Вы находитесь на странице: 1из 60

Best Practices for Integrating SAP PPM and PLM

1
Revised Abstract
Best practices for integrating SAP Portfolio and Project
Management and SAP PLM to reduce time to market and
increase new product development efficiency
Tom Martin, GyanSys, Inc.

This session provides proven tips and actionable advice for integrating SAP Portfolio
and Project Management (PPM) and SAP PLM applications to improve cross-
functional collaboration, reduce time to market and increase efficiency across the
entire product development lifecycle.

Gain an understanding of whats required to integrate PPM and SAP PLM, the
challenges you may face, and best practices for overcoming them. Through GyanSys
customer case studies and documented examples, explore out-of-the-box
functionality as well as tips for using available BAPIs and BAdIs to improve
integration between PPM and SAP PLM.

Come away from this session with a solid understanding of the capabilities and
features included in the latest solutions for improving SAP PLM processes and
integration from GyanSys Product Development Labs.
GyanSys Brief Overview

Global headquarters Indianapolis, IN


US Offices - NJ and TX.
Offices International - Netherlands, Philippines and India
WBE Certified

SAPs National Services Partner


Partnership SAP Ramp-Up PPM 5.0 , PLM 7.01, SRM 7.01
SAP & Microsoft SAP Co-Innovation Lab Partner
In-House System for POC/Conference Room Pilot

Assessment and Evaluation,


Implementation and Development
Our Services Testing , Training, and Support
System Optimization

300+ consultants globally


Part-time Pooled blended hours
Engagement Model Onsite, Near-Shore and Offshore
SLA driven and Metrics reporting
Solution Offerings
Business Process
PLM, CRM, EAM, SRM, SCM, HCM, Financial Management etc.

Core ERP Offerings


Financial
FI, CO, Treasury, FSCM, ECCS, Travel Management etc..
Human Resources
PA, OM, Benefits, CATS, PT, Benefits, PY, ESS/MSS, eRecruiting etc.
Logistics
SD, FI, MM, PP, VC, PM, CS, PS, eWM, QM, TM etc.

Business Analytics
BW, BO, BPC, Pre-Built Dashboards, Information Broadcasting, GRC
Technology
Netweaver
Portal, EDI, MDM, PI, Workflow, Basis, Web DynPro, Workflow, ADS etc.
Solution Manager, TDMS, TAO etc.
MS Platform
.Net development, SharePoint Template/Forms, Project Server Integration, Outlook Integration,
Duet Enterprise
Mobility
iOX Development
Our Differentiation
Pedigree (Hire the best) - Delivery Best Practices
-Academics & Experience Adopting Best Processes
Investments on building Stringent Reviews
skills
Retention with focus on
growth opportunities. Your Benefits

Employee Experienced teams


Process Rapid Project
Engagement
execution
Lower TCO

Alignment to Client
IT ecosystem and
Fiscal Priorities
Technology
Prudence
Responsiveness and
flexibility in
Focus on SAP & MS Focus on operational engagement
Business Suite Expertise efficiency
on NetWeaver Platform Low Capital Investments
Domain Expertise Leverage
Communications
advancements
Our Rapid Deployment Offerings

6 Weeks 9 Weeks 12 Weeks


SAP PLM Major Features Implementation Implementation Implementation

Maturity Level 1 IT Portfolio Mgmt


PLM DIR Object Linkage
Enhanced MS Project Integration
Maturity Level 2 IT Portfolio Mgmt
Level 1 Engineering Change Record
Optimized PPM/PLM Integration
Level 2 Engineering Change Record
Maturity Level 3 IT Portfolio Mgmt

7
GyanSys Introductions

Tom Martin Raj Una


PLM/PPM Practice Director US Delivery Head

15 Years SAP Project Experience 16 Years of SAP Experience


PPM Architect Key architect: Run SAP
PLM Architect Thought leader, presenter
Project Controls expert PPM, PLM architect
Cross-industry experience Multiple Roll Out experience

Leader in PPM Community Entrepreneur, Leader


Keynote Speaker Founded GyanSys
SAP Contributor SAP Certified trainer
ASUG / Sapphire Presenter Cross-industry experience

4/3/2012 8
GyanSys PLM Practice

PLM PPM
Engineering Change Management Portfolio Management
CAD Integration Project Management

Document Management IT, Product Development, Capital


BOM Lifecycle Resource Management

Variant Configuration ECC Integration


Enterprise Search Portfolio Optimization

4/3/2012 9
All About Data

Red Bull Racing F1 RB8

Idles at 6000 RPM


300 Sensors
1.5 Billion signals
4/3/2012
8GB Data per 10
race
Target Audience

1) Companies Already Running SAP PLM


Be aware of the integration capabilities

2) Companies Planning to Implement SAP PLM


Plan future integration

3) Companies with Unacceptable Lead Times


Improve efficiency and effectiveness

4/3/2012 11
Agenda
Introduction: PPM~PLM Integration The last white-space
Background: A history of the development of SAP PPM and PLM
Challenges: Frequently encountered issues and gaps
Goals: The Benefits of Integrated PPM/PLM
Standard Integration: What exists out of the box
PLM 7.02: Whats coming
Netweaver: The power of SAPs integration framework
Case Studies: Real-life examples
Whats Next: What are GyanSys PD Team working on
Summary / Questions
4/3/2012 12
Introduction: The last White-Space

4/3/2012 13
Background: A short history of PPM & PLM

A lot has happened in the last 6 years!

