"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA IE PRIMARIA Y SECUNDARIA N17524 SAN AGUSTI N - BELLAVISTA - JAE N -

CAJAMARCA

DESCRIPCION UND

ESTRUCTURAS
MOVIMIENTO DE TIERRAS
TRAZO NIVELES Y REPLANTEO C/ EQUIPO m3 120.00
EXCAVACION MANUAL PARA ZAPATA m3 47.18
EXCAVACION MANUAL PARA VIGAS DE CIMENTACION/CONEXIO N m3 12.00
EXCAVACION MANUAL PARA SOBRECIMIENTO m3 2.57
EXCAVACION MANUAL PARA CISTERNA m3 11.17
RELLENO CON MATERIAL PROPIO SELECCIONADO m3 34.68
OBRAS DE CONCRETO SIMPLE
CONCRETO CICLO PEO 1:10 + 30%PM m3 20.89
CONCRETO 1:12 PARA SOLADO m3 4.21
FALSO PISO E=4" DE CONCRETO 1:8 C:H m2 111.00
OBRAS DE CONCRETO ARMADO
VIGAS DE CIMENTACIO N
CONCRETO F'C= 210 KG/CM2. EN VIGAS DE CIMENTACIO N m3 10.19
CONCRETO F'C= 210 KG/CM2. EN MURO DE CONTENCION m3 2.30
ACERO F'Y= 4200Kg/cm2 kg 1,285.32
ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION LINEAL m2 67.90
ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 24.38
SOBRECIMIENTOS
CONCRETO F'C= 210 KG/CM2. EN SOBRECIMIENTOS m3 4.88
ACERO F'Y= 4200Kg/cm2 kg 266.75
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 65.10
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 Kg/cm2 m3 5.54
ACERO F'Y= 4200Kg/cm2 kg 1,778.59
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 67.04
VIGAS
CONCRETO EN VIGAS F'C=210 Kg/cm2 m3 6.86
ACERO F'Y= 4200Kg/cm2 kg 1,038.81
ENCOFRADO Y DESENCOFRADO DE VIGAS LINEAL m2 38.42
ESCALERA
CONCRETO EN ESCALERA F'C=210 Kg/cm2 m3 2.20
LOSA ALIGERADA
CONCRETO EN LOSA ALIGERADA F'C=210 Kg/cm2 m3 7.89
ACERO F'Y= 4200Kg/cm2 kg 614.93
LADRILLO HUECO DE ARCILLA 15X30X30 P/TECHO ALIGERADO pza 748.00

GOBIERNO REGIONAL DE CAJAMARCA-GERENCIA SUB REGIONAL JAEN


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. PRIMARIA Y SECUNDARIA N17524 SAN AGUSTI N - BELLAVISTA -JAE N - CAJAMARCA

