QUALITY ASSURANCE MANUAL
CONSTRUCTION OF CONCRETE STRUCTURES |
(Bridges & Fiyovers)
CENTRAL PUBLIC WORKS DEPARTMENT
7 CPWDIEO2-
FOR
GOVERMENT OF INDIA
ose eee eee ee eeCHAPTER -1
CHAPTER -2
CHAPTER -3
CHAPTER -4
CHAPTER -5
CHAPTER -6
CHAPTER -7
INDEX
INTRODUCTION
GUIDELINES FOR USING THE MANUAL
QUALITY ASSURANCE PLAN FOR
BASIC CONSTRUCTION MATERIALS
3
32
33
34
35
36
37
38
QUALITY ASSURANCE PLAN FOR SITE ACTIVITIES
41
42
43
4a
43
46
47
48
49
Materials from Natural Rescurces
Steel / Iron
Chemicals
Bitumen
Prestressing
Pipes
Other Materials
Assembled Accessories
14
5-13
15-86
18-37
38-45
46-57
58-61
62-68
69-72
B81
82-86
87-100
Mix Design including Trial Mix and acceptance criteria 91
RCC work
Piling
‘Embankment construction
Water Bound Macadam
‘Wet Mix Macadam
Bituminous Works (BM, DBM, AC)
Mastic Works
Reinforced Earth Works
IN HOUSE /ON SITE TESTING FACILITIES
5.1
52
53
Materials
Site Activities
Calibration of Equipment
OUTSIDE / INDEPENDENT TESTING FACILITIES
SITE DOCUMENTS
92
93
94
95
96
97-98
9
100
101 - 130
105-118
119-124
125
131-151
153-182CHAPTER -8
CHAPTER- 9
CHAPTER - 10
CHECKLISTS AND TEST PROFORMAS
8.1 Checklists
8.1.1 Checklist for Source/Agency Approval
8.1.2 Checklist for Site Activities
8.1.3 Checklist for Launching Girder
8.14 Checklist for Launching Operation
8.2 Test Proformas
METHOD STATEMENTS
NON CONFORMING PRODUCTS AND PROCEDURES
vi
183-276
183-237
187-204
208-223
224-228
229.237
238-276
277-300
301-310CHAPTER - 1
INTRODUCTIONINTRODUCTIO!
Central Public Works Department is a premier construction agency of the Govt. of India,
which has been entrusted with the task of building several challenging projects all over the
country. The Department had taken up the construction of no. of flyovers in Delhi with a
specific view to reduce the construction time so as to minimize traffic disturbances usually faced
during construction. Amongst the materials for construction of Flyover, cement concrete is
being used widely world over. Four concrete flyovers using precast segmental technology were
recently completed and on the basis of the experience gathered, it was decided to prepare a
uniform and generalized Quality Assurance Manual (QAM) to be followed in the future flyover
projects with specific reference to precast prestressed concrete using segmental technique.
This QAM has been prepared to complete the general procedures and guidelines to be
followed by the construction supervision personnel in carrying out all aspects of the Construction
Supervision tasks. This Manual mainly provides procedures for carrying out tasks related to
inspections, testing and reporting. However, this manual does not deal with day-to-day technical
requirements, nor does it provide solutions to technical problems, as the Specifications and other
Contract Documents usually administer these technical issues.
The document is Jargely based on the norms set up by Indian Road Congress Publication
IRC: SP : 47-1998. Since precast segmental flyovers fall into category of Innovative
Technology, the manual has been based on Class Q-4 of the publication. A concept of Level of
testing has been introduced in order to cover up levels of testing of materials and products
depending upon various factors.
