Project progress for July and August

July project
no harian project start finish pax need priority
1 change bamboo roof beach bale MR 3 1-Jul 2-Jul 6 person 1
2 change bamboo roof beach bale MR 1 2-Jul 3-Jul 6person 1
3 change bamboo roof beach bale MR 2 14-Jul 15-Jul 6person 1
4 change bamboo roof beach bale MR 4 14-Jul 15-Jul 6person 1
5 change alang2 roof horse stable arena 3-Jul 7-Jul 6person 1
6 making cross for the pool railing pumcak 6-Jul 8-Jul 3 person 1
7 making step for neo pool to the beach 1-Jul 3-Jul 3 person 1
8 making step from new staff house to GV 5-Jul 20-Jul 8 person 1
9 making roof for the spa at CF 11-Jul 17-Jul 6 person 1
10 making store for greek spa 18-Jul 23-Jul 6 person 1
11 make new pizza oven tba tba 1
12 making dry store at Kitchen 8-Jul 20-Jul 6 person 1
13 make cold store 22-Jul 6-Aug 6person 1
14 path way lantoro kasambi fix the cement 1-Jul 10-Aug 3 person 1
15 sea wall project TBA TBA 1
16 change bamboo on the top roof all room 4-Jul 30-Jul 3person 1
17 change alang2 roof at the tree house nihioka 4-Jul 6-Jul 6 person 1
Kadek project
1 install keramik at the menara floor 1
2 install keramick at the GV room 1
3 install keramik at the male and female toilet room BOH 1
August project
harian project
1 knock down alang store at the back staff house 2
2 change bamboo fence with waving bamboo 2
from letter s to post 1 2
3 knock down old wooden oven 2
4 making step from lantoro 1 to the beach path way 2
5 making path way from genset to new staff house 2
Kadek project
1 make female bath room at boh 2
2 renovation store side of lake 2