Академический Документы
Профессиональный Документы
Культура Документы
downtown
area development plan
CORPUS CHRISTI
1
1. Introduction: A new era of opportunity..................................................................1
in Corpus Christi
Shaping the Downtown Areas future: A unique moment ........................................................... 2
The DADP aligns closely with Corpus Christis citywide plan.................................................... 7
Downtown vision themes....................................................................................................................... 8
A community-driven process..............................................................................................................10
Taking initiative to seize the opportunity....................................................................................... 12
Working together..................................................................................................................................... 12
2
2. Priority Policy Initiatives and Implementation:...................................... 17
How to build the Downtown Area vision
Vision themes and policy initiatives................................................................................................. 19
Framework diagrams............................................................................................................................ 40
Infrastructure initiatives......................................................................................................................48
DRAFT
3
3. District Framework and Reinvestment Priorities:.............................. 51
Targeted priorities for a vibrant and connected
Corpus Christi
Marina Arts District...............................................................................................................................54
Bayshore Neighborhood........................................................................................................................62
Uptown........................................................................................................................................................66
Washington-Coles...................................................................................................................................70
Hillcrest......................................................................................................................................................74
4
SEA District...............................................................................................................................................78
North Beach...............................................................................................................................................84
5. Transportation.....................................................................................................................................97
Harbor Bridge opportunities...............................................................................................................98
5
Downtown area access improvements.......................................................................................... 100
Transit alternatives............................................................................................................................. 102
Parking management........................................................................................................................... 104
Appendices
A. Real estate market analysis documents for housing, office, hotel and retail available
separately.
B. Advisory Committee Members
C. 2011 North Beach Development Plan
D. 2017 North Beach Redevelopment Initiative
Introduction
A new era of opportunity in Corpus Christi
T
he Downtown Area Development Plan (DADP) is an action-oriented, market-driven strategy
to generate economic growth and quality of life in Corpus Christi over the next 20 years. The DADP
builds on past planning efforts and current investment in the city, and is part of the Plan CC
Comprehensive Plan initiative. At its heart, the DADP aims to establish Corpus Christi as a premier 21st
Century waterfront city in Texas, with safe, vibrant, walkable, and connected districts in which to live, work,
learn, and play.
and explore accessible, welcoming waterfront major driver of downtown development nation- DOWNTOWN AREA DEVELOPMENT OFFERS
activities that all support each other. The Down- ally) is beginning to take root downtown, there CITY-WIDE BENEFITS
town Area has always been and remains a key is significant work to do to tap the full potential Downtown Area destinations matter significant-
driver of Corpus Christis identity. It has the that downtown offers as a housing location. This ly to the local and regional economiesparticu-
greatest opportunity in a generation to become a plan, therefore, focuses on the actions that can larly visitor attractions located within the SEA
much deeper source of community life and pride. most effectively diminish the challenges posed District and North Beach. In 2014, approximately
by the Downtown Area and open up invest- 2,750,000 people flocked to the Convention Cen-
CHALLENGES TO OVERCOME mentparticularly private investmentthat is ter, Art Museum, Museum of Science and His-
The Downtown Area has notable strengths but naturally attracted by the downtowns assets. tory, Whataburger Field, Hurricane Alley, Texas
it continues to struggle to attract development Downtowns are inherently complex places, State Aquarium and USS Lexington, an increase
and businesses due to low foot traffic, a phys- and a plan helps organize the actions of many of 47% in just three years. These attractions,
ical environment designed more for cars than people around common purposes to draw great together with the Downtown Areas nearly 40%
people, rent levels too low to justify redevel- value from a downtowns intensity of activity. share of Corpus Christi hotel rooms, anchor city-
opment costs, unpredictable status of various Downtown Corpus Christi already has many wide visitor destination spending that exceeded
infrastructure and development projects, some stakeholders who are taking important actions $1.2 billion and provided an overall economic
challenging adjacencies to industrial activity, toward well-conceived goals, but who also could impact of over $1.5 billion for each fiscal year
perceived lack of safety or cleanliness in places, achieve more, sooner, through increased coordi- 2012 and 2013. This infusion of outside spending
and a traditional office-dominated identity that nation of these actions. Thus the Downtown Area continues to grow. The tourism industry sup-
does not reflect the much more diverse activity Development Plan emphasizes how to get things ported almost 29,000 local jobs either directly or
and market opportunities available today. While done, as much as what gets done. indirectly in 2013.1
there are signs that residential development (a
1 Source: Email correspondence with Corpus Christi Convention and
Visitors Bureau, March 12, 2015
Uptown ST
UA
I-37
TA
NCA
H
Downtown
N.
N. CARANCAHUA
BR
Opportunity to change streets OA
and roadways to improve Existing Harbor Bridge approach DW
Downtown Area connections to be removed and replaced with AY
and development areas traditional streets and blocks
ST
The planned replacement of the existing Harbor Bridge with a New Harbor Bridge creates opportunities for significant change, including new connections
and development opportunities amidst several Downtown Area districts (panoramic view looking north from the Frost Bank Tower).
The Downtown Area offers broader quality of life A MARKET-DRIVEN PLAN: SETTING THE growth in downtown housing has been a key
benefits to Corpus Christi as well. Besides the STAGE FOR PRIVATE SECTOR INVESTMENT driver of downtown revitalization efforts across
signature visitor destinations highlighted above, A key foundation of the DADP planning process the country, and the potential for Corpus Chris-
the areas beaches, parks, marina, restaurants, art has been an assessment of the downtowns mar- ti to benefit from this trend is very strong. The
centers, churches and other amenities enrich life ket potential to attract new private sector invest- Downtown Area already attracts existing Corpus
for residents on a daily basis. As the Downtown ment. These analyses have identified significant Christi residents as well as people living outside
Area gains a stronger dimension as a neighbor- opportunities for downtown growth and devel- the city (and region) who are looking to relocate
hoodwhile continuing to be a hub of business opment, provided that some key barriers can be to a downtown setting with high quality of life
and tourismthe added residential character eliminated. The DAPD outlines the opportunities and walkable destinations. This interest comes
will raise the value of the Downtown Area not and presents strategies to remove the barriers to from a wide spectrum of household income lev-
just as a place to live, but also to work, learn and capturing this growth. els. Yet today there are relatively few good quality
play. Downtown can offer housing options and a options for living in the Downtown Area, wheth-
type of neighborhood environment not currently Analyses of Downtown Areas residential, office, er at market-rate or more affordable rent levels.
available in other Corpus Christi neighborhoods, hotel, and retail real estate market potential
helping the city attract and retain a more diverse conducted as part of citywide market analysis for There is market potential in the Downtown
workforce with a broad range of skills. This will Plan CCshape the DADPs plan of action. New Area for 1,850 market-rate apartment and
further enhance quality of life and economic housing offers by far the strongest invest- townhouse housing units over the next
opportunity for the whole city. ment opportunity. This is significant because five to seven yearsprimarily multi-family
and other auto-oriented locations, the Down- attractive location for studying and living, and
town Area offers Corpus Christis strongest the program operates independently of the main
concentration of dining and nightlife des- campus. The university has explored potential
tinations. Numerous choices for live music to place the arts program downtown in reno-
and unique, locally-owned venues set the Down- vated or leased space in the past, but has not
town Area apart as a destination for locals and yet acted on this goal due to cost challenges. A
visitors alike. Growth opportunities include: collaborative effort between the university, city
>> Small (100-person) and mid-sized and/or downtown property owners to overcome
(1,000-person) live music venues; these challenges is encouraged, as the programs
>> Nightlife with an added twist such as bowl- presence downtown would yield value not only
ing, dueling pianos or an arcade; to for the university and its students, but also
>> Destination dining, especially restaurants for downtown as an additional arts partner and
that are regionally-based or have just one daytime center of activity.
North Beach
Corpus Christi location; and
>> Mobile retail, such as food trucks Downtown investment in development, programs
A growing residential population will also help and infrastructure is happening at its highest level
diversify Downtown Area retail to include new in decades and sets the stage for a substantially
choicesappealing to residential, worker and higher level of investment capitalizing on the mar-
visitor markets alikesuch as a drugstore, ket opportunities described above. Demonstrating
limited-assortment grocer, family restaurant/ Corpus Christis Downtown Area housing market
diner, discount variety store, coffee house, potential, ongoing or recently completed down-
and other specialized services. There is also town housing development has added 615 new
untapped market potential for several poten- market-rate units, between the Cosmopolitan,
tial destinations that could serve as valuable Atlantic Lofts, Nueces Lofts, Bay Vista, and Bay
North Beach Gateway daytime anchors: an outdoor outfitter, a fami- Vista Pointe. Other initiatives in the Downtown
ly-themed amusement destination (in addition Area that reflect market interest include new boat
ipated in the near term. However, additional to Hurricane Alley Waterpark), and an art slips at the marina, Bayfront Inn redevelopment
hotel development proposals in the Downtown supply store (if Texas A&M-Corpus Christis and a new hotel on Shoreline Boulevard, addition-
Area should be welcomed if market demand Master of Fine Arts program locates down- al hotel development planned in the SEA district,
for them can be demonstrated. A convention town; see below). the new Corpus Christi Regional Transportation
hotel supporting the American Bank Center is Relocating the Master of Fine Arts program Authority transportation center in Uptown, Texas
desired as a strategic resource to expand the of Texas A&M-Corpus Christi downtown State Aquariums expansion in North Beach, and
visitor economy. represents another valuable development or community enthusiasm for park improvements
Downtown Area retail and entertainment tenanting opportunity. This graduate-level along the former Shoreline Boulevard right-of-
offerings have a distinct and deepening market program would be particularly well suited way and Sherrill and McCaughan Parks.
niche. While shopping in Corpus Christi is pri- to a downtown location because faculty and
marily driven by areas outside the downtown, students can connect with the established arts
such as the South Padre Island Drive (SH 358) community there, downtown offers students an
THE DADP ALIGNS CLOSELY WITH PLAN CC VISION ELEMENT THE DADP SUPPORTS THE VISION BY:
CORPUS CHRISTIS CITYWIDE PLAN
Our broadly diversified Supporting Downtown Area business growth with more attractive,
economy provides walkable settings for tourism, dining, office-inclined industries, and
The Downtown Area Development Plan
opportunity for all. other business activities.
(DADP) was created in parallel with the Plan
Helping attract and retain skilled workforce by substantially
CC Comprehensive Plan for all of Corpus
expanding the number and variety of Downtown Area housing
Christi, so that both plans, and the com- optionsfeaturing qualities and amenities not available in other
munity conversations that informed them, portions of the City.
shared a common base of information,
ideas, priorities and initiatives. The table Modernized city services Identifying priority infrastructure investments that can be cost-
below highlights key elements of the Plan and systems support effectively paced with market-driven real estate development.
growth and vitality in all
CC Vision in the left column, and how the Applying updated TIRZ incentive policy to help fund infrastructure
parts of the city.