Every effort has been made to evolve this Manual so that adherence to its guidelines will
result in efficient, safe and consistent supervision of the works in strict conformity with the
Specifications and other Contract requirements. This has led to the basic framework of this
Manual being based on construction supervision procedures consistent with standard
intemational practices for construction of important flyover projects of this type, with specific
guidelines and forms where appropriate, being generated based on standard practices in India in
conformity with MORTH and IRC standards and guidelines. n all cases, however, it is
important that all users of this Manual understand that the contract documents including the
specifications are the controlling documents for the supervision of the construction.Although the intention of this Manual is to provide efficient, safe, high quality
construction, adherence to the adopted guidelines does not necessarily guarantee that these
attributes are achieved. Therefore, the users are cautioned to exercise judgement based on good
engineering practice in all cases rather than blind adherence to the adopted guidelines. This also
points to the urgent need to periodically review and update relevant guidelines and procedures,
and hence the Manual is to be seen as an evolving guide.CHAPTER -2
GUIDELINES FOR USING THE
MANUAL2A
GUIDELINES FOR USING THE MANUAL
This Quality Assurance Manual is a document, by use of which, the total quality of the
construction of flyover will be managed as per the Q 4 standards of IRC: SP: 47. This
Publication of the Indian Roads Congress gives the guidelines for achieving the quality of
construction of roads, flyovers and bridges and provisions of Q 4 system guides the
suppliers and producers for achieving the end product with extra high quality assurance. As
also mentioned in the Chapter 1 i.e, Introduction that while constructing costly structures
for public use, it is desirable that the strong and durable structures needing minimum
maintenance are constructed. Therefore, it is essential that during execution, the works be
managed in such a manner that the best possible quality is achieved. Every agency,
whosoever is involved in the construction, and in whatever capacity it may be, shall aim for
achieving the best quality. This shall require the quality management planning in advance
Every activity during the construction is necessary to be planned and monitored closely
Further it is not only the planning and monitoring, but also the documentation of activities,
which plays a very vital role in assuring and achieving the high quality standards,
This manual is divided into 10 chapters and this chapter elaborates the guidelines for the
use of the manual. Chapter 3 to 8 guides the user regarding the testing of basic ingredients
and site activities, while chapter 9 has coverage of method statements of activities
commonly involved in the construction of a flyover. Chapter 10 covers the non-
conforming praducts and procedure to be followed for deciding their acceptance or
rejection,
Quality Assurance Plan (QAP) for Basic Construction Materials
Every construction activity starts with the use of basic materials which may be either in raw
shape like earth, sand, stone aggregates, etc. or manufactured materials like cement, steel or
bitumen or assembled for accessories like bearings or expansion joints. Materials to be
procured at site for use in any site activity have been covered in Chapter 3. Efforts have
‘been made to include each and every material that is required (o be procured at site for theuse in site activities like concreting work, raising embankments or laying wearing courses.
Chapter 3 has been titled as Quality Assurance Plan for Basic Construction Materials.
The chapter has been classified into different parts on the basis of the type of materials and
their source. QAP includes the tests that every material has to undergo before it is accepted
and approved for use in the work. QAP is given in 5 columns.
Column 1: It lists the name of the test that a material is essentially to undergo before
accepting it as fit for use in the work
Column 2: It gives the frequency of the testing of materials. A material once approved is
required to be tested periodically to ensure the uniformity in its quality and to ensure that
the does not deteriorated after initial acceptance
Column 3: Depending upon the type of material and its use in the structure, it is mandatory
that some materials are repeatedly tested in the site laboratory and also independently
tested from some outside approved reputed laboratory. Column 3 of QAP indicates the
check level of the test, which is to be performed on the material
First Level ie. Level 1 indicates the tests performed by the contractor before
requesting the department for accepting the material. This test may be in the shape
of Manufacturer's Test Certificate (MTC) on the basic tests at random conducted
by the manufacturer or it may be the tests got conducted by the contractor at his
own level before requesting the department for its approval
Next Level ic. level 2 indicates the tests to be conducted by the department in
order to ensure satisfaction regarding the suitability of the material in view of the
test certificates submitted by the contractor. These testing may be at the site
laboratory if the facilities could be created or got done by an outside laboratory if
the facilities are not possible to create in the site laboratory.-Depending upon
whether the tests have been conducted at site laboratory or outside laboratory,
Level 2 is classified in two categories i.e. Level 2A and Level 2B. Level 2A is for2.2
the tests conducted at site laboratory and level 2B is for the tests conducted
‘outside the site laboratory as necessary facilities could not be made available at
site.
There are some materials like cement and steel, which are more sensitive than
other materials. For such sensitive materials, in order to have more confidence, it
is always desired that such materials are got tested from an independent source.
This level of testing the sensitive material from an independent source has been
classified as Level 3. It is essential that such an independent source should be a
well-reputed laboratory equipped with proper controls like temperature, humidity
etc. essential for the specific material testing and also equipped with well-
qualified staff, from whom an expert opinion can be obtained,
As per the above levels, the need of the level required for testing the material is given in
this column,
Column 4: It gives the reference of the Bureau of Indian standard or Indian Roads Congress
standard or some other equivalent recognised standards which the material is expected to
meet. Also these standards depict the test procedure of the test to be performed,
‘Column 5: The acceptance standards of the materials are given in this column,
‘The materials shall be accepted for use on the work only after the testing of the material as
per this Quality assurance plan.
Like the materials, various construction stages are also required to undergo
testing/checking before the items are accepted and payments to the contractor released.
QAP for all these site activities is given in Chapter 4 of the manual and all the activities are
detailed out in 4 columns.2.3
Column 1: It lists the names of the test that every activity is essentially to be subjected
before its acceptance.
Column 2: It gives the frequency of the testing of materials or the lot size for which testing
is required to be done.
Column 3: It gives the reference of the Indian standard or other equivalent applicable
standards which the item is expected to meet. Also these standards depict the test procedure
of the test performed,
ich may be decided by the department.
