No.

Issue Pros Cons Comments


Safety Lift drilled machine to B2
Operation of equipment at confined space (limit clearance)
30 days as the first submission May extension of time if lack of development detail method
Schedule 45 days as new Proposal statement
Speed up excavation progress Obstruct during drilling
Easy to install rebar Narrow space for transportation
Difficulty for installation of formworks/ rebar and joint of
Inital Opton

King post with slab and beam system.


Install bracing system
Not treatment for Construction joint of core wall Construction joint of slab & core wall
Quality Defect of bore pile & treatment Position/ quality of mini bored pile if defecting

Cost reducing cost for formwork system at lift core Cost for bored Pile D400 Cost
foundation cost for steel bracing breakdown
Saving manpower/ material for Coupler connection cost for additional beams detail need to
Cut and removal King post be checked by
QS
More spacing for transportation Material lifting will be limited due to excavation activities
Safety Easy to control safety issue from ground level

30 days for drilling piles May extension of time if lack of development detail method Refer to CTC
Schedule Quick action for rebar & formwork installation statement proposal
Opton 1 (all D800)

Obstruct during drilling


Install bracing system & Pre-loading
Not treatment for Construction joint of core wall Construction joint of slab & core wall
Quality Defecting of bored pile

Not treatment for Construction joint of core wall cost for steel bracing Cost
Cost Saving manpower/ material for Coupler connection Cost for bored Pile D800 breakdown
reducing cost for formwork system at lift core cost for additional beams detail need to
foundation Cut and removal King post be checked by
QS
More spacing for transportation Soil storage area for backfilling
Safety Easy to control safety issue from ground level Material lifting will be limited due to excavation activities
Collapse of excavation pit, slope stability
30 days for drilling pile D800 + 15 days for soil May extension of time if lack of development detail method Refer to CTC
Opton 2 ( a part of D800)

Schedule backfilling after completing pile cap & core wall statement proposal
Quick action for rebar & formwork installation Obstruct during drilling
Install bracing system & Pre-loading
Not treatment for Construction joint of core wall Construction joint of slab & core wall
Quality Position/ quality of bored pile D800 if defecting

Not treatment for Construction joint of core wall Cost for bored Pile D800 Cost
Cost Saving manpower/ material for Coupler connection cost for steel bracing breakdown
reducing cost for formwork system at lift core cost for additional beams detail need to
foundation Cut and removal King post be checked by
Save budget of bored pile QS