Project :

4S2 SLAB DESIGN AND ANALYSIS Building :


Date :
A. STRUCTURE MATERIAL
Fc' = K-400 Es = 200000 MPa
Fy = BJTD-40 Ec = 27081.137 MPa
Fs = BJTP-24

B. SLAB DATA C. LOAD DATA


b = 350 mm 1. Dead Load (DL)
Ln = 2650 mm Slab Self Weight
L = 1 per-m Hanging load
Ly = 7800 mm (Long span) Waterproofing
Lx = 3000 mm (Short span) Concrete ( 60 mm )
Ly/Lx = 2.6 One way slab (Ly/Lx > 2) mortar ( 15 mm )
tmin = 111 mm B asphalt ( 10 mm )
t = 150 mm > tmin . . . SAVE
() y = 13 mm (Long span)
() x = 13 mm (Short span) 2. Live Load (LL)
d' = 30 mm LL (canteen area)
dx = 113.5 mm (dx = t - d' - 1/2)
dy = 101 mm (dy = t - d' - 1/2 - ) 3. Ultimate Load
Sy = 200 mm Wu = 1,2 DL + 1,6 LL
Sx = 200 mm

D. SLAB MOMENT DUE TO THE FACTOR LOADS

1/24 1/10 1/10 1/24

A D
1/14 B C 1/14
1/16

2650 2650 2650

Side moment End moment Cen moment


MA = 727.999 kgm/m MB = 1747.198 kgm/m MAB = 1247.999
MD = 727.999 kgm/m MC = 1747.198 kgm/m MBC = 1091.999
MCD = 1247.999
E. REINFORCEMENT
1. Short Direction 2. Long Direction
- End moment of x direction (Mtx) - End moment of y direction (M
Asreq = 496.447 mm2 Asmin = 300.000 mm2
Asmin = 300.000 mm2 As = 633.500 mm2
Use As = 496.447 mm2
As = 633.500 mm2 > Asreq . . . SAVE

- Center moment of x direction (Mlx) - Center moment of y direction


Asreq = 351.319 mm2 Asmin = 300.000 mm2
Asmin = 300.000 mm2 As = 633.500 mm2
Use As = 351.319 mm2
As = 633.500 mm2 > Asreq . . . SAVE

D 13@ 200 (Short direction)


LL = 1000 kg/m2
30 90 30

D 13@ 200
= 360 kg/m2
= 50 kg/m2

mm ) = 330 kg/m2
mm ) = kg/m2
mm ) = kg/m2
+
= 740 kg/m2

= 1000 kg/m2

Wu = 1,2 DL + 1,6 LL = 2488.000 kg/m2

1247.999 kgm/m
1091.999 kgm/m
1247.999 kgm/m
End moment of y direction (Mty)
mm2
mm2 > Asreq . . . SAVE

Center moment of y direction (Mly)


mm2
mm2 > Asreq . . . SAVE

kg/m2
150

200 (Long direction)


Moment Coefficient

No Design

1/16 1/16

1
A 1/10 B

2650.000

1/24 1/24

A B
1/8
2

2650

1/16 1/9 1/16

3 A
1/14 1/14 C
B
2650 2650

1/24 1/9 1/24

A C
1/11 1/11
4
B
2650 2650

1/16 1/10 1/10 1/16

A B C D
5 1/14 1/16 1/14

2650 2650 2650


Moment Coefficient

No Design

1/24 1/10 1/10 1/24

A D
1/11 B C 1/11
1/16
6
2650 2650 2650

1/16 1/10 1/11 1/10 1/16

A B C D E
7 1/14 1/16 1/16 1/14

2650 2650 2650 2650

1/24 1/10 1/11 1/10 1/24

A B C D E
6 1/11 1/16 1/16 1/11

2650 2650 2650 2650

1/16 1/10 1/11 1/11 1/10 1/16

A B C D E F
7 1/14 1/16 1/16 1/14
1/16

2650 2650 2650 2650 2650


7

Moment Coefficient

No Design

1/24 1/10 1/11 1/11 1/10 1/24

A B C D E F
8 1/11 1/16 1/16 1/16 1/11

2650 2650 2650 2650 2650


ent Coefficient

Moment
End moment
MA = 1091.999 kgm/m
MB = 1091.999 kgm/m

Cen moment
MAB = 1747.198 kgm/m

End moment
MA = 727.999 kgm/m
MB = 727.999 kgm/m

Cen moment
MAB = 2183.998 kgm/m

Side moment Cen moment


MA = 1091.999 kgm/m MAB = 1247.999 kgm/m
MC = 1091.999 kgm/m MBC = 1247.999 kgm/m