DADP supports these in the right column. investments.
Getting more out of existing streets and parking through new man
agement partnerships and better public information.
Stewardship of our Improving access to, and appreciation of, the bayfront and destina
natural heritage and tion parks by filling gaps in the Downtown Areas remarkable park
green-space networks and pathway network
strengthens our unique
Encouraging sustainable building design and preservation
character and supports
techniques through downtown development incentives.
resilience.
T
he DADP comes out of a City-led, the foundation of understanding regarding the Bridge relocation opportunities and challenges,
8-month process of comprehensive challenges and opportunities in Corpus Christi. and met regularly with the local R/UDAT ad-
and intensive public outreach. Early Relevant input from meetings conducted for visory group on an ongoing basis to integrate
interviews with City leaders and key the broader Plan CC Comprehensive Plan was its goals and ideas with the DADP. A series of
Downtown Area community stakeholders, studied. The downtown planning team partic- open public meetings were held in November
neighborhood associations, business owners, ipated in the Regional/Urban Design Assis- 2014, February 2015, and April 2015 along with
land owners, developers, and citizens provided tance Team (R/UDAT) event exploring Harbor a diversity of walking tours and open houses
in which public input and discussions were
facilitated and recorded around key topics such
KEY INPUT FROM
as Vision and Strategies, Market and Econom-
CITIZENS OF CORPUS
ics, and Transportation. Information about the
CHRISTI DURING THE meetings was advertised through print and
DADP PROCESS social media outlets as well as the Plan CC
The Downtown website. A Steering Committee and Advisory
Area should be NOVEMBER 2014Presentation of purpose and goals of the study with analysis Committee were formed at the outset to guide
safe, vibrant, and of opportunities and challenges for the Downtown Areas as well as presentation of the City and its consultants towards the rec-
connected residential market potential, followed by breakout groups and report backs on DADP ommendations in this report.
districts, themes, and priorities.
Distinctive
portions of the A number of ongoing or earlier plan documents
Downtown Area provided a strong foundation for the Down-
should have their town Area Development Plan. The DADP builds
own character and on these plans while incorporating new think-
identity ing around specific implementation actions
that will create transformative change.
The Downtown
Area should be FEBRUARY 2015Presentation of Draft Vision and Strategies, Office and Hotel
walkable and HARBOR BRIDGE RELOCATION (ongoing)The
Market, Development Economics, and Transportation findings, followed by discussion Harbor Bridge relocation is a long-term
inviting, and groups around the presentation topics.
represent the heart plan to replace the Harbor Bridge and
of Corpus Christi reconstruction of portions of US 181, I-37,
and the Crosstown Expressway to address
The Downtown safety and structural deficiencies as well
Area Development as navigational limitations for the Port. The
Plan should focus redesign will change access routes to/from
on enabling real,
North Beach, SEA District, the Northside, and
visible investment.
Downtown and transform downtown Corpus
MAY 2015Presentation of draft DADP recommendations derived from public dis- Christi. This project is one of the key cata-
cussions and stakeholder input to receive final comments in anticipation of creating
lysts that drives the need for the DADP.
the final DADP for Corpus Christi City Council review and approval.
NORTHSIDE LIVABILITY PLAN (2014Ongoing)The MOBILITYCC (2013, updated 2016)MobilityCC is TAX INCREMENT REINVESTMENT ZONE (TIRZ)
Northside Livability Plan is an ongoing initia- the transportation component of Corpus Christis (2008Ongoing)The TIRZ district #3 specifically
tive being led by TxDOT and supporting Fed- comprehensive plan and provides a framework geared to Downtown was established in 2008 as
eral agencies HUD and DOT, to ensure that the for the interrelated transportation elements of part of a broader range of Tax Increment Financ-
Harbor Bridge project incorporates mitigation the plan in terms of design, standards, opera- ing Districts (TIF). The zone includes approxi-
measures for impacted neighborhoods. To-date, tions, and maintenance. A tool box of features mately 856 acres and captures the SEA District
a number of public meetings have been held for and techniques is presented as well as perfor- and Downtown as far west as Tancahua Street
community input. mance measures and implementation priorities and as far south as Morgan Avenue. The pri-
R/UDAT STUDY FOR THE SEA DISTRICT (2014)The for certain areas of the City. In 2016, the City mary revenue source for the zone will be funds
Regional/Urban Design Assistance Team (R/ adopted the Corpus Christi Metropolitan Planning contributed from property tax collections of the
UDAT) was an initiation of the American Institute Organization (CCMPO) Strategic Plan for Active City, County, and Del Mar College on the taxable
of Architects (AIA) and continues through the Mobility, Phase 1: Bicycle Mobility Plan as a com- property value increment within the zone.
work of the local R/UDAT Steering Committee. ponent of Mobility CC to provide an integral plan CORPUS CHRISTI DOWNTOWN VISION PLAN (2008)
Recommendations for reconnecting district and for the community intended to foster cycling as a The Downtown Vision Plan focused on housing
streets, adding new street segments, streets- meaningful transportation alternative for riders and retail along walkable streets along Chapar-
cape improvements and walkable infill develop- of diverse abilities. ral, Peoples and Schatzel. Chaparral, marina, and
ment were promoted in the R/UDAT plan and are CITYS CAPITAL BOND PROGRAM (20122016)The hotel connectivity was emphasized. The DADP
similarly reinforced in the DADP study. Citys capital bond program continues to provide promotes a similar approach to the Downtown
UNIFIED DEVELOPMENT CODE (2011)Approved in tangible improvements to streets and utilities district, with specific priority development par-
2011, the UDC is a comprehensive planning and throughout the city. With over 40 projects in de- cels and public policy incentive approaches to
zoning document with overlay districts that sign, bidding, or construction, the Bond program implement the recommendations.
replaced the Citys older zoning code and other is a visible, voter approved program that has CORPUS CHRISTI DOWNTOWN MANAGEMENT DIS-
standards to ensure that growth and develop- shown results both within the DADP focus area TRICT (DMD) THREE-YEAR STRATEGIC PLAN (2015)
ment meets certain land use and architectural and beyond. The DADP suggests future recom- This plan leverages new leadership and part-
standards in Corpus Christi. The UDC will play an mendations and priorities to focus public dollars nerships to expand the DMDs success in making
important role in the rational implementation of and aims to leverage these public investments Downtown a better place to visit, do business
development as recommended in the DADP as to catalyze private development initiatives wher- and live. It charts clear priorities and initiatives
well as Plan CC. ever possible. supporting cleanliness, business recruitment
CENTRAL BUSINESS DEVELOPMENT PLAN (2013) NORTH BEACH DEVELOPMENT PLAN (2011)Major and support, development, community events,
This work promoted a walkable, mixed-use themes in the North Beach plan included a beach and other elements critical to making the most
range of development in the downtown, with an walk and restoration of natural areas, including a of all Downtown has to offer.
expanded range of accessible affordable housing native, water receiving landscape for the Surf- IMPLEMENTATION PLAN FOR THE HILLCREST/WASH-
options. A recreational path and water access side/Timon Boulevard median, all themes that INGTON-COLES REDEVELOPMENT PLAN (2009)This
network was proposed, similar to updated ideas are reflected in the DADP. A focus of the DADP is plan illustrates vision goals expressed by the
included in the DADP. to ensure integration and connectivity between Hillcrest community.
North Beach, the SEA District, and Downtown
with the future Harbor Bridge relocation project.
Focus infrastructure investments Actively manage event traffic. Intensify destination arts and retail
4 to maximize leverage of private
sector investment. Coordinate
6 During major events, some streets are
clogged with traffic while others are
8 programming. The Downtown Area is
the heart of Corpus Christis cultural
improvements closely with known development underutilized. Provide audiences more and culinary scene. Raise the profile of this
projectswhen and where necessary. Corpus information on access route options, and add amenity with additional, and more visible,
Christi has invested in high-quality street and reasons to come early and stay late, to spread out programming of arts, music, food, recreation and
park infrastructure along Shoreline Boulevard traffic over more area and time, ensuring conve- other activities serving the city and its visitors.
and Chaparral Street. Before undertaking other nient access for all.
large infrastructure projects, focus on enabling
the development that has been attracted by past Fill missing links in Corpus Chris-
investments.
7
Transform old Harbor Bridge
infrastructure to connect districts 9 tis signature waterfront park and
path network. Take advantage of the
and the bay with walkable develop- New Harbor Bridge project and several smaller,
Organize parking at district scale to ment and access. Removal of obsolete highway near-term opportunities to knit together Corpus
5 increase convenience and efficien-
cy. The Downtown Area needs enough
infrastructure will enable new streets and
development to connect Uptown, Washing-
Christis Bayfront Marina, parks and paths into a
highly accessible system serving residents,
conveniently located parking to satisfy market ton-Coles, SEA District and Downtown in ways workers and visitors.
demand, but not so much that the land and that create more cohesive sense of place, greater
funding needs of parking get in the way of market opportunity and a more connected
high-value development. Make the most of every community. Install street trees, pathways and Create clean, safe, welcoming
parking space through parking management that
lets an office workers daytime parking space
signage to create much more welcoming ap-
proaches to North Beach. 10 places. Maintain streets, parks and
other public places to be consistently
serve a resident, hotel guest or concertgoer in the clean and attractive. Expand partnership
evening or weekend. between the City, property and business owners,
residents, and district management to encourage
good stewardship of downtowns public places.
WORKING TOGETHER
Ongoing housing and retail development, together with pedestrian-friendly paving, trees and
signage recently installed at the corner of Chaparral and Lawrence Streets, provide strong
16 | P L A N CC D OW N TOWN AREA DEV ELO PMEN T PL AN | JULY 1 8, 201 7 momentum to spur additional actions that will further enhance the Downtown Area.
2
DRAFT
D
owntowns, more so than other development patterns, enable many different people to engage in
many different activities that support each other, creating a place that is greater than the sum of its
parts. Achieving compelling results from a downtown plan requires a structure to ensure stakehold-
er actions are indeed mutually supportive. Without this, efforts and resources may be dispersed in ways that
lack synergy. The ten priority initiatives in this chapter provide such a structure. The initiatives emphasize
themes that appeal to a broad range of stakeholders, and actions that do the most to catalyze further actions
and investments that build toward big results. Maps following these initiatives indicate key places they should
influence in the study area.
The Downtown Management District, one of the Downtown Areas major community organizations, held this open house in November 2014 to highlight its
priority goals and actions for the next three years. Events like this help achieve the Downtown Area vision by publicizing and coordinating opportunities
for the areas many stakeholders to work together toward common goals.
