Вы находитесь на странице: 1из 14

HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01.07.01 TRAZO Y REPLANTEO PRELIMINAR m 14.44
1 3.80 3.80 14.44

01.01.07.02 TRAZO Y REPLANTEO DURANTE EL PROCESO m 44.33


1er piso 1 2.60 2.35 6.11
2do piso 1 2.60 4.90 12.74
3er piso 1 2.60 4.90 12.74
4to piso 1 2.60 4.90 12.74

02 ESTRUCTURAS
02.01 Movimiento de Tierras
02.01.01.01 EXCAVACION DE ZANJA EN BOLONERIA m 23.10
desde nivel de corte
losa armada 1 3.80 3.80 1.60 23.10

RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO


02.01.03.01 AFIRMADO m 7.50
de la excavacion 1 23.10 23.10
restando losa armada -1 8.66 -8.66
solado -1 14.44 0.10 -1.44
restando columnas: C-1 -4 0.25 0.25 0.90 -0.23
restando Placas: -2 2.10 0.25 0.90 -0.95
-2 1.85 0.25 0.90 -0.83
restando area de ascensor -1 2.10 1.85 0.90 -3.50

02.01.04 Eliminacion de Material Excedente


ACARREO INTERNO, MATERIAL PROCEDENTE DE
02.01.04.01 EXCAVACIONES m esponj. 30.03
Excavacin 23.10 1.30 30.03

02.01.04.02 ELIMINACION MATERIAL EXCEDENTE ACARREADO m 30.03

02.02 Obras de Concreto Simple


02.02.01 Falsos Cimientos
02.02.01.02 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION e=4 M2 14.44
losa armada 1 3.80 3.80 14.44

02.03 Obras de Concreto Armado


02.03.03 Losa de cimentacion
02.03.03.01 LOSA DE CIMENTACION.- CONCRETO f'c=315 kg/cm2 m 8.66
losa armada 1 3.80 3.80 0.60 8.66

02.03.03.02 LOSA DE CIMENTACION.- ACERO Fy=4200 kg/cm2 kg long. cantidaddensidad kg/ml 418.62
losa armada 5/8" @ 0.25 (long.) 2 4.22 16.00 1.55 209.31
5/8" @ 0.25 (trans.) 2 4.22 16.00 1.55 209.31

02.03.06 Muros reforzados


PLACAS, CONCRETO F'c=210
02.03.06.04 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 01 PISO m 7.01
1er. Piso longitudinal 1 2.10 0.25 4.35 2.28
1 2.10 0.25 1.30 0.68
1 2.10 0.25 0.75 0.39
transversal 2 1.85 0.25 3.95 3.65

PLACAS, CONCRETO F'c=210


02.03.06.05 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 02 PISO M3 4.45
2do. Piso longitudinal 1 2.10 0.25 3.05 1.60
1 2.10 0.25 0.75 0.39
transversal 2 1.85 0.25 2.65 2.45

PLACAS, CONCRETO F'c=210


02.03.06.06 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 03 PISO M3 4.45

Pgina 1 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
3er. Piso longitudinal 1 2.10 0.25 3.05 1.60
1 2.10 0.25 0.75 0.39
transversal 2 1.85 0.25 2.65 2.45

PLACAS, CONCRETO F'c=210


02.03.06.07 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 04 PISO M3 4.45
4to. Piso longitudinal 1 2.10 0.25 3.05 1.60
1 2.10 0.25 0.75 0.39
transversal 2 1.85 0.25 2.65 2.45

PLACAS, CONCRETO F'c=210


02.03.06.08 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 05 PISO M3 5.30
5to. Piso longitudinal 1 2.10 0.25 1.25 0.66
1 2.10 0.25 1.95 1.02
1 2.10 0.25 1.25 0.66
transversal 2 1.85 0.25 1.25 1.16
2 1.85 0.25 1.95 1.80

02.03.06.09 PLACAS, ENCOFRADO Y DESENCOFRADO CARAVISTA m caras 207.82


1er. Piso longitudinal 1 2.10 2.00 4.35 18.27
1 2.10 2.00 1.30 5.46
1 2.10 1.00 0.25 0.53
1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 3.95 29.23

2do. Piso longitudinal 1 2.10 2.00 3.05 12.81


1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

3er. Piso longitudinal 1 2.10 2.00 3.05 12.81


1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

4to. Piso longitudinal 1 2.10 2.00 3.05 12.81


1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

5to. Piso longitudinal 1 2.10 2.00 1.25 5.25


1 2.10 2.00 1.95 8.19
1 2.10 2.00 1.25 5.25
transversal 2 1.85 2.00 1.25 9.25
2 1.85 2.00 1.95 14.43

