Вы находитесь на странице: 1из 8

+ + + + + + + + + + + + + + +

INDUST
OF RY
S

AR

EX
2003 2017

TEEN YE

CEL NCE
LE
FIF
THE STATE OF THE

INDUSTRY
+ + + + + + + + + + + + + + +
Chapter Three
The Project Managers
Perspective
Managing Timelines, Budgets, and
Milestones in Multidisciplinary Teams

S. Anne Montgomery

Series
2017
B i o P r o c e s s STATE OF THE INDUSTRY

The Project Managers Perspective


Managing Timelines, Budgets, and Milestones
in Multidisciplinary Teams

S. Anne Montgomery

T
he term project management in
the pharmaceutical industry is
exceedingly broad and covers
multiple functionalities: project
planning, execution, and monitoring;
timeline and budget planning and
management; stakeholder management;
management of regulatory and
compliance strategies; environmental
safety; risk management; and team
management. For most industries,
these are important tasks. However, for
the biopharmaceutical industry all this
must be done while keeping patient ADOBE STOCK (HTTP://STOCK.ADOBE.COM)

safety and efficacy of the drug the


topmost priority. detailed and disciplined project interpret project needs to upper
Looking at this job function on its management program to ensure their management, smooth transitions from
own, though, reveals as many travel logistics and the execution of initial stages to product launch
variations as there are of products and their shows was flawless. (commercial supply), and oversee
processes in development. But project Transformations in Project ongoing contractor and supplier
managers share critical skills for Management: In looking at partnerships (the latter usually
working with (most often these days) approaches to project management together with supply-chain managers).
interdisciplinary groups toward over the past 15 years, it is clear that Project managers oversee progress and
common goals, weighing many more tools are available now for continuity of outsourced elements to
considerations of time and cost against monitoring the progress of, and multiple service providers and to
deadlines set for technical and communicating with teams from development and manufacturing sites.
financial milestones. The combination different departments, functions, and Training and experience are key:
of technical/scientific with business sites. Notably, this functional category Not just any scientist or technician -
(forecasting, communications, and so has (along with the rest of the even one intimately familiar with
on) skills is what sets such valuable bioindustry) been undergoing project details - can step into this role
people apart in any organization. transformation under the influence of effectively. However, that has often
Authors Hazel Aranha (editorial quality-riskbased forecasting and been the approach to project
advisor and viral clearance and assessment tools that include real-time management in the past: the promotion
biosafety officer, Sartorius Stedim analytics, data-tracking software, and of a team member to project manager.
North America Inc.) and Leonore process-modeling software. Project So at the outset, a key issue is the need
Witchey-Lakshmanan (principal managers benefit from the increased for improved training and access to the
consultant, Pharma CMC/IP) spoke transparency provided to team skilled managers and technicians of the
with me about points covered in their members through shared information future.
BPI article (1). Project management systems. Those who oversee elements Biopharmaceutical project
may sometimes feel like running a of change and associated risks, management as a career in and of itself
three-ring circus. In fact Barnum and encourage cross-team collaboration, may not have been much emphasized
Bailey were thought to be one of the troubleshoot technical problems and before. But that is no longer the case: A
first, nearly a century ago, to employ a clashes of personalities and priorities, search for advertised positions reveals