MEDIDAS
DESCRIPCION UND CANT. PARCIAL TOTAL
LARGO ANCHO ALTO

ESTRUCTURAS
MOVIMIENTO DE TIERRAS
TRAZO NIVELES Y REPLANTEO C/ EQUIPO m2 120.00
1.00 20.00 6.00 - 120.00

EXCAVACION MANUAL PARA ZAPATA m3 47.18


TIPO
Z-1 11.00 1.50 1.50 1.70 42.08
Z-2 1.00 1.20 2.50 1.70 5.10

EXCAVACION MANUAL PARA VIGAS DE CIMENTACION/CONEXIN m3 12.00

EJES 1-1, 2-2 2.00 11.30 0.30 1.00 6.78


EJE A-A 1.00 2.00 0.30 1.00 0.60
EJE B-B,C-C,D-D,E-E 4.00 3.10 0.30 1.00 3.72
EJE F-F 1.00 3.00 0.30 1.00 0.90

EXCAVACION MANUAL PARA SOBRECIMIENTO m3 2.57

SSHH 1.00 3.05 0.40 1.10 1.34


ESCALERA 1.00 2.80 0.40 1.10 1.23

EXCAVACION MANUAL PARA CISTERNA m3 11.17

CISTERNA 1.00 1.90 2.40 2.45 11.17

RELLENO CON MATERIAL PROPIO SELECCIONADO m3 34.68


AREA TOTAL OCUAPDA POR ESTRUCTURAS m3 -38.24

AREA OCUPADA POR ZAPATAS m3 -24.98


Z-1 -11.00 1.50 1.50 0.90 -22.28
Z-2 -1.00 1.20 2.50 0.90 -2.70

AREA OCUPADA POR VIGAS DE CIMENTACION m3 -10.77


EJES 1-1, 2-2 -2.00 20.00 0.30 0.50 -6.00
EJE A-A -1.00 5.30 0.30 0.50 -0.80
EJE B-B,C-C,D-D,E-E -4.00 5.30 0.30 0.50 -3.18
EJE F-F -1.00 5.30 0.30 0.50 -0.80

AREA OCUPADA POR SOBRECIMIENTOS m3 -2.49


EJES 1-1, 2-2 -2.00 20.00 0.15 0.30 -1.80
EJE A-A -1.00 0.50 0.15 0.30 -0.02
EJE E-E -1.00 3.50 0.15 0.30 -0.16
EJE F-F -1.00 5.30 0.15 0.30 -0.24
SSHH -1.00 3.30 0.15 0.30 -0.15
ESCALERA -1.00 2.80 0.15 0.30 -0.13

OBRAS DE CONCRETO SIMPLE


CONCRETO CICLPEO 1:10 + 30%PM m3 20.89
ZAPATAS
Z-1 11.00 1.50 1.50 0.70 17.33
Z-2 1.00 1.20 2.50 0.70 2.10
CIMIENTO CORRIDO
SSHH 1.00 3.30 0.40 0.60 0.79
ESCALERA 1.00 2.80 0.40 0.60 0.67

CONCRETO 1:12 PARA SOLADO m3 4.21


ZAPATAS
Z-1 11.00 1.50 1.50 0.10 2.48
Z-2 1.00 1.20 2.50 0.10 0.30
VIGAS DE CIMENTACION
EJES 1-1, 2-2 2.00 11.30 0.30 0.10 0.68
EJE A-A 1.00 2.00 0.30 0.10 0.06
EJE B-B,C-C,D-D,E-E 4.00 3.10 0.30 0.10 0.37
EJE F-F 1.00 3.00 0.30 0.10 0.09
SSHH 1.00 3.05 0.40 0.10 0.12
ESCALERA 1.00 2.80 0.40 0.10 0.11

FALSO PISO E=4" DE CONCRETO 1:8 C:H m2 111.00

1.00 AREA= 111.00 111.00

OBRAS DE CONCRETO ARMADO


VIGAS DE CIMENTACIN
CONCRETO F'C= 210 KG/CM2. EN VIGAS DE CIMENTACIN m3 10.19

EJE 1-1 Y 2-2


2.00 18.20 0.30 0.50 5.46
EJE A-A
1.00 5.00 0.30 0.50 0.75
EJE B-B, C-C, D-D, E-E, F-F
5.00 5.30 0.30 0.50 3.98
MURO DE CONTENCION
CONCRETO F'C= 210 KG/CM2. EN MURO DE CONTENCION m3 2.30
EJE F-F
1.00 5.30 0.25 2.30 2.30

ACERO F'Y= 4200Kg/cm2 kg 1,285.32


VIGAS DE CIMENTACION
EJE 1-1, Y 2-2
cant. N Vec. Long.(m) kg/m
Acero longitudinal: 5 de 5/8" 2.00 5.00 20.64 1.55 319.92
Estribos: 3/8" 1@0.05, RTO @0.15 m 2.00 116.00 1.40 0.56 181.89

EJE A-A, B-B, C-C, D-D, E-E, F-F


cant. N Vec. Long.(m) kg/m
Acero longitudinal: de 5/8" 6.00 5.00 6.64 1.55 308.76
Estribos: 3/8" 1@0.05, RTO @0.15 m 6.00 34.00 1.40 0.56 159.94