Enc
o ura
ge Cre C
ma ate Com Rec live elebr
VIS rke
t-d m ple onn , w ate
ION r ive
nd
ore
h ous a n
te a
d tr atw
ect
n
ork thi
, le s un
THE eve ing ail erfr eig
h b
arn iqu
ME lop
me cho net on
w t
orh
o
and e pl
pla ace
INITIATIVES S nt. ice
s. o r p
k. rk a o d s. y. to
initiative
1
flexible, effective options serving the different incentive needs
of different projects.
RESPONSIBILITY
KEY ELEMENTS
City Business Liaison, TIRZ #3 board
Complete and apply a project plan for TIRZ #3 TIRZ area as additional projects are developed. RESOURCES
that requires applicants to demonstrate finan- This helps to maintain and increase value of all
Established City operations, TIRZ revenues
cial need and consistency with DADP goals, properties.
and offers incentives in several forms that can Once an efficient, effective means of managing TIMEFRAME
be tailored to specific project needs. These TIRZ #3 is in place, consider creating addi- Policy updates were completed within one year.
different forms should include tax rebates of tional TIRZ area in the downtown study area Implementation ongoing
variable duration, and infrastructure including in places where redevelopment is especially
utilities and street improvements. See also desired. As a first priority, consider extend-
TIRZ #3 funding priorities under Initiative 4. ing TIRZ #3 to include the Agnes and Laredo
Assess project financial need through third Street corridors, to promote reinvestment MOMENTUM
> TIRZ #3 Project Plan updated and
party professional evaluators. Establish a along these important downtown gateways.
implemented
means for discussing project financial need Establishing a North Beach TIRZ should also
and appropriate incentive packages with appli- be considered. > Nine projects have advanced in 18
months thanks to TIRZ #3 incentives.
cants in confidence (using real estate finance Suspend use of the citys established tax abate-
professionals not on city staff or the TIRZ ment program in the TIRZ #3 area, where it
board), and then providing recommendations undermines TIRZ resources. Instead, focus
to the TIRZ board for review and approval. the tax abatement program in areas outside
Develop and adopt design guidelines for new TIRZ #3, where it will offer greater value (see
projects in TIRZ #3. Examples of such guide- Initiative 2). Inside TIRZ #3, TIRZ-funded
lines are included in Chapter 4 of the Down- tax rebates can offer equal or greater value to
town Area Development Plan. These reason- development projects than the tax abatement
able design standards provide investors a program.
predictable context for project review, and help
ensure continued design quality across the
TIRZ #3
initiative
2
neighborhoods with new jobs and mixed-income housing.
RESPONSIBILITY
KEY ELEMENTS
City managers office, with support from EDC and
Explicitly expand tax abatement eligibility to Consider applying the Downtown Area Devel- Type A board
non-convention center hotels, multi-tenant of- opment Plans Design Guidelines to any project RESOURCES
fice buildings, and full tax abatement levels for receiving tax abatement incentives. As for
Established City operations
small businesses with as few as 20 employees. the TIRZ #3 area, applying design guidelines
Focus tax abatement and other non-TIRZ will make the project approval process more TIMEFRAME
incentives (such as fee waivers, Type A funds, predictable, and will encourage quality develop- Apply updated policy within one year
Affordable Housing Trust funds, or sale of ment throughout the study area, help maintain
surplus public land at reduced cost) on areas and increase property value over time. Update and consolidate information on devel-
outside of TIRZ #3, to avoid redundancy or Utilize additional resources to help make opment incentives, to make the full range of
conflicts. (TIRZ #3 can independently fund possible the development, renovation and policies and choices clear to developers, prop-
tax rebatesequivalent in effect to tax abate- preservation of affordable/workforce housing erty owners and others interested in making
mentand targeted infrastructure improve- serving a broad spectrum of incomes. Current investments. This should begin with a collab-
ments to support eligible development within and potential resources include: orative effort between the City and the Corpus
its boundary.) >> Type A funds. Continue to utilize Type Christi Regional Economic Development
To leverage the greater impacts possible with A funding to help create new multifamily Corporation to update information available
revitalization projects that are concentrated housing options at below-market rates to online, and to designate a single, consistent
within compact areas, prioritize provision address demand from households. As one point of contact for comprehensive informa-
of tax abatement to projects in areas that are potential use, consider funding property tion. It should also extend to partnerships with
highly visible, accessible, and include a num- acquisition for new housing construction, in local community organizations (such as the
ber of large parcels with revitalization poten- coordination with Initiative 3. Uptown Neighborhood Initiative and Down-
tial and multiple owners. >> Corpus Christi Affordable Housing Trust. town Management District) and other entities
A base level of tax abatement may be offered This new lending entity would utilize Cor- who can help connect potential developers
to any proposed project consistent with DADP pus Christi Finance Corporation Bonds to with these resources.
goals, but higher levels of tax abatement provide low-interest financing and permit
should be offered only to applicants demon- fee waivers to affordable/workforce housing
strating financial need for it. Determine finan- development projects.
cial need through the approach recommended >> Neighborhood Empowerment Zones.
for TIRZ #3. These zones may be created as priority areas
to offer tax abatement, fee waivers and/or
other development incentives.
TIRZ #3
initiative
3
underutilized properties.
RESPONSIBILITY
KEY ELEMENTS
City Business Liaison, with support from DMD, UNI
Target privately-owned property by proactive- Encourage reinvestment in privately-owned and/or other area improvement entities for outreach
ly contacting property and business owners to vacant buildings or lots in prominent areas. to private property owners, and from REDC, city-af-
highlight market potential, incentive policies, re- Inform owners of real estate market analysis filiated housing corporations or other appropriate
cent and planned public infrastructure improve- findings, TIRZ #3 incentives, and the predict- entities for strategic land acquisition, holding and
ments, and other DADP elements that establish able framework provided this plan and its sale.
a more predictable and beneficial setting for guidelines. Encourage property sale or part- RESOURCES
investment. To the extent possible, task DMD, nering to tap developer expertise with new
Operations through established funding streams for
UNI or other locally-focused agents to conduct market opportunities.
City staff and area improvement entities; property
this outreach to maximize impact. Establish Vacant Building Registry to assist
acquisition through Type A funds or other strategic
Target underutilized publicly-owned property with identifying opportunities for investment.
economic development sources (and ultimately
by offering it for sale to private developers for Where extended vacancy is anticipated, seek
revolving funds through sale of parcels).
development of specific projects that support opportunity for temporary pop-up program-
DADP goals. Time these sales to when devel- ming of vacant lots and storefronts, by arts or TIMEFRAME
opment is favorable due to market conditions, recreation organizations or other entities. Apply updated policy within 1 year.
completed infrastructure improvements, or Explore opportunities to expand Heritage Park
other factors. and other areas as an opportunity to improve
our Convention market reach with outdoor
programming space and to protect the viability MOMENTUM
Nueces County has attracted a
of existing public facilities and investments. development proposal for restoration
and adaptive reuse of the former Nueces
County Courthouse. Bringing this
prominent vacant building back to life
with an appropriate use would benefit the
entire Downtown Area, as a demonstration
of smart real estate reinvestment at an
important gateway.
Existing
Harbor Bridge
Future
Harbor Bridge
alignment
initiative
4
that are timed and located together with private investment.
RESPONSIBILITY
KEY ELEMENTS
City Business Liaison, TIRZ #3 board, City Engi-
Pace City investment in streets, parks, utilities, and funding for new bridge, street, multi-use neering Department, and City Planning staff with
parking and other infrastructure in parallel path and park infrastructure (associated support from area stakeholder organizations such
with private development projects. See pages with the New Harbor Bridge and areas where as DMD, and community organizations; and from
4849 for priority infrastructure invest- the existing Harbor Bridge and its approach partner agencies building and using infrastructure
ments in the downtown study area. Integrate streets will be removed) to ensure these in- including the Texas Department of Transportation,
appropriate priorities and concepts developed vestments fully support DADP goals. See also CCRTA and Port of Corpus Christi.
by stakeholders such as the Downtown Man- Initiative 7. RESOURCES
agement District. Include North Beach water Minimize any adverse impact on area prop- TIRZ #3 funds; City and grant-sourced capital im-
service upgrades where needed. Unless there erties and businesses from infrastructure provement funds; Federal and state transportation
is clear immediate need or benefit for improve- construction by: funding associated with the New Harbor Bridge,
ment, begin infrastructure project investment >> Designing and phasing projects to reduce port improvements and other projects; Type A
only when private development that will benefit time and area of impact, funds and/or Marina revenues for appropriate
from the infrastructure improvement is moving >> Enforcing performance criteria for contrac- waterfront projects.
forward. tors (such as incentives for timely project
TIMEFRAME
Top priority use of TIRZ #3 funding should be completion),
for investments that directly enable develop- >> Investing in were open for business cam- Confirm conceptual design and funding of New
Harbor Bridge-related projects. Build development
ment projects, such as gap financing, utility con- paigns that highlight operations and access
project-related infrastructure in parallel with de-
nections, sidewalk or street tree improvements, during construction through supplementary
velopment. Complete a construction management
or other general street improvements/upgrades signage or other publicity, and
plan with affected stakeholders at least two months
directly related to the project. Remaining >> Involving local stakeholder organizations
before starting any infrastructure project.
TIRZ funds may then be invested in broader such as DMD, UNI, SEA District and NBCA in
improvements serving the district. Larger planning and applying these impact mitiga-
scale infrastructure like street extensions and tion strategies. MOMENTUM
parking structures may require funding from > Reconstruction and relocation of Shoreline
other sources such as the Citys biannual capital Given the large scale of work anticipated with Boulevard in the Bayshore Neighborhood,
funding bonds paid through its general budget, construction of the New Harbor Bridge and enhancing access to the Downtown Area
or grants such as have been used to improve removal of the Existing Harbor Bridge, work and creating improved waterfront park area.
Downtown Area street lighting. closely with the Texas Department of Transpor- > Comprehensive reconstruction of Staples
Continue to work closely with the Texas De- tation, its contractors, and community stake- Street, encouraging business and property
partment of Transportation to confirm design holders to avoid adverse impacts. investment in this important corridor
linking the Downtown Area with Southside.
Capital investments have enhanced the Downtown Area as a place to invest and visit. Recent initiatives include Shoreline Boulevard reconstruction (left), a new
playground at the Corpus Christi Museum of Science & History (center), and extension of Chaparral Street streetscape and utility improvements to Taylor Street
(right). See pages 4849 for recommended future improvements.
initiative
5
increase convenience and efficiency.
