OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
1.00 ABRAZADERA PVC DE 1/2" X 4" S/. 3,600.00 S/. 3,600.00 S/. 3,600.00 S/. 3,600.00 S/. 1,800.00
2.00 ACCESORIOS DIVERSOS S/. 5,008.99 S/. 5,008.99 S/. 5,008.99 S/. 5,008.99 S/. 2,504.49
3.00 ACCESORIOS DIVERSOS PARA TANQUE ELEVADO S/. 1,500.00 S/. 1,500.00 S/. 3,000.00 S/. 3,000.00
4.00 ACCESORIOS PVC SAP (AGUA) S/. 470.00 S/. 470.00 S/. 470.00 S/. 470.00 S/. 235.00
5.00 ACERO CORRUGADO 0 3/8" S/. 2.79 S/. 2.79 S/. 5.59 S/. 5.59
6.00 ACERO DE REFUERZO FY=4200 GRADO 60 S/. 150,000.00 S/. 50,000.00 S/. 45,000.00 S/. 23,000.00 S/. 10,000.00
7.00 ADAPTADOR PVC SAP -FF DE 110 MM S/. 868.00 S/. 868.00 S/. 868.00 S/. 868.00 S/. 434.00
8.00 AFORADOR DE FIBRA DE VIDRIO
9.00 AGUA S/. 3,329.88 S/. 3,500.00 S/. 2,500.00 S/. 1,500.00 S/. 1,500.00
10.00 ALAMBRE NEGRO RECOCIDO # 16 S/. 1,000.00 S/. 3,000.00 S/. 3,000.00 S/. 3,000.00 S/. 4,000.00
11.00 ALAMBRE NEGRO RECOCIDO # 8 S/. 750.00 S/. 850.00 S/. 750.00 S/. 750.00 S/. 500.00
12.00 ANDAMIO DE MADERA S/. 104.14
13.00 ANDAMIO METAL TABLAS-ALQUILER S/. 78.25
14.00 ANGULO 1"x1"x1/8" x6m. AREQUIPA S/. 100.00 S/. 47.34
15.00 ANGULO 2"x2"x1/4" x6m. AREQUIPA S/. 104.40
16.00 ANGULO 3/4"x3/4"x1/8"x 6m. AREQUIPA S/. 40.04
17.00 ANILLO DE JEBE DE 110MM PARA AGUA C-7.5 S/. 2,877.39 S/. 2,877.39 S/. 2,877.39 S/. 2,877.39 S/. 1,438.69
18.00 ANILLO DE JEBE DE 200MM S/. 1,794.62 S/. 2,392.83 S/. 1,794.62 S/. 1,794.62 S/. 1,794.62
19.00 ANILLO DE JEBE DE 200MM PARA AGUA C-7.5 S/. 656.74 S/. 656.74 S/. 656.74 S/. 656.74 S/. 328.37
20.00 ANILLO DE JEBE DE 250MM S/. 23,972.54 S/. 25,534.08
21.00 ANILLO DE JEBE DE 300MM S/. 85.05 S/. 113.40 S/. 85.05 S/. 85.05 S/. 85.05
22.00 ANILLO DE JEBE A-10 DE 250MM S/. 41.82 S/. 55.76 S/. 41.82 S/. 41.82 S/. 41.82
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
23.00 ANILLO DE JEBE A-7.5 DE 110MM S/. 62.00 S/. 62.00 S/. 62.00 S/. 62.00 S/. 31.00
24.00 ARENA FINA S/. 100,000.00 S/. 50,000.00 S/. 45,000.00 S/. 45,000.00 S/. 2,790.68
25.00 ARENA GRUESA S/. 50,000.00 S/. 50,000.00 S/. 50,000.00 S/. 40,000.00 S/. 40,000.00
26.00 ARENADO,LABOR PINTADO TUBO FIERRO 16" S/. 707.00
27.00 ARENADO,LABOR PINTADO TUBO FIERRO 8" S/. 1,311.38
28.00 ASFALTO RC-250 S/. 10,000.00 S/. 3,000.00 S/. 3,000.00 S/. 1,604.86
29.00 BALDE PRUEBA-TAPON -ABRAZ. Y ACCESORIOS S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 S/. 308.22
30.00 BARRENO DE PERFORACION DIFERENTES MEDIDA S/. 2,500.00 S/. 1,500.00