02.03.06.10 PLACAS, ACERO Fy=4200 kg/cm2 kg cant. long.


densidad kg/ml 1510.05
1er. Piso muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 5.43 0.56 60.82
3/8" @ 0.225m (trans.) 1 40.00 2.82 0.56 63.17

muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 2.23 0.56 24.98


3/8" @ 0.225m (trans.) 1 14.00 2.82 0.56 22.11
muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 1.27 0.56 14.22
3/8" @ 0.225m (trans.) 1 8.00 2.82 0.56 12.63

muros transversales 3/8" @ 0.225m (long.) 2 18.00 5.43 0.56 109.47


3/8" @ 0.225m (trans.) 2 38.00 2.57 0.56 109.38

2do. Piso muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 3.35 0.56 37.52
3/8" @ 0.225m (trans.) 1 30.00 2.82 0.56 47.38

muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 1.27 0.56 14.22


3/8" @ 0.225m (trans.) 1 8.00 2.82 0.56 12.63

Pgina 2 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO

muros transversales 3/8" @ 0.225m (long.) 2 18.00 3.35 0.56 67.54


3/8" @ 0.225m (trans.) 2 26.00 2.57 0.56 74.84

3er. Piso muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 3.35 0.56 37.52
3/8" @ 0.225m (trans.) 1 30.00 2.82 0.56 47.38

muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 1.27 0.56 14.22


3/8" @ 0.225m (trans.) 1 8.00 2.82 0.56 12.63

muros transversales 3/8" @ 0.225m (long.) 2 18.00 3.35 0.56 67.54


3/8" @ 0.225m (trans.) 2 26.00 2.57 0.56 74.84

4to. Piso muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 3.35 0.56 37.52
3/8" @ 0.225m (trans.) 1 30.00 2.82 0.56 47.38

muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 1.16 0.56 12.99


3/8" @ 0.225m (trans.) 1 8.00 2.82 0.56 12.63

muros transversales 3/8" @ 0.225m (long.) 2 18.00 3.35 0.56 67.54


3/8" @ 0.225m (trans.) 2 26.00 2.57 0.56 74.84

5to. Piso muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 3.91 0.56 43.79
3/8" @ 0.225m (trans.) 1 34.00 2.82 0.56 53.69

muros longitudinales 3/8" @ 0.225m (long.) 1 20.00 1.66 0.56 18.59


3/8" @ 0.225m (trans.) 1 14.00 2.82 0.56 22.11

muros transversales 3/8" @ 0.225m (long.) 2 18.00 3.91 0.56 78.83


3/8" @ 0.225m (trans.) 2 34.00 2.57 0.56 97.87

traslape muros longitudinales 1 20.00 0.55 0.56 6.16


traslape muros longitudinales 2 18.00 0.55 0.56 11.09

02.03.07 Columnas
02.03.07.04 COLUMNAS - CONCRETO 210 KG/CM - 5 piso m 0.14
CX-1 2 0.25 0.13 2.15 0.14

COLUMNAS.- CONCRETO 210 kg/cm2


02.03.07.05 C/ADIT/PLASTIFICANTE-CARAVISTA - 01 PISO M3 1.16
C-1 4 0.25 0.25 4.65 1.16

COLUMNAS.- CONCRETO 210 kg/cm2


02.03.07.06 C/ADIT/PLASTIFICANTE-CARAVISTA - 02 PISO M3 0.84
C-1 4 0.25 0.25 3.35 0.84

COLUMNAS.- CONCRETO 210 kg/cm2


02.03.07.07 C/ADIT/PLASTIFICANTE-CARAVISTA - 03 PISO M3 0.84
C-1 4 0.25 0.25 3.35 0.84

COLUMNAS.- CONCRETO 210 kg/cm2


02.03.07.08 C/ADIT/PLASTIFICANTE-CARAVISTA - 04 PISO M3 1.17
C-1 4 0.25 0.25 3.35 0.84
CX 2 0.25 0.25 2.65 0.33

COLUMNAS.- CONCRETO 210 kg/cm2


02.03.07.09 C/ADIT/PLASTIFICANTE-CARAVISTA - 05 PISO M3 0.95
C-1 4 0.25 0.25 3.80 0.95

02.03.07.10 COLUMNAS.- ENCOFRADO Y DESENCOFRADO m caras 2.71


5to. Piso CX-1 2 0.25 2.00 2.15 2.15
2 0.13 1.00 2.15 0.56

02.03.07.11 COLUMNAS.- ENCOFRADO-DESENCOFRADO CARAVIST m caras 47.66

Pgina 3 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
1er. Piso C-1 1 0.25 1.00 4.25 1.06
1 0.25 1.00 4.65 1.16
1 0.25 1.00 3.60 0.90
C-1 1 0.25 1.00 3.95 0.99
1 0.25 1.00 4.65 1.16
1 0.25 1.00 3.60 0.90
C-1 2 0.25 2.00 4.65 4.65

2do. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35

3er. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35

4to. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35
CX 2 0.25 3.00 2.65 3.98
2 0.12 1.00 2.65 0.64

5to. Piso C-1 2 0.25 2.00 3.80 3.80


2 0.25 1.00 3.35 1.68
C-1 2 0.25 2.00 3.80 3.80

02.03.07.12 COLUMNAS - ACERO Fy=4200 kg/cm2 kg cant. long.


densidad kg/ml 688.26
1er. Piso C-1 4 1/2" 4 4.00 5.43 0.99 86.01
estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 4 35.00 0.98 0.56 76.83

