relative efficiency for this combination. In
the end, the best cam curve is determined for maximizing the
performance of the unit.
Previously, the signals were only acquired in pre-scale units
(volts, current, resistance...). As the procedure was slow and
little automated, practically all post-treatment and efficiency
calculations were made sometimes days after the end of the
tests. Thus, in some cases, acquisition problems were detected
only afterwards, sometimes even invalidating the test.
Nowadays, the signal acquired is already converted to
engineering units (Pascals, millimeters, megawatts, percent
of opening ) and it is possible to do post-treatments such
Fig. 4: Signal Express screen simulating the acquisition of a bearing
as differentiation, integration, filters and verification of RMS vibration and a shaft displacement signals.
amplitude real-time.
With the current procedure, the efficiency curve for a constant
blade position is generated in a few minutes. Its possible to
check the results and verify if the measurements contain some
inconsistency or saturated signal and, if anything wrong is
noticed, it can be quickly fixed by the measurements engineer
and the test is repeated.
The results obtained in a test to verify cam curves are
presented in the following figure:

Fig. 5: Two pairs of shaft displacement signals plotted as orbits.

2.4 Post-Treatment

Fig. 3: Efficiency measurements for determining the best cam curve

2.3 Bearing vibration and radial shaft displacement

Using a commercial software, it is possible, during the tests,


to instantly calculate bearings vibration and shaft displacement
according to the ISO 7919-5 (ISO:7919-5, 2005) and ISO 10816-
5 (ISO:10816-5, 2001) standards.
As an example, on Figure 4, the signal from one accelerometer
and one displacement sensor is presented. The signal from the
accelerometer is integrated and the RMS average of the resultant
signal is calculated, according to the ISO standard.
On the same figure, the original displacement signal is
presented along with its low-pass filtered signal. The peak-to-
peak displacement is then calculated.
Finally, on Figure 5, two pairs of shaft displacement signals
are plotted as orbits. The signals were band-pass filtered to the Fig. 6: Interface of post-treatment program while choosing the folders and
same frequency as the shaft rotation. files that contain the signals.

16 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 15-18
TECHNICAL ARTICLES
DATA ACQUISITION AND DATA ANALYSIS TOOLS FOR
HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS

The Special Measurements Team has also developed software


for post-processing data. The software is easy to use and has a
friendly users interface, as presented in the Figure 6.
The user loads the acquisitions and chooses the signals that
he wishes to analyze. The program is able to perform arithmetic
or RMS means, signal filtering, plotting orbits, peak-to-peak
and Smax shaft displacement, calculate pressure pulsation,
make analysis of acceleration measurements, integrating
or differentiating signals, make noise analysis and calculate
frequency spectrums.
The software allows the user to perform the analyses for
various acquisitions containing various signals simultaneously
(see Figure 7) and the results are presented in a excel table. This
process results in a considerable gain of time and reduces the
possibility of error during calculations.

Fig. 7: Post-treatment program screen while choosing the signals and the
calculations to be carried out.

2.5 Gibson Fig. 9: Defining the low-pass filter (if necessary) and the parameters from
the IEC standard.

A program was created to perform the Gibson discharge


method calculations. The idea is to create a very simple and user-
friendly interface in order to make the data interpretation easier.
On the figure 8, it is shown the first step while using this
program. One can see some initial data input, the original signal
of Gibson pressure and its frequency spectrum. After clicking on
the button Define Filter and IEC 60041 Parameters, the program
will show the user another screen where he can define if he will
use or not a low-pass filter and calculate the parameters B, M, N,
Hj and Hj+1 as defined on the IEC (Figure 9).
Going back to the main screen, one can choose the time
interval where the Gibson pressure signal is averaged in order to
define the A-A and the F-F lines (Figure 10).
Finally, one can define the integration time interval. The user
can either choose the integration end time on his own or by using
the IEC parameters defined previously. On the example on the
figure 11, the end time is defined by the IEC parameters.
Fig. 8: Basic data input, original Gibson pressure signal and its frequency The program will automatically calculate the GPM line and the
spectrum. discharge.

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 15-18 17
ARTIGOS TCNICOS
DATA ACQUISITION AND DATA ANALYSIS TOOLS FOR
HYDRAULIC TURBINES AND GENERATORS ON-SITE TESTS

used for the sensors calibration, Gibson discharge calculation,


general post-treatment, vibration and index test related
measurements.
As a result, Alstom shows its capacity and expertise to perform
complex on-site tests, delivering high quality results to its clients.

4. REFERENCES

ANEEL. (2010). Resoluo 420.


ANEEL. (2013). Resoluo 583.
IEC:60041. (1993). International Standard: Field acceptance
tests to determine the hydraulic performance of hydraulic
turbines, storage pumps and pump turbines.
ISO:10816-5. (2001). Mechanical vibration - Evaluation of
machine vibration by measurements on non-rotating parts.
ISO:7919-5. (2005). Evaluation of machine vibration by
measurements on rotating shafts.

