Вы находитесь на странице: 1из 35

Summary

SUMMARY OF BILL OF QUANTITIES


GN. FUVAHMULAKU JETTY

1 PRELI MINER IES

2 GROUND WORK

3 CONCRETE

4 MASONRY, PLASTERING

? METAL AND TIMBER WORKS

E ROOFING

7 CIELINGS

8 PAINTING

0 ELECR ICAL INSTALLATIONS


10 TENDERER'S ADJUSTMENTS

GRAND TOTAL carried to form of bid

Page 1
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 01
PRELIMINARIES

1.1 General Notes


(1) Abbreviations
m - metre
No - numbers
m' - cubic metre
m2 square metre
Lm - Linear
metre t - tonnes
incl - including
mm - millimetre
dia - diameter
SS - Stainless steel
GI - Galvonized iron

1.2 Site Manaqement Costs

(1) Allow for all on and off site management cost


including costs of forman and asistants,
temporaryservices,teIephone,fax,hoardings and similar item 1.00

1.3
Siqn Board
(1) item 1.00
Allow for sign boards

1.4
Clean-up
(1)
Allow for clean-up of completed works and site upon item 1.00
completion.

BILL No: 01 - PRELIMINERIES


TOTAL OF BILL No: 01 - Carried over to summary

Page 2
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 02
GROUND WORKS

2.1 General
(a) Rates shall include for: levelling, Grading, Trimming,
Compacting to faces of excavation, keeping sides plumb,
backfilling, consolidating and disposing surplus soil.

2.2 Site Clearinq


(1) Clearing site including trees less than 0.5m girth complete
with situmps and roots. item 1.00

2.3
Excavation
(a) Excavation quantities are measured to the faces of
concrete members. Rates shall include for all additional
excavation required to place the formwork.
Excavation for
(1) 1.49
Foundation beam TB1 & TB2

2.4
Back Fillinq
(a) Rates shall include for levelling, grading, trimming and
compacting.
(1) item 1.00
(2) Backfilling to get level of 150mm below G.L item 1.00
(3) Minimum 150mm thick hardcore on compacted item 1.00
ground 25mm thick sand bedding on hardcore

BILL No: 02 - GROUND WORKS


TOTAL OF BILL No: 02 - Carried over to summary

Page 3
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No:03
CONCRETE

3.1 General
(a) Rates shall include for: placing in position; making good
after removal of formwork and casting in all required items
to conform to structural and excavated tolerences
(b) Rates shall include making and transporting of formwork,
oil, nails
(c) Mix ratio for reinforced concrete shall be 1:2:3
and lean concrete shall be 1:2:6 by volume.
(d) Rates shall include for: cleaning, fabrication,
placing, the provision for all necessary temporary
fixings and supports including tie wire and chair
supports, laps and wastage
(e) All reinforcing bars shall be high strength bars

(1) Allow for concrete testing item 1.00

3.2 Lean Concrete


(a) Quantity is measured to the edges of concrete foundation
members. Rates shall be inclusive of any additional concrete
required to place the formwork.

50mm thick lean concrete to bottom of


(1) Foundation beam TB1 & TB2 0.39

3.3 Reinforced Concrete


In-situ reinforced concrete to:

3.3.1 Foundations
(1) Foundation Pad F1 0.63
(2) 1.50
Foundation Beam TB1 & TB2

3.3.2
Ground floor
Columns
(1) 1.55
C1 Column, 250x250
(2) 1.63
C2 Column, 200x200
Sfair & S/a6
(1) 5.91
Stair & Slab
3.3.3
Roof Level
(1) 7tftached Beams 0.74
Beam RB, 300x200
3.3.4
(1) WATER PROOFING
Apply slurry type water proofing to all surfaces of concrete
below ground level in accordance with manufacturer's item 1.00
instructions.
BILL No:03 - CONCRETE WORKS
TOTAL OF BILL No:03 - Carried over to summary

Page 4
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 04
MASONRY AND PLASTERING

