Guided By:
Mr.KESHAV KUMAR
Sr.instrutor
TL/AC
CETI, Thakurli
1
PROJECT REPORT ON
NEUTRAL SECTION
:PRINCIPAL:
MR. YASHWANT URHEKAR
CETI , Thakurli
:Guided By:
:COURCE CO-ORDINATOR:
2
TABLE OF CONTENTS
01 Acknowledgement 04
02 Project team 05
03 Certificate 06
04 Introduction of LHB 07
11 Power Car(LHB) 30
3
ACKNOWLEDGEMENT
Project Team
4
Project Team
5
CERTIFICATE
Signature of principal:
6
LHB TYPE COACH
7
Advantages of LHB Coaches
Mechanical Advantages
Modern designs of vestibule for inter car connection.
Anti climbing feature to prevent climbing off during collision.
Four emergency window are provided per coach.
Coach length is increase by about 1.7 m to provide extra carrying capacity.
Length of ICF coach is 21337 mm (21.3 meter)where as LHB coach is
23040 mm (23.04 meter) . This extra length means two additional rows of
chairs in chair cars or one additional bay in sleeper coaches.
1 AC 18 to 24
2 AC 46 to 54
3 AC 64 to 72
Electrical Advantages
Low noise, microprocessor controlled AC unit.
Light weight epoxy molded 60 KVA Transformer.
Integrated modular single switchboard with controls of AC lighting.
Provision of FRLS cables.
Uniformity of illumination.
IGBT based battery charger used.
Humidity control sensor provided.
Temp control in seven step.
8
POWER SUPPLY ARRANGEMENT
The power system for the coach has been designed to feed the
various electrical loads in the system operating at different voltage. There will be
following voltage system for feeding the various electrical loads.
The coach will select the input supply from either of the two feeders
available on the coach at 750 V Three phase supply through disconnecting and
earthing device provided in which board cabinet.
The 750 V 3 phase supply is stepped down to 415 V ,3- phase supply
with the help of one 60 KVA epoxy cast and encapsulated transformer, which is
provided on the under-frame of the coach.
The electrical equipment of roof mounted package units, exhaust fans and
pump equipment are supplied with 415 V, 3-phase supply received from 60
KVA transformer.
The lights, electric razors socket etc. shall be supplied at 110 V, single
phase AC received from regulated battery charger.
9
The 110 V DC is used for supplying control for roof mounted package unit ,
anti-skid device, light control, emergency lights, telephone, night lights,
berth reading lights, power contactors control etc.
All the equipment above 250 V shall be earthed at two places and below
250 V at one place. Voltage segregation shall be ensured during wiring.
The system will have earth fault/earth leakage protection to disconnect the
supply automatically, if the earth fault current exceeds the limit of current
for keeping the contact potential within reasonable limits.
10
FEEDER JUNCTION BOX
11
Disconnecting and Earthing Device
Disconnecting and earthing device is provided in switch board cabinet and is fed 750
V from power car through ZS couplings. It has two positions ON & EARTH. It
disconnects coach feed at 750V in case of emergency like contactor jamming and
earths the coach for maintenance even during running of coaches.
Capacity : 120Amp.
12
Summary of technical specification of LHB Coaches Electrical
Equipments
INTER VEHICULAR COUPLER ASSEMBLY
: control wires-25Amp
: Neutral wires-95 Sq mm
: Earth wires-70 Sq mm
13
MAIN FEEDER FUSE
protection also.
light.
Setting : As above
LIGHTING TRANSFORMER
14
COACH LIGHTING
Type
15
The inverter for fluorescent lamp
Normal input voltage :110v AC/50Hz (88-138 v Range )
: 0-60 w/12v
16
60 KVA TRANSMORMER
Location : Underframe
Class of Insulation : H
Connections : Star-Star
17
PUMP
Discharge : 38 LPM
18
BATTERY
19
Pressure valve self releasing pressure regulating valve
20
EXHAUST FAN
Purpose to exhaust the coach air to atmosphere in order to dilute the carbon
dioxide concentration & to make toilet & corridor portion indirectly air
conditioned. Location for exhaust toilet, control panel & mini pantry equipment
area.
RMPU UNIT
Nos. of RMPU unit in each coach 2 units (2 X 5 Ton ) capacity each in power car
only one unit.
BLOWER MOTOR
21
CONDENSER MOTOR
COMPRESSOR
FILTERS
22
MINI PANTRY EQUIPMENT
HOT CASE
23
BOTTLE COOLER
24
DEEP FREEZER
25
K15 Light control relay (DC light)
K27 Controller OK
26
LHB AC COACHES FUSES
27
F94/95/96=1 Amp MMR net 2-750V
ALTERNATOR
KVA-500/400KW
750Volts , 3 Phase,1500RPM
Amps-385
Extitation=45V
ALTERNATOR PROTECTION
ENGINE
BHP-490
28
SAFETY DEVICE FOR ENGINE
STATRER MOTOR
Rotation-clockwise
STARTER BATTERIES
24 Volts
THROTTLE MOTOR
OVR RELAY
Input-750
29
RADIATOR MOTOR
415 Volts
40 H.P
54 Amps
Radiator Starter-Star/Delta
VENTILATION FAN
415 Volts
5 KW
Duty-51
ACB
Making capacity=25KA
Breaking capacity=50KA
TRANSFORMER (Delta)
Input-750V
Output-415V
Current
Primary-42.2A
30
Secoundary-83.4A
Take a round in every 60 minutes in the engine room to check whether all
equipments are working normally & enter the reading in the log book in
every one hour.
Always keep your tool box ready with you. Check expiry date of fire
extinguisher.
As & when you get a chance e.g at halt station. Check the under frame.
Keep the power car clean & tidy. Do not keep inflammable articles & ensure
that there is no oil spilled in power car. Always use tin containers for
storing oil etc.
Do record the reason in the log book if standby engine has to be started
enroute.
Ensure that all the HRC fuses are of proper rating and all the indicator
lamps are in working condition.
-----------------------------------------------------------------------------------------------------------------------------------------
31
Equipments Details
MMR 03 Nos
Compressors 04 Nos.
Microprocessor 01 No.
32
Capacitor Bank 01 No.
Refrigerator 01 No.
33