TYPE
KF-A
DOSE
CONCRETE
BATCH
size
(lbs/cu.
yd
of
concrete
batch)
(1
cu.
yd)
REGULAR
MIX
Flatworks,
medium
and
light
8.5
lbs/cu.
yd
=
0.3
lb/cu.
ft
1
cu.
yd
traffic
floors
5
kg/m3
PRECAST
MIX
Precast,
liquid/gas
containing
13
lbs/cu.
yd
=
0.5
lb/cu.
ft
1
cu.
yd
structures,
high
traffic
floors
7.5
kg/m
3
Mortars:
PLASTER,
STUCCO,
GUNITE
&
17
lbs/cu.
yd
=
0.6
lb/cu.
ft
1
cu.
yd
SHOTCRETE
MIXES
or
2
lbs
per
every
100
lbs
of
cement
10
kg/m3
or
2
kg
per
every
100
kg
cement
1.
Shake
the
bag
back
and
forth
or
mix
for
2
minutes
in
a
mixer
to
re-distribute
the
contents,
which
can
settle
during
transportation.
Take
scoops
from
the
center
of
the
batch.
2.
DO
NOT
DISSOLVE
KF-A
WITH
WATER.
Always
add
only
as
a
dry
powder
into
the
batch.
DO
NOT
apply
any
other
chemicals
or
supplementary
materials.
For
best
results:
1)
mix
all
of
the
dry
batch
ingredients
(sand,
cement,
KF-A,
aggregates,
etc)
first
for
2-3
minutes.
2)
Add
water
and
mix
for
5-7
minutes.
The
first
few
rotations
of
the
mixer
could
be
hard,
but
dont
add
more
water
-
just
keep
mixing.
If
after
7
minutes
of
mixing
the
batch
is
still
stiff,
add
4
oz
water
per
cu.
yd
(2
Liters/m3)
and
mix
for
another
5-
7
minutes.
MIX
POT
LIFE:
Concrete
with
KF-A
can
be
mixed
for
up
to
5
hours
without
any
loss
of
quality
or
workability.
Dont
stop
mixing
until
application
is
complete.
SLUMP:
2
"
to
3
"
(6
cm
to
9
cm).
At
this
slump
the
mixture
can
be
pumped
over
150'
(45
meters).
Water/Cement
ratio:
0.38
to
0.42
[Divide
weight
of
water
by
the
weight
of
cement
to
get
the
W/C]
DO
NOT
CURE!
Do
not
spray
water
on
fresh
concrete
surface
with
KF-A.
Do
not
cover
with
any
films,
blankets
or
hydro-isolation
membranes.
SAFETY
Operation
with
KF-A
is
similar
to
other
cement
mixing
jobs.
Always
use
an
approved
particle
respirator
and
rubber
gloves.
In
case
KF-A
gets
in
contact
with
the
eyes
or
skin,
rinse
and
wash
abundantly
with
water.
Do
not
ingest
or
inhale
-
contains
silica
sand
and
cement.
KF-A
is
non-
hazardous,
non-flammable,
and
non-explosive
for
application,
transportation,
and
storage.