RESPONSIBILITY
KEY ELEMENTS
CCPD Parking Control Division, with support from
Encourage sharing of parking spaces by uses dinate pricing of publicly accessible on-and Parking Advisory Committee, City Business Liaison,
with different demand peaks (such as daytime off-street parking, with prime on-street spaces DMD, and other appropriate stakeholders. Coordi-
office worker demand and evening/weekend res- priced higher to encourage more frequent nate with street operations and capital projects.
ident demand) through private agreements and/ turnover. RESOURCES
or district parking policy. This will help mini- Rationalize public on-street parking by estab-
Fund management through current parking meter
mize cost and land area needed for new parking, lishing a consistent meter policy in the Marina
revenues. Fund new parking structures through the
while providing new revenue to existing property Arts District, Uptown, North Beach and any
Citys capital improvement program or other avail-
owners. Contact current owners of underutilized future areas designated for metered parking.
able sources, with possible supplemental funding
parking to confirm potential interest in leasing The policy should determine appropriate
from TIRZ #3.
spaces to others. Connect development appli- meter pricing and time allowances for meters
cants to these parking owners. on each street, calibrated to characteristics of TIMEFRAME
Over the longer term, directly and/or indirectly nearby destinations. Conduct an inventory of Update Marina/Downtown/Uptown parking policy
create public parking shared by multiple users supply and demand to inform policy approach. within 1 year. As developers apply for development
to enable additional development projects. A Coordinate with planned relocation of some projects, discuss with them the potential for inclu-
direct approach would involve proactive acqui- on-street parking spaces as part of Chaparral sion of public parking on their sites, and connect
sition of land suitable for structured parking, Street improvements. them with owners of available parking. As part of
in areas of known development interest. An Enhance the Parking Advisory Committee Action 3, contact owners of sites suitable for poten-
indirect approach would encourage develop- with additional professional parking expertise, tial longer-term public parking structures within 2-5
ment applicants to incorporate shared parking through its membership and/or staff resources. years to determine interest.
in their projects by committing to fund some Reinvest parking proceeds into maintaining
or all of a parking structure with City capital and building additional parking, maintaining
funds, TIRZ revenues and/or other appropriate, or improving sidewalk facilities, and/or other
available sources. See Development Guide- priority needs in the parking districts. MOMENTUM
> TIRZ #3 Downtown Parking Study led
lines chapter for design guidelines explaining
to adoption of the Downtown Parking
how structured and surface parking should be Study Action Plan that will guide
designed to enhance walkability and safety. implementation strategies for the next
Design and install clear, consistent signage for three years, including an improved
parking facilities open to the public. Coor- parking pricing and management
approach
MARINA
ART CENTER
185
341 917
500
124
WATER STREET
111 71 131
346
950 53
60 53 207
4,115 spaces 50
53
1,550 spaces
170
300 CHAP
15 ARRAL
300 STREE
T 325
Marina Arts 58
80
District
126 239 164
61
BROADWAY STREET
143
51
196
239
196 302
LIPAN STREET
266 282
initiative
6
RESPONSIBILITY
KEY ELEMENTS
CCCVB, DMD, with support from Corpus Christi
Establish a working group responsible for >> Minimize pedestrian/vehicle movement Street Operations Department, Parks & Recreation
planning and implementing traffic and parking conflicts near venues by temporarily limiting Department, and Police Department, CCRTA and
management in the Downtown Area. Include vehicular access within one block or other other stakeholders as appropriate.
participation by Corpus Christi Convention appropriate distance from venue. RESOURCES
and Visitors Bureau, Corpus Christi Street >> For events large enough to merit park-and-
Shared support from SEA District, City departments,
Operations Department, Corpus Christi Police ride shuttles, temporarily designate dedicat-
CCRTA and/or other involved stakeholders.
Department, CCRTA, DMD, and other stake- ed lanes to serve shuttles to ensure efficient
holders as appropriate, under leadership of the movement. Offer ferry service in addition to TIMEFRAME
CCCVB. Determine typical levels of manage- buses. Establish working group within 3 months.
ment intervention needed depending on size/ >> Provide additional programming, dining or
attendance of events. other activities before and after major events
Consider these strategies, among others, to to spread driving trips over a longer period of
improve access to and from large events in the time and reduce traffic peaks.
SEA District and other portions of the Down- Help advance supportive infrastructure
town Area: investments like improved walks between
>> Provide people driving to events directions, Shoreline Boulevard, Chaparral and Brewster
via real time street signage and through Streets, Port Avenue and area parking facili-
advance notice, that disperse traffic to and ties, and potential vehicular traffic connection
from different events across multiple routes from Shoreline Boulevard at the Art Museum
such as Port Avenue. of South Texas to Port Avenue.
>> Use signage and consistent pricing to direct To manage event-related traffic and parking in
drivers to parking efficiently, preventing other portions of the study area, set up similar
drivers from having to travel additional working groups and apply successful coordina-
blocks seeking parking. tion techniques used in the SEA District.
Concept for walking path and street alongside the Water Garden, connecting Shoreline Boulevard
and Chaparral Street and creating additional arts and event programming opportunities.
initiative
7
and the bay with walkable development and access.
RESPONSIBILITY
KEY ELEMENTS
City Planning & ESI Department, City Engineering
Study and confirm preferred street network Restore east-west street connections across Department, with support from TxDOT
connections to replace the current interchange the old Harbor Bridge approach in the SEA Dis- RESOURCES
at IH 37 and the US 181/Harbor Bridge ap- trict, and create a new grade-level street along
New Harbor Bridge funding for specific projects.
proach at Broadway Street. the approach (formerly Tiger Street), utilizing
Supplemental city capital funding for areas beyond
Rebuild IH 37 from the Crosstown Expressway new Harbor Bridge project funding. Design
the scope of the Harbor Bridge project.
to Mesquite Street as a boulevard with lower streets to be safe and inviting for walking.
traffic speeds, a landscaped median, sidewalks Discuss new street alignment and design with TIMEFRAME
east of Staples Street, and opportunity for area property owners to ensure new streets Timed with the Harbor Bridge Project.
development adjacent to the right of way. support development opportunity.
>> Consider restoring the original street name Ensure convenient use of multiple access
for this corridor, Aubrey. routes to the SEA District, including Port
>> Create street connections that maximize Avenue and the potential future Staples Street
development opportunity on adjacent sites, extension to Fitzgerald, as well as Broadway
create safe walking and biking conditions, and existing streets to the east of the current
distribute traffic via multiple routes across a bridge.
gridded street network, and have moderate Ensure the project enhances Downtown and
maintenance costs. Uptown connections at key intersections
>> Consider a roundabout at the intersection of along I-37 between Port Avenue and Shoreline
Aubrey and Broadway as a signature gateway Boulevard, and via Agnes and Laredo Streets.
to Corpus Christi and the bayfront. Ensure the project enhances North Beach
>> Consider one or more additional intersec- access with convenient, attractive access at
tions between Carancahua and Waco Streets Beach Avenue connecting to Surfside and
offering improved vehicular, pedestrian and Timon Boulevards.
bike connections between Uptown, Wash- Ensure that all major highway approaches
ington-Coles, SEA District and regional have programmable signage that can be used
highways. to provide access instructions for events and
>> Maintain communication and keep up to tourist destinations.
date on the Harbor Bridge Project construc-
tion process with Texas Department of
Transportation (TxDOT).
initiative
8
RESPONSIBILITY
KEY ELEMENTS
DMD and Corpus Christi Marina for Downtown/Ma-
Develop and apply a coordinated approach projects in this area to include active ground rina branding and marketing; CCCVB with support
to Downtown and Marina branding, building floor uses facing Shoreline Boulevard, prefera- from other stakeholders noted above for broader
on branding efforts by the DMD and Corpus bly including restaurants or shopping. branding and marketing; DMD, Marina and Art
Christi Marina. Create a working inventory of available Center for Shoreline Boulevard programming; DMD,
Coordinate branding and marketing efforts to downtown retail space to assist marketing to Art Center and other arts organizations and stake-
visitors among the DMD, Marina, SEA District, potential retail business tenants. To the extent holders for arts programming; Corpus Christi City
CCCVB, American Bank Center, Texas State possible, focus retail uses within one block of Council, TAMU-CC and DMD for downtown graduate
Aquarium, USS Lexington, hotels and other Chaparral Street to create synergy. arts facility.
visitor industry stakeholders Create a stronger presence of the arts along or RESOURCES
Add regular dining, recreation and/or other within one block of Chaparral Street. Replace
DMD funding from public improvement district and
destination activities along Shoreline Boule- prominent vacancies with galleries, studio
City; contributions from stakeholder organizations;
vard to highlight and expand synergies be- space and/or other arts-related programming.
potential TIRZ #3 funding; TAMU-CC.
tween the Marina, Bayfront, Downtown and Install public art (preferably on a rotating
adjacent areas. Enable expansion of the Art basis) along improved sections of Chaparral, TIMEFRAME
Center of Corpus Christis restaurant/caf La Retama Park and/or other key public spac- Update branding and marketing for the Downtown/
space with outdoor dining as part of transfor- es. Engage the Art Gallery of Corpus Christi, Marina and broader Downtown Area by end of 2017.
mation of former Shoreline Boulevard right TAMU Department of Art, Art Museum of Expand Shoreline Boulevard programming during
of way into park space. Program Shoreline South Texas, gallery owners and/or other arts summer 2018; add more permanent dining opportu-
Boulevard median space near Lawrence and/ stakeholders in programming and publicity. nity by 2019. Fill at least five vacant downtown retail
or Peoples Street with dining, starting with Relocate graduate programs in the Department spaces by end of 2019. Open downtown TAMU-CC
mobile vendors and exploring potential for of Art of Texas A&M University Corpus Christi graduate arts facility within 5 years.
more permanent restaurant facilities. Require (TAMU-CC) to Downtown.
building development and major renovation
initiative
9
signature waterfront park and path network.