MURO DE CONTENCION
EJE F-F
cant. N Vec. Long.(m) kg/m
Acero longitudinal: de 1/2" @0.20m 2.00 27.00 3.12 0.99 166.80
Acero Transversal: de 1/2" @0.20m 2.00 14.00 5.34 0.99 148.02

ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION LINEAL m2 67.90

VIGAS LARGO CARAS ALTURA

EJE 1-1 Y 2-2


2.00 18.20 2.00 0.50 36.40
EJE A-A
1.00 5.00 2.00 0.50 5.00
EJE B-B, C-C, D-D, E-E, F-F
5.00 5.30 2.00 0.50 26.50

ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 24.38


1.00 5.30 2.00 2.30 24.38
SOBRECIMIENTOS
CONCRETO F'C= 210 KG/CM2. EN SOBRECIMIENTOS m3 4.88

EJE 1-1 Y 2-2


2.00 18.20 0.15 0.70 3.82
EJE A-A
1.00 0.50 0.15 0.70 0.05
SSHH
1.00 4.05 0.15 0.70 0.43
ESCALERA
1.00 2.80 0.15 0.70 0.29
DIVICION DORMITORIO
1.00 2.75 0.15 0.70 0.29

ACERO F'Y= 4200Kg/cm2 kg 266.75

EJE 1-1, 2-2 ENTRE EJE B Y C (CORTE 1-1) cant. N Vec. Long.(m) kg/m
Acero longitudinal de 1/2"@0.20m 3.00 4.00 4.24 0.99 50.37
Acero transversal: 1/2"@0.20m 3.00 21.00 1.26 0.99 78.59

EJE 1-1, 2-2 ENTRE EJE C Y D (CORTE 1-1) cant. N Vec. Long.(m) kg/m
Acero longitudinal de 1/2"@0.20m 2.00 4.00 3.64 0.99 28.83
Acero transversal: 1/2"@0.20m 2.00 19.00 1.26 0.99 47.40

EJE 1-1 ENTRE EJE D Y E (CORTE 1 - 1) cant. N Vec. Long.(m) kg/m


Acero longitudinal de 1/2"@0.20m 1.00 4.00 2.64 0.99 10.45
Acero transversal: 1/2"@0.20m 1.00 14.00 1.26 0.99 17.46

EJE 1-1 ENTRE EJE E Y F (CORTE 1 - 1) cant. N Vec. Long.(m) kg/m


Acero longitudinal de 1/2"@0.20m 1.00 4.00 3.14 0.99 12.43
Acero transversal: 1/2"@0.20m 1.00 17.00 1.26 0.99 21.21

ENCOFRADO m2 65.10

LARGO CARAS ALTURA


EJE 1-1 Y 2-2
2.00 18.20 2.00 0.70 50.96
EJE A-A
1.00 0.50 2.00 0.70 0.70
SSHH
1.00 4.05 2.00 0.70 5.67
ESCALERA
1.00 2.80 2.00 0.70 3.92
DIVICION DORMITORIO
1.00 2.75 2.00 0.70 3.85

COLUMNAS
CONCRETO EN COLUMNAS F'C=210 Kg/cm2 m3 5.54

TIPO SECCION
C-1 12.00 0.35 0.30 4.10 5.17
C-2 1.00 0.15 0.30 4.10 0.18
C-3 1.00 0.30 0.15 4.10 0.18

ACERO F'Y= 4200Kg/cm2 kg 1,778.59

COLUMNA C1 Cant. N Vec. Long.(m) kg/m


Acero vertical: 6 aceros de 3/4" 12.00 6.00 9.00 2.24 1,451.52
Estribos: 3/8":1@.05, 8@.10, Rto.@.25 A/S 12.00 24.00 1.12 0.56 180.63

COLUMNA C2 Cant. N Vec. Long.(m) kg/m


Acero vertical: aceros de 5/8" 1.00 4.00 9.00 1.55 55.80
Acero vertical: aceros de 1/2" 1.00 2.00 9.00 0.99 17.82
Estribos: 3/8":1@.05, 8@.10, Rto.@.25 A/S 1.00 24.00 0.72 0.56 9.68