2do. Piso C-1 4 1/2" 4 4.00 3.35 0.99 53.06


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 4 22.00 0.98 0.56 48.29

3er. Piso C-1 4 1/2" 4 4.00 3.35 0.99 53.06


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 4 22.00 0.98 0.56 48.29

4to. Piso C-1 4 1/2" 4 4.00 3.35 0.99 53.06


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 4 22.00 0.98 0.56 48.29

CX 4 1/2" 2 4.00 3.27 0.99 25.90


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 2 22.00 0.98 0.56 24.15

5to. Piso C-1 4 1/2" 4 4.00 3.91 0.99 61.93


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 4 20.00 0.98 0.56 43.90

CX-1 4 1/2" 2 4.00 2.77 0.99 21.94


estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m 2 18.00 0.98 0.56 19.76

traslape 4 4.00 1.50 0.99 23.76

02.03.08 Vigas
02.03.08.04 VIGAS.- CONCRETO 210 kg/cm2 - 4 PISO M3 0.05
viga de confinamiento en muros sueltos 1 1.78 0.13 0.20 0.05

02.03.08.05 VIGAS.- CONCRETO 210 kg/cm2 - 5 PISO M3 0.02


viga de confinamiento en muros sueltos 1 0.76 0.13 0.20 0.02

VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF.


02.03.08.06 (CARAVISTA) - 01 PISO m 1.88
1er. Piso V-1 2 2.10 0.25 0.30 0.32
VA-1 1 2.10 0.15 0.70 0.22

Pgina 4 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
V-2' 2 1.85 0.25 0.70 0.65
V-2 1 2.55 0.25 0.70 0.45
V-2A 1 2.55 0.25 0.40 0.26

VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF.


02.03.08.07 (CARAVISTA) - 02 PISO m 2.17
2do. Piso V-1 2 2.10 0.25 0.30 0.32
VA-2 1 2.10 0.15 0.95 0.30
1 0.50 0.15 0.25 0.02
V-2' 2 1.85 0.25 0.70 0.65
V-2 2 2.55 0.25 0.70 0.89

VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF.


02.03.08.08 (CARAVISTA) - 03 PISO M3 2.17
3er. Piso V-1 2 2.10 0.25 0.30 0.32
VA-2 1 2.10 0.15 0.95 0.30
1 0.50 0.15 0.25 0.02
V-2' 2 1.85 0.25 0.70 0.65
V-2 1 2.55 0.25 0.70 0.45
V-2B 1 2.55 0.25 0.70 0.45

VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF.


02.03.08.09 (CARAVISTA) - 04 PISO M3 3.04
V-1 2 2.10 0.25 0.30 0.32
VA-3 1 2.10 0.15 0.70 0.22
1 2.60 0.10 1.30 0.34
V-2' 2 1.85 0.25 0.70 0.65
V-2C 2 2.55 0.25 0.70 0.89
2 2.43 0.10 1.30 0.63

VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF.


02.03.08.10 (CARAVISTA) - 05 PISO M3 1.66
V-1 2 2.10 0.25 0.30 0.32
V-1 2 1.85 0.25 0.30 0.28
V-3 1 2.10 0.25 0.30 0.16
V-4 1 2.10 0.25 0.15 0.08
V-3 2 1.85 0.25 0.30 0.28
sardinel superior 2 2.60 0.15 0.40 0.31
2 2.05 0.15 0.40 0.25

02.03.08.11 VIGAS.- ENCOFRADO Y DESENCOFRADO M2 caras 1.01


4to. Piso viga de confinamiento en muros sueltos 1 1.78 2.00 0.20 0.71

5to. Piso viga de confinamiento en muros sueltos 1 0.76 2.00 0.20 0.30

02.03.08.12 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA m caras 105.62


1er. Piso V-1 1 2.10 1.00 0.30 0.63
1 2.10 1.00 0.10 0.21
V-1 1 2.10 2.00 0.30 1.26
VA-1 1 2.10 1.00 0.70 1.47
1 2.10 1.00 0.50 1.05
1 2.10 1.00 0.15 0.32
V-2' 2 1.85 2.00 0.70 5.18
V-2 1 2.55 1.00 0.70 1.79
1 2.40 1.00 0.50 1.20
1 2.55 1.00 0.25 0.64
1 0.25 1.00 0.70 0.18
V-2A 1 2.55 1.00 0.40 1.02
1 2.40 1.00 0.20 0.48
1 2.55 1.00 0.25 0.64
1 0.25 1.00 0.40 0.10

2do. Piso V-1 1 2.10 1.00 0.30 0.63


1 2.10 1.00 0.10 0.21

Pgina 5 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
V-1 1 2.10 2.00 0.30 1.26
VA-2 1 2.10 1.00 0.95 2.00
1 2.10 1.00 0.75 1.58
1 2.10 1.00 0.15 0.32
1 0.50 2.00 0.25 0.25
2 0.25 1.00 0.15 0.08
V-2' 2 1.85 2.00 0.70 5.18
V-2 2 2.55 1.00 0.70 3.57
2 2.40 1.00 0.50 2.40
2 2.55 1.00 0.25 1.28
2 0.25 1.00 0.70 0.35

3er. Piso V-1 1 2.10 1.00 0.30 0.63


1 2.10 1.00 0.10 0.21
V-1 1 2.10 2.00 0.30 1.26
VA-2 1 2.10 1.00 0.95 2.00
1 2.10 1.00 0.75 1.58
1 2.10 1.00 0.15 0.32
1 0.50 2.00 0.25 0.25
2 0.25 1.00 0.15 0.08
V-2' 2 1.85 2.00 0.70 5.18
V-2 y V-2B 2 2.55 1.00 0.70 3.57
2 2.40 1.00 0.50 2.40
2 2.55 1.00 0.25 1.28
2 0.25 1.00 0.70 0.35

