MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
4646.04 4294.17 3324.46 $3,457.45 $3,324.47 3324.47 1595.74
1454.54 969.7
3191.49 3324.47 3324.46 $3,457.45 $3,324.47 3324.47 1595.74
63099.01 71073.47 336064.67 $426,852.26 $259,371.70 7477.53
11647.26
6818.41
3691.2 35981.6 30200.21
7996.47 $6,956.45
2099.73 $20,315.82
40942.14 35091.87 41136.81
10494.27 $50,031.17
$21,945.02
244137.19 $210,737.30
$138,811.53 $187,007.03
$50,419.64 7477.53
$1,056,100.54 $330,388.48
943363.68 $259,607.87
78781.51
26824.97 $35,551.66
7130.38 $35,228.95
$29,164.33 $124,072.69 $260,402.87 $266,861.61 $58,088.53 $96,608.26 $40,901.88
$29,164.33 $27,960.62
$6,651.03
$6,673.29 8897.22
$32,432.99 107808.7 217124.75 27491.84
2597.36 47406.66
1485.14 22859.02
7737.67 954.42
37128.07 40901.89
31437.7
74236.84 845.06
$50,354.76 55161.57
11701.18
27088.07
$1,153,009.92 $529,828.81 $599,792.00 $697,171.32 $320,784.70 $107,410.26 $42,497.61
$167,765.76 $77,091.38 $87,271.20 $101,440.13 $46,674.96 $15,628.45 $6,183.52
$115,300.99 $52,982.88 $59,979.20 $69,717.13 $32,078.47 $10,741.03 $4,249.76
$1,436,076.67 $659,903.08 $747,042.40 $868,328.58 $399,538.13 $133,779.74 $52,930.88
$258,493.80 $118,782.55 $134,467.63 $156,299.14 $71,916.86 $24,080.35 $9,527.56
$1,694,570.47 $778,685.63 $881,510.03 $1,024,627.72 $471,454.99 $157,860.09 $62,458.44
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO : "CREACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CAS
SANTA ROSA, DISTRITO DE RAYMONDI, PROVINCIA DE ATALAYA - UCAYALI"
CLIENTE : MUNICIPALIDAD PROVINCIAL ATALAYA
UBICACIN : RAIMONDI - ATALAYA - UCAYALI
FECHA : MARZO 2017
MESES
MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
4646.04 4294.17 3324.46 $3,457.45 $3,324.47 3324.47 1595.74
1454.54 969.7
3191.49 3324.47 3324.46 $3,457.45 $3,324.47 3324.47 1595.74
3191.49 3324.47 3324.46 $3,457.45 $3,324.47 3324.47 1595.74
63099.01 71073.47 336064.67 $426,852.26 $259,371.70 7477.53
11647.26
1678.79
500.03
7981.52
780.02
706.9
6818.41
144.15
98.54
12.25
806.72
148.3
3062.04
537.81
1476.22
253.27
279.11
3691.2 35981.6 30200.21
2705.8 9921.28
985.4 3941.6
530.85
17749.3 22186.63
46.54
516.78 3100.71
2708.1 4062.14
313.15 469.73
254 381
7996.47 $6,956.45
207.52
492.7
29.4
770.6
394.12
5052.13 $842.02
$1,033.56
$4,699.43
1050
$381.44
2099.73 $20,315.82
245.66
295.62
35.28
724.56 $724.56
444.74
$6,185.64
$2,374.06
222.62
$19.20
$85.25
$487.88
$8,919.88
131.25 $918.75
$600.60
40942.14 35091.87 41136.81
44
344.89
604.66
6823.81
2381.52
15291.62 34753.69 8340.89
1462.66
9114.08
2651.99
2019.6
25.68
5028.58
65.81
137.5 312.5 75
1413
18964.21
845.19
6469.94
10494.27 $50,031.17
150.48
344.89
184.66
3847.27
5966.97 $8,353.76
$20,221.58
$11,031.37
$10,394.10
$30.36
$21,945.02
$30.00
$197.08
$32.38
$1,074.12
$670.19
$9,093.96
$1,259.16
$7,131.48
$845.19
$142.26
$359.20
$1,110.00
244137.19 $210,737.30
24634.13
4927
5851.22
143907.08 $143,907.08
$369.52
3469.43
56469.55 $61,175.35
2061.18 $2,232.95
2817.6 $3,052.40
$138,811.53 $187,007.03
$25,175.58
$9,634.86
$2,034.03
$20,850.78 $17,059.72
$8,844.02 $7,236.01
$13,457.89 $31,401.75
$25,204.79 $58,811.19
$10,439.25 $18,031.42
$19,390.76 $45,245.11
$390.36 $910.85
$1,579.88 $3,335.31
$1,809.33 $4,975.67
$50,419.64 7477.53
$432.00
$32,650.78
$7,542.67
$1,971.84
$2,744.48
$805.00
$4,272.87 7477.53
$1,056,100.54 $330,388.48
943363.68 $259,607.87
37470.39 $4,683.79
12052.24 $2,008.71
91947.4 $38,311.42
7039.26 $1,466.51
52827.99 $15,408.16
$37,366.56
277235.07 $69,308.77
135846.04 $33,961.51
138978.65
174208.86 $43,552.21
840.05 $280.02
14917.73 $13,260.21
78781.51
965.91
218.77
34888.75
8680.5
31278.51
2749.07
26824.97 $35,551.66
163.81
65.63
3037.99
591.07
22693.14 $9,455.48
$3,933.29
$14,852.71
273.33 $136.67
$7,173.51
7130.38 $35,228.95
2300
1739.98
2090.58
846.95
$230.40
$159.42
$1,163.15
$25.59
$28,226.12
$2,525.62
$2,112.32
133.08 $731.92
$19.79 $54.41
$29,164.33 $124,072.69 $260,402.87 $266,861.61 $58,088.53 $96,608.26 $40,901.88
$29,164.33 $27,960.62
$4,927.00
$3,793.04
$17,616.79 $16,148.72
$6,276.50
$350.00
$2,387.90
$360.00 $330.00
$2,467.50 $2,467.50
$6,651.03
$25.00
$31.08
$32.26
$200.24
$2,439.56
$884.58
$183.46
$2,854.85
$6,673.29 8897.22
$40.26
$63.59
$154.95
$611.44
$5,484.42
2383.6
$318.63 39.83
6473.79
$32,432.99 107808.7 217124.75 27491.84
$143.40
$238.00
$32,051.59 105312.35
2496.35 2496.35
193159.19
18946.15 4736.54
4943.56
2523.06
17811.74
2597.36 47406.66
56
136.11
2405.25 2405.24
2300.83
24138.38
7913.86
4712.31
1533.27
853.24
3549.53
1485.14 22859.02
45.37
42.49
1397.28 698.64
978.73
11029.03
2523.32
3616.52
318.52
3694.26
7737.67 954.42
30
23.52
475.97
297.53
6692.68
870.69
21.45
217.97 62.28
37128.07 40901.89
50.2
163.45
610.54
5036.87
28140.99
2868.76 2868.75
4371.62
12567.16
4315
904.63
298.8
35.9
1578.87
3855.36
8913.41
257.26
1192.38
31437.7
132.46
96.69
2849.88
293.4