Column 4: The acceptance standards are given in the column 4 of this QAP.
It is only after the completion of the testing of the items/site activities as per this Quality
assurance plan that a particular work is accepted.
In House/On Site Testing Facilities
While Chapter 3 and 4 cover the QAP for the construction materials and the site activities,
their testing facilities are covered under Chapter 5 and 6. For prestigious projects like
flyovers and bridges, it is essential that in house testing laboratory is created so as to
perform the tests which ase comparatively easier to perform with simple setup or are
required to be conducted very frequently. Often the nature of the test is such that immediate
results are needed. Such facilities should be created in the site-testing laboratory. Details of
all such tests are furnished under Chapter 5 of the manual, All the materials for in house
testing are detailed in this chapter under 4 columns. Column | gives the details of the test
to be performed in house i.e. site laboratory. Column 2 gives the size of the sample of each
material to under go a test and the standard which gives the standard testing procedure is,
‘mentioned in next column 3. While testing the material, the readings during the testing are
required to be recorded in a proper manner. In order to simplify the recording and to record
every data essential to record, data sheets have been created. The formats of these data
sheets are given in Chapter 8. For the sake of convenience, all the required facilities for
conducting the test are furnished in column 4. At the end of the Chapter 5, all the facilities
1024
2.5
2.6
ad the standards essential to be provided in site laboratory are summed up and indicated in
this Chapter.
Outside independent Testing Facilities
Since the total tests required to meet the Quality Assurance Pian given under Chapter 3 and
4 are large in oumber and require extensive equipment & personnel set up, all the testing
facilities can not be provided at site. Moreover as per the QAP give under chapter 3, many
test are to be done at level 3, which means testing by an independent agency. Many reputed
Test Houses conduct these tests. For the sake of convenience of the users, some of the
reputed test centres are given in Chapter 6 and information about the testing facilities
available in these centres has been compiled as ready reckoner. It is furnished in tabulated
form, which is quite convenient to consult and use. Wherever the required testing facility is
available, it is shown in a tick mark (“) against that test house and the test to be conducted.
Site Documents
During the currency of a project, itis essential to keep certain documents at site for making
permanent record of each and every item related to the project. Such items may include
tests conducted at site, instructions issued to the contractor, record of drawings issued to
the contractor, inventory of the material at site and so on, All such site documents play a
vital role not only in assuring the quality of the work, but also in making the total
management of the project comparatively easier. For the sake of the user, all these
documents with a unique identification number have been listed under Chapter 7 of the
manual with a format for each of them, The record of all such documents kept at site is to
be stored in the Master Register of the Chapter 7
Check Lists and Test Proformas
For the efficient execution of the work, it is essential to ensure that the work done at
various stages is done as per the standard procedure. Omitting compliance of any check is
likely to create troubles in accomplishing the activity with the desired quality standards.
onl27
Hence in order to ensure a proper follow up of the construction methodology, checks are
conducted at all important stages. To control such tests, checklists are evolved and have
been given under Chapter 8 for all the important items of the work. The site staff are
required to fill up the relevant checklist while allowing the contractor to proceed with the
operation of the particular work.
Itis not only the execution of the item that the checklists are made use of, but also for the
approval of the agency/suppliers for various sub contracts. The checklists have been
separately formulated for this purpose and given in the same chapter.
Further, for the in house testing facilities as given under chapter 5, the formats for the data
sheets for performing various tests are given in chapter 8 and all the test proformas/data
sheets have to be given a unique identification number for proper record of all the tests
results, All the formats of the test proformas are required to be docketed in a separate
register titled as Check lists/Test Proformas Record for which a format has been given as a
site document under Chapter 7.
Method Statements
Chapter 9 incorporates method statements for site activities. These statements are given for
only guidance purpose. It is essential that the contractor submits his own method statement
depending upon his setup and arrangement of the type of the machinery for each and every
item before proceeding with its execution and gets it approved from the department.
Generally for the specialised items like bearings, expansion joints, reinforced soil work,
jaunching of segments, specialised agencies are engaged and depending upon their
experience & way of wotking, the method statements can be given by those selected
specialised agencies. However, some common items like Piling and its testing, Pile Caps,
Bituminous Works, Installation of bearings and Expansion Joints, Embankment, WBM etc.
have been covered in this chapter and it is desirable that the execution of each and every
activity be started only after the method statement is approved and available with the site
staff,
122.8 Non Conforming Products and Procedures
The last Chapter i.e. Chapter 10 covers the procedure to be adopted for the non-conforming
products. While working at site, situation occurs when some particular item/product does
not fulfil certain test standards, but the same is otherwise acceptable as it passes other
alternative tests. On fulfillment of alternative test, such products are generally accepted at
lesser cates than accepted in the contract. The procedure to be followed for accepting such
products is agreement rates or reduced rates is well explained in this chapter.
