Вы находитесь на странице: 1из 1

1'-6"

1'-6"
ST.CASE HEAD lvl. : D+2'0" ST.CASE HEAD
lvl. : D+2'0"

6"
2' 2' ROOMLEVEL ROOMLEVEL

5'
D
5'

1'-6"
LVL.: B+P.P lvl. : A+6''
PARAPET LEVEL PARAPET LEVEL SARVAKAM

1'-6"

3'

3'

3'
3'

3'

10" 1'-6"
A 1'-6"
FIRST FLOOR
MO: +91-9425794227

3'
FIRST FLOOR
ROOF LEVEL

6" 1'
ROOF LEVEL
1'-6"

2'

2'-7"
lvl.: A+1'6'' FIRST FLOOR

6"

3'
(1). DO NOT SCALE THIS DRAWING FOLLOW
LINTEL LEVEL
B lvl.:+1'0'' lvl.:+1'0'' FIRST FLOOR WRITTEN DIMENSIONS ONLY.

5"
(ONLY FOR FRONT ELE) (2). ANY DISCREPANCY IN THE DRAWING SHOULD BE
LINTEL LEVEL IMMEDIATELY BROUGHT TO THE NOTICE OF
lvl.+2''(p.p) ARCHITECT, PRIOR TO THE CONSTRUCTION.

6'
6'

4'-6"

4'-6"
(3). BAD WORKMANSHIP WILL BE SOLE RESPONSIBILITY
OF CLIENT & CONTRACTOR.

10'-8"
FIRST FLOOR FIRST FLOOR

2'-1" 5"
SILL LEVEL SILL LEVEL
C

2'-6"

2'-6"
2'
(1). THE PROPER SOIL INVESTIGATION HAS BEEN CARRIED
2'-6"

2'

OUT FOR DETERMINING THE SAFE BEARING CAPACITY.


GROUND FLOOR GROUND FLOOR

6"
(2). THE SOIL SHOULD NOT LIABLE TO LIQUEFACTION DUE
6"

DUE TO EARTHQUAKES.
ROOF LEVEL ROOF LEVEL

2'-2"
2'-7"
(3). THE SOIL SHOULD NOT LIABLE TO LANDSLIDE HAZARD.

3'
3'

lvl.+2''(p.p)

10"
lvl.+2''(p.p)
10"

10" lvl.: C+1'6'' lvl.:+1'0'' GROUND FLOOR

5"
GROUND FLOOR P1. IT IS MANDATORY TO REMOVE ALL LOOSE SOIL TILL
LINTEL LEVEL LINTEL LEVEL THE FIRM SOIL IS REACHED.
P2. BACK FILLING AROUND THE FOUNDATIONS SHALL BE

LVL.: C+6''

4'-6"

4'-6"
4'-6"

4'-6"

CARRIED OUT USING SOIL,SAND WITHOUT GRAVEL AND


1'-6" PEBBLES.
1'
P3. IT IS ADVISABLE TO ALLOW STANDING WATER IN THE
1' EXCAVATION TRENCHES FOR 24 HOURS. WHEN THE
GROUND FLOOR GROUND FLOOR

5"
1'-6" SURFACE IS SEMIDRY, HAND RAMMING SHALL BE CARRIED
SILL LEVEL SILL LEVEL OUT WITH AT LEAST 6 TO 8 PASSES.

2'-6"
2'-6"

P4. BACK FILLING OF BASEMENT WALLS SHALL BE DONE

3'-7"
ONLY AFTER THE ROOF SLAB HAS BEEN DEPROPPED.
PLINTH LEVEL
4'

PLINTH LEVEL P5. IN NORMAL CIRCUMSTANCES AND WHERE ORDINARY

1'-6"
1'-6"

PORTLAND CEMENT IS USED, FORMS MAY GENERALLY BE


G.L. G.L. REMOVED AFTER THE EXPIRY OF THE FOLLOWING PERIODS
* WALLS, COLUMNS AND VERTICAL
FACES OF ALL MEMBERS 36 TO 48 HOURS

FRONT ELEVATION LEFT SIDE ELEVATION * SLABS (PROPS LEFT UNDER)


* BEAM SOFFITS (PROPS LEFT UNDER)
* REMOVAL OF PROPS UNDER SLABS
-SPANNING UP TO 4500
3 DAYS
7 DAYS

7 DAYS
-SPANNING OVER 4500 14 DAYS
* REMOVAL OF PROPS UNDER BEAMS
-SPANNING UP TO 6000 14 DAYS
1'-6"

1'-6"

6" 1'
-SPANNING OVER 6000 21 DAYS
lvl. : D+2'0" ST.CASE HEAD ST.CASE HEAD
2' 2'
ROOMLEVEL ROOMLEVEL
5'

5'-4"
D

5'
PARAPET LEVEL PARAPET LEVEL

5"
lvl.:+1'0''
3'

3'
5'-7"

FIRST FLOOR FIRST FLOOR

5'-6"
ROOF LEVEL ROOF LEVEL
3'

3'

lvl.:+1'0'' lvl.:+1'0'' lvl.:+1'0'' FIRST FLOOR lvl.:+1'0'' lvl.:+1'0''


5"

FIRST FLOOR

5"
LINTEL LEVEL LINTEL LEVEL
2'
4'-6"

5"

4'-6"

3'-8"
FIRST FLOOR
lvl.:+1'0''

5"
FIRST FLOOR
SILL LEVEL SILL LEVEL
2'-6"

7'-2"

2'-6"

GROUND FLOOR GROUND FLOOR

5'-6"
ROOF LEVEL ROOF LEVEL
3'

3'

lvl.:+1'0'' lvl.:+1'0'' lvl.:+1'0'' lvl.+2''(p.p) GROUND FLOOR lvl.: +1'6'' lvl.:+1'0''


5"

lvl.:+1'0'' GROUND FLOOR

5"
LINTEL LEVEL LINTEL LEVEL
2'

lvl.+2''(p.p)
4'-6"

5"

4'-6"

6'-4"
GROUND FLOOR GROUND FLOOR
4'-7"

SILL LEVEL SILL LEVEL


2'-6"

2'-6"

PLINTH LEVEL PLINTH LEVEL


1'-6"

1'-6"

1'-6"

1'-6"
G.L. G.L.

REAR ELEVATION RIGHT SIDE ELEVATION

Вам также может понравиться