4830.82
1131.21
1138.49
15951.13
1946.65
1413.83
1653.14
74236.84 845.06
43.37
352.17
517.47
5882.44
6393.3
1900.65
2167.12 722.37
3305
167.31 122.69
53508.01
$50,354.76 55161.57
$305.28
$360.25
$5,522.26
$27,886.00
$6,731.41 30291.36
$9,520.39 14280.58
10391.75
$29.17 145.83
52.05
11701.18
62.76
45.82
7616.28
156.94
659.45
1809.82
242.49
132.03
532.74
327.85
115
27088.07
774.33
246.3
1205.56
238.64
3259.28
1168.17
954.31
663.76
3081.91
5969.33
7630.3
1896.18
$1,153,009.92 $529,828.81 $599,792.00 $697,171.32 $320,784.70 $107,410.26 $42,497.61
$167,765.76 $77,091.38 $87,271.20 $101,440.13 $46,674.96 $15,628.45 $6,183.52
$115,300.99 $52,982.88 $59,979.20 $69,717.13 $32,078.47 $10,741.03 $4,249.76
$1,436,076.67 $659,903.08 $747,042.40 $868,328.58 $399,538.13 $133,779.74 $52,930.88
$258,493.80 $118,782.55 $134,467.63 $156,299.14 $71,916.86 $24,080.35 $9,527.56
$1,694,570.47 $778,685.63 $881,510.03 $1,024,627.72 $471,454.99 $157,860.09 $62,458.44
PRESUPUESTO DESGLOSADO
PROYECTO : "CREACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERIO
SANTA ROSA, DISTRITO DE RAYMONDI, PROVINCIA DE ATALAYA - UCAYALI"
CLIENTE : MUNICIPALIDAD PROVINCIAL ATALAYA
UBICACIN : RAIMONDI - ATALAYA - UCAYALI
FECHA : MARZO 2017
ITEM
1
1.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
1.02
01.02.01
01.02.02
01.02.03
1.03
1.04
01.04.01
2
2.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.01.07
02.01.08
02.01.09
02.01.10
2.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
2.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09
2.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
2.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.05.11
02.05.12
02.05.13
02.05.14
2.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
02.06.08
02.06.09
02.06.10
02.06.11
02.06.12
02.06.13
02.06.14
02.06.15
02.06.16
02.06.17
02.06.18
2.07
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.07.06
02.07.07
02.07.08
02.07.09
2.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.08.06
02.08.07
02.08.08
02.08.09
02.08.10
02.08.11
02.08.12
2.09
02.09.01
02.09.02
02.09.03
02.09.04
02.09.05
02.09.06
02.09.07
02.09.08
02.09.09
2.1
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
02.10.06
02.10.07
02.10.08
02.10.09
02.10.10
02.10.11
02.10.12
2.11
02.11.01
02.11.02
02.11.03
02.11.04
02.11.05
02.11.06
02.11.07
3
3.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12
3.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
3.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.03.06
03.03.07
03.03.08
03.03.09
3.04
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
03.04.10
03.04.11
03.04.12
03.04.13
4
4.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
4.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
4.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
4.04
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
04.04.06
04.04.07
04.04.08
04.04.09
4.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.05.06
04.05.07
04.05.08
04.05.09
04.05.10
4.06
04.06.01
04.06.02
04.06.03
04.06.04
04.06.05
04.06.06
04.06.07
04.06.08
04.06.09
4.07
04.07.01
04.07.02
04.07.03
04.07.04
04.07.05
04.07.06
04.07.07
04.07.08
4.08
04.08.01
04.08.02
04.08.03
04.08.04
04.08.05
04.08.06
04.08.07
04.08.08
04.08.09
04.08.10
04.08.11
04.08.12
04.08.13
04.08.14
04.08.15
04.08.16
04.08.17
4.09
04.09.01
04.09.02
04.09.03
04.09.04
04.09.05
04.09.06
04.09.07
04.09.08
04.09.09
04.09.10
04.09.11
4.1
04.10.01
04.10.02
04.10.03
04.10.04
04.10.05
04.10.06
04.10.07
04.10.08
04.10.09
04.10.10
4.11
04.11.01
04.11.02
04.11.03
04.11.04
04.11.05
04.11.06
04.11.07
04.11.08
04.11.09
4.12
04.12.01
04.12.02
04.12.03
04.12.04
04.12.05
04.12.06
04.12.07
04.12.08
04.12.09
04.12.10
04.12.11
4.13
04.13.01
04.13.02
04.13.03
04.13.04
04.13.05
04.13.06
04.13.07
04.13.08
04.13.09
04.13.10
04.13.11
04.13.12
COSTO DIRECTO
GASTOS GENERALES(14.550244%)
UTILIDAD(10%)
SUBTOTAL
IGV(18%)
TOTAL PRESUPUESTO
PRESUPUESTO DESGLOSADO
PROYECTO : "CREACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERIO
SANTA ROSA, DISTRITO DE RAYMONDI, PROVINCIA DE ATALAYA - UCAYALI"
LIENTE : MUNICIPALIDAD PROVINCIAL ATALAYA
BICACIN : RAIMONDI - ATALAYA - UCAYALI
ECHA : MARZO 2017
DESCRIPCIN
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA
OBRAS PROVISIONALES
OFICINAS, ALMACENES Y CASETAS DE GUARDIANIA
COMEDORES
SERVICIOS HIGIENICOS
CARTELES DE IDENTIFICACION DE LA OBRA 4.00 x 2.40m
CERCOS DE TRIPLAY DE DELIMITACION DE OBRA
INSTALACIONES PROVISIONALES
TRABAJOS PRELIMINARES
CONSTRUCCION DE VIAS DE ACCESO
FLETE RURAL, CARGUO DE MATERIALES DE ATALAYA A CASERIO SANTA ROSA
FLETE TERRESTRE DE LIMA A ATALAYA
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL DURANTE LA EJECUCION DE LA OBRA
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y SALUD TRABAJO
OBRAS DE AGUA POTABLE
CAPTACION DE MANANTIAL DE LADERA
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
