Академический Документы
Профессиональный Документы
Культура Документы
aa/dxn, sf7df8f}+
b/vf:t kmf/fd
c:ktfngl;{ xf]dz}lIfs ;+:yf :s"n, sn]hljBfnodxfljBfnoljZj
ljBfnotflnd s]Gb|sf]gofF ejg lgdf{0fgljs/0f:yfg kl/jt{g:t/f]GgtL
Pj+ pkof]u kl/jt{g sf] k|of]hgsf] nflu
>L zx/L ljsf; tyf ejg lgdf{0f ljefu
l8lehg sfof{no sf7df8f}+, aa/dxn .
/fli6o ejg ;++lxtf sfof{Gjogsfo{ljlw, @)^) n] Aoa:yf u/]sf] cfwf/df lgDg
:yfgdfc:ktfngl;{ xf]dz}lIfs ;+:yf :s"n, sn]hljBfnodxfljBfnoljZj
ljBfnotflnd s]Gb| sf] gofF ejg lgdf{0fgljs/0f:yfg kl/jt{g:t/f]GgtL Pj+
pkof]u kl/jt{gsf] k|of]hgsf] nflu tkl;n adf]lhdsf] gS;f tyf sfuhft ;+nUg u/L gofF
lgdf{0f eP l8hfOg;xdlt / k'/fgf] ejgdf ;+rfng eO/x]sf] eP ejgsf] agfj6 ;DaGwdf
Seismic Vulnerability Evaluation /Assessmentu/L l;kmfl/; kfpg lgj]bg u/]sf 5f} .
ejg :yn M
======================lhNnf===============g=kfuf=lj=;j8fg++==
=======GfS;f g++=============lsQf g+============
;+:yfkssf] gfd M
7]ufgf M
kmf]g g+= M
;+:yfkssf]] tkm{af6 b:tvt ug]{sf] gfd M ;+:yfkssf] sfof{nosf] 5fk
b:tvtM
kb M
ldlt M
/fli6o ejg ;++lxtf sfof{Gjogsfof{ljlw, @)^) cg';f/ l8hfO{g k|of]hgsf] lgDt
k|of]u ul/Psf] ejg ;+lxtfsf] lsl;d s'g xf] ;f]df /]hf lrGx nufpg'xf];\ .
;+nUg sfuhftx? M
!_ cfls{6]Sr/n gS;fx? M Laboratory Block (3-LAB-6-ERMC)
S. No. Drawings No.of Sheets
1 Floor plans. AR-01,AR-
02AR-03,AR-04
2 Elevations. AR-05
3 Two sections Longitudinal Section and Cross section (One of the AR-06
sections should be through staircase).
4 Site plan.
5 Elevation of Doors and windows showing its openings and sizes.
6 Staircase Details.
7 Ramp Detail
8 Others (if any)
@_ :6Sr/n gS;fx? M
S. No. Drawings For Framed Structure No. of Sheets
1 Column Reinforcement for critical column (indicate position of the
column in structure)
2 Critical beam reinforcement (indicate position)
3 Slab reinforcement
4 Staircase reinforcement
5 Trench plan and toe wall detail
6 Critical foundation detail (indicate position)
7 Ductile detailing of Beam and column joint
8 Other (if any)
#_ :oflg6/L gS;fx? M
S. No. Drawings No.of Sheets
1 Toilet detail plan (each floor)
2 Roof plan
3 Site plan
4 Plans of Underground water tank, Septic tank, Soak pit& Manhole
5 Isometric drawing (flow diagram chart)
6 Section (toilet with duct detail)
7 Drainage detail
8 Fire fighting system.
9 Others (if any)
$_O{n]S6Lsn gS;fx? M
S. No. Drawings No.of Sheets
2
k]h g+=
1 Layout
2 Wiring
3 Schematic
4 Others (if any)
%_ gfkL gS;f M
gf]6 :
!_ :s]nsf] xsdf ;j} gS;fx? !:!)) jf ! = *' x'g' kg]{ / l86]nx? ! :%) jf !
