RD276 Appointment of Qualified Person ( Supervision) For Proposed Bus Depot at Loyang

C & V ENGINEERING PTE LTD

DAILY SITE REPORT


Date 19/3/2014 WEDNESDAY
S/N Location Chainage Nature of works Time (Hrs) Weather
8-12AM Fine Drizzle Rain
1200MM WIDE RCU DRAIN : ON GOING
1 ZONE1 INSTALLATION OF BRC WALL REBAR 0800- 1800 Condition 1-6PM Fine Drizzle Rain

RE
1

RTO
2 ZONE 1 INSTALLATION OF REBAR OF RC SUMP BASE 0800-1800 2

Total
3

3 ZONE 3 SOIL DISPOSAL TO LTA DUMPING SITE 0800-1800

VISITOR AT SITE:

CUTTING OF SOIL AT ZONE 4 FOR THE


4 ZONE 4 PROPOSED NEW ROAD 0800-1800

5 ZONE 1 BACKFILLING AND SOIL LEVELLING AT ZONE 1 0800-1800

SITE MEETING (IF ANY)

HTC MANPOWER MACHINERY

Project Manager 1 WSHO 2 EXCAVATOR 9

Project Coordinator 1 ECO 1 GENERATOR 3

Site Manager 1 Safety Supervisor 1 ROLLER (10 TONS) 2

Project Engineer 2 Quantity Surveyor 1 SOIL DRILL MACHINE

Planning Engineer SPRO 1 VOLVO TRUCK 2

Architect Surveyor 1 TIPPER TRUCK 2

Consultant Tipper Truck Operator 2 AUTO GRADER 1

QECP Excavator Operator 8 TOTAL 19

Site Supervisor 2 Volvo Truck Operator 2

General Worker 14

TOTAL 40

Prepared by RTO Representative: ALFREDO JR. ARIOS CLARO Checked by RE Representative: Muthu Senthil Kumar
(Name & signature) (Name & signature)
Remark: Photo attached (1 page)

Photos taken on 19/3/2014 WEDNESDAY


RD259 Loyang Bus Depot RD259 Loyang Bus Depot

1200MM WIDE RCU DRAIN WALL REBAR INSTALLATION ON-GOING REBAR INSTALLATION FOR RC SUMP

RD259 Loyang Bus Depot RD259 Loyang Bus Depot

CUTTING OF SOIL AT ZONE 4 ZONE 1 LEVELLING OF SOIL BY EXCAVATOR