Scheduling/Leveling Report - 2017-07-19 11:18:30 - PM.

exe
=========================================================

Default Project..................................................083-C01 Wk-


149

Projects:
083-C01 Wk-149...................................................Site
Dev. of City Infrastructure Support Services Area- North- Wk-147 (DD 1 July 2017)
(CCO#3)

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................No

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................935
# Not Started....................................................278
# In Progress....................................................129
# Completed......................................................528
# Relationships..................................................1516
# Activities with Constraint.....................................24
Project: 083-C01 Wk-149 Activity: 83-MIL-100 Complete Site
Preparation for Power Row
Project: 083-C01 Wk-149 Activity: 83-MIL-110 N.T.P
Project: 083-C01 Wk-149 Activity: 83-MIL-120 Start
Construction
Project: 083-C01 Wk-149 Activity: 83-MIL-130 Complete
Mobilization
Project: 083-C01 Wk-149 Activity: 83-MIL-140 Complete Existing
Condition Survey and Submission of reports and Site Setting out
Project: 083-C01 Wk-149 Activity: 83-MIL-150 Complete Site
Utilities pipeline (PFW/SWW)
Project: 083-C01 Wk-149 Activity: 83-MIL-160 Complete
Telecommunication System,MV/LV Distribution/ Road Lighting
Project: 083-C01 Wk-149 Activity: 83-MIL-170 Complete Road
Networks
Project: 083-C01 Wk-149 Activity: 83-MIL-180 Complete Power and
Telecommunication connection with SEC and STC
Project: 083-C01 Wk-149 Activity: 83-MIL-190 Complete All
Remaining Works Inculding Testing and Commissioning,Cleanup,Closeout
Documentatation and Ready for I/A
Project: 083-C01 Wk-149 Activity: 83-MIL-200 Complete
Demobilization
Project: 083-C01 Wk-149 Activity: 83-NWACT-DC23-100 Removal of
Ma'aden MV over head line (Ma'aden Existing Utilities and MM Harbi)
Project: 083-C01 Wk-149 Activity: 83-NWACT-DC7-100 Handing over
of Site from Other R.C Contractors (MM AL Harbi and PCMC)
Project: 083-C01 Wk-149 Activity: 83-NWACT-MV-DES-130 SEC
Design Change from MRMU to RMU's
Project: 083-C01 Wk-149 Activity: 83-NWACT-R03-110 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R2-100 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R3-P3-100
Handover the Area from (FEMCO) & Backfiled & Compacted upto Level +5 by Other
R.C Contractor (AL-Hajri)
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P1-100 Road
Embankment Backfilling By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P2-100 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P3-110 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-R1-RD-180 Backfilling
& Compaction upto Required Level-5 by other RC contractor
Project: 083-C01 Wk-149 Activity: 83-R1-RD-210 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-R2-RD-50 Backfilling &
Compaction by RC contractor upto Required Level-5
Project: 083-C01 Wk-149 Activity: A1000 Handing over of Road TS-
402 from Ma'aden

Errors:
-------
Warnings:
---------
Activities without predecessors..................................13
Project: 083-C01 Wk-149 Activity: 83-MIL-110 N.T.P
Project: 083-C01 Wk-149 Activity: 83-MR1-TLC-250 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-NWACT-DC23-100 Removal of
Ma'aden MV over head line (Ma'aden Existing Utilities and MM Harbi)
Project: 083-C01 Wk-149 Activity: 83-NWACT-DC7-100 Handing over
of Site from Other R.C Contractors (MM AL Harbi and PCMC)
Project: 083-C01 Wk-149 Activity: 83-NWACT-MV-DES-130 SEC
Design Change from MRMU to RMU's
Project: 083-C01 Wk-149 Activity: 83-NWACT-R2-100 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R3-P3-100
Handover the Area from (FEMCO) & Backfiled & Compacted upto Level +5 by Other
R.C Contractor (AL-Hajri)
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P1-100 Road
Embankment Backfilling By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P3-110 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-R1-RD-210 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-R2-RD-50 Backfilling &
Compaction by RC contractor upto Required Level-5
Project: 083-C01 Wk-149 Activity: 83-R3-P2-TLC-140 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: A1000 Handing over of Road TS-
402 from Ma'aden

