Вы находитесь на странице: 1из 18

Research paper

A techno-economic study for active


Ethernet FTTH deployments
Received (in revised form): 22nd January, 2008

Siamak Azodolmolky*
received his computer hardware (BEng) degree from Tehran University in Iran in 1994 and his rst masters degree (MEng) in computer
architecture from Azad University in 1998. During 19922001, he worked with Data Processing Iran (ex-IBM), as a Systems Engineer and
Senior R&D Engineer. In 2006, he received his second MSc degree with distinction from the Information Networking Institute of Carnegie
Mellon University. In August 2007, he joined Athens Information Technology as a researcher, while also pursuing a PhD. He is a
professional member of ACM and a student member of IEEE.

Ioannis Tomkos
is the Associate Dean of Athens Information Technology and has the rank of Full Professor. In December 2002, he also became an Adjunct
Faculty at the Information Networking Institute of Carnegie-Mellon University. At AIT, he founded and serves as the Head of the High Speed
Networks and Optical Communication (NOC) Research Group. He has co-authored about 50 peer-reviewed articles published in
international scientic journals/magazines/books (over 35 IEEE sponsored) and over 130 presentations at conferences/workshops and other
events. His research work focuses on technical issues related to optical networking and techno-economic studies related to broadband
networks.

*Athens Information Technology, 0.8Km Markopolou Ave., Peania 19002, Athens, Greece
Tel: +30 210 6682771; E-mail:sazo@ait.edu.gr

Abstract Fibre-to-the-home (FTTH) is recognised as the choice for true broadband access, and
major implementations of the technology are beginning to arrive. The main drivers of FTTH are
bandwidth-demanding applications. Among various architectures and technologies of FTTH, home
run active Ethernet FTTH is an interesting technology. The main design issue related to FTTH
deployments, however, is the high level of CAPEX. In order to justify FTTH deployments, service
providers and network planners require a tool to assist them in selecting an optimised deploy-
ment strategy and network design. The lack of modelling tools to perform high-level FTTH net-
work planning is the main motivation behind this paper. This work presents the result of a study
based on a congurable and customisable techno-economic model, which helps network planners
and decision makers to have a high-level picture of Ethernet FTTH deployment. The model cap-
tures both the technical and economic aspects of the Ethernet FTTH networks and provides key
business performance indicators. The results of a case study for an Ethernet FTTH deployment in
a capital city are presented.

KEYWORDS: FTTH, techno-economic model, access networks, network planning

INTRODUCTION streaming video content is considered the


Bandwidth-intensive contents and peer-to-peer ultimate bandwidth-hungry application.
applications consume the great majority of Adding the required bandwidth for one high-
bandwidth in most broadband networks. New denition television (HDTV) stream and
broadband deployments, however, are Internet browsing, which is theoretically
commonly justied mainly by current available by ADSL2+ downstream, it may
applications rather than by anticipated sound as though a bandwidth of 20 Mbps
demands. In most broadband networks today, would be sucient in the long term. The

294 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

emergence of HDTV, however, could competitive infrastructure, in which carriers are


represent a signicant constraint. The prospect competing for subscribers using their own
of oering two HD channels simultaneously infrastructure. With few exceptions, Europe
clearly requires speeds greater than the lags well behind the US and Asian tiger
capabilities of ADSL2+. Other services, such economies (ie Japan, South Korea and China)
as point-to-point (P2P), enhanced instant in the availability of high-speed broadband
messaging, video blogs and online games that services. Within Europe, FTTH is recognised as
are undergoing growth within the framework the choice for real broadband access, and major
of Web 2.0, could also aect upstream speeds. implementation of the technology is beginning
Furthermore, overlapping usage, in which to arrive.3
several users of online services reside in the This paper presents a techno-economic
same home, is another application trend to model for the home run architecture of FTTH,
justify the requirement for bre-to-the-home and investigates Ethernet-based FTTH
(FTTH) architectures. The main market drivers technology as a solution for broadband access
of FTTH can be categorised as follows: (a) provisioning. The rest of this paper is organised
triple play (voice, data and video) oerings, as follows. Following this introduction, an
including multiple-streams and HDTV; (b) overview of FTTH architectures and related
business services, including but not limited to technologies is presented. The techno-economic
application service providers (ASP), IT- model developed for home run FTTH is
outsourcing and virtual business networks; (c) presented next, followed by the results of a case
personal services, such as e-health, care for study for Athens using the model developed.
elderly people and e-medicine; (d) working and Finally, conclusions and a summary are
learning, including but not limited to provided.
teleworking, citizen journalism (eg FourDocs,
CNN iReport), e-learning, and communities; FTTH ARCHITECTURE AND
and, nally, (e) entertainment, such as virtual TECHNOLOGIES
media (eg Second Life), and vlogs on TV (eg Fibre-to-the-home networks can be categorised
Akimbo).1 An important feature of these new into two main architectures: Home run
applications is that all of them require architecture, in which a dedicated bre
bandwidth to be reserved for the entire connects each home to the point of presence
duration of the application. Another factor to (POP) and star architectures, where many
consider is the increasing symmetric nature of homes share one feeder bre. In a star
the trac pattern. With extraordinary increase architecture, a remote node (RN) is deployed
in bandwidth demand, service providers are between the POP and the subscribers premises.
compelled to push bre deeper into the access In the so-called passive star architecture, the
networks in order to be able to oer the RN does not include any active electronics. At
emerging services that customers are the RN, a passive splitter replicates the
requesting. Fibre-to-the-home technologies are downstream optical signal from the feeder bre
considered an ultimate solution for future onto the individual distribution bres, and a
broadband access networks. Greeneld coupler combines the optical signals from the
deployments represent a growing segment of individual homes back onto the feeder bre.
FTTH networks being implemented today.2 The star architecture is referred to as an Active
One of the FTTH business models is an open Star, when the RN contains active devices (eg
access model, where an open access network is a switch).4
built by an infrastructure provider, and Several technologies have been proposed for
wholesale access is provided on equal terms for FTTH networks, such as Ethernet-based
service providers. The second model is FTTH, other variations of active optical
vertically integrated operators. This model is a networks (AONs), and various avours of

