Вы находитесь на странице: 1из 40

BIM PROCESS MODEL REVIEW

AND PROCEDURE
Sara Pace Mike Lucas
Paul Kuehnel Jon Brangan
Members and BIM Roles
Building Stimulus Contact Info

Construction
Manager
Jon Brangan jmb5346@psu.edu
Structural Paul Kuehnel pkk5001@psu.edu
Engineer

Mechanical
Engineer
Sara Pace sap5103@psu.edu
Lighting &
Electrical Mike Lucas lwm124@psu.edu
Designer
Organization Roles

BIM Manager
Jon Brangan
Build Navisworks Models
Run Clash Detections

Alert Responsible Parties of Interferences

Coordinate Effective Design Alternatives


BIM Manager
Organization Roles

Structural Project Manager


Paul Kuehnel
Model Engineered Systems
Structural Project Manager

Structural Members
Provide Structural Revit Model

Collaborate Effective Design Solutions


Organization Roles

Mechanical Project Manager


Model Engineered Systems
Mechanical Project Manager
Sara Pace

Ductwork
Mechanical Equipment
Provide Mechanical Revit Model

Collaborate Effective Design Solutions


Organization Roles

Lighting & Electrical Project Manager


Lighting & Elec. Project Manager

Model Engineered Systems


Mike Lucas

Panelboards, Switchboards & Switchgear


Lighting Components
Conduits
Provide Lighting & Electrical Revit Model

Collaborate Effective Design Solutions


BIM Use Staffing
NUMBER OF
ESTIMATED
BIM USE ORGANIZATION TOTAL STAFF LEAD CONTACT
WORKER HOURS
FOR BIM USE

3D Coordination Building Stimulus 4 TBD Mike Lucas

Design Authoring Building Stimulus 4 TBD Paul Kuehnel

Structural
Building Stimulus 1 TBD Paul Kuehnel
Analysis
Lighting Analysis Building Stimulus 1 TBD Mike Lucas

Energy Analysis Building Stimulus 2 TBD Sara Pace

Mechanical
Building Stimulus 1 TBD Sara Pace
Analysis

4D Modeling Building Stimulus 1 TBD Jon Brangan

Cost Estimation Building Stimulus 1 TBD Jon Brangan


Project Information
Project Information

PROJECT PHASE /
ESTIMATED START DATE ESTIMATED COMPLETION DATE PROJECT STAKEHOLDERS INVOLVED
MILESTONE

PRELIMINARY PLANNING September 1, 2010 September 10, 2010 All Disciplines

EXISTING CONDITIONS
CONFIRMATION AND September 11, 2010 October 4, 2010 All Disciplines
MODELING

SCHEMATIC DESIGN &


CONSTRUCTION October 5, 2010 October 27, 2010 All Disciplines
PLANNING

BIM PROCESS MODEL October 28, 2010 November 15, 2010 All Disciplines

PROPOSAL November 16, 2010 December 3, 2010 All Disciplines

IMPLEMENTATION OF
PROPOSAL December 4, 2010 TBD All Disciplines

Remainder to be
determined upon Spring TBD TBD TBD
Semester
Project Information
Project Goals & BIM Uses
Project Goals & BIM Uses
PRIORITY
(HIGH/ MED/ LOW) GOAL DESCRIPTION POTENTIAL BIM USES

Assess Cost Associated with Design Changes


H Compare money spent/saved vs. quantitative Cost Estimation, Existing Conditions Modeling
benefit of design change

Increase Effectiveness of Design


Design Authoring, Design Reviews, 3D Coordination, Engineering
H Increase efficiency of structural system,
Analysis, Existing Conditions Modeling
lighting/electrical system, and mechanical system

Interdisciplinary Design Coordination


H Effectively implement BIM through open Design Reviews, 3D Coordination
communication and periodical design reviews

Increase Effectiveness of Sustainable Goals


M Increase thermal and lighting efficiency through Engineering Analysis, LEED Evaluation, Daylight Integration
implementation of double skin faade

M Improve On-Site Coordination and Efficiency Site Utilization Planning, 4D Modeling


BIM Use Analysis Worksheet
BIM Uses
Design Authoring 4D Modeling
Site Utilization Planning 3D Coordination
Existing Conditions Daylight
Modeling integration/Lighting
LEED Evaluation analysis
Energy Analysis Design Reviews
Structural Analysis
Cost Estimation
Collaboration Procedures
Meeting Procedures

MEETING TYPE PROJECT STAGE FREQUENCY PARTICIPANTS LOCATION

BIM REQUIREMENTS Building Stimulus


Organizational Once BIM Thesis Lab
KICK-OFF Members

BIM EXECUTION
Building Stimulus
PLAN BIM Process Model Once 107 EUB
& Practitioners
DEMONSTRATION