2 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017


many variations on such roles and, those business goals and know how to if not strongly, that increased options
therefore, good opportunities for help a team achieve them. Especially for outsourcing specialty work
people with the requisite skills to with increased attention to new (biosimilars, cell therapies, conjugates,
effectively apply scheduling, risk therapeutic categories and biosimilars, vaccines, and so on) have widened/
management, and comprehensive a project manager may face both a improved project-management choices
quality assurance and control to the personal learning curve with new regarding where to make clinical
process of bringing a drug to market in technologies and a much more supplies, securing lower-cost materials
a cost-efficient way (2). These are competitive rush to market than in and labor, and conducting specialty
people who can step outside the forest previous years. laboratory analyses. Available platform
to see the trees; who can, when they technologies at CMOs/CDMOs also
need to, navigate smoothly between Survey Highlights are speeding technology transfer
generalist and specialist roles. BPIs State of the Industry survey through building shared expertise and
Careers in project management take section on project management enabling faster process optimization.
many different forms and call for a focused more on the manufacturing But our small group of self-selected
variety of skills, levels of education, and trends to be managed than on the respondents is not enough to support
years of experience. Such a position can tasks and related roles themselves. So any assertion that availability of these
entail managing a project across an it mainly confirms key trends that wider options has significantly
entire business or one specific to one align with industry practices as a changed their companies business
program or department/function, whole. To this extent, survey responses goals. On the contrary, whether or not
applying knowledge, skills, tools and revealed no real surprises. Here are it is a larger trend, these respondents
techniques to project activities to meet the key issues that factor into todays companies appear to be staying the
the project requirements (3). This project-management decisions. course of their product development
makes a project manager accountable Increased Outsourcing Options: We pipelines.
for thesuccess or failure of a project. asked about the effect on managing Respondents did agree, some
No matter what a companys business timelines and expectations from strongly, with the statement that
goals are or how it defines management increased outsourcing options over the Options to outsource to overseas
roles, he or she needs to understand past 15 years. Most respondents agree, manufacturers are reducing our costs

Right.
On Time.
Commitment to your project
and needs is embraced
all the way to our leadership

Im committed to your goal of


getting new therapies to patients
Supervisor, Development Support, UPD, Seattle, Facility

COMPETITIVE ADVANTAGE WITHOUT COMPROMISE


CMC Biologics oers a CDMO relationship where your needs are
prioritized across our organization. Consequent decision-making,
agility, exibility and our collaborative approach reduce timelines
without any compromise in exacting quality.

www.cmcbio.com United States +1 425 485 1900 Europe +45 7020 9470
3 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017
through providing access to their local Communication Amid Complexity Therefore, as Simn concludes, the
labor/talent pools; longer-term It is easy to talk about the importance project manager becomes essential to
planning can be leveraged through of communication, but not so easy to keep the team on the right path and
reserving added manufacturing encapsulate what it really means in the translate functional specifications into a
capacity in geographical regions new context of any one job position. For language that allows the specialist to set
to the industry. project management - even when the right technical specification to
All agree that such options are communications occur within one fulfill the need. At the same time, the
increasing and that such advantages company and supposedly the same project manager keeps an
are possible to achieve. But increased corporate culture - some people are understanding of the global evolution of
access to external expertise may better able than others to translate various aspects of the product to ensure
explain why one respondent from the needs and even key terms across the compatibility and harmonization.
AsiaPacific (APAC) market different departmental/functional Managing SupplierManufacturer