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 295
Azodolmolky and Tomkos

Figure 1: PON architecture

passive optical networks (PONs) (eg BPON, The remote terminal (RT) is equivalent to
GPON, EPON). 47 Passive optical network passive splitter in PONs, and regenerator,
architectures for FTTH deployments, as multiplexer or a switch in AONs. The
generally presented in Figure 1, are customer premises equipment (CPE) can be a
characterised by passive optical splitters to variety of optical network terminations (ONT)
distribute the bre to each customer, using or optical network units (ONU). An ONT is
splitting ratios ranging up to 1:64 or even usually dedicated to an individual end user. An
1:128. Currently, there are three dierent ONU is typically located in the basement or
standards for PON, summarised in Table 1. even on a kerbside and shared by a limited
The indicated bandwidths are the aggregate bit number of users. Data, voice and video (triple
rates in upstream and downstream directions, play) services are distributed over appropriate
which will be shared by 16, 32, 64 or 128 transmission media within the customer
customers, according to the deployment premises from the ONU or ONT.
scenario. Most FTTH rollouts have focused on single
BPON can be considered a traditional dwelling units (SDUs) (eg individual
technology that has been superseded by the residences, houses) but multiple dwelling units
other architectures. Whereas EPON has been (MDUs) (eg apartments) also represent a large
designed for lowest cost using Gigabit Ethernet market segment. There are many ways in
technology, GPON was designed for higher which MDUs can be connected to the FTTH
downstream bit rates, lower overhead and network. Most deployments to date have used
possible use of ATM and TDM. In most an optical terminal in the building basement
implementations, however, GPON is used as and copper drops to each unit. The key
an Ethernet transport platform. implementation choices to address MDUs, as

Table 1: PON standards

Factor BPON EPON GPON

Standard ITU-T G.983 IEEE 802.3ah ITU-T G.984


Bandwidth Downstream Up to 622 Mbps Up to 1.25 Gbps Up to 2,5
Upstream 155 Mbps Up to 1.25 Gbps Up to 1.25 Gbps
Wavelength Downstream 1,490 and 1,550 nm 1,550 nm 1,490 and 1,550 nm
Upstream 1,310 nm 1,310 nm 1,310 nm
Transmission ATM Ethernet Ethernet, ATM, TDM

296 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Figure 2: Delivering FTTH to MDU tenants