4to. Piso V-1 1 2.10 1.00 0.30 0.63


1 2.10 1.00 0.10 0.21
V-1 1 2.10 2.00 0.30 1.26
VA-3 1 2.10 1.00 0.70 1.47
1 2.10 1.00 0.55 1.16
1 2.10 1.00 0.15 0.32
1 2.60 2.00 1.30 6.76
2 0.10 1.00 1.30 0.26
V-2' 2 1.85 2.00 0.70 5.18
V-2C 2 2.55 1.00 0.70 3.57
2 2.40 1.00 0.50 2.40
2 2.55 1.00 0.25 1.28
2 2.43 2.00 1.30 12.61
2 0.10 1.00 1.30 0.26

5to. Piso V-1 2 2.10 1.00 0.30 1.26


2 2.10 1.00 0.10 0.42
V-1 2 1.85 1.00 0.30 1.11
2 1.85 1.00 0.10 0.37
V-3 1 2.10 1.00 0.30 0.63
1 2.10 1.00 0.10 0.21
V-4 1 2.10 1.00 0.15 0.32
1 2.10 1.00 0.25 0.53
V-3 2 1.85 1.00 0.30 1.11
2 1.85 1.00 0.15 0.56
sardinel superior 2 2.60 2.00 0.40 4.16
2 2.05 2.00 0.40 3.28

02.03.08.13 VIGAS.- ACERO Fy=4200 kg/cm2 kg cant. long.


densidad kg/ml 1309.62
1er. Piso V-1 4 1/2" 2 4.00 2.92 0.99 23.13
estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 14.00 1.08 0.56 16.93

VA-1 6 1/2" 1 6.00 2.92 0.99 17.34


2 3/8" 1 2.00 2.82 0.56 3.16
estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m c/extremo 1 15.00 1.68 0.56 14.11
1 15.00 0.68 0.56 5.71

V-2' y V-2 5 5/8" 1 5.00 5.32 1.55 41.23

Pgina 6 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
2 3/8" 1 2.00 5.12 0.56 5.73
estribo 3/8" 1 @ 0.05, 12 @ 0.10, R @ 0.20m c/extremo 1 39.00 1.88 0.56 41.06

V-2' y V-2A 5 5/8" 1 5.00 5.32 1.55 41.23


2 3/8" 1 2.00 5.12 0.56 5.73
estribo 3/8" 1 @ 0.05, 12 @ 0.10, R @ 0.20m c/extremo 1 39.00 1.88 0.56 41.06

2do. Piso V-1 4 1/2" 2 4.00 2.92 0.99 23.13


estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 14.00 1.08 0.56 16.93

VA-2 8 1/2" 1 8.00 2.92 0.99 23.13


2 3/8" 1 2.00 2.82 0.56 3.16
estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m c/extremo 1 15.00 2.18 0.56 18.31
1 15.00 0.68 0.56 5.71

V-2' y V-2 5 5/8" 2 5.00 5.32 1.55 82.46


2 3/8" 2 2.00 5.12 0.56 11.47
estribo 3/8" 1 @ 0.05, 12 @ 0.10, R @ 0.20m c/extremo 2 39.00 1.88 0.56 82.12

3er. Piso V-1 4 1/2" 2 4.00 2.92 0.99 23.13


estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 14.00 1.08 0.56 16.93

VA-2 8 1/2" 1 8.00 2.92 0.99 23.13


2 3/8" 1 2.00 2.82 0.56 3.16
estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m c/extremo 1 15.00 2.18 0.56 18.31
1 15.00 0.68 0.56 5.71

V-2' y V-2 5 5/8" 2 5.00 5.32 1.55 82.46


2 3/8" 2 2.00 5.12 0.56 11.47
estribo 3/8" 1 @ 0.05, 12 @ 0.10, R @ 0.20m c/extremo 2 39.00 1.88 0.56 82.12

4to. Piso V-1 4 1/2" 2 4.00 2.92 0.99 23.13


estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 14.00 1.08 0.56 16.93

VA-3 6 1/2" 1 6.00 2.92 0.99 17.34


2 3/8" 1 2.00 2.82 0.56 3.16
estribo 3/8" 1 @ 0.05, 5 @ 0.10, R @ 0.25m c/extremo 1 15.00 1.68 0.56 14.11
1 15.00 0.68 0.56 5.71
sardinel 6 8mm 1 6.00 2.92 0.40 7.01
3/8" @ 0.25 1 12.00 1.85 0.56 12.43

V-2' y V-2C 5 5/8" 2 5.00 5.32 1.55 82.46


2 3/8" 2 2.00 5.12 0.56 11.47
estribo 3/8" 1 @ 0.05, 12 @ 0.10, R @ 0.20m c/extremo 2 39.00 1.88 0.56 82.12
sardinel 6 8mm 2 6.00 2.87 0.40 13.78
3/8" @ 0.25 2 11.00 1.85 0.56 22.79

viga de confinamiento 4 3/8" 2 4.00 2.60 0.56 11.63


estribo 6mm: 1 @ 0.05, 5 @ 0.10, R @ 0.20m c/extremo 2 15.00 0.70 0.22 4.62

5to. Piso V-1 4 1/2" 2 4.00 2.92 0.99 23.13


estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 14.00 1.08 0.56 16.93
V-1 4 1/2" 2 4.00 2.67 0.99 21.15
estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 13.00 1.08 0.56 15.72