4.1 GENERAL

(a) Rates shall include for: cleaning out cavities, forming


rebated reveals and pointing and cleaning down to
reveals where necessary; fractional size blocks, all
necessary machine cutting, cutting or forming chases or
edges of floor slabs, cutting or leaving holes and
openings as recesses for and building in pipes, conduits,
sleeves and similar as required for all trades; leaving
surfaces rough or raking out joints for plastering and
flashings, bedding frames or plates, building in joists,
bearers or similar,
temporary supports to openings, templates, reinforcement
in walls and for all necessary making good
4.2
4.2.1 Cement blockwork
100 mm wide Cement Solid blocks, laid on and incl.
mortar, tie rods, compression joint gap filler, nylon / plastic
mesh as specified
(1) 4.70
Ground Floor
4.3
Plasterinq
(a) Cement plastering on walls and concrete surfaces as
specified incl. wire mesh at the joints of concrete surfaces
and walls and water proofing additives / admixtures for all
surfaces
4.3.1
(1) 4.70
12mm plaster on exterio of walls and concrete faces
Ground Floor

BILL No: 04 - MASONRY AND PLASTERING


TOTAL OF BILL No: 04 - Carried over to summary

Page 5
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 05
METAL AND TIMBER WORKS

5.1 GENERAL

(a) Rates shall include for: all fabrication work, welding, marking,
drilling for bolts including those securing timbers, steel plates,
bolts, nuts and any type of washer, riveted work, counter sinking
and tapping for bolts or machine screws.

(b) Rates shall include for all polishing and finishing as specified
(c) Rates shall include for fabrication and erection and temporary
supports and fixing into position

5.2 SS railinq
(1)
50mm dia SS pipe handrail (railing between columns) including all
fixings and finishes complete as shown in the drawing Item

5.3
Timber Roof structure
Timber roof structure, including all fixings and complete as
(1) shown in the drawings to; 8.10
(2) 50 x 150mm timber ridge members 120.50
(3) 50 x 100mm timber rafters 176.00
(4) 50 x 35mm timber battens 14.00
(5) 100 x 50mm timber wall plate Item
(6) Timber concealings Item
Timber Decorative partitions

BILL No: 05 - MASONRY AND PLASTERING


TOTAL OF BILL No: 05 - Carried over to summary

Page 6
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 06
ROOFING

6.1 General
(a) Rates shall include for: fair edges,dressing
over angel fillets, turning into grooves, all other
labours, circular edges, nails, screws and other
fixings and laps.

6.2 Roof Coverinqs


6.2.1 Roofing Sheets
(1) Lysaght (or equivalent) roofing sheets, inclusive of all fixtures,
46.42
fixed in accordance with manufacturer's instructions

6.2.2
Capping and Flashing
(1)
400 mm Girth Ridge Capping (HIP flashing) fixed
in accordance with manufacturer's instructions
24.00
(Rate shall include all fixtures)
6.3
6.3.1 Gutters & Downpipes
(1) Gutter
150 x 150 mm Lysaught Gutter or equivalent, rates
shall include for framing, supports, clips, brackets, 16.00
(2) stop-ends, down-pipe outlets, fixing and fastening
100mm dia. PVC Downpipes including all bends junctions, 12.00
straps, brackets and clips
6.4
6.4.1 Insulations
(1)
Rock Wool Insulation
46.00
Rock Wool Insulation with Aluminium foil on both sides, Rates
shall include for wire mesh, nails, and all necessary fixtu`res

BILL No: 06 - ROOFING


TOTAL OF BILL No: 06 - Carried over to summary

Page 7
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 7
CEILINGS

7.1 Plasterboard (External)


Plasterboard ceiling panels on timber framework
including trimming, nails, screws and other fixings.
(1) Ground floor 46.00

BILL No: 07 - CEILINGS


TOTAL OF BILL No: 07 - Carried over to summary

Page 8
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 8
PAINTING

8.1 General
(a) Rates shall include for: the provision, erection and
removal of scaffolding, preparation, rubbing down
between coats and similar work, the protection and / or
masking floors, fittings and similar works

(b) All painting work shall be in accordance with


the specifications

8.2 Columns
8.2.1 Ceramic paint finish
(1) Circuler columns no 16.00

8.3
Ceilinqs
8.3.1
Emulsion paint finish shall be "nippon" or equivalent on ceilings
(1) 46.00
Ground floor

BILL No: 08 - PAINTING


TOTAL OF BILL No: 08 - Carried over to summary

Page 9
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 09
ELECTRICAL INSTALLATIONS

9.1 General

(a) Rates shall include for: screws, nails, bolts, nuts,


standard cable fixing or supporting clips, brackets,
straps, rivets, plugs and all incidential accessories.