shown in Figure 2, can be grouped as PON (eg companies) who have already developed a
GPON, EPON, etc) with copper drops and network (eg gas pipes) but with limited
P2P Ethernet. In the former model, a GPON capacity. In this case, they can benet from the
can be used to serve MDUs. The ONT shared feeder cable. In PON architecture, the
terminates the distribution bre and connects number of optical line terminators (OLTs) is
each unit with copper interfaces. Ethernet- lower than OLT ports in active Ethernet,
based VDSL2 is a common access scheme. Fast because one OLT card can be shared among
or gigabit Ethernet interfaces over copper can 32, 64 or even 128 subscribers. Thus, PON
also be used where existing wiring is available technologies are considered as port saving in
or can be easily installed. In the case of P2P the aggregation POP. The lower number of
Ethernet topology, separate bres are used to ports in the aggregation level translates to easy
connect each MDU building to an Ethernet cable management in each POP. In addition to
switch in the POP. The bre is terminated in the benet for easier cable management, the
the building, using an Ethernet switch with POP size in a PON deployment could be
copper interfaces. smaller than P2P active Ethernet. A lower
Every deployment scheme for FTTH has its number of ports can be translated to less POP
own pros and cons. For example, bre saving space and eventually lower cost. Passive optical
between the optical splitter and the POP network architecture is inherently a broadcast
location is the most important aspect of PON medium; it is possible to use this capability for
FTTH deployments. If a service provider has video distribution. Another feature of PON
existing spare bres available between the POP deployment is that, instead of using powered
and a street cabinet, this may prevent new electronics in the outside plant, it uses passive
digging and cabling. It must be mentioned, splitters and couplers to divide up the
however, that if the available ducts deployed in bandwidth among the subscribers.
the eld (eg the case of ILECs) have limited There are, however, some issues related to
space, PON technologies, which require less PON deployment. The bandwidth of the PON
bre per duct, apparently have advantages over bre is shared among many customers. The
P2P technologies. The PON technologies are shared bandwidth does not seem to full the
also suitable for competitors (eg utility long-term bandwidth demand. As every PON

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 297
Azodolmolky and Tomkos

constitutes a shared medium, encryption is security features.


needed on all data streams. Encryption requires Ethernet still dominates European FTTx
some overhead with each packet, which can deployments instead of PON as far as the
considerably reduce the eective bit rate of a technical architecture is concerned. Indeed, a
PON connection. Passive optical splitters player such as Lliad/Free announced a
cannot transmit any failure indication to the deployment based on Ethernet of four million
network operation centre. Thus, any problem homes to be passed in 2012. Major European
in the bre between the splitter and the incumbents, however, including Deutsche
customer ONT is very dicult to locate. This telekom (Germany), Belgacom (Belgium),
makes maintenance and troubleshooting very Ericom (Ireland), KPN (Netherlands), TDC
complex in PON architecture and leads to (Denmark) or Swisscom (Switzerland)
increased operation cost. From a regulatory conrmed their choices of FTTN+VDSL
point of view, PON networks do not support architectures. Furthermore, signicant new
local loop unbundling (LLU) requirements, deployments such as EnergiMidt and
because there is only a single bre connecting a SEASNVE in Denmark (BPON), the
number of customers that cannot be Government of Asturias in Spain (GPON) are
distinguished on a physical level but only on a using PON technologies. The Parisian trial of
logical level. Local loop unbundling is a very France Telecom carried out in mid-2006 with
important requirement in the European Union. GPON architecture was conrmed by the
Ethernet FTTH, however, requires launch of a pre-commercial FTTH oer in late
considerably more bre and equipment at the 2006.3
OLTs compared with the other shared Every FTTH deployment has its own merits.
infrastructure, which directly translates to One of the options for FTTH deployment is
considerably higher trenching and cabling home run architecture and Ethernet-based
costs. In the case of a possible cable break in the FTTH technology, which is considered further
feeder part, the outage is longer, as a lot of in this analysis. The home run architecture in a
cables should be spliced. The management of a typical Ethernet FTTH (P2P Ethernet)
large number of bres and ports in the topology is shown in Figure 3. It provides
aggregation level (in each POP) appears to be dedicated bres from every endpoint to the
very dicult without an eective cable POP, where they are terminated on a switch.
management strategy (eg optical distribution Endpoints can be SDUs (ie single family
frames). Given the issues of Ethernet FTTH, residence) or MDUs (ie apartments), where a
however, it enables a service provider to switch in the basement fans out to the
guarantee bandwidth for each subscriber. The apartments using any appropriate transmission
POP size in active Ethernet deployments is not technology.
a big issue. In a study for a typical Before deploying the Ethernet FTTH, it is
metropolitan city with a deployment area of important to evaluate the key performance
225 km2, 32 POPs with an average of 12.5 m2 metric of the project from both the technical
area were required. In terms of infrastructure and economical points of view. Therefore,
cost, most of the infrastructure cost (about 40 services providers require a tool which, given
80 per cent) in FTTH deployments is trenching the desired technology, will assist them to
cost (excluding the materials), which should be evaluate their return on investments and to
considered in both active Ethernet and PON. make educated decisions for deployments. In
In case of Ethernet FTTH topology, the the case of Ethernet FTTH technology, the
dedicated bre is the most secure medium optimised number of POPs can be determined
today. Ethernet switches can provide physical based on the customer demographic data and
port level and logical customer trac technical specication of each POP, along with
separation capabilities with many robust its associated costs.