RESPONSIBILITY
KEY ELEMENTS
City Planning & ESI Department, Engineering Ser-
Complete reconstruction of the Marinas boat Connect the new Harbor Bridge multi-use path vices Department, Parks & Recreation Department,
slips south of Coopers Alley. to North Beach and the bay with a new multi- CCRTA
Complete design and construction of Shoreline use path extending along Beach Avenue to the RESOURCES
Boulevard park improvements between Fur- Beachwalk, and along Timon and Surfside
Dedicated and future capital project allocations;
man Avenue and Coopers Alley, using funding Boulevard to the Texas State Aquarium ferry
CCRTA funding and fare revenue, TxDOT mitigation
previously dedicated. dock.
requirements
Design, fund and implement Phase II Shore- Build the planned birding park in North Beach
line Boulevard walkability and streetscape north of Beach Avenue, utilizing new Harbor TIMEFRAME
improvements between I-37 and Lawrence Bridge required wetlands mitigation. Complete Shoreline Boulevard crosswalk improve-
Street. Add crosswalks across Shoreline Boule- Connect Uptown to the bay with improved ments,Leopard/Peoples Street lighting improve-
vard at any cross streets where they are absent, pedestrian lighting and walks along Leopard, ments and marina boat slips within 3 years. Com-
such as Schatzell, Peoples (north side), Starr, Peoples and Lawrence Streets, Coopers Alley, plete park and path improvements along Shoreline
Taylor and Twigg Streets. Include curb bump- and along Park Avenue from South Bluff Park Boulevard and Park Ave. within 4 years. Complete
outs, signage or other devices to promote to McGee Beach. Include bike infrastructure North Beach birding park and Timon/Surfside path
traffic speeds at or below 25 mph. as prescribed in the adopted Bicycle Mobility within 5 years. Complete new Harbor bridge path
Complete design and construction of North Plan. Include sidewalk, crosswalk and acces- connections in conjunction with the bridge comple-
Shoreline Boulevard promenade from the sible ramp improvements at the bluff along tion.
Texas State Aquarium ferry dock to Bridge- Broadway to enhance Uptown-Downtown
port Avenue and the Beachwalk, using funding connections. dor between the SEA District and downtown.
previously dedicated. Explore opportunities for pedestrian-only Brand the service differently from standard
Connect the new Harbor Bridge multi-use corridors throughout the Downtown planning RTA services, and proactively market service to
path to neighborhoods and the bay with a new district. visitors (as well as the Corpus Christi commu-
multi-use path extending west to Hillcrest, Reinstate and expand ferry service with stops nity).
East to Shoreline Boulevard via Washing- at the SEA District (at Ortiz Center dock) and Consider opportunity to connect waterfront
ton-Coles and the SEA District, and south to increased service frequency (30 minutes) by paths to Westside neighborhoods with multi-
Uptown. Include the Solomon Coles Recre- replacing the previous model of a single ferry use trails along former rail corridors.
ation center and historic Old Bayview Ceme- with multiple smaller boats.
tery as part of the route. Inaugurate a Bayfront trolley with shuttle
service along the Shoreline Boulevard corri-
initiative
10
RESPONSIBILITY
KEY ELEMENTS
DMD, other area service organizations, City Busi-
Continue and expand the highly successful regular maintenance. Maintain facilities sup- ness Liaison, Parks & Recreation Department, Police
public/private partnership and volunteer porting daily use, and program periodic events, Department.
efforts led by the Downtown Management to leverage the parks amenity value and to RESOURCES
District (DMD) promoting cleanliness, safety, promote safety.
City and private-sector funding.
and a welcoming environment in the Marina Address issues associated with public nui-
Arts District. These efforts include presence sance complaints and transient populations. TIMEFRAME
of uniformed Clean Team staff who perform This includes ongoing efforts by the DMD, and Ongoing.
dual roles: 1) maintaining downtown public other stakeholders as applicable, to communi-
places, and 2) serving as tourism ambassadors cate with social service providers.
providing people information and assistance. Continue the mural painting programs that
They also include periodic volunteer events for have been applied in the Marina Arts Dis- MOMENTUM
> Implementation of new street cleaning
cleaning, painting and other maintenance of trict and SEA District for buildings as well
equipment
public streets and parks. as electrical boxes and other infrastructure.
Consider applying similar initiatives in other Engage local arts and business organizations
portions of the Downtown Area. to provide artwork that celebrates distinctive
Continue the DMDs partnership with the City qualities of the Downtown Area.
to manage the bike patrol program, which con- In coordination with Initiative 8, develop a
tracts off-duty police officers to ride downtown plan for signature architectural lighting and
streets, providing additional security. signage in the Marina Arts District and/or
Encourage regular use of parks, include the other areas.
recently rebuilt park spaces at La Retama
Park and along Shoreline Boulevard, through
INFRASTRUCTURE INITIATIVES
PARKS AND PATHS PARKING ROADWAY CHANGES AND/OR
Landscape & paving improvements Parking supply/demand, placement OTHER MAJOR STREET IMPROVEMENTS
G1 P1
La Retama Park already complete and pricing study Leopard Street Phase 1: Broadway to
R1a
Park improvementsWaters Edge Park Parking structure A (assumed north, Tancahua completed
G2
nearly complete I-37 or other appropriate SEA District Leopard Street Phase 2: Tancahua to
R1b
Artesian Parkupgrade irrigation, P2 location); 600 space structure, with Josephine completed
G3 occupied space along any adjacent
landscaping, gazebo Staples Street from Morgan to I-37
street edges R2
G4 Park improvementsH. J. Williams Park (Bond 2012) nearly complete
Parking structure B (assumed south Street extensionShoreline Boulevard
Shading, streetscape, food truck plaza R3
of Lawrence, or other appropriate extension
G5 Shoreline Boulevard at Arts Center
P3 location); 600 space structure, with
and/or Lawrence Staples Street pedestrian and bike im-
occupied space along any adjacent
Bike/ped improvementsAntelope from street edges R4a provements/safety, traffic calmingI-37
G6a Staples to Broadway; Peoples from to West Broadway (2,000 lf)
STREETSCAPE
Broadway to Shoreline (3,920 lf) Roadway and sidewalk improvements
S1 Streetscape improvements R4b
Mesquite St bike boulevard (Cooper's miscellaneous streets (3,000 lf)
G6b S2 Streetscape improvements
Alley to I-373,330 lf) Road diet6 to 4 lanesShoreline Blvd
S3 Streetscape improvements Phase II roadway improvements (Coo-
Waterfront bike/ped improvements R5
G7a Pedestrian improvementsLeop- per's Alley to I-373,250 lf); convert 2
Art Museum to Art Center (6,930 lf)
S4 ard Street at Broadway: stop signs, lanes to parking and/or public space
Bike/ped improvementswaterfront
crosswalks Study and confirm street plan replacing
G7b between Art Museum and ferry dock/
Ortiz Center (1,500 lf) Pedestrian improvementsAccessible R6a 37/Harbor Bridge/Broadway inter-
S5
ramps from Upper to Lower Broadway change
Bike boulevardOrtiz Center to I-37 on
G7c S6 Light Up CCPeoples Street R6b I-37 Traffic Circle and Broadway
Mesquite (3,700 lf)
Cycle track & transitional bike bou- Uptown Neighborhood Initiative light- Street extensionsPower, Palo Alto,
S7
levardHillcrest Park to Mesquite ingLeopard Street Fitzgerald, Resace & Hughes from
G8a R7 Tancahua to Mesquite replacing Harbor
via Winnebago, Sam Rankin, N Sam Phase 1: Brewster from Tancahua to
Rankin, Resaca (11,000 lf) S8 Chaparral; sidewalks/shared ped/ Bridge approach (5 @ 720 lf = 3,600 lf);
vehicle street Rebuild Broadway (3,600 lf)
Bike boulevardPort Ave from Mes-
quite, W Broadway, Lexington, Minton, Phase 2: Brewster/Mesquite/Chapar- Street extensionStaples to Fitzgerald/
G8b S9 R8
Kennedy, Koepke, Van Loan, Noakes to ral/Hirsch Tancahua connector (1,500 lf)
Nueces Bay Blvd (7,730 lf) Phase 3: Chaparral to Whataburger Water Street pedestrian and bike
S10 R9 improvements/safety, traffic calming
Cycle trackWinnebago, Staples, Field and Brewster
G9a Kinney to Furman (2,500 lf)
Comanche, Alameda Street/ped improvementsShoreline
S11 Park Avenue pedestrian and bike
Cycle track, bike boulevard, Blucher Boulevard
G9b Park pathComanche from Culbertson, R10 improvements/safety, traffic calming
Street/ped improvementsCoopers Tancahua to Shoreline Blvd (1,600 lf)
Blucher Park, Cooper's Alley S12
AlleyShoreline Blvd to Broadway
South Chaparral and Coleman bike Timon overlayCoastal Ave. to Sandbar
Street/ped improvementsLawrence R11a
G10a boulevards (4,920 lf); Park Ave cycle S13 Ave. (6,000 lf)
StreetShoreline Blvd to Broadway
track (930 lf) Surfside overlayCoastal Ave. to Reef
Street/ped improvementsHill- R11b
Buford and 3rd St Cycle tracks (3,850 Ave. (5,400 lf)
crest-Kennedy Ave., Peabody Ave.,
G10b lf); 6th St Bike boulevard to Morgan S14 Van Loan Ave., Hulbirt St., Minton St., Beach Avenue from Bridge to Beach
(1,000 lf) R12 access (1,300 lf)
Neuces St., John St.
Recreation TrailAquarium to Beach
UTILITY/INFRASTRUCTURE
Ave along existing "Beachwalk"; Beach
G11 Utility upgradesWater main line up-
Ave. to New Harbor Bridge; along U1 grade/extension work ongoing
Timon and Surfside median (7,000 lf)
G12 Birding and wetland park TRANSIT
T1 New marina docks already in progress
T2 Restored ferry service/station
T3 Bus rapid transitStaples Street
District Framework
and Reinvestment Priorities
Targeted priorities for a vibrant and connected Corpus Christi
INTRODUCTION
T
he District Framework and Reinvestment Priorities chapter begins with an overview of the Down-
town Area districts, highlighting their unique qualities alongside broad and synergistic opportunities
for targeted development. The analysis of market-based development potential described in Chapter
1 sets the foundation for these recommendations, as do recent infrastructure initiatives taking place in the
Downtown Area, most importantly the Harbor Bridge relocation, recent Chaparral streetscape implementa-
tion, and Shoreline Boulevard reconfiguration.
Washington-Coles
Strengthening an established neighborhood with
connected streets and housing
Hillcrest
Providing housing options and opportunities for
current residents
SEA District
Promoting vibrant and accessible destinations
within a walkable setting
North Beach
Beach and attractions
LAND USE AND URBAN DESIGN EXISTING Shoreline Boulevard in front of the Art Center
looking north with new food offerings, arts, and
The priority goal for land use in the Downtown
activities.
should be to attract a permanent residential
population through new housing construc-
tion on available sites. This recommendation
is supported by a detailed DADP residential mar-
ket analysis that anticipates potential demand for
up to 1,850 new housing units in the next 5 years.
Simply put, this means that Downtown could
absorb approximately ten new developments the
size of the 165-unit Cosmopolitan by 2020.
