Вы находитесь на странице: 1из 1

DETAIL 1 DETAIL 3

N.T.S. 1:5
SECTION A-A
1:5

DETAIL 4 VENTILATION OPENING


1:5 1:5

=3mm

*Note:

-After completion of foundation trench CM to call PM for inspection and instruction,


if soil improvement >20cm is required prior to placing of blinding.
-Protect joinery with plastic sheets against accidental soiling when plastering and
painting.

FGL = Final Ground Level FCL = Final Concrete Level


FFL = Final Floor Level NGL = Natural Ground level

Position of ventilation opening is in same line with venting on


roof. Ventilation opening is achieved by omitting one brick in
masonry.

DETAIL 2 A FIRST ISSUE 02-12-2013 E.P. P.T. Z.C.


1:5
Rev ISSUE, MODIFICATION DATE Dwn Chd App

REVISIONS

Islamic Republic of
Afghanistan

EMPLOYER Engineer's Approval


Ministry of Urban Development Affairs
Afghanistan Urban Water Supply and Sewerage
Corporation, (AUWSSC), Kabul

ENGINEER
Approved by:
JV Kocks Consult - Fichtner W&T
c/o Fichtner W&T Zoran Cohadzic
Linnestr. 5
79110 Freiburg Checked by:
Federal Republic of Germany Petar Tasic

Designed by:
Project Elizabeta Popa
Construction of Water
Scale
Supply System Balkh 1:5

SHEET:
Title 1/1

RS DRAWING No.
ADMINISTRATION BUILDING
DETAILS ARCHITECT
BL-CIV-DE-049-REV_A

Ludwig Pfeiffer Hoch- und


Tiefbau GmbH & Co.KG,
Kassel, Germany
PFEIFFER