COLUMNA C3 Cant. N Vec. Long.(m) kg/m


Acero vertical: aceros de 1/2" 1.00 6.00 9.00 0.99 53.46
Estribos: 3/8":1@.05, 8@.10, Rto.@.25 A/S 1.00 24.00 0.72 0.56 9.68

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 67.04

COLUMNA C1
EJE 1-1, 2-2 ENTRE EJE B Y E 8.00 PERIM= 1.00 4.10 32.80
C1 ESQUINERAS 3.00 PERIM= 1.00 4.10 12.30
C1 EJE A-A 1.00 PERIM= 1.00 4.10 4.10

COLUMNA C2 1.00 PERIM= 0.75 4.10 3.08

COLUMNA C3 6.00 PERIM= 0.60 4.10 14.76

VIGAS
CONCRETO EN VIGAS F'C=210 Kg/cm2 m3 6.86

TIPO
VP-1
6.00 6.00 0.30 0.40 4.32

VIGA VOLADO VB-1


1.00 4.69 0.20 0.20 0.19

VB-1 ENTRE EJE D Y E


1.00 2.70 0.20 0.20 0.11

VB-1 ENTRE EJE E Y F


1.00 4.20 0.20 0.20 0.17

VB-1 AMARRE DUCTO DE ESCALERA


1.00 1.00 0.20 0.20 0.04

VCH - 1 EJES 1-1, 2-2


2.00 18.20 0.25 0.20 1.82

VCH - 1 ENTRE EJES B, C


1.00 4.30 0.25 0.20 0.22

ACERO F'Y= 4200Kg/cm2 kg 1,038.81

TIPO
VP -1 Cant. N Vec. Long.(m) kg/m
Acero longitudinal Superior: 3/4" 6.00 2.00 6.44 2.24 173.11
Acero longitudinal Superior (Acero Negativo Bastones): 3/4" 6.00 2.00 1.80 2.24 48.38
Acero longitudinal Inferior: 3/4" 6.00 2.00 6.44 2.24 173.11
Acero longitudinal Inferior ( Acero Positivo ): 3/4" 6.00 1.00 3.90 2.24 52.42
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 6.00 39.00 1.36 0.56 178.21

VCH-1 EJES 1-1, 2-2 Cant. N Vec. Long.(m) kg/m


Acero longitudinal Superior: 1/2" 2.00 2.00 19.94 0.99 78.96
Acero longitudinal Superior ( Acero Negativo): 1/2" 2.00 1.00 9.59 0.99 18.99
Acero longitudinal Inferior: 1/2" 2.00 2.00 19.94 0.99 78.96
Acero longitudinal Inferior ( Acero Positivo): 1/2" 2.00 1.00 13.20 0.99
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 2.00 132.00 0.84 0.56 124.19

VCH-1 ENTRE EJES B Y C Cant. N Vec. Long.(m) kg/m


Acero longitudinal Superior: 1/2" 1.00 2.00 4.44 0.99 8.79
Acero longitudinal Superior ( Acero Negativo): 1/2" 1.00 2.00 1.20 0.99 2.38
Acero longitudinal Inferior: 1/2" 1.00 2.00 4.44 0.99 8.79
Acero longitudinal Inferior ( Acero Positivo): 1/2" 1.00 1.00 3.30 0.99
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 1.00 30.00 0.84 0.56 14.11

VB-1 ENTRE EJES D Y E


Acero longitudinal Superior: 1/2" 1.00 2.00 2.84 0.99 5.62
Acero longitudinal Inferior: 1/2" 1.00 2.00 2.84 0.99 5.62
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 1.00 22.00 0.84 0.56 10.35

VB-1 ENTRE EJES E Y F


Acero longitudinal Superior: 1/2" 1.00 2.00 3.34 0.99 6.61
Acero longitudinal Inferior: 1/2" 1.00 2.00 3.34 0.99 6.61
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 1.00 26.00 0.84 0.56 12.23

