c   M/s Bharat Heavy Electricals Limited Date:30.07.2010

c M/s Gujarat State Energy Generation Limited

c 
 M/s FICHTNER Consulting Engineers (I) Limited

 1x 350 MW CCPP,Hazira

9.2 M Dia x 8.7 HT, 578(M3)- Cone with Self Supporting Roof Structure

  c   


All the Drawings,specification and procedures pertaing to the tank were
1 in hand YES / NO
All Welding Procedures pertaing to Tank are to be on hand and
2 approved by client. YES / NO
All requirements of tank Civil foundations were met as per standards
3 and approved drawings . YES / NO
Ensured all fabrications were done as per approved drawings,Any
4 comments. YES / NO

5 Are all Roof and Bottom shell joints were lap welded and inspected. YES / NO

6 Was roof plate to crub angle welded as per drawing and inspected. YES / NO
Was drum,roof rafters on tank top properly placed,inspected and
7 documented. YES / NO
Are all Vertical and Horizontal shell joints were full penetration welded
8 and inspected. YES / NO
Are all Dye Penetrant Testing ,Radiography Testing were completed on
9 Roof ,Bottom,Vertical and Horizontal shell joints. YES / NO
Are all Nozzles properly placed as per nozzle orientation plan and
10 properly checked. YES / NO
Are Man holes properly placed as per orientation plan and properly
11 checked. YES / NO
Are all Nozzle welding and Dye Penetrant Testing done as per approved
12 drawing and procedures. YES / NO
Was rein-forced pads placed on all nozzles as per orientation plan and
13 properly checked. YES / NO
Was Internal ladder,outside stairway,hand rails fabicated and welded as
14 per approved drawing and procedures. YES / NO
Are all supports and clamps for tank related piping properly placed as
15 per dr awing . YES / NO

16 Are all temprorary structures removed and inspected for completion. YES / NO


     
    c   !  " #
c   M/s Bharat Heavy Electricals Limited Date:30.07.2010

c M/s Gujarat State Energy Generation Limited

c 
 M/s FICHTNER Consulting Engineers (I) Limited

 1x 350 MW CCPP,Hazira

10.8 M Dia x 9.5 HT, 870(M3)- Cone with Self Supporting Roof Structure

  c   


All the Drawings,specification and procedures pertaing to the tank were
1 in hand YES / NO
All Welding Procedures pertaing to Tank are to be on hand and
2 approved by client. YES / NO
All requirements of tank Civil foundations were met as per standards
3 and approved drawings . YES / NO
Ensured all fabrications were done as per approved drawings,Any
4 comments. YES / NO

5 Are all Roof and Bottom shell joints were lap welded and inspected. YES / NO

6 Was roof plate to crub angle welded as per drawing and inspected. YES / NO
Was drum,roof rafters on tank top properly placed,inspected and
7 documented. YES / NO
Are all Vertical and Horizontal shell joints were full penetration welded
8 and inspected. YES / NO
Are all Dye Penetrant Testing ,Radiography Testing were completed on
9 Roof ,Bottom,Vertical and Horizontal shell joints. YES / NO
Are all Nozzles properly placed as per nozzle orientation plan and
10 properly checked. YES / NO
Are Man holes properly placed as per orientation plan and properly
11 checked. YES / NO
Are all Nozzle welding and Dye Penetrant Testing done as per approved
12 drawing and procedures. YES / NO
Was rein-forced pads placed on all nozzles as per orientation plan and
13 properly checked. YES / NO
Was Internal ladder,outside stairway,hand rails fabicated and welded as
14 per approved drawing and procedures. YES / NO
Are all supports and clamps for tank related piping properly placed as
15 per dr awing . YES / NO

16 Are all temprorary structures removed and inspected for completion. YES / NO


     