Dutco Balfour Beatty Construction Group

Menu
make a new request

copy a request

search for a request

sort / filter records

delete record
REQUEST FOR INSPECTION / APPROVAL
No. IR - HFC-SEW - 2561

PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)

DESCRIPTION OF WORKS: BOQ ITEM :


Inspection for re -touch up of epoxy painting for valve room of

sewerage pumping station as instructed by DM

LOCATION : sewerage pumping station B.F.R.L :

CHAINAGE : sewerage pumping station

DATE OF INSPECTION: 11/7/2016 TIME 1.30:00 PM DATE OF TESTING TIME:


REQUESTED BY:
(Contractor) Kewal singh ON: 6-Nov-16 AT: 1.30:00 PM
RECEIVED BY:
ON: AT:
(Consultant)

POSITION COMMENTS SIGNATURE

INSPECTORS

SURVEYOR

MATERIAL
INSPECTOR

MATERIAL
ENGINEER

CIVIL/
DRAINAGE/

STRUCTURES
ENGINEER

QUANTITY
SURVEYOR

Approved Approved as Noted For Record only Rejected

RE's Comments:

DATE: SIGNATURE:

RECEIVED FOR CONTRACTOR: DATE:


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of
HFC-
DR 001 excavation, formation Area 1 10+100.00 10-Jul-14 12:00: 10-Jul-14 10:00: Suresh AN 25-02-2015
for gully line of G5 00 AM 00 AM

Inspection of
formation for 160mm 10+125.00
HFC-
DR 002 dia uPVC drainage Area 1 to 12-Jul-14 12:00: 12-Jul-14 10:00: Suresh Revised 25-02-2015
pipe connecting to 10+100.00 00 AM 00 AM
gully # 7
Inspection and joint
line for the connection 10+125.00
HFC- measurement of pipe
DR 003 to Gully No. 5 to MH Area 1 to 14-Jul-14 07:30: 14-Jul-14 09:30: Suresh AN 25-02-2015
laying for 160mm dia
JR/08/1/1A/1 10+100.00 00 AM 00 AM
UPVC drainage
Inspection for
2+107.50 Suresh D
HFC- excavation and sewerage line from
SEW 001 Area 6 to 14-Jul-14 12:15: 14-Jul-14 10:30: Sr. A 20-08-2014
formation of 200mm MH25 to MH24
2+052.75 00 AM 00 AM Engineer
dia UPVC
Inspection of
Suresh
HFC- excavation & MH-25 12:00:
SEW 002 Area 6 16-Jul-14 06:00: 15-Jul-14 Sr. A 20-08-2014
prepared formation for (2+107.50) 10
00 AM Engineer
MH-25 PM

Inspection for 160mm


dia UPVC pipe to main line gully no. 10+125.00 Suresh D
HFC-
DR 004 surrounded with 7 as highlighted in the Area 1 to 15-Jul-14 11:00:0 15-Jul-14 8:30:0 Sr. AN 25-02-2015
geotextile and plan 10+100.00 0 AM 0 AM Engineer
aggregate connecting

Inspection for UPVC drainage pipe


10+125.00 Suresh D
HFC- granular surround and for connecting Gully
DR 005 Area 1 to 15-Jul-14 10:00: 15-Jul-14 6:30:0 Sr. UR
closing of geotextile No. 5 to MH
10+100.00 00 AM 0 AM Engineer
for 160mm JR08/1/1A/1
Inspection of
MH- Suresh D
HFC- excavation & 12:00:
SEW 003 Area 6 24(2+052. 16-Jul-14 06:00: 15-Jul-14 Sr. A 20-08-2014
prepared formation for 10
75) 00 AM Engineer
MH-24 PM
Inspection of
Suresh D
HFC- excavation & MH-23
SEW 004 Area 6 21-Jul-14 10:00: 21-Jul-14 08:45: Sr. A 20-08-2014
prepared formation, (1+990.00)
30 AM 00 AM Engineer
bedding for Mh-23
Inspection for 1st
for connecting Gully 10+125.00 Suresh D
HFC- layer 150mm
DR 006 No. 5 to MH Area 1 to 17-Jul-14 10:30: 17-Jul-14 08:30: Sr. A 20-08-2014
backfilling of 160mm
JR08/1/1A/1 10+100.00 00 AM 10 AM Engineer
Upvc drainage pipe
Inspection for 1st
10+125.00 Suresh D
HFC- layer 150mm for connecting Gully
DR 007 Area 1 to 17-Jul-14 10:30: 17-Jul-14 08:30: Sr. A 20-08-2014
backfilling of 160mm No.7 to main line
10+100.00 00 AM 10 AM Engineer
Upvc drainage pipe

drainage pipe
Inspection for 2nd
connecting Gully No. 10+125.00 Suresh D
HFC- layer backfilling and
DR 008 5 to MH JR08/1/1A/1 Area 1 to 19-Jul-14 11:00:0 19-Jul-14 08:30: Sr. A 20-08-2014
laying of warning tape
as highlighted in the 10+100.00 0 AM 00 AM Engineer
for 160mm UPVC
drawing

drainage pipe
Inspection for 2nd
connecting Gully No. 10+125.00 Suresh D
HFC- layer backfilling and
DR 009 7 to mainline as Area 1 to 19-Jul-14 11:00:0 19-Jul-14 08:30: Sr. A 20-08-2014
laying of warning tape
highlighted in the 10+100.00 0 AM 00 AM Engineer
for 160mm UPVC
drawing

Inspection for 3rd


to the main line as 10+125.00 Suresh D
HFC- layer back filling for
DR 0010 highlighted in the Area 1 to 21-Jul-14 10:00: 21-Jul-14 08:45: Sr. A 20-08-2014
Gully UPVC 160mm
drawing 10+100.00 00 AM 00 AM Engineer
dia pipe, for Gully # 7

Inspection for 3rd


for Gully # 5 to the
layer & final layer 10+125.00 Suresh D
HFC- main line as
DR 0011 back filling for Gully Area 1 to 21-Jul-14 10:00: 21-Jul-14 08:45: Sr. A 20-08-2014
highlighted in the
UPVC 160mm dia 10+100.00 00 AM 00 AM Engineer
drawing
pipe,

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of
2+052.75 Suresh D
HFC- excavation & dia sewer UPVC pipe
SEW 005 Area 6 to 21-Jul-14 10:30: 21-Jul-14 08:45: Sr. A 20-08-2014
prepared formation, line MH-24 to MH-23
1+990.00 00 AM 00 AM Engineer
bedding for 200mm
Inspection of
dia sewer UPVC pipe 1+990.00 Suresh D
HFC- excavation &
SEW 006 line from MH-23 to Area 6 to 23-Jul-14 11:00:0 23-Jul-14 09:00: Sr. A 20-08-2014
prepared formation,
MH-22 1+906.31 0 AM 00 AM Engineer
bedding for 200mm
Inspection of
Suresh D
HFC- excavation & dia sewer UPVC pipe
SEW 007 Area 6 1+906.31 23-Jul-14 11:00:0 23-Jul-14 09:00: Sr. A 20-08-2014
prepared formation, line for MH-22
0 AM 00 AM Engineer
bedding for 200mm
Inspection of
1+600.00 Suresh D
HFC- excavation & dia pressure sewer
SEW 008 Area 1 to 24-Jul-14 08:00: 23-Jul-14 10:45: Sr. Revised 14-09-2014
prepared formation, line
1+630.00 00 AM 00 AM Engineer
bedding for 200mm
Inspection for 4th
10+125.00 Suresh D
HFC- layer back filling, for connecting Gully 7
DR 0012 Area 1 to 26-Jul-14 08:00: 24-Jul-14 11:45: Sr. A 20-08-2014
160mm dia UPVC to main line
10+100.00 00 AM 00 AM Engineer
drainage pipe,

Inspection for
excavation & MH-22 to Suresh D
HFC-
SEW 009 formation preparation Area 6 Chainage 26-Jul-14 08:00: 24-Jul-14 11:45: Sr. A 20-08-2014
for sewer line 200mm 1+896 00 AM 00 AM Engineer
dia upvc pipe

Inspection for
excavation & Suresh D
HFC- 1+856 to
SEW 0010 formation preparation Area 6 27-Jul-14 09:30: 26-Jul-14 11:45: Sr. A 20-08-2014
MH-21
for sewer line 200mm 00 AM 00 AM Engineer
dia upvc pipe

Inspection for
excavation & Suresh D
HFC- MH-21 to
SEW 0011 formation preparation Area 6 27-Jul-14 09:30: 26-Jul-14 11:45: Sr. A 13-09-2014
MH-20
for sewer line 200mm 00 AM 00 AM Engineer
dia upvc pipe

Inspection for
excavation & Suresh D
HFC- MH-21
SEW 0012 formation preparation Area 6 27-Jul-14 09:30: 26-Jul-14 11:45: Sr. A 20-08-2014
(1+846.86)
for sewer Manhole 00 AM 00 AM Engineer
MH-21
Inspection of
excavation & Suresh D
HFC- 1+600 to
SEW 0013 prepared formation for Area 1 30-Jul-14 10:30: 30-Jul-14 09:15: Sr. A 20-08-2014
1+650
sewer pressure line 00 AM 00 AM Engineer
200mm
Inspection for pipe
Suresh D
HFC- laying with aggregate for sewer line 200mm MH-23 to 03:00:
SEW 0014 Area 6 2-Aug-14 09:30: 31-Jul-14 Sr. Revised 4-08-2014
surrounding & dia UPVC pipe MH-22 00
00 AM Engineer
geotextile PM
Inspection for pipe
Suresh D
HFC- laying with aggregate for sewer line 200mm MH-22 to 03:00:
SEW 0015 Area 6 2-Aug-14 09:30: 31-Jul-14 Sr. Revised 4-08-2014
surrounding & dia UPVC pipe MH-21 00
00 AM Engineer
geotextile PM

Inspection for
Suresh D
HFC- excavation & 1+650 to 04:30: Supeseded
SEW 0016 Area 1 2-Aug-14 08:30: 31-Jul-14 Sr. C
prepared formation for 1+680 00 by rfa no 206
00 AM Engineer
sewer pressure line PM

Inspection for
excavation & Suresh D
HFC- 10+070 to 04:30:
ETC 001 prepared formation of Area 1 2-Aug-14 09:00: 31-Jul-14 Sr. A 20-08-2014
10+150 00
Etisalat Duct 4 x 100 00 AM Engineer
PM
dia

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-25,
MH-24, Suresh D
HFC- Inspection for sewer
SEW 0017 Area 6 MH-23, 2-Aug-14 09:00: 2-Aug-14 08:00: Sr. A 20-08-2014
line Manhole blinding
MH-22, & 00 AM 00 AM Engineer
MH-21

Inspection for
Suresh D
HFC- excavation of 1+680 to Supeseded
SEW 0018 Area 1 3-Aug-14 09:30: 3-Aug-14 08:00: Sr. C
prepared formation for 1+710 by rfa no 223
00 AM 00 AM Engineer
sewer pressure line

Inspection for pipe


Suresh D
HFC- laying with aggregate for sewer line 200mm MH-24 TO
SEW 0019 Area 6 3-Aug-14 09:30: 3-Aug-14 08:00: Sr. Revised 4-08-2014
surrounding & dia uPVC pipe MH-23
00 AM 00 AM Engineer
geotextile
Inspection for pipe
Suresh D
HFC- laying with aggregate for sewer line 200mm MH-23 to
SEW 0014A Area 6 6-Aug-14 11:30:0 6-Aug-14 10:00: Sr. AN 29-09-2014
surrounding & dia UPVC pipe MH-22
0 AM 00 AM Engineer
geotextile
Inspection for pipe
Suresh D
HFC- laying with aggregate for sewer line 200mm MH-22 to
SEW 0015A Area 6 6-Aug-14 11:30:0 6-Aug-14 10:00: Sr. AN 29-09-2014
surrounding & dia UPVC pipe MH-21
0 AM 00 AM Engineer
geotextile
Inspection for pipe
Suresh D
HFC- laying with aggregate for sewer line 200mm MH-21 to
SEW 0020 Area 6 6-Aug-14 11:30:0 6-Aug-14 10:00: Sr. AN 29-09-2014
surrounding & dia UPVC pipe MH-20
0 AM 00 AM Engineer
geotextile
Inspection for bottom
Suresh D
HFC- of pipe (top of sand) 10+070 to
ETC 002 Area 1 7-Aug-14 9:30 7-Aug-14 08:00: Sr. A 1-09-2014
for Etisalat Duct 10+150
00 AM Engineer
(4x100)mm
Visual inspection for
Suresh D
HFC- 1st back filling layer of MH-22 TO
SEW 0021 Area 6 11-Aug-14 11:30 11-Aug-14 10:00: Sr. A 9-01-2014
200mm dia UPVC MH-23
00 AM Engineer
sewer pipe
Visual inspection for
Suresh D
HFC- 1st back filling layer of MH-21 TO
SEW 0022 Area 6 11-Aug-14 11:30 11-Aug-14 10:00: Sr. A 1-09-2014
200mm dia UPVC MH-22
00 AM Engineer
sewer pipe
Visual inspection for
Suresh D
HFC- 1st back filling layer of MH-20 TO
SEW 0023 Area 6 11-Aug-14 11:30 11-Aug-14 10:00: Sr. A 9-01-2014
200mm dia UPVC MH-21
00 AM Engineer
sewer pipe
Inspection for water
above of blinding
HFC- proofing (Polyprimes Kiran, Sr.
SEW 0024 concrete for sewer Area 6 MH-22 12-Aug-14 11:30 12-Aug-14 09:30: Revised 28-09-2014
B + Bitustic + Screed Engineer
manhole 00 AM
25mm)
Inspection for water
above of blinding
HFC- proofing (Polyprimes Kiran, Sr.
SEW 0025 concrete for sewer Area 6 MH-23 12-Aug-14 11:30 12-Aug-14 09:30: Revised 28-09-2014
B + Bitustic + Screed Engineer
manhole 00 AM
25mm)
Inspection for water
above of blinding
HFC- proofing (Polyprimes Kiran, Sr.
SEW 0026 concrete for sewer Area 6 MH-24 12-Aug-14 11:30 12-Aug-14 09:30: Revised 28-09-2014
B + Bitustic + Screed Engineer
manhole 00 AM
25mm)
Inspection for water
above of blinding
HFC- proofing (Polyprimes Kiran, Sr.
SEW 0027 concrete for sewer Area 6 MH-25 12-Aug-14 11:30 12-Aug-14 09:30: Revised 28-09-2014
B + Bitustic + Screed Engineer
manhole 00 AM
25mm)

Inspection for
excavation and MH- 0+268.79
HFC- Kiran, Sr.
SEW 0028 formation preparation 1.12 to to 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
Engineer
for sewer line 200mm MH 1.11 0+185.70 00 AM
dia UPVC pipe

Inspection for
HFC- excavation and MH- Kiran, Sr.
SEW 0029 0+268.79 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
formation preparation 1.12 Engineer
00 AM
for sewerage Manhole

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
HFC- excavation and MH- Kiran, Sr.
SEW 0030 0+185.70 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
formation preparation 1.11 Engineer
00 AM
for sewerage Manhole

Inspection for 2nd


MH-23
HFC- layer backfilling of 1+990 to Kiran, Sr.
SEW 0031 to MH- 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
sewer pipe 200mm 1+906.31 Engineer
22 00 AM
dia UPVC
Inspection for 2nd
MH-22 1+906.31
HFC- layer backfilling of Kiran, Sr.
SEW 0032 to MH- to 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
sewer pipe 200mm Engineer
21 1+846.86 00 AM
dia UPVC
Inspection for 2nd
MH-21 1+846.86
HFC- layer backfilling of Kiran, Sr.
SEW 0033 to MH- to 13-Aug-14 10:30 13-Aug-14 07:15: A 13-09-2014
sewer pipe 200mm Engineer
20 1+811.63 00 AM
dia UPVC

Inspection for
MH-
excavation and
HFC- 1.11 to 0+185.7 to Kiran, Sr.
SEW 0034 formation preparation 16-Aug-14 09:30: 16-Aug-14 08:00: A 13-09-2014
MH- 0+101.62 Engineer
for sewer line 200mm 00 AM 00 AM
1.10
dia UPVC pipe

Inspection for
HFC- excavation and MH- Kiran, Sr.
SEW 0035 0+101.62 16-Aug-14 09:30: 16-Aug-14 08:00: A 13-09-2014
formation preparation 1.10 Engineer
00 AM 00 AM
for sewer MH-1.10

Inspection for Etisalat


duct laying D-54,
HFC- 10+070 to Kiran, Sr.
ETC 003 4way surrounded with Area 1 16-Aug-14 09:30: 16-Aug-14 08:00: Revised 9-01-2014
10+150 Engineer
suitasble excavated 00 AM 00 AM
material

Inspection for
MH-
excavation and
HFC- 1.12 to 0+268.79 04:50: Kiran, Sr.
SEW 0036 formation preparation 17-Aug-14 09:30: 16-Aug-14 A 13-09-2014
MH to 0+356.0 00 Engineer
for sewer line 200mm 00 AM
1.13 PM
dia UPVC pipe

Inspection for
HFC- excavation and MH- 04:50: Kiran, Sr.
SEW 0037 0+356.0 17-Aug-14 09:30: 16-Aug-14 A 13-09-2014
formation preparation 1.13 00 Engineer
00 AM
for sewer Manhole PM

Inspection for
MH-
excavation and 0+078.78
HFC- 1.7.3 to 04:50: Kiran, Sr.
SEW 0038 formation preparation to 17-Aug-14 09:30: 16-Aug-14 A 13-09-2014
MH- 00 Engineer
for sewer line 200mm 0+162.32 00 AM
1.7.2 PM
dia UPVC pipe

Inspection for
HFC- excavation and MH- 04:50: Kiran, Sr.
SEW 0039 0+078.78 17-Aug-14 09:30: 16-Aug-14 A 13-09-2014
formation preparation 1.7.3 00 Engineer
00 AM
for sewer Manhole PM
Inspection for
HFC- excavation and MH- 04:50: Kiran, Sr.
SEW 0040 0+0162.32 17-Aug-14 09:30: 16-Aug-14 A 13-09-2014
formation preparation 1.7.2 00 Engineer
00 AM
for sewer Manhole PM
Inspection for
MH-
excavation and 0+356.00
HFC- between MH-1.13 to 1.13 to Kiran, Sr.
SEW 0041 prepared formation for to 18-Aug-14 10:00: 18-Aug-14 07:00: A 13-09-2014
MH-1.14 MH- Engineer
200mm uPVC 0+439.70 00 AM 00 AM
1.14
sewerage line
Inspection for Upvc 200mm dia
MH-
granular bedding, sewerage line and 0+268.79
HFC- 1.12 to Kiran, Sr.
SEW 0042 laying geotextile, joint granular surrounding, to 18-Aug-14 10:00: 18-Aug-14 07:00: AN 29-09-2014
MH- Engineer
measurements for between MH-1.12 to 0+185.70 00 AM 00 AM
1.11
pipe laying MH-1.11

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
HFC- excavation and MH- Kiran, Sr.
SEW 0043 0+439.7 18-Aug-14 10:00: 18-Aug-14 07:00: A 13-09-2014
prepared formation for 1.14 Engineer
00 AM 00 AM
sewerage MH-1.14

MH-
Inspection for Upvc 200mm dia
1.11 to
granular bedding, sewerage line and
HFC- MH- 0+185.7 to 04:30: Kiran, Sr.
SEW 0044 laying geotextile, joint granular surrounding, 19-Aug-14 09:00: 18-Aug-14 C 20/8/14
1.12 0+101.62 00 Engineer
measurements for between MH-1.11 to 00 AM
(Road PM
pipe laying MH-1.12
IR-3)

MH-
Inspection for Upvc 200mm dia
1.12 to
granular bedding, sewerage line and
HFC- MH- 0+268.79 Kiran, Sr.
SEW 0045 laying geotextile, joint granular surrounding, 20-Aug-14 10:30: 20-Aug-14 09:00: AN 9-01-2014
1.13 to 0+356.0 Engineer
measurements for between MH-1.12 to 00 AM 00 AM
(Road
pipe laying MH-1.13
IR-3)

MH-
Inspection for 1.7.2 to
excavation and MH-
HFC- between MH-1.7.2 to 0+162.32 01:30: Kiran, Sr.
SEW 0046 prepared formation for 1.7.1 20-Aug-14 03:00: 20-Aug-14 A 13-09-2014
MH-1.7.1 to 0+244.9 00 Engineer
250mm dia uPVC (Road 00 PM
PM
sewerage line IR-1)
Area 7

MH-
1.14,
MH-
Inspection of pouring
1.13, 0+439.7 /
blinding concrete for
HFC- MH- 0+356.0 / 03:50: Kiran, Sr.
SEW 0047 sewer MH-1.14, MH- 21-Aug-14 07:30: 20-Aug-14 A 28-09-2014
1.12 & 0+268.79 / 00 Engineer
1.13, MH-1.12 & MH- 00 AM
MH- 0+185.7 PM
1.11
1.11
(Area
8 / IR-3)

MH-
Inspection of pouring 1.7.3 &
HFC- blinding concrete for MH- 0+078.78 / 03:50: Kiran, Sr.
SEW 0048 21-Aug-14 07:30: 20-Aug-14 A 28-09-2014
sewer MH-1.7.3 & 1.7.2 0+162.32 00 Engineer
00 AM
MH-1.7.2 (Area PM
7 / IR-1)
MH-23
Inspection for 3rd
to MH-
HFC- layer back filling for 1+990.0 to 03:50: Kiran, Sr.
SEW 0049 22 21-Aug-14 08:00: 20-Aug-14 A 13-09-2014
200mm dia uPVC 1+906.31 00 Engineer
(Area 6 00 AM
from MH-23 to MH-22 PM
- IR-1)
MH-22
Inspection for 3rd
to MH- 1+906.31
HFC- layer back filling for 03:50: Kiran, Sr.
SEW 0050 21 to 21-Aug-14 08:00: 20-Aug-14 A 13-09-2014
200mm dia uPVC 00 Engineer
(Area 6 1+846.86 00 AM
from MH-22 to MH-21 PM
- IR-1)
MH-21
Inspection for 3rd
to MH- 1+846.86
HFC- layer back filling for 03:50: Kiran, Sr.
SEW 0051 20 to 21-Aug-14 08:00: 20-Aug-14 A 13-09-2014
200mm dia uPVC 00 Engineer
(Area 6 1+811.63 00 AM
from MH-21 to MH-20 PM
- IR-1)

Inspection for MH-


HFC- excavation and 1.7.1 03:50: Kiran, Sr.
SEW 0052 0+244.9 21-Aug-14 08:00: 20-Aug-14 A 13-09-2014
prepared formation for Area 7 00 Engineer
30 AM
seweage MH-1.7.1 (IR-1) PM

MH-1.12 to
Visual inspection for
MH-1.11
HFC- 1st layer back filling from MH-1.12 to MH- Area 8 01:30: Kiran, Sr.
SEW 0053 (0+268.79 23-Aug-14 09:00: 21-Aug-14 A 9-01-2014
of 200mm dia UPVC 1.11 (IR-3) 00 Engineer
to 30 AM
sewer pipe PM
0+185.7)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.11 to
Visual inspection for
MH-1.10
HFC- 1st layer back filling from MH-1.11 to MH- Area 8 01:30: Kiran, Sr.
SEW 0054 (0+185.7 23-Aug-14 09:00: 21-Aug-14 A 9-01-2014
of 200mm dia UPVC 1.10 (IR-3) 00 Engineer
to 30 AM
sewer pipe PM
0+101.62)

MH-1.7.3
laying 250mm upvc
Inspection of granular to MH-
sewer line and
HFC- bedding, laying Area 7 1.7.2 01:30: Kiran, Sr.
SEW 0055 granular surrounding 23-Aug-14 08:00: 21-Aug-14 AN 9-01-2014
geotextile, joint (IR-1) (0+078.78 00 Engineer
from MH-1.7.3 to MH- 00 AM
measurements of pipe to PM
1.7.2
0+162.32)

laying 200mm upvc MH-1.14


Inspection of granular
sewer line and to MH-1.13
HFC- bedding, laying Area 8 Kiran, Sr.
SEW 0056 granular surrounding (0+439.70 23-Aug-14 10:00: 23-Aug-14 08:00: AN 9-01-2014
geotextile, joint (IR-3) Engineer
from MH-1.14 to MH- to 00 AM 00 AM
measurements of pipe
1.13 0+356.00)

Inspection for Upvc 200mm dia MH-1.11


granular bedding, sewerage line and to MH-1.10
HFC- Area 8 03:00: Kiran, Sr.
SEW 0057 laying geotextile, joint granular surrounding, (0+185.7 25-Aug-14 07:30: 24-Aug-14 AN 9-01-2014
(IR-3) 00 Engineer
measurements for between MH-1.11 to to 00 AM
PM
pipe laying MH-1.10 0+101.62)

Inspection for Upvc 200mm dia MH-25 to


granular bedding, sewerage line and MH-24
HFC- Area 6 04:30: Kiran, Sr.
SEW 0058 laying geotextile, joint granular surrounding, (2+107.5 25-Aug-14 10:00: 24-Aug-14 AN 9-01-2014
(IR-1) 00 Engineer
measurements for between MH-25 to to 00 AM
PM
pipe laying MH-24 2+052.75)
Inspection for
MH-1.7.1
excavation and
HFC- Area 7 to MH-1.7 Kiran, Sr.
SEW 0059 prepared formation for 25-Aug-14 10:30: 25-Aug-14 09:00: A 28-09-2014
(IR-1) (0+244.9 Engineer
seweage line from 00 AM 00 AM
to 0+320)
MH-1.7.1 to MH-1.7
MH-1.7.2
Inspection for Upvc 250mm dia
to MH-
granular bedding, sewerage line and
HFC- Area 7 1.7.1 04:00: Kiran, Sr.
SEW 0060 laying geotextile, joint granular surrounding, 26-Aug-14 09:30: 25-Aug-14 AN 9-01-2014
(IR-1) (0+162.32 00 Engineer
measurements for between MH-1.7.2 to 00 AM
to PM
pipe laying MH-1.7.1
0+244.9)
Inspection for Upvc 200mm dia MH-24 TO
granular bedding, sewerage line and MH-23
HFC- Area 6 Kiran, Sr.
SEW 019A laying geotextile, joint granular surrounding, (2+052.75 26-Aug-14 09:00: 26-Aug-14 07:00: AN 9-01-2014
(IR-1) Engineer
measurements for between MH-24 to to 00 AM 00 AM
pipe laying MH-23 1+990.0)

MH-1.14 to
Visual inspection for
MH-1.13
HFC- 1st back filling layer of from MH-1.14 to MH- Area 8 Kiran, Sr.
SEW 0061 (0+439.7 26-Aug-14 10:30: 26-Aug-14 08:30: A 1-08-2014
200mm dia UPVC 1.13 (IR-3) Engineer
to 00 AM 00 AM
sewer pipe
0+356.0)

MH-1.13 to
Visual inspection for
MH-1.12
HFC- 1st back filling layer of from MH-1.13 to MH- Area 8 Kiran, Sr.
SEW 0062 (0+356.00 26-Aug-14 10:30: 26-Aug-14 08:30: A 9-01-2014
200mm dia UPVC 1.12 (IR-3) Engineer
to 00 AM 00 AM
sewer pipe
0+268.0)

MH-1.12 to
Inspection for 2nd
MH-1.11
HFC- back filling layer of from MH-1.12 to MH- Area 8 Kiran, Sr.
SEW 0063 (0+268.79 26-Aug-14 10:30: 26-Aug-14 08:30: A 28-09-2014
200mm dia UPVC 1.11 (IR-3) Engineer
to 00 AM 00 AM
sewer pipe
0+185.7)

MH-1.11 to
Inspection for 2nd
MH-1.10
HFC- back filling layer of from MH-1.11 to MH- Area 8 Kiran, Sr.
SEW 0064 (0+185.7 26-Aug-14 10:30: 26-Aug-14 08:30: A 28-09-2014
200mm dia UPVC 1.10 (IR-3) Engineer
to 00 AM 00 AM
sewer pipe
0+101.62)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for MH-2.6 to


excavation and MH-2.5
HFC- between MH-2.6 to Area 9 04:00: Kiran, Sr.
SEW 0065 prepared formation for (0+474.95 27-Aug-14 09:30: 26-Aug-14 A 28-09-2014
MH-2.5 (IR-4) 00 Engineer
200mm uPVC to 00 AM
PM
sewerage line 0+405.24)
Inspection for
HFC- excavation and Area 9 MH-2.6 04:00: Kiran, Sr.
SEW 0066 Manhole - MH-2.6 27-Aug-14 09:30: 26-Aug-14 A 28-09-2014
prepared formation for (IR-4) (0+474.95) 00 Engineer
00 AM
sewerage PM
Inspection for
HFC- excavation and Area 9 MH-2.5 04:00: Kiran, Sr.
SEW 0067 Manhole - MH-2.5 27-Aug-14 09:30: 26-Aug-14 A 26-10-2014
prepared formation for (IR-4) (0+452.24) 00 Engineer
00 AM
sewerage PM
Inspection for sewer
HFC- Manhole formworks Area 6 MH-25 04:00: Kiran, Sr.
SEW 0068 Manhole No. MH-25 27-Aug-14 07:30: 26-Aug-14 Revised 13-09-2014
for casting base with (IR-1) (2+107.5) 00 Engineer
00 AM
benching PM
Inspection for sewer
HFC- Manhole formworks Area 6 MH-23 04:00: Kiran, Sr.
SEW 0069 Manhole No. MH-23 27-Aug-14 07:30: 26-Aug-14 Revised 13-09-2014
for casting base with (IR-1) (1+990.0) 00 Engineer
00 AM
benching PM
Inspection for sewer
HFC- Manhole formworks Area 6 MH-21 04:00: Kiran, Sr.
SEW 0070 Manhole No. MH-21 27-Aug-14 07:30: 26-Aug-14 Revised 13-09-2014
for casting base with (IR-1) (1+846.6) 00 Engineer
00 AM
benching PM
Visula inspection for MH-25 -
HFC- 1st backfilling layer of Area 6 MH 24 ( 2 Kiran, Sr.
SEW 0071 From MH 25 - MH 24 28-Aug-14 09:00: 28-Aug-14 11:00: A 9-01-2014
sewer line 200 mm (IR-1) + 107.5 to Engineer
00 AM 00 AM
UPVC pipe 2+052.75 )

Inspection for pouring


HFC- Area 7 MH-1.7.1 Kiran, Sr.
SEW 0072 blinding concrete for 27-Aug-14 09:30: 27-Aug-14 08:00: Revised 13-09-2014
(IR-1) (0+244.8) Engineer
sewerage MH-1.7.1 00 AM 00 AM

MH-24 -
Visual inspection for
MH 23
HFC- 1st backfilling layer of Area 6 Kiran, Sr.
SEW 0073 From MH 24 - MH 23 ( 2+052.7 28-Aug-14 09:00: 28-Aug-14 11:00: A 9-01-2014
sewer line 200 mm (IR-1) Engineer
5 to 00 AM 00 AM
UPVC pipe
1+990.00)
MH-23 -
Inspection for 4th
MH 22
HFC- back filling layer of Area 6 Kiran, Sr.
SEW 0074 from MH-23 to MH-22 ( 1+990.0 28-Aug-14 09:00: 28-Aug-14 11:00: Revised 13-09-2014
200mm dia UPVC (IR-1) Engineer
0 to 00 AM 00 AM
sewer pipe
1+906.31)
MH-22 -
Inspection for 4th
MH 21
HFC- back filling layer of Area 6 Kiran, Sr.
SEW 0075 from MH-22 to MH-21 ( 1+906.3 28-Aug-14 09:00: 28-Aug-14 11:00: Revised 13-09-2014
200mm dia UPVC (IR-1) Engineer
1 to 00 AM 00 AM
sewer pipe
1+846.86)
MH-21 -
Inspection for 4th
MH 20
HFC- back filling layer of Area 6 Kiran, Sr.
SEW 0076 from MH-21 to MH-20 (1+846.86 28-Aug-14 09:00: 28-Aug-14 11:00: Revised 13-09-2014
200mm dia UPVC (IR-1) Engineer
to 00 AM 00 AM
sewer pipe
1+811.63)

Inspection for pouring MH-2.6


HFC- Area 9 Kiran, Sr.
SEW 0077 blinding concrete for (0+474.95 28-Aug-14 09:00: 28-Aug-14 11:00: Revised 13-09-2014
(IR-4) Engineer
sewerage MH-2.6 ) 00 AM 00 AM

Inspection for pouring MH-2.5


HFC- Area 9 Kiran, Sr.
SEW 0078 blinding concrete for (0+405.24 28-Aug-14 09:00: 28-Aug-14 11:00: Revised 13-09-2014
(IR-4) Engineer
sewerage MH-2.5 ) 00 AM 00 AM

Inspection for MH-2.5 &


excavation and MH-2.4
HFC- between MH-2.5 & Area 9 Kiran, Sr.
SEW 0079 prepared formation for (0+405.24 30-Aug-14 11:00:0 30-Aug-14 09:00: A 28-09-2014
MH-2.4 (IR-4) Engineer
200mm dia Upvc pipe to 0 AM 00 AM
of sewerage 0+335.52)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
HFC- excavation and Area 9 Kiran, Sr.
SEW 0080 MH-2.4 MH-2.4 30-Aug-14 11:00:0 30-Aug-14 09:00: A 28-09-2014
prepared formation for (IR-4) Engineer
0 AM 00 AM
sewerage
sewerage pipe line
Inspection for MH-1.7.1
250mm Upvc &
HFC- granular bedding, Area 7 & MH-1.7 Kiran, Sr.
SEW 0081 granular surrounding 31-Aug-14 08:00: 30-Aug-14 10:00: AN 29-09-2014
laying geotextile, joint (IR-1) (0+244.9 Engineer
between MH-1.7.1 & 00 AM 00 AM
measurements for to 0+320)
MH-1.7
sewerage pipe line
Inspection for
200mm Upvc &
HFC- granular bedding, Area 9 MH-2.6 & Kiran, Sr.
SEW 0082 granular surrounding 31-Aug-14 08:00: 30-Aug-14 10:00: AN 29-09-2014
laying geotextile, joint (IR-4) MH-2.5 Engineer
between MH-2.6 & 00 AM 00 AM
measurements for
MH-2.5
Inspection for
HFC- excavation and 200mm dia Upvc from Area 9 MH-2.4 & 02:30: Kiran, Sr.
SEW 0083 31-Aug-14 08:00: 30-Aug-14 A 28-09-2014
prepared formation for MH-2.4 to MH-2.3 (IR-4) MH-2.3 00 Engineer
00 AM
sewer line PM
Visual inspection for
MH-1.7.3
HFC- 1st layer back filling from MH-1.7.3 to MH- Area 7 02:30: Kiran, Sr.
SEW 0084 & MH- 31-Aug-14 08:00: 30-Aug-14 A 1-10-2014
sewer line 250mm 1.7.2 (IR-1) 00 Engineer
1.7.2 00 AM
Upvc PM
Visual inspection for
MH-1.7.2
HFC- 1st layer back filling from MH-1.7.2 to MH- Area 7 02:30: Kiran, Sr.
SEW 0085 & MH- 31-Aug-14 08:00: 30-Aug-14 A 14-09-2014
sewer line 250mm 1.7.1 (IR-1) 00 Engineer
1.7.1 00 AM
Upvc PM

Inpection of
HFC- excavation and Area 9 MH-2.3 Kiran, Sr.
SEW 0086 31-Aug-14 09:00: 31-Aug-14 07:00: A 28-09-2014
prepared formation for (IR-4) (0+267.57) Engineer
00 AM 00 AM
the sewerage MH-2.3

Inspection for
Supeseded
HFC- excavation and 1+710 to Kiran, Sr.
SEW 0087 Area 1 31-Aug-14 10:00: 31-Aug-14 08:20: C by rfa no
preparation for sewer 1+764 Engineer
00 AM 00 AM 336,515A
pressure line
MH-2.3 to
Inspection for
MH-2.4
HFC- excavation & 200mm uPVC from Area 9 02:00: Kiran, Sr.
SEW 0088 (0+267.57 1-Sep-14 08:00: 31-Aug-14 A 28-09-2014
prepared formation for MH-2.3 to MH-2.4 (IR-4) 00 Engineer
to 00 AM
sewer line PM
0+198.46)
Inspection for
HFC- excavation & Area 9 MH-2.2 02:00: Kiran, Sr.
SEW 0089 MH-2.2 1-Sep-14 08:00: 31-Aug-14 A 28-09-2014
prepared formation for (IR-4) (0+198.46) 00 Engineer
00 AM
sewerage PM
Inspection for blinding MH-MH-
concrete surface manhole MH-1.14, 1.14, MH-
HFC- Area 8 Kiran, Sr.
SEW 0090 preparation prior to MH-1.13, MH-1.12 & 1.13, MH- 1-Sep-14 09:00: 1-Sep-14 08:00: A 4-09-2014
(IR-3) Engineer
primer coating for MH-1.11 1.12 & 00 AM 00 AM
sewer MH-1.11
Inspection for blinding
concrete surface MH-1.7.3
HFC- Manhole MH-1.7.3 & Area 7 Kiran, Sr.
SEW 0091 preparation prior to & MH- 1-Sep-14 09:00: 1-Sep-14 08:00: A 4-09-2014
MH-1.7.2 (IR-1) Engineer
primer coating for 1.7.2 00 AM 00 AM
sewer
Inspection for water MH-1.14,
manhole MH-1.14,
HFC- proofi ng (polyprime Area 8 MH-1.13, Kiran, Sr.
SEW 0092 MH-1.13, MH-1.12 & 1-Sep-14 10:30: 1-Sep-14 08:00: A 13-09-2014
SB+Bitustick XL) for (IR-3) MH-1.12 & Engineer
MH-1.11 00 AM 00 AM
sewer MH-1.11
Inspection for water
MH-1.7.3
HFC- proofi ng (polyprime manhole MH-1.7.3 & Area 7 Kiran, Sr.
SEW 0093 & MH- 1-Sep-14 10:30: 1-Sep-14 08:00: A 13-09-2014
SB+Bitustick XL) for MH-1.7.2 (IR-1) Engineer
1.7.2 00 AM 00 AM
sewer
Inspection for sewer
HFC- Manhole formworks Area 6 MH-25 Kiran, Sr.
SEW 068A Manhole No. MH-25 1-Sep-14 03:00: 1-Sep-14 11:00: A 28-09-2014
for casting base with (IR-1) (2+107.5) Engineer
00 PM 00 AM
benching

