Tower
Activity ID Activity Name Duration Start
Electrical Works 437 10-May-17
1st Fix 18 10-May-17
6466 Installation of Electrical Conduits and Back Boxes 18 10-May-17
2nd Fix 65 16-Jul-17
6756 Installation of Cable Tray 16 16-Jul-17
6766 Telecommunication/Data Cabling 10 21-Jul-17
6746 Wiring of Circuits and Point Wiring 16 26-Jul-17
6767 Fire Alarm Cabling 10 31-Jul-17
6776 Installation of Power Cables 15 1-Aug-17
6768 CCTV System Cabling 10 10-Aug-17
6769 CATV Cabling 10 20-Aug-17
6770 Access Control Cabling 10 9-Sep-17
6771 Video Intercom System Cabling 10 19-Sep-17
3rd Fix 23 28-Jul-18
A224240 Installation of Switches, Sockets in Bathroom 11 28-Jul-18
A224250 Installation of Switches, Sockets and ELV Devices in Kitchen 8 29-Jul-18
A224270 Installation of Switches, Sockets and ELV Devices on Walls 6 30-Jul-18
A224260 Installation of Ceiling Mounted Lights 6 3-Aug-18
6786 Distribution Board Installation & Termination 10 5-Aug-18
6796 Testing & Commissioning 7 15-Aug-18
Finish
12-Feb-19
25-Dec-17
15-Oct-17
31-Oct-17
25-Dec-17
13-May-18
14-Dec-17
4-Jan-18
12-Feb-18
24-Jan-18
29-Jan-18
18-Feb-18
13-May-18
10-Mar-18
30-Mar-18
12-Feb-19
5-Oct-18
5-Nov-18
5-Nov-18
5-Nov-18
5-Dec-18
6-Feb-19
8-Feb-19
10-Feb-19
11-Feb-19
11-Feb-19
1-Feb-19
12-Feb-19
Finish
21-Aug-18
27-May-17
27-May-17
28-Sep-17
31-Jul-17
30-Jul-17
10-Aug-17
9-Aug-17
15-Aug-17
19-Aug-17
8-Sep-17
18-Sep-17
28-Sep-17
21-Aug-18
8-Aug-18
5-Aug-18
5-Aug-18
9-Aug-18
14-Aug-18
21-Aug-18