Вы находитесь на странице: 1из 2

RD276 Appointment of Qualified Person ( Supervision) For Proposed Bus Depot at Loyang

C & V ENGINEERING PTE LTD

DAILY SITE REPORT


Date 21/02/14 Friday
S/N Location Chainage Nature of works Time (Hrs) Weather
8-12AM Fine Drizzle Rain

1 ZONE 3 CUTTING OF SOIL 0800-1800 Condition 1-6PM Fine Drizzle Rain


RE 1
2 ZONE 1 BACKFILLING OF SOIL 0800-1800 RTO 1
Total 2
3 ZONE 1 COMPACTION OF SOIL BY TEN TONNE ROLLER 0800-1800

4 ZONE 3 AND ZONE 4 SOIL INVESTIGATION 0800-1800 Meetings

Prepared by RTO Representative: ALFREDO JR. ARIOS CLARO Checked by RE Representative: Muthu Senthil Kumar
(Name & signature) (Name & signature)
Remark: Photo attached (1 page)

Photos taken on 21/02/14 Friday

RD259 Loyang Bus Depot RD259 Loyang Bus Depot

STOCKPILE OF RECYCLED CONCRETE AGGREGATE


HOARDING INSTALLATION NEAR LOYANG AVENUE AT ZONE 1

RD259 Loyang Bus Depot RD259 Loyang Bus Depot

CHECKING OF ELEVATION OF BACKFILLING


WORKS CUTTING OF SOIL AT ZONE 1

RD259 Loyang Bus Depot RD259 Loyang Bus Depot

SOIL INVESTIGATION NEAR ZONE 3 SOIL INVESTIGATION NEAR ZONE 3