‘The above guidelines are framed for the convenience of the site staff to follow the manual
and make effective use of it. Once the various formulations of the manual are followed
strictly,
system of IRC. SP: 47
is hoped that the end results shall be of a extra high quality as desired under Q4
13CHAPTER -3
QUALITY ASSURANCE PLAN
for
BASIC CONSTRUCTION MATERIALSP for Basic
The first step towards ensuring good quality construction is to get good quality basic materials
required to be used in the construction activities. These materials may be raw materials like
Aggregates, Sand, Earth or Water, processed materials like Cement, Bitumen, Geotextile, Sealant etc
or processed and assembled materials like Bearings and Expansion Joints. This shall also require prior
approval of the source or supplier for the individual material or product as given under chapter 8
In order to ensure that material used in construction is of high quality and meets the codal
requirements of BIS, IRC or MOST as applicable, a seties of tests have to be carried out at regular
frequencies. The testing has to be done first at the level of the supplier / manufacturer or the
conteactor, This forms the first level check The testing may be done jointly with the client or the client
may do the testing independently in the site laboratory. This forms the second level check The
material is also got tested from reputed independent laboratories, This forms the third level check
This chapter gives the level of testing required for the various materials as well as the frequency of
such testing
Extensive testing of the basic materials shall ensure that only the best quality materia! is cleared for
use on the work so that extra high quality construction can be done.
17
1965 CPWOr2002—34,3.1 Materials from Natural Resources
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
For Concrete Works
3.1.1.1 Coarse Aggregates
3.1.1.2 Fine Aggregate
3.1.1.3 Water
Aggregates for Road work
(Non Bituminous Sub bases and
Bases)
a) Granular Sub Base
b) Water Bound Macadam
c) Wet Mix Macadam
Aggregates for Road work
(Bituminous Base and Surface
Courses)
a) Bituminous Macadam
b) Dense Graded Bituminous Macadam
c) Bituminous Concrete
d) Mastic Asphalt
Earth for Embankment
Lime (for Bituminous Works)
18
1965 CPwo2002—38opuy ssouryey J pure uoTeBuo|y paurqusos Jo anpea uINUIXEPY % SE
xepuy
worw8uoiq pus
xopuy ssourpety (q
s-0 wa Sty
07-0 ua OL
ool- 8 un $71 ‘azys [euyuION
oor una 0Z man SZ
s-0 um sup
02-0 unt Ot
001 - $8 ww 07 ams jeuywion,
001 un OF ur 0Z
Gn8}94 Aq) Bupssed vopeudyseq
aBuyuaaieg Aas SI Suypep siskjery aaag (e
ve 399M 8 UL 990 *Z
amos Jo aBuayD
+ £96 pue somos yoe>
ued) 981 Jo yeaoidde 105 advqs,
OL61-€8E I Burumseq MP WT] PUvads ayouuvd (1
POT
Spuwpuwsg eouesdessy | sepog you | ND Aouanbary wo,
SayeBoiBBy asse0D PETE
SHAOM 99190.) JOY TE
19TBI9A, Aq uUNXEPY % OS
unary 1s |
ayBiam Aq wine % Sp
1YBIOM Aq wUNUEEEA % Sp
“amos aun
wo wyGnoug jeroreu Jo Aywuogtun SuuTeUIeU 10 pornos $1 159]
s mmol
aIsyS °s
qWOWBEY YOs ">
£ aAaIg G] MOOT $1 WeYD JOU [eLOIE “¢
sdumy Ae1D 7
i HURL 7B [BOD “1
(aunenpxea) sSt208 Aq uae.
