Академический Документы
Профессиональный Документы
Культура Документы
COMPANY:
PROJECT:
TAG NUMBER:
SERVICEC:
1. Objective
The objective of this calculations is to estimate the dimensions of evaporation pond.
F = A factor that accounts for the change in air density with changes in elevation F = 1.0 1.7 105 * z
R = Solar irradiance (W/m 2) Rs = 10.8 * Tm + 153
s
COMPANY:
PROJECT:
TAG NUMBER:
SERVICEC:
S.NO.
Input
Unit Summer Mean Temp Winter
1 Relative Humidity % 68.6 73.5 78.5
2 Mean Dew Point Temperature C 18.152 12.9 7.7
8 Calculated
9 F Factor 0.991 0.991 0.991
16 m 80 80 80
Width of evaporation pond
17 ft 262 262 262
25 m 0.63 0.60 1
Total Height
26 ft 2.05 1.98 1.92
27
28 Area Calcualted m2 1400 1400 1400