Building
DESIGN Design
COORDINATION Development
Daily Stimulus BIM Thesis Lab
Members
Interactive Workspace
333 Sacket:
Electronic Communication Procedures
\\aeresearch.coeaccess.psu.edu\BIMThesis\Team 2 Working Files (Username & password protected network drive)
Revit\
Central\
001-PSU-MSC-ARCH.rvt -------------------Working Architectural Model
001-PSU-MSC-MEP.rvt----------------------Working MEP Model
001-PSU-MSC-STRU.rvt---------------------Working Structural Model
001-PSU-MSC-SITE.rvt----------------------Working Civil & Site Model
From RVA\
MSC RVA Architecture.rvt-------------------Original Architecture Model
From W-T\
MSC W-T Windows.rvt--------------------- Window Construction Model
MSC W-T Exterior Coordination.rvt-------Precast panel Construction Model
MSC W-T Kinsley Structure.rvt-------------Structural Construction Model
Project Specific Families\
Architecture\-----------------------------------Discipline specific Revit families
Electrical\-------------------------------------- Discipline specific Revit families
Mechanical\----------------------------------- Discipline specific Revit families
Site\-------------------------------------------- Discipline specific Revit families
001-PSU-MSC-Title (30x42).dwg---------- Building Stimulus Title Block
Technological Infrastructure Needs
Software
DISCIPLINE
BIM USE SOFTWARE VERSION
(if applicable)

DESIGN AUTHORING Architect Revit Revit Architecture 2011


Site Utilization
Construction Manager Revit Revit Architecture 2011
Planning
Existing Conditions
Construction Manager Revit Revit Architecture 2011
Modeling
Mech. Engineer, Constr.
LEED Evaluation MS Excel MS Excel 2010
Manager, L/E Engineer
Trace 700 v6.2, RevitMEP 2011,
Energy Analysis Mechanical Engineer Trace, Revit
MS Excel 2010
Revit Structure 2011, SAP 2000
Structural Analysis Structural Engineer Revit, SAP 2000, MS Excel
V14.0.0, MS Excel 2010
Navisworks Manage 2011,
4D Modeling Construction Manager Navisworks, Synchro
Synchro 2011
Quantity Takeoff 2010, Revit MEP
Cost Estimation Construction Manager Quantity Takeoff, Revit
2011
3D Coordination Revit Suite 2011, Navisworks
All Disciplines Revit, Navisworks
(Design) Manage 2011
Daylight Integration & AGi32 v2.15 Rev. 4,
L/E Engineer AGi32, Ecotect, DAYSIM
Lighting Analysis Ecotect 2011
Design Reviews All Disciplines Revit Revit Architecture 2011
Computers/Hardware

Processor: Intel Core i7 CPU 920 @2.67GHz


Operating System: Windows 7 Enterprise
Memory: 24GB
Storage: 929GB (1TB)
Graphics: NVIDIA GeForce GTX 260, 1GB
Monitors: Dual Screen
Quality Control
Quality Control Checks
RESPONSIBLE SOFTWARE
CHECKS DEFINITION FREQUENCY
PARTY PROGRAM(S)

Ensure there are no unintended model


All Project
VISUAL CHECK components and the design intent has been Revit Continuously
Managers
followed

Detect problems in the model where two


INTERFERENCE BIM
building components are clashing including Navisworks Weekly
CHECK Manager
soft and hard

Ensure that the BIM and AEC CADD


STANDARDS All Project
Standard have been followed (fonts, Revit Continuously
CHECK Managers
dimensions, line styles, levels/layers, etc.)

Describe the QC validation process used to


MODEL ensure that the Project Facility Data set has
INTEGRITY no undefined, incorrectly defined or All Project
Revit Continuously
CHECKS duplicated elements and the reporting Managers
process on non-compliant elements and
corrective action plans
Model Accuracy & Tolerances
Accurate to +/- 1 of actual size and location
Information Exchange
Information Exchange
Information Exchange
Process Map
Level 1: Building Stimulus Process Map

Schematic Design Design Development


Perform Engineering Perform Engineering
Analysis Analysis
Engineering Engineering
Engineer Engineer
Analysis Analysis

Schematic Design Design Development


Perform Cost Perform Cost
Estimation Estimation
Cost Cost
Contractor Contractor
Estimation Estimation

Schematic Design Schematic Design Design Development Design Development Operations


Author the Schematic Perforn 3D Author the Design Perforn 3D
Process

Compile Record Model


Design Model Coordination Model Coordination
Arch, SE, ME, Design 3D Marco Design 3D Marco
All Disciplines Arch, SE, ME All Disciplines Contractor Record Model
L/E Authoring Coordination Authoring Coordination
Start
Process End
Schematic Design Design Development Process
Develop Virtual Develop Virtual
Prototypes Prototypes
Cirtual Cirtual
Architect Architect
Prototyping Prototyping