a8eyuaauag snop9s919q1
£961-(AL
wed) 9867 SI
OLGI-E8E 2ST
OL6I-€8E ‘ST
£961-Ul
wed) 98€Z *SI
0L61-£8E “SI
az
Vo
wo
az
syuo ¢ & UL 20UQ °Z
aunos Jo aBueyp
ue 2amos yoe>
‘Jo reaosdde 105
‘BuuI9q OM TV “TL
ypom 8 UL 2000 7
amos jo 98ueyD
pure somos yoe>
‘30 Teaoudde s05
Surunoq ayp 1 “1
qSUUOY & UI 200 7
amos Jo afuey>
ue 2mos yoe2
{Jo peaosdde 105
SuquuyBaq ay yy“
suo ¢ ut 2900 °Z
amos Jo a8uEqo
pare somos y>e9
Jo waoudde 05
Suprurdaq a ty “1
|
anjea vorseaqy (P
souy
quaoued g] (9
onyen weduyy (q
one, Buys)
awedaudsy (e
sopuadorg
reomepey (>
Ausuag
2 Ayauig sypads (¢
seu,
snopaimaq (Z
2020mos Jo yeaoudde 10g parmnbas uorrewoyuy
“syeBaiBSy SnondOUyy
“Burcu a}arou09 Aue Suters
aroyaq UBIsap xn 2xp ut Wo}WOS sayeM yp ISMpe OF patos 12,
%8I- aTeUding uMIsaUsEYY YUM parser
%eI- areyding umrpog WIM poysa}
sajodo ¢ saye WBI9"y JO Ss0'] aeIaAY UIE
e961“
wed) 98€7 ‘St
OL6I-€8E ‘SI
E961-(A
Wed) 98€7 ‘ST
0L61-€8E ‘St
az
amos yo o8ueyo
pus 23mos Yeo
‘Jo Teaoudde 105
BuyuUrdaq AP WT
syuoW € & UI 2000 *Z
‘amos Jo a8uEqo
pue somos qaeo
‘Jo Teaaudde s0y
Suyuursoq ap TY “1
“AyanEY HOT (L
-yuayu09
aanysyom a9epIng (9
sssupanog (ss (anoge $011) [BOL
I areas °S
G qwowdey Yos 'p
£ Mholg ST oO sy UeYR JOU [oud “¢
t sdunq Ae 7 az wuow & ut 29UQ -Z
I 1B TOD "T somos Jo aBuey>
961-00 ue aosnos yore
(wanuprew) 148194 Kq {H2W | eg) 9867 ‘SI {Jo teaordde 103 sea,
aBequa010q Smout9PPC | OL61-£8E ‘ST U ‘BuyuurBoq our ty snopaiped (7
01-0 Ol-o 01-0 wt ost
oret 0€-8 0t-S W 00g
61709 6S-st vest 1 009
oor-se 06-5 OL-08 mnt S1°T
001-8 oot-st $6-09 ww 9¢°7
001-06 001-06 001-06 anu S'p
00t oor 00! wu OF
1y-2u07 Tr3u0z 73u0z osu is9q le ye, {quow @ ut 29u0 7
40) Suyssud syfjam Aq suasvaq 2481S ST aoanos Jo aBuey>
e961-(1 ue 2anos yoeo
“mojaq | Wed) OBEZ ‘SI Jo peaoadde 105
anid se []]-2U0Z 0} J-oU07 Woy BuIpesd JO oq Pinoys gvBaSBy auIy | OL6I-ESE ST l SuyuuySaq ayn ry | sams apnsed (1
PAT :
spaspusig asueidasry | _sepog PU; 92ND Aouanbasg way,
sayeSaussy auly TT Te
22areyding wnisouseyy yyim poser
‘areyding wnipog yim parser (1)
sojok ¢ s0ye 181944 Jo ss07] afeeAy WNLUTKEY
#u
ayojaq uBisop xtu ay! UI WoIUOD Lore OM
aya1ou0s Aue Sues
asmfpe 40} paunbas ys9,
‘010s ay
15 wYBNOWg yeUOVeU Jo AyUOJIUN BulUrPIULEW 403 paxINbas st IS9
Jopuar ayp ul paypoods se 30 9% 3 wrustxeHy
£96140,
weg) 987 ‘ST
OL6I-E8¢ ‘ST
€961-(II
eq) 98€Z ‘ST
OL61-E8E 'SI
OL61-€8E “ST
az
sujUOW ¢ Ul 2UQ *
2ounos jo a8uey>
pure a9un0s 4oea
{Jo peaosdde soy
‘BuuyBaq ay
Area
‘s0unos Jo aBueyo
ue 29un0s yoeo
{go jwaoadde 105
‘SuyuurS9q ayn Wy
sywuow ¢ ut 30uQ
‘goanos Jo 9Bueyo
ue aosnios ype
30 reaosdde 103
Aurea 20u9
2omnos Jo afueyo
ue aounos yor
{Jo yeaosdde soy
z
ssaupunog (9
uondaosqe saem. (s