Activities without successors....................................7


Project: 083-C01 Wk-149 Activity: 83-DLV-RD-140 Precast
Concrete Curb
Project: 083-C01 Wk-149 Activity: 83-MIL-130 Complete
Mobilization
Project: 083-C01 Wk-149 Activity: 83-MIL-140 Complete Existing
Condition Survey and Submission of reports and Site Setting out
Project: 083-C01 Wk-149 Activity: 83-MIL-190 Complete All
Remaining Works Inculding Testing and Commissioning,Cleanup,Closeout
Documentatation and Ready for I/A
Project: 083-C01 Wk-149 Activity: 83-MIL-200 Complete
Demobilization
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-160 Install Pipe
Sleeves
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-340 Install Pipe
Sleeves

Out-of-sequence activities.......................................71
Project: 083-C01 Wk-149 Activity: 83-DC7-110 Backfilling and
Compaction
Project: 083-C01 Wk-149 Activity: 83-INTRF-130 East
-Interface Connections for Potable Water Distribution Systems
Project: 083-C01 Wk-149 Activity: 83-INTRF-150 West
-Interface Connections for Potable Water Distribution Systems
Project: 083-C01 Wk-149 Activity: 83-MR1-TLC-220 Construction
of Duct Banks including Conduits
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-140 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-170 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-120 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-170 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-180 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-R01-P2E-DC12-100
Excavation for Culvert
Project: 083-C01 Wk-149 Activity: 83-R01-P2W-DC13-100
Excavation for Culvert
Project: 083-C01 Wk-149 Activity: 83-R02-N-DC10-100 Excavation
for Culvert
Project: 083-C01 Wk-149 Activity: 83-R02-N-DC16-100 Excavation
for Culvert
Project: 083-C01 Wk-149 Activity: 83-R02-N-DC2-100 Excavation
for Culvert
Project: 083-C01 Wk-149 Activity: 83-R02-POT-100 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R02-POT-170 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R02-TLC-140 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R03-P1-POT-170 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R03-P1-POT-180 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R03-P2-POT-170 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R03-P2E-DC01-100
Excavation for Culvert
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-100 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-140 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-160 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-170 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-140 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-280 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-290 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-300 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-320 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-330 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R06-P3-POT-110 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R06-P3-POT-190 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-P1-LV-15 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R1-P1-MV-100 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-520 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-110 Installation
of Joint Boxes hand holes
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-120 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-P2-LV-174 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-100 Construction
of Duct Banks including Conduits
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-110 Installation
of Joint Boxes hand holes
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-120 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R2-MV-100 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R2-P1-STL-660 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-160 Substructre
Works for Substation
Project: 083-C01 Wk-149 Activity: 83-R3-E1-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R3-P1-LV-150 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R3-P1-TLC-140 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-560 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P1-STL-100 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R6-P1-TLC-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-100 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R6-P2-TLC-130 Construction
of Duct Banks including Conduits
Project: 083-C01 Wk-149 Activity: 83-R6-P2-TLC-150 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R6P2-OC-100 Site
Preperation /Surveying Works
Project: 083-C01 Wk-149 Activity: 83-Rd1-S1-SAN-100
Excavationfor Pipeline
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-260 Construct
and install WO and CO.Chamber
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-270 Construct
Air Release Chambers
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-280 Laying of
Warning tape /backfilling and compaction
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-290 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-330 Install Air
Release and Gate Valves
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-110
Excavationfor Pipeline
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-160 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-SBMT-RDW-180 Paving
Specialties