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for sewer


HFC- Manhole formworks Area 6 MH-23 Kiran, Sr.
SEW 0069A Manhole No. MH-23 1-Sep-14 03:00: 1-Sep-14 11:00: A 28-09-2014
for casting base with (IR-1) (1+990.0) Engineer
00 PM 00 AM
benching
Inspection for sewer
HFC- Manhole formworks Area 6 MH-21 Kiran, Sr.
SEW 0070A Manhole No. MH-21 1-Sep-14 03:00: 1-Sep-14 11:00: A 28-09-2014
for casting base with (IR-1) (1+846.6) Engineer
00 PM 00 AM
benching
Inspection for sewer
HFC- Manhole formworks Manhole No. MH- Area 7 MH-1.7.2 Kiran, Sr.
SEW 0094 1-Sep-14 03:00: 1-Sep-14 11:00: A 28-09-2014
for casting base with 1.7.2 (IR-1) (0+162.32) Engineer
00 PM 00 AM
benching
Inspection of
MH-21.2 to
excavation and
HFC- between MH-21.2 to Area 6 MH-21.3 02:30: Kiran, Sr.
SEW 0095 prepared formation for 2-Sep-14 03:30: 2-Sep-14 A 27-09-2014
MH-21.3 (IR-8) (0+117.59 00 Engineer
200mm Upvc 00 PM
to 0+070) PM
Sewerage line
Inspection of MH-21.3 to
excavation and MH-21.1
HFC- between MH-21.3 to Area 6 02:30: Kiran, Sr.
SEW 0096 prepared formation for (0+070.00 2-Sep-14 03:30: 2-Sep-14 A 27-09-2014
MH-21.1 (IR-8) 00 Engineer
200mm Upvc - 00 PM
PM
Sewerage line 0+046.91)
Inspection of
MH-21.3 to
excavation and
HFC- between MH-21.3 to Area 6 MH-22 02:30: Kiran, Sr.
SEW 0097 prepared formation for 2-Sep-14 03:30: 2-Sep-14 A 27-09-2014
MH-22 (IR-8) (0+070.00 00 Engineer
200mm Upvc 00 PM
- 1+906.3) PM
Sewerage line

MH-21.1,
Inspection of MH-21.2 &
excavation and MH-21.3
HFC- Manhole MH-21.1, Area 6 02:30: Kiran, Sr.
SEW 0098 prepared formation for (0+046.91, 2-Sep-14 03:30: 2-Sep-14 A 27-09-2014
MH-21.2 , MH-21.3 (IR-8) 00 Engineer
200mm Upvc 0+117.59 00 PM
PM
Sewerage line &
0+070.00)

MH-2.4,
MH-2,3 &
Inspection for blinding MH-2.2
HFC- MH-2,4, MH-2.3 & Area 9 02:30: Kiran, Sr.
SEW 0099 concrete for (0+335.52, 2-Sep-14 04:00: 2-Sep-14 A 28-09-2014
MH-2.2 (IR-4) 00 Engineer
sewerage manhole 0+267.57 00 PM
PM
&
0+198.48)

Inspection for pouring


HFC- Area 7 MH-1.7.1 Kiran, Sr.
SEW 0072A blinding concrete for 2-Sep-14 04:00: 2-Sep-14 A 28-09-2014
(IR-1) (0+244.8) Engineer
sewerage MH-1.7.1 00 PM

Inspection for pouring MH-2.6


HFC- Area 9 Kiran, Sr.
SEW 077A blinding concrete for (0+474.95 2-Sep-14 04:00: 2-Sep-14 A 28-09-2014
(IR-4) Engineer
sewerage MH-2.6 ) 00 PM

Inspection for pouring MH-2.5


HFC- Area 9 Kiran, Sr.
SEW 0078A blinding concrete for (0+405.24 2-Sep-14 04:00: 2-Sep-14 A 29-09-2014
(IR-4) Engineer
sewerage MH-2.5 ) 00 PM

sewerage pipe line MH-2.5 &


Inspection for
200mm Upvc & MH-2.4
HFC- granular bedding, Area 9 Kiran, Sr.
SEW 0100 granular surrounding (0+405.24 4-Sep-14 09:00: 3-Sep-14 11:50: AN 29-09-2014
laying geotextile, joint (IR-4) Engineer
between MH-2.5 & to 00 AM 00 AM
measurements for
MH-2.4 0+335.52)
sewerage pipe line MH-2.4 &
Inspection for
200mm Upvc & MH-2.3
HFC- granular bedding, Area 9 Kiran, Sr.
SEW 0101 granular surrounding (0+335.52 4-Sep-14 09:00: 3-Sep-14 11:50: AN 29-09-2014
laying geotextile, joint (IR-4) Engineer
between MH-2.4 & to 00 AM 00 AM
measurements for
MH-2.3 0+267.57)
Visual inspection of MH-1.7.1
HFC- 1st layer back filling from MH-1.7.1 to MH- Area 7 & MH-1.7 Kiran, Sr.
SEW 0102 4-Sep-14 09:00: 4-Sep-14 07:30: A 13-09-2014
for sewer line 250mm 1.7 (IR-1) (0+244.9 Engineer
00 AM 00 AM
Upvc pipe to 0+320)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-2.6 TO
Visual inspection of
MH-2.6
HFC- 1st layer back filling from MH-2.6 to MH- Area 9 Kiran, Sr.
SEW 0103 (0+1+474. 4-Sep-14 09:00: 4-Sep-14 07:30: A 13-09-2014
for sewer line 200mm 2.5 (IR-4) Engineer
99 to 00 AM 00 AM
Upvc pipe
0+405.24))

Inspection for Etisalat


duct laying D-54,
HFC- 10+070 to 03:15: Kiran, Sr.
ETC 003A 4way surrounded with Area 1 6-Sep-14 09:00: 4-Sep-14 A 29-09-2014
10+150 00 Engineer
suitasble excavated 00 AM
PM
material

MH-2.5 &
Inspection & joint
sewerage pipe line MH-2.4
HFC- measurement for pipe Area 9 03:15: Kiran, Sr.
SEW 0100A 200mm Upvc MH-2.5 (0+405.24 6-Sep-14 09:00: 4-Sep-14 A 29-09-2014
laying and granular (IR-4) 00 Engineer
& MH-2.4 to 00 AM
surrounding for PM
0+335.52)
MH-2.4 &
Inspection & joint
sewerage pipe line MH-2.3
HFC- measurement for pipe Area 9 03:15: Kiran, Sr.
SEW 0101A 200mm Upvc MH-2.4 (0+335.52 6-Sep-14 09:00: 4-Sep-14 AN 29-09-2014
laying and granular (IR-4) 00 Engineer
& MH-2.3 to 00 AM
surrounding for PM
0+267.57)
Inspection for MH-2.3 &
& granular
granular bedding, MH-2.2
HFC- surrounding for sewer Area 9 03:15: Kiran, Sr.
SEW 0104 laying geotextile, joint (0+267.57 7-Sep-14 08:00: 6-Sep-14 AN 29-09-2014
line from MH-2.3 to (IR-4) 00 Engineer
measurement of pipe to 00 AM
MH-2.2 PM
laying 0+198.46)
Inspection for 2nd MH-25 to
layer backfilling for MH-24
HFC- Area 6 03:15: Kiran, Sr.
SEW 0105 sewer line 200mm dia (2+107.5 7-Sep-14 09:30: 6-Sep-14 A 9-10-2014
(IR-1) 00 Engineer
uPVC pipe from MH- to 00 AM
PM
25 to MH-24 2+052.75)
MH-24 to
Inspection for 2nd
MH-23
layer backfilling for
HFC- Area 6 ( 2+052.75 03:15: Kiran, Sr.
SEW 0106 sewer line 200mm dia 7-Sep-14 09:30: 6-Sep-14 A 9-10-2014
(IR-1) to 00 Engineer
uPVC pipe from MH- 00 AM
1+9990.90 PM
24 to MH-23
)
MH-23 -
Inspection for 4th
MH 22
HFC- back filling layer of Area 6 03:15: Kiran, Sr.
SEW 0074A from MH-23 to MH-22 ( 1+990.0 7-Sep-14 09:30: 6-Sep-14 A 9-10-2014
200mm dia UPVC (IR-1) 00 Engineer
0 to 00 AM
sewer pipe PM
1+906.31)
MH-22 -
Inspection for 4th
MH 21
HFC- back filling layer of Area 6 03:15: Kiran, Sr.
SEW 0075A from MH-22 to MH-21 ( 1+906.3 7-Sep-14 09:30: 6-Sep-14 A 9-10-2014
200mm dia UPVC (IR-1) 00 Engineer
1 to 00 AM
sewer pipe PM
1+846.86)
MH-21 -
Inspection for 4th
MH 20
HFC- back filling layer of Area 6 03:15: Kiran, Sr.
SEW 0076A from MH-21 to MH-20 (1+846.86 7-Sep-14 09:30: 6-Sep-14 A 9-10-2014
200mm dia UPVC (IR-1) 00 Engineer
to 00 AM
sewer pipe PM
1+811.63)

MH-2.6,
MH-2.5,
Inspection for water MH-2.4 &
manhole Blinding
HFC- proofi ng (polyprime Area 9 MH-2.2 04:00: Kiran, Sr.
SEW 0107 concrete MH-2.6, MH- 8-Sep-14 09:00: 7-Sep-14 A 29-09-2014
SB+Bitustick XL) for (IR-4) ( 0+474.95 00 Engineer
2.5, MH-2.4 & MH-2.2 00 AM
sewer , 0+405.24, PM
0+335.52,
0+198.46 )

Inspection for water


HFC- proofi ng (polyprime manhole Blinding Area 7 MH-1.7.1 04:00: Kiran, Sr.
SEW 0108 8-Sep-14 09:00: 7-Sep-14 A 29-09-2014
SB+Bitustick XL) for concrete MH-1.7.1 (IR-1) ( 0+244.9 ) 00 Engineer
00 AM
sewer PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.3
Inspection of
to MH-
excavation and
HFC- between MH-1.7.3 to Area 7 1.7.4 04:00: Kiran, Sr.
SEW 0109 prepared formation for 8-Sep-14 09:30: 7-Sep-14 A 9-10-2014
MH-1.7.4 (IR-1) ( 0+078.78 00 Engineer
250mm Upvc 00 AM
TO PM
Sewerage line
0+004.60 )

Inspection of
MH-1.7.4
HFC- excavation and Area 7 04:00: Kiran, Sr.
SEW 0110 MH-1.7.4 ( 0+004.60 8-Sep-14 09:30: 7-Sep-14 A 9-10-2014
prepared formation for (IR-1) 00 Engineer
) 00 AM
Sewerage Manhole PM

MH-1.14 to
Inspection for 2nd
MH-1.13
HFC- Layer back filling of from MH-1.14 to MH- Area 8 04:00: Kiran, Sr.
SEW 0111 (0+439.70 8-Sep-14 09:30: 7-Sep-14 A 9-10-2014
200mm dia UPVC 1.13 (IR-3) 00 Engineer
to 00 AM
sewer pipe PM
0+356.00 )

MH-1.13 to
Inspection for 2nd
MH-1.12
HFC- Layer back filling of from MH-1.13 to MH- Area 8 04:00: Kiran, Sr.
SEW 0112 (0+356.00 8-Sep-14 09:30: 7-Sep-14 A 8-10-2014
200mm dia UPVC 1.12 (IR-3) 00 Engineer
to 00 AM
sewer pipe PM
0+268.79 )

MH-1.12 to
Inspection for 2nd
MH-1.11
HFC- back filling layer of from MH-1.12 to MH- Area 8 04:00: Kiran, Sr.
SEW 0063A (0+268.79 8-Sep-14 09:30: 7-Sep-14 A 8-10-2014
200mm dia UPVC 1.11 (IR-3) 00 Engineer
to 00 AM
sewer pipe PM
0+185.7)

MH-1.11 to
Inspection for 2nd
MH-1.10
HFC- back filling layer of from MH-1.11 to MH- Area 8 04:00: Kiran, Sr.
SEW 0064A (0+185.7 8-Sep-14 09:30: 7-Sep-14 A 9-10-2014
200mm dia UPVC 1.10 (IR-3) 00 Engineer
to 00 AM
sewer pipe PM
0+101.62)

Inspection for
MH-21.2 to
granular bedding, and granular
HFC- from MH-21.2 to MH- Area 6 MH-21.3 05:00: Kiran, Sr.
SEW 0113 laying geotextile, joint surrounding for sewer 9-Sep-14 09:30: 8-Sep-14 AN 29-09-2014
21.3 (IR-1) (0+117.59 00 Engineer
measurement of pipe line 200mm dia uPVC 00 AM
to 0+070) PM
laying
Inspection for MH-21.3 to
granular bedding, and granular MH-21.1
HFC- from MH-21.3 to MH- Area 6 05:00: Kiran, Sr.
SEW 0114 laying geotextile, joint surrounding for sewer (0+070.00 9-Sep-14 09:30: 8-Sep-14 AN 29-09-2014
21.1 (IR-1) 00 Engineer
measurement of pipe line 200mm dia uPVC - 00 AM
PM
laying 0+046.91)
Inspection for MH-21.3 to
granular bedding, and granular MH-22
HFC- from MH-21.3 to MH- Area 6 05:00: Kiran, Sr.
SEW 0115 laying geotextile, joint surrounding for sewer (0+070.00 9-Sep-14 09:30: 8-Sep-14 AN 29-09-2014
22 (IR-1) 00 Engineer
measurement of pipe line 200mm dia uPVC - 00 AM
PM
laying 1+906.31)
Inspection for sewer
HFC- Manhole formworks Manhole No. MH- Area 7 MH-1.7.3 Kiran, Sr.
SEW 0116 10-Sep-14 11:0:00 10-Sep-14 09:00: A 1-10-2014
for casting base with 1.7.3 (IR-1) (0+078.78) Engineer
AM 00 AM
benching
Inspection for sewer
HFC- Manhole formworks Manhole No. MH- Area 7 MH-1.7.4 Kiran, Sr.
SEW 0117 10-Sep-14 11:0:00 10-Sep-14 09:00: A 1-10-2014
for casting base with 1.7.4 (IR-1) (0+004.60) Engineer
AM 00 AM
benching
Inspection for sewer
HFC- Manhole formworks Manhole No. MH- MH-1.7.5 Kiran, Sr.
SEW 0118 Area 5 10-Sep-14 11:0:00 10-Sep-14 09:00: A 1-10-2014
for casting base with 1.7.5 (0+107.65) Engineer
AM 00 AM
benching
MH-1.7.3
Inspection for
to MH-
granular bedding, and granular
HFC- from MH-1.7.3 to MH- Area 7 1.74.4 Kiran, Sr.
SEW 0119 laying geotextile, joint surrounding for sewer 10-Sep-14 11:0:00 10-Sep-14 09:00: Revised 13-09-2014
1.7.4 (IR-1) (0+078.78 Engineer
measurement of pipe line 250mm dia uPVC AM 00 AM
to
laying
0+004.6)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-2.2 to
Inspection of
200mm dia uPVC MH-2.1
HFC- excavation and Area 9 02:00: Kiran, Sr.
SEW 0120 pipe line from MH-2.2 (0+198.46 11-Sep-14 08:0:0 10-Sep-14 A 8-10-2014
prepared formation for (IR-4) 00 Engineer
to MH-2.1 to 0 AM
Sewerage line PM
0+135.14)
Inspection of
excavation and
HFC- Area 9 MH-2.1 02:00: Kiran, Sr.
SEW 0121 prepared formation for 11-Sep-14 08:0:0 10-Sep-14 A 8-10-2014
(IR-4) (0+135.14) 00 Engineer
Sewerage Manhole 0 AM
PM
MH 2.1
MH-2.5 to
Visual inspection for
MH-2.4
HFC- 1st layer backfilling for from MH-2.5 to MH- Area 9 02:00: Kiran, Sr.
SEW 0122 (0+405.24 11-Sep-14 09:0:0 10-Sep-14 A 28-09-2014
sewer line 200mm dia 2.4 (IR-4) 00 Engineer
to 0 AM
uPVC PM
0+335.52)
MH-2.4 to
Visual inspection for
MH-2.3
HFC- 1st layer backfilling for from MH-2.4 to MH- Area 9 02:00: Kiran, Sr.
SEW 0123 (0+335.52 11-Sep-14 09:0:0 10-Sep-14 A 21-09-2014
sewer line 200mm dia 2.3 (IR-4) 00 Engineer
to 0 AM
uPVC PM
0+267.57)
MH-2.3 to
Visual inspection for
MH-2.2
HFC- 1st layer backfilling for from MH-2.3 to MH- Area 9 02:00: Kiran, Sr.
SEW 0124 ( 0+267.57 11-Sep-14 09:0:0 10-Sep-14 A 21-09-2014
sewer line 200mm dia 2.2 (IR-4) 00 Engineer
to 0 AM
uPVC PM
0+198.46)
MH-1.7.3
Visual inspection for to MH-
HFC- 2nd layer backfilling from MH-1.7.3 to MH- Area 7 1.7.2 02:00: Kiran, Sr.
SEW 0125 11-Sep-14 08:0:0 10-Sep-14 A 21-09-2014
for sewer line 250mm 1.7.2 (IR-1) ( 0+078.78 00 Engineer
0 AM
dia uPVC to PM
0+162.32)

MH-1.7.2
Visual inspection for to MH-
HFC- 2nd layer backfilling from MH-1.7.2 to MH- Area 7 1.7.1 02:00: Kiran, Sr.
SEW 0126 11-Sep-14 08:0:0 10-Sep-14 A 21-09-2014
for sewer line 250mm 1.7.1 (IR-1) ( 0+162.32 00 Engineer
0 AM
dia uPVC to PM
0+244.9)

Visual inspection for MH-1.7.1


HFC- 2nd layer backfilling from MH-1.7.1 to MH- Area 7 to MH-1.7 ( 02:00: Kiran, Sr.
SEW 0127 11-Sep-14 08:0:0 10-Sep-14 A 21-09-2014
for sewer line 250mm 1.7 (IR-1) 0+244.9 to 00 Engineer
0 AM
dia uPVC 0+320.00) PM

Inspection for sewer


MH-1.7.6
HFC- Manhole formworks Manhole No. MH- Area 7 03:00: Kiran, Sr.
SEW 0128 ( 0+057.35 11-Sep-14 09:0:0 10-Sep-14 A 8-10-2014
for casting base with 1.7.6 (IR-1) 00 Engineer
) 0 AM
benching PM
MH-1.7.3
Inspection for 3rd to MH-
HFC- layer backfilling for from MH-1.7.3 to MH- Area 7 1.7.2 Kiran, Sr.
SEW 0129 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 250mm dia 1.7.2 (IR-1) ( 0+078.78 Engineer
0 AM 00 AM
uPVC to
0+162.32)

MH-1.7.2
Inspection for 3rd to MH-
HFC- layer backfilling for from MH-1.7.2 to MH- Area 7 1.7.1 Kiran, Sr.
SEW 0130 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 250mm dia 1.7.1 (IR-1) ( 0+162.32 Engineer
0 AM 00 AM
uPVC to
0+244.9)

Inspection for 3rd MH-1.7.1


HFC- layer backfilling for from MH-1.7.1 to MH- Area 7 to MH-1.7 ( Kiran, Sr.
SEW 0131 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 250mm dia 1.7 (IR-1) 0+244.9 to Engineer
0 AM 00 AM
uPVC 0+320.00)

MH-1.14 to
Inspection for 3rd
MH-1.13
HFC- layer backfilling for from MH-1.14to MH- Area 8 Kiran, Sr.
SEW 0132 (0+439.70 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia 1.13 (IR-3) Engineer
to 0 AM 00 AM
uPVC
0+356.00 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.13 to
Inspection for 3rd
MH-1.12
HFC- layer backfilling for from MH-1.13 to MH- Area 8 Kiran, Sr.
SEW 0133 (0+356.00 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia 1.12 (IR-3) Engineer
to 0 AM 00 AM
uPVC
0+268.79 )

MH-1.12 to
Inspection for 3rd
MH-1.11
HFC- layer backfilling for from MH-1.12 to MH- Area 8 Kiran, Sr.
SEW 0134 (0+268.79 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia 1.11 (IR-3) Engineer
to 0 AM 00 AM
uPVC
0+185.7)

MH-1.11 to
Inspection for 3rd
MH-1.10
HFC- layer backfilling for from MH-1.11 to MH- Area 8 Kiran, Sr.
SEW 0135 (0+185.7 13-Sep-14 09:0:0 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia 1.10 (IR-3) Engineer
to 0 AM 00 AM
uPVC
0+101.62)

MH-2.6 to
Inspection for 2nd
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 Kiran, Sr.
SEW 0136 (0+474.95 13-Sep-14 09:30: 13-Sep-14 07:00: A 28-09-2014
sewer line 200mm dia 2.5 (IR-4) Engineer
to 00 AM 00 AM
uPVC
0+405.24)
MH-2.5 to
Inspection for 2nd
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 Kiran, Sr.
SEW 0137 (0+405.24 13-Sep-14 09:30: 13-Sep-14 07:00: A 29-09-2014
sewer line 200mm dia 2.4 (IR-4) Engineer
to 00 AM 00 AM
uPVC
0+335.52)
MH-2.4 to
Inspection for 2nd
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 Kiran, Sr.
SEW 0138 (0+335.52 13-Sep-14 09:30: 13-Sep-14 07:00: A 28-09-2014
sewer line 200mm dia 2.3 (IR-4) Engineer
to 00 AM 00 AM
uPVC
0+267.57)
MH-2.3 to
Inspection for 2nd
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 Kiran, Sr.
SEW 0139 ( 0+267.57 13-Sep-14 09:30: 13-Sep-14 07:00: A 28-09-2014
sewer line 200mm dia 2.2 (IR-4) Engineer
to 00 AM 00 AM
uPVC
0+198.48)
MH-25 to
Inspection for 3rd
MH-24
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0140 from MH-25 to MH-24 ( 2+107.5 13-Sep-14 09:30: 13-Sep-14 07:00: A 19-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM 00 AM
uPVC
2+052.75)
MH-24 to
Inspection for 3rd
MH-23
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0141 from MH-24 to MH-23 ( 2+052.7 13-Sep-14 09:30: 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia (IR-1) Engineer
5 to 00 AM 00 AM
uPVC
1+990.00 )
MH-1.7.3
Inspection for
to MH-
granular bedding, and granular
HFC- from MH-1.7.3 to MH- Area 7 1.74.4 Kiran, Sr.
SEW 0119A laying geotextile, joint surrounding for sewer 13-Sep-14 09:30: 13-Sep-14 08:00: AN 28-09-2014
1.7.4 (IR-1) (0+078.78 Engineer
measurement of pipe line 250mm dia uPVC 00 AM 00 AM
to
laying
0+004.6)

Inspection for
HFC- surrounding backfilling 10+070 to Kiran, Sr.
ETC 004 Area 1 13-Sep-14 09:30: 13-Sep-14 08:00: A 28-09-2014
for Etisalat duct 4-way 10+150 Engineer
00 AM 00 AM
D-54

MH-23 to
Inspection for 5th
MH-22
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0142 from MH-23 to MH-22 ( 1+990.0 13-Sep-14 10:00: 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia (IR-1) Engineer
0 to 00 AM 00 AM
uPVC
1+906.31 )
MH-22 to
Inspection for 5th
MH-21
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0143 from MH-22 to MH-21 ( 1+906.31 13-Sep-14 10:00: 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM 00 AM
uPVC
1+846.86 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-21 to
Inspection for 5th
MH-20
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0144 from MH-21 to MH-20 (1+846.86 13-Sep-14 10:00: 13-Sep-14 07:00: A 9-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM 00 AM
uPVC
1+811.63 )

MH-21.2 to
Visual inspection of
MH-21.3
HFC- 1st layer backfilling for from MH-21.2 to MH- 04:15: Kiran, Sr.
SEW 0145 Area 6 (0+117.59 14-Sep-14 09:00: 13-Sep-14 A 28-09-2014
200mm dia uPVC 21.3 00 Engineer
to 00 AM
sewer line PM
0+070.00 )

MH-21.3 to
Visual inspection of
MH-21.1
HFC- 1st layer backfilling for from MH-21.3 to MH- 04:15: Kiran, Sr.
SEW 0146 Area 6 (0+070.00 14-Sep-14 09:00: 13-Sep-14 A 28-09-2014
200mm dia uPVC 21.1 00 Engineer
to 00 AM
sewer line PM
0+046.91)

MH-21.3 to
Visual inspection of
MH-22
HFC- 1st layer backfilling for from MH-21.3 to MH- 04:15: Kiran, Sr.
SEW 0147 Area 6 (0+070.00 14-Sep-14 09:00: 13-Sep-14 A 28-09-2014
200mm dia uPVC 22 00 Engineer
to 00 AM
sewer line PM
1+906.31)
MH-20 to
Inpection of
MH-19
HFC- excavation and 04:30: Kiran, Sr.
SEW 0148 from MH-20 to MH-19 Area 6 (1+811.63 14-Sep-14 10:00 13-Sep-14 A 9-10-2014
prepared formation for 00 Engineer
to
200mm dia sewer line PM
1+728.99)
Inpection of
excavation and
HFC- MH-20 04:30: Kiran, Sr.
SEW 0149 prepared formation for MH-20 Area 6 14-Sep-14 10:00 13-Sep-14 Revised 21-09-2014
(1+811.63) 00 Engineer
200mm dia sewer line
PM
Manhole
Inpection of
excavation and MH-19
HFC- 04:30: Kiran, Sr.
SEW 0150 prepared formation for MH-19 Area 6 (1+1728.9 14-Sep-14 10:00 13-Sep-14 Revised 21-09-2014
00 Engineer
200mm dia sewer line 9)
PM
Manhole
Visual inspection for
HFC- 1st layer backfilling for 10+070 to Kiran, Sr.
ETC 005 Area 1 15-Sep-14 09:00: 15-Sep-14 08:30: A 28-09-2014
Etisalat duct 4-way 10+150 Engineer
00 AM 00 AM
D54
Inspection for MH-2.2 to
granular bedding, and granular MH-2.1
HFC- Area 9 Kiran, Sr.
SEW 0151 laying geotextile, joint surrounding for sewer from MH-2.2 o MH-2.1 (0+198.46 15-Sep-14 10:00: 15-Sep-14 08:30: AN 14-10-2014
(IR-4) Engineer
measurement of pipe line 200mm dia uPVC to 00 AM 00 AM
laying 0+135.14)

MH-1.14 to
Inspection for air test MH-1.13
HFC- from MH-1.14 to MH- Area 8 Kiran, Sr.
SEW 0152 for sewer line 200mm (0+439.70 15-Sep-14 09:00: 15-Sep-14 08:30: C 18-09-2014
1.13 (IR-3) Engineer
dia uPVC to 00 AM 00 AM
0+356.00 )

MH-1.7.3
to MH-
Inspection for air test
HFC- from MH-1.7.3 to MH- Area 7 1.7.2 Kiran, Sr.
SEW 0153 for sewer line 250mm 15-Sep-14 09:00: 15-Sep-14 08:30: Revised 18-09-2014
1.7.2 (IR-1) (0+078.78 Engineer
dia uPVC 00 AM 00 AM
to
0+162.32)

Inspection of shutter,
HFC- reinforcement and MH-22 Kiran, Sr.
SEW 0154 manhole, MH-22 Area 6 15-Sep-14 03:00: 15-Sep-14 09:30: A 8-10-2014
concreting for base (1+906.31) Engineer
00 PM 00 AM
slab for sewerage

Inspection of shutter,
HFC- reinforcement and Area 8 MH-1.14 10:30: 03:30: Kiran, Sr.
SEW 0155 manhole, MH-1.14 16-Sep-14 15-Sep-14 A 8-10-2014
concreting for base (IR-3) (0+439.70) 00PM 00 Engineer
slab for sewerage PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
HFC- reinforcement and Area 8 MH-1.13 10:30: 03:30: Kiran, Sr.
SEW 0156 manhole, MH-1.13 16-Sep-14 15-Sep-14 A 8-10-2014
concreting for base (IR-3) (0+356.0) 00PM 00 Engineer
slab for sewerage PM

Inspection for MH-16.2 to


excavation and MH-16.3
HFC- from MH-16.2 to MH- Area 6 09:00: 03:30: Kiran, Sr.
SEW 0157 prepared formation for (0+108.28 16-Sep-14 15-Sep-14 A 8-10-2014
16.3 (IR-1) 00AM 00 Engineer
200mm Upvc sewer to
PM
line 0+063.63)

Inspection for MH-16.3 to


excavation and MH-16.1
HFC- from MH-16.3 to MH- Area 6 09:00: 03:30: Kiran, Sr.
SEW 0158 prepared formation for (0+063.63 16-Sep-14 15-Sep-14 A 8-10-2014
16.1 (IR-1) 00AM 00 Engineer
200mm Upvc sewer to
PM
line 0+040.00)

Inspection for MH-16.3 to


excavation and MH-7
HFC- from MH-16.3 to MH- Area 6 09:00: 03:30: Kiran, Sr.
SEW 0159 prepared formation for (0+063.63 16-Sep-14 15-Sep-14 A 8-10-2014
17 (IR-1) 00AM 00 Engineer
200mm Upvc sewer to
PM
line 1+562.05)
Inspection for
excavation and
HFC- MH-16.2 09:00: 03:30: Kiran, Sr.
SEW 0160 prepared formation for MH-16.2 Area 6 16-Sep-14 15-Sep-14 A 8-10-2014
(0+108.28) 00AM 00 Engineer
200mm Upvc sewer
PM
manhole
Inspection for
excavation and
HFC- MH-16.3 09:00: 03:30: Kiran, Sr.
SEW 0161 prepared formation for MH-16.3 Area 6 16-Sep-14 15-Sep-14 A 8-10-2014
(0+063.63) 00AM 00 Engineer
200mm Upvc sewer
PM
manhole
Inspection for
excavation and
HFC- MH-16.1 09:00: 03:30: Kiran, Sr.
SEW 0162 prepared formation for MH-16.1 Area 6 16-Sep-14 15-Sep-14 A 8-10-2014
(0+040.00) 00AM 00 Engineer
200mm Upvc sewer
PM
manhole
MH-1.7.3
Visual inspection for to MH-
HFC- 1st layer backfilling for from MH-1.7.3 to MH- Area 7 1.7.4 09:30: 03:30: Kiran, Sr.
SEW 0163 16-Sep-14 15-Sep-14 A 1-10-2014
250mm upvc sewer 1.7.4 (IR-1) (0+078.78 00AM 00 Engineer
line to PM
0+004.60)

MH-1.13 to
Inspection for 4th MH-1.12
HFC- from MH-1.13 to MH- Area 8 09:30: 03:30: Kiran, Sr.
SEW 0164 layer back filling for (0+396.00 16-Sep-14 15-Sep-14 A 9-10-2014
1.12 (IR-3) 00AM 00 Engineer
200mm sewer line to
PM
0+268.79)

MH-1.12 to
Inspection for 4th MH-1.11
HFC- from MH-1.12 to MH- Area 8 09:30: 03:30: Kiran, Sr.
SEW 0165 layer back filling for ( 0+268.79 16-Sep-14 15-Sep-14 A 9-10-2014
1.11 (IR-3) 00AM 00 Engineer
200mm sewer line to
PM
0+185.70)

MH-1.11 to
Inspection for 4th MH-1.10
HFC- from MH-1.11 to MH- Area 8 09:30: 03:30: Kiran, Sr.
SEW 0166 layer back filling for ( 0+185.70 16-Sep-14 15-Sep-14 A 9-10-2014
1.10 (IR-3) 00AM 00 Engineer
200mm sewer line to
PM
0+101.62)

MH-1.7.2
to MH-
Inspection for 4th
HFC- from MH-1.7.2 to MH- Area 7 1.7.1 09:30: 03:30: Kiran, Sr.
SEW 0167 layer back filling for 16-Sep-14 15-Sep-14 A 9-10-2014
1.7.1 (IR-1) ( 0+162.32 00AM 00 Engineer
250mm sewer line
to PM
0+244.9)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.1
Inspection for 4th to MH-1.7
HFC- from MH-1.7.1 to MH- Area 7 09:30: 03:30: Kiran, Sr.
SEW 0168 layer back filling for (0+244.9 16-Sep-14 15-Sep-14 A 9-10-2014
1.7 (IR-1) 00AM 00 Engineer
250mm sewer line to
PM
0+320.00)
MH-18 to
Inspection for excav
MH-19
HFC- ation and prepared Area 6 09:30: 03:30: Kiran, Sr.
SEW 0169 from MH-18 to MH-19 (1+645.43 16-Sep-14 15-Sep-14 A 9-10-2014
formation for 200mm (IR-1) 00AM 00 Engineer
to
upvc sewer line PM
1+728.89)

Inspection for blinding


HFC- Area 7 MH-1.7.4 09:30: 03:30: Kiran, Sr.
SEW 0170 concrete for 200mm MH-1.7.4 16-Sep-14 15-Sep-14 A 8-10-2014
(IR-1) (0+004.60) 00AM 00 Engineer
upvc manhole
PM

Inspection for blinding


HFC- Area 9 MH-2.3 09:30: 03:30: Kiran, Sr.
SEW 0171 concrete for 200mm MH-2.3 16-Sep-14 15-Sep-14 A 8-10-2014
(IR-4) (0+267.57) 00AM 00 Engineer
upvc manhole
PM

Inspection for blinding


HFC- Area 9 MH-2.1 09:30: 03:30: Kiran, Sr.
SEW 0172 concrete for 200mm MH-2.1 16-Sep-14 15-Sep-14 A 8-10-2014
(IR-4) (0+135.14) 00AM 00 Engineer
upvc manhole
PM
Visual inspection of
HFC- 2nd layer backfilling 10+070 to 11:00:0 Kiran, Sr.
ETC 006 Area 1 17-Sep-14 17-Sep-14 10:00: A 9-10-2014
for Etisalat duct 4-way 10+150 0AM Engineer
00 AM
D54
MH-14 to
Inspection for 4th MH-1.13
HFC- from MH-1.14 to MH- Area 8 09:30: Kiran, Sr.
SEW 0173 layer back filling for ( 0+493.70 20-Sep-14 20-Sep-14 07:30: A 9-10-2014
1.13 (IR-3) 00AM Engineer
200mm sewer line to 00 AM
0+356.00)
MH-1.7.3
to MH-
Inspection for 4th
HFC- from MH-1.7.3 to MH- Area 7 1.7.2 09:30: Kiran, Sr.
SEW 0174 layer back filling for 20-Sep-14 20-Sep-14 07:30: A 9-10-2014
1.7.2 (IR-1) ( 0+078.78 00AM Engineer
250mm sewer line 00 AM
to
0+162.32)

Inspection of 3rd layer


HFC- 10+070 to 09:30: Kiran, Sr.
ETC 007 backfilling for Etisalat Area 1 20-Sep-14 20-Sep-14 07:30: A 12-10-2014
10+150 00AM Engineer
duct 4-way D54 00 AM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 09:30: Kiran, Sr.
SEW 0175 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
concreting for base MH-1.8 Area 00AM Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 09:30: Kiran, Sr.
SEW 0176 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
concreting for base MH-1.10 Area 00AM Engineer
00 AM
slab with benching

MH-2.2 to
Visual Inspection for MH 2.1
HFC- from MH-2.2 to MH- Area 9 09:30: Kiran, Sr.
SEW 0177 1st layer back filling ( 0+198.46 20-Sep-14 20-Sep-14 07:30: A 28-09-2014
2.1 (IR-4) 00AM Engineer
for 200mm sewer line to 00 AM
0+135.14 )
MH-2.6 to
Inspection for 3rd
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 09:30: Kiran, Sr.
SEW 0178 (0+474.95 20-Sep-14 20-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia 2.5 (IR-4) 00AM Engineer
to 00 AM
uPVC
0+405.24)
MH-2.5 to
Inspection for 3rd
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 09:30: Kiran, Sr.
SEW 0179 (0+405.24 20-Sep-14 20-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia 2.4 (IR-4) 00AM Engineer
to 00 AM
uPVC
0+335.52)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-2.4 to
Inspection for 3rd
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 09:30: Kiran, Sr.
SEW 0180 (0+335.52 20-Sep-14 20-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia 2.3 (IR-4) 00AM Engineer
to 00 AM
uPVC
0+267.57)
MH-2.3 to
Inspection for 3rd
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 09:30: Kiran, Sr.
SEW 0181 ( 0+267.57 20-Sep-14 20-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia 2.2 (IR-4) 00AM Engineer
to 00 AM
uPVC
0+198.48)
MH-1.14,
MH-1.13,
MH-1.12 &
MH-1.11
[( 0+439.7
Inspection of Screed
HFC- MH 1.14, MH 1.13, Area 8 0), 09:30: Kiran, Sr.
SEW 0182 for Sewerage 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
MH 1.12 & MH 1.11 (IR-3) (0+356.00) 00AM Engineer
Manhole Blinding 00 AM
,
( 0+268.79
)&
( 0+185.70
)]
MH-1.7.3,
MH-1.7.2
& MH-
1.7.1
Inspection of Screed
HFC- MH 1.7.3, MH-1.7.2 & Area 7 [( 0+078.7 09:30: Kiran, Sr.
SEW 0183 for Sewerage 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
MH-1.7.1 (IR-1) 8), 00AM Engineer
Manhole Blinding 00 AM
(0+162.32)
&
( 0+244.90
)]
Inspection for water
MH-1.7.4
HFC- proofi ng (polyprime manhole Blinding Area 7 09:30: Kiran, Sr.
SEW 0184 ( 0+004.60 20-Sep-14 20-Sep-14 07:30: A 28-09-2014
SB+Bitustick XL) for concrete MH-1.7.4 (IR-1) 00AM Engineer
) 00 AM
sewer
MH-2.3 &
Inspection for water MH-
manhole Blinding
HFC- proofi ng (polyprime Area 9 2.1( 0+267 09:30: Kiran, Sr.
SEW 0185 concrete MH-2.3 & 20-Sep-14 20-Sep-14 07:30: A 28-09-2014
SB+Bitustick XL) for (IR-4) .54 ) & 00AM Engineer
,MH-2.1 00 AM
sewer ( 0+135.14
)
Inspection for MH-20 To
granular bedding, and granular MH-19
HFC- Area 6 09:30: Kiran, Sr.
SEW 0186 laying geotextile, joint surrounding for sewer from MH-20 to MH-19 (1+811.63 20-Sep-14 20-Sep-14 07:30: AN 28-09-2014
(IR-1) 00AM Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 1+728.89)
Inspection for MH-19 To
granular bedding, and granular MH-18
HFC- Area 6 09:30: Kiran, Sr.
SEW 0187 laying geotextile, joint surrounding for sewer from MH-19 to MH-18 (1+728.89 21-Sep-14 20-Sep-14 07:30: AN 28-09-2014
(IR-1) 00AM Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 1+645.43)

