RE
1
RTO
2 ZONE 1 INSTALLATION OF REBAR OF RC SUMP BASE 0800-1800 2
Total
3
VISITOR AT SITE:
General Worker 14
TOTAL 40
Prepared by RTO Representative: ALFREDO JR. ARIOS CLARO Checked by RE Representative: Muthu Senthil Kumar
(Name & signature) (Name & signature)
Remark: Photo attached (1 page)
1200MM WIDE RCU DRAIN WALL REBAR INSTALLATION ON-GOING REBAR INSTALLATION FOR RC SUMP