emphasizes the need for a strong disciplines in a project. And because a Projects: Managing a project within
global rather than regional business project manager does not, him- or one company may introduce conflicts
perspective. Does this signal a trend herself, perform the work of the teams in communication and goal setting,
toward greater participation from involved, he or she may come into a but as mentioned elsewhere in this
APAC in the worldwide industry? He project needing to be brought up-to- special issue, the industry is also
writes, For a successful player, speed on unfamiliar areas of personal experiencing a strong trend toward
building a global biotherapeutic expertise before being able to envision partnering and long-term supplierend
footprint is more important than the the combined goals of the project. user relationships. Driven in part by
cost. Unlike chemical processes, We asked BPI author Marcos earlier warnings about shortfalls in
bioprocesses do not support shortcuts. Simn (founder of the Bolt-On manufacturing capacity and potential
Another person notes that, as a Bioreactor Project) to comment on supply-chain interruptions as well as
CDMO, his company is benefiting this from the perspective of managing by the need to ensure continuity and
from being able to offer improved his ongoing bioreactor project (4). comparability of supplier materials,
platform technologies and increasing Given that (for example) bioreactor this trend further emphasizes the need
familiarity and expertise with new automation requires the collaboration for skilled project management in our
types of products. of experts in biology, mechanical/ industry. Sobering examples of supply-
Alignment of regulations is electrical engineering, and computers/ chain disruptions over the past 15
clarifying and helping to speed software, I asked What challenges years include shipping delays due to a
completion of documentation at come when such different functions major volcanic eruption and supply
different sites and with various must come together and communicate shortages after the Japanese tsunami.
partners. Respondents who agreed with one another? I asked editorial advisor Miriam
strongly with this statement appear to His response: Specialists from Monge (director of marketing,
be those working in regions for which different fields approach the same integrated solutions at Sartorius
regulatory pathways are emerging challenges from surprisingly different Stedim Biotech) to comment on the
through newly harmonized perspectives. Therefore, each of them role of project management in these
regulations. Those respondents in tends to apply solutions that proved long-term business relationships. She
particular agreed with the statement, successful in their past experiences, said, As suppliers work with end users
I see a trend toward better neglecting considerations that are to implement fully single-use
alignment and understanding of IT irrelevant in their respective fields of technologies, analytics, and services
needs with regulatory documentation expertise. Besides, very often the same (full platforms so to speak), the end-
and data tracking over a products word has a different meaning in users are really outsourcing to a third
lifecycle. different areas of technology. And party quite a lot of what they would
And a final question asked how tacit understanding is completely previously have managed internally. It
managers go about finding a contract different in every discipline. is therefore the nature of this
service provider with specific expertise This cocktail of perspectives relationship that drives the trend
(e.g., analytical testing, cell-line provides a great opportunity to merge toward long-term supplier-
development) - to which most solutions from different fields, but it manufacturer relationships because a
respondents say they rely on colleague requires constant surveillance to strong level of trust needs to be
recommendations and existing alleviate the strains created by established between both parties.
contractual relationships with alternative solutions. In this situation, Sartorius worked with Synthon for
analytical laboratories. The APAC it is important to share a common goal end-to-end integration of single-use
respondent notes that his company and ensure that the development team technologies for commercial
brings in a trusted industry has clear priorities when setting manufacturing. This study was
consultant to make sure we are current product specifications that evolve presented at the ISPE annual meeting
with development and documentation constantly during initial stages of in Barcelona in April 2017 of Upstream
needs. product development. Biotechnology. Nienke Vriezen director