Activities with Actual Dates > Data Date.........................0

Milestone Activities with invalid relationships..................0

Finish milestone and predecessors have different calendars.......0

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................935
# Relationships with other projects..............................0
Data Date........................................................15-Jul-17
Earliest Early Start Date........................................15-Jul-17
Latest Early Finish Date.........................................06-Oct-18
Exceptions:
-----------
Critical Activities..............................................404
Project: 083-C01 Wk-149 Activity: 83-APRV-180 Control and Survey
Monuments
Project: 083-C01 Wk-149 Activity: 83-APRV-190 Pavement Markers
Project: 083-C01 Wk-149 Activity: 83-APRV-230 Signalization of
Road Intersection
Project: 083-C01 Wk-149 Activity: 83-APRV-240 Road Signs
Project: 083-C01 Wk-149 Activity: 83-DC7-100 Excavation for
Culvert (Including Dewatering Works)
Project: 083-C01 Wk-149 Activity: 83-DC7-110 Backfilling and
Compaction
Project: 083-C01 Wk-149 Activity: 83-DC7-120 Base Slab /
Foundattion Works
Project: 083-C01 Wk-149 Activity: 83-DC7-130 Foundation Works
for Wing Wall and Head wall
Project: 083-C01 Wk-149 Activity: 83-DC7-140 Form Shuttering /
Pour Concrete for Vertical wall Members for cells
Project: 083-C01 Wk-149 Activity: 83-DC7-150 Tie
Reinforcement /Pour Concrete for Head wall
Project: 083-C01 Wk-149 Activity: 83-DC7-160 Pour Concrete for
Wing Wall
Project: 083-C01 Wk-149 Activity: 83-DC7-170 Instalation of
Precast Arch Cullverts and connections
Project: 083-C01 Wk-149 Activity: 83-DC7-180 Backfillingand
compaction above precast segments
Project: 083-C01 Wk-149 Activity: 83-DEMOB-200 Complete all
demobilization Works
Project: 083-C01 Wk-149 Activity: 83-DLV-INS-100 Potable and
Fire Water Supply Distribution System
Project: 083-C01 Wk-149 Activity: 83-DLV-INS-110 Sanitary
Waste Water Collection System (SWW)
Project: 083-C01 Wk-149 Activity: 83-DLV-MV-110 Standby
Diesel Generator Set and Automatic Transfer Switch
Project: 083-C01 Wk-149 Activity: 83-DLV-RD-110 Chainlink
Fence and Gate
Project: 083-C01 Wk-149 Activity: 83-DLV-RD-120 Control and
Survey Monuments
Project: 083-C01 Wk-149 Activity: 83-DLV-RD-130 Pavement
Markers
Project: 083-C01 Wk-149 Activity: 83-DLV-RD-150 Road Signs
Project: 083-C01 Wk-149 Activity: 83-DLV-RD-160 Paving Tiles
Project: 083-C01 Wk-149 Activity: 83-DLV-STL-110
Signalization of Road Intersection
Project: 083-C01 Wk-149 Activity: 83-DLV-TLC-100 Fiber Optic
Cable
Project: 083-C01 Wk-149 Activity: 83-DLV-TLC-110 Fiber Optic
Distribution Terminal (FDT)
Project: 083-C01 Wk-149 Activity: 83-INA-100 Inspection
checklists,Repair work,Restoration and other remaining Activities
Project: 083-C01 Wk-149 Activity: 83-INA-200 Initial Acceptance
and approval
Project: 083-C01 Wk-149 Activity: 83-INTRF-100 Installation
of Potable and Fire Water Supply Distribution System control unit
Project: 083-C01 Wk-149 Activity: 83-INTRF-110 Interface
Connections for Sanitary Waste Water System
Project: 083-C01 Wk-149 Activity: 83-INTRF-120 Installation
of Sanitary Waste Water Collection System control unit
Project: 083-C01 Wk-149 Activity: 83-INTRF-140 South-
Interface Connections for Potable Water Distribution Systems
Project: 083-C01 Wk-149 Activity: 83-INTRF-160 Notrh
-Interface Connections for Potable Water Distribution Systems
Project: 083-C01 Wk-149 Activity: 83-INTRF-170 Connection
with main power distribution system with SECECO
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-M1-N-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-M1-R-100 Laying /poring of
Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-M1-S-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-M2-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-M2-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-M2-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-M2-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-M2-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-M2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-M2-OC-170 Construction
of End of culvert @ sea end
Project: 083-C01 Wk-149 Activity: 83-M2-R-100 Laying /poring of
Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-MIL-150 Complete Site
Utilities pipeline (PFW/SWW)
Project: 083-C01 Wk-149 Activity: 83-MIL-160 Complete
Telecommunication System,MV/LV Distribution/ Road Lighting
Project: 083-C01 Wk-149 Activity: 83-MIL-170 Complete Road
Networks
Project: 083-C01 Wk-149 Activity: 83-MIL-180 Complete Power and
Telecommunication connection with SEC and STC
Project: 083-C01 Wk-149 Activity: 83-MIL-190 Complete All
Remaining Works Inculding Testing and Commissioning,Cleanup,Closeout
Documentatation and Ready for I/A
Project: 083-C01 Wk-149 Activity: 83-MIL-200 Complete
Demobilization
Project: 083-C01 Wk-149 Activity: 83-MR1-TLC-171 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-MR1-TLC-240 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-NWACT-R03-110 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R2-100 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R3-P3-100
Handover the Area from (FEMCO) & Backfiled & Compacted upto Level +5 by Other
R.C Contractor (AL-Hajri)
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P1-100 Road
Embankment Backfilling By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P2-100 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-NWACT-R6P3-110 Backfilling