PRUEBAS DE CALIDAD
OTROS
CAMARA ROMPE PRESIN
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
PRUEBAS DE CALIDAD
OTROS
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBAS DE CALIDAD
CAMARAS DE VALVULAS DE AIRE 2"
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO DE TUBERIAS, ACCES. Y VALVULAS
PRUEBAS DE CALIDAD
OTROS
CAMARAS DE VALVULA DE PURGA
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE ZANJAS
CAMA DE APOYO
RELLENO DE ZANJA
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
PRUEBAS DE CALIDAD
OTROS
RESERVORIO APOYADO Y CASETA DE VALVULAS RAP-01 V=50M3
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS DE ALBAILERIA
REVOQUES Y REVESTIMIENTO
PISOS Y VEREDAS
CARPINTERIA METALICA
CERRAJERIA
PINTURA, ADITAMENTOS Y VARIOS
EXCAVACIONES DE ZANJA-LINEA DE DRENAJE
PRUEBAS DE CALIDAD
PRUEBAS HIDRAULICAS
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
SUMINISTRO E INSTALACION DE MANOMETRO RANGO 0-15 PSI
OTROS
CERCO PERIMETRICO DEL RAP-01 V=50M3
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CONCRETO ARMADO
MURO DE ALBAILERIA
CARPINTERIA METALICA Y HERRERIA
OTROS
CAMARA REDUCTORA DE PRESION
TRABAJOS PRELIMINARES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE MANOMETRO
SUMINISTRO E INSTALACION DE SUMIDERO
PRUEBAS DE CALIDAD
OTROS
LINEA DE ADUCCION
TRABAJOS PRELIMINARES
ELIMINACION DE OBSRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBAS DE CALIDAD
REDES DE AGUA POTABLE
TRABAJOS PRELIMINARES
OBRAS DE CONCRETO ARMADO
TRAZO NIVELACION Y REPLANTEO
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE ZANJAS
CAMA DE APOYO
RELLENO DE ZANJA
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF
SUMINISTRO E INSTALACION DE VALVULAS
PRUEBAS
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS, TOMA , CONDUCCION Y CONTROL
PRUEBAS
OTROS
SISTEMA DE ALCANTARILLADO
REDES DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION DE ZANJAS
RELLENO DE ZANJA
ELIMINACION DE DESMONTE
ENTIBADO DE ZANJAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SUMINISTRO E ISNTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBAS HIDRAULICAS Y DE RESISTENCIA
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
CAJAS DE INSPECCION
SUMINISTRO E INSTALACION DE ELEMENTOS PARA CONEXION DOMICILIARIA
PRUEBAS DE CALIDAD
CAMARA DE BOMBEO DE DESAGUE
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
PRUEBAS DE CALIDAD
OTROS
SISTEMA ELECTRICO PLANTA DE ENERGIA
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CAMA DE APOYO
RELLENO DE ZANJA
ELIMINACION DE MATERIAL EXCEDENTE
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
ACABADOS D/MURETE DE CAJA DE CONEXIONES ELECTRICAS P/T. ELECT. CAJA BOMBEO 0.4X0.60X1.00
SUMINISTRO E INSTALACION ELECTRICASUBT. P/CAMARA DE BOMBEO
TABLERO ELECTRICO P/CAMARA DE BOMBEO 0.60X1.00
SISTEMA DE POZO CONEXIN A TIERRA P/ BOMBA SUMERGIBLE
PRUEBAS DE CALIDAD
TRANSPORTE
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-PTAR
DISTRIBUCION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
ELIMINACION DE OBSTRUCCIONES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
PISOS Y PAVIMENTOS
CASETA DE GUARDIANIA
JARDINES Y OTRAS OBRAS
PRUEBAS DE CALIDAD
OTROS
CAPTACION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
PRUEBAS DE CALIDAD
OTROS
CAMARA DE REJAS, DESARENADOR Y CANALETA PARSHALL
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
PRUEBAS DE CALIDAD
OTROS
TANQUE IMHOFF
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
PRUEBAS DE CALIDAD
OTROS
LECHO DE SECADO
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
ESTRUCTURA DE MADERA
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
PRUEBAS DE CALIDAD
OTROS
FILTRO BIOLOGICO
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
PRUEBAS DE CALIDAD
OTROS
CAMARA DE CONTACTO DE CLORO
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CONCRETO ARMADO
REVOQUES Y REVESTIMIENTO
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBAS DE CALIDAD
CASETA DE CLORACION Y CISTERNA
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CONCRETO ARMADO
MURO DE ALBAILERIA
REVOQUES Y REVESTIMIENTO
PISOS Y VEREDAS
CARPINTERIA METALICA
PINTURA
CERRAJERIA
VIDRIOS Y CRISTALES
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO E INSTALACIONES SANITARIAS DEL PLAN DE CONTINGENCIA
SUMINISTRO E INSTALACION DE EQUIPO DE CLORACION
PRUEBAS DE CALIDAD
OTROS
REDES COLECTORAS INTERNAS
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE ZANJAS
CAMA DE APOYO
RELLENO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBA HIDRAULICA DE TUBERIA PARA DESAGUE
OTROS
PLANTA DE ENERGIA SOLAR
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CONCRETO ARMADO
MURO DE ALBAILERIA
REVOQUES Y REVESTIMIENTO
CARPINTERIA METALICA Y HERRERIA
PRUEBAS DE CALIDAD
OTROS
CERCO PERIMETRICO PTAR
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
CONCRETO ARMADO
