Академический Документы
Профессиональный Документы
Культура Документы
Accessibility in RRC phase points towards poor RF conditions, bad RRU or an UE trying to
access the network in poor conditions. You will need to try and improve the RF conditions to see
better RRC Success Rate. If its a bad RRU replace the RRU.
UEs trying to access the network in poor RF conditions can be determined by looking for high
pegs in pmRrcConnEstabAttReatt
Accessibility failures in S1 phase happen due to Hardware fault or transport issues.
Accessibility in ERAB phase can happen due to an UE issue or due to hanging resources in the
eNb or an RRU issue.
With regards to hanging resources in eNb a restart normally helps. With regards to faulty
RRUs if restarting the RRU doesnt help, replacing the RRU is the option.
Check to see that the cell isnt reserved or barred. Command on AMOS - get . plmn reserved (
if the value is true-site is not commercial launched yet, if false its commercial launched)
Check if there is any increase in traffic which can impact KPIs {Special events etc}. Check
counters pmPdcpVolDlDrb, pmPdcpVolDlSrb
Check if it is a coverage issue. Use
counters pmRadioTbsPwrRestricted, pmRadioUeRepCqiDistr, pmbadcovevalreport.
After having approx idea of coverage / footprint of site, Do tilt optimization as per
clutter/terrain data.
Check cell designation(Core/Border) & set IRAT/Reselection parameters accordingly.
Please give a soft restart to RRU Or Sector Or site to remove any bug or malfunction.
Main cause can be cell unavailability, High UL RSSI,HO failures but do all check listed
in accessibility.
Causes for poor Retainability will normally be due to poor RF. Improve RF in the
region, Maintain balance between the IRAT rate and Retainability. Cell Range changes in
cases where the cell range doesnt match the RF footprint can also help in Retainability
improvement.
Increase in Max RLC retransmission can also improve Retainability.
Tilt optimization as per clutter / terrain can help.
High IRAT on cell indicates poor coverage, Most happens on border cell. Look at the trend
with Acc. & Ret.
Check IRAT & Reselection parameter, Set to core if Acc & Ret looks ok.
Change HyesteresisA2prim to 2 Or 3dB if Acc & Ret looks Ok.
To delay IRAT time to triggerA2 can also be changed.
Do tilt optimization as per Clutter / Terrain data.