4 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017


Advisors and Authors Speak Up on Scope Management
upstream, Synthon Biopharmaceuticals,
explained key success factors behind Interdependencies are inevitable among groups, and a project manager (PM) has to
executing the project in record time. ensure adequate communication within sites and across sites. This gets even more
They included the close collaboration challenging when working globally. In general, projects have a way of morphing into
between the project management and enormous entities, and a key function of the PM is scope management.
engineering teams, regular face-to face With the dramatic changes in the global political landscape (e.g., Brexit), it is
meetings, understanding of the mandatory to have professionals available who can keep their finger on the pulse of
limitations and drivers for decisions, the various changes and regulatory requirements
and ensuring fully scalable bioreactor Sensitivity with regard to culture, be it the company or country culture, is essential.
technologies from development It is necessary to be informed about the norms of the teams you are working with.
through to production-scale. Vriezen Adequate communication is at the core to keep programs on track toward the desired
result. The expansion of the scope of work, or scope creep, needs to be kept in
noted that this attention to
check, or the result can suffer.
communication and understanding
shared goals enabled the first Timely communication includes periodic reports to keep all stakeholders informed
and aligned. How much detail to include in a report is essential to know, always
engineering batch to be started in
keeping in mind the audience and their specific needs.
under 12-months.
As Vriezen put it, The engineering Responsible communication, while not always discussed, must always be on our
radar. The project manager must practice ethical communications and ensure that
principles represented in the Sartorius
accurate information is provided so that the right decisions are made. It is important
bioreactor portfolio were essential in to remember that the stockholder is not the only stakeholder or even the key one; all
the smooth scale-up of cell culture the activities are carried out to ensure patient safety. Corporate management has to
from lab scale to a disposable 2,000-L be aware of the issues. Remember that when a Consent Decree is issued, it is the CEO/
reactor. Face-to-face meetings were COO of the company that would be named as defendant. So although the PM may
instrumental in the design and quick not always be the decision maker, it is he or she who drives the decision-making
implementation of all process process.
equipment. Hazel Aranha (PhD, RAC, technology expert, viral clearance and biosafety oficer,
The Influence of Platform Sartorius Stedim North America Inc.), and Leonore C. Witchey-Lakshmanan (PhD,
Approaches: Development and principal consultant, Pharma CMC/IP)
implementation of platform
technologies also contribute to
streamlining project management. project management also benefits from action (CAPA) plans that are in place
Platform approaches take many forms availability of cost-modeling tools and and necessary in all pharmaceutical
in our industry, but as Monge current techniques for risk-assessment, facilities.
explains, the benefits have been which can model a process from end Many software options are
greatest in the context of managing to end (512). Such tools influence key available. Selection will be based on
projects that use disposable decisions and encourage increased your needs. A balanced framework
technologies. A platform approach integration of end-to-end single-use during selection focuses not only on the
builds a standard end-to-end single- processes, analytics, and services in bells-and-whistles associated with the
use process from process development commercial biomanufacturing. software but also barriers to
to commercial and aims to ensure a Aranha and Witchey-Lakshmanan implementation - the stakeholders
consistent approach for all products/ note that any discussion of project buy-in and commitment. It is
processes, services, and analytics. Such management-tools evokes visions of intuitively obvious that the software
an approach enables us to develop full Program Evaluation and Review you select has to be compatible with
support and guidance through the life Technique (PERT) and Gantt charts the IT infrastructure of the company
cycle of our clients projects. that help identify tasks, timelines, and (e.g., some commercial software may
Standardization of single-use designs critical path issues. Tools such as these not be compatible with a Mac system).
ensures supply-chain security, are also beneficial in managing the
facilitates technology transfers, foreseeable risks with known impact: Risk Management
facilitates operator training, enhances the known-knowns. Examples of via Project Management
flexibility, ensures better predictability managing known-knowns include Identifying risks at the right stage and
reducing risk, and enables us to build development tasks required for developing an effective mitigation plan
up knowledge to fine-tune platforms product registration and licensing, are key factors for success, both
and optimize cost. This integrated sourcing supply chain management, financially and technically. The
technology, service, and analytics analytical testing and QA release complex drug development and
platform approach enables us to activities, packaging and labeling, and registration process includes
considerably speed up project distribution management. These management of multiple business
implementation. activities might also include training, processes, such as technical
Risk Assessments and Cost- documentation, facility maintenance development using quality by design,
Modeling Tools: Finally, modern and any corrective-and-preventative regulatory strategy, clinical studies, and

