Вы находитесь на странице: 1из 10

Proposed Site Survey:

Project Name:
Region:

Do not Copy or Alter without Permission. All Rights Reserved.


General Information Form

Sites Geographical Information


Type of Site:
Site Name:
Site Number:
GPS Co-ordinates
Provided
GPS Co-ordinates
actual calculated on
site

...........
. . . . . . . . . . . Remarks:
...........
........... ...................................................................................
...........
...........
......... ...................................................................................

Company Representive during


Vendor Representive during Survey
Survey

Name: Name:
Signatures: Signatures:

Date: Date:

Do not Copy or Alter without Permission. All Rights Reserved.


Survey Date Surveyor Company
Site Name Site No.
Transmission Ring
Equip/Model
name
Surveyor Name Contact no.
Note: If Site name &/or number differ in field from information provided indicate here (SN/S#):

1. Type of Site: Existing Site :


Indoor Site
Outdoor Site

New Site.

2. Floor Type: Raised Floor (Height Between grounding level & upper surface of raised floor.)
Cement Floor.
Shelter.

3. Space(s) Located: Available (Transmission Cabinet & W.S Location)


Location-1:
Location-2:
Location-3:

4. DC Power Information: Use Existing Fuse on DCDP (See DC Fuse Assignment Sheet)
Use Existing CB/Fuse on GPS/LDB/Rectifier.
Need Install new DCDP.
DCDP Proposed Location:
Distance from Rectifier Room to Equipment: (M).
Distance from DCDP to Equipment: (M).

No DC Power Availble.

5.Ground Bar: Availble.


Not Availble.
6. AC Socket: Availble.
Not Availble.
7. Cable Ladder Information: Availble.
Not Availble.

Other Installation (Materials,Comments):

Do not Copy or Alter without Permission. All Rights Reserved.


Survey Date Surveyor Company
Site Name Site No.
Transmission Ring
Equip/Model
name
Surveyor Name Contact no.

1.     Rectifier Survey Information:

1- Sketch Floor Plan.


2- Assign Location W/L/H.
3- Check for Floor Loading (Raised, Cement or other).
4-     Electricity Available.
5-    AC Panel Availble in Equipment Room.
6-    Check for Current Availibility ______Amps.

2. Other Information (material, Coments):

Do not Copy or Alter without Permission. All Rights Reserved.


Survey Date Surveyor Company
Site Name Site No.
Equip/Model Transmission Ring
name
Surveyor Name Contact no.

Attach Site Access Drawing


Co-ordinates: X= Y=

Do not Copy or Alter without Permission. All Rights Reserved.


Existing Site Survey Report
Survey Date: Surveyor: Surveyor Mobile:

Site Name/No. DISTRICT:


Site GPS position: N= E= Project: Site Status (Expansion/New)

1. Site Room Environment:


Floor No. (Basement/Ground Floor/1st Floor/2nd Floor/...)
Net height of room: Height of cable ladder
Floor Type: Cement Floor
Raised Floor, the height of Raised floor (from cement to Raised floor above surface): mm
Floorplan: Available , need to proposed the new location. Pls see the Site Floorplan
Not available
Grounding information: Available Pls mark the Protection Grounding on the floor plan.
Not available, We need report to make it ready.
Cable Ladder information: Available, not require new cable ladder.
Not Available, lucent should make new cable ladder m Pls mark on the floorplan

2. Main Equipment Pls write down the proposed location and mark on Floorplan
Cabinet number: Cabinet Proposed Location: (Floor/Row.Bay)
(Floor/Row.Bay)
Spare Location: (more than 3 spare location)
Length of grounding cable of Equipment: m (Distance from Protection Grounding Bar to equipment)