MURO DE ALBAILERIA
CARPINTERIA METALICA Y HERRERIA
PRUEBAS DE CALIDAD
OTROS
RED DE AGUA POTABLE-PTAR
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE ZANJAS
CAMA DE APOYO
RELLENO DE ZANJA
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE ACCESORIOS
PRUEBAS DE CALIDAD
EMISOR TERRESTRE
TRABAJOS PRELIMINARES
TRAZOS, NIVELES Y REPLANTEOS
MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION DE ZANJAS
CAMA DE APOYO
RELLENO DE ZANJA
ENTIBADO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SUMINISTRO E INSTALACION DE TUBERIAS
PRUEBAS HIDRAULICAS Y DE RESISTENCIA
COSTO DIRECTO
GASTOS GENERALES(14.550244%)
UTILIDAD(10%)
SUBTOTAL
IGV(18%)
TOTAL PRESUPUESTO
N EL CASERIO
CAYALI"
TUBERIA DE PVC-U UF NTP ISO 4435 SN4 DN110MM INCL.ANILLO + 10% DESPERDICIOS m
INSTALACION DE TUBERIA DE PVC UF DE 110 MM m
INSTALACION DE CAJA Y TAPA DE REGISTRO 0.30 X 0.60M EN T-NORMAL und
SUMINISTRO DE ACCESORIOS P/CONEXION DOMICILIARIA DE ALCANTARILLADO glb
INSTALACION DE ACCESORIOS P/CONEX. DOMICILIARIAS und
PRUEBAS DE CALIDAD
PRUEBA HIDRAULICA DE TUBERIA PARA DESAGUE DN 160MM m
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
CAMARA DE BOMBEO DE DESAGUE
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO m2
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
CONCRETO F'C 140KG/CM2 P/ PERFILAMIENTO DE CANAL
m3
OBRAS DE CONCRETO ARMADO
CONCRETO F'C 245KG/CM2 P/LOSA DE FONDO PISO m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO F'C=245KG/CM2 P/PLACAS m3
ENCOFRADO Y DESENCOFRADO P/ PLACAS m2
ACERO ESTRUCTURAL P/PLACAS kg
CONCRETO F'C 245KG/CM2 P/LOSAS SUPERIOR
m3
ENCOFRADO Y DESENCOF. P/LOSAS SUPERIOR
m2
ACERO ESTRUCTURAL P/LOSAS SUPERIOR
kg
REVOQUES Y REVESTIMIENTO
TARRAJEO C/IMPERM. MUROS INTERIORES EN CAMARA SECA M=1:3, E=2 CM. m2
TARRAJEO C/IMPERM. DE LOSA EN CAMARA SECA M=1:3, E=2CM. m2
TARRAJEO C/IMPERM. MUROS INTERIORES EN CAMARA HUMEDA M=1:3, E=2 CM. m2
TARRAJEO C/IMPERM. DE LOSA EN CAMARA HUMEDA M=1:3, E=2CM. m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO TUBERIAS, ACCES. Y VALV. P/ CAMARA DE BOMBEO
glb
SUMINISTRO DE EQUIPO DE BOMBEO glb
MONTAJE E INSTALACIONES HIDRAULICAS P/CAMARA DE BOMBEO glb
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
OTROS
ESCALERA MARINERA F G 0.85X0.40M und
ESCALERA MARINERA F.G. 1.65Mx0.40M
und
ESCALERA MARINERA F.G. 3.00Mx0.40M
und
REJILLA CON PERFORACIONES 0.30x0.40
und
TAPA Y MARCO DE HIERRO DUCTIL ESTNDAR 600MM
und
GRUPO ELECTROGENO DE 7500KW - 220V TIPO DIESEL INCL. TABLEROS DE CONTROL, CALENTA und
SISTEMA ELCTRICO PLANTA DE ENERGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO m
TRAZO, NIVELACION Y REPLANTEO m
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
MOVIMIENTO DE TIERRAS
EXCAVACIN ZANJA(MAQ,) P/TUB. ELECT. BAJA TENSIN. DN 25mm DE 0.4M A 0.75 M DE PROF. m3
REFINE Y NIVELACION FONDO DE ZANJA m
EXCAVACIN DE POZO PARA INSTALACIN ELECTRICA DEL POZO A TIERRA 1,00x2,5m D/PROF. m3
TRASLADO DE TIERRA DE PRESTAMO DE CANTERA A PUNTO DE INSTALACIN P/ POZO A TIERRA m3
CAMA DE APOYO
CAMA DE ARENA E=0.05 M. ZANJA P/TUB. ELECT. m
SEALIZACIN SUBTERRNEA DEL CABLEADO ELECTRICO DE BAJA TENSIN m
RELLENO DE ZANJA
RELLENO ZANJA MAT. ARENA %H =12 COMPACT. 98% PROCTOR DE 0.4 A 0.50 PROF. m
RELLENO ZANJA MAT. PROPIO. DE 0.4 A 0.20 PROF. m
RELLENO Y COMPACTACIN DE PUESTA A TIERRA CON MATERIAL ADECUADO P/POZO A TIERRA m
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO m3
ENCOFRADO Y DESENCOFRADO
ENCOFRADO Y DESENCOFRADO P/CIMENTACIN DE LA CAJA DE CONEXIONES (TG) P/CAM. BOMBm2
ENCOFRADO Y DESENCOFRADO P/CAJA DE CONEXIONES (TG) P/CAM. BOMBEO m2
OBRAS DE CONCRETO ARMADO
ACERO ESTRUCTURAL P/CIMENTACION DEL MURETE D/CAJA DE CONEXIONES (0,40x0,60x1,00m) kg
ACERO ESTRUCTURAL P/MURETE (TG) D/CAJA DE CONEXIONES (0,40x0,60x1,00m) kg
CONCRETO 210Kg/cm2 P/ CIMENTACIN DEL MURETE D/CAJA CONEXIONES (0,40x0,60x1,00m) m3
CONCRETO 210Kg/cm2 P/ CIMENTACIN DEL MURETE D/CAJA CONEXIONES (0,40x0,60x1,00m) m3
ACABADOS D/MURETE DE CAJA DE CONEXIONES P/T. ELECT. CAJA BOMBEO 0.40x0.60x1.00
ACABADOS D/ MURETE CAJA DE CONEXIONES P/TABLERO ELECTRICO D/CAMARA DE BOMBEO 0,60
m2
SUMINISTROS E INSTALACION ELECTRICA SUBT. P/CAMARA DE BOMBEO
CABLE ELECTRICO THW 90 DE 6MM2 - (N 10AWG) m
TUBERIA ELECTRICA PVC SAP-L 25 mm m
TUBERIA FLEXIBLE CORRUGADA CONDUIT PEAD DE 25 mm m
CAJA DE PASE FG-L 200x200x100mm und
ACCESORIOS P/INSTALACION ELCTRICA P/CAMARA DE BOMBEO glb
TABLERO ELECTRICO P/CAMARA DE BOMBEO 0.60x1.00
TABLERO ELECTRICO P/CAMARA DE BOMBEO 220V 20 POLOS und
LAMPARA DE EMERGENCIA und
ACCESORIOS P/INSTALACION DEL TABLERO ELECTRICO P/CAMARA DE BOMBEO glb
SISTEMA DE POZO CONEXIN A TIERRA P/BOMBA SUMERGIBLE
MEDICIN DE RESISTENCIA Y RESISTIVIDAD DEL TERRENO (INCLUYE TELUROMETRO) glb
INSTALACIN DEL POZO PUESTA A TIERRA TIPO PAT-1 CON ELECTRODO VERTICAL EN POSTE DE und
ACCESORIOS DE CONEXIN Y FIJACIN PARA LA INSTALACION DE PUESTA A TIERRA glb