31.00 BOMBA DE AGUA 4 HP DE CAUDAL S/. 600.00 S/. 600.00 S/. 600.00 S/. 600.00
32.00 BOMBA PARA PRUEBA, 12 HP S/. 360.00
33.00 BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 8" S/. 130.00
34.00 BRIDA DE ACERO P/ SOLDAR-EMPERNAR DE 8" S/. 1,000.00 S/. 560.00
35.00 CABLE TW # 10 AWG S/. 48.30
36.00 CABLE TW # 14 AWG 2.5 MM2 S/. 204.10
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
59.00 CEMENTO PORTLAND TIPO V S/. 100,000.00 S/. 20,000.00 S/. 27,528.01
60.00 CINTA AISLANTE S/. 0.90
61.00 CINTA TEFLON S/. 240.00
62.00 CIZALLA P/FIERRO CONST. HASTA 1" S/. 250.00 S/. 250.00 S/. 250.00 S/. 100.12
63.00 CLAVOS Fo No C/C 3" S/. 32.00
64.00 CLAVOS Fo No C/C 3/4" S/. 842.00
65.00 CLAVOS PARA MADERA C/C 3" S/. 2,500.00 S/. 2,000.00 S/. 2,000.00 S/. 1,000.00
66.00 CLAVOS PARA MADERA C/C 3/4" S/. 104.73
67.00 COCINILLA A GAS I/ACCESORIOS/PLOMO S/. 17.15
68.00 CODO PVC SAP 110MM*22.5 S/. 780.00
69.00 CODO PVC SAP 110MM*90 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 640.00
70.00 CODO DE 900 SP PVC SAP P/AGUA DE 1/2" S/. 250.00 S/. 250.00 S/. 500.00 S/. 500.00 S/. 300.00
71.00 CODO DE ACERO DE 200MM S/. 340.00
72.00 CODO PVC SAP 110MM*45 S/. 260.00
73.00 CODO PVC SAP 200MM*90 S/. 1,295.00
74.00 COMPACTADOR VIBR. TIPO PLANCHA 4 HP S/. 552.00
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
75.00 COMPACTADOR VIBR. TIPO PLANCHA 7 HP S/. 250.00 S/. 500.00 S/. 200.00 S/. 5.39
76.00 COMPACTADOR VIBR. TIPO PLANCHA 8 HP S/. 25,000.00 S/. 25,000.00 S/. 25,000.00 S/. 25,000.00 S/. 9,803.68
77.00 COMPRESORA NEUMATICA 196 HP 600-690 PCM S/. 2,500.00 S/. 1,000.00 S/. 1,000.00
78.00 COMPUERTA DE MADERA 0.30X0.40m S/. 100.00
79.00 CONEXION A CAJA PVC SAP 3/4" S/. 4.80
80.00 CONEXION A CAJA PVC SEL P/INS ELECT 5/8" S/. 50.00
81.00 CONEXIONES A CAJA PVC SEL 3/4"
82.00 CORDEL S/. 237.00
83.00 CORPORATION RT-NIPLE-TUERCA-EMPAQ. 1/2" S/. 6,850.00 S/. 5,000.00 S/. 1,000.00 S/. 200.00
84.00 CORTADORA DE CONCRETO 8HP S/. 58.72
85.00 COSTO ESTIMADO S/. 420.00
86.00 COSTO ESTIMADO PARA DIAGRAFIA S/. 4,144.00
87.00 CRUZ PVC SAP DE 110MM S/. 224.00 S/. 224.00 S/. 224.00 S/. 300.00 S/. 148.00
88.00 CRUZ PVC SAP DE 200MM S/. 500.00 S/. 500.00 S/. 416.00
89.00 CURVA LIVIANO PVC SEL P/INST. ELECT 1" S/. 2.60
90.00 CURVA LIVIANO PVC SEL P/INST. ELECT 5/8" S/. 3.00
91.00 CURVA PESADO PVC SAP P/INST. ELECT. 1" S/. 0.90
92.00 CURVA PVC 1/2" P/AGUA S/. 900.00
93.00 CURVAS PVC SEL 3/4" S/. 5.85
94.00 DISCO DE CORTE DIAMANTADO S/. 3,555.91
95.00 ELECTROBOMBA 25HP SUMERGIBL TUBULAR 6"MON S/. 20,000.00