= $' eGbf sdsf] x'g gx'g] . ;fO{6 Knfgsf] xsdf Ps /f]kgL ;Dd !:!)) jf !
= *' / Ps /f]kgL b]vL dfyL !:@)) jf ! = !^ ' x'g' kg]{ .
@_ l8hfO{g ;xdlt k|bfg ug]{ s|ddf lgdf{0f :yn lg/If0f ug'{ kg]{ cfjZos
ePdf ;DalGwt k|fjlwsx?af6 cfjZostf cg';f/ lgdf{0f :yn lg/LIf0f u/fO{g] 5
.
3
k]h g+=
-S'mg} k/fdz{bftf AolQm ;+:yfaf6 l8hfOg jf lgdf{0f ;'k/Lj]If0f x'g] eP
dfq ._
#_ o;} ;fy ;+nUg Architectural, Structural, Sanitary and Electrical gS;fx? g]kfn
O{lGhlgol/ kl/ifb\(NEA)df btf{ ePsf] JolQmn] btf{ g+ pNn]v u/L
b:tvt u/]sf] x'g' kg]{ 5 .
$_ k'/fgf] ejgdf ;+rfng eO{/x]sf] eP ejgsf] Seismic Vulnerability evaluation
/Assessment Reportg]kfn O{lGhlgol/ kl/ifb\ (NEA)df btf{ ePsf] JolQmn]
btf{ g+ pNn]v u/L b:tvt u/]sf] x'g' kg]{ 5 .
4
k]h g+=
k|fljlws ljj/0f kmf/fd
-s_ cfls{6]Sr/n l8hfOg ;DalGw
-;DjlGwt k|fljlws jf k/fdz{bftf jf6 e/fpg' kg]{_
Forms
for
NBC Code 206:2003- Architectural Design Requirements.
(In case of many buildings, fill up the form for main building only)
5
k]h g+=
k|flalws ljj/0f kmf/fdx?
-v_:oflg6/L l8hfOg ;DalGw
-;DjlGwt k|fljlws jf k/fdz{bftfjf6 e/fpg' kg]{_
Forms
for
NBC 208 : 2003--Sanitary and Plumbing Design Requirements
Type of Building :
Description As per Submitted Design Remarks
1. Water Requirement in buildings.
1.1 Water consumption per head per day
1.2 Storage Capacity of Underground
Water Tank
1.3 Storage Capacity of Overhead water tank
1.4 Residual Head at Consumer's Tap
2. Fixture Requirements
2.1Fire Hydrant
a. No of floors (Indoor)
b. Floor area (Indoor)
c. Capacity of wet riser for
underground water tank
d. Vertical fire hydrant riser pipe size
2.2 Toilet for one unit :
Average family size ......................Persons
a. Water closet
b. Tap
c. WashBasin
d.Kitchen sink & dish washers
6
k]h g+=
k|flalws ljj/0f kmf/fdx?
-u_ On]lS6sn l8hfO{g ;DjlGw
-;DjlGwt k|fljlws jf k/fdz{bftfjf6 e/fpg' kg]{_
Formsfor
NBC 207 : 2003--Electrical Design Requirements
( In case of many units, fill up the form for main unit only )