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 10:00: Kiran, Sr.
SEW 0188 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
concreting for base MH-1.12 Area 00AM Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 10:00: Kiran, Sr.
SEW 0189 20-Sep-14 20-Sep-14 07:30: A 8-10-2014
concreting for base MH-1.11 Area 00AM Engineer
00 AM
slab with benching

Inspection for water


MH-22
HFC- proofi ng (polyprime manhole Blinding 10:00: Kiran, Sr.
SEW 0024A Area 6 ( 1+906.31 20-Sep-14 20-Sep-14 07:30: AN 3/3/2015
SB+Bitustick XL) for concrete MH-22 00AM Engineer
) 00 AM
sewer
Inspection for water
MH-23
HFC- proofi ng (polyprime manhole Blinding 10:00: Kiran, Sr.
SEW 0025A Area 6 ( 1+990.00 20-Sep-14 20-Sep-14 07:30: AN 3/3/2015
SB+Bitustick XL) for concrete MH-23 00AM Engineer
) 00 AM
sewer
Inspection for water
MH-24
HFC- proofi ng (polyprime manhole Blinding 10:00: Kiran, Sr.
SEW 0026A Area 6 ( 2+052.75 20-Sep-14 20-Sep-14 07:30: AN 3/3/2015
SB+Bitustick XL) for concrete MH-24 00AM Engineer
) 00 AM
sewer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for water MH-25


HFC- manhole Blinding 10:00: Kiran, Sr.
SEW 0027A proofing (Polyprimes Area 6 ( 2+107.50 20-Sep-14 20-Sep-14 07:30: AN 3/3/2015
concrete MH-25 00AM Engineer
B + Bitustic ) ) 00 AM

Inspection for water MH-21


HFC- manhole Blinding 10:00: Kiran, Sr.
SEW 0190 proofing (Polyprimes Area 6 ( 1+846.86 20-Sep-14 20-Sep-14 07:30: A 28-09-2014
concrete MH-21 00AM Engineer
B + Bitustic ) ) 00 AM

MH-21.3,
MH-21.2 &
MH-21.1
Inspection for blinding
HFC- MH-21.3, MH-21.2 & Area 6 (Ch. 11:00:0 Kiran, Sr.
SEW 0191 concrete for sewer 20-Sep-14 20-Sep-14 08:30: A 8-10-2014
MH-21.1 (IR-1) 0+070.00, 0AM Engineer
manhole 00 AM
0+117.85
&
0+046.91)

MH-1.7.4
Inspection for
to MH-
excavation and
HFC- from MH-1.7.4 to MH- Area 5 1.7.5 8:00:0 01:30: Kiran, Sr.
SEW 0192 formation preparation 21-Sep-14 20-Sep-14 A 26-10-2014
1.7.5 (IR-1) ( 0+004.60 0AM 00 Engineer
for sewer line 200mm
to PM
dia UPVC pipe
0+107.65)

MH-1.7.5
Inspection for
to MH-
excavation and
HFC- from MH-1.7.5 to MH- Area 5 1.7.6 8:00:0 01:30: Kiran, Sr.
SEW 0193 formation preparation 21-Sep-14 20-Sep-14 A 26-10-2014
1.7.6 (IR-1) ( 0+107.65 0AM 00 Engineer
for sewer line 200mm
to PM
dia UPVC pipe
0+057.37)
Inspection for
HFC- excavation and MH-1.7.5 8:00:0 01:30: Kiran, Sr.
SEW 0194 MH-1.7.5 Area 5 21-Sep-14 20-Sep-14 A 26-10-2014
formation preparation (0+107.65) 0AM 00 Engineer
for sewer Manhole PM
Inspection for
HFC- excavation and MH-1.7.6 8:00:0 01:30: Kiran, Sr.
SEW 0195 MH-1.7.6 Area 5 21-Sep-14 20-Sep-14 A 26-10-2014
formation preparation (0+057.37 0AM 00 Engineer
for sewer Manhole PM
MH-1.7.3
Inspection for 5th to MH-
HFC- layer backfilling for From MH-1.7.3 to Area 7 1.7.2 8:00:0 01:30: Kiran, Sr.
SEW 0196 21-Sep-14 20-Sep-14 A 10/21/2014
sewer line 250mm dia MH-1.7.2 (IR-1) (0+078.79 0AM 00 Engineer
uPVC to PM
0+162.32)

MH-1.7.2
Inspection for 5th to MH-
HFC- layer backfilling for From MH-1.7.2 to Area 7 1.7.1 8:00:0 01:30: Kiran, Sr.
SEW 0197 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 250mm dia MH-1.7.1 (IR-1) (0+162.32 0AM 00 Engineer
uPVC to PM
0+244.90)
Inspection for 5th MH-1.7.1
HFC- layer backfilling for From MH-1.7.1 to Area 7 to MH-1.7 8:00:0 01:30: Kiran, Sr.
SEW 0198 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 250mm dia MH-1.7 (IR-1) (0+244.90 0AM 00 Engineer
uPVC to 0+320) PM

MH-1.14
Inspection for 5th
to MH-1.13
HFC- layer backfilling for From MH-1.14 to Area 8 8:30:0 01:30: Kiran, Sr.
SEW 0199 (0+439.70 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 200mm dia MH-1.13 (IR-3) 0AM 00 Engineer
to
uPVC PM
0+356.00)

MH-1.13
Inspection for 5th
to MH-1.12
HFC- layer backfilling for From MH-1.13 to Area 8 8:30:0 01:30: Kiran, Sr.
SEW 0200 (0+356.00 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 200mm dia MH-1.12 (IR-3) 0AM 00 Engineer
to
uPVC PM
0+268.79)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.12
Inspection for 5th
to MH-1.11
HFC- layer backfilling for From MH-1.12 to Area 8 8:30:0 01:30: Kiran, Sr.
SEW 0201 (0+268.79 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 200mm dia MH-1.11 (IR-3) 0AM 00 Engineer
to
uPVC PM
0+185.70)

MH-1.11
Inspection for 5th
to MH-1.10
HFC- layer backfilling for From MH-1.11 to MH- Area 8 8:30:0 01:30: Kiran, Sr.
SEW 0202 (0+185.70 21-Sep-14 20-Sep-14 A 26-10-2014
sewer line 200mm dia 1.10 (IR-3) 0AM 00 Engineer
to
uPVC PM
0+101.62)

MH-2.6,
MH-2.5,
MH-2.4 &
Inspection of Screed
HFC- MH-2.6, MH-2.5, MH- Area 9 MH-2.2 8:30:0 01:30: Kiran, Sr.
SEW 0203 for Sewerage 21-Sep-14 20-Sep-14 A 8-10-2014
2.4 & MH-2.2 (IR-4) ( 0+474.95 0AM 00 Engineer
Manhole Blinding
, 0+405.24, PM
0+335.52,
0+198.46 )

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 01:30: Kiran, Sr.
SEW 0204 Yard Area 21-Sep-14 21-Sep-14 11:30: A 8-10-2014
concreting for base MH-1.9 Area 00PM Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 01:30: Kiran, Sr.
SEW 0205 Yard Area 21-Sep-14 21-Sep-14 11:30: A 8-10-2014
concreting for base MH-14 Area 00PM Engineer
00 AM
slab with benching

Inspection for
excavation and
HFC- 1+600 to 03:00: Kiran, Sr.
SEW 0206 formation preparation Area 1 21-Sep-14 21-Sep-14 11:30: A 8-10-2014
1+680 00PM Engineer
for sewer line 315mm 00 AM
dia UPVC pipe

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 01:30: Kiran, Sr.
SEW 0207 Yard Area 22-Sep-14 22-Sep-14 8:00:0 A 9-10-2014
concreting for base MH-21.1 Area 00PM Engineer
0 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 01:30: Kiran, Sr.
SEW 0208 22-Sep-14 22-Sep-14 8:00:0 A 9-10-2014
concreting for base MH-2.3 Area 00PM Engineer
0 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: 03:20: Kiran, Sr.
SEW 0209 23-Sep-14 23-Sep-14 A 9-10-2014
concreting for base MH-2.2 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: 03:20: Kiran, Sr.
SEW 0210 23-Sep-14 23-Sep-14 A 9-10-2014
concreting for base MH-12 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: 03:20: Kiran, Sr.
SEW 0211 23-Sep-14 23-Sep-14 A 9-10-2014
concreting for base MH-16 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0212 24-Sep-14 9:30 24-Sep-14 7:00:0 A 20-01-2015
concreting for base MH-2.4 Area Engineer
0 AM
slab with benching

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0213 24-Sep-14 9:30 24-Sep-14 7:00:0 A 19-10-2014
concreting for base MH-2.5 Area Engineer
0 AM
slab with benching

MH 20 to
Visual Inspection for
MH 19
HFC- 1st layer backfilling for From MH-20 to MH- Area 6 ( Kiran, Sr.
SEW 0214 ( 1+811.63 24-Sep-14 9:30 24-Sep-14 7:00:0 A 27-09-2014
sewer line 200mm dia 19 IR-1 ) Engineer
TO 0 AM
uPVC
1+728.89 )
MH 19 to
Visual Inspection for
MH 18
HFC- 1st layer backfilling for From MH-19 to MH- Area 6 ( Kiran, Sr.
SEW 0215 (1+728.89 24-Sep-14 9:30 24-Sep-14 7:00:0 A 27-09-2014
sewer line 200mm dia 18 IR-1 ) Engineer
to 0 AM
uPVC
1+645.43 )
Inspection for water
MH 21.2
HFC- proofi ng (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0216 (0+117.58 24-Sep-14 9:30 24-Sep-14 7:00:0 A 27-09-2014
SB+Bitustick XL) for concrete MH-21.2 IR-1 ) Engineer
) 0 AM
sewer
Inspection for water
MH 21.3
HFC- proofi ng (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0217 ( 0+070.00 24-Sep-14 9:30 24-Sep-14 7:00:0 A 27-09-2014
SB+Bitustick XL) for concrete MH-21.3 IR-1 ) Engineer
) 0 AM
sewer
Inspection for water
MH 21.1
HFC- proofi ng (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0218 ( 0+046.91 24-Sep-14 9:30 24-Sep-14 7:00:0 A 27-09-2014
SB+Bitustick XL) for concrete MH-21.1 IR-1 ) Engineer
) 0 AM
sewer

Inspection for MH 16.2


granular bedding, and granular TO MH-
HFC- from MH-16.2 to MH- Area 6 ( Kiran, Sr.
SEW 0219 laying geotextile, joint surrounding for sewer 16.3( 0+10 24-Sep-14 9:30 24-Sep-14 7:00:0 A 28-09-2014
16.3 IR-1 ) Engineer
measurement of pipe line 200mm dia uPVC 8.28 TO 0 AM
laying 0+063.63 )

Inspection for MH 16.3


granular bedding, and granular TO MH-
HFC- from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0220 laying geotextile, joint surrounding for sewer 16.1( 0+0 24-Sep-14 9:30 24-Sep-14 7:00:0 A 28-09-2014
16.1 IR-1 ) Engineer
measurement of pipe line 200mm dia uPVC 63.63 TO 0 AM
laying 0+040.00)

Inspection for MH 16.3


granular bedding, and granular TO MH-17(
HFC- from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0221 laying geotextile, joint surrounding for sewer 0+063.63 24-Sep-14 9:30 24-Sep-14 7:00:0 A 28-09-2014
17 IR-1 ) Engineer
measurement of pipe line 200mm dia uPVC TO 0 AM
laying 1+562.05)

MH 21.2,
MH-21.3 &
Inspection of Screed MH-21.1
HFC- MH 21.2, MH-21.3 & Area 6 ( Kiran, Sr.
SEW 0222 for Sewerage ( 0+117.59, 24-Sep-14 9:30 24-Sep-14 7:00:0 A 19-01-2015
MH-21.1 IR-1 ) Engineer
Manhole Blinding 0+070.00 0 AM
&
0+046.01 )

Inspection for
excavation and
HFC- 1+680 TO 01:00: Kiran, Sr.
SEW 0223 prepared formation for Area 1 24-Sep-14 24-Sep-14 11:00: A 9-10-2014
1+723.33 00PM Engineer
315mm Upvc sewer 00 AM
line
Inspection for
granular bedding, and granular
HFC- 1+600 to 08:00: 01:00: Kiran, Sr.
SEW 0224 laying geotextile, joint surrounding for sewer Area 1 24-Sep-14 24-Sep-14 AN 1-10-2014
1+680 00AM 00 Engineer
measurement of pipe line 315mm dia uPVC
PM
laying
MH-1.7.4
Inspection for and granular
to MH-
granular bedding, surrounding for sewer
HFC- 1.7.5 09:30: Kiran, Sr.
SEW 0225 laying geotextile, joint line 200mm dia uPVC Area 5 25-Sep-14 25-Sep-14 07:30: AN 1-10-2014
( 0+004.60 00AM Engineer
measurement of pipe from MH-1.7.4 to MH- 00 AM
to
laying 1.7.5
0+107.65)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.5
Inspection for and granular
to MH-
granular bedding, surrounding for sewer
HFC- 1.7.6 09:30: Kiran, Sr.
SEW 0226 laying geotextile, joint line 200mm dia uPVC Area 5 25-Sep-14 25-Sep-14 07:30: AN 1-10-2014
( 0+107.65 00AM Engineer
measurement of pipe from MH-1.7.5 to MH- 00 AM
to
laying 1.7.6
0+057.35 )

MH-1.7.5
& MH-
Inspection for blinding
HFC- 1.7.6 09:30: Kiran, Sr.
SEW 0227 concrete for Sewer MH-1.7.5 & MH-1.7.6 Area 5 25-Sep-14 25-Sep-14 07:30: A 9-10-2014
( 0+107.6 00AM Engineer
Manhole 00 AM
5&
0+057.35 )

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0228 25-Sep-14 16:00 25-Sep-14 07:30: AN 19-10-2014
concreting for base MH-13 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0229 25-Sep-14 16:00 25-Sep-14 07:30: AN 19-10-2014
concreting for base MH-21.2 Area Engineer
00 AM
slab with benching

Inpection of
HFC- excavation and MH-20 Kiran, Sr.
SEW 0149A MH-20 Area 6 25-Sep-14 9:30 25-Sep-14 07:30: A 26-10-2014
prepared formation for (1+811.63) Engineer
00 AM
sewer Manhole
Inpection of
MH-19
HFC- excavation and Kiran, Sr.
SEW 0150A MH-19 Area 6 (1+1728.9 25-Sep-14 9:30 25-Sep-14 07:30: A 9-10-2014
prepared formation for Engineer
9) 00 AM
sewer Manhole
Inpection of
MH-18
HFC- excavation and Kiran, Sr.
SEW 0230 MH-18 Area 6 ( 1+645.43 25-Sep-14 9:30 25-Sep-14 07:30: A 9-10-2014
prepared formation for Engineer
) 00 AM
sewer Manhole
MH 20 to
Visual Inspection for
MH 19
HFC- 2nd layer backfilling From MH-20 to MH- Area 6 ( Kiran, Sr.
SEW 0231 ( 1+811.63 25-Sep-14 9:30 25-Sep-14 07:30: A 28/9/114
for sewer line 200mm 19 IR-1 ) Engineer
TO 00 AM
dia uPVC
1+728.89 )
MH 19 to
Visual Inspection for
MH 18
HFC- 2nd layer backfilling From MH-19 to MH- Area 6 ( Kiran, Sr.
SEW 0232 (1+728.89 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
for sewer line 200mm 18 IR-1 ) Engineer
to 00 AM
dia uPVC
1+645.43 )
MH-1.7.3
Visual Inspection for to MH-
HFC- 2nd layer backfilling from MH-1.7.3 to MH- Area 7 1.7.4 Kiran, Sr.
SEW 0233 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
for sewer line 250mm 1.7.4 (IR-1) (0+078.78 Engineer
00 AM
dia uPVC to
0+004.6)

MH-1.7.3
Inspection for 3rd to MH-
HFC- layer backfilling for from MH-1.7.3 to MH- Area 7 1.7.4 Kiran, Sr.
SEW 0234 25-Sep-14 9:30 25-Sep-14 07:30: A 26-10-2014
sewer line 250mm dia 1.7.4 (IR-1) (0+078.78 Engineer
00 AM
uPVC to
0+004.6)
MH-2.6 to
Inspection for 4th
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 Kiran, Sr.
SEW 0235 (0+474.95 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia 2.5 (IR-4) Engineer
to 00 AM
uPVC
0+405.24)
MH-2.5 to
Inspection for 4th
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 Kiran, Sr.
SEW 0236 (0+405.24 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia 2.4 (IR-4) Engineer
to 00 AM
uPVC
0+335.52)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-2.4 to
Inspection for 4th
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 Kiran, Sr.
SEW 0237 (0+335.52 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia 2.3 (IR-4) Engineer
to 00 AM
uPVC
0+267.57)
MH-2.3 to
Inspection for 4th
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 Kiran, Sr.
SEW 0238 ( 0+267.57 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia 2.2 (IR-4) Engineer
to 00 AM
uPVC
0+198.48)
MH-2.2 to
Visual Inspection for
MH 2.1
HFC- 2nd layer backfilling from MH-2.2 to MH- Area 9 Kiran, Sr.
SEW 0239 ( 0+198.46 25-Sep-14 10:30 25-Sep-14 07:30: A 28-09-2014
for sewer line 200mm 2.1 (IR-4) Engineer
to 00 AM
dia uPVC
0+135.14 )
MH-24 to
Inspection for 4th
MH-23
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0240 from MH-24 to MH-23 ( 2+052.7 25-Sep-14 10:30 25-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia (IR-1) Engineer
5 to 00 AM
uPVC
1+990.00 )
MH-23 to
Inspection for 6th
MH-22
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0241 from MH-23 to MH-22 ( 1+990.0 25-Sep-14 10:30 25-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia (IR-1) Engineer
0 to 00 AM
uPVC
1+906.31 )
MH-22 to
Inspection for 6th
MH-21
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0242 from MH-22 to MH-21 ( 1+906.31 25-Sep-14 10:30 25-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM
uPVC
1+846.86 )
MH-21 to
Inspection for 6th
MH-20
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0243 from MH-21 to MH-20 (1+846.86 25-Sep-14 10:30 25-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM
uPVC
1+811.63 )

MH-21.2 to
Visual inspection of
MH-21.3
HFC- 2nd layer backfilling from MH-21.2 to MH- Kiran, Sr.
SEW 0244 Area 6 (0+117.59 25-Sep-14 10:30 25-Sep-14 07:30: A 28-09-2014
for 200mm dia uPVC 21.3 Engineer
to 00 AM
sewer line
0+070.00 )

MH-21.3 to
Visual inspection of
MH-21.1
HFC- 2nd layer backfilling from MH-21.3 to MH- Kiran, Sr.
SEW 0245 Area 6 (0+070.00 25-Sep-14 10:30 25-Sep-14 07:30: A 28-09-2014
for 200mm dia uPVC 21.1 Engineer
to 00 AM
sewer line
0+046.91)

MH-21.3 to
Visual inspection of
MH-22
HFC- 2nd layer backfilling from MH-21.3 to MH- Kiran, Sr.
SEW 0246 Area 6 (0+070.00 25-Sep-14 10:30 25-Sep-14 07:30: A 1-10-2014
for 200mm dia uPVC 22 Engineer
to 00 AM
sewer line
1+906.31)

MH-21.2 to
Inspection of 3rd layer MH-21.3
HFC- from MH-21.2 to MH- Kiran, Sr.
SEW 0247 backfilling for 200mm Area 6 (0+117.59 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
21.3 Engineer
dia uPVC sewer line to 00 AM
0+070.00 )

MH-21.3 to
Inspection of 3rd layer MH-21.1
HFC- from MH-21.3 to MH- Kiran, Sr.
SEW 0248 backfilling for 200mm Area 6 (0+070.00 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
21.1 Engineer
dia uPVC sewer line to 00 AM
0+046.91)

MH-21.3 to
Inspection of 3rd layer MH-22
HFC- from MH-21.3 to MH- Kiran, Sr.
SEW 0249 backfilling for 200mm Area 6 (0+070.00 25-Sep-14 10:30 25-Sep-14 07:30: A 14-10-2014
22 Engineer
dia uPVC sewer line to 00 AM
1+906.31)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inpection of MH-8.3 To
excavation and MH-8.2
HFC- From MH-8.3 to MH- Area 6 ( Kiran, Sr.
SEW 0250 prepared formation for ( 0+125.50 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
8.2 IR-1 ) Engineer
sewer line 200 mm TO 00 AM
dia uPVC pipe 0+069.23 )
MH-8.2 To
Inpection of
MH-8.1
excavation and
HFC- From MH-8.2 to MH- Area 6 ( ( 0+069.2 Kiran, Sr.
SEW 0251 prepared formation for 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
8.1 IR-1 ) 3 to Engineer
sewer line 200 mm 00 AM
0+041.372
dia uPVC pipe
)

MH-8.2 To
Inpection of
MH-9
excavation and
HFC- Area 6 ( ( 0+069.23 Kiran, Sr.
SEW 0252 prepared formation for From MH-8.2 to MH-9 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
IR-1 ) to Engineer
sewer line 200 mm 00 AM
1+150.82
dia uPVC pipe
)
Inspection for water
MH-22
HFC- proofing (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0253 ( 1+906.31 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
SB+Bitustick XL) for concrete MH-22 IR-1 ) Engineer
) 00 AM
sewer
Inspection for water
MH-23
HFC- proofing (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0254 ( 1+990.00 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
SB+Bitustick XL) for concrete MH-23 IR-1 ) Engineer
) 00 AM
sewer
Inspection for water
MH-24
HFC- proofing (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0255 ( 2+052.75 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
SB+Bitustick XL) for concrete MH-24 IR-1 ) Engineer
) 00 AM
sewer

Inspection for water MH-25


HFC- manhole Blinding Area 6 ( Kiran, Sr.
SEW 0256 proofing (Polyprimes ( 2+107.50 25-Sep-14 9:30 25-Sep-14 07:30: A 28-09-2014
concrete MH-25 IR-1 ) Engineer
B + Bitustic ) ) 00 AM

MH-1.7.5
Inspection for water & MH-
HFC- proofing (polyprime 1.7.6 10:30: Kiran, Sr.
SEW 0257 MH-1.7.5 & MH-1.7.6 Area 5 25-Sep-14 25-Sep-14 07:30: A 1-10-2014
SB+Bitustick XL) for ( 0+107.6 00AM Engineer
00 AM
sewer 5&
0+057.35 )
Inpection of
MH-8.3
HFC- excavation and Kiran, Sr.
SEW 0258 MH-8.3 Area 6 ( 0+125.50 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
prepared formation for Engineer
) 00 AM
sewer Manhole
Inpection of
MH-8.2
HFC- excavation and Kiran, Sr.
SEW 0259 MH-8.2 Area 6 ( 0+069.2 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
prepared formation for Engineer
3) 00 AM
sewer Manhole
Inpection of
MH-8.1
HFC- excavation and Kiran, Sr.
SEW 0260 MH-8.1 Area 6 ( 0+041.37 25-Sep-14 13:15 25-Sep-14 07:30: A 14-10-2014
prepared formation for Engineer
2) 00 AM
sewer Manhole

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 12:15: Kiran, Sr.
SEW 0261 27-Sep-14 27-Sep-14 A 12-10-2014
concreting for base MH-8.1 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 12:15: Kiran, Sr.
SEW 0262 27-Sep-14 27-Sep-14 A 12-10-2014
concreting for base MH-16.2 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 12:15: Kiran, Sr.
SEW 0263 27-Sep-14 27-Sep-14 A 12-10-2014
concreting for base MH-16.3 Area 00PM 00 Engineer
slab with benching PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 12:15: Kiran, Sr.
SEW 0264 27-Sep-14 27-Sep-14 A 12-10-2014
concreting for base MH-18 Area 00PM 00 Engineer
slab with benching PM

MH-18 ,
MH-19,
MH-20 &
Inspection for blinding MH-16.2
HFC- MH-18 , MH-19, MH- 09:30: Kiran, Sr.
SEW 0265 concrete for Sewer Area 6 ( 1+645.43 29-Sep-14 29-Sep-14 07:30: A 12-10-2014
20 & MH-16.2 00AM Engineer
Manhole , 1+728.89, 00 AM
1+811.63
&
0+108.28 )

Inspection for
granular bedding, and granular
HFC- 1+680 TO 09:30: Kiran, Sr.
SEW 0266 laying geotextile, joint surrounding for sewer Area 1 29-Sep-14 29-Sep-14 07:30: A 12-10-2014
1+723.33 00AM Engineer
measurement of pipe line 315mm dia uPVC 00 AM
laying
MH-1.7.3
Inspection for 6th to MH-
HFC- layer backfilling for From MH-1.7.3 to Area 7 1.7.2 09:30: Kiran, Sr.
SEW 0267 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 250mm dia MH-1.7.2 (IR-1) (0+078.79 00AM Engineer
00 AM
uPVC to
0+162.32)

MH-1.7.2
Inspection for 6th to MH-
HFC- layer backfilling for From MH-1.7.2 to Area 7 1.7.1 09:30: Kiran, Sr.
SEW 0268 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 250mm dia MH-1.7.1 (IR-1) (0+162.32 00AM Engineer
00 AM
uPVC to
0+244.90)
Inspection for 6th MH-1.7.1
HFC- layer backfilling for From MH-1.7.1 to Area 7 to MH-1.7 09:30: Kiran, Sr.
SEW 0269 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 250mm dia MH-1.7 (IR-1) (0+244.90 00AM Engineer
00 AM
uPVC to 0+320)

MH-1.12
Inspection for 6th
to MH-1.11
HFC- layer backfilling for From MH-1.12 to Area 8 09:30: Kiran, Sr.
SEW 0270 (0+268.79 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia MH-1.11 (IR-3) 00AM Engineer
to 00 AM
uPVC
0+185.70)

MH-1.11
Inspection for 6th
to MH-1.10
HFC- layer backfilling for From MH-1.11 to MH- Area 8 09:30: Kiran, Sr.
SEW 0271 (0+185.70 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 200mm dia 1.10 (IR-3) 00AM Engineer
to 00 AM
uPVC
0+101.62)

MH-1.7.3
Inspection for 4th to MH-
HFC- layer backfilling for from MH-1.7.3 to MH- Area 7 1.7.4 09:30: Kiran, Sr.
SEW 0272 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
sewer line 250mm dia 1.7.4 (IR-1) (0+078.78 00AM Engineer
00 AM
uPVC to
0+004.6)
MH-2.2 to
Inspection for 3rd
MH 2.1
HFC- layer backfilling for from MH-2.2 to MH- Area 9 09:30: Kiran, Sr.
SEW 0273 ( 0+198.46 29-Sep-14 29-Sep-14 07:30: A 26-10-2014
sewer line 200mm dia 2.1 (IR-4) 00AM Engineer
to 00 AM
uPVC
0+135.14 )
MH-18 to
Inspection for excav
MH-17
HFC- ation and prepared Area 6 10:15: Kiran, Sr.
SEW 0274 from MH-18 to MH-17 (1+645.43 29-Sep-14 29-Sep-14 07:30: A 14-10-2014
formation for 200mm (IR-1) 00AM Engineer
to 00 AM
upvc sewer line
1+562.05 )

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 03:30: Kiran, Sr.
SEW 0275 Yard Area 30-Sep-14 29-Sep-14 A 19-10-2014
concreting for base MH-8.2 Area 00PM 00 Engineer
slab with benching PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 03:30: Kiran, Sr.
SEW 0276 Yard Area 30-Sep-14 29-Sep-14 C 6-10-2014
concreting for base MH-11 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 03:30: Kiran, Sr.
SEW 0277 Yard Area 30-Sep-14 29-Sep-14 A 19-10-2014
concreting for base MH-17 Area 00PM 00 Engineer
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 04:00: 03:30: Kiran, Sr.
SEW 0278 Yard Area 30-Sep-14 29-Sep-14 A 19-10-2014
concreting for base MH-15 Area 00PM 00 Engineer
slab with benching PM

MH-23 to
Inspection for 7th
MH-22
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0279 from MH-23 to MH-22 ( 1+990.0 30-Sep-14 8:30 29-Sep-14 03:30: A 14-10-2014
sewer line 200mm dia (IR-1) Engineer
0 to 00 AM
uPVC
1+906.31 )
MH-22 to
Inspection for 7th
MH-21
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0280 from MH-22 to MH-21 ( 1+906.31 30-Sep-14 8:30 29-Sep-14 03:30: A 14-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM
uPVC
1+846.86 )
MH-21 to
Inspection for 7th
MH-20
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0281 from MH-21 to MH-20 (1+846.86 30-Sep-14 8:30 29-Sep-14 03:30: A 14-10-2014
sewer line 200mm dia (IR-1) Engineer
to 00 AM
uPVC
1+811.63 )

Inspection for precast


HFC- sewer manhole (base) Area 8 MH-1.14 Kiran, Sr.
SEW 0282 MH-1.14 30-Sep-14 8:30 29-Sep-14 03:30: AN 14-10-2014
placing including (IR-3) (0+439.70) Engineer
00 AM
alignment and level

Inspection for precast


HFC- sewer manhole (base) Area 8 MH-1.12 Kiran, Sr.
SEW 0283 MH-1.12 30-Sep-14 8:30 29-Sep-14 03:30: AN 30-12-2014
placing including (IR-3) (0+268.79) Engineer
00 AM
alignment and level

Inspection for precast


HFC- sewer manhole (base) Area 7 MH-1.7.4 Kiran, Sr.
SEW 0284 MH-1.7.4 30-Sep-14 8:30 29-Sep-14 03:30: A 12-10-2014
placing including (IR-1) (0+004.6) Engineer
00 AM
alignment and level

Inpection of
excavation and
HFC- DC 04:30: Kiran, Sr.
SEW 0285 prepared formation for Area 1 30-Sep-14 8:30 29-Sep-14 A 14-10-2014
(1+587.45) 00 Engineer
sewer discharge
PM
chamber
Inpection of
HFC- excavation and MH 01 04:30: Kiran, Sr.
SEW 0286 Area 1 30-Sep-14 8:30 29-Sep-14 A 14-10-2014
prepared formation for (1+723.33) 00 Engineer
sewer manhole PM
MH-18,
MH-19 &
MH-20
Inspection for water
manhole Blinding [ ( 1+645.4
HFC- proofi ng (polyprime Area 6 ( Kiran, Sr.
SEW 0287 concrete MH-18, MH- 3), 1-Oct-14 9:30 1-Oct-14 07:30: A 8-10-2014
SB+Bitustick XL) for IR-1 ) Engineer
19 & MH- 20 ( 1+728.89 00 AM
sewer
)&
( 1+811.63
)]
Inspection for water
MH-16.2
HFC- proofi ng (polyprime manhole Blinding Area 6 ( Kiran, Sr.
SEW 0288 ( 0+108.28 1-Oct-14 9:30 1-Oct-14 07:30: A 8-10-2014
SB+Bitustick XL) for concrete MH-16.2 IR-1 ) Engineer
) 00 AM
sewer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.4
Visula Inspection for to MH-
HFC- 1st layer backfilling for from MH-1.7.4 to MH- 1.7.5 Kiran, Sr.
SEW 0289 Area 5 1-Oct-14 9:30 1-Oct-14 07:30: A 8-10-2014
sewer line 200mm dia 1.7.5 ( 0+004.60 Engineer
00 AM
uPVC to
0+107.65)

MH-1.7.5
Visula Inspection for to MH-
HFC- 1st layer backfilling for from MH-1.7.5 to MH- 1.7.6 Kiran, Sr.
SEW 0290 Area 5 1-Oct-14 9:30 1-Oct-14 07:30: A 8-10-2014
sewer line 200mm dia 1.7.6 ( 0+107.65 Engineer
00 AM
uPVC to
0+057.35 )

MH-21.2 to
Inspection of 4th layer MH-21.3
HFC- from MH-21.2 to MH- Area 6 ( Kiran, Sr.
SEW 0291 backfilling for 200mm (0+117.59 1-Oct-14 10:00 1-Oct-14 07:30: A 14-10-2014
21.3 IR-8 ) Engineer
dia uPVC sewer line to 00 AM
0+070.00 )

MH-21.3 to
Inspection of 4th layer MH-21.1
HFC- from MH-21.3 to MH- Area 6 ( Kiran, Sr.
SEW 0292 backfilling for 200mm (0+070.00 1-Oct-14 10:00 1-Oct-14 07:30: A 14-10-2014
21.1 IR-8 ) Engineer
dia uPVC sewer line to 00 AM
0+046.91)

MH-21.3 to
Inspection of 4th layer MH-22
HFC- from MH-21.3 to MH- Area 6 ( Kiran, Sr.
SEW 0293 backfilling for 200mm (0+070.00 1-Oct-14 10:00 1-Oct-14 07:30: A 14-10-2014
22 IR-8 ) Engineer
dia uPVC sewer line to 00 AM
1+906.31)

MH 16.2
Visula Inspection for
TO MH-
HFC- 1st layer backfilling for from MH-16.2 to MH- Area 6 ( Kiran, Sr.
SEW 0294 16.3( 0+10 1-Oct-14 10:00 1-Oct-14 07:30: A 8-10-2014
sewer line 200mm dia 16.3 IR-7 ) Engineer
8.28 TO 00 AM
uPVC
0+063.63 )

MH 16.3
Visula Inspection for
TO MH-
HFC- 1st layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0295 16.1( 0+0 1-Oct-14 10:00 1-Oct-14 07:30: A 8-10-2014
sewer line 200mm dia 16.1 IR-7 ) Engineer
63.63 TO 00 AM
uPVC
0+040.00)

MH 16.3
Visula Inspection for
TO MH-17(
HFC- 1st layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0296 0+063.63 1-Oct-14 10:00 1-Oct-14 07:30: A 8-10-2014
sewer line 200mm dia 17 IR-7 ) Engineer
TO 00 AM
uPVC
1+562.05)

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0297 Yard Area 2-Oct-14 11:00 1-Oct-14 07:30: AN 19-10-2014
concreting for base MH-19 Area Engineer
00 AM
slab with benching

MH-24 to
Inspection for 5th
MH-23
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0298 from MH-24 to MH-23 ( 2+052.7 1-Oct-14 10:00 1-Oct-14 07:30: Revised 7-10-2014
sewer line 200mm dia (IR-1) Engineer
5 to 00 AM
uPVC
1+990.00 )
MH-25 to
Inspection for 4th MH-24
HFC- layer backfilling for Area 6 ( 2+107.5 Kiran, Sr.
SEW 0299 from MH-25 to MH-24 1-Oct-14 10:00 1-Oct-14 07:30: A 14-10-2014
sewer line 200mm dia (IR-1) 0 to Engineer
00 AM
uPVC 2+052.75
)

MH-25 to
Inspection for 5th MH-24
HFC- layer backfilling for Area 6 ( 2+107.5 Kiran, Sr.
SEW 0300 from MH-25 to MH-24 1-Oct-14 10:00 1-Oct-14 07:30: Revised 7-10-2014
sewer line 200mm dia (IR-1) 0 to Engineer
00 AM
uPVC 2+052.75
)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.4
Inspection for 2nd to MH-
HFC- layer backfilling for from MH-1.7.4 to MH- 1.7.5 Kiran, Sr.
SEW 0301 Area 5 2-Oct-14 11:00 2-Oct-14 07:30: A 26-10-2014
sewer line 200mm dia 1.7.5 ( 0+004.60 Engineer
00 AM
uPVC to
0+107.65)

MH-1.7.5
Inspection for 2nd to MH-
HFC- layer backfilling for from MH-1.7.5 to MH- 1.7.6 Kiran, Sr.
SEW 0302 Area 5 2-Oct-14 11:00 2-Oct-14 07:30: A 2-11-2014
sewer line 200mm dia 1.7.6 ( 0+107.65 Engineer
00 AM
uPVC to
0+057.35 )

MH 16.2
Inspection for 2nd
TO MH-
HFC- layer backfilling for from MH-16.2 to MH- Area 6 ( Kiran, Sr.
SEW 0303 16.3( 0+10 2-Oct-14 11:00 2-Oct-14 07:30: A 26-10-2014
sewer line 200mm dia 16.3 IR-7 ) Engineer
8.28 TO 00 AM
uPVC
0+063.63 )

MH 16.3
Inspection for 2nd
TO MH-
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0304 16.1( 0+0 2-Oct-14 11:00 2-Oct-14 07:30: A 26-10-2014
sewer line 200mm dia 16.1 IR-7 ) Engineer
63.63 TO 00 AM
uPVC
0+040.00)

MH 16.3
Inspection for 2nd
TO MH-17(
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0305 0+063.63 2-Oct-14 11:00 2-Oct-14 07:30: A 26-10-2014
sewer line 200mm dia 17 IR-7 ) Engineer
TO 00 AM
uPVC
1+562.05)

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0306 2-Oct-14 16:00 2-Oct-14 07:30: A 19-10-2014
concreting for base MH-1.5 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0307 2-Oct-14 16:00 2-Oct-14 07:30: A 19-10-2014
concreting for base MH-21.3 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0308 2-Oct-14 16:00 2-Oct-14 07:30: A 19-10-2014
concreting for base MH-8.3 Area Engineer
00 AM
slab with benching