(b) Rates for work in trench shall include for:


excavation, maintaining faces of excavations,
backfilling, compaction, appropriate cable covers,
warning tape and disposal of surplus spoil.
(c) Rates for work in trench shall include for electrical
condiuts, fittings, equipment and similar all fixings to
various building surfaces

(d) Each Light / light fixtures and its switch is measured as


one point; similarly each fan or each socket oulet is
measured as one point; installation
(f) All main distribution boards are 3 phase.

9.2 Electrical wirinq


Electrical wiring with copper conductor cable in conduits in
walls and in casing on soffits of slab as specified to:
(1) \/Viring with 1.5mm2 cable to lighting points 27.00

9.3 Liqhtinq
(1) nos 20.00
Ceiling mount light (weatherproof)

9.4
Liqht switches
(a) All light switches shall be "Clipsal" or equivalent
(1) no 7.00
One way switch

BILL No: 09 - ELECTRICAL INSTALLATIONS


TOTAL OF BILL No: 09 - Carried over to summary

Page 10
Gn. Fuvahmulaku Jetty Bill of Quantities

BILL No: 10
TENDERER'S ADJUSTMENTS

(a) Provide detail description of work items under each bill


and insert extra page if required

10.1 Additions
1 Preliminaries - Bill
2 no:1
3 Ground works - Bill no:2
4 Concrete - Bill no:3
5 Masonry and plastering - Bill no:4
6 Metal and Timber works - Bill no: 5
7 Roofing - Bill no:6
8 Ceiling - Bill no:7
9 Painting - Bill no:8
Electrical installations - Bill no:9
10.2 ADDITIONAL TOTAL
1 Omissions
2 Preliminaries - Bill no:1
3 Ground works - Bill
4 no:2 Concrete - Bill
5 no:3
6 Masonry and plastering - Bill no:4
7 Metal and Timber works - Bill no: 5
8 Roofing - Bill no:6
9 Ceiling - Bill no:7
Painting - Bill no:8
Electrical installations - Bill no:9
OMISSIONS TOTAL

BILL No: 10 - TENDERER'S ADJUSTMENTS


TOTAL OF BILL No: 10 - Carried over to summary

Page 11
JEfTY LOCATION:

Ceiling recessed
light

DSIGN BY:
SALFIYYA ANWAR

STRUCTURE BY:
SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAH JETTY

IS MAY 2011

CEILING/LIGHT PLAN
SCALE 1:50
241 [20'-6"
PROJECT:
CONSTRUCTION OF

FRONT ELEVATION
GN. FUVAHMULAH JETTY

SCALE 1:50
DES
SALFI YYA ANWAR
IS MAY 2011

SHIFAZ ALI
JEfTY LOCATION:

CONC R FINISH

DSIGN BY:
CeIurf1ns with SALFI YYA ANWAR

STRUCTURE BY:
SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAH JETTY

[2'-6"]
IS MAY 2011

GROUND PLAN
SCALE 1:50
JEfTY LOCATION:

Elevated roof

Lysaght roofing on
timber battens ano
timber rafters

Timber ceiling

Timber concealing the


gutter and edges

Concealed gutter

g 50mm SS Railing ir1


between columns
Columns with angled support

DES
SALFIYYA ANWAR

SHIFAZ ALI

PROJECT:
CONSTRUCTION OF

SECTIONAL ELEVATION GN. FUVAHMULAH JETTY

5CALEl:5O

IS MAY 2011
JEfTY LOCATION:

DSIGN BY:
SALFI YYA ANWAR

STRUCTURE BY:
SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAH JETTY

IS MAY 2011

ROOFPLAN
SCALE 1:50
PROJECT:
CONSTRUCTION OF

SIDE ELEVATION
GN. FUVAHMULAH JETTY

DES SCALEl:50
SALFI YYA ANWAR

IS MAY 2011

SHIFAZ ALI
JETTY LOCATION:

75mm T ICU LAB


RFMT: R6 35
B/W (SINGL LA

SLAB TO BE CAST WITH


JET STAIR AND EXTENDED B1
MT. FROM THE JETTY
USE GROUND SLAB.