V-3 4 1/2" 1 4.00 2.92 0.99 11.56


estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 1 14.00 1.08 0.56 8.47
V-4 4 1/2" 1 4.00 2.92 0.99 11.56
estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 1 14.00 0.78 0.56 6.12
V-3 4 1/2" 2 4.00 2.67 0.99 21.15
estribo 3/8" 1 @ 0.05, R @ 0.15m c/extremo 2 13.00 1.08 0.56 15.72
sardinel 2 3/8" 2 2.00 2.92 0.56 6.54
3/8" @ 0.25 2 10.00 0.85 0.56 9.52

Pgina 7 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
sardinel 2 3/8" 2 2.00 2.67 0.56 5.98
3/8" @ 0.25 2 9.00 0.85 0.56 8.57

viga de confinamiento 4 3/8" 2 4.00 1.58 0.56 7.08


estribo 6mm: 1 @ 0.05, 5 @ 0.10, R @ 0.20m c/extremo 2 8.00 0.70 0.22 2.46

02.03.09 Losas Macizas


02.03.09.04 LOSAS MACIZAS.- CONC.210 kg/cm2-4 PISO m 0.94
1 2.10 2.40 0.20 1.01
menos ducto -1 0.60 0.60 0.20 -0.07

02.03.09.05 LOSAS MACIZAS.- CONC.210 kg/cm2-5 PISO m 1.55


planta n. +11.65 1 2.10 1.85 0.20 0.78
planta nivel superior 1 2.10 1.85 0.20 0.78

02.03.09.06 LOSAS MACIZAS.- ENCOFRADO Y DESENCOFRADO m 12.45


4to. Piso 1 2.10 2.40 5.04
menos ducto -1 0.60 0.60 -0.36
5to. Piso planta n. +11.65 1 2.10 1.85 3.89
planta nivel superior 1 2.10 1.85 3.89

02.03.09.07 LOSAS MACIZAS.- ACERO Fy=4,200 kg/cm2 kg cant. long.


densidad kg/ml 169.34
4to. Piso 3/8" @ 0.25m (long.) 1 22.00 2.85 0.56 35.11
3/8" @ 0.25m (trans.) 1 18.00 3.05 0.56 30.74

5to. Piso losa inferior 3/8" @ 0.25m (long.) 1 16.00 2.85 0.56 25.54
3/8" @ 0.25m (trans.) 1 18.00 2.60 0.56 26.21
losa superior 3/8" @ 0.25m (long.) 1 16.00 2.85 0.56 25.54
3/8" @ 0.25m (trans.) 1 18.00 2.60 0.56 26.21

02.03.10.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 1 PISO m 0.44


losa 1 2.10 2.40 0.05 0.25
viguetas 6 2.10 0.10 0.15 0.19

02.03.10.02 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 2 PISO m 0.44


losa 1 2.10 2.40 0.05 0.25
viguetas 6 2.10 0.10 0.15 0.19

02.03.10.03 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 3 PISO M3 0.44


losa 1 2.10 2.40 0.05 0.25
viguetas 6 2.10 0.10 0.15 0.19

02.03.10.07 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO m 15.12


1er. Piso 1 2.10 2.40 5.04
2do. Piso 1 2.10 2.40 5.04
3er. Piso 1 2.10 2.40 5.04

02.03.10.09 LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2 kg cant. long.


densidad kg/ml 78.04
1er. Piso 3/8" (superior) 6 1.00 2.85 0.56 9.58
3/8" (inferior) 6 1.00 2.85 0.56 9.58
1/4" @ 0.25m 1 9.00 3.05 0.25 6.86

2do. Piso 3/8" (superior) 6 1.00 2.85 0.56 9.58


3/8" (inferior) 6 1.00 2.85 0.56 9.58
1/4" @ 0.25m 1 9.00 3.05 0.25 6.86

3er. Piso 3/8" (superior) 6 1.00 2.85 0.56 9.58


3/8" (inferior) 6 1.00 2.85 0.56 9.58
1/4" @ 0.25m 1 9.00 3.05 0.25 6.86

02.03.10.10 LOSA ALIGERADA.- LADR. HUECO 15x30x30 und 126.00


1 15.12 8.33 125.95

02.03.20.01 GARGOLA DE CONCRETO.-TERMINADO S/DISEO UND 4.00


4 4.00

03 ARQUITECTURA

Pgina 8 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
03.01 Muros y Tabiques de Albailera
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 cm
03.01.02 (*) M2 5.83
4to. Piso 1 1.78 2.45 4.35
5to. Piso 1 0.76 1.95 1.48

03.01.05 ACERO DE REFUERZO HORIZONTAL EN MUROS 6mm KG cant. long.


densidad kg/ml 6.02
4to. Piso 1 20.00 0.76 0.22 3.34
5to. Piso 1 16.00 0.76 0.22 2.68

03.02 Revoques y Revestimientos


03.02.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR M2 caras 12.68
4to. Piso 1 1.78 2.00 2.65 9.41
5to. Piso 1 0.76 2.00 2.15 3.27