MH 16.3 &
MH-16.1
Inspection for blinding
HFC- Area 6 ( [( 0+063.6 Kiran, Sr.
SEW 0309 concrete for Sewer MH-16.3 & MH-16.1 2-Oct-14 9:30 2-Oct-14 07:30: A 19-10-2014
IR-7 ) 3)& Engineer
Manhole 00 AM
( 0+040.00
)]

MH-8.3,
MH-8.2 &
MH-8.1
Inspection for blinding [ ( 0+125.5
HFC- MH-8.3, MH- 8.2 & Area 6 ( Kiran, Sr.
SEW 0310 concrete for Sewer 0), 2-Oct-14 9:30 2-Oct-14 07:30: A 19-10-2014
MH-8.1 IR-6 ) Engineer
Manhole ( 0+069.23 00 AM
), &
( 0+041.37
2) ]

Inspection for blinding


HFC- concrete for Sewer DC Kiran, Sr.
SEW 0311 Area 1 2-Oct-14 9:30 2-Oct-14 07:30: AN 30-12-2014
Discharge Chamber (1+587.45) Engineer
00 AM
( D.C )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for blinding


concrete for Sewer
HFC- H.C # 01 Kiran, Sr.
SEW 0312 Manhole / House Area 1 2-Oct-14 9:30 2-Oct-14 07:30: A 19-10-2014
(1+723.33) Engineer
Connection ( H.C # 1 00 AM
)
Visual Inspection for
( 1+600 )
HFC- 1st layer backfilling for Kiran, Sr.
SEW 0313 Area 1 to 2-Oct-14 11:30 2-Oct-14 07:30: A 8-10-2014
sewer line 315mm dia Engineer
( 1+723 ) 00 AM
uPVC
MH-1.7.5
& MH-
Inspection for precast
1.7.6
HFC- sewer manhole (base) Kiran, Sr.
SEW 0314 MH-1.7.5 & MH-1.7.6 Area 5 [( 0+107.6 2-Oct-14 9:30 2-Oct-14 07:30: Revised 6-10-2014
placing including Engineer
5) & 00 AM
alignment and level
( 0+057.35
)]

Inspection for precast


MH-1.13
HFC- sewer manhole (base) Area 8 Kiran, Sr.
SEW 0315 MH-1.13 (0+396.00 2-Oct-14 9:30 2-Oct-14 07:30: A 12-10-2014
placing including (IR-3) Engineer
) 00 AM
alignment and level

Inspection for MH-1.10 to


excavation and MH-1.9
HFC- from MH-1.10 to MH- Area 8 03:30: Kiran, Sr.
SEW 0316 prepared formation for (0+101.62 7-Oct-14 7:30 6-Oct-14 A 26-10-2014
1.9 (IR-3) 00 Engineer
sewer line 200 mm to
PM
dia 0+070.00)
Inspection for MH-1.9 to
excavation and MH-1.8
HFC- from MH-1.9 to MH- Area 8 03:30: Kiran, Sr.
SEW 0317 prepared formation for ( 0+070.00 7-Oct-14 7:30 6-Oct-14 A 26-10-2014
1.8 (IR-3) 00 Engineer
sewer line 200 mm to
PM
dia 0+038.55)
Inspection for MH-1.8 to
excavation and MH-1.7
HFC- from MH-1.8 to MH- 03:30: Kiran, Sr.
SEW 0318 prepared formation for Area 8 ( 0+038.55 7-Oct-14 7:30 6-Oct-14 A 26-10-2014
1.7 00 Engineer
sewer line 200 mm to
PM
dia 0+347.29)
Inspection for MH-1.7 to
excavation and MH-1.7.1
HFC- from MH-1.7 to MH- 03:30: Kiran, Sr.
SEW 0319 prepared formation for Area 7 ( 0+347.29 7-Oct-14 7:30 6-Oct-14 A 26-10-2014
1.7.1 00 Engineer
sewer line 250 mm to
PM
dia 0+320.00)

MH-1.8,
MH-1.9 &
Inspection for MH-1.10
HFC- excavation and MH-1.8, MH-1.9 & (Ch.0+038. 03:30: Kiran, Sr.
SEW 0320 Area 8 7-Oct-14 7:30 6-Oct-14 A 26-10-2014
prepared formation for MH-1.10 55, 00 Engineer
sewer manhole 0+070.00 PM
&
0+101.62)

Inspection for MH-16 to


excavation and MH-17
HFC- Area 6 03:30: Kiran, Sr.
SEW 0321 prepared formation for from MH-16 to MH-17 (ch.1+518. 7-Oct-14 9:00 6-Oct-14 A 26-10-2014
(IR-1) 00 Engineer
sewer line 200 mm 64 to
PM
dia 1+562.05)

Inspection of shutter,
MH-20
HFC- reinforcement and for sewerage manhole Yard 03:30: 03:30: Kiran, Sr.
SEW 0322 (1+811.630 7-Oct-14 6-Oct-14 A 26-10-2014
concreting for base MH-20 Area 00PM 00 Engineer
)
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: 03:30: Kiran, Sr.
SEW 0323 MH-1.4 7-Oct-14 6-Oct-14 A 26-10-2014
concreting for base MH-1.4 Area 00PM 00 Engineer
slab with benching PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.2
& MH-
Inspection for precast
1.7.3
HFC- sewer manhole (base) Area 7 09:30: Kiran, Sr.
SEW 0324 MH-1.7.2 & MH-1.7.3 [( 0+162.3 7-Oct-14 7-Oct-14 07:30: A 12-10-2014
placing including (IR-1) 00AM Engineer
2) & 00 AM
alignment and level
( 0+078.78
)]

Inspection for precast


MH-1.11
HFC- sewer manhole (base) Area 8 09:30: Kiran, Sr.
SEW 0325 MH-1.11 ( 0+185.70 7-Oct-14 7-Oct-14 07:30: A 12-10-2014
placing including (IR-3) 00AM Engineer
) 00 AM
alignment and level

MH-2.5,
MH-2.4,
MH-2.3 &
MH-2.2
Inspection for precast [( 0+405.2
HFC- sewer manhole (base) MH-2.5, MH-2.4, MH- Area 9 4), 09:30: Kiran, Sr.
SEW 0326 7-Oct-14 7-Oct-14 07:30: AN 12-10-2014
placing including 2.3 & MH-2.2 (IR-4) ( 0+335.52 00AM Engineer
00 AM
alignment and level ),
( 0+267.57
)&
( 0+198.46
)]

Inspection for 2nd


( 1+600 )
HFC- layer backfilling for with Warning tape 09:30: Kiran, Sr.
SEW 0327 Area 1 to 7-Oct-14 7-Oct-14 07:30: A 26-10-2014
sewer line 315mm dia below. 00AM Engineer
( 1+723 ) 00 AM
uPVC
MH-1.7.3
Inspection for 7th to MH-
HFC- layer backfilling for From MH-1.7.3 to Area 7 1.7.2 09:30: Kiran, Sr.
SEW 0328 7-Oct-14 7-Oct-14 07:30: A 26-10-2014
sewer line 250mm dia MH-1.7.2 (IR-1) (0+078.79 00AM Engineer
00 AM
uPVC to
0+162.32)

MH-1.7.2
Inspection for 7th to MH-
HFC- layer backfilling for From MH-1.7.2 to Area 7 1.7.1 09:30: Kiran, Sr.
SEW 0329 7-Oct-14 7-Oct-14 07:30: A 26-10-2014
sewer line 250mm dia MH-1.7.1 (IR-1) (0+162.32 00AM Engineer
00 AM
uPVC to
0+244.90)
Inspection for 7th MH-1.7.1
HFC- layer backfilling for From MH-1.7.1 to Area 7 to MH-1.7 09:30: Kiran, Sr.
SEW 0330 7-Oct-14 7-Oct-14 07:30: A 26-10-2014
sewer line 250mm dia MH-1.7 (IR-1) (0+244.90 00AM Engineer
00 AM
uPVC to 0+320)
MH-1.7.5
& MH-
Inspection for water
1.7.6
HFC- proofi ng (polyprime Area 5 10:30: Kiran, Sr.
SEW 0331 MH-1.7.5 & MH-1.7.6 [( 0+107.6 7-Oct-14 7-Oct-14 07:30: C 13-10-2014
SB+Bitustick XL) for (IR-1) 00AM Engineer
5) & 00 AM
Sewer Manhole
( 0+057.35
)]

MH-2.5,
MH-2.4,
MH-2.3 &
MH-2.2
Inspection for water [( 0+405.2
HFC- proofi ng (polyprime MH-2.5, MH-2.4, MH- Area 9 4), 10:30: Kiran, Sr.
SEW 0332 7-Oct-14 7-Oct-14 07:30: C 13-10-2014
SB+Bitustick XL) for 2.3 & MH-2.2 (IR-4) ( 0+335.52 00AM Engineer
00 AM
Sewer Manhole ),
( 0+267.57
)&
( 0+198.46
)]

Inspection for water


HFC- proofi ng (polyprime 10:30: Kiran, Sr.
SEW 0333 MH-1.7 MH-1.7 7-Oct-14 7-Oct-14 07:30: Revised 13-10-2014
SB+Bitustick XL) for 00AM Engineer
00 AM
Sewer Manhole

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.14,
MH-1.13 ,
MH-1.12 &
MH-1.11 [ (
Inspection for water
0+439.70),
HFC- proofi ng (polyprime MH-1.14, MH-1.13 , Area 8 ( 10:30: Kiran, Sr.
SEW 0334 (0+356.00) 7-Oct-14 7-Oct-14 07:30: Revised 9-10-2014
SB+Bitustick XL) for MH-1.12 & MH-1.11 IR-3 ) 00AM Engineer
, 00 AM
Sewer Manhole
( 0+268.79
)&
( 0+185.70
)]

Inspection for MH-17 &


excavation & MH-16
HFC- 01:00: Kiran, Sr.
SEW 0335 formation preparation from MH-17 to MH-16 Area 6 (ch.1+562. 8-Oct-14 8-Oct-14 11:30 A 11-10-2014
00PM Engineer
for sewer line 200mm 05 to
dia Upvc 1+518.64)
Inspection for
excavation &
HFC- H.C # 01 01:00: Kiran, Sr.
SEW 0336 formation preparation from H.C- 01 to 02 Area 1 8-Oct-14 8-Oct-14 11:30 A 26-10-2014
to 02 00PM Engineer
for sewer line 315mm
dia Upvc
Inspection for pipe MH-18 to
laying 200mm upvc MH-17
HFC- 01:00: Kiran, Sr.
SEW 0337 with aggregate from MH-18 & Mh-17 Area 6 (1+645.43 8-Oct-14 8-Oct-14 11:30 AN 12-10-2014
00PM Engineer
surrounding & to
geotextile 1+562.05 )

MH-1.9,
MH-1.8 &
MH-1.10
Inspection for blinding
HFC- MH-1.9, MH-1.8 & (ch 01:00: Kiran, Sr.
SEW 0338 concrete for sewerage Area 8 8-Oct-14 8-Oct-14 11:30 AN 2-11-2014
MH-1.10 0+070.00, 00PM Engineer
manhole
0+038.55
&
0+185.70)

Inspection of shutter
HFC- and concrete for DC 08:00: 03:15: Kiran, Sr.
SEW 0339 Area 1 9-Oct-14 8-Oct-14 Revised 12-10-2014
sewerage discharge (1+587.45) 00AM 00 Engineer
chamber (DC) PM
Inspection of shutter
HFC- and concrete for 08:00: 03:15: Kiran, Sr.
SEW 0340 HC-01 Area 1 HC-01 9-Oct-14 8-Oct-14 Revised 12-10-2014
sewerage House 00AM 00 Engineer
Connection (HC) PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0341 9-Oct-14 9:00 9-Oct-14 07:30: A 3-11-2014
concreting for base MH-8 Area Engineer
00 AM
slab with benching

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-01 to Kiran, Sr.
SEW 0342 MH-25, from HC-01 to 9-Oct-14 9:00 9-Oct-14 07:30: A 26-10-2014
sewer House IR-1 ) HC-02 Engineer
HC-02 00 AM
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-25 to Kiran, Sr.
SEW 0343 MH-25, from MH-25 to 9-Oct-14 9:00 9-Oct-14 07:30: A 26-10-2014
sewer House IR-1 ) HC-02 Engineer
HC-02 00 AM
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-03 to Kiran, Sr.
SEW 0344 MH-25, from HC-03 to 9-Oct-14 9:00 9-Oct-14 07:30: A 26-10-2014
sewer House IR-1 ) HC-04 Engineer
HC-04 00 AM
connection line 160
mm dia

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-25 to Kiran, Sr.
SEW 0345 MH-25, from MH-25 to 9-Oct-14 9:00 9-Oct-14 07:30: A 26-10-2014
sewer House IR-1 ) HC-04 Engineer
HC-04 00 AM
connection line 160
mm dia
Inspection for MH-1.10 to
granular bedding, and granular MH-1.9
HFC- from MH-1.10 to MH- Area 8 Kiran, Sr.
SEW 0346 laying geotextile, joint surrounding for sewer (0+101.62 11-Oct-14 9:30 11-Oct-14 07:30: AN 14-10-2014
1.9 (IR-3) Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 0+070.00)
Inspection for MH-1.9 to
granular bedding, and granular MH-1.8
HFC- from MH-1.9 to MH- Area 8 Kiran, Sr.
SEW 0347 laying geotextile, joint surrounding for sewer ( 0+070.00 11-Oct-14 9:30 11-Oct-14 07:30: AN 14-10-2014
1.8 (IR-3) Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 0+038.55)
Inspection for MH-1.8 to
granular bedding, and granular MH-1.7
HFC- from MH-1.8 to MH- Area 8 Kiran, Sr.
SEW 0348 laying geotextile, joint surrounding for sewer ( 0+038.55 11-Oct-14 9:30 11-Oct-14 07:30: AN 19-10-2014
1.7 (IR-3) Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 0+347.29)
Inspection for MH-1.7 to
granular bedding, and granular MH-1.7.1
HFC- from MH-1.7 to MH- Area 7 Kiran, Sr.
SEW 0349 laying geotextile, joint surrounding for sewer ( 0+347.29 11-Oct-14 9:30 11-Oct-14 07:30: A 16-10-2014
1.7.1 (IR-1) Engineer
measurement of pipe line 250mm dia uPVC to 00 AM
laying 0+320.00)

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0350 MH-1.7.1 11-Oct-14 9:30 11-Oct-14 07:30: AN 3-11-2014
concreting for base MH-1.7.1 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0351 MH-1.2 11-Oct-14 9:30 11-Oct-14 07:30: AN 3-11-2014
concreting for base MH-1.2 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0352 MH-1.6 11-Oct-14 9:30 11-Oct-14 07:30: AN 3-11-2014
concreting for base MH-1.6 Area Engineer
00 AM
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0353 MH-24 11-Oct-14 9:30 11-Oct-14 07:30: AN 3-11-2014
concreting for base MH-24 Area Engineer
00 AM
slab with benching

Inspection for
MH-1.7
HFC- excavation and Area 7 Kiran, Sr.
SEW 0354 MH-1.7 ( 0+347.29 11-Oct-14 9:30 11-Oct-14 07:30: A 2-11-2014
prepared formation for (IR-1) Engineer
) 00 AM
sewer Manhole
Inspection for
H.C-1,
excavation and of Sewer Manhole
HFC- Area 6 ( H.C-2, Kiran, Sr.
SEW 0355 prepared formation for MH-25: H.C-1, H.C- 11-Oct-14 9:30 11-Oct-14 07:30: A 2-11-2014
IR-1 ) H.C-3 & Engineer
sewer House 2, H.C -3 & H.C-4 00 AM
H.C-4
connection
Abutment
Inspection of laying 1 to 2
HFC- Etisalat duct 4xD54 (10+323.2 01:00: Kiran, Sr.
ETC 008 Area 4 11-Oct-14 11-Oct-14 11:30: Revised 13-10-2014
from abutment 1 to to 00PM Engineer
00 AM
abutment 2 10+825.00
)
Inspection of laying
geotextile, gravel for 315mm uPVC
HFC- HC-01 to 01:00: Kiran, Sr.
SEW 0356 bedding, joint sewer line from HC-01 Area 1 11-Oct-14 11-Oct-14 11:30: A 26-10-2014
HC-02 00PM Engineer
measurement and to HC-02 00 AM
grannular surround

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.3
Inspection for 5th to MH-
HFC- layer backfilling for from MH-1.7.3 to MH- Area 7 1.7.4 09:30: Kiran, Sr.
SEW 0357 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 250mm dia 1.7.4 (IR-1) (0+078.78 00AM Engineer
uPVC to
0+004.6)

MH-1.7.3
Inspection for 8th to MH-
HFC- layer backfilling for From MH-1.7.3 to Area 7 1.7.2 09:30: Kiran, Sr.
SEW 0358 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 250mm dia MH-1.7.2 (IR-1) (0+078.79 00AM Engineer
uPVC to
0+162.32)

MH-1.7.2
Inspection for 8th to MH-
HFC- layer backfilling for From MH-1.7.2 to Area 7 1.7.1 09:30: Kiran, Sr.
SEW 0359 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 250mm dia MH-1.7.1 (IR-1) (0+162.32 00AM Engineer
uPVC to
0+244.90)
Inspection for 8th MH-1.7.1
HFC- layer backfilling for From MH-1.7.1 to Area 7 to MH-1.7 09:30: Kiran, Sr.
SEW 0360 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 250mm dia MH-1.7 (IR-1) (0+244.90 00AM Engineer
uPVC to 0+320)
MH-2.6 to
Inspection for 5th
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 09:30: Kiran, Sr.
SEW 0361 (0+474.95 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 200mm dia 2.5 (IR-4) 00AM Engineer
to
uPVC
0+405.24)
MH-2.5 to
Inspection for 5th
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 09:30: Kiran, Sr.
SEW 0362 (0+405.24 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 200mm dia 2.4 (IR-4) 00AM Engineer
to
uPVC
0+335.52)
MH-2.4 to
Inspection for 5th
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 09:30: Kiran, Sr.
SEW 0363 (0+335.52 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 200mm dia 2.3 (IR-4) 00AM Engineer
to
uPVC
0+267.57)
MH-2.3 to
Inspection for 5th
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 09:30: Kiran, Sr.
SEW 0364 ( 0+267.57 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 200mm dia 2.2 (IR-4) 00AM Engineer
to
uPVC
0+198.48)
MH-1.7.4
Inspection for 3rd
to MH-
layer (with warning
HFC- from MH-1.7.4 to MH- 1.7.5 09:30: Kiran, Sr.
SEW 0365 tape ) backfilling for Area 5 13-Oct-14 13-Oct-14 7:30 A 10-11-2014
1.7.5 ( 0+004.60 00AM Engineer
sewer line 200mm dia
to
uPVC
0+107.65)

MH-1.7.5
Inspection for 3rd
to MH-
layer (with warning
HFC- from MH-1.7.5 to MH- 1.7.6 09:30: Kiran, Sr.
SEW 0366 tape ) backfilling for Area 5 13-Oct-14 13-Oct-14 7:30 A 10-11-2014
1.7.6 ( 0+107.65 00AM Engineer
sewer line 200mm dia
to
uPVC
0+057.35 )

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: Kiran, Sr.
SEW 0367 MH-6 13-Oct-14 13-Oct-14 7:30 A 3-11-2014
concreting for base MH-6 Area 00PM Engineer
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: Kiran, Sr.
SEW 0368 MH-1.7 13-Oct-14 13-Oct-14 7:30 C 14-10-2014
concreting for base MH-1.7 Area 00PM Engineer
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 03:30: Kiran, Sr.
SEW 0369 MH-1.1 13-Oct-14 13-Oct-14 7:30 AN 3-11-2014
concreting for base MH-1.1 Area 00PM Engineer
slab with benching

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-25,
MH-23 &
MH-22
Inspection for precast
[( 2+107.5
HFC- sewer manhole (base) MH-25, MH-23 & MH- Area 6 09:30: Kiran, Sr.
SEW 0370 0), 13-Oct-14 13-Oct-14 7:30 Revised 15-10-2014
placing including 22 (IR-1) 00AM Engineer
( 1+990.00
alignment and level
)&
( 1+906.31
)]

MH-21,
MH-20 &
MH-19
Inspection for precast
[( 1+846.8
HFC- sewer manhole (base) MH-21, MH-20 & MH- Area 6 09:30: Kiran, Sr.
SEW 0371 6), 13-Oct-14 13-Oct-14 7:30 A 26-10-2014
placing including 19 (IR-1) 00AM Engineer
( 1+811.63
alignment and level
)&
( 1+728.89
)]

MH-21.2,
MH-21.3 &
MH-21.1
Inspection for precast
[( 0+117.59
HFC- sewer manhole (base) MH-21.2, MH-21.3 & Area 6 09:30: Kiran, Sr.
SEW 0372 ), 13-Oct-14 13-Oct-14 7:30 A 28-12-2014
placing including MH-21.1 (IR-1) 00AM Engineer
( 0+070.00
alignment and level
)&
( 0+046.91
)]

MH-8.3,
MH-8.2 &
MH-8.1
Inspection for precast
[( 0+125.5
HFC- sewer manhole (base) MH-8.3, MH-8.2 & Area 6 09:30: Kiran, Sr.
SEW 0373 0), 13-Oct-14 13-Oct-14 7:30 AN 14-10-2014
placing including MH-8.1 (IR-1) 00AM Engineer
( 0+069.23
alignment and level
)&
( 0+041.37
2 )]

MH-2.2 to
Inspection for 4th
MH 2.1
HFC- layer backfilling for from MH-2.2 to MH- Area 9 09:30: Kiran, Sr.
SEW 0374 ( 0+198.46 13-Oct-14 13-Oct-14 7:30 A 2-11-2014
sewer line 200mm dia 2.1 (IR-4) 00AM Engineer
to
uPVC
0+135.14 )

Inspection of shutter,
reinforcement and
HFC- 10:00: Kiran, Sr.
SEW 0340A concrete for sewerage HC-01 Area 1 HC-01 13-Oct-14 13-Oct-14 7:30 AN 3-11-2014
00AM Engineer
House Connection
(HC)

Inspection of shutter,
reinforcement and
HFC- DC 01:30: Kiran, Sr.
SEW 0339A concrete for sewerage Area 1 13-Oct-14 13-Oct-14 07:30: AN 3-11-2014
(1+587.45) 00PM Engineer
discharge chamber 00 AM
(DC)

Inspection of shutter
HFC- Yard 03:30: 01:00: Kiran, Sr.
DR 0013 and concreting for Yard area 13-Oct-14 13-Oct-14 AN 3-11-2014
Area 00PM 00 Engineer
Storm Gully 2 nos
PM
Inspection for
for Irrigation Pump Irrigatio Irrigation
HFC- excavation and 04:30: Kiran, Sr.
IRR 001 Station ( as attached n pump pump 2-Oct-14 11:00 1-Oct-14 A 26-10-2014
prepared formation 00 Engineer
drawing ) station station
prior to Blinding PM
Inspection of
HFC- excavation and sewer line from D.C to DC 11:00:0 Kiran, Sr.
SEW 0375 Area 1 14-Oct-14 14-Oct-14 09:00: A 2-11-2014
prepared formation for 1+600 to1+600 0AM Engineer
00 AM
315mm dia uPVC

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual inspection of
HFC- 1st layer backfilling for HC-01 to 11:00:0 Kiran, Sr.
SEW 0376 from HC-01 TO HC-02 Area 1 14-Oct-14 14-Oct-14 09:00: AN 19-10-2014
315mm dia uPVC HC-02 0AM Engineer
00 AM
sewer line
Visual inspection of
HFC- 2nd layer backfilling HC-01 to 01:00: Kiran, Sr.
SEW 0377 from HC-01 TO HC-02 Area 1 14-Oct-14 14-Oct-14 09:00: A 10-11-2014
for 315mm dia uPVC HC-02 00PM Engineer
00 AM
sewer line
MH-1.8,
MH-1.9 &
MH-
Inspection for precast
1.10[( 0+0
HFC- sewer manhole (base) MH-1.8, MH-1.9 & 09:30: Kiran, Sr.
SEW 0378 Area 8 38.55), 15-Oct-14 15-Oct-14 07:30: A 16-10-2014
placing including MH-1.10 00AM Engineer
( 0+070.00 00 AM
alignment and level
)&
( 0+101.62
)]

Inspection for precast


MH-24
HFC- sewer manhole (base) Area 6 ( 09:30: Kiran, Sr.
SEW 0379 MH-24 ( 2+052.75 15-Oct-14 15-Oct-14 07:30: Revised 16-10-2014
placing including IR-1) 00AM Engineer
) 00 AM
alignment and level

Inspection for MH-1.8 to


granular bedding, and granular MH-1.7
HFC- from MH-1.8 to MH- Area 8 09:30: Kiran, Sr.
SEW 0348A laying geotextile, joint surrounding for sewer ( 0+038.55 15-Oct-14 15-Oct-14 07:30: A 16-10-2014
1.7 (IR-3) 00AM Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 0+347.29)
Inspection for MH-16 to
granular bedding, and granular MH-17
HFC- Area 6 09:30: Kiran, Sr.
SEW 0380 laying geotextile, joint surrounding for sewer from MH-16 to MH-17 ( 1+518.64 15-Oct-14 15-Oct-14 07:30: A 12/4/2014
(IR-1) 00AM Engineer
measurement of pipe line 200mm dia uPVC to 00 AM
laying 1+562.05)
MH-18 to
Visual inspection of
MH-17
HFC- 1st layer backfilling for 09:30: Kiran, Sr.
SEW 0381 from MH-18 to Mh-17 Area 6 (1+645.43 15-Oct-14 15-Oct-14 07:30: AN 19-10-2014
200mm dia uPVC 00AM Engineer
to 00 AM
sewer line
1+562.05 )
MH 19 to
Inspection for 3rd
MH 18
HFC- layer backfilling for From MH-19 to MH- Area 6 ( 09:30: Kiran, Sr.
SEW 0382 (1+728.89 15-Oct-14 15-Oct-14 07:30: A 23-11-2014
sewer line 200mm dia 18 IR-1 ) 00AM Engineer
to 00 AM
uPVC
1+645.43 )
Inspection of shutter
and concreting for Type A ( 4 no. ), Type
HFC- Yard 011:30: Kiran, Sr.
SEW 0383 Sewer House B ( 2 no. ) & Type C Yard area 15-Oct-14 15-Oct-14 09:30: A 9/8/2015
Area 00AM Engineer
Connections chamber ( 2 no. ) 00 AM
base
Inspection for MH-8.3 To
granular bedding, and granular MH-8.2
HFC- From MH-8.3 to MH- Area 6 ( 09:30: 07:30: Kiran, Sr.
SEW 0384 laying geotextile, joint surrounding for sewer ( 0+125.50 16-Oct-14 16-Oct-14 AN 26-10-2014
8.2 IR-6 ) 00AM 00AM Engineer
measurement of pipe line 200mm dia uPVC TO
laying 0+069.23 )
MH-8.2 To
Inspection for
MH-8.1
granular bedding, and granular
HFC- From MH-8.2 to MH- Area 6 ( ( 0+069.2 09:30: 07:30: Kiran, Sr.
SEW 0385 laying geotextile, joint surrounding for sewer 16-Oct-14 16-Oct-14 AN 26-10-2014
8.1 IR-6 ) 3 to 00AM 00AM Engineer
measurement of pipe line 200mm dia uPVC
0+041.372
laying
)

MH-8.2 To
Inspection for
MH-9
granular bedding, and granular
HFC- Area 6 ( ( 0+069.23 09:30: 07:30: Kiran, Sr.
SEW 0386 laying geotextile, joint surrounding for sewer From MH-8.2 to MH-9 16-Oct-14 16-Oct-14 A 26-10-2014
IR-6 ) to 00AM 00AM Engineer
measurement of pipe line 200mm dia uPVC
1+150.82
laying
)
Inspection of shutter,
water stopper & MH-25
HFC- Area 6 ( 09:30: 07:30: Kiran, Sr.
SEW 0387 concreting for the wall ( 2+107.50 16-Oct-14 16-Oct-14 Revised 16-10-2014
IR-1 ) 00AM 00AM Engineer
of Sewerage Manhole )
MH-25

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
water stopper & MH-24
HFC- Area 6 ( 09:30: 07:30: Kiran, Sr.
SEW 0388 concreting for the wall ( 2+052.75 16-Oct-14 16-Oct-14 AN 10-11-2014
IR-1 ) 00AM 00AM Engineer
of Sewerage Manhole )
MH-24
Inspection of shutter,
water stopper & MH-21
HFC- Area 6 ( 09:30: 07:30: Kiran, Sr.
SEW 0389 concreting for the wall ( 1+846.86 16-Oct-14 16-Oct-14 AN 10-11-2014
IR-1 ) 00AM 00AM Engineer
of Sewerage Manhole )
MH-21
MH-24 to
Inspection for 5th
MH-23
HFC- (Final layer ) Area 6 09:30: 07:30: Kiran, Sr.
SEW 0298A from MH-24 to MH-23 ( 2+052.7 16-Oct-14 16-Oct-14 A 10-11-2014
backfilling for sewer (IR-1) 00AM 00AM Engineer
5 to
line 200mm dia uPVC
1+990.00 )
MH-25 to
Inspection for 5th MH-24
HFC- (Final Layer ) Area 6 ( 2+107.5 09:30: 07:30: Kiran, Sr.
SEW 0300A from MH-25 to MH-24 16-Oct-14 16-Oct-14 A 10-11-2014
backfilling for sewer (IR-1) 0 TO 00AM 00AM Engineer
line 200mm dia uPVC 2+052.75
)
MH 20 to
Inspection for 3rd
MH 19
HFC- layer backfilling for From MH-20 to MH- Area 6 ( 09:30: 07:30: Kiran, Sr.
SEW 0390 ( 1+811.63 16-Oct-14 16-Oct-14 A 10-11-2014
sewer line 200mm dia 19 IR-1 ) 00AM 00AM Engineer
TO
uPVC
1+728.89 )
Inspection for
excavation and ( 1+550 )
HFC- From chainage 11:30:0 07:30: Kiran, Sr.
SEW 0391 prepared formation for Area 1 to 16-Oct-14 16-Oct-14 Revised 18-10-2014
( 1+550 ) to ( 1+480 ) 0AM 00AM Engineer
sewer Line 315mm ( 1+480 )
dia Upvc
MH
Inspection of breaking
JR08/1/1A/
HFC- of drainage manhole 08:00: 03:00: Kiran, Sr. RO/Rejecte
DR 0014 Gully line G5 Area 1 1 18-Oct-14 16-Oct-14 2-11-2014
for the connections of 00AM 00AM Engineer d
(10+100.0
160mm uPVC
0)
G5 to
JR08/1/1A/
Inspection of
1
HFC- connection for 160mm including st. special 08:00: 03:00: Kiran, Sr.
DR 0015 Area 1 (10+125.0 18-Oct-14 16-Oct-14 AN 2-11-2014
uPVC gully line (G5) JR08/1/1A/1 00AM 00AM Engineer
0)
to drainage manhole
(10+100.0
0)
Inspection of fixing
JR08/1/1A/
HFC- external water the drainage manhole 08:00: 03:00: Kiran, Sr.
DR 0016 Area 1 1 18-Oct-14 16-Oct-14 A 26-10-2014
proofing for the JR08/1/1A/1 00AM 00PM Engineer
(10+100.0
connection portions to
0)
Inspection of shutter,
HFC- water stopper & houe connection 08:00: 03:00: Kiran, Sr.
SEW 0392 Area 1 HC-01 18-Oct-14 16-Oct-14 Revised 18-10-2014
concreting for the wall chamber HC-01 00AM 00PM Engineer
of sewerage
Inspection for
excavation and ( 1+550 )
HFC- From chainage 10:30: 09:30: Kiran, Sr.
SEW 0391A prepared formation for Area 1 to 18-Oct-14 18-Oct-14 A 10-11-2014
( 1+550 ) to ( 1+480 ) 00AM 00PM Engineer
sewer Line 200mm ( 1+480 )
dia HDPE
Inspection and joint (2 Nos. including st.
HFC- measurement of pipe special) of 315mm dia 11:30:0 10:30: Kiran, Sr.
SEW 0393 Area 1 HC-01 18-Oct-14 18-Oct-14 AN 2-11-2014
laying for the UPVC sewer line to 0AM 00PM Engineer
connecton portion HC-01
Inspection for
excavation and
HFC- between HC-01 to Area 7 HC-01 to 02:30: 12:30: Kiran, Sr.
SEW 0394 formation preparation 18-Oct-14 18-Oct-14 A 10-11-2014
MH-1.7.1 (IR-1) MH-1.7.1 00PM 00PM Engineer
for sewer house
connection

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and
HFC- for HC-01 of sewer Area 7 02:30: 12:30: Kiran, Sr.
SEW 0395 formation preparation HC-01 18-Oct-14 18-Oct-14 A 10-11-2014
MH-1.7.1 (IR-1) 00PM 00PM Engineer
for sewer house
connection
Inspection for
excavation and
HFC- between HC-01 to Area 7 HC-01 to 02:30: 12:30: Kiran, Sr.
SEW 0396 formation preparation 18-Oct-14 18-Oct-14 A 10-11-2014
MH-1.7.3 (IR-1) MH-1.7.3 00PM 00PM Engineer
for sewer house
connection
Inspection for
excavation and
HFC- for HC-01 of sewer Area 7 02:30: 12:30: Kiran, Sr.
SEW 0397 formation preparation HC-01 18-Oct-14 18-Oct-14 A 10-11-2014
MH-1.7.3 (IR-1) 00PM 00PM Engineer
for sewer house
connection
Inspection of shutter,
HFC- water stopper & houe connection 03:00: 02:30: Kiran, Sr.
SEW 0392A Area 1 HC-01 18-Oct-14 18-Oct-14 AN 10-11-2014
concreting for the wall chamber HC-01 00PM 00PM Engineer
of sewerage

Inspection of 3rd layer


HFC- HC-01 to 03:00: 02:30: Kiran, Sr.
SEW 0398 backfilling for 315mm from HC-01 TO HC-02 Area 1 18-Oct-14 18-Oct-14 A 10-11-2014
HC-02 00PM 00PM Engineer
dia uPVC sewer line

Inspection of 4th layer


backfilling including
HFC- HC-01 to 09:00: 02:30: Kiran, Sr.
SEW 0399 warning tape for from HC-01 TO HC-02 Area 1 19-Oct-14 18-Oct-14 A 24-11-2014
HC-02 00AM 00PM Engineer
315mm dia uPVC
sewer line
Inspection for water
HFC- proofi ng (polyprime 09:00: 02:30: Kiran, Sr.
SEW 0400 Area 1 DC 19-Oct-14 18-Oct-14 Revised 22-10-2014
SB+Bitustick XL) for 00AM 00PM Engineer
sewer DC

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 09:30: Kiran, Sr.
SEW 0401 MH-10 19-Oct-14 19-Oct-14 7:30 AN 10-11-2014
concreting for base MH-10 Area 00AM Engineer
slab with benching

MH-1.10 to
Visual Inspection for
MH-1.9
HFC- 1st layer backfilling for from MH-1.10 to MH- Area 8 09:30: Kiran, Sr.
SEW 0402 (0+101.62 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
Sewer Line 200 mm 1.9 (IR-3) 00AM Engineer
to
Upvc
0+070.00)
MH-1.9 to
Visual Inspection for
MH-1.8
HFC- 1st layer backfilling for from MH-1.9 to MH- Area 8 09:30: Kiran, Sr.
SEW 0403 ( 0+070.00 19-Oct-14 19-Oct-14 7:30 A 20-10-2014
Sewer Line 200 mm 1.8 (IR-3) 00AM Engineer
to
Upvc
0+038.55)
MH-1.8 to
Visual Inspection for
MH-1.7
HFC- 1st layer backfilling for from MH-1.8 to MH- Area 8 09:30: Kiran, Sr.
SEW 0404 ( 0+038.55 19-Oct-14 19-Oct-14 7:30 A 20-10-2014
Sewer Line 200 mm 1.7 (IR-3) 00AM Engineer
to
Upvc
0+347.29)
MH-1.7 to
Visual Inspection for
MH-1.7.1
HFC- 1st layer backfilling for from MH-1.7 to MH- Area 7 09:30: Kiran, Sr.
SEW 0405 ( 0+347.29 19-Oct-14 19-Oct-14 7:30 A 20-10-2014
Sewer Line 250 mm 1.7.1 (IR-1) 00AM Engineer
to
Upvc
0+320.00)

MH-21.2 to
Inspection of 5th layer MH-21.3
HFC- from MH-21.2 to MH- Area 6 ( 09:30: Kiran, Sr.
SEW 0406 backfilling for 200mm (0+117.59 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
21.3 IR-8 ) 00AM Engineer
dia uPVC sewer line to
0+070.00 )