of Remaining Quntity for Road Embankment by Other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-PO-RDW-130 Chainlink
Fence and Gate
Project: 083-C01 Wk-149 Activity: 83-PO-RDW-150 Control and
Survey Monuments
Project: 083-C01 Wk-149 Activity: 83-PO-RDW-160 Pavement
Markers
Project: 083-C01 Wk-149 Activity: 83-PO-RDW-170 Road Signs
Project: 083-C01 Wk-149 Activity: 83-PO-RDW-180 Paving
Specialties
Project: 083-C01 Wk-149 Activity: 83-PO-STL-130
Signalization of Road Intersection
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-100 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-110 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-120 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-130 Concrete
ENcasement of pipeline
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-140 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-150 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-170 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R01-P1-POT-180 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-R01-P1E-DC18-180
Backfillingand compaction above precast segments
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-100 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-110 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R01-P2-POT-120 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R02-POT-150 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R02-POT-180 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R02-TLC-130 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R02-TLC-150 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R03-P1-POT-150 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R03-P1-POT-170 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R03-P2-POT-150 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-100 Excavation
for Pipeline
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-120 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-140 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-150 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R03-P3-POT-160 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-110
Excavation for Culvert
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-120
Backfilling and Compaction
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-130 Base
Slab / Foundattion Works
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-140 Form
Shuttering / Pour Concrete for Vertical wall Members for cells
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-150 Tie
Reinforcement /Pour Concrete for Head wall
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-160 Pour
Concrete for Wing Wall
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-170
Instalation of Precast Arch Cullverts and connections
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-180
Backfillingand compaction above precast segments
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-190
Foundation Works for Wing Wall and Head wall
Project: 083-C01 Wk-149 Activity: 83-R06-P1-DC23-200
Fabrication/Production of Precast Arch Cullverts
Project: 083-C01 Wk-149 Activity: 83-R06-P1-LV-110 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R06-P1-LV-120 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R06-P1-LV-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R06-P1-LV-140 Installation
of Main/Low Distribution boards/Circuit Breakers and Switch racks
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-110 Excavation/
Compaction Works
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-130 Ploy
ethylene Vapour Bariar Sheet and Lean Conreting
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R06-P1-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-100 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-110 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-120 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-140 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R06-P1-POT-150 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-280 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-290 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-300 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-310 Concrete
ENcasement of pipeline
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-320 Pipeline
backfilling
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-330 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-R06-P2-POT-360 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-R06-P3-POT-190 Install
wshout/fire hydrant
Project: 083-C01 Wk-149 Activity: 83-R06-P3-POT-200 Construct
Air Release/ Butter fly Valves and washout chambers
Project: 083-C01 Wk-149 Activity: 83-R06-P3-POT-210 Install Air
release valve /Butter valves
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R1-E1-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R1-E2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R1-P1-LV-11 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R1-P1-LV-1200 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-P1-LV-15 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R1-P1-LV-19 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-520 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-530 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-560 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-570 Installation
of panelboards
Project: 083-C01 Wk-149 Activity: 83-R1-P1-STL-580 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-100 Construction
of Duct Banks including Conduits