PRUEBAS DE CALIDAD
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PROTOCOLO DE PRUEBAS DE INSTALACIONES ELECTRICAS glb
TRANSPORTE
TRANSPORTE DE MATERIALES glb
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES-PTAR
DISTRIBUCION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
ELIMINACION DE OBSTRUCCIONES
TALA DE ARBOLES und
ELIMINACION DE RAICES und
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. SATURADO m3
REFINE Y NIVELACION DE TERRENO m2
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
PISOS Y PAVIMENTOS
CONCRETO F'C 140KG/CM2 P/VEREDA m3
ENCOFRADO Y DESENCOFRADO P/VEREDA m2
PISTAS m2
CASETA DE GUARDIANIA
CASETA DE GUARDIANA glb
JARDINES Y OTRAS OBRAS
SEMBRIO DE GRASS m2
TRASPLANTE DE ARBOLES und
PRUEBAS DE CALIDAD
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
OTROS
SISTEMA DE BOMBEO EN EXCAVACIONES
glb
CAPTACION DE LA PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
OBRAS DE CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 P/LOSAS DE FONDO PISO* m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO F'C 210 KG/CM2 P/MUROS REFORZADOS* m3
ENCOFRADO Y DESENCOFRADO .P/MUROS m2
ACERO ESTRUCTURAL P/MUROS kg
REVOQUES Y REVESTIMIENTO
TARRAJEO INTERIOR C/IMPERMEABILIZANTE m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
SUMINISTRO E INSTALACION DE PLACA DE ACERO INOXIDABLE P/VERTEDERO TRIANGULAR DE B und
SUMINISTRO E INSTALACION DE COMPUERTA VENTANA CON MARCO 40X40 CM und
SUMINISTRO E INSTALACION DE WATER STOP PVC 6" m
CAMARA DE REJAS, DESARENADOR Y CANALETA PARSHALL
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
CONCRETO FC=100 KG/CM2 PARA ENTRADA A LA CAMARA DE REJAS
m3
ENCOFRADO DE ENTRADA DE CAMARA DE REJAS
m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 P/LOSAS DE FONDO PISO* m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO F'C 210 KG/CM2 P/MUROS REFORZADOS* m3
ENCOFRADO Y DESENCOFRADO .P/MUROS m2
ACERO ESTRUCTURAL P/MUROS kg
REVOQUES Y REVESTIMIENTO
TARRAJEO INTERIOR C/IMPERMEABILIZANTE M=1:3 E=2CM m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
SUMINISTRO E INSTALACION DE COMPUERTA DE CONTROL 0.35x0.56
und
SUMINISTRO E INSTALACION DE VERTEDERO SUTRO
und
SUMINISTRO E INSTALACION DE REJILLAS FIJAS
und
SUMINISTRO E INSTALACION DE REJILLA FIJA INCLINADA
und
CANALETA PARSHALL DE FIBRA DE VIDRIO PRE FABRICADA
m
SUMINISTRO E INSTALACION DE TUBERIA 2" PVC m
SUMINISTRO E INSTALACION DE JUNTAS WATER STOP 9"
und
TANQUE IMHOFF
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
TABLESTACADO EN T-NORMAL SATURADO HASTA 4 M. PROFUNDIDAD m
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
ENCOFRADO Y DESENCOF.P/SOLADO m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=245 KG/CM2 PARA ZAPATAS m3
ACERO ESTRUCTURAL P/ZAPATAS
kg
CONCRETO F'C 245KG/CM2 P/LOSA DE FONDO PISO m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO fc=245 Kg/cm2 PARA CAJA COLECTORA
m3
ENCOFRADO Y DESENCPFRADO PARA CAJA COLECTORA
m2
ACERO ESTRUC. P/CAJA COLECTORA kg
CONCRETO F'C=245KG/CM2 P/PLACAS m3
ENCOFRADO Y DESENCOFRADO P/ PLACAS m2
ACERO ESTRUCTURAL P/PLACAS kg
CONCRETO F'C=245KG/CM2 P/VIGAS TIPO PLACA m3
ENCOFRADO Y DESENCOFRADO DE VIGAS TPO PLACA
m2
ACERO ESTRUCTURAL P/ VIGAS TIPO PLACA
kg
REVOQUES Y REVESTIMIENTO
TARRAJEO C/IMPERM. INTERIOR DE PLACAS M=1:3, E=2CM.
m2
TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3, E=2CM.
m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
SUMINISTRO E INSTALACIN TUBERIAS, ACCES. Y VALV.
SUMINSTRO DE TUBERIAS, ACCESORIOS Y VALVULAS PARA TANQUE IMHOF glb
MONTAJE E INSTALACIONES HIDRAULICAS P/ TANQUE IMHOF glb
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
SISTEMA DE BOMBEO EN EXCAVACIONES
glb
TUBO PARA BARANDA DE SEGURIDAD Fo. GALVANIZADO 1 1/2" + 5%desperdicio
m
DADOS DE CONCRETO FC=140 kg/cm2 m3
SUMINISTRO E INSTALACION DE WATER STOP PVC 6" m
LECHO DE SECADO
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
CONCRETO 1:10 + 30% P.G P/CIMIENTO CORRIDO m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C 210 KG/CM 2 PARA ZAPATAS* m3
ACERO ESTRUCTURAL P/ZAPATAS
kg
CONCRETO F'C 210 KG/CM2 P/LOSAS DE FONDO PISO* m3
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
CONCRETO F'C=210 KG/CM2 P/LOSA DE SALPICADERA m3
ACERO ESTRUCTURAL P/LOSA DE SALPICADERA
kg
ENCOFRADO Y DESENCOF.P/LOSA DE SALPICADERA m2
CONCRETO FC=210 KG/CM2 P/PLACAS* m3
ACERO ESTRUCTURAL P/PLACAS kg
ENCOFRADO Y DESENCOFRADO DE PLACAS m2
CONCRETO FC=210 KG/CM2 P/COLUMNAS* m3
ACERO ESTRUC. TRABAJADO P/COLUMNA kg
ENCOFRADO Y DESENCOFRADO .P/COLUMNAS m2
CONCRETO F'C 210 KG/CM2 PARA VIGAS m3
ACERO ESTRUCTURAL P/VIGAS kg
ENCOFRADO Y DESENCOFRADO DE VIGAS m2
REVOQUES Y REVESTIMIENTO
TARRAJEO C/IMPERM. LOSA DE FONDO-PISO M=1:3, E=2CM.
m2
TARRAJEO C/IMPERM. INTERIOR DE PLACAS M=1:3, E=2CM.
m2
TARRAJEO PARA COLUMNAS M=1:3, E=2CM.
m2
TARRAJEO PARA VIGAS M=1:3, E=2CM.