298 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Figure 3: Home run architecture with P2P Ethernet topology

FTTH TECHNO-ECONOMIC MODEL POP will reach to the distribution point


This section presents a techno-economic model through manholes or hand holes and,
specically developed for congurable and eventually, the micro-ducts will serve individual
customisable Ethernet-based FTTH SDUs or MDUs in the nal digging distance.
deployments. A model framework of The following modules are also dened in
demographic data, costs, parameters, this model:
connections, housings and equipment is
considered for this study.7,8. The technology . access network architecture description (areas,
chain used for this FTTH techno-economic customer demography, deployment phases,
model is shown in Figure 4. It depicts a home income level of customers, distribution of
run architecture, in which feeder cable from MDUs and SDUs in each area)

Figure 4: The home run Ethernet FTTH technology chain

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 299
Azodolmolky and Tomkos

. denitions and parameters (penetration The model considers the provision of


schedule, revenues, cable denitions and infrastructure to a building consisting of many
terminal value of the infrastructure during units, both MDUs and SDUs. The model
and at the end of study period) examines the use of three basic services (triple
. costs consisting of rollout costs, POP costs play): voice services, data services and video on
and the costs associated with buildings an average revenue per user (ARPU) basis. The
connection and customer acquisition addressable customers are grouped in SDU and
. study period: the model has a forecast period MDU subscribers. The wholesale customers
of X years. who will use the FTTH infrastructure in order
to provide their own services to the potential
A functional diagram of the model is shown in customers are also considered.
Figure 5. The key component of this model is In order to combine the sub-area in a larger
the core routines that process the input data, group with similar features, a zone denition
considering the denitions and parameters, cost matrix is included in the model. Using this
gures and generating various outputs. The matrix, the sub-areas can be grouped together
rst step in the modelling approach is to based on similar characteristics (eg deployment
provide the model with demographic data. In phase and/or income level of customers) and
Table 2, the table header and a sample row are preserving the canonical form of the group
presented. with reference to a geographical map. This

Figure 5: The key components of the FTTH techno-economic model

Table 2: Sample input data table

Sub-area Active/ Phase Income SDUs MDUs Total Area (km2) No. of units
deactive level buildings

1, 2, 3 , . . . 1/0 1, 2, 3, . . . H/M/L eg 400 eg 1,600 eg 2,000 eg 3.5 eg 13,200

300 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

approach is shown in Figure 6, in which two CAPEX, OPEX or cash ow) and results (eg
sub-areas (ie 19 and 21) with similar number of POPs, trenching length, inter-
characteristics, are grouped together to make a building spacing (IBS)), the core routines of the
zone (ie Zone 8). model require particular parameters, which are
In order to produce the output reports (eg provided by a denitions and parameters
module. The cabling plan part of the model
reports the number of required POPs,
maximum bre loop length, port utilisation in
each zone and also the number of required
manholes (or hand holes). This report depends
on the parameters that determine the available
cables and POP sizing (eg number of ports per
rack or number of racks per POP). The model
has four dierent cost modules (rollout, POP,
building connection and subscriber acquisition),
which are dedicated for cost assumptions. Each
of sizing parameters and cost factors is
summarised in Table 3.
Figure 6: Grouping sub-areas to make zones The demographic data, technical denitions,

Table 3: Cost and sizing factors

Cost/sizing component Parameter Description

POP Ports per rack Denes the number of FTTH ports in each rack
Racks per POP Determines the number of racks per each POP
POP fan-out This parameter determines the number of cables that
goes out of the POP to serve the coverage area of
each zone. In current version of the model, it can be
4, 6 or 8
Floor space per POP Based on the number of racks per POP, the required
oor space is computed. The derived value is used
for computation of POP tting cost and rental cost
POP tting cost The associated cost for tting the POP specied per
square metre
Rent cost This cost is specied per square metre per month
Utility cost This cost is dened per month
Active equipment cost per port The cost of active equipments in POP (measured per
port)
Building connection costs Final digging (cost and amount) Two parameters dene the amount of nal diggings
to reach the customer premises and the cost per
metre of this nal digging
POP equipment cost per customer The associated POP equipment cost for connecting
each customer
Optical termination The cost of optical termination for each building
Installation cost The installation cost per customer
CPE cost The cost of CPE for SDUs, MDUs and wholesale (if
any)
Customer acquisition cost Subscriber acquisition cost This cost can be dened for SDU, MDU and
wholesale customers
Rollout costs CAPEX per metre of duct This cost includes the materials and labour cost of
each metre of duct
Cost of MH/HH Cost of each manhole or hand hole. It is assumed
that for every 48 buildings a MH/HH will be installed