4/3/2012 14
Challenge: Undo Deeply Embedded Silos

Functional Silos: Concurrent Engineering:


Developed over time Big OCM Effort

4/3/2012 15
Goals: The Benefits of Integrated PPM/PLM

Aligning Reality with Perception


@Management Level
Closed-loop system
Exception reporting
Supports decision making
Improves efficiency

@Functional Level
Fewer mouse-clicks
Intuitive, good UI
Elimination of data duplication
Less admin, more analysis (job support)
4/3/2012 16
What is PPM?

4/3/2012 17
What is PPM?

Portfolio Project Resource


Management Management Management

4/3/2012 18
SAP Standard: What Exists Out-of-Box?

Product Lifecycle Management PLM

Process, Product Management PPM PDM

Business Functions Change Req. Portfolio Resource Legacy PLM eBOM


Eng Change
Management
Replacement Management Management Replacement mBOM - sBOM
(PPM, PDM) Document Mgt

ECC Integration

PLM will manage the process lifecycle of a new / existing product via PPM
PLM will manage the data lifecycle of new / existing BOMs and Parts via PDM
Deep vertical integration into all areas of ECC
Limited horizontal integration between PPM and PLM
4/3/2012 19
PLM 7.02: Whats Coming?

4/3/2012 20
Netweaver: The Power of Integration

Netweaver provides the keys to link PPM and PLM


Object Linkages BAPIs, BADIs

Document Management

4/3/2012 21
Agenda
Introduction: PPM~PLM Integration The last white-space
Background: A history of the development of SAP PPM and PLM
Challenges: Frequently encountered issues and gaps
Goals: The Benefits of Integrated PPM/PLM
Standard Integration: What exists out of the box
PLM 7.02: Whats coming
Netweaver: The power of SAPs integration framework
Case Studies: Real-life examples
Whats Next: What are GyanSys PD Team working on
Summary / Questions
4/3/2012 22
Case Studies: Real-life Examples

1) Integrated Engineering Change Process

2) Part Dashboard

3) Enhanced Object Linkage

4) Optimized Project Task Dashboard

5) Aggregated MS Project Integration

4/3/2012 23
Engineering Change Process

Header Individual
Information Functional
Tab Team Tab

4/3/2012
Use PPM to Manage24the Process of ECR
Engineering Change Process

DMS
Document
Folder
Accessed
via PPM

4/3/2012 25
Functional Team Tab: Engineering

Each Tab is
Functional
Team
Specific

Contains the processes and


data necessary to manage
production changes
4/3/2012 26
Engineering Design Checklist

Checklists ensure all steps are


completed per Functional
Team

Custom Screens powered by


NWBC, Custom fields are
standard BADI activation

4/3/2012 27
Plant Tooling, Equipment Costs Tab

Capture all Tooling, Facilities


and Equipment Costs

4/3/2012 28
Financial Analysis Tab

and include in the overall


Financial Analysis tab.

then compare against


original Business Case using
PPM Financial Planning
4/3/2012 29 functionality.
Action Items

Action Items capture and


track tasks across all
functional teams.

4/3/2012 30
Case Studies: Real-life Examples

1) Integrated Engineering Change Process

2) Part Dashboard

3) Enhanced Object Linkage

4) Optimized Project Task Dashboard

5) Aggregated MS Project Integration

4/3/2012 31
Part Dashboard

Origins of Part Dashboard


Started life as a spreadsheet
containing the Virtual (V-
BOM).

Why not capture in SAP, and


eliminate the manual BOM?

and provide a launch-pad for all


engineering workflows!

4/3/2012 32
Part Dashboard

On the Left Side is the V-BOM On the Right Side is the E-BOM

Integrate the V-BOM with the E-BOM


inside SAP PLM
4/3/2012 33
Integrated Parts Request Process

Use Dashboard as a central


launch-pad to request new /
changed part requests

Launch workflows that trigger


the creation of Material
Masters and DIRs

4/3/2012 34
Integrated NWBC Workflow

All Workflows run on the new


NWBC Business Workflow
Workplace

4/3/2012 35
Integrated Part Request Form

In-built Part Request


Form contains the
details and who the
approvers are

4/3/2012 36
Design Approval Request Form

Design Approval / Review


Process tracks Engineering
Design Approval.

