DESCRIPTION REMARKS
1 ConfirmBridgePlugdepth 2734.5m
2 ConfirmTopPackerdepth (around2,681.3m)
3 ConfirmPerforationzonedepth 2713.52717.0;2718.52729.5
4 ConfirmPackerdepthisfreefromCCLdepth 2678.0;2690.0
5 Confirm7"TopLinerDepth 2525.0
6 CompleteTopPackerAssy.(WITHOUTFLAPPERVALVE)&Workorder completed
7 PrepareHandlingequipment&WashpipeonceBasketandPalletcomeatRig completed
8 CompleteLowerCompletionTally
9 Givename/labelonassyandwashpipeasperTally
MakemeetingwithComan,ProductionEng,FracEngineer,Toolpusheranddirller
10 1 ServiceToolPositioning completed
2 Completionprogram
3 HydrilBagisingoodconditionforreverseandstriptest(1.7m) completed
4 X/O3.5"IFPinx3.5"EUEBoxanddriftedwith2.125"Ball available;driftok
5 X/O3.5"EUEPxChicsanConnectiondriftedw/2.125"settingBall(ContingencyPlan)
6 X/O3.5"EUEPx5.5"FH(connectionofTopDrive)
7 EnsureRigStandPipeManifoldLineupforFRACPACKJob
8 3.5"EUETubingTally(givenbyONGCProdEng.)
9 BallCatcherfor2.125"settingBall(CONTINGENCYPLAN)
10 LTSAUpperCompletionaddHalfmuleshoebelowmostbottomsealunit
11 TIWValveforWellControldriftedwith2.125"settingball(Optional)
Killsubw/31/2"9.2#FoxthreadstoTIWValve(Optional.)
Killsubw/TIWconection31/2"9.2#Foxpinx11/4"CSpintoTIWValve(Optional)
HandlingEquipmentfromRigFloor/ONGC
11 1 3.5"FOXTUBINGSAFETYCLAMP(RIGFLOOR) availableoncantilever
2 3.5"ELEVATORforFOXTUBING(RIGFLOOR) availableoncantilever
3 3.5"RotarySlipforFOXTUBING(RIGFLOOR) availableonR/F
4 27/8"DriftforFOXTubing(RIGFLOOR) availableonR/F
5 PUPJOINT3.5"EUEPinxBox(forspaceout) 4eaavailableinsideWSSbasket
6 PUPJOINT3.5"FOXPinxBox(ForScreenLiftingSub) 1eaavailableinsideWSSbasket
7 3.5"IFLiftingSubforTopPackerAssy(3.5"IFBoxofSettingTool)(RIGFLOOR) availableoncantilever
8 3.5"9.2#JFEFOXTUBING2ea+2eaBU