Contract Award: 1986 (Trees Ph I) No. Trees: 65 (25 by FMC) Petrobras 100% 1992 (Trees Ph II) Water Depth: 150 - 1,050 m 1994 (Manifolds Ph I) (490 - 3,440 ft) 1995 (Manifolds Ph II) Tree Type: Vertical Sales: Rio de Janeiro, Brazil Tree Pressure 5,000 psi Fabrication: Rio de Janeiro, Brazil Tree Bore size: 4x2 Service Base: Maca, Brazil Hydrocarbon: Oil and Gas Host Type: Semi and FPSO Contract Type: EPC BRAZIL Scope of Work Comments Subsea: Phase I (P-25 Platform) In 1984, the Albacora Field was discovered at Campos Basin, 4 Thirteen (13) vertical 4x2 5,000 psi diverless DLL subsea proving the existence of giant deepwater fields in Brazil. The trees Albacora Field comprises sixty-five (65) wells, two (2) production units (semi-submersible P-25 and FPSO P-31) and seven (7) diver- 4 Two (2) subsea production manifolds less manifolds (6 for oil production and 1 for water injection). 4 Four (4) subsea control modules The production has reached 150,000 bopd and 90 mmcf/d of natural gas. 4 Twelve (12) vertical connection modules (manifold flowline connection system) The semi-submersible platform P-25 has a process plant with the Subsea: Phase II (P-31 Platform) capacity of 100,000 bopd and 115 mmcf/d of natural gas. There 4 Fourteen (14) vertical 4x2 5,000 psi subsea trees are fourteen (14) production wells connected directly to the platform (satellite wells) and sixteen (16) wells connected to two One (1) GLL-I (2) diverless production manifolds by a vertical flowline connec- Five (5) GLL-III tion system. These FMC Technologies manifolds, installed in Four (4) GLL-IV December 1995 and April 1996, were the worlds deepest subsea Two (2) GLL-V production manifolds and multiplex control pods at the time. Two (2) GLL-VI 4 Four (4) multiplexed subsea production manifolds with The FPSO P-31 process plant capacity is 200,000 bopd and valves and chokes 130 mmcf/d of gas. The plant processes the oil produced in P-25 platform and the oil production of twenty-eight (28) production 4 One (1) multiplexed subsea water injection manifold with wells connected to four (4) FMC production diverless manifolds. valves and chokes 4 Nineteen (19) subsea control modules 4 Forty-seven (47) vertical connection modules (manifold and tree flowline connection systems) 4 System integration, testing, installation assistance, service and maintenance Floating Production: Phase II (P-31 Platform) 4 Design and construction of permanent internal mooring system
Worldwide Headquarters: Regional Sales Office:
FMC Technologies FMC Technologies 1803 Gears Road Rodovia Presidente Dutra, 2660 Houston, TX 77067, USA Pavuna 21538-900 Phone: +1 (281) 591 4000 Rio de Janeiro, Brazil Fax: +1 (281) 591 4291 Phone: +55 (21) 2472 7770 Fax: +55 (21) 2471 2924