Schematic Design Design Development

Create 4D Model Create 4D Model

Contractor 4D Modeling Contractor 4D Modeling


Info. Exchange

D.D. D.D. 3D Marco D.D. Engineering 3D Micro Record


D.D. Virtual D.D. Cost
Struct. Struct. 4D Model Coordination Coordination Mdoel
Arch S.D. Cost S.D. Arch Prototypes Estimation Analysis Model
Model S.D. Engineering Model Model Model
Model Estimation 4D Model Model
Program Model Analysis Model

Possible Possible Possible Possible


Project Project S.D. 3D Macro S.D. Virtual Project Project
Delays Delays Coordination Prototypes Delays Delays
Model
Questions & Comments
Design Authoring
Level 2: Design Authoring

Create Design
Create Schematic
Development
Design
Architecture Model
Architecture Model
Architect
Architect

Create Design
Create Schematic
Development
Design Structural No
Model
No Structural Model
Process

Structural Engineer
Structural Engineer
Does the Does the
Develop Initial model Meet model Meet Yes
Architecture Model requirements requirements
? Yes Create Design
?
Architect Create Schematic Development MEP
Design MEP Model Model
Start MEP Engineer End
Process MEP Engineer
Process

Create Other
Create Other
Models As Needed
Models As Needed

All Disciplines
All Disciplines
Information Exchange

Initial All Disciplines


All Disciplines
Architecture Design
Schematic Design
Model Development
Site Utilization Planning
Level 2: Site Utilization Planning
Reference Info

Construction
Schedule Equipment
Libraries

Add Construction Analyze Site


Equipment Layout for Phase No
No transition
Contractor Contractor
Identify
Construction All Phases Is Plan Yes
Process

Phases Analyzed? Acceptable?


Analyze Site
Determine
Contractor Layout for Space
Temporary
and Time Conflicts
Facilities
Start Contractor End
Process Contractor
Process

Insert Phased
Staging Area

Contractor
Info Exchange

Design & Existing


Site Conditions Site Utilization
Models Plan
Existing Conditions Modeling
Level 2: Existing Conditions Modeling
Reference Info

Design Models

Construction
Models

Collect Data
Through
Photographs

Responsible Party Compile Existing


Collect Current Site Review Existing
Conditions
Conditions Data
Process

Conditions Models
Information

Responsible Party Responsible Party Responsible Party


Compile Existing
Start Conditions Models
Process End
Responsible Party Process
Info Exchange

Existing
Conditions
Information
Model
LEED Evaluation
Level 2: LEED Evaluation
Reference Info

LEED for New


Construction
Criteria

No
Generate
Establish LEED Compile Additional
Point Targets Results
Yes
Information
Process

Required
Information Acceptable?
Owner / Design
Team MEP MEP

Start
Process End
Process
Info Exchange

Energy Analysis Site Utilization


Model Plan
Lighting Design
Model
Lighting Analysis & Daylight Integration
Structural Analysis
Level 2: Structural Analysis
Reference Info

Soil Data Wind Loads Seismic Loads Snow Loads

Generate SAP 2000


Analyze Model No
Model

Structural Engineer Structural Engineer


Process

Generate
Model Yes
Structural Layout
Acceptable?

Structural Engineer Generate


Structural Design
Start Model
End
Process
Structural Engineer Process
Info Exchange

Structural Design
Structural Design
Model (Draft)
Arch. Model Model
Energy Analysis
4D Modeling
Level 2: 4D Modeling
Reference Info

Productivity Lead Times


Information

Set Construction
Prepare/Adjust
Sequencing and
Schedule
Flow

All Disciplines All Disciplines


Process

No
No
Start
Establish Info.
Process Exchange Modify 3D Model
Link 3D Elements Validate Accuracy
Model Yes Review 4D Model &
Schedule Yes
to Activities of 4D Model Schedule
Requirements Correct? Optimized?

All Disciplines All Disciplines Contractor All Disciplines All Disciplines

End
Process
Info Exchange

3D Model Schedule (Draft) 4D Model (Draft) Schedule 4D Model


Cost Estimation
Design Coordination
Level 2:Design Coordination
Reference Info

Contract
Requirements
Information
Company
Exchange
Standards
Requirements

Collect Current Site


Conditions Data

Contractor

Define
Coordination
Meeting Location
End
All Disciplines Process
No
Process

Define Information Create Discipline Compile Composite Preform Collsion Identify Solutions
for Disciplines Models Model Detection Yes to Collisions
``
All Disciplines All Disciplines Contractor Contractor All Disciplines
Any Collisions?
Start Define Areas of Develop Schedule Start Design
Process Coordination for Coordination Coordination
Process
All Disciplines All Disciplines

Establish a
Protocol to
Address Collisions

All Disciplines
Info Exchange

Existing
Arch Model Structural MEP Model Coordination Conditions
Model
Model by Information
Discipline Model

Вам также может понравиться