qwaywon ms (¢
23wrustxeur Sur 900¢ (81 Ued)sZOE'SI sonew sweBsouy (9
wnutxew Bu oz {81 Wed)szZOE'S! saueu sHUeAIQ (q
az | sqmuow ¢ ur 2009 7 ue
wnuixew [/8u 9907 (LI Ued)sZ0E:S oanos Jo aBueyo popuadsng (&
pur so1nos yoeo
| Jo peaosdde 103 sisiwuy
{ I ‘SutuuiBaq 8 20UQ) *| reaskqd (Z
i (oreorpur
exis qu)
. FOStH Yim
191m JO [UH QOL 9s1]esIMAU Or >OSEY [BUOY ZO" Jo Iu sz wINWIXEYA EZ YeA)SzOE'S
| 4J91BM JO [LU OO] AstEAIMDY OF HORN [PULOU ZO JO Jw ¢ UNUNXEY |(ZZUEA)SZOE'SI| sny Bunsay
[Auoor |(zeved)sZ0E-SI} se) sayeyding (9
ve €
(uggs (veued)szOE'sI] az Syjuous £ UE BDUO "Z| (1D Se) sAPHOIYD (4
ammos Jo aBueys
9 wu ue a01nos y>ea anyen Hd (@
‘Jo jeaosdde 40
0007:9Sp ‘SI 1 ‘SuyuurBoq we 20uQ “| | sisyeuy yeoman (1
F | pAay 3
sprepunig sundasoy | _ sapog yma} wreND, Aauanbasy sah,
NIRA CTE
24or> or> ol> mse |
sesz SES of-01" wun sub
oot 08-0s SLSs ww 5°97
a oor i ww o'¢s
a : oot unu O'S
Teuarews aseq
TmEsepuy waapeyg 1 supwD voneusisoq qn sejnuess
aang Sy Busssed 1q312q4 Aq aBetu90I0q ‘2AaIg ST poperd-s5045, (q
ore Olt ore Woe
SE-07 ses ST-O1 W sty
S9-0r os-0€ Ov-0z uw 9¢°7
08-05 so-or SS-S7 wu sz |
$69 08-05 so-se wu 66
001 oot-oL 06-ss unw ¢°92
: oot 001-08 ww o's
o : 01 tu g's wa
az 007 sad 1893 9Q “7 Tevareu oseq_
M3mypey Impey Supe uonwudys2q ‘s03nos Jo a8ueyo ns sejnuvsy
AaIg Sy Suyssud sqt2q4 Aq eBvu22I0g ans ST £961-(1 ue 2osnos yrs papesB-ssojy (P
Weg) 98ET ‘Si } Jo yeaoadde soy
0L61-€8€ ‘ST I Suruutdoq amp ty “1 oy Bupery (1
PAT
spaspusig aounjda2y | _ s9p03 yy | PHD | Aauambary 2
(aS) aseg qng JBjnuEAD (¥)
25%9 WNWIXEYL
% sz WNULKeY,
%8l- a1eyding wnisouBeyy ym porsar (11)
%EI- areyding winipog yr paysar (1)
sajoko ¢ saye 1y819 JO Ss07] aBesOAY WNUIEKEY
(uo)
100 payeos ut ajdues Joy). ¢ wiNUILUIY
wuMUNXEPY % Z
siuamipsuoo snoworajap say20 pue o1eBID WY 2214
(g ued)
O@LZ: SI
£961-A,
ued) 98€2 ‘SI
0L61-€8E ‘ST
(un
wed) 718 | SE
£9614
ued) 98¢2 ‘ST
O461-£8E ‘ST
£961-(
ued) 9867 'SI
OL6I-E8£ ‘SI
Vua7
az
az
ve
az
«tt 007 42d 20
Sounos Jo aBuey>
ue 2ounos yor
{Jo [eaosdde 403
SuruuiBoq ay ry
suow ¢ u1 2009
2oanos Jo afuey>
pure 2o:n0s yor
‘Jo |eaosdde 103
SuyuurBoq ayn rv
syquout ¢ Ut 20UQ
‘aasnos jo aBueyo
ue aounos yor
{Jo tpaosdde 103
Suruurdoq oy wy
002 40d 2000
Sounos jo aBueyo
ue aounos yoea
‘Jo yeaosdde soy
SuruuvBaq oy ty
syquow € Ut 20U0
2oanos Jo oBueyD
pure aounos yoeo
Jo jeaosdde 40
SuruurBoq ory
aaays tI zp Suyssud
a9v8Ut 405
suum] B1aquany (9
(% z wey sareasB
idosge s21eM
bas st 101)
ssoupunog (5
SI
z
sound % OF (r
wondiosge sare (¢
seua1eW
snouapa (Za uous & ut 2000 °Z
200s Jo aBueyD
e961-(0 ‘pur aounos Yoeo
-aosnos oy) wo 1y8n03q jeLayeU Jo AyusOHTUN BuTUrE LUTEUS 109 | weg) 9B¢z ‘ST ‘Jo feaoudde 103 seus