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 301
Azodolmolky and Tomkos

parameters and costs will enable the FTTH Based on reports from National Statistical
core routines to derive important deployment Authorities and collected data, 20 per cent of
information such as: the buildings in each sub-area are addressable
SDU customers, and the remaining are
. number of total required POPs (based on the potential MDU customers, with one exception
available ports in each POP) and number of for selected high-income areas, in which 80 per
POPs for each zone cent of buildings are SDUs, and the remaining
. the average IBS (with some optional routing 20 per cent are MDUs with an average of six
ineciency considerations) units per MDU. Furthermore, it is assumed
. total trenching length that 1 per cent and 5 per cent of the SDUs and
. maximum bre loop length per zone MDUs addressable customers, respectively,
. suggested cable type for each zone will turn out to be wholesale customers in each
. POP port utilisation per zone. year. It is assumed that there are 100,000
customers for each phase of the project and
Given the cost and revenue parameters, the 300,000 in total. By means of the zone
model is able to generate nancial reports and denition matrix, the sub-areas are grouped
charts to give the project managers concrete into 20 zones with two constraints of
gures to make an educated decision for the preserving the canonical form (rectangle) of
project in hand. Among other reports and zones according to the geographical map of
charts, the model generates capital expenditure Athens and putting the sub-areas with similar
(CAPEX), operating expenditure (OPEX), cash deployment phase and income level in the same
ows and earning before interest, tax, zones (partially shown in Figure 6). The Athens
depreciation and amortisation (EBITDA) city centre is considered a single zone (zone 10)
charts. The CAPEX per POP and OPEX per in the zone denition matrix. The sub-areas are
POP reports are especially important in order categorised in three income levels (high,
to select the optimum number of POPs for the medium and low), and it is assumed that the
deployment area. Key performance indicators deployment will take place in three consecutive
such as net present value (NPV) and internal years. A summary of sub-area data is presented
rate of return (IRR) for a given interest rate in Table 4. As indicated in this table, the model
are also computed by the model. The next computes the trenching length for each phase
section presents the results generated using this and in total to provide an initial estimate of the
model for a deployment in a European capital trenching cost for the project in hand.
city. Table 5 presents the zone summary. The
model computes the important parameters (eg
CASE STUDY RESULTS IBS and trenching length) for each zone and
This section presents the results generated for similarly enables the designer to determine the
an active Ethernet FTTH deployment scenario distribution of MDUs and SDUs in order to
in Athens. The raw data are collected for 39 meet the total number of targeted customers.
sub-areas based on municipal divisions. The Another output of the model is the total
area of each sub-area, number of buildings and number of required bres per zone. It is
population of each sub-area is collected. The assumed that there is one bre for each SDU
study assumes a telecom rm which is planning and two bres for MDUs. This assumption can
to provide services in a particular area. The be modied, however, as the number of
telecom companies may have some copper or required bres for each zone is considered a
cable infrastructure prior to FTTH model parameter.
implementation but, for symmetry, it is The distribution of IBS and the trenching
supposed that the company does not have any length for all 20 zones are shown in Figure 7.
infrastructure prior to planning. The most frequent IBS is between 50 and 60

302 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Table 4: Summary of sub-areas in Athens

Phase No. of SDUs No. of MDUs Total No. of Area (km2) Total No. of Inter-building Trenching (km)
buildings units spacing (m)

1 4,864 11,724 16,588 62.19 120,031 58 969


2 9,392 37,574 46,968 95.20 385,136 44 2,060
3 4,454 17,817 22,270 66.66 182,632 54 1,197
Total 18,710 67,115 85,826 224.04 687,799 4,227

Table 5: Zone summary

Zone Phase Income level Area (km2) No. of units IBS (m) Trenching (km) No. of bres

1 1 H 7.76 12,555 71 109 2,596


2 1 H 4.13 7,924 65 63 1,656
3 1 H 14.14 20,237 76 187 3,716
4 1 H 4.38 6,888 72 61 1,434
5 1 H 15.09 20,619 77 195 3,122
6 1 H 3.09 19,338 36 85 3,102
7 1 H 4.57 18,151 45 101 3,284
8 1 H 5.08 5,153 44 114 3,041
9 1 H 3.95 9,166 59 66 1,980
10 2 M 38.96 213,288 39 1,007 7,329
11 2 M 24.28 49,321 64 382 4,769
12 2 M 9.63 20,359 62 155 4,318
13 2 M 13.27 70,373 39 337 5,098
14 2 M 9.06 31,795 48 187 4,496
15 3 L 26.10 76,723 53 494 6,397
16 3 L 9.28 27,576 53 177 3,829
17 3 L 8.57 25,263 53 163 3,795
18 3 L 16.36 29,358 68 242 3,858
19 3 L 4.03 17,140 44 92 3,667
20 3 L 2.33 6,572 54 43 1,327

metres. The most frequent trenching length is dened in order to produce the key performance
between 100 and 200 km per zone. indicators. The values used in the study are
As mentioned earlier, there are some presented in Table 6. In the study, it was assumed
parameters and cost factors that should be that there is no installation cost. The CPE costs