5 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017


supply-chain management. Multiple testingaposteriori: You cant peek at risk prevention worked at preventing
challenges and decision points mandate data from a scientific study something that hadnt occurred yet
a realistic and robust risk management tothendecide what you will use as a that makes it so difficult to pin down
model. The integration of risk threshold for success. for users.
management into product development Similarly, you cant take a list of Aranha and Witchey-Lakshmanan
is imperative. Parallel issues exist also highest-leverage risk factors in your spoke further about the importance of
for products and devices that are business model (that your experts have identifying known unknowns. Risk
commercialized. decided upon) and then choose what management has become more and
What to Watch For: BPI author Ben to work on based on what feels right. more important in our global
Locwin (13) described common If working on what feels right was environment, in particular in light of
mistakes that managers make when the key to success, then businesses issues such as contaminated heparin
attempting to apply a risk-based wouldnt haveanylatent risks to products and such. Thus,
approach: What I seemost oftenis resolve or defects/deviations in their biopharmaceutical teams must assess
that organizations take risk assessment backlogs, nor any quality issues risks of all kinds, identifying ones with
and risk-based decision making too because their gut instincts would have known certainty and known impact
lightly: After conducting exhaustive led them to perfection. (known-knowns). However the teams
risk assessments and prioritizing the Sometimes choosing between also must assess the potential of
most critical elements, the courses of action can be hard for unknown risks and their associated
organizations will sometimes then try managers and leaders, and a good risk- unknown impact (unknown-
to pick-and-choose their favorite based decision-making program can unknowns). Consequently, project
themes to spend time and resources on. make divorcing emotion from such management becomes more complex
This goes against the very nature of decisions much easier and more when addressing these as well as the
quantitative risk assessment. An effective for the business. This way, known-unknowns. Managing known-
ordinal list tells you exactlywhereto pet projects and favorite goals dont unknown risk may include contingency
focus your efforts, and if you then take survive at the expense of objectively planning in multiple areas:
that risk registry and subject it to favorable courses of action. Project globalization in shipping, distribution
personal opinion, you undermine its management activities should always channels, global compliance and in
objective value and clarity. This is incorporate relative probabilities of clinical, analytical, production,
exactly the same as whats called something occurring properly (or not). packaging, labeling, and so on. In
p-hacking, or conducting hypothesis This is just good forecasting, and its addition, continual regulatory changes,
also one of the biggest stumbling from development through marketing
blocks that I see for groups and and labeling, scale up and process
Increasingly Global companies. A good Gantt-view of the improvement even postapproval risk
Patient populations for clinical trials are world (a complex project) should be assessments are areas where
increasingly global. Clinical trials are replete with probabilistic assessments contingency planning is essential and
expensive, and cost management may of the uncertainty of each task has to be customized specifically for
be a factor when deciding where to occurring properly. the project.
conduct trials. It is necessary to Project management encounters
recognize that trials may be conducted What the Industry Is Doing Well: even greater challenges when
in countries where there are low barriers Further elaborating on decision- encountering unknown-unknown
to patient enrollment or other making tools, Locwin continues: risks. These can also be considered
incentivization programs. For example,
There has been an overall greater risks that have high uncertainty of
conducting clinical trials in India or
incorporation of risk management occurring and yet would have an
Eastern Europe may be more cost
effective because, in general, costs are themes into the industrys vernacular. unknown impact. To minimize such
lower compared with the those of the However, deep and thorough events, teams can gather and evaluate
Uniter States. However, the patient understanding of how to actually process effects on critical quality
populations are not always accepted in apply it and execute it has been attributes of a product or a device.
the country of the eventual filing. Some lagging. Risk is a tricky entity to wrap Often this translates to a color-coded
countries subsidize clinical trials by as ones arms around. Its asking about matrix pairing processing steps with
much as 4060%, which makes them things that havent happened yet, and product/device critical quality
more attractive choices. Managing data directing businesses to spend resources attributes. Then each cell of the
input from multiple global sites requires (time and money) on preventing a matrix is coded with green for low
considerable PM skills to ensure that
potential issue before it occurs. It impact low uncertainty or red for high
there is harmonization among the sites
comes down to avoidance of certain uncertainty and high impact. Yellow
so that data can be extrapolated
appropriately to target patient significant events, which may or may and orange can be used for
populations. Hazel Aranha and not have occurred anyway. Locwin intermediate risks. In this way a team
Leonore C. Witchey-Lakshmanan adds that Its this mindset of proving can anticipate high risk issues and
a negative demonstrating that your circumvent them as best as possible.

