Total Qty
Sr. No. Activity ID Activity Name B.O.Q Description No.s Length Widt Height Qty/Unit Unit Cement Bags Consumed
1.4 EARTH WORK
1.4.1 Excavation
1.4.1 as per drawingsand adding working space with 1 19000 17000 3000 969.00 M3 969.0
SUM 969.0
1.4.2 BACKFILL
1.4.2 as per drawings 1 M3 230.0
SUM
PC CONCRETE
3. Base Slab
1 18000 16000 10 28.80 M3 28.8
SUM 28.8 97.0
RC CONCRETE
4. Base Slab
2.4.1 (a) Slab asd per drawing and specifications 1 15800 17800 500 140.62 M3 140.6 875.0
SUM 140.6 875.0
5. Walls
2.4.1 (f) Short Wall 2 13650 350 3300 15.77 M3 31.5 196.0
2.4.1 (f) Long Wall 2 15650 350 3300 18.08 M3 36.2 225.0
2.4.1 (f) Chamfer 1 58600 450 450 6.00 M3 6.0 38.0
SUM 73.7 459.0
STEEL
6. Slab and Walls
2.2.1 (a) Slab & Walls asd per drawing and specifications 1 - - - - Ton 12.448
SUM Ton 12.448
Sr. No. Activity ID Activity Name B.O.Q Description No.s Length Widt/Dia. Height Qty/Unit Unit Total Qty Cement Bag Status
Consumed
EXCAVATION
R.C.C Walls long side 1:2:4 2 9300 300 2800 7.81 M3 15.62 Complete
R.C.C Walls short side 2 2800 300 2800 2.35 M3 4.70 Complete
Total Qty
Sr. No. Activity ID Activity Name B.O.Q Description No.s Length Widt Height Qty/Unit Unit Cement Bags Consumed
EARTH WORK
1. Excavation
SUM
2. BACKFILL
1.4.2 as per drawingsand adding working space with 1 M3 234.2
SUM 234.2
GRANULAR FILL MATERIAL
3. Raft Foundation
SUM
PC CONCRETE
4. Raft Foundation
SUM
RC CONCRETE
5. Raft Foundation
SUM
6.Pedestal
6.1 P1 as per drawing and specifications 16 500 500 1200 0.30 M3 4.8
SUM 4.8 38.0
STEEL
7. Raft Foundation
8. Columns
SUM
Sr. No. Activity ID Activity Name B.O.Q Description No.s Length Widt Height Qty/Unit Unit Total Qty Cement Bags Consumed
EARTH WORK
1. Excavation
SUM
2. BACKFILL
1.4.2 as per drawings 1 343.00 M3 343.0
SUM
GRANULAR FILL MATERIAL
3. Raft Foundation
SUM
PC CONCRETE
4. Raft Foundation
SUM
RC CONCRETE
5. Raft Foundation
SUM
6. Columns
6.1 as per drawings and specs 24 500 500 1200 0.30 M3 7.2
SUM 7.2 57.0
STEEL
7. Raft Foundation
8. Columns
SUM
Total Qty
Sr. No. Activity ID Activity Name B.O.Q Description No.s Length Widt Height Qty/Unit Unit Cement Bags Consumed
EARTH WORK
1.Excavation
1.4.1
SUM
2. BACKFILL
1.4.2 as per drawings 1 M3 230.0
SUM
PC CONCRETE
3. Base Slab
SUM
RC CONCRETE
4. Base Slab
2.4.1 (a)
SUM
5. Walls
2.4.1 (f)
2.4.1 (f)
2.4.1 (f)
SUM
STEEL
6. Slab and Walls
2.2.1 (a)
SUM