Cement
Type
III
none
41
0.28
Colton
White
Cement,
Type
III
Pumice
Aggregate
620
7.44
620
7.44
Water
14.4
Gal
120
1.92
120
1.92
KALMATRON
KF-A
6
0.06
6
0.60
Pigments
none
Yellow
2.18
lbs
Brown
1.44
lbs
Black
0.72
l bs
EXPECTED RESULTS
1. Exothermic heat is lower by 30% to 50%.
2. No shrinkage cracks, bubbling, flakes, efflorescence, or discoloration.
3. Water impermeability of veneer stone layer at thick is 100%.
4. Yield of mixed batch is higher by 8% to 14%.
5. Highest resistance to chemical and climate corrosion
6. Curing is not necessary under regular environmental conditions.
Aggregate 1/16 1/8 17 .00640 29 .1036 Varies with glass, marble, etc. 1.5 - 3 mm
KALMATRON KF-A 1.5 .00093 2.5 .0254 OR: K1OO by 10 OZ/100 Lbs of cement
Total: 100 0.0416 168.5 1.06 Unit Weight: 159 Lbs/CY or 2,400 Kg/m3
BATCH INSTALLATION
DOSAGE
1. Use shown dosage of KF-A per batch.
2. Do not add any other admixtures or supplementary materials.
3. Do not dissolve KF-A with water before application into mix.
4. Apply shown amount of water to obtain recommended water to cement ratio of 0.33.
5. Mix for 5 to 7 minutes until concrete batch becomes workable.
6.
W/C RATIO
4. If the mix is still stiff, add 6 oz of water per cu ft and mix it for another 5 minutes.
5. Slump should be at 1 to 2, which creates a creamy concrete batch.
6.
CURING
1. Do not spray water or curing compounds onto the concrete surface.
2. Curing
of
concrete
is
not
required.
VERSATILITY
Shown are the basic ratios of the batch. Pigments, glass, marble, stone, glass fibers, PVA fibers, pumice, etc.,
could be added to get the desirable color and texture. Please do not use any other admixtures. Especially,
avoid Silica Fume, oily additives, set retarders or set accelerators.
FOR
FINISHING/PINHOLE
FILLING
For finishing jobs, blend any cement (50%), sand (40%), and KF-A (10%) by weight.
Mix 3 parts of this blend with 1 part water, by volume.
The amount of water can be varied by 1/6 part for better workability.
Apply the slurry onto the surface to fill up any gaps or pin holes.
KALMATRON
CORPORATION
Alex@kalmatron.com
(415)
385-3290
www.kalmatron.com
4
KF-A
for
SCULPTURES
High density, corrosion resistant material for architectural details, sculptures, tiles, ornaments, moldings, etc.
Strength close to that of ceramic, high density and abrasion resistance. Natural stone/ceramic-like surface
quality.
Materials Lbs Notes
1
Portland Cement type III 20 Cement type III, such as "Colton
White"
Gypsum 2.25 Increases strength
Methyl Cellulose 0.05 Increases viscosity, a fine binder
KF-A 1 Do not dissolve KF-A with water
before adding to batch
2
Coarse Sand #16 40 Coarse Filler
Fine Sand #30 36.7 Fine Filler
BATCH INSTALLATION
BATCH PREPARATION
1. Prepare a dry batch no smaller than 20 lbs and mix all the dry materials thoroughly.
2. Do not use any other admixtures or supplementary materials.
3. Pigments, if any are required, should be applied in accordance with the pigment
supplier's instructions. Iron oxide pigments will work the best for this mix.
4. Place dry mix into a container and add water. Mix for 5-7 minutes. Avoid adding extra
water during the first 5-7 minutes.
5. If the batch is still stiff after 7 minutes, add 2 ounces of water per every 100 lb of the
batch.
6. Continue mixing during the entire application - do not stop the mixer.
7. Slump: 2" up to 3".
8. Batch will be sticky and heavy. The more water, the worse the results. Rely on hard
mixing - a tough, "cookie dough" consistency.
9. For molds, apply graphite powder or lime-water paste to the mold, but avoid form
oils.
10. For polishing, apply emulsions or thin paste without coarse inclusions.
11. Do not cure. Do not spray water and do not use any curing compounds.
12. The surface can be finished/polished with a wet trowel. Do not cover with any films
or blankets.
BATCH INSTALLATION
BATCH PREPARATION
13. Prepare a batch no smaller than 20 lbs to cover about 24 sq. ft (at a layer thickness of
0.08").
14. For small batches, use an electric drill mixer.
15. Mix for 1 minute or longer, until the batch has a slurry-like consistency.
16. If after 5-7 minutes the batch is still stiff, add 8 ounces of water for every 100 lb of the batch,
and mix for another 1 minutes.