3. POWER (1) Use existing CB/Fuse on DCDP Distance from DCDP to Equipment: m
(DC) DCDP name,CB/Fuse info pls see the DCDP Survey
(2) Use existing CB/Fuse on GPS/LDB in Rectifier Room (Sub Site)
Distance from Rect to Equipment: m
GPS/LDB name,CB/Fuse info pls see the GPSxx00/LDB/GPS48xx/RECT (Rectifier Room) Survey
(3) Need install new DCDP (Hub Site) DCDP Dimension: (HxWxD)
(Need Survey Rectifier Room) DCDP proposed location (Floor/Row.Bay)
Distance from Rectifer Room to Equipment: m
Distance from DCDP to Equipment: m
Length of grounding cable of DCDP: m (Distance from Protection Grounding Bar to equipment)
GPS/LDB name,CB/Fuse info pls see the GPS/LDB (Rectifier Room) Survey

(4) No DC Power, only AC power AC Distribution Bar location


SECCO No. AC voltage (220V / 110V / 220V+110V)

4. information:

Note: 1. Pls take the hardcopy of floorplan when site survey, and make sure the room you survey is the right room and right floor,
then check the existing eqpt. and vacant location on floorplan with actual site room , correct and mark them on floorplan.
2. When Propose eqpt. location, Pls proposed the location is in the same row as possible, especially expansion site.

Do not Copy or Alter without Permission. All Rights Reserved.


Actual Location Marked in FP
Cable Lader Requirment False Ceings no CT
Cable Entry requirement Available
Cable routing requirement Available

All these items to be marked in the floor plan.

Do not Copy or Alter without Permission. All Rights Reserved.


DCDP SURVEY REPORT

Site Name/No.: Surveyor:


BUILDING TYPE: Survey Date:
DISTRICT:
Project:
Distance from DCDP to Equipment: m

DCDP
DCDP Name:
POSITIVE (+) COMMON TERMINALS

Note: 1. Measure the actual Current of the main fuse input by meter. For example, Current: 31.2A
2. Measure the Distance from DCDP to equipment. For example , Distance from DCDP to equipment: 18m
3. Write down the CBs use information (CBs/Fuse Rating),
ON - CBs used by other equipment.
OFF - Spare CBs
If the position have no CBs, Pls keep mark as " Vacant"
4.Record the survey data as follow:
DCDP Name - Top of the DCDP label
DCDP Main Fuse Actual Current - use Meter measure the current drawn
Main Fuse Rating
CB Status - ON/OFF
CB Rating
If the Panel/Module not existing, pls mark it as N/A

For example
A1 A2 NO DCDP
ON
OFF
A A

Do not Copy or Alter without Permission. All Rights Reserved.


LDB
Site Name/No.

Global Power System LDB


Cabinet Label

DC Output BIG
CBs

DC Output BIG
CBs

Monitor Module

DC Output BIG
CBs

DC Output BIG
CBs

DC Output Fuse

Do not Copy or Alter without Permission. All Rights Reserved.


Site Name/No.

Global Power System


Cabinet Name

BATT 01 BATT 02 BATT 03

Amps Amps Amps

BIG CBs
P01 CB01 Amps
CB02 Amps
CB03 Amps
CB04 Amps
DC Output CBs
CB05 Amps
CB06 Amps
CB07 Amps
CB08 Amps

SMALL CBs
P02 CB01 Amps CB02 Amps
CB03 Amps CB04 Amps
CB05 Amps CB06 Amps
CB07 Amps CB08 Amps DC Output CBs
CB09 Amps CB10 Amps
CB11 Amps CB12 Amps
CB13 Amps CB14 Amps

Note: USED/ON — Existing CB/FUSE and Power Cable connected to it (used by other Equipment)
Spare/OFF — Existing CBs/FUSE and no Power Cable connected to it (not used)
Vacant — Space for installing new CBs/FUSE

Please check the OFF CBs have Power Cable connecting to it.
If have the Monitor to display the actual current of the cabinet, please write down the information.

Record the survey data as follow:


Cabinet Name - Top of the Cabinet label
Cabinet Actual Current - If have the Moniter Display
CB Rating and Status - ON/OFF/Vacant
FUSE Rating and Status - USED/Spare/Vacant
If the Panel/Module not existing, pls mark it as N/A

For example
CB# CB info(ON/OFF/Vacant) CB Rating
CB1 ON Amps

CB2 OFF Amps

CB01 Spare Amps


CB03 USED Amps
CB05

Do not Copy or Alter without Permission. All Rights Reserved.