03.02.08 VESTIDURA DE DERRAMES (1:5) M 2.10


P2 1 2.10 2.10

03.02.09 BRUAS SEGUN DETALLE (1x1CM) M 7.60


en techo de cto de maquinas 1 1.30 1.30
2 2.10 4.20
1 2.10 2.10

03.03 Cielo Rasos


03.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 4.20
en techo de cto de maquinas 1 2.10 1.94 4.07
1 0.80 0.16 0.13

03.04 Pisos y Pavimentos


03.04.01 Contrapisos
CONTRAPISO DE 33mm, PARA RECIBIR BALDOSA DE
03.04.01.01 TERRAZO M2 12.35
2do. Piso 1 2.10 1.96 4.12
3er. Piso 1 2.10 1.96 4.12
4to. Piso 1 2.10 1.96 4.12

03.04.02 Pisos
PISO DE BALDOSA DE TERRAZO MONOCAPA
03.04.02.01 30X30X1.7 GRIS CLARO N 01 M2 12.35

PISO DE CEMENTO FROTACHADO Y BRUADO CON


03.04.02.05 ENDURECEDOR E=2" S/COLOREAR M2 10.08
voladizo de 4to piso 1 2.40 2.45 5.88
cto. De maquinas 1 2.10 1.94 4.07
1 0.80 0.16 0.13

03.04.02.07 ACABADO DE PISO SISTEMA MICROCEMENTO M2 9.24


1er. Piso 1 2.10 0.25 0.53
2do. Piso 1 2.60 2.55 6.63
menos contrapiso de 33mm. -1 2.10 1.96 -4.12
1 2.10 0.25 0.53
3er. Piso 1 2.60 2.55 6.63
menos contrapiso de 33mm. -1 2.10 1.96 -4.12
1 2.10 0.25 0.53
4to. Piso 1 2.60 2.55 6.63
menos contrapiso de 33mm. -1 2.10 1.96 -4.12
menos columnas -2 0.25 0.25 -0.13
menos muro de suelto -1 1.75 0.16 -0.28
1 2.10 0.25 0.53

03.04.02.08 CANALETA "MEDIA CAA" EN CIRCULACION M 7.60

Pgina 9 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
3er. Piso 1 2.60 2.60
4to. Piso 1 2.60 2.60
5to. Piso 1 2.40 2.40

03.06 Cobertura (Cubierta)


CUB.DE LADR.PASTELERO ASENTADO CON BARRO
03.06.01 e=2"C/FRAGUA M2 4.03
1 2.30 1.75 4.03

03.06.02 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA M2 4.03

CUNETA DE MORTERO P/EVACUACION PLUVIAL EN


03.06.03 TECHO =3" M 2.30
1 2.30 2.30

JUNTA DE DILATACION EN COB.LAD.PAST.C/MORTERO


03.06.04 ASFALTICO M 1.75
1 1.75 1.75

03.08 Carpintera Metlica y Herrera


03.08.01 Puertas y Ventanas de Fierro
PUERTA METALICA CONTRAPLACADA UNA HOJA CON
03.08.01.04 ORIFICIOS 1" (CISTERNA Y ASCENSOR) M2 1.68
P2 1 0.80 2.10 1.68

03.08.03 Pasamanos y Barandas


PASAMANO DE TUBO DE FIERRO 2" EN RAMPA Y
03.08.03.06 ASCENSOR, INC. PINTURA M 1.60
en voladizo de 4to. Piso 2 0.80 1.60

BARANDA METALICA EN AREA DE CIRCULACION


03.08.03.07 H=0.90M INC. PINTURA M 5.20
3er. Piso 1 2.60 2.60
4to. Piso 1 2.60 2.60

03.08.04 Escaleras Metalicas


03.08.04.02 ESCALERA P/CTO DE MAQUINAS INC. PINTURA UND 1.00
1 1.00

03.08.05 Elementos Metalicos Especiales


03.08.05.02 TAPA DE FIERRO 0.82m x 0.82m P/CTO DE MAQUINAS UND 1.00
1 1.00

03.09 Cerrajeria
03.09.02 Cerraduras
03.09.02.01 CERRADURA DE SOBREPONER TRES GOLPES EN PUERPZA 1.00
P2 1 1.00

03.09.03 Accesorios Cierre


03.09.03.02 ALDABAS PARA CANDADO PZA 1.00
P2 1 1.00

03.09.03.03 CANDADO TIPO FORTE 60 mm. PZA 1.00


P2 1 1.00

03.11 Pintura
03.11.01 Pintura de Cielos Rasos, Vigas, Columnas y Muros
03.11.01.01 SELLADO DE CONCRETO CARAVISTA M2 336.08
placas caras
1er. Piso longitudinal 1 2.10 2.00 3.00 12.60
1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.60 19.24

Pgina 10 de 14
HOJA DE SUSTENTO DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N 8190, SOL
NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

MEDIDAS
PARTIDA DESCRIPCIN UND CANT PARCIAL TOTAL
LARGO ANCHO ALTO
2do. Piso longitudinal 1 2.10 2.00 3.05 12.81
1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

3er. Piso longitudinal 1 2.10 2.00 3.05 12.81


1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

4to. Piso longitudinal 1 2.10 2.00 3.05 12.81


1 2.10 2.00 0.75 3.15
1 2.10 1.00 0.25 0.53
transversal 2 1.85 2.00 2.65 19.61

5to. Piso longitudinal 1 2.10 2.00 1.25 5.25


1 2.10 2.00 1.95 8.19
1 2.10 2.00 1.25 5.25
transversal 2 1.85 2.00 1.25 9.25
2 1.85 2.00 1.95 14.43
columnas
1er. Piso C-1 1 0.25 1.00 2.90 0.73
1 0.25 1.00 3.30 0.83
1 0.25 1.00 2.25 0.56
C-1 1 0.25 1.00 2.60 0.65
1 0.25 1.00 3.30 0.83
1 0.25 1.00 2.25 0.56
C-1 2 0.25 2.00 3.30 3.30