96.00 ELECTROBOMBA 2HP SUMERGIBL TUBULAR 6"TRI S/. 8,657.17
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
97.00 ELECTROBOMBA 36HP SUMERGIBL TUBULAR 6"MON S/. 13,913.60 S/. 49,600.00 S/. 6,000.00 S/. 54.40
98.00 EMPAQUETADURA DE JEBE DE 8" S/. 384.00
99.00 ENCOFRADO METALICO S/. 882.37
100.00 EQUIPO DE CLORINACION S/. 3.21
101.00 EQUIPO DE CONTROL AUTOMATICO DE NIVEL
102.00 EQUIPO DE CONTROL AUTOMATICO ENCENDIDO + ESTABILIZADOR S/. 22,775.90
103.00 EQUIPO DE CORTE Y SOLDEO (OXI-ACET) S/. 20,000.00 S/. 20,000.00 S/. 21,921.28
104.00 EQUIPO IMPORTADO S/. 1,500.00 S/. 1,000.00 S/. 1,000.00 S/. 500.00
105.00 ESCALERA DE CARACON D=1.30M H=2.40M S/. 4,216.32
106.00 ESTACA DE MADERA S/. 8,090.16
107.00 ESTERA DE 2.00 X 3.00 M.
108.00 ESTIMADO S/. 185.00
109.00 FILTRO ESPECIA DE FGIMPORTADO S/. 5,000.00 S/. 10,000.00 S/. 10,000.00
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
110.00 FLETE TRANSPORTE LOCAL S/. 3,000.00 S/. 1,000.00 S/. 2,803.87
111.00 FLETE TUBERIA P.V.C. 1/2" - 1" S/. 120.00
112.00 GENERADOR DIESSEL 10 KW S/. 22,500.00
113.00 GRAVA PARA FILTRO DE 10-18MM S/. 2,000.00 S/. 2,000.00 S/. 2,006.96
114.00 GRAVILLA PARA PROTECCION DE MEDIDOR S/. 900.00
115.00 GRIFO CONTRA INCENDIO T/POSTE 2 BOCAS S/. 500.00 S/. 500.00 S/. 500.00
116.00 HIPOCLORITO DE CALCIO 70% S/. 450.00
117.00 HIPOCLORITO DE CALCIO AL 70% S/. 726.74 S/. 2,000.00 S/. 2,000.00
118.00 HORMIGON S/. 100.00 S/. 508.93
119.00 HORMIGON (PUESTO EN OBRA) S/. 389.04
120.00 IMPERMEAB.MORTERO/CONCRETO CHEMA 1 POLVO S/. 786.19
121.00 IMPERMEABILIZANTE S/. 78.79
122.00 IMPRIMANTE S/. 1,703.29
123.00 INODORO TQUE. BAJO NORMAL BLANCO C/A. S/. 65.00
124.00 INSTALACION PROVISIONAL DE AGUA Y DESAGU S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00
125.00 INSTALACIONES ELECTRICAS (ESTIMADO) Z.S. S/. 2,000.00 S/. 574.00
126.00 INTERRUPTOR SIMPLE BIPOLAR BAKELITA S/. 14.40
127.00 INTERRUPTOR TERMOMAGNETICO DE 3x60A S/. 70.00
128.00 INTERRUPTORES DE COMMUTACION S/. 75.00
129.00 LADRILLO CORRIENTE 6 x 12 x 24 CM S/. 1,000.00 S/. 1,000.00 S/. 46.00
130.00 LADRILLO CORRIENTE 6 x 12 x 24 CM S/. 229.85
131.00 LADRILLO KING KONG HECHO A MANO 10x14x24 CM S/. 446.78
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
145.00 MATERIAL DE PRESTAMO-SELECCIONADO OBRA S/. 5,000.00 S/. 5,000.00 S/. 5,000.00 S/. 5,000.00 S/. 5,000.00
146.00 MEDIDOR DE CAUDAL 1/2" S/. 15,000.00
147.00 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00