Figure 7: (a) Distribution of IBS and (b) trenching length

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 303
Azodolmolky and Tomkos

Table 6: Values for parameters and cost factors

Cost/sizing component Parameter Description

POP Ports per rack 1,500


POP fan-out 4
POP tting cost US$1,400/m2
Rent cost US$45 per month/m2
Utility cost US$200 per month
Active equipment cost per port US$350
Building connection costs Final digging (cost and amount) 10 m, US$10
POP equipment cost per customer US$20
Optical termination US$80
Installation cost US$0
CPE cost US$0
Customer acquisition cost Subscriber acquisition cost SDU:US$30; MDU:US$20; Wholesale: US$20
Rollout costs CAPEX per metre of duct US$60
Cost of MH/HH US$1,300
Customer ARPUs SDU US$50
MDU US$200
Wholesale US$10

were also ignored; however, the model is In Figure 8, the total OPEX is computed
capable of taking into account the cost of CPE based on the rental and utility cost. Increasing
for SDU, MDU and wholesale customers. the number of racks per POP will also increase
After dening the zones, the network the required space, which leads to more rental
planner can dene the POPs. There are two cost and utility cost. The graph shows that
key parameters in the model that determine the three racks per POP (or 4,500 ports per POP)
size of a POP. The rst parameter is the is the optimum point. The corresponding total
number of ports per rack, and the second is the OPEX for the resulting 24 POPs with three
number of racks per POP. The values of these racks in each of them amounts to around
parameters are set to 1,500 and 3, respectively, US$200,000 per year.
in the study. Based on these parameters and In the model, the network designer can
demographic data, the model derives the dene the cables that can be used for cabling.
number of POPs that are required for the Currently, four dierent cables have been
whole city. There are three key constraints in dened in the model; however, there is no
order to compute the number of POPs. The logical limitation for this parameter. All
rst is the reach of optics, which translates to dened cables have seven sub-ducts and 96
the coverage area of each POP. The fan-out bres per sub-duct. The numbers of ducts per
parameter, which determines the number of cable are 8, 4, 2 and 1 for each cable type.
ducts per POP is the second constraint and, Table 7 presents the cabling plan, which is
nally, the physical size of the POP is a computed and suggested by the model.
limiting factor. The computed value is 24 As indicated in this table, the model
POPs. By changing the number of racks per computes the maximum bre loop length for
POP, the total number of POPs will obviously each zone, the number of POPs and the
change. In order to nd the optimum number utilisation percentage of ports for each zone.
of POPs, however, the OPEX costs were Based on the fan-out parameter of the POP
computed for dierent scenarios by varying the and the number of required bre terminations,
number of racks per POP and, as shown in the model also derives the optimum cable type
Figure 8, the optimum point is for three racks for each zone. It was assumed that, for every N
per POP, which leads to a total of 24 POPs for buildings, one manhole or hand hole will be
the whole city. installed, and hence the numbers of manholes

304 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Figure 8: OPEX vs racks per POP parameter

Table 7: Cabling plan

Zone Max. bre loop No. of POPs Suggested cable No. of MH/HH per
length (km) type zone

1 2.79 1 4 32
2 2.03 1 4 20
3 3.76 1 4 51
4 2.09 1 4 18
5 3.89 1 4 52
6 1.76 1 4 49
7 2.14 1 4 46
8 1.59 1 4 54
9 1.99 1 4 23
10 4.41 2 3 542
11 3.48 2 4 125
12 3.10 1 3 52
13 2.58 2 4 179
14 3.01 1 3 81
15 3.61 2 4 195
16 3.05 1 3 70
17 2.93 1 3 64
18 4.04 1 3 75
19 2.01 1 3 44
20 1.52 1 3 17

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 305
Azodolmolky and Tomkos

Table 8: Penetration schedule

Penetration Schedules Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9

# of SDUs: 4,431 11,492 13,938 12,544 11,290 10,161 8,129 6,503 3,902
Addressable # of MDUs: 9,755 16,077 20,893 14,625 10,238 7,166 4,300 2,580 1,032
Total: 14,176 27,569 34,831 27,170 21,528 17,327 12,429 9,083 4,934

SDU % 10% 10% 10% 10% 10% 20% 20% 40% 40%
Penetration MDU % 30% 30% 30% 30% 30% 40% 40% 60% 100%
Percentages (%) Wholesale % (from SDUs): 1% 1% 1% 1% 1% 1% 1% 1% 0%
Wholesale % (from MDUs): 5% 5% 5% 5% 5% 5% 5% 5% 0%