6 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017


Key Indicators of Results and ago and todays proven implementation tremendous gap in offerings between
Performance: According to Aranha of complex single-use process what the industry needs and what
and Witchey-Lakshmanan, many equipment, there is a demand to brand-new candidates have for
industries are moving toward a matrix adapttraditional bioprocess project- training (1315). This is true on the
approach in PM to include other management activities. In particular, R&D side (especially in
players such as functional managers customers needs for flexible facility pharmacovigilance, PV), as well as
and upper management, each group arrangements and for platform on the manufacturing and
with its own role and responsibilities. processing (including various media/ commercial side. There are some
The project managers are challenged buffer distribution concepts) are excellent offerings, for example
with keeping this interrelationship increasing the need for extensive through NBC2 (the Northeast
viable to benefit the project. We are single-use technology integration Biomanufacturing Center and
all familiar with key performance concepts (SUTIC). As these concepts Collaborative http://
indicators (KPIs). Todays focus is also move engineering work packages and biomanufacturing.org), BTEC (the
on key results indicators (KRIs). A procurement processes to earlier Biomanufacturing Training and
KRI is the result of many behaviors project phases, the industry is Education Centerhttps://www.btec.
and activities (performance indicators). rethinking its traditional bioprocess ncsu.eduthrough North Carolina
KRIs report on the results of many project execution models. All this State University), and other groups.
activities, so are backward looking; requires new training concepts and Locwin notes that for those who
they measure the effect of activities updated project execution models to are interested in careers in project
without focusing on the cause. KRIs do the right thing at the right time management, the first step to
reflect the wins, and the actions are and to benefit from fast-track project approaching any field or career path
tracked with suitable KPIs. If you execution. That is one of the most properly is to see whats out there for
meet your KPIs, the wins will take relevant reasons for moving into a body of knowledge (BoK). In the
care of themselves. single-use processing. project management world, this is
Training Gaps: I asked Locwin fairly easy because organizations such
Training the Project Managers how new people coming into the as the Project Management Institute
of the Future biopharmaceutical industry receive have amassed and compiled targeted
Adapting to change is easier to say management training beyond BoKs to serve as a basis for minimum
than to accomplish, and the past 15 academic preparation. He and other expertise (3). That establishes a
years have introduced radical changes authors agree that there is still a baseline for a person to follow and to
to biopharmaceutical development
and manufacturing. The QbD
mandate alone has affected just
about every operation in drug
development, from process design to
contract relationships, to packaging
The Dawn of a NEW Manufacturing Paradigm
and shipping. Biomanufacturers
embrace of single-use technologies
introduced greater possibilities for Introducing our SCALE-OUT approach
flexibility in manufacturing along
with more complex risk-assessment
...that eliminates cell culture scale-up risks
needs in an industry that long has . for ultimate flexibility and scalability
needed more people trained in using only disposable bioreactors
interpreting statistical findings.
I asked Jan Schfer (manager of
.to achieve metric ton outputs
process applications at Sartorius
Stedim Systems GmbH Integrated
Solutions) about the impact of the
above on project management career
preparation. In the past decades we
were focusing on traditional stainless
steel project management by
concentrating on well-established
schedules, tasks and deliverables
during basic design, detailed design,
Contact us to learn more about our "scale-out" approach utilizing the
and execution of bioprocess
equipment. Since the introduction of
world's largest single-use bioreactor manufacturing plant (14 x 2,000 L).
single-use technologies some years
info@wuxibiologics.com
www.wuxibiologics.com
2015: 3440; and Part 4: Process Economics,
honestly assess his or her knowledge offering specialized services are
BioProcess Int. 13(8) 2015: 2229.
against a benchmark. gaining prominence. Such companies
5 Forgione P. Bioprocess Data
Aranha and Witchey-Lakshmanan offer targeted expertise for the specific Management. Industry Yearbook 20102011:
note that training programs focus on stage of product development and stay 99; www.bioprocessintl.com/wp-content/
both hard and soft skills. In addition focused on the key decisions relevant uploads/2014/07/
to developing several basic to each phase. Built into their BPI_A_100807AR57_O_104314a.pdf.