MH-21.3 to
Inspection of 5th layer MH-21.1
HFC- from MH-21.3 to MH- Area 6 ( 09:30: Kiran, Sr.
SEW 0407 backfilling for 200mm (0+070.00 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
21.1 IR-8 ) 00AM Engineer
dia uPVC sewer line to
0+046.91)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-21.3 to
Inspection of 5th layer MH-22
HFC- from MH-21.3 to MH- Area 6 ( 09:30: Kiran, Sr.
SEW 0408 backfilling for 200mm (0+070.00 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
22 IR-8 ) 00AM Engineer
dia uPVC sewer line to
1+906.31)
MH-18 to
Visual inspection of
MH-17
HFC- 2nd layer backfilling 09:30: Kiran, Sr.
SEW 0409 from MH-18 to Mh-17 Area 6 (1+645.43 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
for 200mm dia uPVC 00AM Engineer
to
sewer line
1+562.05 )
MH-16 to
Visual Inspection for
MH-17
HFC- 1st layer backfilling for Area 6 09:30: Kiran, Sr.
SEW 0410 from MH-16 to MH-17 ( 1+518.64 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
sewer line 200 mm (IR-1) 00AM Engineer
to
UPVC
1+562.05)
Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 2 - 09:30: Kiran, Sr.
SEW 0411 MH-21.2, from HC-02 19-Oct-14 19-Oct-14 7:30 A 7-12-2014
sewer House IR-8 ) H.C # 1 00AM Engineer
to HC-01
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 1 - 09:30: Kiran, Sr.
SEW 0412 MH-21.2, from HC-01 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
sewer House IR-8 ) MH-21.2 00AM Engineer
to MH-21.2
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 01 & 09:30: Kiran, Sr.
SEW 0413 MH-21.2, HC-01 & 19-Oct-14 19-Oct-14 7:30 A 4-12-2014
sewer House IR-8 ) H.C # 02 00AM Engineer
H.C-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 2 - 09:30: Kiran, Sr.
SEW 0414 MH-21.1, from HC-02 19-Oct-14 19-Oct-14 7:30 A 4-12-2014
sewer House IR-8 ) H.C # 1 00AM Engineer
to HC-01
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 1 - 09:30: Kiran, Sr.
SEW 0415 MH-21.1, from HC-01 19-Oct-14 19-Oct-14 7:30 A 4-12-2014
sewer House IR-8 ) MH-21.1 00AM Engineer
to MH-21.1
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( H.C # 01 & 09:30: Kiran, Sr.
SEW 0416 MH-21.1, HC-01 & 19-Oct-14 19-Oct-14 7:30 A 4-12-2014
sewer House IR-8 ) H.C # 02 00AM Engineer
H.C-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-01 to 09:30: Kiran, Sr.
SEW 0417 MH-24, from HC-01 to 19-Oct-14 19-Oct-14 7:30 A 10-11-2014
sewer House IR-1 ) HC-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-24 to 09:30: Kiran, Sr.
SEW 0418 MH-24, from MH-24 to 19-Oct-14 19-Oct-14 7:30 Revised 26-10-2014
sewer House IR-1 ) HC-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-03 to 09:30: Kiran, Sr.
SEW 0419 MH-24, from HC-03 to 19-Oct-14 19-Oct-14 7:30 A 2-11-2014
sewer House IR-1 ) HC-04 00AM Engineer
HC-04
connection line 160
mm dia

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-24 to 09:30: Kiran, Sr.
SEW 0420 MH-24, from MH-24 to 19-Oct-14 19-Oct-14 7:30 A 10-11-2014
sewer House IR-1 ) HC-04 00AM Engineer
HC-03
connection line 160
mm dia

Inspection for
excavation and H.C-01,
HFC- prepared formation for H.C-01, H.C -02, H.C- Area 6 ( H.C -02, 09:30: Kiran, Sr.
SEW 0421 19-Oct-14 19-Oct-14 7:30 A 2-11-2014
sewer House 03 & H.C-04 IR-1 ) H.C-03 & 00AM Engineer
connections OF MH- H.C-04
24

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-01 - 09:30: Kiran, Sr.
SEW 0422 MH-23, from HC-01 - 19-Oct-14 19-Oct-14 7:30 A 2-11-2014
sewer House IR-1 ) H.C-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-02 - 09:30: Kiran, Sr.
SEW 0423 MH-23, from HC-02 - 19-Oct-14 19-Oct-14 7:30 AN 10-11-2014
sewer House IR-1 ) MH-23 00AM Engineer
MH-23
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-03 - 09:30: Kiran, Sr.
SEW 0424 MH-23, from HC-03 - 19-Oct-14 19-Oct-14 7:30 A 23-11-2014
sewer House IR-1 ) MH-23 00AM Engineer
MH-23
connection line 160
mm dia

Inspection for
excavation and
H.C-01,
HFC- prepared formation for H.C-01, H.C -02 & Area 6 ( 09:30: Kiran, Sr.
SEW 0425 H.C -02 & 19-Oct-14 19-Oct-14 7:30 A 24-11-2014
sewer House H.C-03 IR-1 ) 00AM Engineer
H.C-03
connections OF MH-
23

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-01 - 09:30: Kiran, Sr.
SEW 0426 MH-22, from HC-01 - 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
sewer House IR-1 ) H.C-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( HC-02 - 09:30: Kiran, Sr.
SEW 0427 MH-22, from HC-02 - 19-Oct-14 19-Oct-14 7:30 A 12/4/2014
sewer House IR-1 ) MH-23 00AM Engineer
MH-22
connection line 160
mm dia

Inspection for
excavation and
HFC- prepared formation for Area 6 ( H.C-01 & 09:30: Kiran, Sr.
SEW 0428 H.C-01 & H.C -02 19-Oct-14 19-Oct-14 7:30 A 4-12-2014
sewer House IR-1 ) H.C -02 00AM Engineer
connections OF MH-
22
Inspection of granular
surround and for the connection
HFC- HC-1 (St. 09:00: Kiran, Sr.
SEW 0429 geotextile closing for portion from DC to Area 1 19-Oct-14 19-Oct-14 7:30 A 2-11-2014
special) 00AM Engineer
315 mm Upvc sewer HC-1
line
Inspection of granular
surround and for the connection HC-1 to
HFC- 09:00: Kiran, Sr.
SEW 0430 geotextile closing for portion from HC-1 to Area 1 HC-2 (St. 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
00AM Engineer
315 mm Upvc sewer HC-2 special)
line
Inspection for Plate
Load Test on Irrigatio Irrigation
HFC- for Irrigation Pump 04:30: Kiran, Sr.
IRR 002 formation ( prior to n pump pump 2-Oct-14 11:00 1-Oct-14 AN 14-10-2014
Station 00 Engineer
proceed further station station
PM
works )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and DC
HFC- 09:00: Kiran, Sr.
SEW 0431 prepared formation for Area 1 (1+587.45) 19-Oct-14 19-Oct-14 7:30 RO 9/8/2015
00AM Engineer
315mm dia uPVC to 1+600
sewer line

Inspection of 5th layer


HFC- HC-1 TO 10:00: Kiran, Sr.
SEW 0432 backfilling for 315mm from HC-01 TO HC-02 Area 1 19-Oct-14 19-Oct-14 7:30 RR 9/8/2015
HC-2 00AM Engineer
dia uPVC sewer line

Inspection for blinding


Irrigatio Irrigation
HFC- concrete pouring for Kiran, Sr.
IRR 003 (as attached drawing) n pump pump 11-Oct-14 11:30 11-Oct-14 10:00: AN 3-11-2014
Irrigation pumping Engineer
station station 00 AM
station

Inspection of shutter
Type A ( 2 no. ), Type
HFC- and concreting for Yard 11:00:0 Kiran, Sr.
SEW 0433 B ( 2 no. ) & Type C Yard area 19-Oct-14 19-Oct-14 7:30 AN 10-11-2014
base of Sewer House Area 0AM Engineer
( 2 no. )
Connections chamber

Inspection of shutter,
water stopper & MH-21.2
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0434 concreting for the wall ( 0+117.59 20-Oct-14 20-Oct-14 7:30 AN 10-11-2014
IR-8 ) 00AM Engineer
of Sewerage Manhole )
MH-21.2
Inspection of shutter,
water stopper & MH-21.3
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0435 concreting for the wall ( 0+070.00 20-Oct-14 20-Oct-14 7:30 AN 10-11-2014
IR-8 ) 00AM Engineer
of Sewerage Manhole )
MH-21.3
Inspection of shutter,
water stopper & MH-21.1
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0436 concreting for the wall ( 0+046.91 20-Oct-14 20-Oct-14 7:30 AN 10-11-2014
IR-8 ) 00AM Engineer
of Sewerage Manhole )
MH-21.1

Inspection for precast


MH-
HFC- sewer manhole (base) Area 8 09:00: Kiran, Sr.
SEW 0437 MH-16.2 16.2(0+10 20-Oct-14 20-Oct-14 7:30 A 26-10-2014
placing including (IR-7) 00AM Engineer
8.28)
alignment and level

Inspection for precast


HFC- sewer manhole (base) Area 8 MH-16.3 09:00: Kiran, Sr.
SEW 0438 MH-16.3 20-Oct-14 20-Oct-14 7:30 A 26-10-2014
placing including (IR-7) (0+063.63) 00AM Engineer
alignment and level

Inspection for precast


HFC- sewer manhole (base) Area 8 MH-16.1 09:00: Kiran, Sr.
SEW 0439 MH-16.1 20-Oct-14 20-Oct-14 7:30 Revised 27-10-2014
placing including (IR-7) (0+040.00) 00AM Engineer
alignment and level

Inspection of shutter,
water stopper & MH-8.3
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0440 concreting for the wall ( 0+125.50 20-Oct-14 20-Oct-14 7:30 AN 10-11-2014
IR-6 ) 00AM Engineer
of Sewerage Manhole )
MH-8.3
Inspection of shutter,
water stopper & MH-8.2
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0441 concreting for the wall ( 0+069.23 20-Oct-14 20-Oct-14 7:30 AN 9-11-2014
IR-6 ) 00AM Engineer
of Sewerage Manhole 0)
MH-8.2
Inspection of shutter,
water stopper & MH-8.1
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0442 concreting for the wall ( 0+041.37 20-Oct-14 20-Oct-14 7:30 AN 10-11-2014
IR-6 ) 00AM Engineer
of Sewerage Manhole 2)
MH-8.1
Inspection of shutter,
water stopper & MH-20
HFC- Area 6 ( 09:00: Kiran, Sr.
SEW 0443 concreting for the wall ( 1+811.63 20-Oct-14 20-Oct-14 7:30 Revised 26-10-2014
IR-1 ) 00AM Engineer
of Sewerage Manhole )
MH-20

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of laying
geotextile, gravel for 315mm uPVC
HFC- DC (1+587 09:00: Kiran, Sr.
SEW 0444 bedding, joint sewer line from DC to Area 1 20-Oct-14 20-Oct-14 8:30 A 2-11-2014
to 1+600) 00AM Engineer
measurement and ch.1+600
grannular surround
MH-2.6 to
Inspection for 6th
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 11:00:0 09:00: Kiran, Sr.
SEW 0445 (0+474.95 20-Oct-14 20-Oct-14 A 10-11-2014
sewer line 200mm dia 2.5 (IR-4) 0AM 00AM Engineer
to
uPVC
0+405.24)
MH-2.5 to
Inspection for 6th
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 11:00:0 09:00: Kiran, Sr.
SEW 0446 (0+405.24 20-Oct-14 20-Oct-14 A 10-11-2014
sewer line 200mm dia 2.4 (IR-4) 0AM 00AM Engineer
to
uPVC
0+335.52)
MH-2.4 to
Inspection for 6th
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 11:00:0 09:00: Kiran, Sr.
SEW 0447 (0+335.52 20-Oct-14 20-Oct-14 A 10-11-2014
sewer line 200mm dia 2.3 (IR-4) 0AM 00AM Engineer
to
uPVC
0+267.57)
MH-2.3 to
Inspection for 6th
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 11:00:0 09:00: Kiran, Sr.
SEW 0448 ( 0+267.57 20-Oct-14 20-Oct-14 A 10-11-2014
sewer line 200mm dia 2.2 (IR-4) 0AM 00AM Engineer
to
uPVC
0+198.48)
MH-2.2 to
Inspection for 5th
MH-2.1
HFC- layer backfilling for from MH-2.2 to MH- Area 9 11:00:0 09:00: Kiran, Sr.
SEW 0449 ( 0+198.4 20-Oct-14 20-Oct-14 A 10-11-2014
sewer line 200mm dia 2.1 (IR-4) 0AM 00AM Engineer
8 to
uPVC
0+135.14)
MH-1.10 to
Visual Inspection for
MH-1.9
HFC- 2nd layer backfilling from MH-1.10 to MH- Area 8 09:30: Kiran, Sr.
SEW 0450 (0+101.62 21-Oct-14 21-Oct-14 7:30 A 26-10-2014
for Sewer Line 200 1.9 (IR-3) 00AM Engineer
to
mm Upvc
0+070.00)
MH-1.9 to
Visual Inspection for
MH-1.8
HFC- 2nd layer backfilling from MH-1.9 to MH- Area 8 09:30: Kiran, Sr.
SEW 0451 ( 0+070.00 21-Oct-14 21-Oct-14 7:30 A 26-10-2014
for Sewer Line 200 1.8 (IR-3) 00AM Engineer
to
mm Upvc
0+038.55)
MH-1.8 to
Visual Inspection for
MH-1.7
HFC- 2nd layer backfilling from MH-1.8 to MH- Area 8 09:30: Kiran, Sr.
SEW 0452 ( 0+038.55 21-Oct-14 21-Oct-14 7:30 A 26-10-2014
for Sewer Line 200 1.7 (IR-3) 00AM Engineer
to
mm Upvc
0+347.29)
MH-1.7 to
Visual Inspection for
MH-1.7.1
HFC- 2nd layer backfilling from MH-1.7 to MH- Area 7 09:30: Kiran, Sr.
SEW 0453 ( 0+347.29 21-Oct-14 21-Oct-14 7:30 A 26-10-2014
for Sewer Line 250 1.7.1 (IR-1) 00AM Engineer
to
mm Upvc
0+320.00)
MH-1.10 to
Inspection for 3rd
MH-1.9
HFC- layer backfilling for from MH-1.10 to MH- Area 8 09:30: Kiran, Sr.
SEW 0454 (0+101.62 21-Oct-14 21-Oct-14 7:30 A 19-02-2015
Sewer Line 200 mm 1.9 (IR-3) 00AM Engineer
to
Upvc
0+070.00)
MH-1.9 to
Inspection for 3rd
MH-1.8
HFC- layer backfilling for from MH-1.9 to MH- Area 8 09:30: Kiran, Sr.
SEW 0455 ( 0+070.00 21-Oct-14 21-Oct-14 7:30 A 19-02-2015
Sewer Line 200 mm 1.8 (IR-3) 00AM Engineer
to
Upvc
0+038.55)
MH-1.8 to
Inspection for 3rd
MH-1.7
HFC- layer backfilling for from MH-1.8 to MH- Area 8 09:30: Kiran, Sr.
SEW 0456 ( 0+038.55 21-Oct-14 21-Oct-14 7:30 A 19-02-2015
Sewer Line 200 mm 1.7 (IR-3) 00AM Engineer
to
Upvc
0+347.29)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7 to
Inspection for 3rd
MH-1.7.1
HFC- layer backfilling for from MH-1.7 to MH- Area 7 09:30: Kiran, Sr.
SEW 0457 ( 0+347.29 21-Oct-14 21-Oct-14 7:30 A 19-02-2015
Sewer Line 250 mm 1.7.1 (IR-1) 00AM Engineer
to
Upvc
0+320.00)
Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( MH-1.10 to 09:30: Kiran, Sr.
SEW 0458 MH-1.10, from MH- 21-Oct-14 21-Oct-14 7:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
1.10 to HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 to 09:30: Kiran, Sr.
SEW 0459 MH-1.10, from HC-01 22-Oct-14 22-Oct-14 8:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
to HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 & 09:30: Kiran, Sr.
SEW 0460 MH-1.10, for HC-01 & 23-Oct-14 23-Oct-14 9:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( MH-1.12 to 09:30: Kiran, Sr.
SEW 0461 MH-1.12, from MH- 21-Oct-14 21-Oct-14 7:30 A 12/4/2014
sewer House IR-3 ) HC-02 00AM Engineer
1.12 to HC-01
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 to 09:30: Kiran, Sr.
SEW 0462 MH-1.12, from HC-01 22-Oct-14 22-Oct-14 8:30 AN 10-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
to HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 & 09:30: Kiran, Sr.
SEW 0463 MH-1.12, for HC-01 & 23-Oct-14 23-Oct-14 9:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( MH-1.11 to 09:30: Kiran, Sr.
SEW 0464 MH-1.11, from MH- 21-Oct-14 21-Oct-14 7:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
1.11 to HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 to 09:30: Kiran, Sr.
SEW 0465 MH-1.11, from HC-01 22-Oct-14 22-Oct-14 8:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
to HC-02
connection line 160
mm dia

Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 8 ( HC-01 & 09:30: Kiran, Sr.
SEW 0466 MH-1.11, for HC-01 & 23-Oct-14 23-Oct-14 9:30 A 9-11-2014
sewer House IR-3 ) HC-02 00AM Engineer
HC-02
connection line 160
mm dia
Inspection for water
HFC- proofi ng (polyprime sewer house 08:00: 07:30: Kiran, Sr.
SEW 0467 Area 1 HC 01 21-Oct-14 21-Oct-14 A 26-10-2014
SB+Bitustick connection HC 01 00AM 00AM Engineer
XL+Bittuboard) for

Inspection for precast


HFC- sewer manhole (base) Area 8 MH-1.14 02:00: 12:30: Kiran, Sr.
SEW 0282A MH-1.14 21-Oct-14 21-Oct-14 A 26-10-2014
placing including (IR-3) (0+439.70) 00PM 00PM Engineer
alignment and level

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.5
& MH-
Inspection for precast
1.7.6
HFC- sewer manhole (base) 02:00: 12:30: Kiran, Sr.
SEW 0314A MH-1.7.5 & MH-1.7.6 Area 5 [( 0+107.6 21-Oct-14 21-Oct-14 A 26-10-2014
placing including 00PM 00PM Engineer
5) &
alignment and level
( 0+057.35
)]

MH-1.7.2
& MH-
Inspection for precast
1.7.3
HFC- sewer manhole (base) Area 7 02:00: 12:30: Kiran, Sr.
SEW 0324A MH-1.7.2 & MH-1.7.3 [( 0+162.3 21-Oct-14 21-Oct-14 A 26-10-2014
placing including (IR-1) 00PM 00PM Engineer
2) &
alignment and level
( 0+078.78
)]

Inspection for precast


MH-1.11
HFC- sewer manhole (base) Area 8 02:00: 12:30: Kiran, Sr.
SEW 0325A MH-1.11 ( 0+185.70 21-Oct-14 21-Oct-14 A 26-10-2014
placing including (IR-3) 00PM 00PM Engineer
)
alignment and level

MH-25,
MH-23 &
MH-22
Inspection for precast
[( 2+107.5
HFC- sewer manhole (base) MH-25, MH-23 & MH- Area 6 02:00: 12:30: Kiran, Sr.
SEW 0370A 0), 21-Oct-14 21-Oct-14 UR
placing including 22 (IR-1) 00PM 00PM Engineer
( 1+990.00
alignment and level
)&
( 1+906.31
)]

Inspection of
excavation and
HFC- 1+550 to 02:00: 12:30: Kiran, Sr.
SEW 0468 prepared formation for Area 1 21-Oct-14 21-Oct-14 A 10-11-2014
1+560 00PM 00PM Engineer
200mm HDPE sewer
pressure line
Inspection of
excavation and
HFC- 1+460 to 02:00: 12:30: Kiran, Sr.
SEW 0469 prepared formation for Area 1 21-Oct-14 21-Oct-14 A 21-12-2014
1+480 00PM 00PM Engineer
200mm HDPE sewer
pressure line
Visual inspection for
HFC- 1st layer backfilling for 1+680 02:00: 12:30: Kiran, Sr.
SEW 0470 Area 1 21-Oct-14 21-Oct-14 A 26-10-2014
315mm upvc sewer to1+723.33 00PM 00PM Engineer
line
inspection for 2nd
HFC- layer backfilling for 1+680 02:00: 12:30: Kiran, Sr.
SEW 0471 Area 1 21-Oct-14 21-Oct-14 A 26-10-2014
315mm upvc sewer to1+723.33 00PM 00PM Engineer
line
Visual inspection for
HFC- 1st layer backfilling for 02:00: 12:30: Kiran, Sr.
SEW 0472 Area 1 HC-01 21-Oct-14 21-Oct-14 A 26-10-2014
sewerage HC 00PM 00PM Engineer
chamber surround
Inspection for 2nd
HFC- layer backfilling for 03:00: 12:30: Kiran, Sr.
SEW 0473 Area 1 HC-01 21-Oct-14 21-Oct-14 A 26-10-2014
sewerage HC 00PM 00PM Engineer
chamber surround
Inspection for 2nd
HFC- layer backfilling for 0+938.41 03:00: 12:30: Kiran, Sr.
SEW 0474 Area 1 21-Oct-14 21-Oct-14 A 2-11-2014
150mm upvc irigation to 0+990 00PM 00PM Engineer
transmission line
Inspection for 3rd
HFC- layer backfilling for 01:00: 12:30: Kiran, Sr.
SEW 0475 Area 1 HC-01 22-Oct-14 22-Oct-14 A 10-11-2014
sewerage HC 00PM 00PM Engineer
chamber surround
Inspection for 4th
HFC- layer backfilling for 01:00: 12:30: Kiran, Sr.
SEW 0476 Area 1 HC-01 22-Oct-14 22-Oct-14 A 17-02-2015
sewerage HC 00PM 00PM Engineer
chamber surround

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

inspection for 4th


HFC- layer backfilling for 1+680 03:00: 12:30: Kiran, Sr.
SEW 0477 Area 1 22-Oct-14 22-Oct-14 Revised 8-10-2014
315mm upvc sewer to1+723.33 00PM 00PM Engineer
line
Inspection for
HFC- excavation and irrigation transmission 0+880 to 10:00: Kiran, Sr.
IRR 004 Area 1 14-Oct-14 14-Oct-14 09:00: Revised 16-10-2014
prepared formation for line 0+904 00AM Engineer
00 AM
150mm dia uPVC
Inspection for
HFC- excavation and irrigation transmission 0+938.41 10:00: Kiran, Sr.
IRR 005 Area 1 14-Oct-14 14-Oct-14 09:00: Revised 16-10-2014
prepared formation for line to 0+990 00AM Engineer
00 AM
150mm dia uPVC
Inspection for
excavation and
HFC- irrigation transmission 0+904 to 11:00:0 Kiran, Sr.
IRR 006 prepared formation for Area 1 14-Oct-14 14-Oct-14 09:00: Revised 16-10-2014
line 0+938.41 0AM Engineer
concrete surround for 00 AM
150mm dia uPVC
Inspection and joint
HFC- measurement of pipe 0+938.41 09:00: Kiran, Sr.
IRR 007 transmission line Area 1 19-Oct-14 19-Oct-14 7:30 AN 8-12-2014
laying for 150mm dia to 0+990 00AM Engineer
UPVC irrigation
Visaual inspection for
soil surround for
HFC- 0+938.41 10:00: Kiran, Sr.
IRR 008 150mm dia uPVC Area 1 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
to 0+990 00AM Engineer
irrigation transmission
line
inspection for shutter,
water stopper &
HFC- 03:00: 12:30: Kiran, Sr.
SEW 0478 concreting for wall of Area 6 MH-22 22-Oct-14 22-Oct-14 AN 10-11-2014
00PM 00PM Engineer
Sewerage Manhole
MH- 22
inspection for shutter,
water stopper & MH-18
HFC- 03:00: 12:30: Kiran, Sr.
SEW 0479 concreting for wall of Area 6 ( 1+645.43 22-Oct-14 22-Oct-14 Revised 26-10-2014
00PM 00PM Engineer
Sewerage Manhole )
MH- 18
inspection for shutter,
water stopper &
HFC- 03:00: 12:30: Kiran, Sr.
SEW 0480 concreting for wall of Area 6 MH-16.2 22-Oct-14 22-Oct-14 AN 9-11-2014
00PM 00PM Engineer
Sewerage Manhole
MH- 16.2
Inspection for
Sewera
excavation and Sewerage
HFC- ge 11:00:0 08:30: Kiran, Sr.
SEW 0481 prepared formation for pump 23-Oct-14 23-Oct-14 A 24-11-2014
pump 0AM 00AM Engineer
Sewerage Pumping station
station
Station
inspection for shutter,
MH-1.14,
water stopper &
HFC- 11:00:0 08:30: Kiran, Sr.
SEW 0482 concreting for wall of Area 8 23-Oct-14 23-Oct-14 AN 10-11-2014
CH:0+439. 0AM 00AM Engineer
Sewerage Manhole
70
MH- 1.14
inspection for shutter,
MH-1.13,
water stopper &
HFC- 11:00:0 08:30: Kiran, Sr.
SEW 0483 concreting for wall of Area 8 23-Oct-14 23-Oct-14 AN 10-11-2014
CH:0+356. 0AM 00AM Engineer
Sewerage Manhole
00
MH- 1.13
inspection for shutter,
MH-1.10,
water stopper &
HFC- 11:00:0 08:30: Kiran, Sr.
SEW 0484 concreting for wall of Area 8 23-Oct-14 23-Oct-14 AN 10-11-2014
CH:0+101. 0AM 00AM Engineer
Sewerage Manhole
62
MH- 1.10
inspection for shutter,
MH-1.14,
water stopper &
HFC- 11:00:0 08:30: Kiran, Sr.
SEW 0485 concreting for wall of Area 8 23-Oct-14 23-Oct-14 AN 10-11-2014
CH:0+268. 0AM 00AM Engineer
Sewerage Manhole
79
MH- 1.12

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of
for Sewerage House HC - 01,
HFC- formwork and mass 11:00:0 08:30: Kiran, Sr.
SEW 0486 Connection Chamber Area 1 CH:1+723. 23-Oct-14 23-Oct-14 AN 21-01-2015
concreting of the 0AM 00AM Engineer
HC-01 5
benching

inspection for shutter,


reinforcement and
HFC- precast 11:00:0 09:30: Kiran, Sr.
SEW 0487 concreting for base HC-2 23-Oct-14 23-Oct-14 AN 24-11-2014
yard 0AM 00AM Engineer
slab of House
connection HC-2

Inspection for
HFC- as per
excavation and 10+040 11:00:0 09:30: Kiran, Sr.
ITS/DI 001 attache 23-Oct-14 23-Oct-14 A 28-10-2014
C prepared formation for to10+90 0AM 00AM Engineer
d sheet
4WXD54 DU Duct line

inspection for shutter,


water stopper &
HFC- 03:00: 12:30: Kiran, Sr.
SEW 0488 concreting for wall of Area 6 MH-16.3 22-Oct-14 22-Oct-14 AN 10-11-2014
00PM 00PM Engineer
Sewerage Manhole
MH- 16.3
MH-8.3 -
Visual Inspection for MH-8.2 ,
HFC- 1st & 2nd layer back between MH: 8.3 - CH 09:00: 7:00:3 Kiran, Sr.
SEW 0489 Area 6 26-Oct-14 26-Oct-14 A 28-10-2014
filling for 200 mm dia MH: 8.2 0+125.50 00AM 0AM Engineer
Sewer line &CH
0+069.25

MH-8.2 -
Visual Inspection for MH-8.1 ,
HFC- 1st & 2nd layer back between MH: 8.2 - CH 09:00: 7:00:3 Kiran, Sr.
SEW 0490 Area 6 26-Oct-14 26-Oct-14 A 28-10-2014
filling for 200 mm dia MH: 8.1 0+69.25 00AM 0AM Engineer
Sewer line &CH
0+041.377
MH-8.2 -
Visual Inspection for
MH-9 , CH
HFC- 1st & 2nd layer back between MH: 8.2 - 09:00: 7:00:3 Kiran, Sr.
SEW 0491 Area 6 0+69.23 26-Oct-14 26-Oct-14 A 28-10-2014
filling for 200 mm dia MH: 9 00AM 0AM Engineer
&CH
Sewer line
1+160.82
MH-1.10 -
Inspection for 4th
MH-1.9 ,
HFC- layer back filling for between MH: 1.10 - 09:00: 7:00:3 Kiran, Sr.
SEW 0492 Area 8 CH 0+ 26-Oct-14 26-Oct-14 A 10-11-2014
200 mm dia Sewer MH: 1.9 00AM 0AM Engineer
101.62 &
line
CH 0+070
MH-1.9 -
Inspection for 4th
MH-1.8 ,
HFC- layer back filling for between MH: 1.9 - 09:00: 7:00:3 Kiran, Sr.
SEW 0493 Area 8 CH 0+070 26-Oct-14 26-Oct-14 A 10-11-2014
200 mm dia Sewer MH: 1.8 00AM 0AM Engineer
& CH
line
0+038.65
MH-1.8 -
Inspection for 4th MH-1.7 ,
HFC- layer back filling for between MH: 1.8 - CH 0 + 09:00: 7:00:3 Kiran, Sr.
SEW 0494 Area 8 26-Oct-14 26-Oct-14 A 10-11-2014
200 mm dia Sewer MH: 1.7 374.25 00AM 0AM Engineer
line &CH
0+347.29

MH-1.7 -
Inspection for 4th MH-1.7.1 ,
HFC- layer back filling for from MH: 1.7 to MH: CH 09:00: 7:00:3 Kiran, Sr.
SEW 0495 Area 7 26-Oct-14 26-Oct-14 A 10-11-2014
250 mm dia Sewer 1.7.1 0+347.29 00AM 0AM Engineer
line & CH
0+244.90

Inspection of pouring HC-01


HFC- blinding concrete for HC-01 ,HC-02 ,HC-03 ,HC-02 09:00: 7:00:3 Kiran, Sr.
SEW 0496 Area 7 26-Oct-14 26-Oct-14 AN 15-01-2015
Sewer House ,HC-04 OF MH-25 ,HC-03 00AM 0AM Engineer
connection chambers ,HC-04

Inspection and joint


HFC- CH:
measurement for from 10+040 to 10 11:00:0 7:00:3 Kiran, Sr.
ITS/DI 002 Area 1 10+040 to 26-Oct-14 26-Oct-14 A 4-11-2014
C laying of 4wxD54 DU +090 0AM 0AM Engineer
10 +090
duct line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visaual inspection for


1st layer backfilling for
HFC- 0+938.41 11:00:0 Kiran, Sr.
IRR 009 150mm dia uPVC Area 1 19-Oct-14 19-Oct-14 7:30 A 26-10-2014
to 0+990 0AM Engineer
irrigation transmission
line
for sewer line of
Inspection of laying of
HFC- house connection 160 MH: 25 - 11:00:0 10:00: Kiran, Sr.
SEW 0497 geotextile and Area 6 26-Oct-14 26-Oct-14 Revised 3-11-2014
mm dia upvc from HC-04 0AM 30AM Engineer
granular bedding
MH: 25 - HC-04
for sewer line of
Inspection of laying of
HFC- house connection 160 MH: 25 - 11:00:0 10:00: Kiran, Sr.
SEW 0498 geotextile and Area 6 26-Oct-14 26-Oct-14 A 3-11-2014
mm dia upvc from HC-02 0AM 30AM Engineer
granular bedding
MH: 25 - HC-02
for sewer line of
Inspection of laying of
HFC- house connection 160 MH: 24 - 11:00:0 10:00: Kiran, Sr.
SEW 0499 geotextile and Area 6 26-Oct-14 26-Oct-14 A 3-11-2014
mm dia upvc from HC-03 0AM 30AM Engineer
granular bedding
MH: 24 - HC-03
for sewer line of
house connection 160 HC-3 to
HFC- Inspection of laying 11:00:0 10:00: Kiran, Sr.
SEW 0500 mm dia upvc from Area 6 HC-4 (MH- 26-Oct-14 26-Oct-14 Revised 8-10-2014
for granular bedding 0AM 30AM Engineer
HC-3 - HC-04 of MH- 25)
25
for sewer line of
Inspection and joint
HFC- house connection 160 MH: 25 - 11:00:3 10:00: Kiran, Sr.
SEW 0501 measurement of pipe Area 6 26-Oct-14 26-Oct-14 AN 9-12-2014
mm dia upvc from HC-04 0AM 30AM Engineer
laying
MH: 25 - HC-04
for sewer line of
Inspection and joint
HFC- house connection 160 MH: 25 - 11:00:3 10:00: Kiran, Sr.
SEW 0502 measurement of pipe Area 6 26-Oct-14 26-Oct-14 Revised 28-10-2014
mm dia upvc from HC-02 0AM 30AM Engineer
laying
MH: 25 - HC-02
for sewer line of
Inspection and joint
HFC- house connection 160 MH: 24 - 11:00:3 10:00: Kiran, Sr.
SEW 0503 measurement of pipe Area 6 26-Oct-14 26-Oct-14 Revised 28-10-2014
mm dia upvc from HC-03 0AM 30AM Engineer
laying
MH: 24 - HC-03
for sewer line of
Inspection and joint
HFC- house connection 160 H:C 03 - 11:00:3 10:00: Kiran, Sr.
SEW 0504 measurement of pipe Area 6 26-Oct-14 26-Oct-14 Revised 9/8/2015
mm dia upvc from HC: HC-04 0AM 30AM Engineer
laying
03 - HC-04
for sewer line of
Inspection of granular
HFC- house connection 160 MH: 25 - 11:00:3 10:00: Kiran, Sr.
SEW 0505 surround and closing Area 6 26-Oct-14 26-Oct-14 A 3-11-2014
mm dia upvc from HC-04 0AM 30AM Engineer
of geotextile
MH: 25 - HC-04
for sewer line of
Inspection of granular
HFC- house connection 160 MH: 25 - 11:00:3 10:00: Kiran, Sr.
SEW 0506 surround and closing Area 6 26-Oct-14 26-Oct-14 A 3-11-2014
mm dia upvc from HC-02 0AM 30AM Engineer
of geotextile
MH: 25 - HC-02
for sewer line of
Inspection of granular
HFC- house connection 160 MH: 24 - 11:00:3 10:00: Kiran, Sr.
SEW 0507 surround and closing Area 6 26-Oct-14 26-Oct-14 A 3-11-2014
mm dia upvc from HC-03 0AM 30AM Engineer
of geotextile
MH: 24 - HC-03
for sewer line of
house connection 160 HC-3 to
HFC- Inspection of granular 11:00:3 10:00: Kiran, Sr.
SEW 0508 mm dia upvc from Area 6 HC-4 (MH- 26-Oct-14 26-Oct-14 Revised 1-11-2014
surround 0AM 30AM Engineer
HC-03 - HC-04 of MH- 25)
25
inspection for shutter,
water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0509 concreting for wall of Area 5 MH-1.7.6 26-Oct-14 26-Oct-14 AN 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.7.6
inspection for shutter,
water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0510 concreting for wall of Area 5 MH-1.7.5 26-Oct-14 26-Oct-14 AN 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.7.5

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

inspection for shutter,


water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0511 concreting for wall of Area 5 MH-1.7.4 26-Oct-14 26-Oct-14 A 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.7.4
inspection for shutter,
water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0512 concreting for wall of Area 8 MH-1.9 26-Oct-14 26-Oct-14 AN 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.9
inspection for shutter,
water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0513 concreting for wall of Area 8 MH-1.8 26-Oct-14 26-Oct-14 AN 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.8
inspection for shutter,
water stopper &
HFC- 03:00: 10:30: Kiran, Sr.
SEW 0514 concreting for wall of Area 8 MH-1.11 26-Oct-14 26-Oct-14 AN 24-11-2014
00PM 00AM Engineer
Sewerage Manhole
MH- 1.11
Inspection for
excavation and
HFC- from CHainage 0+445 0+445 - 11:00:0 10:30: Kiran, Sr.
WD 001 prepared formation of Area 7 26-Oct-14 26-Oct-14 AN 27-10-2014
- 0+700 0+700 0AM 00AM Engineer
150 mm dia GRE
water line
Inspection for
HFC- excavation and irrigation transmission 0+938.41 01:00: 12:30: Kiran, Sr.
IRR 005A Area 1 22-Oct-14 22-Oct-14 A 17-02-2015
prepared formation for line to 0+990 00PM 00PM Engineer
150mm dia uPVC
inspection for shutter,
water stopper &
HFC- Area 6 MH-18,CH 10:00: 9:30:0 Kiran, Sr.
SEW 0479A concreting for wall of 11-Nov-14 11-Nov-14 A 9/8/2015
(IR1) 1+645.43 00AM 0AM Engineer
Sewerage Manhole
MH- 18
Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-24 to 11:00:0 7:30:0 Kiran, Sr.
SEW 0418A MH-24, from MH-24 to 27-Oct-14 26-Oct-14 Revised 2-11-2014
sewer House IR-1 ) HC-02 0AM 0AM Engineer
HC-02
connection line 160
mm dia
Inspection of shutter,
water stopper & MH-20
HFC- Area 6 ( 430:00 7:30:0 Kiran, Sr.
SEW 0443A concreting for the wall ( 1+811.63 16-Feb-15 ` Revised 2-03-2015
IR-1 ) :00PM 0AM Engineer
of Sewerage Manhole )
MH-20
Inspection for
excavation and
HFC- irrigation transmission 0+904 to 01:00: 12:30: Kiran, Sr.
IRR 006A prepared formation for Area 1 22-Oct-14 22-Oct-14 A 17-02-2015
line 0+938.41 00PM 00PM Engineer
concrete surround for
150mm dia uPVC

Inspection for HC-02 to


excavation and From HC-02 to Existing
HFC- 03:00: 8:30:0 Kiran, Sr.
SEW 0515 prepared formation Existing MH Area 1 MH 27-Oct-14 27-Oct-14 Revised 4-12-2014
00PM 0AM Engineer
for 315 mm dia Upvc S19/24/10A/5 S19/24/10
Sewer force main line A/5

Inspection for
excavation and
HFC- in area- 1 at ch HC-02, CH 03:00: 1:30:0 Kiran, Sr.
SEW 0516 prepared formation Area 1 27-Oct-14 27-Oct-14 A 10-11-2014
1+747,68 1+747.67 00PM 01PM Engineer
for House Connection
chamber HC- 02

Inspection and joint


measurement of pipe
HFC- in area- 4 from ch 0+920 to 09:00: 1:30:0 Kiran, Sr.
SEW 0517 laying for 200 mm dia Area 4 28-Oct-14 27-Oct-14 Revised 1-11-2014
0+920 - 1+150 1+150 00AM 01PM Engineer
HDPE Sewer force
main line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

from ch 0+060 to
Inspection and joint CH 0+
HFC- for 225 mm dia GRE 0+160 in area 4 over 09:00: 8:30:0 Kiran, Sr.
WD 002 measurement of pipe Area 4 060 to 0+ 28-Oct-14 27-Oct-14 Revised 1-11-2014
water line the bridge RHS 00AM 0PM Engineer
laying 160
towards Island
Inspection and joint abutment-
HFC- measurement of pipe from abutment-1 to 1 to 09:00: 8:30:0 Kiran, Sr.
ITS/DI 003 Area 4 28-Oct-14 27-Oct-14 Revised 1-11-2014
C laying for 4w x D54 abutment-2 abutment- 00AM 0PM Engineer
DU duct pipe line 2
Inspection of shutter,
water stopper & MH-1.7.3
HFC- 11:00:0 7:30:0 Kiran, Sr.
SEW 0518 concreting for the wall Area 7 ( 0+079.78 28-Oct-14 28-Oct-14 AN 4-12-2014
0AM 0AM Engineer
of Sewerage Manhole )
MH-1.7.3
Inspection of shutter,
water stopper & MH-
HFC- 11:00:0 7:30:0 Kiran, Sr.
SEW 0519 concreting for the wall Area 9 2.3( 0+267 28-Oct-14 28-Oct-14 A 24-11-2014
0AM 0AM Engineer
of Sewerage Manhole .57)
MH-2.3
Inspection of pouring MH-1.7.
HFC- 11:00:0 7:30:0 Kiran, Sr.
SEW 0520 blinding concrete for Area 7 ( 0+ 28-Oct-14 28-Oct-14 AN 24-11-2014
0AM 0AM Engineer
sewer MH-1.7 347.29)