S.No Electrical Elements As per Submitted Design Remarks
1. Rating and sizes
1.1 Minimum size (sq.mm.)of copper cable for light circuit 2.5 sq. mm.
1.2 Minimum size (sq.mm.) of copper cable for power circuit 4.0 sq. mm.
1.3 Wattage of ordinary power socket (2 pin)estimated as 1000 Watt
1.4 Wattage of power socket outlet (3 pin) estimated as 3000 Watt
1.5 Wall thickness of cast iron switch or regulator boxes 3.00 mm.
1.6 Wall thickness of mild steel sheet switch or regulator boxes for up to 1.18 mm.
20cm.X30cm
1.7 Wall thickness of mild steel sheet switch or regulator boxes for above 1.16 mm.
20cm.X30cm
1.8 Depth of the switch or regulator boxes -
2. Maximum number of cables in a conduit
2.1 No. of 2.5 sq.mm.cross-sectional area cable in 20 mm. dia conduit 5 Nos. of cables
2.2 No. of 4 sq.mm. cross-sectional area cable in 20 mm dia conduit 3 Nos. of cables
2.3 No. of 6 sq.mm. cross-sectional area cable in 20 mm. dia conduit 2 Nos. of cables
2.4 No. of 2.5 sq.mm.cross-sectional area cable in 25 mm. dia conduit 10 Nos. of cables
2.5 No. of 4 sq.mmcross-sectional area cable in 25 mm. dia conduit 6 Nos. of cables
2.6 No. of 6 sq.mm.cross-sectional area cable in 25 mm. dia conduit 5 Nos. of cables
2.7 No. of 2.5 sq.mm.cross-sectional area cable in 32 mm. dia conduit -
2.8 No. of 4 sq.mm.cross-sectional area cable in 32 mm. dia conduit -
2.9 No. of 6 sq.mm.cross-sectional area cable in 32 mm. dia conduit -
3. Earthing
3.1 The value of any earth system resistance unless otherwise specified 5.00 ohm
3.2 Diameter of rod electrodes of steel or galvanized iron -
3.3 Diameter of rod electrodes of copper -
3.4 Internal diameter of pipe electrodes of galvanized iron or steel -
3.5 Internal diameter of pipe electrodes of cast iron -
3.6 The B17length of the rod & pipe electrodes -
3.7 Thickness of plate electrodes of galvanized iron or steel -
3.8 Thickness of plate electrodes of copper 3.15 mm
3.9 Size of plate electrodes of galvanized iron or steel or copper 60 cm x 60 cm
3.10 Depth of the top edge of plate electrodes buried from ground 1.50 m.
4. Testing
4.1 Insulation resistance (M ohm) between earth and the whole system of 50/No points on the circuits .
conductor or any section thereof
4.2 Insulation resistance (M ohm) between the metallic case and all live 1/2 M ohm
parts of each rheostat, appliance and sign when they are disconnected,
4.3 Insulation resistance (M ohm) between all the conductors connected 50/No Points in the
to one pole or phase conductor and all the conductor connected to the Circuits
middle wire or to the neutral or to the other pole of the phase
conductor
4.4 The applied dc voltage (Volt)of meggering 2 x Working voltage
4.5 Each switch is placed in phase or neutral? Switch in phase
Note :
1. When substation and external electrical works are required, designer must comply NBC 207: 2003 or/and
relevent international electrical codes.
7
k]h g+=
2. Designer is advised to consider lightning protection designated by international electrical codes .
8
k]h g+=
S.N. Description As per submitted design Remarks
Wind zone
Basic wind velocity
2.6 NBC 105-1994 Seismic Design of Buildings in Nepal
Method of earthquake analysis: Seismic coefficient method
Model Response Spectrum
Method
Subsoil category Type II IS 1893,2002
Fundamental transactions period 0.516 IS 1893,2002
Basic seismic coefficient 0.135 IS 1893,2002
Seismic zoning factor 0.36 (Zone 5) IS 1893,2002
Importance factor 1.5 IS 1893,2002
Structural performance factor
9
k]h g+=
S.N. Description As per submitted design Remarks
10
k]h g+=
S.N. Description As per submitted design Remarks
Critical span of the beam element
Designed deflection
Slenderness ratio of the critical post
Joint type:
2.14 NBC : 113 : 1994 Aluminium
Have you used aluminium as structure Yes
member? No
If yes, please mention the name of
design code.
2.15NBC : 114 : 1994 Construction safety
Are you sure that all safety measures Yes
will be fulfilled in the construction site
as per this code?
