MATERIAL QUALITY INSPECTION REPORT

Item Name: Ring main Unit Date Received:


Supplier/Manufacturer: IET/Lucy switchgear Date Inspected: 29.03.2017

Method of Inspection: Visual, Measurement and Testing. Sample Delivery Note No:
Contract No. Invoice No:
QUALITY CHECK LIST Total No. Inspected: 3

No.Quality checks /measurement done Umeme Requirement Observation Comment (Pass/Fail)


1RMU rating 11kV & 33kV 11kV

2Type Outdoor - non extensible and extensible Outdoor - Extensible Pass

3Switch gear category Standard Operation Standard Operation Pass

4Switch gear Automation Fully wired (ENABLED) Fully wired (ENABLED) Pass

5Equipment class 15kV 15kV Pass

6Insulating gas SF6 SF6 Pass

7Rated Voltage 12kV 12kV Pass

8Operating Voltage 11kV 11kV Pass

9Frequency 50Hz 50Hz Pass

10Number of Poles 3 3 Pass

11Ring main switch rated current (temperature rise within IEC) 630A 630A Pass

12Impulse Voltage withstand level, peak (1.2/50s dry) 95kV 95kV Pass

13Power frequency withstand voltage, rms (50Hz 60s wet) 38kV 38kV Pass

14Tee-off circuit rated current 200 - 250A 200A Pass

15Phase markings confirm confirmed Pass

Test certificates (Routine, type tests, National accreditation of


22 supplier) Provide Provided Pass
Remarks/Comments (Indicated the Total quantities passed/Failed): a) All 03 (three) units passed. B) Extensions should be designed with isolation points from Main rings. c) Extensions should be designed with better cable connection facilities
e.g Cable entry point and more space.

Inspected by: Designation Signature Date


1Edward Kalule Foreman switchgear 29.03.2017
2
3
4
5
6
7
8
Approval

. ..

Quality Assurance Manager Inventory Manager

Tools: - Tape Measure, Callipers, Threads and any other tool


demeed necessary.