Inspection of pouring (MH 24)


blinding concrete for HC-01
HFC- (MH 24) HC-01 ,HC- 09:00: 7:00:3 Kiran, Sr.
SEW 0521 Sewer House Area 6 ,HC-02 28-Oct-14 28-Oct-14 AN 24-11-2014
02 ,HC-03 ,HC-04 00AM 0AM Engineer
connection chambers ,HC-03
of sewer MH 24 ,HC-04

Inspection of pouring
(MH 23)
blinding concrete for
HFC- (MH 23) HC-01 ,HC- HC-01 09:00: 7:00:3 Kiran, Sr.
SEW 0522 Sewer House Area 6 28-Oct-14 28-Oct-14 AN 24-11-2014
02 ,HC-03 ,HC-02 00AM 0AM Engineer
connection chambers
,HC-03
of sewer MH 23

Inspection of pouring
blinding concrete for (MH 22)
HFC- (MH 22) HC-01 ,HC- 09:00: 7:00:3 Kiran, Sr.
SEW 0523 Sewer House Area 6 HC-01 28-Oct-14 28-Oct-14 AN 24-11-2014
02 00AM 0AM Engineer
connection chambers ,HC-02
of Sewer MH 22

Inspection of pouring
blinding concrete for (MH 21.2)
HFC- (MH 21.2) HC-01 09:00: 7:00:3 Kiran, Sr.
SEW 0524 Sewer House Area 6 HC-01 28-Oct-14 28-Oct-14 AN 24-11-2014
,HC-02 00AM 0AM Engineer
connection chambers ,HC-02
of sewer MH 21.2

Inspection of pouring
blinding concrete for (MH 21.1)
HFC- (MH 21.1) HC-01 09:00: 7:00:3 Kiran, Sr.
SEW 0525 Sewer House Area 6 HC-01 28-Oct-14 28-Oct-14 AN 24-11-2014
,HC-02 00AM 0AM Engineer
connection chambers ,HC-02
of sewer MH 21.1

Inspection for water


HFC- for the base of Sewer MH 25 CH 11:30:0 7:00:3 Kiran, Sr.
SEW 0526 proofing (Polyprime Area 6 28-Oct-14 28-Oct-14 A 2-11-2014
MH 25 2+107.50 0AM 0AM Engineer
SB + Bitustic XL)
Inspection for water
HFC- for the wall of Sewer MH 25 CH 11:30:0 7:00:3 Kiran, Sr.
SEW 0527 proofing (Polyprime Area 6 28-Oct-14 28-Oct-14 A 2-11-2014
MH 25 2+107.50 0AM 0AM Engineer
SB + Bitustic XL)
Inspection for water
HFC- for the base of Sewer MH 24 CH 11:30:0 7:00:3 Kiran, Sr.
SEW 0528 proofing (Polyprime Area 6 28-Oct-14 28-Oct-14 A 2-11-2014
MH 24 2+062.76 0AM 0AM Engineer
SB + Bitustic XL)
Inspection for water
HFC- for the wall of Sewer MH 24 CH 11:30:0 7:00:3 Kiran, Sr.
SEW 0529 proofing (Polyprime Area 6 28-Oct-14 28-Oct-14 A 2-11-2014
MH 24 2+062.76 0AM 0AM Engineer
SB + Bitustic XL)
Inspection for Irrigation road
HFC- excavation and crossing duct at ch 10 01:00: 12:30: Kiran, Sr.
IRR 0010 Area 1 10+114.22 22-Oct-14 22-Oct-14 Revised 17-02-2015
prepared formation +114 .225 in area -1 00PM 00PM Engineer
5
for 1wx300mm dia RrHS)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and
HFC- from CHainage 1+000 1+000 - 10:00: 7:00:3 Kiran, Sr.
WD 003 prepared formation of Area 8 28-Oct-14 28-Oct-14 Revised 2-11-2014
- 1+200 0+200 00AM 0AM Engineer
150 mm dia GRE
potable water line
Inspection and joint
measurement for pipe
HFC- from CHainage 1+000 1+000 - 11:00:0 7:00:3 Kiran, Sr.
WD 004 laying of 150 mm dia Area 8 28-Oct-14 28-Oct-14 Revised 1-11-2014
- 1+050 0+050 0AM 0AM Engineer
GRE potable water
line
Inspection and joint
measurement for pipe
HFC- from CHainage 0+445 0+445 - 11:00:0 7:00:3 Kiran, Sr.
WD 005 laying of 150 mm dia Area 7 28-Oct-14 28-Oct-14 Revised 1-11-2014
- 0+700 0+0700 0AM 0AM Engineer
GRE potable water
line
Inspection for
excavation and
HFC- from CHainage 0+545 0+545- 0+ 11:00:0 7:00:3 Kiran, Sr.
WD 006 prepared formation of Area 7 28-Oct-14 28-Oct-14 Revised 2-11-2014
- 0+445 445 0AM 0AM Engineer
150 mm dia GRE
potable water line
Inspection and joint Irrigation line,
HFC- mesurement of pipe 1wx300mm dia and 0+904 to 01:00: 12:30: Kiran, Sr.
IRR 0011 Area 1 22-Oct-14 22-Oct-14 AN 2-11-2014
laying for 150 mm dia 2wx150mm dia spare 0+938.41 00PM 00PM Engineer
upvc duct
Irrigation line,
Inspection of shutter
HFC- 1wx300mm dia and 0+904 to 01:00: 12:30: Kiran, Sr.
IRR 0012 for concrete surround Area 1 22-Oct-14 22-Oct-14 AN 24-11-2014
2wx150mm dia spare 0+938.41 00PM 00PM Engineer
for 150 mm dia upvc
duct
Inspection for
HFC- excavation and irrigation transmission 0+740 to 0 11:00:0 7:00:3 Kiran, Sr.
IRR 0013 Area 1 26-Oct-14 26-Oct-14 A 19-02-2015
prepared formation for line +845 0AM 0AM Engineer
150mm dia uPVC
Inspection of
HFC- excavated soil from chainage 10+040 to 01:00: 11:30: Kiran, Sr.
ITS/DI 004 Area 1 28-Oct-14 28-Oct-14 A 2-11-2014
C surround (RHS/LHS) 10+040 - 10+090 10+090 00PM 00AM Engineer
for 4wxD54 DU duct

Inspection and joint from CHainage 0+160


HFC- measurement for pipe - 0+560 over the 0+160 to 05:00: 1:00:0 Kiran, Sr.
WD 007 Area 4 29-Oct-14 28-Oct-14 Revised 11/1/2014
laying of 225 mm dia bridge RHS towards 0+560 00PM 0PM Engineer
GRE water line island

Visual inspection of
HFC-
1st layer back filling from ch 0+040 - 0+040 to 03:00: 1:00:0 Kiran, Sr.
ITS/DI 005 Area 1 28-Oct-14 28-Oct-14 A 11/2/2014
C for 4wxD54 DU duct 0+090 0+090 00PM 0PM Engineer
line
for 2wx150mm dia
inspection for upvc IRR Road
HFC- 01:00: 11:30: Kiran, Sr.
IRR 0014 excavation and crossing duct at ch Area 1 10+87.74 26-Oct-14 26-Oct-14 A 2/19/2015
00PM 00AM Engineer
prepared formation 10+87.74 +300 MM
dia upvc
Abutment
1 to 2
Inspection and joint duct 4WxD54 from
HFC- (10+323.2 05:00: 01:30: Kiran, Sr.
ETC 008A measurement for abutment 1 to Area 4 29-Oct-14 28-Oct-14 Revised 11/1/2014
to 00PM 00PM Engineer
laying of Etisalat abutment 2
10+825.00
)

MH-2.5,
MH-2.4, &
MH-2.2
Inspection for precast
[( 0+405.2
HFC- sewer manhole (base) MH-2.5, MH-2.4 & Area 9 03:00: 01:30: Kiran, Sr.
SEW 0326A ` 4), 28-Oct-14 28-Oct-14 A 11/2/2014
placing including MH-2.2 (IR-4) 00PM 00PM Engineer
( 0+335.52
alignment and level
)&
( 0+198.46
)]

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation &
HFC- from MH 2.10 to MH MH 2.10 to 03:00: 01:30: Kiran, Sr.
DR 0017 formation for 500mm Area 7 28-Oct-14 28-Oct-14 Revised 11/2/2014
2.9 MH 2.9 00PM 00PM Engineer
dia GRP storm water
Line
Inspection for
excavation &
HFC- from MH 2.9 to MH MH 2.9 to 03:00: 01:30: Kiran, Sr.
DR 0018 formation for 500mm Area 7 28-Oct-14 28-Oct-14 Revised
2.8 MH 2.8 00PM 00PM Engineer
dia GRP storm water
Line
Inspection for
excavation &
HFC- from MH 2.8 to MH MH 2.8 to 03:00: 01:30: Kiran, Sr.
DR 0019 formation for 500mm Area 7 28-Oct-14 28-Oct-14 Revised 11/2/2014
2.7 MH 2.7 00PM 00PM Engineer
dia GRP storm water
Line
Inspection of shutter,
water stopper &
HFC- 9:00:0 08:30: Kiran, Sr.
SEW 0530 concreting for the wall Area 7 MH 1.7.1 29-Oct-14 29-Oct-14 AN 12/4/2014
0AM 00AM Engineer
of Sewerage Manhole
MH-1.7.1
Inspection of shutter,
water stopper &
HFC- 9:00:0 08:30: Kiran, Sr.
SEW 0531 concreting for the wall Area 7 MH 1.7.2 29-Oct-14 29-Oct-14 AN 12/4/2014
0AM 00AM Engineer
of Sewerage Manhole
MH-1.7.2

Inspection for pouring


HFC- blinding concrete for 9:00:0 08:30: Kiran, Sr.
SEW 0532 Area 1 HC- 2 29-Oct-14 29-Oct-14 AN 12/17/2014
sewerage House 0AM 00AM Engineer
connection HC- 02

Inspection for water


over the blinding
HFC- proofing (Polyprime HC-02 CH 11:30:0 8:00:3 Kiran, Sr.
SEW 0533 concrete of house Area 1 29-Oct-14 29-Oct-14 A 11/2/2014
SB + Bitustic 1+747.64 0AM 0AM Engineer
connection HC-02
X+bituboard)
Inspection and joint
HFC- measurement of pipe 0+880 to 09:00: 08:30: Kiran, Sr.
IRR 0015 transmission line Area 1 29-Oct-14 29-Oct-14 AN 11/2/2014
laying for 150mm dia 0+904 00AM 00AM Engineer
UPVC irrigation
Inspection for
Irrigation road
excavation and
HFC- crossing duct at ch 10 11:00:0 8:30:0 Kiran, Sr.
IRR 0010A prepared formation Area 1 10+114.22 27-Oct-14 27-Oct-14 AN 2/24/2015
+114 .225 in area -1 0AM 0AM Engineer
for 1wx300 + 2wx150 5
RrHS)
mm dia UPVC
for Irrigation pump Irrigatio Irrigation
HFC- Inspection for original 11:30:0 7:00:3 Kiran, Sr. RO/Rejecte
IRR 0016 station as per n pump pump 28-Oct-14 28-Oct-14 11/2/2014
ground level (OGL) 0AM 0AM Engineer d
attacehed sketch station station

for 2wx150mm dia +


HFC- inspection and joint 1wx3oomm dia upvc 01:00: 11:30: Kiran, Sr.
IRR 0017 Area 1 10+114.22 28-Oct-14 28-Oct-14 AN 11/2/2014
measurement IRR Road crossing 00PM 00AM Engineer
5, RHS
duct at ch 10+114.225

1wx300mm dia +
Inspection of shutter 2wx150mm dia
HFC- 01:00: 11:30: Kiran, Sr.
IRR 0018 concreting of irrigation road Area 1 10+87.74, 28-Oct-14 28-Oct-14 AN 11/24/2014
00PM 00AM Engineer
surround for crossing duct at CH RHS
10+87.74
for 2wx150mm dia
inspection for upvc + 1wx300mm
HFC- 10+146.02 01:00: 11:30: Kiran, Sr.
IRR 0019 excavation and dia upvc IRR Road Area 1 28-Oct-14 28-Oct-14 A 11/24/2014
9, RHS 00PM 00AM Engineer
prepared formation crossing duct at ch
10+146.029
Visual Inspection of
HFC- 2nd layer back filling 10+040 11:00:0 08:30: Kiran, Sr.
ITS/DI 006 Area 1 29-Oct-14 29-Oct-14 A 11/2/2014
C for 4WXD54 DU Duct to10+050 0AM 00AM Engineer
line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
water stopper & MH-2.4
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0534 concreting for the wall ( 0+335.62 29-Oct-14 29-Oct-14 AN 11/24/2014
9( IR-4 ) 00PM 0PM Engineer
of Sewerage Manhole )
MH-2.4
Inspection of shutter,
water stopper & MH-2.2
HFC- Area 9 ( 03:00: 1:30:0 Kiran, Sr.
SEW 0535 concreting for the wall ( 0+198.46 29-Oct-14 29-Oct-14 AN 11/24/2014
IR-4 ) 00PM 0PM Engineer
of Sewerage Manhole )
MH-2.2
MH -2 ,CH
Inspection for 200 mm dia upvc 0+742.88
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0536 excavation (1st sewer line from MH to MH-3, 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-4) 00PM 0PM Engineer
lowering step) for -2 to MH-3 CH
0+811.85
MH -3 ,CH
Inspection for 200 mm dia upvc 0+811.83
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0537 excavation (1st sewer line from MH to MH-4, 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-4) 00PM 0PM Engineer
lowering step) for -3 to MH-4 CH
0+861.72
MH -4 ,CH
Inspection for 200 mm dia upvc 0+861.72
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0538 excavation (1st sewer line from MH to MH-5, 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-4) 00PM 0PM Engineer
lowering step) for -4 to MH-5 CH
0+911.85
MH -2 ,CH
Inspection for 200 mm dia upvc 0+742.88
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0539 excavation (1st sewer line from MH to MH-03, 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-4) 00PM 0PM Engineer
lowering step) for -5 to MH-6 CH
0+811.85
MH -6 ,CH
Inspection for 200 mm dia upvc 0+968.96
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0540 excavation (1st sewer line from MH to MH-7, 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-4) 00PM 0PM Engineer
lowering step) for -6 to MH-07 CH
1+032.78
MH -7 ,CH
Inspection for 200 mm dia upvc 1+032.78
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0541 excavation (1st sewer line from MH to MH-8, 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-1) 00PM 0PM Engineer
lowering step) for -7 to MH-8 CH
1+086.48
MH -8 ,CH
Inspection for 200 mm dia upvc
HFC- Area 1+ to MH- 03:00: 1:30:0 Kiran, Sr.
SEW 0542 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-1) 9, CH 00PM 0PM Engineer
lowering step) for -8 to MH-9
1+150.82
MH -9 ,CH
Inspection for 200 mm dia upvc 1+150.82
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0543 excavation and sewer line from MH to MH-10, 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-1) 00PM 0PM Engineer
formation for -9 to MH-10 CH
1+215.06
MH -10
,CH
Inspection for 200 mm dia upvc
HFC- Area 1+215.06 03:00: 1:30:0 Kiran, Sr.
SEW 0544 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-1) to MH-11, 00PM 0PM Engineer
lowering step) for -10 to MH-11
CH
1+266.48

MH -11
,CH
Inspection for 200 mm dia upvc
HFC- Area 1+266.48 03:00: 1:30:0 Kiran, Sr.
SEW 0545 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-1) to MH-12, 00PM 0PM Engineer
lowering step) for -11 to MH-12
CH
1+323.64

MH -12
,CH
Inspection for 200 mm dia upvc
HFC- Area 1+323.64 03:00: 1:30:0 Kiran, Sr.
SEW 0546 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-1) to MH-13, 00PM 0PM Engineer
lowering step) for -12 to MH-13
CH
0+811.85

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -13
,CH
Inspection for 200 mm dia upvc
HFC- Area 1+386.36 03:00: 1:30:0 Kiran, Sr.
SEW 0547 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 Revised 11/2/2014
6(IR-1) to MH-14, 00PM 0PM Engineer
lowering step) for -13 to MH-14
CH
1+425.89
MH -14
Inspection for 200 mm dia upvc ,CH 1+425
HFC- Area 03:00: 1:30:0 Kiran, Sr.
SEW 0548 excavation (1st sewer line from MH to MH-15, 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-1) 00PM 0PM Engineer
lowering step) for -14 to MH-15 CH
1+480.69
MH -15
,CH
Inspection for 200 mm dia upvc
HFC- Area 1+480.69 03:00: 1:30:0 Kiran, Sr.
SEW 0549 excavation (1st sewer line from MH 29-Oct-14 29-Oct-14 C 11/2/2014
6(IR-1) to MH-16, 00PM 0PM Engineer
lowering step) for -15 to MH-16
CH
1+518.64
Inspection for 250 mm dia upvc
HFC- MH -1.1 to 03:00: 2:30:0 Kiran, Sr.
SEW 0550 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 C 11/2/2014
MH-1.2 00PM 0PM Engineer
lowering step) for -1.1 to MH-1.2
Inspection for 250 mm dia upvc
HFC- MH -1.2 to 03:00: 2:30:0 Kiran, Sr.
SEW 0551 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 C 11/2/2014
MH-1.3 00PM 0PM Engineer
lowering step) for -1.2 to MH-1.3
Inspection for 250 mm dia upvc
HFC- MH -1.3 to 03:00: 2:30:0 Kiran, Sr.
SEW 0552 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 C 11/2/2014
MH-1.4 00PM 0PM Engineer
lowering step) for -1.3 to MH-1.4
Inspection for 250 mm dia upvc
HFC- MH -1.4 to 03:00: 2:30:0 Kiran, Sr.
SEW 0553 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 Revised 11/2/2014
MH-1.5 00PM 0PM Engineer
lowering step) for -1.4 to MH-1.5
Inspection for 250 mm dia upvc
HFC- MH -1.5 to 03:00: 2:30:0 Kiran, Sr.
SEW 0554 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 Revised 11/2/2014
MH-1.6 00PM 0PM Engineer
lowering step) for -1.5 to MH-1.6
Inspection for 250 mm dia upvc
HFC- MH -1.6 to 03:00: 2:30:0 Kiran, Sr.
SEW 0555 excavation (1st sewer line from MH Area 7 29-Oct-14 29-Oct-14 Revised 11/2/2014
MH-1.7 00PM 0PM Engineer
lowering step) for -1.6 to MH-1.7
Inspection of shutter,
water stopper & MH-2.5
HFC- 04:00: 2:30:0 Kiran, Sr.
SEW 0556 concreting for the wall Area 7 ( 0+405.24 29-Oct-14 29-Oct-14 AN 11/24/2014
00PM 0PM Engineer
of Sewerage Manhole )
MH-2.5
MH-2.6 to
Inspection for 7th
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 8:00:0 03:00: Kiran, Sr.
SEW 0557 (0+474.95 30-Oct-14 29-Oct-14 A 11/24/2014
sewer line 200mm dia 2.5 (IR-4) 0AM 00PM Engineer
to
uPVC
0+405.24)
MH-2.5 to
Inspection for 7th
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 8:00:0 07:00: Kiran, Sr.
SEW 0558 (0+405.24 1-Nov-14 1-Nov-14 A 11/24/2014
sewer line 200mm dia 2.4 (IR-4) 0AM 00PM Engineer
to
uPVC
0+335.52)
MH-2.4 to
Inspection for 7th
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 8:00:0 03:00: Kiran, Sr.
SEW 0559 (0+335.52 30-Oct-14 29-Oct-14 A 11/24/2014
sewer line 200mm dia 2.3 (IR-4) 0AM 00PM Engineer
to
uPVC
0+267.57)
MH-2.3 to
Inspection for 7th
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 8:00:0 03:00: Kiran, Sr.
SEW 0560 ( 0+267.57 30-Oct-14 29-Oct-14 A 11/24/2014
sewer line 200mm dia 2.2 (IR-4) 0AM 00PM Engineer
to
uPVC
0+198.48)
MH-2.2 to
Inspection for 6th
MH-2.1
HFC- layer backfilling for from MH-2.2 to MH- Area 9 8:00:0 03:00: Kiran, Sr.
SEW 0561 ( 0+198.4 30-Oct-14 29-Oct-14 A 11/24/2014
sewer line 200mm dia 2.1 (IR-4) 0AM 00PM Engineer
8 to
uPVC
0+135.14)
Inspection and joint
HFC- measurement of pipe transmission line from 0+750 to 03:00: 01:30: Kiran, Sr.
IRR 0020 Area 1 28-Oct-14 28-Oct-14 AN 11/8/2014
laying for 150mm dia ch 0+750 - 0+830 0+830 00PM 00PM Engineer
UPVC irrigation

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

HFC- Inspection of from 4wxD54 DU duct


10+090 to 9:00:0 08:00: Kiran, Sr.
ITS/DI 007 excavation and from ch 10+090 to Area 1 30-Oct-14 30-Oct-14 A 11/24/2014
C 10+160 0AM 00AM Engineer
prepared formation 10+160
Inspection for
excavation and
of Sewer Manhole
HFC- prepared formation for Area 6 ( MH-24 to 9:00:0 08:00: Kiran, Sr.
SEW 0418A MH-24, from MH-24 to 30-Oct-14 30-Oct-14 Revised 11/24/2014
sewer House IR-1 ) HC-02 0AM 00AM Engineer
HC-02
connection line 160
mm dia
HFC- Inspection of for 4wxD54 DU duct 10+040 to
9:00:0 Kiran, Sr.
ITS/DI 008 excavation and from ch 10+040 to DU Area 1 DU MH 02 30-Oct-14 30-Oct-14 A 11/24/2014
C 0AM Engineer
prepared formation MH 02 (JRC14) (JRC14)

Inspection for fixing of


HFC- precasted cover slab 8:00:0 07:00: Kiran, Sr.
SEW 0562 Area 1 1+747.67 1-Nov-14 1-Nov-14 A 11/23/2014
for house connection 0AM 00AM Engineer
chamber HC - 02

HFC- Inspection and joint from DU MH-


10+090 to 8:00:0 07:00: Kiran, Sr.
ITS/DI 009 measurement of pipe for 4wxD54 DU duct 04(JRC14) to DU MH- Area 1 1-Nov-14 1-Nov-14 A 11/4/2014
C 10+160 0AM 00AM Engineer
laying 03(JRC14)
Inspection of screed
HFC- for House connection 8:00:0 07:00: Kiran, Sr.
SEW 0563 over waterproofing of Area 1 1+747.67 1-Nov-14 1-Nov-14 AN 1/15/2015
chamber- 02 0AM 00AM Engineer
blinding concrete
Inspection of fixing
and placing precasted
HFC- 8:00:0 07:00: Kiran, Sr.
SEW 0564 sewerage house Area 1 1+747.67 1-Nov-14 1-Nov-14 A 11/4/2014
0AM 00AM Engineer
connection chamber
base HC-02
for the wall of
Inspection of shutter,
HFC- Sewerage house 10:00: 07:00: Kiran, Sr.
SEW 0565 water stopper & Area 1 1+747.67 1-Nov-14 1-Nov-14 AN 11/24/2014
connection chamber 00AM 00AM Engineer
concreting
HC- 02

Inspection for fixing of


HFC- precasted cover slab 8:00:0 07:00: Kiran, Sr.
SEW 0566 Area 1 1+723.33 1-Nov-14 1-Nov-14 Revised 11/4/2014
for house connection 0AM 00AM Engineer
chamber HC - 01

HFC- Inspection and joint for 4wxD54 DU duct 10+040 to


8:00:0 07:00: Kiran, Sr.
ITS/DI 0010 measurement of pipe from ch 10+040 to DU Area 1 DU MH 02 1-Nov-14 1-Nov-14 A 11/4/2014
C 0AM 00AM Engineer
laying MH 02 (JRC14) (JRC14)
HFC- for 4wxD54 DU duct 10+040 to
Visual Inspection of 11:00:0 07:00: Kiran, Sr.
ITS/DI 0011 from ch 10+040 to DU Area 1 DU MH 02 1-Nov-14 1-Nov-14 A 11/3/2014
C 1st layer back filling 0AM 00AM Engineer
MH 02 (JRC14) (JRC14)
for 4wxD54 DU duct
HFC- 10+040 to
Visual Inspection of from DU MH 03 11:00:0 07:00: Kiran, Sr.
ITS/DI 0012 Area 1 DU MH 02 1-Nov-14 1-Nov-14 A 11/3/2014
C 1st layer back filling (JRC14) to DU MH-04 0AM 00AM Engineer
(JRC14)
(JRC14)
2wx150mm dia upvc
Inspection of
HFC- Irrigation road Kiran, Sr.
IRR 0021 excavation and at ch 10+100 Area 1 10+100 5-Nov-14 3:00:0 5-Nov-14 08:00: A 12/13/2014
crossing duct no 12 Engineer
prepared formation for 0 PM 00 AM
(remaining portion)
1wx300mm dia +
Inspection and joint
HFC- 2wx150mm dia 10+146.02 01:00: 08:30: Kiran, Sr.
IRR 0022 mesurement of pipe ch 10+146.039 Area 1 29-Oct-14 29-Oct-14 AN 11/2/2014
Irrigation road 9 00PM 00AM Engineer
laying for
crossing duct at

Inspection of 3rd layer transmission line


HFC- 0+938.41 09:00: 08:30: Kiran, Sr.
IRR 0023 back filling for 150mm (including warning Area 1 29-Oct-14 29-Oct-14 A 12/4/2014
to 0+990 00AM 00AM Engineer
dia UPVC irrigation tape)

of pipe laying
Inspection of laying HC -02 to
,granular surround
HFC- geotextile, gravel from HC -02 to MH MH 10:00: 07:00: Kiran, Sr.
SEW 0567 and closing of Area 1 1-Nov-14 1-Nov-14 A 11/4/2014
bedding, joint S19/2410A/5 S19/2410A 00AM 00AM Engineer
geotextile for 315 mm
measurement of /5
dia upvc sewer line

Inspection for shutter, base slab with


HFC- Yard 10:00: 07:00: Kiran, Sr.
SEW 0568 reinforcement and benching for the Yard Area 1-Nov-14 1-Nov-14 AN 11/24/2014
Area 00AM 00AM Engineer
concreting of the Sewerage MH 9

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter, base slab with


HFC- Yard 10:00: 07:00: Kiran, Sr.
SEW 0569 reinforcement and benching for the 0+534.69 1-Nov-14 1-Nov-14 AN 11/24/2014
Area 00AM 00AM Engineer
concreting of the Sewerage MH 1.3

Inspection for shutter, base slab with


HFC- Yard 10:00: 07:00: Kiran, Sr.
SEW 0570 reinforcement and benching for the 0+347.029 1-Nov-14 1-Nov-14 AN 11/24/2014
Area 00AM 00AM Engineer
concreting of the Sewerage MH 1.7

Inspection of shutter
Type A ( 2 no. ), Type
HFC- and concreting for Yard 11:00:0 Kiran, Sr.
SEW 0571 B ( 2 no. ) & Type C Yard Area 1-Nov-14 1-Nov-14 7:30 A 9/8/2015
base of Sewer House Area 0AM Engineer
( 2 no. )
Connections chamber

Inspection for water for base & wall of 0+117.69,0


HFC- Kiran, Sr.
SEW 0572 proofing (polyprime sewer MH 21.2,21.3 & Area 6 +070.00,0 1-Nov-14 3:30:0 1-Nov-14 08:00: A 11/4/2014
Engineer
SB+Bitustick XL) 21.1 +046.91 0 PM 00 AM

Sewera
Inspection for blinding Sewerage
HFC- ge 01:30: Kiran, Sr.
SEW 0573 (PCC) for Sewerage pump 1-Nov-14 1:30:0 1-Nov-14 AN 12/17/2014
pump 00 Engineer
pump station station 0 PM
station PM
Inspection for water Sewera
Sewerage
HFC- proofing (polyprime for sewerage pump ge 01:30: Kiran, Sr.
SEW 0574 pump 1-Nov-14 2:00:0 1-Nov-14 Revised 11/3/2014
SB+Bitustick XL+ station PCC pump 00 Engineer
station 0 pM
screed) station PM
Sewera
Inspection for shutter, Sewerage
HFC- for base of Sewerage ge 01:30: Kiran, Sr.
SEW 0575 reinforcement and pump 1-Nov-14 2:30:0 1-Nov-14 Revised 11/3/2014
pump station pump 00 Engineer
concreting station 0 PM
station PM
Inspection for
HFC- shuttering & Yard Kiran, Sr.
DR 0020 at precast yard area Yard area 1-Nov-14 2:30:0 1-Nov-14 1:30:0 AN 11/24/2014
concreting for Gully- Area Engineer
0 PM 0 PM
02 nos

Inspection for Air test


HFC- MH-24 to Kiran, Sr.
SEW 0576 for Sewer line of from MH-24 to MH-23 Area 6 1-Nov-14 11:30:0 1-Nov-14 08:00: Revised 11/6/2014
MH-23 Engineer
200mm dia upvc 0 AM 00 AM

Inspection for Air test


HFC- MH-23 to Kiran, Sr.
SEW 0577 for Sewer line of from MH-23 to MH-22 Area 6 1-Nov-14 11:30:0 1-Nov-14 08:00: Revised 11/6/2014
MH-22 Engineer
200mm dia upvc 0 AM 00 AM

MH-8.3 -
Inspection for 3rd MH-8.2 ,
HFC- layer back filling for between MH: 8.3 - CH 02:00: Kiran, Sr.
SEW 0578 Area 6 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
200 mm dia Sewer MH: 8.2 0+125.50 00 Engineer
0 PM
line &CH PM
0+069.25

MH-8.2 -
Inspection for 3rd MH-8.1 ,
HFC- layer back filling for between MH: 8.2 - CH 02:00: Kiran, Sr.
SEW 0579 Area 6 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
200 mm dia Sewer MH: 8.1 0+69.25 00 Engineer
0 PM
line &CH PM
0+041.377
MH-8.2 -
Inspection for 3rd
MH-9 , CH
HFC- layer back filling for between MH: 8.2 - 02:00: Kiran, Sr.
SEW 0580 Area 6 0+69.23 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
200 mm dia Sewer MH: 9 00 Engineer
&CH 0 PM
line PM
1+160.82

MH 16.2
Inspection for 3rd
TO MH-
HFC- layer backfilling for from MH-16.2 to MH- Area 6 ( 02:00: Kiran, Sr.
SEW 0581 16.3( 0+10 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
sewer line 200mm dia 16.3 IR-7 ) 00 Engineer
8.28 TO 0 PM
uPVC PM
0+063.63 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH 16.3
Inspection for 3rd
TO MH-
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( 02:00: Kiran, Sr.
SEW 0582 16.1( 0+0 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
sewer line 200mm dia 16.1 IR-7 ) 00 Engineer
63.63 TO 0 PM
uPVC PM
0+040.00)

MH 16.3
Inspection for 3rd
TO MH-17(
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( 02:00: Kiran, Sr.
SEW 0583 0+063.63 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
sewer line 200mm dia 17 IR-7 ) 00 Engineer
TO 0 PM
uPVC PM
1+562.05)

MH-18 to
Inspection of 3rd
MH-17
HFC- layer backfilling for 02:00: Kiran, Sr.
SEW 0584 from MH-18 to Mh-17 Area 6 (1+645.43 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
200mm dia uPVC 00 Engineer
to 0 PM
sewer line PM
1+562.05 )
MH-16 to
Visual Inspection for
MH-17
HFC- 2nd layer backfilling Area 6 02:00: Kiran, Sr.
SEW 0585 from MH-16 to MH-17 ( 1+518.64 1-Nov-14 3:00:0 1-Nov-14 A 11/4/2014
for sewer line 200 mm (IR-1) 00 Engineer
to 0 PM
UPVC PM
1+562.05)
MH 19 to
Inspection for 4th
MH 18
HFC- layer backfilling for From MH-19 to MH- Area 6 ( 02:00: Kiran, Sr.
SEW 0586 (1+728.89 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
sewer line 200mm dia 18 IR-1 ) 00 Engineer
to 0 PM
uPVC PM
1+645.43 )
MH 20 to
Inspection for 4th
MH 19
HFC- layer backfilling for From MH-20 to MH- Area 6 ( 02:00: Kiran, Sr.
SEW 0587 ( 1+811.63 1-Nov-14 3:00:0 1-Nov-14 A 11/24/2014
sewer line 200mm dia 19 IR-1 ) 00 Engineer
TO 0 PM
uPVC PM
1+728.89 )
Visual inspection for
HFC- Irrigation transmission 0+880 to 9:00:0 08:00: Kiran, Sr.
IRR 0024 1st layer back filling Area 1 30-Oct-14 30-Oct-14 A 11/2/2014
line 0+904 0AM 00PM Engineer
for 150 mm dia upvc
1wx300 mm upvc +
Inspection of shutter
2wx150mm dia upvc
HFC- and pouring of 10+146.02 9:00:0 08:00: Kiran, Sr.
IRR 0025 Irrigation road Area 1 30-Oct-14 30-Oct-14 AN 11/24/2014
concrete for concrete 9 0AM 00AM Engineer
crossing duct at ch
surround of
10+146.029 RHS
Inspection and joint
measurement for pipe
HFC- from CHainage 1+000 1+000 - Kiran, Sr.
WD 004A laying of 150 mm dia Area 8 2-Nov-14 4:00:0 2-Nov-14 08:00: A 11/10/2014
- 1+050 1+050 Engineer
GRE potable water 0 PM 00 AM
line
Inspection and joint
measurement for pipe
HFC- from CHainage 1+050 1+000 - Kiran, Sr.
WD 008 laying of 150 mm dia Area 8 2-Nov-14 9:00:0 2-Nov-14 08:00: AN 11/10/2014
- 1+350 1+050 Engineer
GRE potable water 0 AM 00 AM
line
from ch 1+120 to
Inspection and joint
HFC- for 225 mm dia GRE 0+940 in area 4 over CH 1+120 Kiran, Sr.
WD 009 measurement of pipe Area 4 2-Nov-14 9:00:0 2-Nov-14 08:00: Revised 11/3/2014
water line the bridge LHS to 0+940 Engineer
laying 0 AM 00 AM
towards Island
Inspection and joint
measurement of pipe
HFC- in area- 4 from ch 1+150 to Kiran, Sr.
SEW 0588 laying for 200 mm dia Area 4 2-Nov-14 9:00:0 2-Nov-14 08:00: AN 23-11-2014
1+150 - 1+430 1+430 Engineer
HDPE Sewer 0 AM 00 AM
pressure line
Inspection and joint
in area- 1 from ch
measurement of pipe
HFC- 1+460 - 1+560 from 1+460 - Kiran, Sr.
SEW 0589 laying for 200 mm dia Area 1 2-Nov-14 9:00:0 2-Nov-14 08:00: A 4-11-2014
gate valve-1 to ch 1+560 Engineer
HDPE Sewer 0 AM 00 AM
1+560
pressure line
Inspection for
excavation &
HFC- from MH 2.10 to MH MH 2.10 to Kiran, Sr.
DR 0017A formation for 500mm Area 7 2-Nov-14 9:00:0 2-Nov-14 08:00: Revised 3-11-2014
2.9 MH 2.9 Engineer
dia GRP storm water 0 AM 00 AM
Line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation &
HFC- from MH 2.9 to MH MH 2.9 to Kiran, Sr.
DR 0018A formation for 500mm Area 7 2-Nov-14 9:00:0 2-Nov-14 08:00: Revised 3-11-2014
2.8 MH 2.8 Engineer
dia GRP storm water 0 AM 00 AM
Line
Inspection for
excavation &
HFC- from MH 2.8 to MH MH 2.8 to Kiran, Sr.
DR 0019A formation for 500mm Area 7 2-Nov-14 9:00:0 2-Nov-14 08:00: Revised 3-11-2014
2.7 MH 2.7 Engineer
dia GRP storm water 0 AM 00 AM
Line
Inspection for
excavation &
HFC- from MH 2.7 to MH MH 2.7 to Kiran, Sr.
DR 0021 formation for 500mm Area 7 2-Nov-14 9:00:0 2-Nov-14 08:00: AN 12-11-2014
2.6 MH 2.6 Engineer
dia GRP storm water 0 AM 00 AM
Line
Inspection for gravel
bedding,laying of
HFC- geotextile, joint gravel surround with from MH 2.10 to MH MH 2.10 to Kiran, Sr.
DR 0022 Area 7 2-Nov-14 11:00:0 2-Nov-14 08:00: A 8-11-2014
measurement of pipe closing of geotextile 2.9 MH 2.9 Engineer
0 AM 00 AM
laying 500mm dia
GRP and

Inspection for gravel


bedding,laying of
HFC- geotextile, joint gravel surround with from MH 2.9 to MH MH 2.9 to Kiran, Sr.
DR 0023 Area 7 2-Nov-14 11:00:0 2-Nov-14 08:00: A 8-11-2014
measurement of pipe closing of geotextile 2.8 MH 2.8 Engineer
0 AM 00 AM
laying 500mm dia
GRP and