# of SDUs: 442 1,149 1,394 1,254 1,129 2,032 1,626 2,601 3,902
Number of # of MDUs: 2,927 4,823 6,268 4,388 3,071 2,867 1,720 1,548 1,032
Connected # of Wholesale % (from SDUs) 44 115 139 125 113 102 81 65 0
SDus MDUs and # of Wholesale % (from MDUs) 488 804 1,045 731 512 358 215 129 0
Wholesales # of Wholesale 532 919 1,184 857 625 460 296 194 0
Total Connected: 3,901 6,891 8,846 6,499 4,825 5,359 3,642 4,343 4,934

# of SDUs: 3,979 10,343 12,544 11,290 10,161 8,129 6,503 3.902 0


Number of not # of MDUs: 6,829 11,254 14,625 10,238 7,166 4,300 2,580 1,032 0
Connected Total not Connected; 10,807 21,597 27,170 21,528 17,327 12,429 9.083 4,934 0

or hand holes (for N=48) are computed and cumulative cash ow are also presented in
presented in this table. Figure 10. With the current cost assumption
Table 8 presents the penetration schedule used and demographic data, it seems that the cash
for the study. The penetration schedule enables ow of the project breaks even after the eighth
the designer to dene the marketing plan by year of the project. The NPV turns positive at
specifying the percentage of each group of the tenth year.
customers that will be absorbed in each year. The discussion on the techno-economic
In Table 7, only the rst nine years of analysis of the FTTH economic model is not
deployment are presented, but the model is complete without a brief discussion on
capable of considering the penetration schedule sensitivity. Figure 11 shows the results of the
for every individual year of the deployment sensitivity analysis on some key parameters.
period. It is assumed that, by the end of the Trenching costs have the main contribution on
fth year, all the addressable customers will be the cost per unit in FTTH deployments.
connected. The terminal value of the FTTH Changing the trenching cost from US$30 to
infrastructure is derived and included in the US$70 simply leads to a change of about
cash ow computation. US$1,500 on CAPEX per unit. The cases in
The project overview is presented in Figure 9. which there are some available spaces in the
In this gure, the CAPEX, revenue and ducts were also studied, and it was found that,
EBITDA for a period of 15 years are plotted. In in these cases the CAPEX per unit reduced to
addition to this graph, the model also computes US$900 per unit (subscriber). Varying the
the key performance indicators including NPV penetration percentage from 50 per cent to 100
and IRR. For the given scenario the discount per cent (at the end of year 9) results in a
rate is set at 7 per cent, and the computed NPV variation of US$1,140 per unit. The amount of
is US$191,047,850. The IRR parameter for the nal digging and its cost have the least
mentioned setting is 15 per cent. In the last year contribution on the CAPEX per unit variation.
(year 15), the value of the infrastructure is also Variation in the cost of active equipment in the
included in the graph. POP has only a modest (US$145) impact on
The cash ow of the project and the the cost per unit. Another important factor also

306 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Figure 9: CAPEX, revenue and EBITDA

studied was the density of subscribers per OTHER CASE STUDIES


deployment area, which aects the nal In order to study the eect of dierent
CAPEX per unit. In the high-density zone demographic data and parameters on the
with around 20,000 subscriber per square results, a comparison study between three
kilometre, the CAPEX per unit amounts to other cities was performed. The cost and
US$564, while the same factor increases to denition parameters were kept constant for
US$2,654 for a low-density deployment of all the studies. Table 9 includes the important
only 3,700 subscriber per square kilometre. For characteristics of these three cases and some
these results, high-density and low-density results obtained using the techno-economic
zones of Athens were selected. model. The rst city was a capital city with

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 307
Azodolmolky and Tomkos

Figure 10: Cash ow

Figure 11: Sensitivity analysis for the Ethernet FTTH deployment in Athens

308 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)
Active Ethernet FTTH deployments

Table 9: Three-city case study

Case IBS (m) Density No. of buildings/ POP size (m2) IRR (%) CAPEX/cust.
(customer/km2) km2

City 1 40 2,089 710 28 6.4 US$2,112


City 2 51 1,487 432 28 5.2 US$2,119
City 3 37 3,767 844 15 6.9 US$1,184

baseline values for density of customer per In summary:


area (square kilometres) compared with other
two cases. The other two cities were selected . Current and emerging applications, such as
so as to have dierent values for this density triple play oerings, business services (ASP,
quantity. As indicated in Table 9, active IT-outsourcing and virtual business
Ethernet deployments in densely populated networks), personal services (e-health, care
areas results in a lower amount of CAPEX per for elderly people and e-medicine), working
unit value. Another interesting outcome of and learning (teleworking, citizen
this study reveals that, for all three cases, the journalism and communities), and nally
average required space for each POP is in the entertainment with huge bandwidth
range 1528 m2, which is not an enormous requirements are the main market drivers of
size for active Ethernet-based FTTH FTTH deployment.
deployments. . Fibre to the home networks can be
categorised into two main architectures:
CONCLUSIONS home run architecture, in which a dedicated
Fibre deployment to residences is a huge bre connects each home to the POP, and
investment that should last for many decades. star architectures, where many homes share
Although every deployment scheme for FTTH one feeder bre.
has its own merits, there is a high risk that . Several technologies have been proposed for
short-term saving in particular bre FTTH networks, such as Ethernet-based
infrastructure deployments will signicantly FTTH, other variations of AONs and
aect the future use of the expensive bre various avours of PONs (eg BPON,
infrastructure without major follow-on GPON, EPON).
investments. The presented techno-economic . Ethernet FTTH enables a service provider
model paves the way for a better view of the to guarantee bandwidth for each
costs, revenue and cash ow of a typical FTTH subscriber. In Ethernet FTTH topology,
deployment. The main cost of FTTH projects the dedicated bre is the most secure
is the construction of the FTTH network medium today. In addition, Ethernet
infrastructure. The model provided also assists switches can provide physical port level
service providers or network planners to and logical customer trac separation
determine the optimum number of POPs, capabilities with many robust security
based on demographic data. A service provider features. Ethernet FTTH requires
must carefully consider the market opportunity considerably more bre and OLTs
before investing in a FTTH project. The cash compared with other shared infrastructure.
ow, key performance indicators and . Before deploying the Ethernet FTTH, it is
sensitivity analysis are presented in this work. important to evaluate the key performance
Active Ethernet FTTH deployment in densely metric of the project from both the technical
populated areas leads to lower CAPEX per and economic points of view. Therefore,
customer value. services providers require a tool which, given

# Henry Stewart Publications 17541662 (2008) Vol. 1, 3 294310 Journal of Telecommunications Management 309
Azodolmolky and Tomkos

the desired technology, will assist them to References


evaluate their return on investments and to 1 Van Bofaet, J.M. (2007) Europe at the speed of light,
Europe FTTH Council, 19th June.
make educated decisions on deployment. 2 Conner, M. and Hanlon, P. (2006) FTTH design metrics for
. The presented techno-economic model can greeneld deployments, presented at the Optical Fiber
determine the optimised number of POPs Communication (OFC) Conference.
3 IDATE Consulting & Research (2007) FTTH situation in
based on the customer demographic data
Europe, IDATE Report, Barcelona, 7th February.
and technical specication of each POP, 4 Banerjee, A. and Marvin, S. (2005) Towards technologically
along with associated cost of each POP. and competitively neutral ber to the home (FTTH)
. In addition to technical information, the infrastructure, in I. Chlamtac, A. Gumaste and C. Czabo
(eds), Broadband Services: Business Models and
model presented also provides key Technologies for Community Networks, John Wiley, NJ.
performance indicators for business 5 Luo, R., Ning, T., Li, T., Cai, L., Qiu, F., Jian, S. and Xu,
planning. These information include J. (2005) FTTH a promising broadband technology, in
International Conference on Communications, Circuits and
CAPEX, OPEX, Revenue, EBITDA, NPV Systems, 27th30th May, Vol. 1, pp. 609612, IEEE, Hong
(for given interest rate), IRR, cash ow and Kong.
also cumulative cash ow. 6 Tomkos, I. (2006) Optical access network technologies and
architectures, Workshop organized by National Technical
. For the case study of the FTTH deployment
University of Athens (NTUA), Athens, February.
in Athens, the computed NPV is 7 Kolias, C., Makris, A., Nikopoulos, N., Panagiotopoulos, P.,
US$191,047,850 and the IRR is 15 per cent. Zacharopoulos, I., Yovanof, G. and Tomkos, I. (2005)
The CAPEX per unit for this case study is Comparative Study and Techno-economic Analysis of
Residential Broadband Access Technologies: GPON and
US$1,281. FWA, Journal of Communication Networks, Vol. 4, pp. 211
. Using the model, the number of POPs for 217.
the case of deployment in Athens is 24. 8 Jankovic, M., Petrovic, Z., and Dukic, M. (2000) A techno-
economic study of broadband access network
. Trenching cost, density of customers per implementation models, 10th Mediterranean Electro-
square kilometre and the penetration technical Conference (MELECON 2000), 2931 May 2000,
percentage are two sensitive parameters, Vol. 1, pp. 168171, IEEE, Lemesos, Cyprus.
9 Mochida, Y. (1994) Technologies for local-access bering,
which greatly aect the overall CAPEX per
IEEE Communications Magazine, February, pp: 6473.
unit.

310 Journal of Telecommunications Management Vol. 1, 3 294310 # Henry Stewart Publications 17541662 (2008)