Safety wares use Safety hard hat
Safety goggles
Safety boots
Safety belt
First aid facility
11
k]h g+=
ldlt M ===================
>Ldfg\ dxflgb]{zsHo",
zx/L ljsf; tyf ejg lgdf{0f ljefu.
ljifo M k|ltj4tf kq .
s_k/fdz{bftfsf] tk{maf6 M
;+:yfks
>L===========================================n]
lhNnf==================================g=kf=uf=lj=;=
=======================j8f
g+========:yfg========================sf] hDdf hUufsf]
If]qkmn ==========================/f]kgLju{ld6/df ejg P]g
@)%%, ejg lgdofjnL @)^^, ejg lgdf{0f dfkb08 @)^$, g]kfn /fli6o ejg
;+lxtf @)^) / ;f] df pNn]v gePsf Standard ;DaGwdf InternationalStandard sf]
clwgdf /lx ejg ;+Vof ======== j6f e"ldut tNnf /x]sf] / ;f] eGbf dfly
=========== clwstd tNnf ePsf]========== ju{ld6/ju{ lkm6 Built
Date : -----------------------
sDkgLsf]
k/fdz{bfqL ;+:yfsf] gfd M 5fk
k|f]k|fO{6/sf] gfd tyf x:tfIf/ M
12
k]h g+=
------------------------------------------------------------------------------------------------------------------------------
13
k]h g+=
v_ lgdf{0f sfo{ ;'k/Lj]Ifssf] tk{maf6 M
;+:yfks
>L===========================================n]
lhNnf==================================g=kf=uf=lj=;=
=======================j8f
g+=======:yfg=======================dfgofF ejg
lgdf{0fgljs/0f:yfg kl/jt{g:t/f]GgtL Pj+ pkof]u kl/jt{gsf]
k|of]hgug{ nfu]sf], k/fdz{bfqL
=====================================sf tk{maf6
>L===============================n] l8hfOg u/]sf] ejgsf]
lgdf{0f sfo{sf] k|fljlws ;'k/Lj]If0fdf :jLs[t gS;f adf]lhd ug]{ u/fpg]k|ltj4tf
k]z u/]sf 5'5f} .
DesignerNameNEC NO.Signature
5. Architect : Ar. Sudeep Shakya
6. Structural Engineer : Dr. Purushotam Dangol
7. Sanitary Engineer :
8. Electrical Engineer :
Date : -----------------------
sDkgLsf]
;'k/Lj]If0f ug]{ ;+:yfsf] gfd / 7]ufgf M 5fk
k|f]k|fO{6/sf] gfd tyf x:tfIf/ M
----------------------------------------------------------------------------------------------------------------------------------
--
14
k]h g+=
u_ ;+:yfkssf] tk{maf6 M
Architectural/Structural/ Sanitary/Electrical/Fire Safetysf gS;fx?l8hfO{g cg';f/ dfly
pNn]lvt k/fdz{bfqLsf] k/fdz{ tyf k|fljlws ;'k/Lj]If0f lnO{ ejg P]g @)%%,
ejg lgodfjnL @)^^, ejg ;+lxtf @)^) adf]lhd lglb{i6 u'0f:t/ sfod /fvL
lgdf{0f sfo{ ug{,u/fpg / lgdf{0f sfo{ ePsf] k|ltj4tf hfx]/ ub{5'ub{5f} .
em'f ljj/0f k]z u/]sf] 7xl/Pdf / :jLs[t gS;f, l8hfO{g, :6of088{; /
:k]l;lkms]zg adf]lhd lgdf{0f sfo{ km/s kfO{Pdf k|rlnt sfg"g jdf]lhd
;hfosf] eflubf/ x'g,Joxf]g{ d~h'/ ePsf] Aoxf]/f ;d]t o;} k|ltj4tf kq4f/f
cg'/f]w ub{5'ub{5f} .
;+:yfkssf] gfd M
7]ufgf M
kmf]g g+= M sDkgLsf]
x:tfIf/ M 5fk
ldlt M
15
k]h g+=