2do. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35

3er. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35

4to. Piso C-1 2 0.25 1.00 2.95 1.48


2 0.25 1.00 3.35 1.68
2 0.25 1.00 2.30 1.15
C-1 2 0.25 2.00 3.35 3.35
CX 2 0.25 3.00 2.65 3.98
2 0.12 1.00 2.65 0.64

5to. Piso C-1 2 0.25 2.00 3.80 3.80


2 0.25 1.00 3.35 1.68
C-1 2 0.25 2.00 3.80 3.80
vigas caravista 105.62

03.11.01.02 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS M2 4.43


CIELO RASO CON MEZCLA C:A 1:5 1 4.20 4.20
BRUAS SEGUN DETALLE (1x1CM) 1 7.60 0.03 0.23

03.11.01.03 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 13.02


TARRAJEO EN MURO: INTERIOR Y EXTERIOR 1 12.68 12.68
VESTIDURA DE DERRAMES (1:5) 1 2.10 0.16 0.34

03.11.02 Pintura de Puertas y Ventanas


03.11.02.01 PINT.ANTICOR.Y ESMALTE 2 MANOS-PTA/VENT. M2 caras 3.36
P2 1 0.80 2.00 2.10 3.36

Pgina 11 de 14
HOJA DE RESUMEN DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N


8190, SOL NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

PARTIDA DESCRIPCIN UND TOTAL

1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01.07 Trazo, Niveles y Replanteo
01.01.07.01 TRAZO Y REPLANTEO PRELIMINAR M2 14.44
01.01.07.02 TRAZO Y REPLANTEO DURANTE EL PROCESO M2 44.33
02 ESTRUCTURAS
02.01 Movimiento de Tierras
02.01.01.01 EXCAVACION DE ZANJA EN BOLONERIA M3 23.10
02.01.03 Rellenos
02.01.03.01 RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO AFIRMADO M3 7.50
02.01.04 Eliminacion de Material Excedente
02.01.04.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 30.03
02.01.04.02 ELIMINACION MATERIAL EXCEDENTE ACARREADO M3 30.03
02.02 Obras de Concreto Simple
02.02.01 Falsos Cimientos
02.02.01.02 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION e=4", 1:12 CEM/HORM M2 14.44
02.03 Obras de Concreto Armado
02.03.03 Losa de cimentacion
02.03.03.01 LOSA DE CIMENTACION.- CONCRETO f'c=315 kg/cm2 M3 8.66
02.03.03.02 LOSA DE CIMENTACION.- ACERO Fy=4200 kg/cm2 KG 418.62
02.03.06 Muros reforzados
02.03.06.04 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 01 PISO M3 7.01
02.03.06.05 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 02 PISO M3 4.45
02.03.06.06 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 03 PISO M3 4.45
02.03.06.07 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 04 PISO M3 4.45
02.03.06.08 PLACAS, CONCRETO F'c=210 kg/cm2.C/ADIT/PLASTIFICANTE-CARAVIS - 05 PISO M3 5.30
02.03.06.09 PLACAS, ENCOFRADO Y DESENCOFRADO CARAVISTA M2 207.82
02.03.06.10 PLACAS, ACERO Fy=4200 kg/cm2 KG 1510.05
02.03.07 Columnas
02.03.07.04 COLUMNAS - CONCRETO 210 KG/CM - 5 piso M3 0.14
02.03.07.05 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTA - 01 PISO M3 1.16
02.03.07.06 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTA - 02 PISO M3 0.84
02.03.07.07 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTA - 03 PISO M3 0.84
02.03.07.08 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTA - 04 PISO M3 1.17
02.03.07.09 COLUMNAS.- CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE-CARAVISTA - 05 PISO M3 0.95
02.03.07.10 COLUMNAS.- ENCOFRADO Y DESENCOFRADO M2 2.71
02.03.07.11 COLUMNAS.- ENCOFRADO-DESENCOFRADO CARAVISTA M2 47.66
02.03.07.12 COLUMNAS - ACERO Fy=4200 kg/cm2 KG 688.26
02.03.08 Vigas
02.03.08.04 VIGAS.- CONCRETO 210 kg/cm2 - 4 PISO M3 0.05
02.03.08.05 VIGAS.- CONCRETO 210 kg/cm2 - 5 PISO M3 0.02
02.03.08.06 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA) - 01 PISO M3 1.88
02.03.08.07 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA) - 02 PISO M3 2.17
02.03.08.08 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA) - 03 PISO M3 2.17
02.03.08.09 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA) - 04 PISO M3 3.04
02.03.08.10 VIGAS.- CONCRETO 210 kg/cm2 C/ADITIVO PLASTIF. (CARAVISTA) - 05 PISO M3 1.66

Pgina 12 de 14
HOJA DE RESUMEN DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N