Inspection for gravel


bedding,laying of
HFC- geotextile, joint gravel surround with from MH 2.8 to MH MH 2.8 to Kiran, Sr.
DR 0024 Area 7 2-Nov-14 11:00:0 2-Nov-14 08:00: A 8-11-2014
measurement of pipe closing of geotextile 2.7 MH 2.7 Engineer
0 AM 00 AM
laying 500mm dia
GRP and
Inspection of
HFC- excavation and Irrigation transmission 0+990 to 08:00: 07:00: Kiran, Sr.
IRR 0026 Area 1 1-Nov-14 1-Nov-14 A 4-12-2014
prepared formation for line from CH 0+990 - 1+000 00AM 00AM Engineer
150mm dia upvc 1+000

Inspection and joint


HFC- Irrigation transmission 0+990 to 10:00: 07:00: Kiran, Sr.
IRR 0027 measurement for Area 1 1-Nov-14 1-Nov-14 AN 10-11-2014
line from CH 0+990 - 1+000 00AM 00AM Engineer
150mm dia upvc
1+000

Visual Inspection of
HFC- Irrigation transmission 0+880 to 10:00: 07:00: Kiran, Sr.
IRR 0028 2nd layer back filling Area 1 1-Nov-14 1-Nov-14 A 4-11-2014
line from CH 0+880 - 0+904 00AM 00AM Engineer
for 150mm dia upvc
0+904
from ch 10+090 to
HFC- Inspection for soil
10+160 (DU MH-04 10+090 to Kiran, Sr.
ITS/DI 0013 surround (RHS+LHS) Area 1 3-Nov-14 010:00 3-Nov-14 08:00: A 8-11-2014
C (JRC14) to DU MH-03 10+160 Engineer
for 4wxD54 DU duct :00 AM 00 AM
(JRC 03)

HFC- Inspection for soil


from ch10+040 to DU 10+040 to Kiran, Sr.
ITS/DI 0014 surround (RHS+LHS) Area 1 3-Nov-14 010:00 3-Nov-14 08:00: A 6-11-2014
C MH-02 DU MH-02 Engineer
for 4wxD54 DU duct :00 AM 00 AM

10+070-
4WXD54 Etislat duct
Inspection for 10+020
HFC- from ch 10+070- Kiran, Sr.
ETC 009 excavation and Area 1 (MH no. 3-Nov-14 011:00: 3-Nov-14 08:00: A 24-11-2014
10+020 (MH no. Engineer
prepared formation of 50626 JRC 00 AM 00 AM
50626 JRC 14)
14)
10+070-
4WXD54 Etislat duct
Inspection and joint 10+020
HFC- from ch 10+070- Kiran, Sr.
ETC 0010 measurement of pipe Area 1 (MH no. 3-Nov-14 02:00: 3-Nov-14 08:00: AN 12-11-2014
10+020 (MH no. Engineer
laying for 50626 JRC 00 PM 00 AM
50626 JRC 14)
14)
1wx300 mm upvc +
Inspection of 2wx150mm dia upvc
HFC- 02:00: Kiran, Sr.
IRR 0029 excavation and Irrigation road at ch 10+087.74 LHS Area 1 10+087.74 1-Nov-14 3:00:0 1-Nov-14 AN 4-12-2014
00 Engineer
prepared formation for crossing duct no 11 0 PM
PM
(half portion)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

2wx150mm dia upvc


Inspection of
HFC- Irrigation road 02:00: Kiran, Sr.
IRR 0030 excavation and at ch 10+100 Area 1 10+100 1-Nov-14 3:00:0 1-Nov-14 AN 24-11-2014
crossing duct no 12 00 Engineer
prepared formation for 0 PM
(half portion) PM
1wx300 mm upvc +
Inspection and joint 2wx150mm dia upvc
HFC- Kiran, Sr.
IRR 0031 measurement for pipe Irrigation road at ch 10+087.74, LHS Area 1 10+087.74 2-Nov-14 01:00: 2-Nov-14 08:00: AN 8-11-2014
Engineer
laying of crossing duct no 11 00 PM 00 AM
(half portion)
Visual inspection for HC-02 to
HFC- 1st back filling layer of from HC-02 to existing MH Kiran, Sr.
SEW 0590 Area 1 3-Nov-14 011:00: 3-Nov-14 08:00: A 8-11-2014
315 mm dia UPVC MH S19/24/10A/5 S19/24/10 Engineer
00 AM 00 AM
sewer pipe line A/5
Visual inspection for HC-02 to
from HC-02 to
HFC- 2nd layer back filling MH Kiran, Sr.
SEW 0591 existing MH Area 1 3-Nov-14 01:00: 3-Nov-14 08:00: A 8-11-2014
of 315 mm dia UPVC S19/24/10 Engineer
S19/24/10A/5 00 PM 00 AM
sewer pipe line A/5
Inspection and joint including st. special
HC-
HFC- measurement of pipe ( 2nos) for Sewerage Kiran, Sr.
SEW 0592 Area 1 02,1+747.6 3-Nov-14 011:00: 3-Nov-14 08:00: A 10-11-2014
laying for the house connection Engineer
9 00 AM 00 AM
connecton portion chamber HC-02
Inspection of granular
of Sewerage house HC-
HFC- surround for line Kiran, Sr.
SEW 0593 connection chamber Area 1 02,1+747.6 3-Nov-14 01:00: 3-Nov-14 08:00: AN 12-11-2014
conncetion of pipe Engineer
HC-02 9 00 PM 00 AM
laying (2nos)
house connection
Inspection of fixing
HFC- chamber base HC- HC-01,HC- 3:00:0 02:00: Kiran, Sr.
SEW 0594 and placing precasted Area 6 3-Nov-14 3-Nov-14 A 12/1/2014
01,HC-02 of Sewer 02 0PM 00PM Engineer
sewerage
MH 25
house connection
Inspection of fixing
HFC- chamber base HC- HC-01,HC- 3:00:0 02:00: Kiran, Sr.
SEW 0595 and placing precasted Area 6 3-Nov-14 3-Nov-14 A 8-11-2014
01,HC-02 of Sewer 02 0PM 00PM Engineer
sewerage
MH 24
Inspection for
160mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-25 to 3:00:0 02:00: Kiran, Sr.
SEW 0596 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between HC-04 0PM 00PM Engineer
measurements for
MH-25 to HC-04
pipe laying of
Inspection for
160mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-25 to 3:00:0 02:00: Kiran, Sr.
SEW 0597 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between HC-02 0PM 00PM Engineer
measurements for
MH-25 to HC-02
pipe laying of
Inspection for
200mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-25 to 3:00:0 02:00: Kiran, Sr.
SEW 0598 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between MH-24 0PM 00PM Engineer
measurements for
MH-25 to MH-24
pipe laying of
Inspection for
160mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-24 to 3:00:0 02:00: Kiran, Sr.
SEW 0599 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between HC-03 0PM 00PM Engineer
measurements for
MH-24 to HC-03
pipe laying of
Inspection for
160mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-24 to 3:00:0 02:00: Kiran, Sr.
SEW 0600 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between HC-02 0PM 00PM Engineer
measurements for
MH-24 to HC-02
pipe laying of
Inspection for
200mm dia upvc for
granular bedding,
HFC- connection 0f straight MH-24 to 3:00:0 02:00: Kiran, Sr.
SEW 0601 laying geotextile, joint Area 6 3-Nov-14 3-Nov-14 AN 12-11-2014
special pipe between MH-23 0PM 00PM Engineer
measurements for
MH-24 to MH-23
pipe laying of
for the wall of
Inspection of shutter,
HFC- Sewerage chamber HC-01 of 3:00:0 02:00: Kiran, Sr.
SEW 0602 water stopper & Area 6 3-Nov-14 3-Nov-14 A 24-11-2014
HC-01 of Sewerage (MH-25) 0PM 00PM Engineer
concreting
Manhole MH-25

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

for the wall of


Inspection of shutter,
HFC- Sewerage chamber HC-03 of 3:00:0 02:00: Kiran, Sr.
SEW 0603 water stopper & Area 6 3-Nov-14 3-Nov-14 AN 24-11-2014
HC-03 of Sewerage (MH-25) 0PM 00PM Engineer
concreting
Manhole MH-25
for the wall of
Inspection of shutter,
HFC- Sewerage chamber HC-01 of 3:00:0 02:00: Kiran, Sr.
SEW 0604 water stopper & Area 6 3-Nov-14 3-Nov-14 Revised 13-11-2014
HC-01 of Sewerage (MH-24) 0PM 00PM Engineer
concreting
Manhole MH-24
for the wall of
Inspection of shutter,
HFC- Sewerage chamber HC-04 of 3:00:0 02:00: Kiran, Sr.
SEW 0605 water stopper & Area 6 3-Nov-14 3-Nov-14 A 4-12-2014
HC-04 of Sewerage (MH-24) 0PM 00PM Engineer
concreting
Manhole MH-24

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 3:00:0 02:00: Kiran, Sr.
SEW 0606 MH-2.1 3-Nov-14 3-Nov-14 AN 24-11-2014
concreting for base MH-2.1 Area 0PM 00PM Engineer
slab with benching

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 3:00:0 02:00: Kiran, Sr.
SEW 0607 MH-7 3-Nov-14 3-Nov-14 AN 24-11-2014
concreting for base MH-7 Area 0PM 00PM Engineer
slab with benching

for sewer line of


Inspection and joint
HFC- house connection 160 MH: 24 - 3:00:0 02:00: Kiran, Sr.
SEW 0503A measurement of pipe Area 6 3-Nov-14 3-Nov-14 Revised 7-12-2014
mm dia upvc from HC-03 0PM 00PM Engineer
laying
MH: 24 - HC-03
for sewer line of
Inspection and joint
HFC- house connection 160 MH: 25 - 3:00:0 02:00: Kiran, Sr.
SEW 0502A measurement of pipe Area 6 3-Nov-14 3-Nov-14 Revised 8-12-2014
mm dia upvc from HC-02 0PM 00PM Engineer
laying
MH: 25 - HC-02
2wx150mm dia upvc
Inspection and joint
HFC- Irrigation road Kiran, Sr.
IRR 0032 measurement for pipe at ch 10+100 ,LHS Area 1 10+100 2-Nov-14 01:00: 2-Nov-14 08:00: AN 8-11-2014
crossing duct no 12 Engineer
laying of 00 PM 00 AM
(half portion)
1wx300 mm upvc +
Inspection for 2wx150mm dia upvc
HFC- at ch 10+146.029, Kiran, Sr.
IRR 0033 excavation and Irrigation road Area 1 10+146.02 2-Nov-14 01:00: 2-Nov-14 08:00: A 24-11-2014
LHS Engineer
prepared formation of crossing duct no 4 9, LHS 00 PM 00 AM
(half portion)
Inspection of Irrigation road
2W 150mm
HFC- shuttering and crossing Duct No. 11 10+087.74, Kiran, Sr.
IRR 0034 uPVC+1wx300mm dia Area 1 3-Nov-14 02:00: 3-Nov-14 08:00: AN 3-12-2014
pouring concrete for at ch 10+087.74 (half LHS Engineer
upvc 00 PM 00 AM
Bed & surround of portion)LHS
Inspection of soil
surround (RHS+LHS) Irrigation road
HFC- Kiran, Sr.
IRR 0035 & 1st layer back filling crossing duct no.12 Area 1 10+100 3-Nov-14 09:00: 3-Nov-14 08:00: AN 9-12-2014
Engineer
for 2WX150mm dia (half portion) 00 AM 00 AM
Upvc
Inspection of soil
surround (RHS+LHS) Irrigation road
HFC- Kiran, Sr.
IRR 0036 & 2nd layer back crossing duct no.12 Area 1 10+100 3-Nov-14 01:00: 3-Nov-14 08:00: AN 8-11-2014
Engineer
filling for 2WX150mm (half portion) 00 PM 00 AM
dia Upvc
MH-2.6 to
Inspection for 8th
MH-2.5
HFC- layer backfilling for from MH-2.6 to MH- Area 9 9:30:0 08:00: Kiran, Sr.
SEW 0608 (0+474.95 4-Nov-14 4-Nov-14 A 4-12-2014
sewer line 200mm dia 2.5 (IR-4) 0AM 00AM Engineer
to
uPVC
0+405.24)
MH-2.5 to
Inspection for 8th
MH-2.4
HFC- layer backfilling for from MH-2.5 to MH- Area 9 9:30:0 08:00: Kiran, Sr.
SEW 0609 (0+405.24 4-Nov-14 4-Nov-14 A 4-12-2014
sewer line 200mm dia 2.4 (IR-4) 0AM 00AM Engineer
to
uPVC
0+335.52)
MH-2.4 to
Inspection for 8th
MH-2.3
HFC- layer backfilling for from MH-2.4 to MH- Area 9 9:30:0 08:00: Kiran, Sr.
SEW 0610 (0+335.52 4-Nov-14 4-Nov-14 A 4-12-2014
sewer line 200mm dia 2.3 (IR-4) 0AM 00AM Engineer
to
uPVC
0+267.57)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-2.3 to
Inspection for 8th
MH-2.2
HFC- layer backfilling for from MH-2.3 to MH- Area 9 9:30:0 08:00: Kiran, Sr.
SEW 0611 ( 0+267.57 4-Nov-14 4-Nov-14 A 12/4/2014
sewer line 200mm dia 2.2 (IR-4) 0AM 00AM Engineer
to
uPVC
0+198.48)
MH-2.2 to
Inspection for 7th
MH-2.1
HFC- layer backfilling for from MH-2.2 to MH- Area 9 9:30:0 08:00: Kiran, Sr.
SEW 0612 ( 0+198.4 4-Nov-14 4-Nov-14 A 12/4/2014
sewer line 200mm dia 2.1 (IR-4) 0AM 00AM Engineer
8 to
uPVC
0+135.14)

Inspection of shutter,
MH-19
HFC- water stopper & Area 6 ( 9:30:0 08:00: Kiran, Sr.
SEW 0613 MH 19 ( 1+720.00 4-Nov-14 4-Nov-14 AN 24-11-2014
concreting for the wall IR-1 ) 0AM 00AM Engineer
)
of Sewerage Manhole

house connection
Inspection of fixing 011:0
HFC- chamber base HC- HC-01,HC- 2:00:0 Kiran, Sr.
SEW 0614 and placing precasted Area 6 4-Nov-14 4-Nov-14 0:00A A 7-12-2014
01,HC-02 of Sewer 02 0PM Engineer
sewerage M
MH 21.1
for the wall of
Inspection of shutter, 011:0
HFC- Sewerage chamber HC-01 of 2:00:0 Kiran, Sr.
SEW 0615 water stopper & Area 6 4-Nov-14 4-Nov-14 0:00A AN 24-11-2014
HC-01 of Sewerage (MH-21.1) 0PM Engineer
concreting M
Manhole MH-21.1
sewerage house HC-02 of
Inspection of fixing
connection chamber ext. SEW 011:0
HFC- external water 11:30:0 Kiran, Sr.
SEW 0616 HC-02 of existing Area 1 MH 4-Nov-14 4-Nov-14 0:00A A 6-11-2014
proofing for wall & 0AM Engineer
Sewerage MH S19/24/10 M
base of
S19/24/10A/5 A/5
Irrigation road
Inspection and joint 2W x150mm
HFC- crossing Duct No. 4 at 10+146.02 Kiran, Sr.
IRR 0037 measurement of pipe uPVC+1wx300mm dia Area 1 3-Nov-14 02:00: 3-Nov-14 08:00: AN 8-11-2014
ch 10+146.029 (half 9, LHS Engineer
laying for upvc 00 PM 00 AM
portion)LHS
Inspection of shutter Irrigation road
2W x150mm
HFC- and pouring concrete crossing Duct No. 4 at 10+146.02 Kiran, Sr.
IRR 0038 uPVC+1wx300mm dia Area 1 3-Nov-14 03:00: 3-Nov-14 08:00: AN 3-12-2014
for concrete ch 10+146.029 (half 9, LHS Engineer
upvc 00 PM 00 AM
encasement of portion)LHS
2wx150mm dia upvc
Inspection of 3rd layer
HFC- Irrigation road 02:00: Kiran, Sr.
IRR 0039 back filling with at ch 10+100 ,LHS Area 1 10+100 3-Nov-14 03:30: 3-Nov-14 A 4-12-2014
crossing duct no 12 00 Engineer
warning tape 00 PM
(half portion) PM
Inspection of soil
011:0
HFC- surround for 200 mm form ch 1+460 - 1+460 to 1:00:0 Kiran, Sr.
SEW 0617 Area 1 4-Nov-14 4-Nov-14 0:00A AN 10-11-2014
dia HDPE Sewer 1+540 1+540 0PM Engineer
M
pressure line

Inspection of laying joint measurement of for 500mm dia GRP 011:0


HFC- MH2.6 to 11:30:0 Kiran, Sr.
DR 0025 geotextile, gravel pipe laying and Storm water line from Area 7 4-Nov-14 4-Nov-14 0:00A A 6-11-2014
MH 2.7 0AM Engineer
bedding, grannular surround MH2.6 to MH 2.7 M

Inspection for road crossing Duct 012:0


HFC- 2x10W 150mm dia 10+108.60 3:00:0 Kiran, Sr.
ED 001 excavation and No.1 at ch Area 1 4-Nov-14 4-Nov-14 0:00A A 4-12-2014
upvc addittional HV 5 0PM Engineer
prepared formation for 10+108.605 M

Inspection for road crossing Duct 012:0


HFC- 2x4W 150mm dia 10+107.68 3:00:0 Kiran, Sr.
ED 002 excavation and No.1 at ch Area 1 4-Nov-14 4-Nov-14 0:00A A 4-12-2014
upvc addittional LV 1 0PM Engineer
prepared formation for 10+107.681 M

2wx150mm dia upvc


Inspection of 4th &
HFC- Irrigation road 02:00: Kiran, Sr.
IRR 0040 final layer back filling at ch 10+100 ,LHS Area 1 10+100 4-Nov-14 08:30: 3-Nov-14 A 4-12-2014
crossing duct no 12 00 Engineer
for 00 AM
(half portion) PM
Irrigation road
Inspection excavation 2W x150mm crossing Duct No. 11
HFC- 02:00: Kiran, Sr.
IRR 0041 and prepared uPVC+1wx300mm dia at ch 10+87.065 Area 1 10+087.74 4-Nov-14 08:30: 3-Nov-14 A 4-12-2014
00 Engineer
formation for upvc (remaining 00 AM
PM
portion)LHS
Inspection for
from ch 1+000 to between 150mm 011:0
HFC- excavation and 1+000 to 11:00:0 Kiran, Sr.
IRR 0042 1+015 irrigation diax450 bend - 150mm Area 1 4-Nov-14 4-Nov-14 0:00A A 4-12-2014
prepared formation for 1+015 0AM Engineer
transmission line dia x450 bend M
150mm dia uPVC

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint


irrigation transmission between 150mm 011:0
HFC- measurement of pipe 1+000 to 1:00:0 Kiran, Sr.
IRR 0043 line from ch 1+000 to diax450 bend - 150mm Area 1 4-Nov-14 4-Nov-14 0:00A AN 4-12-2014
laying for 150mm dia 1+015 0PM Engineer
1+015 dia x450 bend M
uPVC
Inspection of soil
011:0
HFC- surround for 150 mm from ch 0+990 - 0+900 to 11:30:0 Kiran, Sr.
IRR 0044 Area 1 4-Nov-14 4-Nov-14 0:00A AN 12-11-2014
dia upvc Irrigation 1+000 1+000 0AM Engineer
M
transmission line
2wx150mm dia upvc
Inspection and joint
HFC- Irrigation road Kiran, Sr.
IRR 0045 measurement of pipe at ch 10+100 Area 1 10+100 5-Nov-14 9:00:0 5-Nov-14 08:00: A 10-11-2014
crossing duct no 12 Engineer
laying for 0 AM 00 AM
(remaining portion)
Inspection for
012:0
HFC- excavation and irrigation transmission 0+884 to 2:00:0 Kiran, Sr.
IRR 0046 Area 1 4-Nov-14 4-Nov-14 0:00A A 12/4/2014
prepared formation for line 0+872 0PM Engineer
M
150mm dia uPVC
HFC- Inspection of laying 012:0
from ch 10+090 to 10+090 to 3:30:0 Kiran, Sr.
ITS/DI 0015 warning tape for Area 1 5-Nov-14 5-Nov-14 0:00A A 7-12-2014
C 10+160 10+160 0PM Engineer
4wxD54 DU duct M
Inspection and joint
irrigation transmission 012:0
HFC- measurement of pipe 0+884 to 2:30:0 Kiran, Sr.
IRR 0047 line from 0+884 - Area 1 4-Nov-14 4-Nov-14 0:00A AN 8-11-2014
laying for 150mm dia 0+872 0PM Engineer
0+872 M
uPVC
Inspection of soil
irrigation transmission 012:0
HFC- surround & 1st layer 0+884 to 3:00:0 Kiran, Sr.
IRR 0048 line from 0+884 - Area 1 4-Nov-14 4-Nov-14 0:00A AN 8-11-2014
back filling (visual) for 0+872 0PM Engineer
0+872 M
150mm dia uPVC
Inspection of 2nd
irrigation transmission 012:0
HFC- layer back filling with 0+884 to 3:30:0 Kiran, Sr.
IRR 0049 line from 0+884 - Area 1 4-Nov-14 4-Nov-14 0:00A A 8-11-2014
warning tape for 0+872 0PM Engineer
0+872 M
150mm dia uPVC

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard Kiran, Sr.
SEW 0618 MH 2.6 5-Nov-14 08:30: 5-Nov-14 08:00: AN 4-12-2014
concreting for base MH-2.6 Area Engineer
00 AM 00 AM
slab with benching

Visual inspection of Sewerag House


HFC- Kiran, Sr.
SEW 0619 1st layer surruonding connection chember Area 1 HC-02 5-Nov-14 11:30:0 5-Nov-14 09:00: A 6-11-2014
Engineer
back filling around HC-02 0 AM 00 AM

Visual inspection of Sewerag House


HFC- Kiran, Sr.
SEW 0620 2nd layer surruonding connection chember Area 1 HC-02 5-Nov-14 11:00:0 5-Nov-14 09:00: A 8-11-2014
Engineer
back filling around HC-02 0 AM 00 AM

Inspection of 3rd Sewerag House


HFC- Kiran, Sr.
SEW 0621 layer surruonding connection chember Area 1 HC-02 5-Nov-14 1:30:0 5-Nov-14 09:00: A 12/4/2014
Engineer
back filling around HC-02 0 AM 00 AM

Inspection of 4th Sewerag House


HFC- Kiran, Sr.
SEW 0622 layer surruonding connection chember Area 1 HC-02 5-Nov-14 2:30:0 5-Nov-14 09:00: A 4-12-2014
Engineer
back filling around HC-02 0 PM 00 AM

Inspection of warning irrigation transmission 012:0


HFC- 0+872 to 3:30:0 Kiran, Sr.
IRR 0050 tape for 150mm dia line from 0+872 to Area 1 4-Nov-14 4-Nov-14 0:00A A 8-11-2014
0+990 0PM Engineer
uPVC 0+990 M
Inspection of 3rd & irrigation transmission 012:0
HFC- 0+872 to 3:30:0 Kiran, Sr.
IRR 0051 final layer back filling line from 0+872 to Area 1 4-Nov-14 4-Nov-14 0:00A A 4-12-2014
0+990 0PM Engineer
for 150mm dia uPVC 0+990 M

Inspection of fixing house connection


HFC- HC-04 of 01:00: Kiran, Sr.
SEW 0623 and placing precasted chamber base HC-04 Area 6 5-Nov-14 2:30:0 5-Nov-14 A 7-12-2014
(MH-24) 00 Engineer
sewerage of Sewer MH 24 0 PM
PM

Inspection of fixing house connection


HFC- HC-02 of 01:00: Kiran, Sr.
SEW 0624 and placing precasted chamber base HC-02 Area 6 5-Nov-14 2:30:0 5-Nov-14 A 7-12-2014
(MH-25) 00 Engineer
sewerage of Sewer MH 25 0 PM
PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

for the wall of


Inspection of shutter,
HFC- Sewerage chamber HC-02 of 01:00: Kiran, Sr.
SEW 0625 water stopper & Area 6 5-Nov-14 2:30:0 5-Nov-14 AN 4-12-2014
HC-02 of Sewerage (MH-25) 00 Engineer
concreting 0 PM
Manhole MH-25 PM
for the wall of
Inspection of shutter,
HFC- Sewerage chamber HC-02 of 01:00: Kiran, Sr.
SEW 0626 water stopper & Area 6 5-Nov-14 2:30:0 5-Nov-14 AN 4-12-2014
HC-02 of Sewerage (MH-24) 00 Engineer
concreting 0 PM
Manhole MH-24 PM
for the wall of
Inspection of shutter,
HFC- Sewerage chamber HC-04 of 01:00: Kiran, Sr.
SEW 0627 water stopper & Area 6 5-Nov-14 2:30:0 5-Nov-14 C 4-12-2014
HC-04 of Sewerage (MH-24) 00 Engineer
concreting 0 PM
Manhole MH-24 PM
Irrigation road
Inspection and joint 2W x150mm crossing Duct No. 11
HFC- Kiran, Sr.
IRR 0052 measurement of pipe uPVC+1wx300mm dia at ch 10+87.065 Area 1 10+087.74 5-Nov-14 08:30: 4-Nov-14 08:00: AN 9-11-2014
Engineer
laying for upvc (remaining 00 AM 00 AM
portion)LHS
Irrigation road
Inspection and joint 2W x150mm crossing Duct No. 4 at
HFC- 10+146.02 Kiran, Sr.
IRR 0053 measurement of pipe uPVC+1wx300mm dia ch 10+146.029 Area 1 5-Nov-14 08:30: 5-Nov-14 08:00: AN 8-11-2014
9, LHS Engineer
laying for upvc (remaining 00 AM 00 AM
portion)LHS

Inspection for MH
HFC- Storm water drainage 03:00: Kiran, Sr.
DR 0026 excavation and Area 7 2.6,0+225. 5-Nov-14 3:30:0 5-Nov-14 A 6-11-2014
MH 2.6 00 Engineer
prepared formation for 6435 0 PM
PM

Inspection for MH
HFC- Storm water drainage 03:00: Kiran, Sr.
DR 0027 excavation and Area 7 2.7,0+174. 5-Nov-14 3:30:0 5-Nov-14 A 12/4/2014
MH 2.7 00 Engineer
prepared formation for 7024 0 PM
PM

Inspection for MH
HFC- Storm water drainage 03:00: Kiran, Sr.
DR 0028 excavation and Area 7 2.8,0+127. 5-Nov-14 3:30:0 5-Nov-14 A 12/4/2014
MH 2.8 00 Engineer
prepared formation for 98.95 0 PM
PM

Inspection for MH
HFC- Storm water drainage 03:00: Kiran, Sr.
DR 0029 excavation and Area 7 2.9,0+081. 5-Nov-14 3:30:0 5-Nov-14 A 12/4/2014
MH 2.9 00 Engineer
prepared formation for 7331 0 PM
PM

Inspection for MH
HFC- Storm water drainage 03:00: Kiran, Sr.
DR 0030 excavation and Area 7 2.10,0+034 5-Nov-14 3:30:0 5-Nov-14 A 4-12-2014
MH 2.10 00 Engineer
prepared formation for .4192 0 PM
PM
Sewera
Inspection for shutter, Sewerage
HFC- for base of Sewerage ge 03:00: Kiran, Sr.
SEW 0575A reinforcement and pump 5-Nov-14 3:30:0 5-Nov-14 AN 24-11-2014
pump station pump 00 Engineer
concreting station 0 PM
station PM
Inspection for water Sewera
Sewerage
HFC- proofing (polyprime for sewerage pump ge 03:00: Kiran, Sr.
SEW 0574A pump 5-Nov-14 3:30:0 5-Nov-14 A 10-11-2014
SB+Bitustick XL+ station PCC pump 00 Engineer
station 0 PM
screed) station PM

MH 16.2
Inspection for 4th
TO MH-
HFC- layer backfilling for from MH-16.2 to MH- Area 6 ( Kiran, Sr.
SEW 0628 16.3( 0+10 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200mm dia 16.3 IR-7 ) Engineer
8.28 TO 00 AM 00 AM
uPVC
0+063.63 )

MH 16.3
Inspection for 4th
TO MH-
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0629 16.1( 0+0 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200mm dia 16.1 IR-7 ) Engineer
63.63 TO 00 AM 00 AM
uPVC
0+040.00)

MH 16.3 to
Inspection for 4th
MH-
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0630 17( 0+063 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200mm dia 17 IR-7 ) Engineer
.63 TO 00 AM 00 AM
uPVC
1+562.05)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-8.3 to
Inspection for 4th MH-8.2 ,
HFC- layer back filling for from MH: 8.3 to MH: CH Kiran, Sr.
SEW 0631 Area 6 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
200 mm dia Sewer 8.2 0+125.50 Engineer
00 AM 00 AM
line &CH
0+069.25

MH-8.2 to
Inspection for 4th MH-8.1 ,
HFC- layer back filling for from MH: 8.2 to MH: CH Kiran, Sr.
SEW 0632 Area 6 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
200 mm dia Sewer 8.1 0+69.25 Engineer
00 AM 00 AM
line &CH
0+041.377
MH-8.2 to
Inspection for 4th
MH-9 , CH
HFC- layer back filling for Kiran, Sr.
SEW 0633 from MH: 8.2 to MH: 9 Area 6 0+69.23 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
200 mm dia Sewer Engineer
&CH 00 AM 00 AM
line
1+160.82
MH-18 to
Inspection of 4th
MH-17
HFC- layer backfilling for Kiran, Sr.
SEW 0634 from MH-18 to MH-17 Area 6 (1+645.43 6-Nov-14 10:00: 6-Nov-14 08:00: A 12/4/2014
200mm dia uPVC Engineer
to 00 AM 00 AM
sewer line
1+562.05 )
MH-16 to
Inspection for 3rd
MH-17
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0635 from MH-16 to MH-17 ( 1+518.64 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200 mm (IR-1) Engineer
to 00 AM 00 AM
UPVC
1+562.05)
MH 19 to
Inspection for 5th
MH 18
HFC- layer backfilling for From MH-19 to MH- Area 6 ( Kiran, Sr.
SEW 0636 (1+728.89 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200mm dia 18 IR-1 ) Engineer
to 00 AM 00 AM
uPVC
1+645.43 )
MH 20 to
Inspection for 5th
MH 19
HFC- layer backfilling for From MH-20 to MH- Area 6 ( Kiran, Sr.
SEW 0637 ( 1+811.63 6-Nov-14 10:00: 6-Nov-14 08:00: A 4-12-2014
sewer line 200mm dia 19 IR-1 ) Engineer
TO 00 AM 00 AM
uPVC
1+728.89 )

Inspection for water wall and base of MH-22


HFC- Kiran, Sr.
SEW 0638 proofing (Polyprimes sewer manhole no. Area 6 ( 1+906.36 6-Nov-14 10:00: 6-Nov-14 08:00: A 24-11-2014
Engineer
B + Bitustic xl) for MH-22 ) 00 AM 00 AM

Inspection for water wall and base of MH-21


HFC- Kiran, Sr.
SEW 0639 proofing (Polyprimes sewer manhole no. Area 6 ( 1+848.00 6-Nov-14 10:00: 6-Nov-14 08:00: A 24-11-2014
Engineer
B + Bitustic xl) for MH-21 ) 00 AM 00 AM

Visual inspection of
HFC- from ch 10+070 to 10+070 to Kiran, Sr.
ETC 0011 soil surruond for Area 1 6-Nov-14 10:00: 6-Nov-14 08:00: A 10-11-2014
10+020 10+020 Engineer
4wxD54 Etislat duct 00 AM 00 AM

Visual inspection of
HFC- 1st layer back filling from ch 10+070 to 10+070 to Kiran, Sr.
ETC 0012 Area 1 6-Nov-14 11:00:0 6-Nov-14 08:00: AN 9-11-2014
for 4wxD54 Etislat 10+020 10+020 Engineer
0 AM 00 AM
duct
Please check &
approved Visual (Vide attached this is unreturned till
HFC- from ch 10+070 to 10+070 to Kiran, Sr.
ETC 0013 inspection of 2nd submittal copy of date after elapsed 70 Area 1 16-Feb-15 11:30:0 16-Feb-15 08:00: AN 2/24/2015
10+020 10+020 Engineer
layer back filling for same IR #, days) 0 AM 00 AM
4wxD54 Etislat duct

Visual inspection of
HFC- 1st layer back filling from ch 1+460 to 1+460 to Kiran, Sr.
SEW 0640 Area 1 6-Nov-14 10:30: 6-Nov-14 08:00: AN 10-11-2014
for 200 mm dia HDPE 1+540 1+540 Engineer
00 AM 00 AM
Sewer pressure line

Inspection for water Irrigation pump Irrigatio Irrigation


HFC- Kiran, Sr.
IRR 0054 proofing blinding station as per n pump pump 5-Nov-14 08:30: 5-Nov-14 08:00: Revised 5-11-2014
Engineer
(PCC) of attacehed sketch station station 00 AM 00 AM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Irrigation road
Inspection of shutter
2Wx 150mm crossing Duct No. 11
HFC- and concreting of 10+087.74, Kiran, Sr.
IRR 0055 uPVC+1wx300mm dia at ch 10+087.74 Area 1 5-Nov-14 2:30:0 5-Nov-14 09:00: AN 3-12-2014
concrete encasement LHS Engineer
upvc (remaining 0 PM 00 AM
for
portion)LHS
Irrigation road
Inspection of shutter
2Wx 150mm crossing Duct No. 04
HFC- and concreting of 10+146.02 Kiran, Sr.
IRR 0056 uPVC+1wx300mm dia at ch 10+146.029 Area 1 5-Nov-14 2:30:0 5-Nov-14 09:00: AN 15-01-2015
concrete encasement 9, LHS Engineer
upvc (remaining 0 PM 00 AM
for
portion)LHS
Visual Inspection of
1st layer back filling
HFC- from ch 0+990 - 0+990 to 01:00: Kiran, Sr.
IRR 0057 for 150 mm dia upvc Area 1 5-Nov-14 2:30:0 5-Nov-14 AN 10-11-2014
1+000 1+000 00 Engineer
Irrigation transmission 0 PM
PM
line
Irrigation road
Inspection for 2Wx 150mm crossing Duct No. 04
HFC- 10+146.02 01:00: Kiran, Sr.
IRR 0058 excavation and uPVC+1wx300mm dia at ch 10+146.029 Area 1 5-Nov-14 2:30:0 5-Nov-14 A 4-12-2014
9, LHS 00 Engineer
prepared formation for upvc (remaining 0 PM
PM
portion)LHS
Visual inspection of
1st layer back filling
HFC- from ch 0+990 to 0+990 to Kiran, Sr.
IRR 0059 for 150 mm dia upvc Area 1 6-Nov-14 10:30: 6-Nov-14 08:00: AN 10-11-2014
1+000 1+000 Engineer
Irrigation transmission 00 AM 00 AM
line

Inspection and joint road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 01:00: Kiran, Sr.
ED 003 measurement of pipe No.1 at ch Area 1 6-Nov-14 2:30:0 6-Nov-14 AN 18-11-2014
upvc addittional HV 5 00 Engineer
laying for 10+108.605 0 PM
PM

Inspection and joint road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 01:00: Kiran, Sr.
ED 004 measurement of pipe No.1 at ch Area 1 6-Nov-14 2:30:0 6-Nov-14 AN 18-11-2014
upvc addittional LV 1 00 Engineer
laying for 10+107.681 0 PM
PM

MH 16.2
Inspection for 5th
TO MH-
HFC- layer backfilling for from MH-16.2 to MH- Area 6 ( Kiran, Sr.
SEW 0641 16.3( 0+10 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200mm dia 16.3 IR-7 ) Engineer
8.28 TO 00 AM 00 AM
uPVC
0+063.63 )

MH 16.3
Inspection for 5th
TO MH-
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0642 16.1( 0+0 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200mm dia 16.1 IR-7 ) Engineer
63.63 TO 00 AM 00 AM
uPVC
0+040.00)

MH 16.3
Inspection for 5th
TO MH-17(
HFC- layer backfilling for from MH-16.3 to MH- Area 6 ( Kiran, Sr.
SEW 0643 0+063.63 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200mm dia 17 IR-7 ) Engineer
TO 00 AM 00 AM
uPVC
1+562.05)

MH-18 to
Inspection of 5th
MH-17
HFC- layer backfilling for Kiran, Sr.
SEW 0644 from MH-18 to Mh-17 Area 6 (1+645.43 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
200mm dia uPVC Engineer
to 00 AM 00 AM
sewer line
1+562.05 )
MH-16 to
Inspection for 4th
MH-17
HFC- layer backfilling for Area 6 Kiran, Sr.
SEW 0645 from MH-16 to MH-17 ( 1+518.64 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200 mm (IR-1) Engineer
to 00 AM 00 AM
UPVC
1+562.05)
MH 19 to
Inspection for 6th
MH 18
HFC- layer backfilling for From MH-19 to MH- Area 6 ( Kiran, Sr.
SEW 0646 (1+728.89 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200mm dia 18 IR-1 ) Engineer
to 00 AM 00 AM
uPVC
1+645.43 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH 20 to
Inspection for 6th
MH 19
HFC- layer backfilling for From MH-20 to MH- Area 6 ( Kiran, Sr.
SEW 0647 ( 1+811.63 8-Nov-14 10:00: 8-Nov-14 08:00: Revised 13-11-2014
sewer line 200mm dia 19 IR-1 ) Engineer
TO 00 AM 00 AM
uPVC
1+728.89 )

road crossing Duct


HFC- Visual Inspection of 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 005 No.1 at ch Area 1 8-Nov-14 10:00: 8-Nov-14 08:00: A 10-11-2014
soil surround for upvc addittional HV 5 Engineer
10+108.605 00 AM 00 AM

road crossing Duct


HFC- Visual Inspection of 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 006 No.1 at ch Area 1 8-Nov-14 10:00: 8-Nov-14 08:00: A 10-11-2014
soil surround for upvc addittional LV 1 Engineer
10+107.681 00 AM 00 AM

Visual Inspection of road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 007 1st layer back filling No.1 at ch Area 1 8-Nov-14 11:00:0 8-Nov-14 08:00: A 10-11-2014
upvc addittional HV 5 Engineer
for 10+108.605 0 AM 00 AM