Development should be targeted to sites near or existing surface parking lots with housing or existing retail and help support additional retail,
on Chaparral Street with vacant, single-story other higher-value uses, while minimizing the dining and cultural offerings.
buildings, large underperforming parcels with significant costs of providing parking for new de-
single ownership, and/or other underutilized velopment. Rehabilitation of existing structures The retail market analysis shows that the Mari-
sites such as large surface parking lots. With over can also play a role in new housingpotentially na Arts District possesses the Downtown Areas
11,000 existing off-street parking spaces in the leveraging historic tax credits as an important best established cluster of destination retail and
Downtown, there is ample opportunity to use funding mechanismwith vacant multi-story entertainment destinations, and some of its best
existing parkingparticularly structured park- and well-designed buildings like the former opportunities to reinforce this cluster with more
ingmore efficiently among uses like housing Montgomery Ward structure at the corner of and larger venues. Live music and unique dining
and office that have peak demands at different Chaparral and Peoples as prime candidates. destinations are prime strengths, with opportu-
times. This would enable redevelopment of Future residents will in turn increase demand for nity to grow their share of market demand. The
DEVELOPMENT PROGRAM
MARINA ARTS DISTRICT
Building Type/Density Multifamily residential with
structured parking, office,
hotel
Typical Height Range 35+ stories
Range of Development 1,000,000 sf
Quantity (in SF)
Unit Counts 1,5002,000 residential
units, 150,000200,000 sf
office space
See page
60 for more
detailed
information.
districts established role in tourism and emerg- on the SEA District (two hotels) and Bayshore average Texas city. That said, demand for up
ing role as a neighborhood will strongly benefit Neighborhood (one hotel), but the Marina Arts to 100,000 square feet of additional downtown
from and contribute to a stronger retail and District remains an appropriate place for poten- space for administrative and support industries
entertainment presence. tial additional hotels and upgrades to existing is projected over the next 10 years. There is
hotels. enough existing vacant office space in Downtown
The Marina Arts District is well known for its Corpus Christi to accommodate this. Trends
array of hotels along Shoreline Boulevard facing Prospects for office space growth are less strong, in other downtowns like Corpus Christis that
the waterfront which welcome tourists and as the office-inclined financial services, informa- are seeing an influx of residents indicate that
visitors. The hotel market is performing well tion and professional & business services sectors mixed-use downtowns particularly support the
and continues to deserve a major presence in the play only about half as much a role in Corpus establishment and growth of small businesses,
Downtown. Active hotel proposals have focused Christis underlying economy as they do in the
POTENTIAL
New Restored New Chaparral: wider sidewalks, Artesian Park
housing Ritz Theater housing compact lanes, two-way activated
EXISTING
Chaparral Street at Artesian Park, looking south with new residential development and streetscape.
which together contribute more to job growth emphasis on providing active ground floor uses routes and improved information. Continued
than large businesses. like retail wherever possible, and particularly linkage to the new RTA center on Leopard Street
Having a variety of uses present on or near all along established retail corridors. Active ground is essential and could be integrated within an
blockskeeping streets active day and night, floor uses also deserve priority along Shoreline improved Leopard Street (see Streets and Pub-
weekday and weekendwill help expand market Boulevard, which lacks retail today but offers lic Realm below). Convenient service to North
potential for development. Improved walking important opportunity for it with signature Beach is also essential and must be integrated
connections between the concentration of office walks attracting tourists, workers and residents with street pattern changes associated with the
uses on the bluff west of Broadway, and the alike, and connections to the Marina. new Harbor Bridge.
greater mix of retail, office, hotel and housing
activities east of Broadway, could effectively With over 11,000 parking spaces in private
improve the integration of land uses. This would TRANSPORTATION AND PARKING garages and surface lots in the Downtown
enhance the emerging residential character (including the two blocks west of Upper Broad-
The existing street grid has inherent advantages
present on parts of the bluff, and reinforce way to Tancahua Street), there is an abundant
that enhance access capacity and convenience:
Chaparral Street retail by harnessing demand supply of parking that can be leveraged as an
walkable, bikeable scale; a density of destina-
from more daytime workers. asset for future development. Focus on in-
tions that makes walking, transit and biking
access convenient; and multiple driving routes creasing utilization of existing parking by
Urban design in the Marina Arts District establishing district-scale parking man-
that prevent bottlenecks. Moving forward,
should be geared towards creating an invit- transportation policy for the district should agement that enables uses with different
ing, memorable, and walkable street and maintain and enhance this set of qualities, with demand peaks to share spaces during
block pattern. Downtown already offers the particular emphasis on prioritizing walkability the course of a day or week. In the near-
citys best environment for walkable mixed -use amidst the balance of transportation modes. term, surface lots can potentially serve new
developmentowing to its frequently spaced Inviting people to walk or bike instead of drive development nearby, while large surface lots
streets, human-scaled streets and sidewalks, through safe, convenient sidewalks, transit themselvesparticularly between Shoreline
and variety of established, interdependent land service and bike routes in Downtown will calm Boulevard and Water Street and along Chap-
uses, These qualities are principally responsible traffic, ease parking demand, and create still arralmay be prime candidates for redevelop-
for the recent attractiveness of downtown as a safer streets for pedestrians and bicyclists. ment. In those instances, new parking could be
place to invest in new housing. To maintain and Specifically, transit improvements should take contained on site within the new development
expand these qualities, and the investment that the form of a branded circulator/trolley for (as in the Cosmopolitan) or be accommodated
comes with them, any development incentives visitors (and others) that would run between in nearby garages if applicable. Over time and
offered through TIRZ #3 or other means should the Art Center and the SEA District on Shore- with development momentum, additional
be conditioned on building design that supports line Boulevard linking the two districts. Simi- structured parking utilizing public funds or
these goals. With each development project, this larly, restored water ferry service between the through public-private partnerships might be
approach will enhance the quality and value not Marina, the SEA District (with re-established considered in strategic locations. For further
only of one parcel but of the streets and prop- service) and North Beach would link all three detail, see the Transportation Chapter on page
erties around it as well. See chapter 4 for more districts efficiently while highlighting Corpus 101 and the map of potential shared parking
detail on appropriate development guidelines. Christis signature bayfront. Established bus opportunities on page 59.
To leverage its traditional walkable charac- routes serving workers, residents and the gen-
ter, the Marina Arts District deserves special eral public should be improved with simplified
PARKING
ANK
ART CENTER
185
341 917
500
124
WATER STREET
111 71 131
346
950 53
60 53 207
4,115 spaces 50
53
1,550 spaces
170
300 CHAP
15 ARRAL
300 STREE
T 325
Marina Arts 58
80
District
126 239 164
61
BROADWAY STREET
LEGEND 143
Organize management +
placement of on street parking:
pricing, time limits,and investment
of proceeds
LIPAN STREET
266 282
(Art Center, YMCA) that will promote vibrancy to traffic on summer Sundays from sunrise to
STREETS AND PUBLIC REALM on the waterfront. New or improved Shoreline sunset. Phase 2 Chaparral Street improve-
Boulevard crosswalks at every intersection ments will be supported through dedicated City
While there should be current focus on lever-
between Lawrence and Mann Streets should funding, but based on the Phase 1 precedent it is
aging private investment and incentivizing
be implemented through wide paint striping, critical that construction processes emphasize
housing, this development should be supported
pedestrian controlled walk signals, ADA accessi- unimpeded pedestrian and vehicular access to
with targeted public investments in specific
ble curb cuts, and landscape treatments to calm existing businesses, to minimize disruptions to
street and public realm improvements. For
traffic and create a seamless integration between these establishments. This can be accomplished
instance, the former northbound Shoreline
interior streets and the waterfront. In addition, through sequenced construction staging, public
Boulevard right-of-way between William
pedestrian and bicycle-only days might be media alerts, and other forms of public informa-
Street and Furman Avenue offers a unique and
considered through the closing of Shoreline tion sharing. Improvements to Leopard Street
timely opportunity to focus new arts, dining,
Boulevard northbound and southbound lanes and Upper and Lower Broadway are recommend-
and recreation programming tied to nearby uses
ed, including improved landscape, paving, and of Corpus Christi public spaces and districts.
lighting in the near term and pedestrian ramps The recreation trail could be extended into the
in the long term to strongly connect Uptown and marina T-heads at Peoples and Lawrence as a
Downtown (see diagram on page 60). clear wayfinding route that welcomes people into
the marina environment and provides access to
DMD programming of La Retama Park and the easternmost edge facing the bay. The trail
Artesian Park should be continued to contrib- should be defined by clear, consistently designed
ute to a lively, community-building atmosphere. signage, shade, water fountains, benches and
Both of these public spaces could be connected lighting, as well as opportunities for public art.
to the waterfront through a new multi-purpose
recreational trail for pedestrians and bicyclists
that ties into a larger network and links a variety
Potential promenade replacing former roadway at As in this example, portions of Shoreline Boulevard or other roadways could be closed to
the Art Center of Corpus Christi traffic on weekends or at other times of low traffic demand, to allow biking, walking and
in-line skating.
Bayshore Neighborhood
IDENTITY KEY THEMES
Connecting neighborhoods and people > The attractive, welcoming southern gateway to the Downtown Area
to the Bay and destination parks > Signature waterfront parks
> An established place to live that can grow into a waterfront neighborhood
> Active hotels, churches, and neighborhood services
T
he Bayshore Neighborhood is defined
by two main featuresthe parks along
the waterfront and Corpus Christi Bay
itself. Recent reconstruction of Shore-
line Boulevard, Sherrill Park, Waters Edge Park
(formerly known as Bayshore or McCaughan
Park), and the McGee Beach bathroom/conces-
sion pavilion have dramatically enhanced the
areas appearance and opportunity for enjoyable
activities near the water. Between this signature
public space and established neighborhoods on
the bluff to the west, there is an attractive oppor-
tunity to transform vacant lots into a mixed-use
district that celebrates its connections to the
waterfront, to the Marina Arts District, and to
other neighborhoods. Water and Park Streets
are well-located to play important roles as
principal streets in the district. Water Street is
a wide, vehicle dominated corridor with narrow
sidewalks and few street trees. New residences
would create an inviting, active street with the
potential for focused retail activity. Park Avenue
is currently an auto-oriented street with narrow
sidewalks. A new approach would recognize this
streets potential as a gateway to the Bay from
Uptown, with exceptional views to the water
along the top of the bluff. Together, these changes
will make the Bayshore Neighborhood a gracious,
Water Street looking toward Downtown Bay Vista Apartments from Carancahua Street
residential land uses already taking shape at DADP. The Shoreline circulator could ultimately
Bay Vista apartments (169 units) and Bay Vista TRANSPORTATION connect to Spohn Hospital as well as Cole Park
Pointe apartments (181 units). There are also to link these destinations to the Marina Arts and
Public transit connectivity between the
opportunities to strengthen land use connections the SEA Districts.