8190, SOL NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

PARTIDA DESCRIPCIN UND TOTAL

02.03.08.11 VIGAS.- ENCOFRADO Y DESENCOFRADO M2 1.01


02.03.08.12 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA M2 105.62
02.03.08.13 VIGAS.- ACERO Fy=4200 kg/cm2 KG 1309.62
02.03.09 Losas Macizas
02.03.09.04 LOSAS MACIZAS.- CONC.210 kg/cm2-4 PISO M3 0.94
02.03.09.05 LOSAS MACIZAS.- CONC.210 kg/cm2-5 PISO M3 1.55
02.03.09.06 LOSAS MACIZAS.- ENCOFRADO Y DESENCOFRADO M2 12.45
02.03.09.07 LOSAS MACIZAS.- ACERO Fy=4,200 kg/cm2 KG 169.34
02.03.10 Losas aligeradas
02.03.10.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 1 PISO M3 0.44
02.03.10.02 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 2 PISO M3 0.44
02.03.10.03 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 3 PISO M3 0.44
02.03.10.07 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO M2 15.12
02.03.10.09 LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2 KG 78.04
02.03.10.10 LOSA ALIGERADA.- LADR. HUECO 15x30x30 UND 126.00
02.03.20 Otros
02.03.20.01 GARGOLA DE CONCRETO.-TERMINADO S/DISEO UND 4.00
03 ARQUITECTURA
03.01 Muros y Tabiques de Albailera
03.01.02 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 cm (*) M2 5.83
03.01.05 ACERO DE REFUERZO HORIZONTAL EN MUROS 6mm KG 6.02
03.02 Revoques y Revestimientos
03.02.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR M2 12.68
03.02.08 VESTIDURA DE DERRAMES (1:5) M 2.10
03.02.09 BRUAS SEGUN DETALLE (1x1CM) M 7.60
03.03 Cielo Rasos
03.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 4.20
03.04 Pisos y Pavimentos
03.04.01 Contrapisos
03.04.01.01 CONTRAPISO DE 33mm, PARA RECIBIR BALDOSA DE TERRAZO M2 12.35
03.04.02 Pisos
03.04.02.01 PISO DE BALDOSA DE TERRAZO MONOCAPA 30X30X1.7 GRIS CLARO N 01 M2 12.35
03.04.02.05 PISO DE CEMENTO FROTACHADO Y BRUADO CON ENDURECEDOR E=2" S/COLOREAR M2 10.08
03.04.02.07 ACABADO DE PISO SISTEMA MICROCEMENTO M2 9.24
03.04.02.08 CANALETA "MEDIA CAA" EN CIRCULACION M 7.60
03.06 Cobertura (Cubierta)
03.06.01 CUB.DE LADR.PASTELERO ASENTADO CON BARRO e=2"C/FRAGUA M2 4.03
03.06.02 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA M2 4.03
03.06.03 CUNETA DE MORTERO P/EVACUACION PLUVIAL EN TECHO =3" M 2.30
03.06.04 JUNTA DE DILATACION EN COB.LAD.PAST.C/MORTERO ASFALTICO M 1.75
03.08 Carpintera Metlica y Herrera
03.08.01 Puertas y Ventanas de Fierro
03.08.01.04 PUERTA METALICA CONTRAPLACADA UNA HOJA CON ORIFICIOS 1" (CISTERNA Y ASCEN M2 1.68
03.08.03 Pasamanos y Barandas
03.08.03.06 PASAMANO DE TUBO DE FIERRO 2" EN RAMPA Y ASCENSOR, INC. PINTURA M 1.60

Pgina 13 de 14
HOJA DE RESUMEN DE METRADOS - ASCENSOR

PROYECTO : MEJORAMIENTO DE LA PRESTACION DE SERVICIO EDUCATIVO EN LA I.E. DEL NIVEL SECUNDARIA N


8190, SOL NACIENTE DISTRITO DE CARABAYLLO-LIMA-LIMA
HECHO POR: ING. BLADIMIR TALES YAURI CUETO FECHA : JULIO 2016

PARTIDA DESCRIPCIN UND TOTAL

03.08.03.07 BARANDA METALICA EN AREA DE CIRCULACION H=0.90M INC. PINTURA M 5.20


03.08.04 Escaleras Metalicas
03.08.04.02 ESCALERA P/CTO DE MAQUINAS INC. PINTURA UND 1.00
03.08.05 Elementos Metalicos Especiales
03.08.05.02 TAPA DE FIERRO 0.82m x 0.82m P/CTO DE MAQUINAS UND 1.00
03.09 Cerrajeria
03.09.02 Cerraduras
03.09.02.01 CERRADURA DE SOBREPONER TRES GOLPES EN PUERTA, CON TIRADOR TIPO FORTE PZA 1.00
03.09.03 Accesorios Cierre
03.09.03.02 ALDABAS PARA CANDADO PZA 1.00
03.09.03.03 CANDADO TIPO FORTE 60 mm. PZA 1.00
03.11 Pintura
03.11.01 Pintura de Cielos Rasos, Vigas, Columnas y Muros
03.11.01.01 SELLADO DE CONCRETO CARAVISTA M2 336.08
03.11.01.02 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS M2 4.43
03.11.01.03 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 13.02
03.11.02 Pintura de Puertas y Ventanas
03.11.02.01 PINT.ANTICOR.Y ESMALTE 2 MANOS-PTA/VENT. M2 3.36

Pgina 14 de 14