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-120 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-130 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-140 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R1-P1-TLC-150 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R1-P2-LV-124 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R1-P2-LV-14 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R1-P2-LV-174 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R1-P2-LV-178 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-P2-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R1-P2-STL-130 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R1-P2-STL-140 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R1-P2-STL-150 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-100 Construction
of Duct Banks including Conduits
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-110 Installation
of Joint Boxes hand holes
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-120 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-130 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-140 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R1-P2-TLC-150 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R1-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R1-RD-110 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R1-RD-120 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R1-RD-130 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R1-RD-140
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R1-RD-150 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R1-RD-160 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R1-RD-170 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R1-RD-180 Backfilling
& Compaction upto Required Level-5 by other RC contractor
Project: 083-C01 Wk-149 Activity: 83-R1-RD-190
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R1-RD-200 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R1-RD-210 Road
Embankment Backfilling upto Level-7 By other R.C Contractor
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R1-W1-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R1-W2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R2-LV-110 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R2-LV-120 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R2-LV-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-100 Site
Preperation Works
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R2-N-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R2-P1-STL-660 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R2-P1-STL-670 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R2-P1-STL-700 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R2-P1-STL-720 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R2-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R2-RD-110 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R2-RD-120 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R2-RD-130 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R2-RD-140
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R2-RD-150 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R2-RD-160 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R2-RD-170 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R2-RD-180
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R2-RD-190 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R2-RD-50 Backfilling &
Compaction by RC contractor upto Required Level-5
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-100 Site
Preperation r Works
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R2-S-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-170 Super
structure works
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-180 Electro-
mechanical Works
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-190 Complete all
finihing works
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-200 Install
allSubstations and panel boards
Project: 083-C01 Wk-149 Activity: 83-R2-SSTN-210 Install
Deisel Genrator Set and automatic \Transsfer Switch
Project: 083-C01 Wk-149 Activity: 83-R3-E1-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R3-E2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-100 Site
Preperation r Works
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R3-E3-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R3-P1-LV-160 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R3-P1-LV-170 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R3-P1-LV-180 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R3-P1-LV-190 Installation
of Main/Low Distribution boards/Circuit Breakers and Switch racks
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-130 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-140 Installation
of panelboards
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-150 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R3-P1-STL-160 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R3-P1-TLC-130 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R3-P1-TLC-150 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R3-P2-LV-110 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R3-P2-LV-120 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R3-P2-LV-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R3-P2-STL-380 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R3-P2-STL-390 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R3-P2-STL-420 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R3-P2-STL-430 Installation
of panelboards
