3 Measured Initial Performance Ratio related to Taking-Over

The measured performance ratio (PR meas) for the Project is calculated as follows:



 

 

In case the difference between the monthly Module Temperature (T CELL,month) is higher than 1C compared to
the measured Module Temperature ( T CELL,measure) during the test period, the measured performance ratio
(PR meas) shall be calculated as follows:



 
 
 


Where:
- iavail is the instantaneous availability of the Plant (see section IV.5 for more details).
- PPV plant is the total installed capacity (in kWp)
-  is the AC energy measured at the metering point in HV substation during the time step i,
considered in kilowatt hour (kWh)
- ti is the duration (in hours) of the time step i. Here, 10 min = 1/6 hour
- Gi is the weighted average irradiance measured in module plane during the time step i (10 min),
expressed in kW/m
- GSTC is the irradiance at STC conditions, (1kW/m)
- a is the weighted average of the temperature coefficient on power of the PV Modules installed (1/C)
(in example 0.45%/C). This coefficient will be defined according to the final module supplier
selection and shall be used with ve sign
- TCELL measure is the average module temperature measured during each Metering Interval j by the
temperature sensors placed on the reverse side of the modules (in C)
- TCELL month is the average monthly module temperature expected

3.4 Measured Performance Ratio between Taking-Over and Final Acceptance

The yearly measured performance ratio (PR meas) for the Plant is calculated as follows:


 

 


In case the difference between the monthly Module Temperature (T CELL,month) is higher than 1C compared to
the measured Module Temperature (T CELL,measure) during the test period, the yearly measured performance
ratio (PR meas) shall be calculated as follows:


 
 
 


Where:
97