Академический Документы
Профессиональный Документы
Культура Документы
200
WASTE PIPE SV SHOWER VALVE CWR COLD WATER RISER
VENT PIPES KS KITCHEN SINK VSTR VENT STACK THRU ROOF
DOWNSPOUT LT LAUNDRY TRAY CO CLEAN OUT
14. ALL PLUMBING INSTALLATION INCLUDED HEREIN SHALL BE UNDER THE F FAUCET SD SHOWER DRAIN
DIRECT SUPERVISION OF A DULY REGISTERED AND LICENSED MASTER VP VENT PIPE
FD FLOOR DRAIN
PLUMBER. WP WASTE PIPE
HB HOSE BIBB
SP SOIL PIPE
PLUMBING LEGEND: WC WATER CLOSET
MV MAIN VENT
1600
1200
LAV LAVATORY
VAC VENT ABOVE CEILING
GATE VALVE STORM DRAIN PIPE BT BATH TUB
FCO FLOOR CLEANOUT
FB FOOT BATH
CHECK VALVE VENT PIPE UFV UNDER FLOOR VENT
M WATER METER HRP HORIZONTAL
CB CATCH BASIN RAINWATER PIPING ISOMETRIC
CWL
COLD WATERLINE
CP
DS
CONDENSATE PIPE
DOWNSPOUT
SANITARY SEWAGE LAYOUT
200
DS DOWNSPOUT SCALE 1:50 MTS
WASTE PIPE RD ROOF DRAIN
SOIL PIPE
PLAN
A B C D E F A B C D E F
25000 25000
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
10025
1 1
300
300
AIR SPACE
AIR SPACE AIR SPACE
WATER LEVEL
51
7000
WATER LEVEL
51
WATER LEVEL
51
14000
1550
2 2
1000
7000
3 3
150
SECTION
Prepared by: Checked by: Approved by: PROJECT NAME : Sheet Content: DRAWN BY: JMG Revisions: Sheet No.:
REPUBLIC OF THE PHILIPPINES
CHECKED BY: CFQ/JCC
DEPARTMENT OF TRANSPORTATION AND MATI AIRPORT DEVELOPMENT PROJECT (C.Y. 2015) P-1
COMMUNICATIONS JULIUS C. CARLOS DATE DRAWN: 2016
PROJECT DEVELOPMENT SERVICE Engineer IV, Project Development Service PROJECT SCOPE: 1 1
REHABILITATION OF EXISTING TERMINAL BUILDING
DATE PRINTED: 2016 Total Sheet No.:
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK,
ORTIGAS AVENUE, MANDALUYONG CITY 1555
LOCATION : MATI, DAVAO ORIENTAL SCALE : AS SHOWN DATE APPROVED: 2016 09 / 10
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.
A B C D E F A B C D E F
25000 25000
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
5000
4300
4400
1 1
7000
14000
2 2
7000
3 3
PROPOSED PROPOSED
FOUNDATION PLAN ROOF BEAM PLAN
SCALE 1 : 150 M SCALE 1 : 150 M
CO M M U N
Office of the Director Engineer IV, Project Development Service Director, Project Development Service
TM
IC
AT
R
REHABILITATION OF EXISTING TERMINAL BUILDING
IO
N S DE PA
Project Development Service
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
06 / 10
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made
TRUSS 2 DETAIL
SCALE 1 : 50 M
TRUSS 1 DETAIL
SCALE 1 : 50 M
CO M M U N
Office of the Director Engineer IV, Project Development Service Director, Project Development Service
TM
IC
AT
R
REHABILITATION OF EXISTING TERMINAL BUILDING
IO
N S DE PA
Project Development Service
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
07 / 10
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made
NOTE:
REINFORCING BAR FOR SLAB OPENING
OPENING SIZE VERTICAL & HORIZONTAL
UNDER 600
UNDER 800
CO M M U N
Office of the Director Engineer IV, Project Development Service Director, Project Development Service
TM
IC
AT
R
REHABILITATION OF EXISTING TERMINAL BUILDING
IO
N S DE PA
Project Development Service
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
09 / 10
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made