Bayshore Neighborhood, the Marina Arts Dis-
with infill development between Bay Vista and
trict, Uptown, and the SEA District, as well as
the Spohn Shoreline Hospital, including housing,
points to the south should be clear, efficient, and STREETS AND PUBLIC REALM
medical and other professional offices, and/or
accessible. This can logically take the form of
improved streets.
improved public bus routes along primary north/ Improving Park Avenue and Water Street to
south corridors such as Tancahua, Carancahua, make them inviting to pedestrians and bicyclists
In terms of urban design, view corridors are and to promote ongoing and future develop-
Chaparral, Water, and Shoreline Boulevard. Fu-
particularly important in the district, with long ment deserves priority, as does repurposing the
ture connectivity should be considered through
views to the Bay from the upper bluff. These former Shoreline Boulevard right-of-way into an
the dedicated Shoreline Boulevard trolley/cir-
views can be strengthened through improved active, public space destination. The Shoreline
culator route that is being analyzed by the RTA
streetscape and trees that define sidewalk edges Boulevard paving could be simply re-painted to
and is one of the key recommendations in the
and promote wayfinding. New buildings should
front onto Water Street with limited setbacks to
create a more intimate walkable environment
that still allows generous sidewalks, on-street
parking, and vehicle traffic lanes (see potential
street section diagram). At the same time, those
buildings should have faades that address
Shoreline Boulevard, Sherrill and Waters Edge
Parks, and the water to the east through key pri-
mary entries, balconies, and window treatments.
Development should be at a scale that creates a
comfortable walking environment with engaging
ground floor uses (possibly retail, small office,
and/or transparent residential entries) while
integrating building forms that highlight the
intersection of Park Avenue and Water Street as
a memorable district center.
Proposed street section: section for Water Street, featuring shade trees and ground level
plantings separating pedestrians from traffic, and narrower lanes to reduce vehicle speed
EXISTING
U
ptown is the focus of municipal life
in the city with City Hall positioned
strategically at the corner of Leopard
and Staples Streets, and the Nueces
County Courthouse complex nearby. Uptown is
also a place of offices, small businesses and the
new RTA transit hub for the city, at Staples and
Leopard Streets. Established residential neigh-
borhoods are arrayed to the west and south, and
additional housing is present just to the east,
including the Trinity Towers senior housing at
Carancahua Street and Coopers Alley, and Atlan-
tic Lofts at Carancahua and Winnebago Streets.
At the same time, Uptown lacks sufficient cohe-
siveness to feel like a place of consistent identity
and quality. As in the Marina Arts District and
Bayshore Neighborhood, however,housing can be
a catalyst. There is potential to bring new mar-
ket-rate and affordable housing to selected areas
of Uptown and the surrounding neighborhoods,
building neighborhood cohesion and leverag-
ing the presence of jobs and transportation.
The Leopard, Staples, Agnes and Laredo Street
corridors offer particular need and opportunity
for this investment. The significant visibility,
accessibility and development gaps of these
corridors enhance development opportunity, and
the high visibility of potential new development
would in turn have an outsized impact benefiting
the areas image and market position. Ongoing
city hall parking needs on nearby blocks could entrance and exit points from the Marina Arts This location allows efficient access and connec-
free up enough space for new housing at the District (becoming more so with the coming tivity to Uptown and the Marina Arts District
corner of Leopard and Staples Streets, extending of the new Harbor Bridge), and could provide a east along Leopard and Lipan Streets and north
south along Staples to complement the new RTA focus for affordable housing and diverse busi- along Staples Street to Washington-Coles. The
building, making a powerful statement about nesses. Public spaces such as South Bluff Park DADP recommends extending Staples Street into
new housing and development opportunities in and Blucher Park provide important public space the SEA District thereby creating even greater
Uptown. Staples Street still retains the charac- options for existing neighborhoods and potential connectivity and access opportunities between
ter of a mixed-use corridor with potential for new housing. Uptown and the waterfront.
housing, retail, and small businesses. South of
Lipan Street, the historic corridors of Agnes and Uptown also presents important opportunities to
Laredo need particular attention as prominent TRANSPORTATION create a network of convenient, safe bike routes
serving the Downtown Area. Bike lanes parallel
The RTA Staples Street Center at the intersec-
to Leopard on Antelope Street, and parallel to
tion of Leopard Street is a new Uptown land-
Staples on Alameda Street, deserve priority to
mark. The $22 million facility provides a strong
serve major Uptown destinations and connect
center of activity and use in the heart of Uptown,
to Westside and Downtown. Connection to the
helping create a more marketable setting for
new Harbor Bridges planned recreational path
real estate investment on surrounding blocks.
CCRTA headquarters at
Leopard and Staples Streets
will open a direct off-street biking connection occasional landscaped medians. A lighting initia- mixed-use destinations for residential, retail,
to North Beach. From the southern end of the tive for increased pedestrian lightingfocusing and businesses.
New Harbor Bridge, east-west bike routes should on public safety for intensively used pedestrian
connect with Park Avenue to access Shoreline zones along Leopard Street (extending into the
Boulevard parks and trails. Marina Arts District along Peoples Street)is
already underway and should be fully coordinat-
ed and integrated with Leopard Street redesign
STREETS AND PUBLIC REALM (see potential street section, page 68). These EXISTING
improvements can complement new develop-
Beyond the Staples Street improvements already
ment to make Leopard Street an attractive and
underway, Leopard Street improvements deserve
economically strong gateway to the city. Critical
first priority to improve walkability and bikabil-
improvements are also needed to make Staples
ity in Uptown. Possibilities include reducing
Street, Agnes Street, and Laredo Street more
the number of vehicle lanes from four to three,
walkable and inviting. Future infill development
expanding space for sidewalks, street trees, and
will help fully reinforce these corridors as active
POTENTIAL
Visible businesses Expanded sidewalks New housing using Shade New housing using
on side street and landscape areas existing parking trees existing parking
Leopard Street looking east towards Downtown with improved streetscape and infill development.
Washington-Coles
IDENTITY KEY THEMES
Strengthening an established > Transformative reconnection to the waterfront and Uptown along new streets and recreational paths
neighborhood with connected streets > Expression of a long, strong community history
> New mixed-income housing opportunities
and housing
W
ashington-Coles is an estab-
lished, historic neighborhood
in Corpus Christi, defined by
modest single-family homes, res-
idential streets and blocks, historic churches and
landmarks such as the Old Bayview Cemetery
and Coles High School and Educational Center.
Historically confined by the West Broadway rail
tracks and Harbor Bridge to the east and I-37
to the south, Washington-Coles has long felt
disconnected from the Marina Arts District, the
SEA District and the waterfront. Largely as a re-
sult of these barriers, the neighborhood has seen
little market-driven investment in decades, and
contains numerous vacant properties.
LAND USE AND URBAN DESIGN Building Type/Density Multifamily residential with surface
parking
Current land use in Washington-Coles includes Typical Height Range 25 stories
housing, three churchesSt. Matthew, Holy
Range of Development 1,680,000 sf
Cross, and St. Paulthe Solomon-Coles commu- Quantity (in SF)
nity center, and several light industrial proper-
ties near I-37. These uses are largely dispersed, Unit Counts 1,0001,500 residential units
with many vacant or underutilized properties
between them, leaving no strong perception of
a neighborhood or district. With future land use
POTENTIAL
EXISTING Staples Street has the opportunity to become a focus of affordable, workforce housing to strengthen
the established Washington-Coles neighborhood.
emphasis an open question, renewing housing job-intensive uses benefiting from visibility
as the neighborhoods primary land use de- and accessibility. Staples Street can be extend-
serves special emphasis for several reasons. ed through to the SEA District across disused
It will leverage market opportunity, leverage portions of the Broadway sewage treatment
city-owned and other vacant land with redevel- plant, making this a more visible and attractive
opment potential, fit with the existing neighbor- corridor for business investment. One block to
hood-scale street network, and revive a neigh- the west, the former Northside Manor prop-
borhood with important history, particularly as erty has been closed following relocation of its
a center of Corpus Christis African-American affordable housing units to the Palms at Leopard,
community. Portions of the neighborhood along and the property is up for sale. Depending on the
I-37 can also be appropriate for office or other purchaser, this too might provide possibilities for
Hillcrest
IDENTITY KEY THEMES
Providing housing options and > Improved neighborhood streets and parks
opportunities for current residents > New recreational path connections to the New Harbor Bridge, waterfront and other neighborhoods
> Options for living in or out of the district
H
illcrest has been a cherished residen-
tial neighborhood in Corpus Christi
for generations. Hillcrest now faces
a number of challenges that com-
promise its long-term future. The new Harbor
Bridge will create a significant barrier to the east,
while surrounding port and industrial facilities
HILLCREST PARK
to the north and west have long had negative im-
pacts on the neighborhood. Over the past two to
three decades, industrial entities have followed
a consistent pattern of acquiring residential
I-37
properties and removing any buildings on them,
generally west of Palm Drive. Some light indus-
trial uses are present on blocks adjacent to the
oil refinery to the west, while blocks adjoining
remaining residential properties are generally
vacant. Blocks to the east that remain residential
have a mixture of occupied and vacant proper-
ties. Houses vary in their state of repair; some are
in good condition, while others need repair or are
abandoned. Of the 700 parcels in the neighbor-
hood, there are approximately 400 housing units.
Approximately 235 units are inhabited. Some are
owner-occupied, while others are rental proper-
ties. Blocks at the center of the neighborhood are
occupied by Hillcrest Park, Bayview Cemetery
and the abandoned, fire-damaged Crossley Ele-
mentary School.
Current residents and property owners have var- A 2009 City-sponsored design charrette with
ied opinions on the best future for the communi- Hillcrest residents resulted in a vision plan for
ty. Some desire to continue to inhabit Hillcrest, neighborhood revitalization supported by some
due to their long term connection to the place current residents. The plan maintains existing
and its people. Other residents and property vacant, industrially-owned properties west of
owners acknowledge the neighborhoods signifi- Palm Drive as a buffer from industrial uses, while
cant challenges, and envision an ongoing transi- reinforcing residential blocks to the east with re-
tion whereby residents move to other sustainable habilitation of existing homes and construction
neighborhoods, and residential properties are of new ones on vacant lots amidst them. New
sold to capture their value as industrial or com- multi-family housing replacing the school and
mercial real estate. around the park would restore a neighborhood
center. To date, no action has
FUTU
RE H
ARBO
been taken on implementing
R BR
IDGE the plan.
PORT
AVEN
UE
There are two ongoing initia-
tives focusing on the Hillcrest
neighborhood. The Livability
Plan, an initiative led by the
Texas Department of Trans-
HILLCREST PARK portation to mitigate impacts
of the new Harbor Bridge, will
identify strategies to enhance
quality of life for residents
I-37
who remain in Hillcrest. City
Planning staff is actively
participating in this Livability
Planning Process with the
community. The Voluntary
Acquisition & Relocation
Program, currently under way,
offers current residents oppor-
tunity to sell their property, or
receive rental assistance, and
move to an alternative neigh-
borhood, if they wish to do so.