Project: 083-C01 Wk-149 Activity: 83-R3-P2-STL-440 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R3-P2-TLC-120 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R3-P2-TLC-130 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R3-P2-TLC-150 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R3-P3-STL-450 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R3-P3-STL-460 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R3-P3-STL-490 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R3-P3-STL-510 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R3-P3-TLC-100 Installation
of Joint Boxes hand holes
Project: 083-C01 Wk-149 Activity: 83-R3-P3-TLC-110 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R3-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R3-RD-110 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R3-RD-120 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R3-RD-130 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R3-RD-140
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R3-RD-150 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R3-RD-160 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R3-RD-170 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R3-RD-180
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R3-RD-190 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R3-W1-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-110 Excavation/
Backfilling Works
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-120
Backfilling/compaction with Sub base material
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-130 Ploy
ethylene Vapour Bariar Sheet
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-140 Conrete
Linning for base/bottom slab
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-150 Conrete
Linning for Side Slope of channel
Project: 083-C01 Wk-149 Activity: 83-R3-W2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R6-DC-23-140 Dmolition of
existing Culvert
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-560 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-570 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-580
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-590 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-600 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-610 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-620 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-640
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R6-P1-RD-650 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R6-P1-STL-100 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R6-P1-STL-120 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R6-P1-STL-140 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R6-P1-STL-160 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R6-P1-TLC-120 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R6-P1-TLC-140 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-100 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-110 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-120 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6-P2-LV-140 Installation
of Main/Low Distribution boards/Circuit Breakers and Switch racks
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-110 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-120 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-130 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-140
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-150 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-160 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-170 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-180
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R6-P2-RD-190 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-130 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-140 Installation
of panelboards
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-150 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R6-P2-STL-160 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R6-P2-TLC-140 Installation
of Joint Boxes hand holes
Project: 083-C01 Wk-149 Activity: 83-R6-P2-TLC-160 Laying of
Fiber Optic Cables and Splicing
Project: 083-C01 Wk-149 Activity: 83-R6-P2-TLC-180 Installation
of FDT's and FOC Closures
Project: 083-C01 Wk-149 Activity: 83-R6-P3-LV-100 Construction
of Duct Banks
Project: 083-C01 Wk-149 Activity: 83-R6-P3-LV-110 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R6-P3-LV-120 LVcable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R6-P3-LV-130 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6-P3-LV-140 Installation
of Main/Low Distribution boards/Circuit Breakers and Switch racks
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-100 Install
Spare Sleeves
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-110 Laying
/poring of Sub-base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-120 Laying of
Curbstone works
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-130 Laying/
Poring of Base coarse
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-140
Laying/Poring of Asphalt Concrete Base Course
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-150 Laying of
AEP
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-160 Installation
of Guard Rails/Barriers
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-170 Installation
of road markings/Road Specialities /Monuments
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-180
Laying/Poring of Asphalt Concrete Sarface Course
Project: 083-C01 Wk-149 Activity: 83-R6-P3-RD-190 Pour /
Filling of Gravel mulch
Project: 083-C01 Wk-149 Activity: 83-R6-P3-SSTN-110 Super
structure works