148.00 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 S/. 500.00 S/. 1,200.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00
149.00 MOLDE METALICO PARA BUZON S/. 500.00 S/. 200.00 S/. 200.00 S/. 200.00
150.00 MOTOBOMBA 10 HP 4" S/. 381.77
151.00 MOTOBOMBA 3.5 HP 2" S/. 500.00
152.00 MOTOBOMBA 3.5HP D=2" S/. 300.00 S/. 300.00 S/. 300.00 S/. 22.61
153.00 MOTOBOMBA 4" INCL. MANGUERA Y ACCS. S/. 1,000.00 S/. 1,000.00 S/. 2,500.00 S/. 1,500.00 S/. 1,000.00
154.00 MOTOSOLDADORA DE 250 AMP. S/. 350.00 S/. 500.00 S/. 250.00
155.00 MOVILIZACION Y DESMOVILIZACION S/. 3,654.26
S/. 764,446.20 S/. 598,265.37 S/. 492,303.19 S/. 413,844.49 S/. 269,234.22
CALENDARIO DE ADQUISICION DE MATERIALES
OBRA: MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE OYOTUN-CHICLAYO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OYOTUN
VALOR REFERENCIAL: S/. 9,997,833.45
PLAZO DE EJECUCION DE OBRA: 353 DIAS
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05
S/. 76,444.62 S/. 59,826.54 S/. 49,230.32 S/. 41,384.45 S/. 26,923.42
S/. 38,222.31 S/. 29,913.27 S/. 24,615.16 S/. 20,692.22 S/. 13,461.71
S/. 38,222.31 S/. 29,913.27 S/. 24,615.16 S/. 20,692.22 S/. 13,461.71
S/. 917,335.44 S/. 717,918.44 S/. 590,763.83 S/. 496,613.39 S/. 323,081.06
S/. 174,293.73 S/. 136,404.50 S/. 112,245.13 S/. 94,356.54 S/. 61,385.40
S/. 1,091,629.18 S/. 854,322.94 S/. 703,008.95 S/. 590,969.94 S/. 384,466.46
DE ADQUISICION DE MATERIALES
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
MESES
MES 06 MES 07 MES 08 SUMA PARCIAL
CALENDARIO DE ADQUISICION DE MATERIALES
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
132.00
133.00
134.00
135.00
136.00 COSTO DIRECTO
137.00 GASTOS GENERALES (10%)
138.00 UTILIDAD (5%) S/. 96,820.00
139.00 SUPERVISION DE OBRA (5%)
140.00 SUBTOTAL
141.00 IGV (19%)
142.00 COSTO TOTAL
143.00
144.00
CALENDARIO DE ADQUISICION DE MATERIALES
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
145.00
146.00 S/. 26,073.60
147.00
148.00
149.00
150.00 S/. 750.00
151.00
152.00 S/. 4,084.80
153.00 S/. 10,892.80
154.00 S/. 6,808.00
155.00 S/. 200.00
MESES
Item Descripcin
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
S/. 387.00
S/. 46,978.42
S/. 90,134.00
S/. 66,117.51
S/. 192.46
S/. 5,994.50
S/. 96,820.00 S/. 411,434.66
S/. 0.00 S/. 3,810.43
S/. 0.00 S/. 158,007.95
S/. 0.00 S/. 155.25
S/. 0.00 S/. 160,342.00
S/. 0.00 S/. 137,843.00
S/. 0.00 S/. 3,059.43
ADQUISICION DE MATERIALES
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL
MESES
Parcial (S/.)
MES 08 SUMA PARCIAL