m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
ESTRUCTURA DE MADERA
TIJERALES und
COBERTURA DE CALAMINA ZINC m2
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO DE TUBERIAS Y ACCESORIOS PARA LECHO DE SECADO glb
MONTAJE E INSTALACION DE DE TUBERIIAS Y ACCESORIOS P/LECHO DE SECADO glb
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
SUMINISTRO E INSTALACION DE LECHO DE GRAVA GRUESA 1/4" A 1/2" m3
SUMINISTRO E INSTALACION DE LECHO DE GRAVAFINA 1/8" A 1/4" m3
SUMINISTRO E INSTALACION DE LECHO DE ARENA FINA
m3
SUMINISTRO E INSTALACION DE BLOQUES DE CONCRETO DE 9X10X24 cm
und
FILTRO BIOLOGICO
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
TABLESTACADO EN T-NORMAL SATURADO HASTA 4M DE PROFUNDIDAD m2
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
ENCOFRADO Y DESENCOF.P/SOLADO m2
DADOS DE CONCRETO FC=140 kg/cm2 m3
OBRAS DE CONCRETO ARMADO
CONCRETO F'C 245KG/CM2 P/LOSA DE FONDO PISO m3
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
CONCRETO F'C=245KG/CM2 P/PLACAS m3
ENCOFRADO Y DESENCOFRADO DE PLACAS m2
ACERO ESTRUCTURAL P/PLACAS kg
REVOQUES Y REVESTIMIENTO
TARRAJEO INTERIOR C/IMPERMEABILIZANTE m2
REVESTIMIENTO INTERIOR C/IMPERMEABILIZANTE m2
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO DE TUBERIAS, ACCESORIOS Y VALVULAS P/FILTRO BIOLOGICO glb
MONTAJE E INSTALACION HIDRALICA EN FILTRO BIOLOGICO glb
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
SUMINISTRO E INSTALACION DE LECHO DE GRAVA 2" A 2 1/2" m3
SUMINISTRO E INSTALACION DE LECHO DE GRAVA 1" A 1/2" m3
SUMINISTRO E INSTALACION DE LECHO DE GRAVA 1/2" A 3/4" m3
SUMINISTRO E INSTALACION DE LECHO DE GRAVA GRUESA 1/4" A 1/2" m3
SISTEMA DE BOMBEO EN EXCAVACIONES
glb
MALLA METALICA PROTECTORA DE 13.2X13.2CM
und
ESCALERA MARINERA F.G. 2.30Mx0.40M
und
SUMINISTRO E INSTALACION DE WATER STOP PVC 6" m
CAMARA DE CONTACTO DE CLORO
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
ENCOFRADO Y DESENCOF.P/SOLADO m2
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 P/LOSAS DE FONDO PISO* m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO F'C 210 KG/CM2 P/MUROS REFORZADOS* m3
ENCOFRADO Y DESENCOFRADO .P/MUROS m2
ACERO ESTRUCTURAL P/MUROS kg
REVOQUES Y REVESTIMIENTO
TARRAJEO INTERIOR C/IMPERMEABILIZANTE m2
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE DIFUSOR PVC DE 1/2" CON 5 ORIFICIOS DE 1/4" m
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
CASETA DE CLORACION Y CISTERNA
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
EXCAVACION C/MAQUINARIA PARA LA CISTERNA
m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO. m3
CONCRETO 1:10 + 30% P.G P/CIMIENTO CORRIDO m3
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTO m3
ENCOFRADO Y DESENCOF.P SOBRECIMIENTO m2
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 P/LOSAS DE FONDO PISO* m3
ENCOFRADO Y DESENCOF.P/LOSAS DE FONDO m2
ACERO ESTRUCTURAL P/LOSAS DE FONDO kg
CONCRETO F'C 210 KG/CM2 P/MUROS REFORZADOS* m3
ENCOFRADO Y DESENCOFRADO .P/MUROS m2
ACERO ESTRUCTURAL P/MUROS kg
CONCRETO F'C 210 KG/CM2 PARA CAJA DE REBOSE* m3
ENCOFRADO Y DESENCOFRADO PARA CAJA DE REBOSE m2
ACERO ESTRUCTURAL P/CAJA DE REBOSE kg
CONCRETO F'C=210KG/CM2 P/PLACAS SUPERIORES DE CISTERNA m3
ENCOFRADO Y DESENCOFRADO P/ PLACAS SUPERORES DE CISTERNA
m2
ACERO ESTRUCT. P/ PLACAS SUPERIORES DE CISTERNA
kg
CONCRETO FC=210 KG/CM2 P/COLUMNAS* m3
ENCOFRADO Y DESENCOFRADO .P/COLUMNAS m2
ACERO ESTRUC. TRABAJADO P/COLUMNA kg
CONCRETO F'C 210 KG/CM2 PARA VIGAS m3
ENCOFRADO Y DESENCOFRADO DE VIGAS m2
ACERO ESTRUCTURAL P/VIGAS kg
CONCRETO F'C 210 KG/CM2 PARA LOSA ALIGERADA m3
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2
ACERO ESTRUCTURAL P/LOSA ALIGERADA kg
LADRILLO DE TECHO 15X30X30 und
MURO DE ALBAILERIA
MURO DE LADRILLO KING KON 18H DE SOGA m2
REVOQUES Y REVESTIMIENTO
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m
CIELO RASO C/MORTERO C:A 1:5 E=1.5CM m2
TARRAJEO EN INTERIORES FROTACHADO MORTERO MEZC.C:A 1:5,E=1.5 CM
m2
TARRAJEO C/IMPERM. LOSA DE FONDO M=1:3, E=2CM.
m2
TARRAJEO C/IMPERM. PARA PLACAS M=1:3, E=2CM.
m2
TARRAJEO C/ IMPERM. PARA LOSA DE TECHO M=1:3, E=2CM m2
PISOS Y VEREDAS
FALSO PISO DE 4" DE CONCRETO 1:10 m3
CONTRAPISO DE 50 MM. m2
CONCRETO F'C 140KG/CM2 P/VEREDA m3
ENCOFRADO Y DESENCOFRADO P/VEREDA m2
CARPINTERIA METALICA
VENTANA DE ALUMINIO und
PUERTA METALICA CASETA DE CLORACION glb
PINTURA
PINTURA EN PUERTA METALICA CON ESMALTE Y ANTICORROSIVO COLOR BAYO
m2
PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) m2
CERRAJERIA
CANDADO INCLUYE ALDABAS und
PICAPORTE und
CERRADURA P/EXTERIOR CON LLAVES INTERIOR Y EXTERIOR 2 GOLPES und
VIDRIOS Y CRISTALES
PROVISION Y COLOC. DE VIDRIO SEMIDOBLE EN VENTANA DE FIERRO p2
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
SUMINISTRO DE TUB. , ACCESORIOS Y VALVULAS P/CASETA DE CLORACION glb
ELECTROBOMBA und
MONTAJE E INSTALACIONES HIDRAULICAS P/ CASETA DE CLORACION glb
SUMINISTRO E INSTALACIONES SANITARIAS DEL PLAN DE CONTINGENCIA
glb
SUMINISTRO E INSTALACION DE EQUIPO DE CLORACION glb
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
PRUEBA HIDRAULICA m3
OTROS
REJILLA METALICA 40X25CM und
BALANZA
und
ABRAZADERA ANCLADA METALICA DE TUBERIA und
REDES COLECTORAS INTERNAS
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO FINALES m
TRAZO, NIVELACION Y REPLANTEO INICIALES m
EXCAVACION DE ZANJAS
EXCAVACIN DE ZANJA C/MAQ EN TERRENO SATURADO P/TUB. 200MM
m
. INSTALACION DE TUBERIA)
REFINE Y NIVELACION DE ZANJAS
REFINE Y NIVEL DE ZANJA T-NORMAL C/NAPA FREATICA P/TUB. DN 200MM. m
CAMA DE APOYO
CAMA DE ARENA E=0.10 M. ZANJA P/TUB 200 MM.