Fig. 10: Defining A-A and F-F lines.

Fig. 11: Defining the integration interval. The calculated discharge is then
shown on the screen.

3. CONCLUSION

This paper intended to present the methodology adopted


nowadays by the Alstoms on-site measurements team to perform
data acquisition and post-treatment.
Alstom has developed new tools which reduced considerably
the time to analyze data and, at the same time, improved the
quality and confidence on the results.
This paper presented some examples of programs that are

18 PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015, DA PG. 15-18
TECHNICAL ARTICLES

PCH NOTCIAS & SHP NEWS, 65, (2), ABR,JUN/2015 19


INSTRUES AOS AUTORES INSTRUCTIONS FOR AUTHORS

Forma e preparao de manuscrito Form and preparation of manuscripts

Primeira Etapa (exigida para submisso do artigo) First Step (required for submition)
O texto dever apresentar as seguintes caractersticas: espa- The manuscript should be submitted with following format:
amento 1,5; papel A4 (210 x 297 mm), com margens superior, should be typed in Times New Roman; 12 font size; 1.5 spaced
inferior, esquerda e direita de 2,5 cm; fonte Times New Roman 12; lines; standard A4 paper (210 x 297 mm), side margins 2.5 cm
e conter no mximo 16 laudas, incluindo quadros e figuras. wide; and not exceed 16 pages, including tables and figures.
Na primeira pgina dever conter o ttulo do trabalho, o In the first page should contain the title of paper, Abstract
resumo e as Palavras-chave. Os quadros e as figuras devero ser and Keywords. The tables and figures should be numbered con-
numerados com algarismos arbicos consecutivos, indicados no secutively in Arabic numerals, which should be indicated in the
texto e anexados no final do artigo. Os ttulos das figuras devero text and annexed at the end of the paper. Figure legends should
aparecer na sua parte inferior antecedidos da palavra Figura mais be written immediately below each figure preceded by the word
o seu nmero de ordem. Os ttulos dos quadros devero aparecer Figure and numbered consecutively. The table titles should be
na parte superior e antecedidos da palavra Quadro seguida do written above each table and preceded by the word Table fol-
seu nmero de ordem. Na figura, a fonte (Fonte:) vem sobre a lowed by their consecutive number. Figures should present the
legenda, direta e sem ponto final; no quadro, na parte inferior data source (Source) above the legend, on the right side and no
e com ponto final. full stop; and tables, below with full stop.
O artigo em PORTUGUS dever seguir a seguinte sequn- The manuscript in PORTUGUESE should be assembled in the
cia: TTULO em portugus, RESUMO (seguido de Palavras- following order: TTULO in Portuguese, RESUMO (followed by
-chave), TTULO DO ARTIGO em ingls, ABSTRACT (seguido de Palavras-chave), TITLE in English; ABSTRACT in English (fol-
keywords); 1. INTRODUO (incluindo reviso de literatura); lowed by keywords); 1. INTRODUO (including references);
2. MATERIAL E MTODOS; 3. RESULTADOS E DISCUSSO; 4. 2. MATERIAL E MTODOS; 3. RESULTADOS E DISCUSSO; 4.
CONCLUSO (se a lista de concluses for relativamente curta, a CONCLUSO (if the list of conclusions is relatively short, to the
ponto de dispensar um captulo especfico, ela poder finalizar point of not requiring a specific chapter, it can end the previous
o captulo anterior); 5. AGRADECIMENTOS (se for o caso); e 6. chapter); 5. AGRADECIMENTOS (if it is the case); and 6. REFER-
REFERNCIAS, alinhadas esquerda. NCIAS, aligned to the left.
O artigo em INGLS dever seguir a seguinte sequncia: The article in ENGLISH should be assembled in the follow-
TTULO em ingls; ABSTRACT (seguido de Keywords); TTULO ing order: TITLE in English; ABSTRACT in English (followed by
TECHNICAL ARTICLES

