Results
Production increased to
1,200 bbl/d of dry oil following
intervention. Complete water
shutoff was achieved.
XX,750
XX,800
XX,850
XX,900
XX,950
XY,000
FloScan Imager flow profile indicated water production of 5,000 bbl/d and oil production
of just 650 bbl/d.
Direct measurement of the velocity and fluid holdup profile helped the analyst
determine downhole phase split and reduced the uncertainties associated with multiphase
flow interpretation. FloScan Imager visualization software optimized the real-time display
of spinner and probe measurements.