m
RELLENO DE ZANJAS
RELLENO ZANJA MATERIAL PROPIO COMPACT. C/EQUIPO m
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION MATERIAL EXCEDENTE C/EQUIPO TUB. 200 MM. D=10KM
m3
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC UF NTP ISO4435 DN 200MM. +10% de desperdicio m
TUBERIA PVC CLASE 10 DE 200MM.
m
TUBERIA HD DN 200 MM + 5%desperdicio
m
INSTALACION DE TUBERIAS PVC m
INSTALACION DE TUBERIAS HD m
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO DE ACCESORIOS P/REDES COLECTORAS glb
INSTALACION DE ACCESORIOS PVC DN 200 MM und
PRUEBA HIDRAULICA DE TUBERIA PARA DESAGUE
PRUEBA HIDRAULICA P/TUBERIA DE DESAGUE DE 200MM m
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
OTROS
BUZON I T-NORMAL A MAQ. 1.76 A 2.00M PROFUNDIDAD (ENCOF. EXTERIOR E INTERIOR) und
PLANTA DE ENERGIA SOLAR
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO m3
CONCRETO 1:10 + 30% P.G P/CIMIENTO CORRIDO m3
ENCOFRADO Y DESENCOF.P/CIMIENTO CORRIDO m2
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTO m3
ENCOFRADO Y DESENCOF.P SOBRECIMIENTO m2
CONCRETO SIMPLE DE FC=140 KG/CM2 P/PISO DE PANELES SOLARES
m3
ENCOFRADO Y DESENCOFRADO P/PISO DE PANELS SOLARES m2
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM 2 PARA ZAPATAS* m3
ACERO ESTRUCTURAL P/ZAPATAS
kg
CONCRETO FC=210 KG/CM2 P/COLUMNAS* m3
ENCOFRADO Y DESENCOFRADO .P/COLUMNAS m2
ACERO ESTRUCtURAL P/COLUMNA kg
CONCRETO F'C 210 KG/CM2 PARA VIGAS m3
ENCOFRADO Y DESENCOFRADO DE VIGAS m2
ACERO ESTRUCTURAL P/VIGAS kg
CONCRETO F'C 210 KG/CM2 PARA LOSA ALIGERADA m3
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2
ACERO ESTRUCTURAL P/LOSA ALIGERADA kg
LADRILLO DE TECHO 15X30X30 und
MURO DE ALBAILERIA
MURO DE LADRILLO KING KON 18H DE SOGA m2
REVOQUES Y REVESTIMIENTO
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m
CIELO RASO C/MORTERO C:A 1:5 E=1.5CM m2
TARRAJEO EN INTERIORES FROTACHADO MORTERO MEZC.C:A 1:5,E=1.5 CM
m2
TARRAJEO EN EXTERIORES FROTACHADO MORTERO C:A 1:5, E=1.5CM m2
CARPINTERIA METALICA Y HERRERIA
PUERTAS METALICAS EN CUARTO DE MAQUINAS glb
CANDADO INCLUYE ALDABAS und
VENTANA METALICA C/MALLA und
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
OTROS
CERCO DE MADERA C/ ALAMBRE DE PUAS H=1.5M m
PANEL POLICRISTALINO DE 260WP und
BATERIA GEL 12V-230Ah
und
CONTROLADOR DE CARGA DE 150/70 MPPT
und
INVERSOR CARGADOR 48VDC/3000VA
und
CERCO PERIMETRICO PTAR
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO INICIAL
m2
TRAZO, NIVELACION Y REPLANTEO FINAL
m2
MOVIMIENTO DE TIERRAS
EXCAVACIONES-CORTES C/EQUIPO EN T. NORMAL m3
EXCAVACIONES CORTES MANUALES EN TERRENO NORMAL m3
RELLENO COMPACTADO C/MATERIAL PROPIO EN T. NORMAL C/MAQ.
m3
ELIMINACION DESMONTE(CARG. Y VOLQ10M3) TERRENO NORMAL D=10KM m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM2 P/SOLADO m3
CONCRETO 1:10 + 30% P.G P/CIMIENTO CORRIDO m3
ENCOFRADO Y DESENCOF.P/CIMIENTO CORRIDO m2
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTO m3
ENCOFRADO Y DESENCOF.P SOBRECIMIENTO m2
CONCRETO ARMADO
CONCRETO F'C=210KG/CM2 P/ZAPATAS m3
ACERO ESTRUCTURAL P/ZAPATAS
kg
CONCRETO F'C 210 KG/CM2 PARA COLUMNA m3
ENCOFRADO Y DESENCOFRADO .P/COLUMNAS m2
ACERO ESTRUCtURAL P/COLUMNA kg
CONCRETO F'C 210 KG/CM2 PARA VIGAS m3
ENCOFRADO Y DESENCOFRADO DE VIGAS m2
ACERO ESTRUCTURAL P/VIGAS kg
MURO DE ALBAILERIA
MURO DE LADRILLO KING KON 18H DE SOGA m2
CARPINTERIA METALICA Y HERRERIA
ALAMBRE DE PUAS GALVANIZADO @0.1m P/PARTE SUPERIOR DE TABIQUERIA
m
CANDADO INCLUYE ALDABAS und
PUERTA METALICA und
PRUEBAS DE CALIDAD
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
OTROS
PROVISION Y COLOCADO DE TEKNOPORT DE 1"
m2
RED DE AGUA POTABLE-PTAR
TRABAJOS PRELIMINARES
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO FINALES m
TRAZO, NIVELACION Y REPLANTEO INICIALES m
EXCAVACION DE ZANJAS
EXCAVACION MANUAL P/AGUA T. NORMAL P/TUB. 26.5 MM.
m
EXCAVACION MANUAL P/AGUA T. NORMAL P/TUB. 33 MM.
m
EXCAVACION MANUAL P/AGUA T. NORMAL P/TUB. 21 MM.
m
REFINE Y NIVELACION DE ZANJAS
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB. 33MM. m
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB. 26.5 MM. m
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB. 21 MM. m
CAMA DE APOYO
CAMA DE APOYO E= 0.10 M. ZANJA P/TUB 26.5MM m
CAMA DE APOYO E= 0.10 M. ZANJA P/TUB 33MM m
CAMA DE APOYO E= 0.10 M. ZANJA P/TUB 21MM m
RELLENO DE ZANJA
RELLENO DE ZANJA CON MAT. PROPIO COMPACTADO. C EQUIPO P TUBERIA 26.5MM m
RELLENO DE ZANJA CON MAT. PROPIO COMPACTADO. C EQUIPO P TUBERIA 33MM m
RELLENO DE ZANJA CON MAT. PROPIO COMPACTADO. C EQUIPO P TUBERIA 21MM m
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION MANUAL MATERIAL EXCEDENTE T.N. TUB. 26.5 MM.