VB-1 VOLADO
Acero longitudinal Superior: 1/2" 1.00 2.00 4.83 0.99 9.56
Acero longitudinal Inferior: 1/2" 1.00 2.00 4.83 0.99 9.56
Estribos: 3/8" 2@0.05, 4@0.10, 4@0.15 RTO @0.20 m A/S 1.00 26.00 0.84 0.56 12.23

ENCOFRADO Y DESENCOFRADO DE VIGAS LINEAL m2 38.42

TIPO
LARGO CARAS ALTURA
VP-1
6.00 5.70 2.00 0.40 27.36
VIGA VOLADO VB-1
1.00 4.69 2.00 0.20 1.88

VB-1 ENTRE EJE D Y E 0.00


1.00 2.70 1.00 0.20
0.00
VB-1 ENTRE EJE E Y F
1.00 4.20 1.00 0.20 0.84

VB-1 AMARRE DUCTO DE ESCALERA


1.00 1.00 1.00 0.20 0.20

VCH - 1 EJES 1-1, 2-2


2.00 18.20 1.00 0.20 7.28

VCH - 1 ENTRE EJES B, C


1.00 4.30 1.00 0.20 0.86

ESCALERA
CONCRETO EN ESCALERA F'C=210 Kg/cm2 m3 2.20

CIMIENTO ESCALERA 1.00 0.60 1.10 1.00 0.66

ANCHO
I 1.00 AREA= 0.16 1.10 0.176
II 1.00 AREA= 0.22 1.10 0.242
III 1.00 AREA= 0.62 1.10 0.682
IV 20.00 AREA= 0.02 1.10 0.440

LOSA ALIGERADA
CONCRETO EN LOSA ALIGERADA F'C=210 Kg/cm2 m3 7.89
AREA
PRIMER NIVEL 1.00 A1= 23.65 0.20 2.08
1.00 A2= 19.28 0.20 1.70
1.00 A3= 20.35 0.20 1.79
1.00 A4= 11.07 0.20 0.97
1.00 A5= 15.41 0.20 1.36

ACERO F'Y= 4200Kg/cm2 kg

PRIMER NIVEL cant. N Vec. Long.(m) kg/m 614.93


ACERO SUPERIOR ENTRE EJES A Y B
1 1/2" 1.00 2.00 2.40 0.99 5.13
ACERO INFERIOR ENTRE EJES A Y B
1 1/2" 1.00 2.00 5.90 0.99 12.62
13/8" 1.00 2.00 5.90 0.56 7.14

ACERO SUPERIOR ENTRE EJES C Y D


1 1/2" 1.00 2.00 2.00 0.99 4.28
ACERO INFERIOR ENTRE EJES C Y D
1 1/2" 1.00 2.00 4.15 0.99 8.87
13/8" 1.00 2.00 4.15 0.56 5.02

ACERO SUPERIOR ENTRE EJES E Y F


1 1/2" 1.00 2.00 2.00 0.99 4.28
ACERO INFERIOR ENTRE EJES E Y F
1 1/2" 1.00 2.00 3.60 0.99 7.70
13/8" 1.00 2.00 3.60 0.56 4.35

ACERO SUPERIOR ENTRE EJES A Y F


1 1/2" 1.00 7.00 10.40 0.99 77.84
ACERO INFERIOR ENTRE EJES A Y F
1 1/2" 1.00 7.00 20.23 0.99 151.41
13/8" 1.00 7.00 20.23 0.56 85.65

ACERO SUPERIOR ENTRE EJES A Y E


1 1/2" 1.00 3.00 9.40 0.99 30.15
ACERO INFERIOR ENTRE EJES A Y E
1 1/2" 1.00 3.00 18.85 0.99 60.46
13/8" 1.00 3.00 18.85 0.56 34.20

ACERO DE TEMPERATURA cant. N Vec. Long.(m) kg/m


1 1/4" 1.00 78.00 5.50 0.25 115.83

LADRILLO HUECO DE ARCILLA 15X30X30 P/TECHO ALIGERADO pza 748.00


LADRIL LOS/
M2

AREA
DE 89.76 8.33 748.00
LOSA=