NOMOR :
TANGGAL : 29 Juli 2013
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
- 0
Nip. Site Engineer
NGUKURAN LAPANGAN
#REF! TETAP
0 -
Site Engineer Staf Teknis
40000000
35000000
30000000
25000000
Row 19
Row 20
20000000
Row 22
Row 23
Row 24
15000000
10000000
5000000
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
LAMPIRAN BERITA ACARA HASIL EVALUASI PEKERJAAN TAMBAH KURANG (CC0)
PEKERJAN : #REF!
KONTRAK NOMOR : #REF!
KONSULTAN : #REF!
KONTRAKTOR : : 620/600/10/KONT-BM/2016, Tanggal 23 fEBRUARI 2016
SUMBER DANA : APBD KABUPATEN WAKATOBI
TAHUN ANGGARAN : 2013
-
- - -
100.00 100.00
JUMLAH 1,661,342,923.23 1,661,342,923.23
PPN 10% 166,134,292.32 166,134,292.32
JUMLAH TOTAL 1,827,477,215.55 1,827,477,215.55
DIBULATKAN 1,827,400,000.00 1,827,400,000.00
PERTAMBAHAN TAMBAH/KURANG
PERBEDAAN
KETERANGAN
BERTAMBAH BERKURANG RUPIAH
MUNAFAR,ST SEKRETARIS 2
LD JAINUDIN,A.AST ANGGOTA 4
100.00
JUMLAH 792,742,340.69
PPN 10% 79,274,234.07
JUMLAH TOTAL 872,016,574.76
DIBULATKAN 872,000,000.00
74.58
39.3
40,650,000.00
38,250,000.00 4.83
2,400,000.00 0.30
645,183,642.22
645,183,642.22 81.39 223.95 42,223,017.83 Tambah
106,908,698.47
53,822,654.96 6.79 -2.67 -5,906,555.23 Kurang
4,115,872.75 0.52 -141.32 -3,704,809.79 Kurang
48,970,170.76 6.18 -24.69 -32,660,008.54 Kurang
100.00
792,742,340.69 223.95 (168.68) (48,355.73)
79,274,234.07 22.40 (16.87) (4,835.57)
872,016,574.76 (185.55) 53,191.31
872,000,000.00 (100,000.00) -
-
- - -
100.00 100.00
JUMLAH 734,989,693.47 734,989,693.47
PPN 10% 73,498,969.35 73,498,969.35
JUMLAH TOTAL 808,488,662.82 808,488,662.82
DIBULATKAN 808,400,000.00 808,400,000.00
Dibuat Oleh :
Kontraktor Pelaksana
CV. MITRA PALAWA
VOLUME
NO. URAIAN SAT
AWAL CCO-01
DIV I UMUM
1.2 Mobilisasi Ls 1.00 1.00
MUNAFAR,ST MARHANA, ST
19760115 200604 1 006 Site Engineer
PENGUKURAN LAPANGAN
WKTB/X/2014
PERBEDAAN VOLUME
KETERANGAN
(+) (-)
- BERKURANG
-28.05 BERKURANG
19.24 BERTAMBAH
15.26 BERTAMBAH
16.80 - BERTAMBAH
Dibuat Oleh :
Kontraktor Pelaksana
CV. MITRA PALAWA