Posnbes st say, ‘speroyeu snowoisjap Woy aay aq Pinoys jeusieWy | OL6I-ESE “SI 1 ‘SurmuBaq O41 Ty “| snouarrd (7
SE-st oto Most
001-06 sest nur 9°¢
001 001-06 ww ZT
e oot umm Z€1
we TH amt Z'¢1 uopend}s9q
OaaHS SI Buyssed 48:44 Aq aB¥puadI0g ‘aaatg SI
FaTUSTIS
$0 > - uw ZT
or-0 - $0 s-0 ue FZ,
06°59 01-0 st-0 wu sp
001-56 06-59 7 wu gs
oor 001-06 $9-S7 wiur ¢9 a1eSau88e
a 001 001-06 ‘wu 06 we | J0 ,u ot 30d 2009 z
: 001 ww sZI Somnos jo afuey>
£961-(1 Pur 2oxnos yoo
wu PTZ-E5 = WU Sb-£9. wIWSp-06 woywusisaq | wed) 98£Z ‘ST Jo jeaordde 105
aAaIg SI Susssed 1yB12q4 Aq aSepuaoueg Pats SI} OL6I-E8E ‘ST 1 SuruurBoq ay) tV “T sysdqeuy aaa (1
PAT
spaspueyg aoueidassy | sapog you] 49949 Aouanbaag 1591
(NAA) Wepese] punog 49984 (4)
27%8I~ aeyding wisausep yum porsar (11)
%LI- aqeyding wnipog yim pasar (1)
so[oK9 ¢ s9Ye 1YBI9M Jo ssOT] aBeLany uNUTKEY,
1yBramy Aq wnULNeyNY % OF
qyBIM Aq wnULXeA % OF
TyBI9Ay Aq mmeaTeWN % OF
1YsIEM Aq wNUUIXEY % OF
LUND E % Z
£961-(A
ued) 9867 ST
OL61-E8€ “SI
£9614AL
ued) 98€7 ‘SI
0461-£8E ‘SI
£9614
ued) 987 ST
OL61-€8€ ‘SI
az
azve
ve
pastnbos
Ji ‘ywoul e Ut 20uQ °Z
omnes jo aBueys
ue 201n0s yes
{Jo [eaoadde 105
Suruuidoq ay ry
‘ayeBartae
JO WU Oz 49d 20U0 7
Somos jo aBuey>
ue aounos yoee
{Jo teaoudde 40
‘Suruurdaq a1 3V
‘YWOW By INQ 7
goinos jo oBuByo
pur sounos yoeo
{go yeacadde 105
‘Suruui8aq ays ty “1
(% z wey as0u
5 vondiosqy s9vem pt
a}anpuod aq 07 1521)
ssaupanog (S
anyen,
uonefuoly
pue ssourye|
pauiguioy (P
ane, worsesqy
sojatiuy soy (>
anren 198
anqen Sunysruy
awioniiy (e
sapuadosg
Ieormeqoaw Oy
wondiosqe sa1eAn CE
28£961-(1
) Weg) 9R€Z ‘SL
%Ol WHWIXEA | OL6I-ERE ‘ST
9 wnUTSEYY,
Oz WHERE,
ued) OZLz' SI
g wnunxey | Hed) OZLZ: SI
iG
G|
ve 2oinos jo a8uey>
ue 2010s yoea
Jo reaosdde soy |
1 Fuuuioq ay 1 |
azve | ywoure ut 20u9 z |
| ao4nos jo aBueyo
ue somos yoo |
{Jo Teaoudde 305
1 Suyuurdoq oy iVy 1
Tearew Surpurg
azvz | Jo wz sed s0uQ 7
201n0s Jo aBueys
pure 2020s yes
Jo jeaosdde 10
I ‘BeyuuiBq oy ty “T
aaats sy
Buyssed peparey
Buna (¢
xapuy Aususeid (q
mury pmbrt (e
sBupua9.05 Jo
sary Bisquany (L
feuaww Sarporg
Joxapal Gpnseg (9
29SR aaaag SHEE eo
vz Kep Kiana 2000 7.
2ourt0s Jo a8uByD
€961-(1IT pur aounos yoeo
wed) O8€7 ‘ST {Jo [erode soy
WNUEAL % Z| OZ6I-E8E ‘ST I Fuuufaq apy 1 | wondaosqe sare (€
az quow v ur su Z
20anos jo aueyo
e961 ue aounos yea
‘aounos ay wo 1YBnozg eUOTeWH Jo Arinroyjun ButurErUTELY 405 | wed) 98¢z ‘ST Fo qeaosdde 203 square
pasinbas st S94, sjeus9veur snolsayojap woyy a0yj 9q Pinoys jeu | vél-ege si] 1 eet Peaeee(e
8-0 nse 8
wz-6 14009
oe-st wu 9¢°7
or-sz uur sz"
09-0r ww 211
08-09 ww» 2Z awias88e
o01-s6 uw 0 sb wz | 40 woot sedaoug Z|.
