PROJECT PROPOSAL ON CONTINUOUS IMPROVEMENT PLAN

SCHOOL INTERVENTION ON CHILD AGAINST


PROJECT TITLE DROPPED OUT PROGRAM ( SICAD)
PROJECT CODE PES2-CIP001
SCHOOL PINAGBUHATAN ELEMENTARY SCHOOL
TEAM COMPOSITIONNAME ROLE
Manuel A. Rosaldo Jr. Team Leader
Lovely Rollaine B. Cruz Assistant Team Leader
Scribe
Joey D. Gimeno
Communication
Marilyn G. Astillero Documentation
Roberto B. Amar Process Observer
All Grade Leaders Other Members
All Master Teachers Resource Persons

KEY CUSTOMERS Potential Drop-out students,parents,teacher

PROCESS

OBJECTIVES At the end of school year 2017-2018,the drop-out rate will reduce to 2%.
Even though school completion rates have The number of drop-outs of Pinagbuhatan
continually grown from the past years, Elementary School is extremely alarming from
dropping out of school persists as a problem the past two years. School year 2014-2015, the
that interferes with educational system number of drop-out is 194 ,2015-2016, the
efficiency. A lot of factors arise not to pursue
their studies. They may be trudging the number of drop-outs is 147, still it is a big For this year, we have 127 dr
BRIEF BACKGROUND hardship of life such us poverty, ignorance of number to consider. It is 3.93% and 3.07 % which is 3. 06 % .Our school is
parents, low-self-esteem, lack of support from respectively. It is also 1.93 % and 1.07 % higher reduce the drop-out rate b
their family. than the division standard of 2%.

REGULAR MEETING
SCHEDULE Every end of the month.

PROJECT SCHEDULE ACTIVITY OUTPUT TARGET


DATE 1 2 3
ASSESS June
1. Get organized Team Structuring July
2. Talk with customers Orientation July
3. Walk the Process mapping July
4. Identify Improvement Areas Focused on the Problem Statement August
ANALYZE 5. Do Root Cause Analysis why-why Diagram September
6. Develop Solutions Validation of Root Causes,Generating of Solution September
7. Finalize Improvement Plans Plan the resources needed,Risk Management Plan September
ACT 8. Pilot Solution Pilot Test Result,Evaluate the result,Cost Benefit Analysis October
9. Roll Out Solution Implementation of Solution October
10. Check Progress Monitoring and evaluation October
IP001

ave 127 drop-outs


school is aiming to
out rate by 2%.