Hillcrest is home to more than 200 families Industrial uses serve as a backdrop to the The former Crossley Elementary School
Hillcrest neighborhood building, damaged by a 2013 fire
Charrette concept and illustration of Hillcrest redevelopment vision from 2009 community charrette. To-date, implementation has not occurred of the
plan envisioned.
SEA District
IDENTITY KEY THEMES
Promoting vibrant and accessible > Corpus Christis premier sports, entertainment and arts destination
destinations within a walkable setting > Exciting new places to play, work, and live
> Attractive, walkable public streets, waterfront, and gathering places
> New street and recreational path connections to the Marina Arts District, Washington-Coles and North Beach
T
he SEA District is Corpus Christis pre-
mier sports, entertainment, and arts
destination serving an ever-growing
local and regional population. Plan-
ning for the SEA Districts future in light of the
forthcoming Harbor Bridge relocation has been
an intensive, ongoing process, driven by the 2014
Regional Urban Design Assistance Team (R/
UDAT) study. With the relocation of the Harbor
Bridge, the SEA District stands to evolve from
an auto-oriented destination area, separated
from the Marina Arts District by I-37, to a more
connected, accessible, and walkable setting. Key
street and sidewalk improvements within the
district, and pedestrian street improvements and
public transit to and from the area are critical
and should be implemented as soon as possible.
In addition, there are significant development
opportunities between the Convention Center
and Federal Courthouse which would add needed
housing in areas facing Shoreline Boulevard and
the waterfront and bring added vitality to both.
District and waterfront. A generous pedestrian The current I-37 and old Harbor Bridge
TRANSPORTATION promenade should be included along the new highway interchange can be transformed
street segment, which could be closed during once the bridge is relocated. A new gateway
Three key enhancements are recommended in
special events such as Ride-In movie nights. and traffic circle have the potential to allow for
the SEA District to improve the transportation
Extending Staples Street past West Broad- more clear and efficient wayfinding to the SEA
and pedestrian network:
way through Washington-Coles to Fitzger- District, the Marina Arts District, and Uptown
Adding an extension of Shoreline Boule-
ald Street is recommended. Promoting this while offering better pedestrian connectivity
vard between the Convention Center and Art
important access link from the west once the across the I-37 corridor. The current south
Museum past the Water Gardens and connect-
Harbor Bridge is relocated would relieve traffic approach to the bridge can be rebuilt as North
ing to Port Street will complete the Shoreline
during events and connect Uptown, Washing- Broadway Street, which existed here prior to
loop and tie the SEA District to the Marina Arts
ton-Coles, and the SEA District. bridge construction, and cross-streets linking
POTENTIAL
Convenient Stronger connections Enhanced development Expanded
traffic flow among districts address sidewalks
EXISTING
A roundabout concept replaces the highway interchange where I-37 today meets the current Harbor
Bridgethis would create efficient traffic flow and a new gateway to Corpus Christi.
Tancahua to Mesquite and other north/south porate pedestrian and bike improvements across Center complete the SEA District access net-
streets. Broadway can connect directly into the the I-37 corridor to improve access and wayfind- work.
south leg of the traffic circle, improving links to ing from the Marina Arts District. Programmati-
Uptown and the Marina Arts District. cally, an event traffic management plan should
be put into place that coordinates the work of the
Port Street can also take on added significance as City, TxDOT, RTA, and event hosts, along with
a way to enter the SEA District from the west event signage and other directional assistance to
the street has already been improved to accom- parking and event facilities. Public transit in the
modate high traffic volumes generated by events form of a dedicated Shoreline Boulevard trolley/
and industry. The primary north/south local circulator and a reinstated and enhanced water
streets of Chaparral and Mesquite should incor- ferry service with a station at the Solomon Ortiz
POTENTIAL
EXISTING The area between the Convention Center and Art Museum of South Texas, looking towards the new
Harbor Bridge and showing an activated space with arts and Shoreline Boulevard connection to
Port Street.
North Beach
IDENTITY KEY THEMES
Beach and attractions > Easy access to spectacular beachfront
> Spectacular opportunities to explore nature and history
> A unique dining, shopping, and hotel destination
> A connected neighborhood community
N
orth Beach is a tourist destination
and beachfront residential commu-
nity with a mixture of single family
homes, condominiums, and hotels
extending north from the Texas State Aquar-
ium and USS Lexington along Corpus Christi
Bay. Distinct from the SEA District and Marina
Arts District, yet still connected to them by the
Harbor Bridge, North Beach is a unique place
in the City to experience long, uninterrupted
expanses of sand, the distant horizon line of the
Bay, the open sky, and the waters edge. Recent
renovations to waterfront hotels and restaurants,
new single family residential construction to the
northwith raised first floors and other flood
prevention design elementsand projects such
as the Aquarium expansion and improvements
to North Shoreline Boulevard in front of the Lex-
ington are changing the face of North Beach. The
biggest change will come through the relocation
of the Harbor Bridge which will transform the
circulation patterns between North Beach and
the Downtown area. Relocation of on/off ramps
will free up land previously occupied by high-
way infrastructure that can be re-purposed or
possibly redeveloped. Recognizing the previous
planning efforts and extensive community input
embedded in the North Beach Development Plan
(2011) and the North Beach Redevelopment
Beach Avenue where single family cottages are Building Type/Density Multifamily residential units
possible (following an existing precedent of re- with surface parking
cent construction north of Beach Avenue). In the Typical Height Range 25 stories
central and southern portions of the district land
will become available for potential development Range of Development 1,860,000 sf
Quantity (in SF)
when the land for the current Harbor Bridge
infrastructure is vacated. Opportunities here Unit Counts 1,0001,500 residential units
could include hotels, other tourism-related uses,
and surface parking serving visitor destinations. Bridge. Beach Avenue should be improved with to the SEA District and downtown marina. Pe-
The DADP does not recommend future develop- new pathways, destination signage, plantings, destrian improvements are recommended along
ment in sensitive lands west of the Harbor Bridge and lighting to ensure a bold and recognizable North Shoreline Boulevard to link the existing
along the interior canal in order to encourage entrance point. Sculptural elements that reflect North Beach Beachwalk to the ferry dock, USS
natural landscape and water retention areas, and the Texas State Aquarium and Lexington could Lexington, Texas State Aquarium and other
to focus any development in areas with existing also be located here within the median of Timon visitor destinations. This in turn will link to the
structures and infrastructure. Portions of that and Surfside Boulevard for wayfinding. A new Beach Avenue improvements, extending to a new
infrastructure have been upgraded, and addition- North Beach Boulevard should also be creat- wetlands and bird watching park at the northern
al improvements may be needed to serve priority ed, through the redesign of existing Timon and tip of North Beach and to a proposed recreation
development zones. Surfside Boulevards with street upgrades, a new trail along the new Harbor Bridge. Public transit
wide multi-purpose path for pedestrians and bi- bus service from North Beach to Downtown and
cyclists (as part of the larger city-wide recreation other employment centers should be maintained
TRANSPORTATION, STREETS, AND trail network), and planting the center median and reconfigured with upgraded signage and bus
PUBLIC REALM with a rich palette of native, coastal plant spe- stops as part of the Harbor Bridge construction.
cies. The Harbor Bridge recreational trail can tie
First among these will be the creation of a
into this greenway at Burleson Street. Ferry ser-
welcoming Beach Avenue gateway at the new
vice should be restored to connect North Beach
point of entry to North Beach off the Harbor
E
H AV
BEAC
NOR EXISTING BEACHWALK
TH B
EACH
BLVD
HAR
BOR
BRID
GE
NEW TRAILS
EXISTING POTENTIAL
Replicated North Beach Multi-use path to Signage and landscaping
sign to create gateway beach and bridge introducing visitor destinations
Development
District Frameworks Guidelines
for
and TIRZ #3
Reinvestment Priorities
&Targeted
Connecting Corridors
priorities for a vibrant and connected Corpus Christi
T
his chapter provides a framework for future design guidelines
for new development focused in TIRZ #3, but expanding to other
high-traffic areas. The design concepts are intended to promote
high-quality new development that promotes a walkable, attractive, mixed-
use environment and maximizes value for new projects and properties
around them. These concepts build off guidelines adopted by the TIRZ #3
Board as part of incentive requirements and emphasize walkability and hu-
man scale. The guidelines vary according to three distinct types of streets
that occur in the TIRZ, that have different implications for program, design
and vehicular access for properties that face them. The diagram at right
indicates street type, and the following pages explain the design concepts
for each type, with visual examples.
vehicular access for parking or service Mesquite from Brewster to Coopers Alley
Tancahua from Port to Padre, then from
Buffalo to Furman
District Frameworks
and Reinvestment Priorities
Transportation
Targeted priorities for a vibrant and connected Corpus Christi
TRANSIT ALTERNATIVES
Public transit in Corpus Christi will play a key part in enhancing the Downtown areas.
In the DADP, recommendations include the dedicated trolley/circulator along Shore-
line Boulevard, reinstated and enhanced water ferry service between the Marina, SEA
District, and North Beach and enhanced north/south and east/west bus routing that is
intended to be clear and efficient. The diagram indicates where these networks might
intersect and where stations can be located for access and transfers. The corridors of
Chaparral, Tancahua, Carancahua, and Staples are the primary north/south routes,
while Leopard and Lipan provide the east/west routes between Uptown and Downtown.
The new Harbor Bridge alignment also accommodates an important bus route linking
commuters from North Beach to Downtown area employment centers. The Shoreline
Boulevard dedicated trolley/circulator has the potential to be extended farther south to
Cole Park if future demand warrants it.
PARKING MANAGEMENT
With over 16,797 parking spaces, 4,337 on-street spaces and 12,642 off-street spaces in
private garages and surface lots in the Uptown District, Marina Arts District, Bayshore
Neighborhood, and SEA District, there is an abundant supply of parking that can be
leveraged as an asset for future development. In the near-term, surface lots can poten-
tially serve new development nearby, while large surface lots may be prime candidates
for redevelopment. In those instances, new parking could be contained on site within
the new development (as in the Cosmopolitan Apartments) or be accommodated in
nearby garages Other key strategies include encouraging shared parking by uses with
different demand peaks (such as daytime office worker demand and evening/weekend
resident demand) through private agreements and/or district parking policy. Rational-
izing the public on-street parking system by establishing a consistent metering policy is
encouraged, while enhancing the Parking Advisory Committee with additional profes-
sional parking expertise and reinvesting parking proceeds into maintaining and building
additional parking as needed is also recommended.