m
ELIMINACION MANUAL MATERIAL EXCEDENTE T.N. TUB. 33 MM.
m
ELIMINACION MANUAL MATERIAL EXCEDENTE T.N. TUB. 21 MM.
m
OBRAS DE CONCRETO SIMPLE
CONCRETO FC =140 KG/CM CEMENTO TIPO-I m3
ENCOFRADO Y DESENCOFRADO P/ CAJA DE VALVULA m2
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA P.V.C. CLASE-10 SP DE 26.5 MM +10% DE DESPERDICIO m
TUBERIA P.V.C. CLASE-10 SP DE 33 MM +10% DE DESPERDICIO m
TUBERIA P.V.C. CLASE-10 SP DE 21 MM +10% DE DESPERDICIO m
INSTALACION DE TUBERIA DE PVC SP DE 26.5-33MM m
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA 26.5-33MM ZANJA ABIERTA m
SUMINISTRO E INSTALACION DE ACCESORIOS
CODO DE PVC - SP DN 26.5MM 90 und
TEE PVC-SP DN 26.5MM und
REDUCCION DE PVC SP DN 26.5MMX21MM und
VALVULA ESFERICA DE 33MM und
VLVULA ESFERICA DE JARDIN CROMADA 1/2"
und
NIPLE ROSCADO PVC 33MM und
INSTALACION DE ACCESORIOS PVC-SP und
PRUEBAS DE CALIDAD
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
EMISOR TERRESTRE
TRABAJOS PRELIMINARES
LIMPIEZA C/EQUIPO DE TERRENO m
SEALIZACION TEMPORAL C/ MALLA Y CINTA PLASTICA DE SEGURIDAD m
TRAZOS, NIVELES Y REPLANTEOS
TRAZO, NIVELACION Y REPLANTEO FINALES m
TRAZO, NIVELACION Y REPLANTEO INICIALES m
MOVIMIENTO DE TIERRAS
EXCAVACION DE BUZONES m3
EXCAVACION DE ZANJA ( MAQ ) P/TUB. T-NORMAL DN 160MM DE 0.90M PROF. m
EXCAVACION DE ZANJA (MAQ.) P/TUB. T-NORMAL DN 160MM DE 0.9 M A 1.20M PROF. m
EXCAVACION DE ZANJA (MAQ.) P/TUB. T-NORMAL DN 160MM DE 1.20M A 1.50M PROF. m
EXCAVACION DE ZANJA (MAQ.) P/TUB. T-NORMAL DN 160MM DE 1.51M A 2.00M PROF. m
EXCAVACION DE ZANJA (MAQ.) P/TUB. T-NORMAL DN 160MM DE 2.01M A 2.50M PROF. m
REFINE Y NIVELACION DE ZANJAS
REFINE Y NIVELACION FONDO DE ZANJA P/TUB 160 MM. m
REFINE Y NIVELACION EN T-NORMAL m2
CAMA DE APOYO
CAMA DE APOYO E= 0.10 M. ZANJA P/TUB 160MM m
RELLENO DE ZANJA
RELLENO COMPACTADO DE ZANJA (PULSO) P/TUB. T-NORMAL DN 160 HASTA 0.90M PROF. m
RELLENO COMPACTADO DE ZANJA (PULSO) P/TUB. T-NORMAL DN 160 DE 0.90M A 1.20M PROF.
m
RELLENO COMPACTADO DE ZANJA (PULSO) P/TUB. T-NORMAL DN 160 DE 1.20M A 1.50M PROF.
m
RELLENO COMPACTADO DE ZANJA (PULSO) P/TUB. T-NORMAL DN 160 DE 1.51M A 2.00M PROF.. m
RELLENO COMPACTADO DE ZANJA (PULSO) P/TUB. T-NORMAL DN 160 DE 2.01M A 2.50M PROF m
ENTIBADO DE ZANJAS
m
ENTIBADO DE ZANJA T-NORMAL DN 160MM DE 0.90M A 1.20M PROF.
m
ENTIBADO DE ZANJA T-NORMNAL DN 160MM DE 1.20M A 1.50M PROF.
m
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION DE DESMONTE (CARG+V) T-NORMAL D=10KM P/TUB. DN 160MM PARA TODA PROF m3
OBRAS DE CONCRETO SIMPLE
HORMIGON m3
CONCRETO F'C=175KG/CM2 P/ CIMIENTO DE BUZON
m3
CONCRETO F'C=100KG/CM2 P/EMPALME DE BUZON
m3
CONCRETO F'C=100KG/CM2 P/FONDO DEL BUZON
m3
CONCRETO F'C=210KG/CM2 P/PAREDES DE BUZON
m3
ENCOFRADO Y DESENCOFRADO DE PAREDES BUZON m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210KG/CM2 P/TECHO DE BUZON
m3
ENCOFRADO Y DESENCOFRADO .P/TECHO DE BUZON m2
ACERO ESTRUCTURAL P/ TECHOS DE BUZONES
kg
CONCRETO F'C 210KG/CM2 P/ TAPAS DE BUZONES
m3
ENCOFRADO Y DESENCOFRADO DE TAPA DE BUZON m2
ACERO ESTRUCTURAL P/TAPA DE BUZONES kg
CONCRETO F'C 210 KG P/CANAL DE PROTECCION m3
ENCOFRADO Y DESENCOFRADO P/CANAL DE PROTECCION DE TUB DN160MM m2
ACERO ESTRUCTURAL P/CANAL DE PROTECCION TUB DN 160MM kg
CONCRETO F'C 210KG/CM2 P/TAPA DE CANAL DE PROTECCION DE TUB DN 160MM m3
ENCOFRADO P/TAPA DE CANAL DE PROTECCION DE TUB.160MM m2
ACERO P/TAPA DE CANAL DE PROTECCION DE TUB.160MM kg
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO DE TUBERIA DE PVC-U DN 160 SN4 INC. ANILLO+ 10% DE DESPERDICIO
m
INSTALACION DE TUBERIA DE PVC PARA ALCANTARILLADO DN 160MM m
PRUEBAS HIDRAULICAS Y DE RESISTENCIA
PRUEBA HIDRAULICA DE TUBERIA PARA DESAGUE DN 160MM m
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und
PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIFICADO Y DE CONTROL DE COMPACTAC und
DO EN EL CASERIO
A - UCAYALI"
ERROR $57,116.63