Project: 083-C01 Wk-149 Activity: 83-R6-P3-SSTN-120 Electro-
mechanical Works
Project: 083-C01 Wk-149 Activity: 83-R6-P3-SSTN-130 Complete all
finihing works
Project: 083-C01 Wk-149 Activity: 83-R6-P3-SSTN-140 Install
allSubstations and panel boards
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-100 Construction
of Duct banks
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-110 Installation
of Manhole/hand holes/pullboxes
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-120 Construct
and Install Street Light Foundations
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-130 Excavation
and Cable laying street lighting system
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-140 Installation
of Signal posts and Streetlight poles
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-150 Installation
of panelboards
Project: 083-C01 Wk-149 Activity: 83-R6-P3-STL-160 Installation
of Street lighting fixtures and signal controlers/Signal Heads
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-140 Construction
of Duct Banks & RMU
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-150 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-160 MV cable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-170 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-180 Construction
of Duct Banks & RMU
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-190 Excavation
for cable laying
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-200 MV cable
laying including (Grounding cable,fiber cable& Splicing)
Project: 083-C01 Wk-149 Activity: 83-R6-P4-MV-210 Backfilling
and compaction
Project: 083-C01 Wk-149 Activity: 83-R6P2-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-R6P3-OC-160 Compaction
with 150 mm Aggregate protection @ sides
Project: 083-C01 Wk-149 Activity: 83-Rd1-S1-SAN-120 Construct
and install WO and CO.Chamber
Project: 083-C01 Wk-149 Activity: 83-Rd1-S1-SAN-140 Construct
Air Release Chambers
Project: 083-C01 Wk-149 Activity: 83-Rd1-S1-SAN-170 Install Air
Release and Gate Valves
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-260 Construct
and install WO and CO.Chamber
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-270 Construct
Air Release Chambers
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-280 Laying of
Warning tape /backfilling and compaction
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-290 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-300 Install Pipe
Sleeves
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-310 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-320
Excavationfor Pipeline
Project: 083-C01 Wk-149 Activity: 83-Rd6-P2-SAN-330 Install Air
Release and Gate Valves
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-110
Excavationfor Pipeline
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-130 Construct
and install WO and CO.Chamber
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-140 Install Pipe
Sleeves
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-150 Pipe laying
and jointing
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-160 Hydrotesting
of pipe installed
Project: 083-C01 Wk-149 Activity: 83-Rd6-P3-SAN-170 Laying of
Warning tape /backfilling and compaction
Project: 083-C01 Wk-149 Activity: 83-SBMT-RDW-150 Control and
Survey Monuments
Project: 083-C01 Wk-149 Activity: 83-SBMT-RDW-160 Pavement
Markers
Project: 083-C01 Wk-149 Activity: 83-SBMT-RDW-170 Road Signs
Project: 083-C01 Wk-149 Activity: 83-TST-100 Complete Testing
and commisioning of SWWC System
Project: 083-C01 Wk-149 Activity: 83-TST-110 Complete Testing
and commisioning of Potable Distribution System
Project: 083-C01 Wk-149 Activity: 83-TST-120 Complete Testing
and commisioning of all Electrical System
Project: 083-C01 Wk-149 Activity: 83-TST-130 Complete Testing
and commisioning of all Telecommunication System
Project: 083-C01 Wk-149 Activity: 83-TST-140 Complete Testing
and commisioning of Road Works
Project: 083-C01 Wk-149 Activity: 83-TST-150 Complete Testing
and commisioning of Storm Drainage system
Project: 083-C01 Wk-149 Activity: 83-TST-160 Complete /Finish
all construction for Arch Culveverts
Project: 083-C01 Wk-149 Activity: 83-TST-170 installation of
road markings/Road SIGNS
Project: 083-C01 Wk-149 Activity: C83-LST-120 Installation of
Chain Link Fence Including Footing , Grade Beam, Waterproofing and All Accessories
Complete
Project: 083-C01 Wk-149 Activity: C83-LST-150 Installation of
Equipment, Submersible Pump, Odor Removal System ,Gen Set and All Accessories
Complete

Activities with unsatisfied constraints..........................7


Project: 083-C01 Wk-149 Activity: 83-MIL-150 Complete Site
Utilities pipeline (PFW/SWW)
Project: 083-C01 Wk-149 Activity: 83-MIL-160 Complete
Telecommunication System,MV/LV Distribution/ Road Lighting
Project: 083-C01 Wk-149 Activity: 83-MIL-170 Complete Road
Networks
Project: 083-C01 Wk-149 Activity: 83-MIL-180 Complete Power and
Telecommunication connection with SEC and STC
Project: 083-C01 Wk-149 Activity: 83-MIL-190 Complete All
Remaining Works Inculding Testing and Commissioning,Cleanup,Closeout
Documentatation and Ready for I/A
Project: 083-C01 Wk-149 Activity: 83-MIL-200 Complete
Demobilization
Project: 083-C01 Wk-149 Activity: 83-NWACT-R3-P3-100
Handover the Area from (FEMCO) & Backfiled & Compacted upto Level +5 by Other
R.C Contractor (AL-Hajri)

Activities with unsatisfied relationships........................0

Activities with external dates...................................1


Project: 083-C01 Wk-149 Activity: 83-TST-120 Complete Testing
and commisioning of all Electrical System