competencies organizational functions of strategic planning and 6 Torres M. Challenges in Implementing
Quality By Design: An Industry Perspective.
leadership and decision making, tactical deployment are scope
BioProcess Int. 13(6) 2015: 1825.
technical and leadership skills, management and risk mitigation.
7 Boddins JR et al. CMC Forum:
strategic and business management Boutique consulting currently Evolution of Biopharmaceutical Control
training programs also include courses benefits from availability of a big Strategy Through Continued Process
in professional communications and talent pool with significant expertise Verification. BioProcess Int. 15(1) 2017: 1019.
negotiations and conflict resolution. and talent. Currently, theres a bigger 8 Little TA. Quality Risk Management for
Formal training and certification as a cadre of ex-pharma managers who can Drug Products and Drug Substances. BioProcess
Int. 12(5) 2014: 2431.
project management professional can provide both business and technical
9 Pentia DC et al. Reducing Clinical-
be obtained either through insights. Choosing between a boutique
Phase Manufacturing Costs: Collaborating for
professional associations or approach and hiring a single PM Savings without Compromising Quality or
universities. Boot camps for consultant depends on a teams Performance. BioProcess Int. 14(11) 2016: 4453.
additional coaching are also offered. specific needs. 10 Pollard D et al. Standardized Economic
Locwin says that to be credible, you Aranha and Witchey-Lakshmanan Cost Modeling for Next-Generation MAb
need targeted training to build your conclude that the efforts toward Production. BioProcess Int. 14(8) 2016. 1423.
foundational knowledge. There are establishing good project management 11 Price S, Marr James Jr. Shrink Your
Inventory Costs and Make Your Staff Happier.
plenty of project managers who just pay off literally. Pharma industry
BioProcess Int. 12(11) 2014: 5255.
took their jobs because of opportunity. data suggest that companies
12 Sinclair A, Monge M, Brown A. A
But although they can function in a implementing project management Framework for Process Knowledge
certain pocket of performance, as teams improvement initiatives have seen Management. BioProcess Int. 10(11) 2012: 2229.
or projects get more complex, they appreciable return on investment 13 Locwin B. Quality Risk Assessment and
wont have the depth of skills and tools (ROI). Decision makers recognize Management Strategies for Biopharmaceutical
that are available if they just happened this, and in spite of competing Companies. BioProcess Int. 11(11) 2013: 5257.
into the role and learned it in a trial by demands for resources, project 14 Langer ES. Hiring and Staffing in
Biopharmaceutical Manufacturing: Five-Year
fire. management professionals whether
Trends Indicate Difficulty in Filling Positions.
So where are the best project as in house or outsourced expertise BioProcess Int. 14(1) 2016: 1417, 35.
managers found? In-house? Outside are deployed to facilitate projects. 15 Humphrey R. Recruiting and Market
the organization? According to
Locations. BioProcess Int. 13(1) 2015: 48. c
Share Reshape Life Sciences Facilities and
Aranha and Witchey-Lakshmanan, References
this debate is akin to the one weve 1 Aranha H, Witchey-Lakshmanan L.
How Project Management Fits into the Drug
had related to outsourcing other
Development Continuum. BioProcess Int. 8(5) S. Anne Montgomery is cofounder and
functions such as R&D and 2010: 1017. editor in chief of BioProcess International,
manufacturing. Do you have the 2 Bateman L. Of Projects and Programs. PO Box 70, Dexter, OR 97431;
required expertise in-house to address Rabb School of Continuing Studies Division of amontgomery@bioprocessintl.com.
the complexities of PM at various Graduate Professional Studies, Brandeis
stages of the development cycle? University, February 2012: projectmgmt.
This is an extended version of the article
brandeis.edu; http://projectmgmt.brandeis.edu/
Assuming you do, do your employees published in BPIs June 2017 print issue.
downloads/BRU_MSMPP_WP_Feb2012_
have the bandwidth to take on the Pharma.pdf.
additional functions on the critical 3 PMI. A Guide to the Project Management To share this article in a PDF or professionally
path to drug development? Body of Knowledge (5th Edition, Project printed format, contact Rhonda Brown,
Boutique Consulting: Given the Management Institute, Inc. Newtown Square: rhondab@fosterprinting.com, 1-866-879-9144
x194.
difficulties in grooming in-house PA, 2013).
talent, pharmaceutical companies both 4 Simn M. Bioreactor Design for Adherent
Cell Culture: The Bolt-On Bioreactor Project. Part
large and small have been touring
1: Volumetric Productivity, BioProcess Int. 13(1)
outside their own walls. Aranha and 2015: 2833; Part 2: Process Automation,
Witchey-Lakshmanan continue: BioProcess Int. 13(4) 2015: 4047; Part 2:
Boutique consulting companies Containment, Sterility, BioProcess Int. 13(5)

8 BioProcess International 15(6) Chapter 3 of 11 State of the Industry 2017

Вам также может понравиться