17. Continue mixing during application - do not stop mixer.
INSTALLATION
1. Pour slurry onto the floor from a height of 1.5 ft for self-leveling.
2. Spread the layer to a thickness of 0.08" (2 mm).
3. Using a hard brush or trowel, apply some pressure onto the concrete floor.
4. After application, do not provide curing, and do not use any curing compounds.
5. Do not cover fresh layer with any films or blankets.
6. Avoid drafts from doors and windows for first 4 hours after application.
KALMATRON
CORPORATION
Alex@kalmatron.com
(415)
385-3290
www.kalmatron.com
6
KF-A
for
STUCCO
&
PLASTER
KF-A
for
STUCCO
-
NO
SCRATCH
&
BROWN
COATS
NEEDED!
Breathable,
100%
waterproof
stucco
Ready
for
painting
on
the
4th
day
after
application
Only
a
single-layer
stucco
application
is
needed
No
time-consuming
scratch
and
brown
coats
High
adhesion,
no
sliding
Initial
setting
time
is
4-6
hours
No
curing
is
needed
in
temperatures
up
to
104
F
The
creamy
effect
of
KF-A
on
concrete
batch
-
the
batch
flow
is
smooth,
with
high
workability
KALMATRON
CORPORATION
Alex@kalmatron.com
(415)
385-3290
www.kalmatron.com
7
DRIVEWAYS,
ROADS,
PAVEMENTS
&
FLOORS
SHIELDCRETE
-
Mix
design
for
High
Strength
Concrete
for
high
traffic
areas
1. Clean the surface by washing it with water; remove any loose materials, paint or oil spots.
2. Let the surface dry for at least 45 minutes, until there is no water left standing on the surface. Apply
SHIELDCRETE after 45 minutes, with layer thickness starting from " up to 2" or thicker.
3. Do not cure.
SHIELDCRETE
MIX
DESIGN
Mass
Volume
NOTES:
minimal
thickness
of
the
Material
layer
is
"
or
20
mm.
Lbs
Kg
CF
m3
1
Kg/m3
=
0.0623
Lbs/CF
Ordinary
Portland
Cement
345
205
1.75
0.065
SHIELDCRETE
BATCH
INSTALLATION
18. Batch must be no smaller than 200 lbs (91 Kg).
19. Turn on mixer for 3 minutes.
20. In a case of the batch stiffness do not add water. Continue mixing for another 2 minutes.
21. Continue mixing during application. Do not stop mixer.
22. Vibrate until coarse aggregate appears on the surface.
ESSENTIALS:
7. After application, do not provide curing and do not use any curing compounds.
8. Do not cover fresh SHIELDCRETE with any films or blankets and do not spray water onto the
surface.
9. Expected results: - Compressive Strength at 50 MPa
- Tensile Strength at 8 MPa
- Water impermeability at W12
KF-B - Waterproofing, corrosion and mildew resistant coating, ideal for constantly damp
environments like elevator pits, basements, garages, underground tanks and storage rooms.
KF-B is a one-component, cold-applied mortar. It is safe and simple to use (no special tools or
equipment is needed, just mix the powder with water) and it is 100% waterproof. Usually, KF-
B is applied by a metal trowel or roller directly onto the wet surface, with no need to dry it
before application.
KF-C - Fast-setting, leak stopping patching material. Just mix KF-C powder with water and
apply by hand, trowel or spray gun. Instantly stops even high pressure leaks. KF-C can also
be used for patching leaks underwater.
PATCHCRETE - Ready Mix overlay with no shrinkage and no cracking. Apply it over
concrete or asphalt - no priming needed, just wash the surface with water and allow to dry
for 45 minutes before Patchcrete application. High adhesion, no cracks, very durable under
regular and industrial traffic. Please visit www.drivewayoverlay.com for more information!