oot wu o'€s Sounos Jo aBueys
£961- Pur sounos yous:
worwusisaq | ued) 98¢7 SI + Jo yeaosdde soy
aAaIS ST Buyssed 1y81944 Aq advjua42g aAaIg SI] OL6I-E8E ‘ST 1 SuuuGaq ary “1 siskyeuy aaatg (1
| paeT
spiepurys aourjdarsy | sped PY | 492qD. Aauanbaay 19,
CAAA) WepeaelAl XUN 924 (2)g wiNWXEA,
%81- areyding wnysaudepy YEN poisar
[zi ateyding wntpos yu poisar (1)
Salpko ¢ saye 1yBI9M Jo Ssor aBeIOAY UNUITXEP
1ydieM Aq wINUULEW % OF
ryBlogy Aq wNUUEXEW % OF
BION Aq wNUINEA % OF
ryBiagy Aq wnwxeyy % OF
acve
G
ued) OzLz: SI]
a
961-0
utd) 98¢2 ‘ST
OLer-ese St] 1
ace,
£961-(AT
ued) 98EZ ST
OLer-ese st} I
sowBarle jo
€u ODI Jad 20uQ 7
amos Jo aBueyo
ue somos yoro
Jo eaoudde soy
BuruuiBaq am Ww”
parnbas
Hquow e 2000
‘aamnos Jo o8ueyo
ue somos yore
{Jo teaosdde 305
Suyuurdaq ony "1
aBas88e
Jo uu 997 49d 9009
Somos Jo a8uey>
puv aoimos yora
jo [waoudde 105
Suuundaq ayy vy 5
aaays 1 SZ TEM
souy sTeLANE A,
Jo xapay Gpnseig (9
(% Z vem asour
st uondiosqe so1em
1 parompuod 24 01 1801)
ssoupumes (¢
anqea
uoneBuorg
pur ssounely
paurquiog,
Pp
anieA worsesqy
sojstuy soy (2
ane, weduy (q
anqea Surysniy
aiedaiday (e
sansadoig
TeoyueypaW (Fr
31seen tmtnoeitit ee nena
nM % Z
sounos otp woxy wyBRoxg peuayeUl Jo Auo;TUN SuyurEIUTEL J05
pasinbar st soy, “sjetsarew snousrafap wor, 9243 9q pinous jeuareP
anats 1 gL Buyssed 9% ¢ wnunxeyy
SI
0L61-€8E ‘SI
“ 961-0
weg) 98EZ ‘SI
OL6I-E8E “ST
vu
Aephiaaa 20ug °Z
gomos Jo 28ue4>
pure aounos Yeo
Jo eaosdde 403
‘Suruutdaq ay ty")
tquow e ut 2900-7
oimos Jo a8uey>
pure sasnos yoe9
Jo yeacsdde 10y
Suruurdag op 1 “1
owe8aisae
J
ue aounos yse0
‘Jo teaasdde soy
‘Suruurdaq ayy ty “1
pannbar
BH "quows v 20u0
daunos Jo aueyo
pur gaitos yoeo
Jo yeaoudde 403
‘Suruurdaq om ty “T
somnos Jo @Bueyo
961-1 pue gouttos yora
utd) 98€7 ‘ST Jo yeaosdde 103
wnurxeyy % Z| oL6l-ese ssi} I Suruuidaq ay “| | wondsosqe iem (¢
az uous # UF 2009 °%
somnos Jo a8ueyo
£961 ue aasnos yaa
ued) 9867 ST Jo yeaosdde 105 sqepaey,
0L61-€8E ‘SL 1 Buruuioq ayn ay “1 snowed (Z
so uu 9¢°7, aueBan8e
96°88 wu Z'E1 ve Jo ,w cz sad aug °z,
ont uu 0°61 ‘adunos jo a8uey>
£961- pue aaunos yor
woneudsag ) wed) 9R¢7 ‘ST jo yeaosdde 105
PAatg S] Buissed yyspayy Aq aequadiag AAatS ST] OL6I-E8E ‘ST 1 Buruus8aq ap ry “1 siskteuy aaaig (1
PAT
spaepueys eouedesoy | sepey you | 42ND, Aouanbasy, 19,
qeydsy anseW (P)
34
1965 CPWO/2002—48% 08 WRUNTUTA
padduns vowing uayny $6 Suneoo paureias wnusuI,
481 - areyding wasaudeyy yum paisa
azl- ——-ateydrag winpos yim parsar (
sajpko ¢ soye IY8IOX\ JO ss07] aBerany WUE,
az
l
az
Ie st] oT
az
(s
weg) 02/7: SI) I
quo! # 2909 °Z
aaunos 30 a uey>
uv aosnos yoeo
{jo jeaoudde 103
‘Buyzuoq 2 TY “1
qnuow ® 2909 7
soinos Jo oBuey>
ue sounos yoe2
40 peaosdde 103
Suruuidaq oy YT
paynbas
SE “tuo ® 299%
ammo Jo a8ueyo
pire aoinos yoeo
Jo eaoudde 105
Suruuideq oy “1
% $6 we
ssoj st Sune09 poureias
431 paronpuoa 2@ 01 1891)
wuens
aysuay paureed (L
sant,
ayeBai83y
coun
aay Smdding (9
(% Z wey asour
st uondiosqe soem
3! Paronpuod 9q 01 152))
ssaupunos (S
35% SI-L | THEA OLE S| VE |