4/3/2012 37
Integrated Release Request

Similar process for handling


part releases.

Manages early engineering


releases (e.g. Experimental)
to full Production release.

4/3/2012 38
Configuration Change Summary

The Configuration
Change Summary is an
interactive report
listing all part changes
across the BOM.

4/3/2012 39
Case Studies: Real-life Examples

1) Integrated Engineering Change Process

2) Part Dashboard

3) Enhanced Object Linkage

4) Optimized Project Task Dashboard

5) Aggregated MS Project Integration

4/3/2012 40
Enhanced Object Linkage

Object linkages are the key to connecting PPM and PLM

Available for every object in SAP


Standard object links available
Easy to configure new links
Link to BADIs, FMs

4/3/2012 41
Enhanced Object Linkage

For this customer we


linked PPM Tasks to
the Document DIR,
and updated progress
based on status

4/3/2012 42
Case Studies: Real-life Examples

1) Integrated Engineering Change Process

2) Part Dashboard

3) Enhanced Object Linkage

4) Optimized Project Task Dashboard

5) Aggregated MS Project Integration

4/3/2012 43
Optimized Project Task Dashboard

Now that all tasks are


connected via Object
Links to PLM
Documents

. We optimized the
PPM Task Dashboard
to sort tasks by
criticality and Severity
4/3/2012 44 (a configurable icon)
Case Studies: Real-life Examples

1) Integrated Engineering Change Process

2) Part Dashboard

3) Enhanced Object Linkage

4) Optimized Project Task Dashboard

5) Aggregated MS Project Integration

4/3/2012 45
Aggregated MS Project Integration

Standard MS Project
integration performs a
1:1 replication of all
tasks.

Many PMs want to


summarize the PPM
tasks and allow much
deeper planning in
MSP.

4/3/2012 46
Aggregated Project Integration

MS Project Detailed
task data is
aggregated and
passed to PPM:

- Actual Dates
- Percent
4/3/2012 Completes 47
Agenda
Introduction: PPM~PLM Integration The last white-space
Background: A history of the development of SAP PPM and PLM
Challenges: Frequently encountered issues and gaps
Goals: The Benefits of Integrated PPM/PLM
Standard Integration: What exists out of the box
PLM 7.02: Whats coming
Netweaver: The power of SAPs integration framework
Case Studies: Real-life examples
Whats Next: What are GyanSys Product Devt Team working on?
Summary / Questions
4/3/2012 48
Whats Next: PFEP

4/3/2012 49
Project Managing the BOM

PFEP explodes the BOM into a


PPM Project Structure.

Each Part is further exploded to


a detailed cross-functional task
list4/3/2012 50
Process Overview (1 of 2)
New
1
Change
2

PFEP Steps:

1) Trigger a BOM Creation / change event


2) Create / change a PFEP master project
3) Generate each part detailed task sub-project
4) Prioritize tasks according to Task Dashboard
5) Auto-progress tasks based on normal operations
4/3/2012 51
Process Overview (2 of 2)

PFEP Steps:

1) Trigger a BOM Creation / change event 5


2) Create / change a PFEP master project
3) Generate each part detailed task sub-project
4) Prioritize tasks according to Task Dashboard
5) Auto-progress tasks based on normal operations
4/3/2012 52
PFEP: How It Works
Step 1) Explode a Material BOM, Assembly, Sub-Assembly or
Part into a project structure

4/3/2012 53
PFEP: How It Works
Step 2) Create / Change PFEP Master Project

4/3/2012 54
PFEP: How It Works
Step 3) Generate each part detailed task sub-project

4/3/2012 55
PFEP: How It Works
Step 4) Prioritize tasks according to Task Dashboard

4/3/2012 56
PFEP: How It Works
Step 5) Auto-progress tasks based on normal operations

4/3/2012 57
Summary
Integrated PPM/PLM = Efficiency, Effectiveness Gains
@Management Level
Closed-loop system
Exception reporting
Supports decision making
Improves efficiency
@Functional Level
Fewer mouse-clicks
Intuitive, good UI
Elimination of data duplication
Less admin, more analysis (job support)
Bring Your Product Development Processes to Life
4/3/2012 58
Questions

Tom Martin
GyanSys Inc.
Tom.Martin@GyanSys.com
+1 949 307 3052

4/3/2012 59
GyanSys Contact Information

GyanSys Inc
8440 Woodfield Crossing Blvd., Suite #290
Indianapolis, IN 46240, USA
O: (+1) 317 580 4200
Email: sales@GyanSys.com
www.GyanSys.com

Visit our Booth # 130 for detailed


discussion with our Solution Architect

Вам также может понравиться