DO ARTIGO em portugus; RESUMO (seguido de Palavras- keywords); TITLE in Portuguese; ABSTRACT in Portuguese (fol-
-chave); 1. INTRODUCTION (incluindo reviso de literatura); 2. lowed by keywords); 1. INTRODUCTION (including references);
MATERIALAND METHODS; 3. RESULTS AND DISCUSSION; 4. 2. MATERIAL AND METHODS; 3. RESULTS AND DISCUSSION;
CONCLUSIONS (se a lista de concluses for relativamente curta, 4. CONCLUSIONS (if the list of conclusions is relatively short,
a ponto de dispensar um captulo especfico, ela poder finalizar to the point of not requiring a specific chapter, it can end the
o captulo anterior); 5. ACKNOWLEDGEMENTS (se for o caso); previous chapter); 5. ACKNOWLEDGEMENTS (if it is the case);
e 6. REFERENCES. and 6. REFERENCES.
O artigo em ESPANHOL dever seguir a seguinte sequn- The article in SPANISH should be assembled in the follow-
cia: TTULO em espanhol; RESUMEN (seguido de Palabra llave), ing order: TTULO in Spanish; RESUMEN (following by Palabra-
TTULO do artigo em portugus, RESUMO em portugus (segui- llave), TITLE of the article in Portuguese, ABSTRACT in Portu-
do de palavras-chave); 1. INTRODUCCTIN (incluindo reviso guese (followed by keywords); 1. INTRODUCCTIN (including
de literatura); 2. MATERIALES Y METODOS; 3. RESULTADOS Y references); 2. MATERIALES Y MTODOS; 3. RESULTADOS Y
DISCUSINES; 4. CONCLUSIONES (se a lista de concluses for DISCUSINES; 4. CONCLUSIONES (if the list of conclusions is
relativamente curta, a ponto de dispensar um captulo especfi- relatively short, to the point of not requiring a specific chapter, it
co, ela poder finalizar o captulo anterior); 5. RECONOCIMIEN- can end the previous chapter); 5.RECONOCIMIENTO (if it is the
TO (se for o caso); e 6. REFERENCIAS BIBLIOGRFICAS. case); and 6. REFERENCIAS BIBLIOGRFICAS.
Os subttulos, quando se fizerem necessrios, sero escritos The section headings, when necessary, should be written
com letras iniciais maisculas, antecedidos de dois nmeros with the first letter capitalized, preceded of two Arabic numerals
arbicos colocados em posio de incio de pargrafo. placed at the beginning of the paragraph.
No texto, a citao de referncias bibliogrficas dever ser References cited in the text should include the authors
feita da seguinte forma: colocar o sobrenome do autor citado last name, only with the first letter capitalized, and the year
com apenas a primeira letra maiscula, seguido do ano entre in parentheses, when the author is part of the text. When the
parnteses, quando o autor fizer parte do texto. Quando o autor author is not part of the text, include the last name in capital
no fizer parte do texto, colocar, entre parnteses, o sobrenome, letters followed by the year separated by comma, all in pa-
em maisculas, seguido do ano separado por vrgula. rentheses.
O resumo dever ser do tipo indicativo, expondo os pontos Abstracts should be concise and informative, presenting the
relevantes do texto relacionados com os objetivos, a metodologia, key points of the text related with the objectives, methodology,
os resultados e as concluses, devendo ser compostos de uma results and conclusions; it should be written in a sequence of
sequncia corrente de frases e conter, no mximo, 250 palavras. sentences and must not exceed 250 words.
Para submeter um artigo para a Revista PCH Notcias & SHP For paper submission, the author(s) should access the online
News o(os) autor(es) devero entrar no site www.cerpch.unifei. submission Web site www.cerpch.unifei.edu.br/submeterartigo
edu.br/submeterartigo. (submit paper).
ARTIGOS TCNICOS

Sero aceitos artigos em portugus, ingls e espanhol. No The Magazine PCH Notcias & SHP News accepts papers in Por-
caso das lnguas estrangeiras, ser necessria a declarao de tuguese, En-glish and Spanish. Papers in foreign languages will be
reviso lingustica de um especialista. requested a declaration of a specialist in language revision.

Segunda Etapa (exigida para publicao) Second Step (required for publication)
O artigo depois de analisado pelos editores, poder ser After the manuscript has been reviewed by the editors, it is
devolvido ao(s) autor(es) para adequaes s normas da Revista either returned to the author(s) for adaptations to the Journal
ou simplesmente negado por falta de mrito ou perfil. Quando guidelines, or rejected because of the lack of scientific merit and
aprovado pelos editores, o artigo ser encaminhado para trs suitability for the journal. If it is judged as acceptable by the
revisores, que emitiro seu parecer cientfico. Caber ao(s) editors, the paper will be directed to three reviewers to state
autor(es) atender s sugestes e recomendaes dos revisores; their scientific opinion. Author(s) are requested to meet the re-
caso no possa(m) atender na sua totalidade, dever(o) viewers, suggestions and recommendations; if this is not totally
justificar ao Comit Editorial da Revista. possible, they are requested to justify it to the Editorial Board.

Obs.: Os artigos que no se enquadram nas normas acima Obs.: Papers that fail to meet totally or partially the guide-
descritas, na sua totalidade ou em parte, sero devolvidos e lines above described will be returned and lose the priority of the
perdero a prioridade da ordem sequencial de apresentao. sequential order of presentation.