1615

SALFIYYA ANWAR

B1 BI
SHIFAZ ALI
PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAKU JETTY

150 [b""] 3300 [10'-10" 1550 [6'-5"


3300 [10'-10" 1760 [5'-9" 15 MAY "2011
ENGINEERING DMSION
vlnDTRT 0r n0utlwG aO DMftOnvEW

SCALE 1 :56
JETTY LOCATION:

SLAB TO BE CAST WITH *y


JETTY STAIR AND EXTENDED

HOUSE GROUND SLAB.

LAN D

F1/C1

F1/C1 1/C1 SALFIYYA ANWAR


F1/C1

SHIFAZ ALI
F1/C1
PROJECT:
1760 [5'-9" CONSTRUCTION OF
s3oo [10'-1 0" GN. FUVAHMULAKU JETTY
150 [6" 250 [10"]
1550 [6'-5"
3300 [10'-10"
SEA 15 MAY "2011
ENGINEERING DMSION
uixsTPr or h0uSixG xio Bwi90xucf
SCALE 1 :?0
JETTY LOCATION:

5884 [19'-4"
2788 [9'-2" 1570 [5'-2"

CONCEALED
GUTTER
350 [1'-2" 200 [S]

ROOF TB2 TB2 TB2


LINE ' C2 C2
TB2 TB2 TB2 TB2
C2 C2
O=O=!

CONCRETE FLOOR FINISH


+300

TB1 TB

DSIGN BY:

SALFIYYA ANWAR
TB2 ], TB TB2 E2 C2
C2 C C2 C2
TB2 TB2 TB2 TB2 STRUCTURC BY:

SHIFAZ ALI
COLUMNS WITH PROJECT:
RAILING IN BETWEEN CONSTRUCTION OF
GN. FUVAHMULAKU JETTY
295 [1']
250 [10"

15 MAY "2011
ENGINEERING DMSION
763 [2'-6"] or
763 [2'-
6"]
763 [2'-6]
6"]
763 [2'-
F0U5 6l45
SCALE 1 : 56
94TI0
5
763 [2'-6"]
763 [2'-
6"]
JETTY LOCATION:

"639 [21'-9 ,

?225 [7'-4 , ?188 [7'-2 , ?225 [7'-4 ,

oncealed gutter 50X35 TMBER


BATTONS @ 300 C/C
50X3S TIMBER
BATTONS /0 300 C/C

r------'--------------n
ROOF
LINE

50X100 TIMBER 50X100 TIMBER


RAFTERS 450 C/C RAFTERS @ 450 C/C

50X150 TIMBER 50X150 TIMBER

---------5400 [17'- 3"


RIDGE MEMBER RIDGE MEMBER

50X100 TIMBER
RAFTERS @ 450 C/C 50X100 TIMBER
RAFTERS 450
C/C

SALFIYYA ANWAR

621 [2']
SHIFAZ ALI

50X35 TIMBER

PURLINS @ 300 C/C CONSTRUCTION OF

421 [1'-5" -
GN. FUVAHMULAKU JETTY
1525 *589 [11'-9"] 1525 [5'
[5']
421 [1'-5"

50X35 TIMBER
0HI6 600F F60MI9 P05
SCALE I : SG
BATTONS @ 300 15 MAY "2011
u/L
ENGINEERING DMSION
vlnDTRT 0r n0utlwG aO DMftOnvEW
JETTY LOCATION:

LAND

SALFIYYA ANWAR

SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAKU JETTY
300
1950 [6'-5"
[1']
SEA 300 3300 [10'-1 0"
[1'
15 MAY "2011
ENGINEERING DMSION
SCALE 1:?0 uixsTPr or h0uSixG xio Bwi90xucf
"159 [20'-2"] JETTY LOCATION:

1835 [6' ?489 [9'-2" 1835 [6'

CONS ALED
TTER
129 [.6"] 200 [8"

ROFOR
200
LINE ' [8"]
'

RB' i RB
RB RB RB

200 [8"
F00 [11'-6"

PPER LEVEL
F BEAMS
200 [8"]

SALFIYYA ANWAR

RBi' RB
RB RB RB SHIFAZ ALI

CONSTRUCTION OF
GN. FUVAHMULAKU JETTY
05 [1'-4"]

405 [1'-4"

763 [2'-6"] 763 [2'- 15 MAY "2011


763 [2'- 6"] 763 [2'-6"]
6"] 763 [2'- ENGINEERING DMSION
6"] uixsTPr or h0uSixG xio Bwi90xucf
SCALE 1 : 5Li
T10

STAIR WAIST

T12

JETTY LOCATION:

SALFIYYA ANWAR

SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAKU JETTY

DIT2II-5 15 MAY "1011


SCALE 1 :20 ENGINEERING DMSION
uixsTPr or h0uSixG xio Bwi9oxuxT
T10

STAIR WAIST

T12

JETTY LOCATION:

SALFIYYA ANWAR

SHIFAZ ALI

PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAKU JETTY

DIT2II-5 15 MAY "1011


SCALE 1 :20 ENGINEERING DMSION
uixsTPr or h0uSixG xio Bwi9oxuxT
JETTY LOCATION:

2T10 3T10
R6-150
R6-150 P6fO150c/c
5T12
5T12 2T10 { ) ) 3T10
C2 TB1 TB2
C1

"' 2T12

in
R6rO150c/c
EXISTING 75mm THICK
GROUND LEVEL R.C GROUND
SLAB )) 2T12
B1

2T12

R6 350 B/W
(SINGLE LAYER) R6rD150c/c
SOLIDE BLOCK
MASONRY 250 COLUMN (C2)
(SEE COLUMN DETAILS) j j 2T12 SALFIYYA ANWAR
RB

GENERAL NOTES: SHIFAZ ALI


- COVER TO BEAMS 6 COLUMNS = Comm.
(F"2) - COVER TO FOUNDATION = 50mm.
PROJECT:
CONSTRUCTION OF
- Fcu = 35n /mm GN. FUVAHMULAKU JETTY
- Fy = 415n/mm
STUC7UI DITIIS
SCALE 1:20

15 MAY "2011
ENGINEERING DMSION
uixsTPr or h0uSixG xio Bwi90xucf
JETTY LOKATION:

300 [1'

EXISTING GROUND LEVEL

600 [2']
B1 B1
DETAIL-A FOUNDATION BOTTOM LEVEL ON LAND

APPRG X. 1400 [4'-7"]


COLUMN (C1 )

ASSUMED LOW TIDE ELVEL


B1
COLUMN (C1 )

APPRG X. 2109 [6'-11"]


SALFIYYA ANWAR

SHIFAZ ALI
FN NF)TIQN PD SSUMED SEA BED ELYEL PROJECT:
CONSTRUCTION OF
GN. FUVAHMULAKU JETTY

SCALE 1:?0

15 MAY "2011
ENGINEERING DMSION
uixsTPr or h0uSixG xio Bwi90xucf
JETTY LOCATION:

1525 [5' *588 [11'-9"


*50 [1'-10"]

50X35 TIMBER
PURLINS/ 300 C/C

421 [1'-5"
ROOF
LINE

50XIO0TMBER
50X35TMBER
RAFTERS @450C
_PURLlNSL) 300C/C

3400 [17'-9"
50X150 TIMBER
RIDGE MEMBER

50X100 TIMBER
RAFTERS @ 450 c ROOF
BELOW
ROOF
BELGW
Columns with
railing in between

!i "i ! I

421 [1'-5 ,
U66IR R00f fR2NI5G 6l2N
SCALE 1 : SFI

SALFIYYA ANWAR

SHIFAZ ALI

CONSTRUCTION OF
GN. FUVAHMULAKU JETTY

15 MAY "2011

ENGINEERING DMSION
vlnDTRT 0r n0utlwG aO DMftOnvEW

Вам также может понравиться