Basement upto Podium

Activity ID Activity Name Duration Start


Electrical Works 524 8-Aug-17
1st Fix 129 8-Aug-17
Installation of Electrical Conduits and Back Boxes for Swtiches and
6506 Sockets. 60 8-Aug-17
10116 Installation of Cable Tray 35 27-Sep-17
A239310 Floor Conduiting for power circuits 50 6-Nov-17
2nd Fix 209 16-Oct-17
10106 Wiring of Circuits and Point Wiring 60 16-Oct-17
10107 Telecommunication/Data Cabling 20 15-Dec-17
10136 Installation of Power Cables 60 16-Dec-17
10108 Fire Alarm Cabling 20 4-Jan-18
10109 CCTV System Cabling 20 9-Jan-18
10110 CATV Cabling 20 29-Jan-18

10926 Distribution Board Installation & Cable Termination 90 14-Feb-18


10111 Access Control Cabling 20 18-Feb-18
10112 Video Intercom System Cabling 20 10-Mar-18
3rd Fix 179 8-Aug-18
A239550 Installation of Switches, ELV Devices 60 8-Aug-18
A239560 Installation of Light Fixtures 30 7-Oct-18
A239570 Earthing & Lightning Protection System 30 7-Oct-18
A239575 UPS Installation 30 7-Oct-18
A239576 Metal Detector Gate Installation 30 6-Nov-18
A265930 Installation of H.T Switch Boards and Cables 90 10-Nov-18*
A265980 Installation of L.T Switch Boards and Cables 90 12-Nov-18
A265990 MCC and Busbar Trunking System 90 14-Nov-18
A234780 Installation of LT panels 90 15-Nov-18
A234770 Installation of Indoor Power Transformer 90 15-Nov-18
A234760 Installation of generators 70 25-Nov-18
A284220 Testing and Commissioning 10 3-Feb-19

Tower
Activity ID Activity Name Duration Start
Electrical Works 437 10-May-17
1st Fix 18 10-May-17
6466 Installation of Electrical Conduits and Back Boxes 18 10-May-17
2nd Fix 65 16-Jul-17
6756 Installation of Cable Tray 16 16-Jul-17
6766 Telecommunication/Data Cabling 10 21-Jul-17
6746 Wiring of Circuits and Point Wiring 16 26-Jul-17
6767 Fire Alarm Cabling 10 31-Jul-17
6776 Installation of Power Cables 15 1-Aug-17
6768 CCTV System Cabling 10 10-Aug-17
6769 CATV Cabling 10 20-Aug-17
6770 Access Control Cabling 10 9-Sep-17
6771 Video Intercom System Cabling 10 19-Sep-17
3rd Fix 23 28-Jul-18
A224240 Installation of Switches, Sockets in Bathroom 11 28-Jul-18
A224250 Installation of Switches, Sockets and ELV Devices in Kitchen 8 29-Jul-18
A224270 Installation of Switches, Sockets and ELV Devices on Walls 6 30-Jul-18
A224260 Installation of Ceiling Mounted Lights 6 3-Aug-18
6786 Distribution Board Installation & Termination 10 5-Aug-18
6796 Testing & Commissioning 7 15-Aug-18
Finish
12-Feb-19
25-Dec-17

15-Oct-17
31-Oct-17
25-Dec-17
13-May-18
14-Dec-17
4-Jan-18
12-Feb-18
24-Jan-18
29-Jan-18
18-Feb-18

13-May-18
10-Mar-18
30-Mar-18
12-Feb-19
5-Oct-18
5-Nov-18
5-Nov-18
5-Nov-18
5-Dec-18
6-Feb-19
8-Feb-19
10-Feb-19
11-Feb-19
11-Feb-19
1-Feb-19
12-Feb-19

Finish
21-Aug-18
27-May-17
27-May-17
28-Sep-17
31-Jul-17
30-Jul-17
10-Aug-17
9-Aug-17
15-Aug-17
19-Aug-17
8-Sep-17
18-Sep-17
28-Sep-17
21-Aug-18
8-Aug-18
5-Aug-18
5-Aug-18
9-Aug-18
14-Aug-18
21-Aug-18