End moment
MB = 1941.331 kgm/m

Side moment Cen moment


MA = 727.999 kgm/m MAB = 1588.362 kgm/m
MC = 727.999 kgm/m MBC = 1588.362 kgm/m

End moment
MB = 1941.331 kgm/m

Side moment Cen moment


MA = 1091.999 kgm/m MAB = 1247.999 kgm/m
MD = 1091.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1247.999 kgm/m
End moment
MB = 1747.198 kgm/m
MC = 1747.198 kgm/m
ent Coefficient

Moment
Side moment Cen moment
MA = 727.999 kgm/m MAB = 1588.362 kgm/m
MD = 727.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1588.362 kgm/m
End moment
MB = 1747.198 kgm/m
MC = 1747.198 kgm/m

Side moment Cen moment


MA = 1091.999 kgm/m MAB = 1247.999 kgm/m
ME = 1091.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1091.999 kgm/m
End moment MDE = 1247.999 kgm/m
MB = 1747.198 kgm/m
MC = 1588.362 kgm/m
MD = 1747.198 kgm/m

Side moment Cen moment


MA = 727.999 kgm/m MAB = 1588.362 kgm/m
ME = 727.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1091.999 kgm/m
End moment MDE = 1588.362 kgm/m
MB = 1747.198 kgm/m
MC = 1588.362 kgm/m
MD = 1747.198 kgm/m

Side moment Cen moment


MA = 1091.999 kgm/m MAB = 1247.999 kgm/m
MF = 1091.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1091.999 kgm/m
End moment MDE = 1091.999 kgm/m
MB = 1747.198 kgm/m MEF = 1247.999 kgm/m
MC = 1588.362 kgm/m
MD = 1588.362 kgm/m
ME = 1747.198 kgm/m

ent Coefficient

Moment
Side moment Cen moment
MA = 727.999 kgm/m MAB = 1588.362 kgm/m
MF = 727.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1091.999 kgm/m
End moment MDE = 1091.999 kgm/m
MB = 1747.198 kgm/m MEF = 1588.362 kgm/m
MC = 1588.362 kgm/m
MD = 1588.362 kgm/m
ME = 1747.198 kgm/m
MATERIAL TULANGAN ULIR

Mutu beton Berat Diameter Luas


Kode
(K) (Fc') kg/m mm mm2
K-225 18.68 10 0.56 9.53 71.3
K-250 20.75 13 0.995 12.7 126.7
K-400 33.20 16 1.56 15.9 198.6
19 2.25 19.1 286.5
Mutu baja 22 3.04 22.2 387.1
BJ Fy 25 3.98 25.4 506.7
BJTD-40 400 29 5.04 28.6 642.4
BJTP-24 240 32 6.23 31.8 794.2
35 7.51 34.9 956.6
100 38 8.95 38.1 1140
150
200

2
3
4
LIR JARAK ANTAR TULANGAN (JAPAN STANDRAD)

Perimeter 2 3 4 5 6
mm D10 19.5 23.5 28 33 38
D16
3 D13 21 25 30 34.5 39.5
4 D10 19.5 24 29 34.5 39.5
D19
5 D13 21.5 25.5 30.5 36 41
6 D10 20 25 31 36.5 42.5
D22
7 D13 22 26.5 32.5 38 44
8 D10 21 26.5 33 39.5 46
9 D25 D13 22.5 28 34.5 41 47.5
10 D16 24.5 30 36.5 43 50
11 D13 23.5 30 38 45.5 53
D29
12 D16 25.5 32 39.5 47 55
D13 24.5 31.5 40 48.5 57
D32
D16 26 33.5 42 50 58.5
D13 25 33.5 42.5 52 61
D35
D16 27 35 44.5 53.5 63
(JAPAN STANDRAD) TULANGAN MINIMAL SLAB

7 8 9 10 Tipe Requirement Fy = 400


43 48 53 58 A L/20 133
44.5 49.5 54.5 59.5 B L/24 111
45 50 55 60.5 C L/28 95
46.5 51.5 57 62 D L/10 265
48 54 60 65.5
50 55.5 61.5 67
52.5 59.5 66 72.5
54 61 67.5 74
56.5 63 69.5 76
61 68.5 76 84
62.5 70 78 85.5
65.5 73.5 82 90.5
67 75.5 84 92
70.5 79.5 89 98
72 81.5 90.5 100
N MINIMAL SLAB

Fy > 400 or Fy < 400


130
108
93
258
Solid Slab

Ribbed Slab