Вы находитесь на странице: 1из 2

Hands-On

IEC 61850 is the


world standard
Energy companies desire an open and
future-proof standard
The energy companies substations and operations centers must communicate with each other
about switch positions, values of current, voltage, power and direction, interlocking, trips and
about maintenance.

John Jansen van der Sligte ous working groups of the IEC models on new communication nalities to the devices that form
TC57 that have defined the stan- stacks. the substation automation
Until today every supplier of dard. P Flexible design: The new stan- system. Both centralized and
systems and components has had This new standard is designed dard grants users the flexibility to decentralized solutions are sup-
his own approach, functionalities to fulfill the following require- freely allocate the various functio- ported.
and protocol. This mix of various ments:
systems has caused extension or
modification of substations to be P Interopera-
very complex, expensive or even bility: Intelli-
impossible. Therefore, energy com- gent Electronic
panies (utilities) desire an open Devices (IEDs)
and future-proof standard. Utili- of various
ties, suppliers and consultants manufacturers
have worked intensively during are able to
the past several years and the exchange and
global substation automation use the infor-
standard is now ready: the IEC mation for
61850 standard. their own func-
The IEC 61850 is more than tions.
just a new standard for communi- P Future
cation within substations. It also proof: The
introduces data models for all basis for the
major substation components and standard is the
defines services to enable map- data models
ping on mainstream communica- that relate to
tion stacks. Manufacturers have the basic func-
released the first commercial tionality of the
products with IEC 61850 imple- substation,
mentations in 2004. KEMA has which changes
played an active role in the vari- less rapidly
than communi-
cation or auto-
mation techno-
Ing. John Jansen logy. IEC
van der Sligte is 61850 is able
Consultant
Substation Auto-
to follow new
mation & KEMA developments
Projectmanager in data com-
IEC 61850 at
munication by
KEMA Nederland
B.V., Arnhem/Netherlands easily mapping
www.kema.com the data The IEC 61850 is more than just a new standard for communication within substations

00 PRAXIS Profiline AdvancedTCA Juli 2005


Hands-On

Our company profile


Nothing works with-
out energy
Energy supply is one of the with its own supply network,
most important sectors in you know that every minute of
modern society. Nothing works standstill is one too many.
without energy. The lighting Energy supply is also a special-
system, computers, security ty of KEMA. For more than 75
systems, all of them need an years and operating from
uninterrupted energy supply. over 50 offices in 20 countries
As players in this energy chain KEMA has supplied solutions
energy generation, trade and for the energy market: high-
distribution or government quality business and technical
that is mere childs play for consultancy and inspection, The....
you. testing and certification of low ...anywhere in the world.
But also if you are the through to high voltage.
operator of an industrial plant

Integrated system Well-founded advice


When a complete set of IEC KEMA has thorough knowl-
61850 products is available, the edge and experience in the design
new standard will result in an and specification of a substation
integrated system of all the sub- based on conventional technology
station equipment. This integrated and IEC 61850. We offer all tech-
system would include instrument nical consultancy, project execu-
transformers, protective relays, tion support and test services for
control systems but also HV- projects dealing with this stan-
switchgear that is controlled and dard, including:
supervised using the IEC 61850
process and station bus. Measure- P Workshops, e.g. in the orienta-
ments from the instrument trans- tion phase
formers as well as trip commands P Training;
from the protection relays will uti- P Feasibility studies;
lize the communication network. P Conceptual and preliminary
Because of this integration, design;
specification, implementation, P Migration strategies;
testing and maintenance of an P Specification of equipment;
IEC 61850-based system can no P Type testing of protective devi-
longer be handled by communica- ces;
tion specialists only. It will require P Conformance and interopera-
coordination between the various bility testing;
disciplines and knowledge areas: P Test tools
communication technology, P Project execution support;
protocol testing, protections and P Quality assurance
protection systems, protection Up until now, KEMA has sup-
relays functional testing, instru- ported over 40 companies with
ment transformers, substation the introduction and implementa-
control & automation, HV- tion of the IEC 61850 standard.
switchgear (testing) SCADA/EMS We look forward to assisting you
and distribution automation. The in the process of implementing
question is not if we are going to IEC 61850 as a one stop-shop-
use IEC 61850 in a way the user ping partner who knows all about
will get the benefits, but rather the electricity industry.
when and how.

PRAXIS Profiline AdvancedTCA Juli 2005 00

Вам также может понравиться