Visual Inspection of road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 008 1st layer back filling No.1 at ch Area 1 8-Nov-14 11:00:0 8-Nov-14 08:00: A 10-11-2014
upvc addittional LV 1 Engineer
for 10+107.681 0 AM 00 AM

Visual inspection of
HFC- 2nd layer back filling 1+460 to Kiran, Sr.
SEW 0648 Area 1 8-Nov-14 10:00: 8-Nov-14 08:00: A 10-11-2012
for 200 mm dia HDPE 1+540 Engineer
00 AM 00 AM
Sewer pressure line

Inspection for pouring MH


HFC- Storm water drainage Kiran, Sr.
DR 0031 of concrete for the Area 7 2.7,0+174. 8-Nov-14 10:00: 8-Nov-14 08:00: AN 3-12-2014
MH 2.7 Engineer
blinding (PCC) of 7024 00 AM 00 AM

Inspection for pouring MH


HFC- Storm water drainage Kiran, Sr.
DR 0032 of concrete for the Area 7 2.8,0+127. 8-Nov-14 10:00: 8-Nov-14 08:00: AN 12/7/2014
MH 2.8 Engineer
blinding (PCC) of 98.95 00 AM 00 AM

Inspection for pouring MH


HFC- Storm water drainage Kiran, Sr.
DR 0033 of concrete for the Area 7 2.9,0+081. 8-Nov-14 10:00: 8-Nov-14 08:00: AN 3-12-2014
MH 2.9 Engineer
blinding (PCC) of 7331 00 AM 00 AM

Inspection for pouring MH


HFC- Storm water drainage Kiran, Sr.
DR 0034 of concrete for the Area 7 2.10,0+034 8-Nov-14 10:00: 8-Nov-14 08:00: AN 3-12-2014
MH 2.10 Engineer
blinding (PCC) of .4192 00 AM 00 AM

Inspection for pouring MH


HFC- Storm water drainage Kiran, Sr.
DR 0035 of concrete for the Area 7 2.6,0+225. 8-Nov-14 11:00:0 8-Nov-14 08:00: AN 3-12-2014
MH 2.6 Engineer
blinding (PCC) of 6435 0 AM 00 AM

Inspection for
granular bedding, gravel surround for HC -02 to
HFC- from HC -02 to HC-01 02:00: Kiran, Sr.
SEW 0649 laying geotextile, joint house connection line Area 6 HC-01 of 8-Nov-14 3:00:0 8-Nov-14 A 7-12-2014
of MH-25 00 Engineer
measurements of 160 mm dia upvc (MH-25) 0 PM
PM
pipe laying &
Inspection for
granular bedding, gravel surround for HC -02 to
HFC- from HC -02 to HC-01 02:00: Kiran, Sr.
SEW 0650 laying geotextile, joint house connection line Area 6 HC-01 of 8-Nov-14 3:00:0 8-Nov-14 A 16-11-2014
of MH-24 00 Engineer
measurements of 160 mm dia upvc ( MH-24) 0 PM
PM
pipe laying &

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 02:00: Kiran, Sr.
SEW 0651 MH-5 8-Nov-14 3:00:0 8-Nov-14 A 4-01-2015
concreting for base MH-5 Area 00 Engineer
0 PM
slab with benching PM

Inspection of shutter,
HFC- reinforcement and for sewerage manhole Yard 02:00: Kiran, Sr.
SEW 0652 MH-4 8-Nov-14 3:00:0 8-Nov-14 A 4-01-2015
concreting for base MH-4 Area 00 Engineer
0 PM
slab with benching PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

for 150 mm dia upvc


Visual inspection of
HFC- Irrigation transmission 0+990 to Kiran, Sr.
IRR 0060 2nd layer back filling Area 1 6-Nov-14 11:30:0 6-Nov-14 08:00: AN 10-11-2014
line from ch 0+990 to 1+000 Engineer
with warning tape 0 AM 00 AM
1+000

Inspection for air test


HFC- DC to HC- 02:00: Kiran, Sr.
SEW 0653 for 315 mm dia uPVC from DC to HC-01 Area 1 8-Nov-14 3:00:0 8-Nov-14 RR 27-11-2014
01 00 Engineer
sewer line 0 PM
PM

Inspection for mirrior


HFC- DC to HC- 02:00: Kiran, Sr.
SEW 0654 test for 315 mm dia from DC to HC-01 Area 1 8-Nov-14 3:30:0 8-Nov-14 RR 27-11-2014
01 00 Engineer
uPVC sewer line 0 PM
PM

Inspection for mandrel


HFC- DC to HC- 02:00: Kiran, Sr.
SEW 0655 test for 315 mm dia from DC to HC-01 Area 1 8-Nov-14 4:00:0 8-Nov-14 RR 27-11-2014
01 00 Engineer
uPVC sewer line 0 PM
PM

Inspection for air test


HFC- HC-01 to 02:00: Kiran, Sr.
SEW 0656 for 315 mm dia uPVC from HC-01 to HC-02 Area 1 8-Nov-14 3:00:0 8-Nov-14 RR 27-11-2014
HC-02 00 Engineer
sewer line 0 PM
PM

Inspection for mirrior


HFC- HC-01 to 02:00: Kiran, Sr.
SEW 0657 test for 315 mm dia from HC-01 to HC-02 Area 1 8-Nov-14 3:30:0 8-Nov-14 RR 27-11-2014
HC-02 00 Engineer
uPVC sewer line 0 PM
PM

Inspection for mandrel


HFC- HC-01 to 02:00: Kiran, Sr.
SEW 0658 test for 315 mm dia from HC-01 to HC-02 Area 1 8-Nov-14 4:00:0 8-Nov-14 RR 27-11-2014
HC-02 00 Engineer
uPVC sewer line 0 PM
PM
HC-02 to
Inspection for air test existing
HFC- from HC-02 to existing 02:00: Kiran, Sr.
SEW 0659 for 315 mm dia uPVC Area 1 MH 8-Nov-14 3:00:0 8-Nov-14 RR 27-11-2014
MH S19/24/10A/5 00 Engineer
sewer line S19/24/10 0 PM
PM
A/5
HC-02 to
Inspection for mirrior existing
HFC- from HC-02 to existing 02:00: Kiran, Sr.
SEW 0660 test for 315 mm dia Area 1 MH 8-Nov-14 3:30:0 8-Nov-14 RR 3-12-2014
MH S19/24/10A/5 00 Engineer
uPVC sewer line S19/24/10 0 PM
PM
A/5
HC-02 to
Inspection for mandrel existing
HFC- from HC-02 to existing 02:00: Kiran, Sr.
SEW 0661 test for 315 mm dia Area 1 MH 8-Nov-14 4:00:0 8-Nov-14 RR 27-11-2014
MH S19/24/10A/5 00 Engineer
uPVC sewer line S19/24/10 0 PM
PM
A/5
Inspection for
granular bedding, joint for connection portion of 200mm dia upvc
HFC- MH-22 to 02:00: Kiran, Sr.
SEW 0662 measurement of pipe (including st. specials sewer line between Area 6 8-Nov-14 3:00:0 8-Nov-14 A 24-11-2014
MH-21 00 Engineer
laying and gravel 2nos) MH-22 to MH-21 0 PM
PM
surrounding
Inspection for
granular bedding, joint for connection portion of 200mm dia upvc
HFC- MH-22 to 02:00: Kiran, Sr.
SEW 0663 measurement of pipe (including st. specials sewer line between Area 6 8-Nov-14 3:30:0 8-Nov-14 A 24-11-2014
MH-21.3 00 Engineer
laying and gravel 2nos) MH-22 to MH-21.3 0 PM
PM
surrounding
Inspection for
granular bedding, joint for connection portion of 200mm dia upvc
HFC- MH-21.3 to 02:00: Kiran, Sr.
SEW 0664 measurement of pipe (including st. specials sewer line between Area 6 8-Nov-14 4:00:0 8-Nov-14 A 24-11-2014
MH-21.1 00 Engineer
laying and gravel 2nos) MH-21.3 to MH-21.1 0 PM
PM
surrounding
Inspection for
granular bedding, joint for connection portion of 200mm dia upvc
HFC- MH-21.3 to 02:00: Kiran, Sr.
SEW 0665 measurement of pipe (including st. specials sewer line between Area 6 8-Nov-14 4:00:0 8-Nov-14 A 24-11-2014
MH-21.2 00 Engineer
laying and gravel 2nos) MH-21.3 to MH-21.2 0 PM
PM
surrounding

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and
HFC- from chainage 0+920 0+920 to Kiran, Sr.
SEW 0666 prepared formation for Area 5 9-Nov-14 10:00: 9-Nov-14 09:00: Revised 7-12-2014
to 0+875 0+875 Engineer
200 mm dia HDPE 00 AM 00 AM
sewer pressure line

Inspection for
excavation and
HFC- from chainage 0+860 0+860 to Kiran, Sr.
SEW 0667 prepared formation for Area 7 9-Nov-14 10:00: 9-Nov-14 09:00: AN 4-12-2014
to 0+770 0+770 Engineer
200 mm dia HDPE 00 AM 00 AM
sewer pressure line

Inspection for placing


& fixing precast
HFC- for Sewer MH 2.6 & MH 2.6 & Kiran, Sr.
SEW 0668 sewer manhole (base) Area 9 9-Nov-14 10:00: 9-Nov-14 09:00: A 7-12-2014
MH 2.1 MH 2.1 Engineer
including alignment 00 AM 00 AM
and level

Inspection of shutter, for base slab with


HFC- Yard Kiran, Sr.
SEW 0669 reinforcement and benching of sewerage MH-23 9-Nov-14 10:00: 9-Nov-14 09:00: AN 4-12-2014
area Engineer
concreting MH 23 00 AM 00 AM

Inspection for
HFC- shuttering & Yard Kiran, Sr.
DR 0036 at precast yard area Yard area 9-Nov-14 10:00: 9-Nov-14 09:00: AN 3-12-2014
concreting for Gully- Area Engineer
00 AM 00 AM
02 nos
Inspection for
sewera
shuttering , for the wall of sewerage
HFC- ge Kiran, Sr.
SEW 0670 reinfocement & sewerage pump pump 9-Nov-14 10:00: 9-Nov-14 09:00: AN 4-12-2014
pump Engineer
pouring concrete (1st station station 00 AM 00 AM
station
stage)
Inspection for
excavation and
HFC- from CHainage 1+000 1+000 to Kiran, Sr.
WD 003A prepared formation of Area 8 9-Nov-14 9:30:0 9-Nov-14 09:00: A 3/3/2015
- 1+350 0+350 Engineer
150 mm dia GRE 0 AM 00 AM
potable water line
Visual Inspection for
HFC- 1st layer back filling of from CHainage 1+000 1+000 to Kiran, Sr.
WD 0010 Area 8 9-Nov-14 10:00: 9-Nov-14 09:00: A 12/7/2014
150 mm dia GRE - 1+320 0+320 Engineer
00 AM 00 AM
potable water line
Visual Inspection for
HFC- 2nd layer back filling from CHainage 1+000 1+000 to Kiran, Sr.
WD 0011 Area 8 9-Nov-14 12:00: 9-Nov-14 09:00: A 12/7/2014
of 150 mm dia GRE - 1+320 0+320 Engineer
00 AM 00 AM
potable water line
Inspection of shutter,
houe connection
HFC- water stopper & HC-04 of Kiran, Sr.
SEW 0671 chamber HC-04 of Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/4/2014
concreting for the wall ( MH 25) Engineer
sewer MH 25 00 AM 00 AM
of sewerage
Inspection of shutter,
houe connection
HFC- water stopper & HC-01 of Kiran, Sr.
SEW 0672 chamber HC-01 of Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/4/2014
concreting for the wall ( MH 24) Engineer
sewer MH 24 00 AM 00 AM
of sewerage
Inspection of shutter,
houe connection
HFC- water stopper & HC-02 of Kiran, Sr.
SEW 0673 chamber HC-02 of Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/4/2014
concreting for the wall ( MH 22) Engineer
sewer MH 22 00 AM 00 AM
of sewerage

Inspection of fixing house connection


HFC- HC-04 of Kiran, Sr.
SEW 0674 and placing precasted chamber base HC-04 Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: A 12/7/2014
( MH 25) Engineer
sewerage of Sewer MH 25 00 AM 00 AM

Inspection of fixing house connection


HFC- HC-01 of Kiran, Sr.
SEW 0675 and placing precasted chamber base HC-01 Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: A 12/7/2014
( MH 24) Engineer
sewerage of Sewer MH 24 00 AM 00 AM

Inspection of fixing house connection


HFC- HC-02 of Kiran, Sr.
SEW 0676 and placing precasted chamber base HC-02 Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: A 12/7/2014
(MH 22) Engineer
sewerage of Sewer MH 22 00 AM 00 AM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual inspection of between 150mm dia


HFC- soil surruond for 150 from ch 1+000 to upvc x450 bend - 1+000 to Kiran, Sr.
IRR 0061 Area 1 6-Nov-14 10:30: 6-Nov-14 08:00: AN 11/10/2014
mm dia upvc Irrigation 1+015 150mm dia upvc x450 1+015 Engineer
00 AM 00 AM
transmission line bend

between 150mm dia


Visual inspection of upvc Irrigation
HFC- upvc x450 bend - 1+000 to Kiran, Sr.
IRR 0062 1st layer back filling transmission line from Area 1 6-Nov-14 11:30:0 6-Nov-14 08:00: A 11/10/2014
150mm upvc dia x450 1+015 Engineer
for 150 mm dia ch 1+000 to 1+015 0 AM 00 AM
bend

Inspection for
fire fighting line from
HFC- excavation and 2+360 to Kiran, Sr.
FF 001 chanaige 2+360 to Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/3/2014
prepared formation for 2+130 Engineer
2+130 00 AM 00 AM
250 mm dia HDPE

Ins[ection of fixing
HFC- cover and frame & for house connection Kiran, Sr.
SEW 0677 Area 1 HC-02 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/4/2014
placing haunching chamber HC -02 Engineer
00 AM 00 AM
concrete
Ins[ection of fixing
HFC- cover and frame & for house connection Kiran, Sr.
SEW 0678 Area 1 HC-01 9-Nov-14 10:00: 9-Nov-14 09:00: A 1/4/2015
placing haunching chamber HC -01 Engineer
00 AM 00 AM
concrete

Inspection of 2nd road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 009 layer back filling with No.1 at ch Area 1 9-Nov-14 10:00: 9-Nov-14 09:00: Revised 11/18/2014
upvc addittional HV 5 Engineer
warning tape for 10+108.605 00 AM 00 AM

Inspection of 2nd road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 0010 layer back filling with No.1 at ch Area 1 9-Nov-14 10:00: 9-Nov-14 09:00: Revised 11/18/2014
upvc addittional LV 1 Engineer
warning tape for 10+107.681 00 AM 00 AM

Inspection of 3rd & road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 0011 final layer back filling No.1 at ch Area 1 9-Nov-14 11:00:0 9-Nov-14 09:00: Revised 11/18/2014
upvc addittional HV 5 Engineer
for 10+108.605 0 AM 00 AM

Inspection of 3rd & road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 0012 final layer back filling No.1 at ch Area 1 9-Nov-14 11:00:0 9-Nov-14 09:00: Revised 11/18/2014
upvc addittional LV 1 Engineer
for 10+107.681 0 AM 00 AM

Inspection of shutter of 450 bend x150mm


HFC- Kiran, Sr.
IRR 0063 and concreting for dia Upvc at ch Area 1 1+003.052 6-Nov-14 11:30:0 6-Nov-14 08:00: AN 12/3/2014
Engineer
thrust block 1+003.052 0 AM 00 AM

Inspection for shutter for sewerage house


HFC- Kiran, Sr.
SEW 0679 & mass concreting of connection chamber Area 1 HC-02 9-Nov-14 11:00:0 9-Nov-14 09:00: A 1/15/2015
Engineer
the benching HC-02 0 AM 00 AM

Inspection for shutter


HFC- for Discharge Kiran, Sr.
SEW 0680 & mass concreting of Area 1 DC 11:00:0 9-Nov-14 09:00: A 1/4/2015
chamber DC-02 Engineer
the benching 0 AM 00 AM

MH 54657
(JRC 14)
Inspection of 3rd &
from MH 54657 (JRC to MH
HFC- final layer back filling Kiran, Sr.
ETC 0014 14) to MH 50626 Area 1 50626 9-Nov-14 11:00:0 9-Nov-14 09:00: A 12/4/2014
with warning tape for Engineer
(JRC14) (JRC14), 0 AM 00 AM
4wxD54 Etislat duct
10+150 -
10+020

Inspection for
excavation and
HFC- from chainage 0+770 0+770 to Kiran, Sr.
SEW 0681 prepared formation for Area 7 10-Nov-14 10:00: 10-Nov-14 09:00: A 12/4/2014
to 0+620 0+620 Engineer
200 mm dia HDPE 00 AM 00 AM
sewer pressure line

Inspection of shutter,
water stopper &
HFC- Kiran, Sr.
SEW 0682 concreting for the wall Area 9 MH 2.6 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/4/2014
Engineer
of Sewerage Manhole 00 AM 00 AM
MH-2.6
A Dutco Balfour Beatty Company WI PM 015/May 2014
PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
water stopper &
HFC- Kiran, Sr.
SEW 0683 concreting for the wall Area 9 MH-2.1 11-Nov-14 11:00:0 11-Nov-14 09:30: AN 12/4/2014
Engineer
of Sewerage Manhole 0 AM 00 AM
MH-2.1
for the wall of Ram
Inspection of shutter,
HFC- Sewerage chamber HC-02 of kumar,
SEW 0684 water stopper & Area 6 11-Nov-14 3:00:0 11-Nov-14 11:30: AN 12/4/2014
HC-02 of Sewerage (MH-21.1) Sr.
concreting 0 PM 00 AM
Manhole MH-21.1 Engineer
Inspection for
HFC- shuttering & Yard Kiran, Sr.
DR 0037 at precast yard area Yard area 11-Nov-14 11:00:0 11-Nov-14 09:30: AN 12/3/2014
concreting for Gully- Area Engineer
0 AM 00 AM
02 nos
Inspection for water
HFC- proofing (Polyprimes base of sewer Kiran, Sr.
SEW 0685 Area 6 MH- 8.1 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.1 Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer Kiran, Sr.
SEW 0686 Area 6 MH- 8.1 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.1 Engineer
0 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes base of sewer Kiran, Sr.
SEW 0687 Area 6 MH- 8.2 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.2 Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer Kiran, Sr.
SEW 0688 Area 6 MH- 8.2 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.2 Engineer
0 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes base of sewer Kiran, Sr.
SEW 0689 Area 6 MH- 8.3 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.3 Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer Kiran, Sr.
SEW 0690 Area 6 MH- 8.3 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-8.3 Engineer
0 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes base of sewer MH- 20 Kiran, Sr.
SEW 0691 Area 6 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-20 (1+811.63) Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer MH- 20 Kiran, Sr.
SEW 0692 Area 6 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-20 (1+811.63) Engineer
0 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes base of sewer Kiran, Sr.
SEW 0693 Area 6 MH- 19 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-19 Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer Kiran, Sr.
SEW 0694 Area 6 MH- 19 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-19 Engineer
0 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes base of sewer Kiran, Sr.
SEW 0695 Area 6 MH- 18 11-Nov-14 10:00: 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-18 Engineer
00 AM 00 AM
bituboard) for
Inspection for water
HFC- proofing (Polyprimes wall of sewer Kiran, Sr.
SEW 0696 Area 6 MH- 18 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/7/2014
B + Bitustic xl + manhole no. MH-18 Engineer
0 AM 00 AM
bituboard) for

Inspection for fixing for irrigation


HFC- Kiran, Sr.
IRR 0064 of of 150 mm dia upvc transmission line at Area 1 1+003.052 10-Nov-14 11:00:0 10-Nov-14 09:00: Revised 12/4/2014
Engineer
X450 bend chanaige 1+003.052 0 AM 00 AM

Inspection for of 150 mm dia upvc


HFC- excavation and 450 bend for irrigation 02:00: Kiran, Sr.
IRR 0065 Area 1 1+003.052 8-Nov-14 3:00:0 8-Nov-14 A 2/17/2015
prepared formation for transmission line at 00 Engineer
0 PM
thrust block 1+003.052 PM

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
Irrigation line from
HFC- excavation and 1+290 to Kiran, Sr.
IRR 0066 chainage 1+290 to Area 6 9-Nov-14 10:00: 9-Nov-14 09:00: AN 12/3/2014
prepared formation for 1+160 Engineer
1+160 00 AM 00 AM
200 mm dia upvc
Visual Inspection of between 150mm dia
upvc Irrigation
HFC- 2nd layer back filling upvc x450 bend - 1+000 to Kiran, Sr.
IRR 0067 transmission line from Area 1 9-Nov-14 11:00:0 9-Nov-14 09:00: A 12/7/2014
with warning tape for 150mm upvc dia x450 1+015 Engineer
ch 1+000 to 1+015 0 AM 00 AM
150 mm dia bend
2wx150mm dia upvc
Inspection for sand 10+100
HFC- Irrigation road Kiran, Sr.
IRR 0068 surround & 1st layer at ch 10+100 Area 1 (remaining 11-Nov-14 10:00: 11-Nov-14 09:30: AN 11/18/2014
crossing duct no 12 Engineer
back filling for portion) 00 AM 00 AM
(remaining portion)
2wx150mm dia upvc
Inspection 2nd layer 10+100
HFC- Irrigation road Kiran, Sr.
IRR 0069 back filling with at ch 10+100 Area 1 (remaining 11-Nov-14 11:00:0 11-Nov-14 09:30: A 12/4/2014
crossing duct no 12 Engineer
warning tape for portion) 0 AM 00 AM
(remaining portion)

Inspection for
excavation and
HFC- from chainage 0+620 0+620 to Kiran, Sr.
SEW 0697 prepared formation for Area 7 11-Nov-14 11:30:0 11-Nov-14 09:30: AN 12/4/2014
to 0+410 0+410 Engineer
200 mm dia HDPE 0 AM 00 AM
sewer pressure line

Inspection for 3rd


HFC- layer back filling of from CHainage 1+000 1+000 - Kiran, Sr.
WD 0012 Area 8 11-Nov-14 11:30:0 11-Nov-14 09:30: AN 12/3/2014
150 mm dia GRE - 1+320 0+320 Engineer
0 AM 00 AM
potable water line
for the wall of Ram
Inspection of shutter,
HFC- Sewerage chamber HC-02 of kumar,
SEW 0698 water stopper & Area 6 11-Nov-14 3:00:0 11-Nov-14 11:30: A 12/4/2014
HC-02 of Sewerage (MH-21.2) Sr.
concreting 0 PM 00 AM
Manhole MH-21.2 Engineer
2wx150mm dia upvc
Inspection for 3rd & 10+100
HFC- Irrigation road Kiran, Sr.
IRR 0070 final layer back filling at ch 10+100 Area 1 (remaining 11-Nov-14 11:30:0 11-Nov-14 09:30: A 12/4/2014
crossing duct no 12 Engineer
for portion) 0 AM 00 AM
(remaining portion)
Inspection for
Ram
granular bedding, joint for connection portion MH-18
HFC- of 200mm dia upvc kumar,
SEW 0699 measurement of pipe (including st. specials Area 6 ( 1+645.43 11-Nov-14 3:00:0 11-Nov-14 2:30:0 A 11/24/2014
sewer line to MH-18 Sr.
laying and gravel 2nos) ) 0 PM 0 PM
Engineer
surrounding
Inspection for
Ram
granular bedding, joint for connection portion
HFC- of 200mm dia upvc MH-19 kumar,
SEW 0700 measurement of pipe (including st. specials Area 6 11-Nov-14 3:00:0 11-Nov-14 2:30:0 A 11/24/2014
sewer line to MH-19 (1+728.89) Sr.
laying and gravel 2nos) 0 PM 0 PM
Engineer
surrounding
Inspection for
Ram
granular bedding, joint for connection portion
HFC- of 200mm dia upvc MH-20 kumar,
SEW 0701 measurement of pipe (including st. specials Area 6 11-Nov-14 3:00:0 11-Nov-14 2:30:0 A 11/24/2014
sewer line to MH-20 (1+811.63) Sr.
laying and gravel 2nos) 0 PM 0 PM
Engineer
surrounding
for the wall of Ram
Inspection of shutter,
HFC- Sewerage chamber HC-02 of kumar,
SEW 0702 water stopper & Area 6 12-Nov-14 11:00:0 12-Nov-14 8:30:0 Revised 12/3/2014
HC-02 of Sewerage (MH-23) Sr.
concreting 0 AM 0 AM
Manhole MH-23 Engineer

Inspection of shutter, Ram


HFC- reinforcement and Yard kumar,
SEW 0703 for Sewer MH-3 0+811.83 12-Nov-14 10:00: 12-Nov-14 8:30:0 AN 12/4/2014
concreting for base Area Sr.
00 AM 0 AM
slab with benching Engineer

Inspection of shutter, Ram


HFC- reinforcement and Yard kumar,
SEW 0704 for Sewer MH-11 1+266.48 12-Nov-14 10:00: 12-Nov-14 8:30:0 AN 12/4/2014
concreting for base Area Sr.
00 PM 0 AM
slab with benching Engineer

Inspection for
Ram
excavation and
HFC- from chainage 0+380 0+380 to kumar,
SEW 0705 prepared formation for Area 7 12-Nov-14 9:00:0 12-Nov-14 8:30:0 A 12/13/2014
to 0+280 0+280 Sr.
200 mm dia HDPE 0 AM 0 AM
Engineer
sewer pressure line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for Ram


gravel surround for HC -03 to
HFC- granular bedding, joint from HC -03 to end kumar,
SEW 0706 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of cap of sewer MH-25 Sr.
160 mm dia upvc ( MH-25) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -04 to
HFC- granular bedding, joint from HC -04 to end kumar,
SEW 0707 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of cap of sewer MH-25 Sr.
160 mm dia upvc ( MH-25) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -01 to
HFC- granular bedding, joint from HC -01 to end kumar,
SEW 0708 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of cap of sewer MH-25 Sr.
160 mm dia upvc ( MH-25) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to end kumar,
SEW 0709 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements cap of sewer MH-25 Sr.
160 mm dia upvc ( MH-25) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for
HFC- granular bedding, joint HC -02 to kumar,
SEW 0710 house connection line from HC -02 to MH-24 Area 6 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/12/2014
measurements of MH-24 Sr.
160 mm dia upvc 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to end kumar,
SEW 0711 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/12/2014
joint measurements cap of sewer MH-24 Sr.
160 mm dia upvc ( MH-24) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for HC -01 to
HFC- granular bedding, joint from HC -01 to end kumar,
SEW 0712 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/12/2014
measurements of cap of sewer MH-24 Sr.
160 mm dia upvc ( MH-24) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -03 to
HFC- granular bedding, from HC -03 to end kumar,
SEW 0713 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements cap of sewer MH-24 Sr.
160 mm dia upvc ( MH-24) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for HC -04 to
HFC- granular bedding, from HC -04 to end kumar,
SEW 0714 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements cap of sewer MH-24 Sr.
160 mm dia upvc ( MH-24) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for HC -02 to
HFC- granular bedding, joint from HC -02 to HC-01 kumar,
SEW 0715 house connection line Area 6 HC-01 of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of of sewer MH-21.2 Sr.
160 mm dia upvc ( MH-21.2) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for
HFC- granular bedding, from HC-01 to sewer HC -01 to kumar,
SEW 0716 house connection line Area 6 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements MH-21.2 MH-21.2 Sr.
160 mm dia upvc 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for HC -01 to
HFC- granular bedding, from HC -01 to end kumar,
SEW 0717 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements cap of sewer MH-21.2 Sr.
160 mm dia upvc ( MH-21.2) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for HC -02 to
HFC- granular bedding, joint from HC -02 to end kumar,
SEW 0718 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of cap of sewer MH-21.2 Sr.
160 mm dia upvc ( MH-21.2) 0 AM 0 AM
pipe laying & Engineer
Inspection for Ram
gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to HC-01 kumar,
SEW 0719 house connection line Area 6 HC-01 of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements of sewer MH-21.1 Sr.
160 mm dia upvc ( MH-21.1) 0 AM 0 AM
of pipe laying & Engineer
Inspection for Ram
gravel surround for
HFC- granular bedding, joint from HC -01 to sewer HC -01 to ( kumar,
SEW 0720 house connection line Area 6 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of MH-21.1 MH-21.1) Sr.
160 mm dia upvc 0 AM 0 AM
pipe laying & Engineer

Inspection for Ram


gravel surround for HC -01 to
HFC- granular bedding,joint from HC -01 to end kumar,
SEW 0721 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
measurements of cap of sewer MH-21.1 Sr.
160 mm dia upvc ( MH-21.1) 0 AM 0 AM
pipe laying & Engineer

Inspection for Ram


gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to end kumar,
SEW 0722 house connection line Area 6 end cap of 12-Nov-14 9:00:0 12-Nov-14 8:30:0 Revised 11/13/2014
joint measurements cap of sewer MH-21.1 Sr.
160 mm dia upvc ( MH-21.1) 0 AM 0 AM
of pipe laying & Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for Ram


fire fighting line from
HFC- excavation and 2+130 to kumar,
FF 002 chanaige 2+130 to Area 6 12-Nov-14 9:00:0 12-Nov-14 8:30:0 A 2/18/2015
prepared formation for 2+030 Sr.
2+030 0 AM 0 AM
250 mm dia HDPE Engineer

Inspection of laying
2W x150mm Irrigation road
HFC- warning tape & 1st Kiran, Sr.
IRR 0071 uPVC+1wx300mm dia crossing Duct No. 11 Area 1 10+087.74 11-Nov-14 10:30: 11-Nov-14 09:30: Revised 12/4/2014
(final layer back filling Engineer
upvc at ch 10+87.065 00 AM 00 AM
for
Inspection of laying
2W x150mm Irrigation road
HFC- warning tape & 1st 10+146.02 Kiran, Sr.
IRR 0072 uPVC+1wx300mm dia crossing Duct No. 4 at Area 1 11-Nov-14 10:30: 11-Nov-14 09:30: A 12/4/2014
(final) layer back filling 9 Engineer
upvc ch 10+146.029 00 AM 00 AM
for
Inspection of shutter
Ram
and pouring of
HFC- irrigation transmission 0+750 to 0 kumar,
IRR 0073 concrete for concrete Area 1 11-Nov-14 3:00:0 11-Nov-14 11:30: AN 12/3/2014
line +845 Sr.
surround of 150mm 0 PM 00 AM
Engineer
dia uPVC
Inspection for Ram
Irrigation line from
HFC- excavation and 1+160 to kumar,
IRR 0074 chainage 1+160 to Area 6 12-Nov-14 9:00:0 12-Nov-14 8:30:0 AN 12/7/2014
prepared formation for 1+060 Sr.
1+060 0 AM 0 AM
200 mm dia upvc Engineer
Inspection for
Ram
excavation and (remaining portion as Irrigatio Irrigation
HFC- kumar,
IRR 0075 prepared formation for attached & clouded in n pump pump 12-Nov-14 2:00:0 12-Nov-14 1:30:0 A 12/4/2014
Sr.
Irrigation pumping drawing) station station 0 PM 0 PM
Engineer
station
Inspection for blinding Ram
(remaining portion as Irrigatio Irrigation
HFC- concrete pouring for kumar,
IRR 0076 attached & clouded in n pump pump 12-Nov-14 2:30:0 12-Nov-14 1:30:0 AN 12/4/2014
Irrigation pumping Sr.
drawing) station station 0 PM 0 PM
station Engineer
Ram
Inspection for Air test
HFC- MH-24 to kumar,
SEW 0576A for Sewer line of from MH-24 to MH-23 Area 6 13-Nov-14 9:30:0 13-Nov-14 8:30:0 Revised 12/4/2014
MH-23 Sr.
200mm dia upvc 0 AM 0 AM
Engineer
Ram
Inspection for Air test
HFC- MH-23 to kumar,
SEW 0577A for Sewer line of from MH-23 to MH-22 Area 6 13-Nov-14 9:30:0 13-Nov-14 8:30:0 Revised 12/4/2014
MH-22 Sr.
200mm dia upvc 0 AM 0 AM
Engineer

Inspection for precast Ram


HFC- sewer manhole (base) Area 8 MH-16.1 kumar,
SEW 0439A MH-16.1 13-Nov-14 9:30:0 13-Nov-14 8:30:0 A 9/7/2015
placing including (IR-7) (0+040.00) Sr.
0 AM 0 AM
alignment and level Engineer

Inspection for fixing of Ram


HFC- precasted cover slab kumar,
SEW 0566A Area 1 1+723.33 13-Nov-14 9:30:0 13-Nov-14 8:30:0 AN 11/18/2014
for house connection Sr.
0 AM 0 AM
chamber HC - 01 Engineer

Ram
Inspection for Air test
HFC- MH-25 to kumar,
SEW 0723 for Sewer line of from MH-25 to MH-24 Area 6 13-Nov-14 9:30:0 13-Nov-14 8:30:0 Revised 12/3/2014
MH-24 Sr.
200mm dia upvc 0 AM 0 AM
Engineer
Inspection and joint
Ram
measurement of pipe
HFC- in area- 4 from ch 0+920 to kumar,
SEW 0517A laying for 200 mm dia Area 4 13-Nov-14 9:30:0 13-Nov-14 8:30:0 Revised 12/9/2014
0+920 - 1+150 1+150 Sr.
HDPE Sewer force 0 AM 0 AM
Engineer
main line
Ram
Inspection for water Irrigatio Irrigation
HFC- Irrigation pump kumar,
IRR 0054A proofing and screed n pump pump 13-Nov-14 11:30:0 13-Nov-14 8:30:0 AN 11/23/2014
station Sr.
over the blinding of station station 0 AM 0 AM
Engineer
for the wall of
Inspection of shutter, S. Bala
HFC- Sewerage chamber HC-01 of
SEW 0724 water stopper & Area 6 13-Nov-14 01:30: 13-Nov-14 11:30: Ji, Sr. AN 12/4/2014
HC-01 of Sewerage (MH-23)
concreting 00 PM 00 AM Engineer
Manhole MH-23

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
houe connection S. Bala
HFC- water stopper & HC-01 of
SEW 0725 chamber HC-01 of Area 6 13-Nov-14 01:30: 13-Nov-14 11:30: Ji, Sr. AN 12/4/2014
concreting for the wall ( MH-22)
sewer MH- 22 00 PM 00 AM Engineer
of sewerage
Inspection for
S. Bala
HFC- shuttering & Yard
DR 0038 at precast yard area Yard area 13-Nov-14 01:30: 13-Nov-14 11:30: Ji, Sr. AN 12/3/2014
concreting for Gully- Area
00 PM 00 AM Engineer
02 nos

Inspection for
excavation and S. Bala
HFC- from chainage 0+280 0+280 to
SEW 0726 prepared formation for Area 7 13-Nov-14 01:30: 13-Nov-14 11:30: Ji, Sr. AN 12/4/2014
to 0+150 0+150
200 mm dia HDPE 00 PM 00 AM Engineer
sewer pressure line

for sewer line of


S. Bala
HFC- Inspection of granular house connection 160 MH: 25 -
SEW 0497A Area 6 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/18/2014
bedding mm dia upvc from HC-04
00 PM 00 AM Engineer
MH: 25 - HC-04
Inspection for
gravel surround for HC -03 to S. Bala
HFC- granular bedding, joint from HC -03 to end
SEW 0706A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
measurements of cap of sewer MH-25
160 mm dia upvc ( MH-25) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -04 to S. Bala
HFC- granular bedding, joint from HC -04 to end
SEW 0707A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
measurements of cap of sewer MH-25
160 mm dia upvc ( MH-25) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -01 to S. Bala
HFC- granular bedding, joint from HC -01 to end
SEW 0708A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
measurements of cap of sewer MH-25
160 mm dia upvc ( MH-25) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, from HC -02 to end
SEW 0709A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
joint measurements cap of sewer MH-25
160 mm dia upvc ( MH-25) 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for S. Bala
HFC- granular bedding, joint HC -02 to
SEW 0710A house connection line from HC -02 to MH-24 Area 6 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
measurements of MH-24
160 mm dia upvc 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, from HC -02 to end
SEW 0711A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. Revised 11/22/2014
joint measurements cap of sewer MH-24
160 mm dia upvc ( MH-24) 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for HC -01 to S. Bala
HFC- granular bedding, joint from HC -01 to end
SEW 0712A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
measurements of cap of sewer MH-24
160 mm dia upvc ( MH-24) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -03 to S. Bala
HFC- granular bedding, from HC -03 to end
SEW 0713A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
joint measurements cap of sewer MH-24
160 mm dia upvc ( MH-24) 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for HC -04 to S. Bala
HFC- granular bedding, from HC -04 to end
SEW 0714A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/22/2014
joint measurements cap of sewer MH-24
160 mm dia upvc ( MH-24) 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, joint from HC -02 to HC-01
SEW 0715A house connection line Area 6 HC-01 of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. AN 11/23/2014
measurements of of sewer MH-21.2
160 mm dia upvc ( MH-21.2) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for S. Bala
HFC- granular bedding, from HC-01 to sewer HC -01 to
SEW 0716A house connection line Area 6 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
joint measurements MH-21.2 MH-21.2
160 mm dia upvc 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for HC -01 to S. Bala
HFC- granular bedding, from HC -01 to end
SEW 0717A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
joint measurements cap of sewer MH-21.2
160 mm dia upvc ( MH-21.2) 00 PM 00 AM Engineer
of pipe laying &

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, joint from HC -02 to end
SEW 0718A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
measurements of cap of sewer MH-21.2
160 mm dia upvc ( MH-21.2) 00 PM 00 AM Engineer
pipe laying &
Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, from HC -02 to HC-01
SEW 0719A house connection line Area 6 HC-01 of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
joint measurements of sewer MH-21.1
160 mm dia upvc ( MH-21.1) 00 PM 00 AM Engineer
of pipe laying &
Inspection for
gravel surround for S. Bala
HFC- granular bedding, joint from HC -01 to sewer HC -01 to (
SEW 0720A house connection line Area 6 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
measurements of MH-21.1 MH-21.1)
160 mm dia upvc 00 PM 00 AM Engineer
pipe laying &

Inspection for
gravel surround for HC -01 to S. Bala
HFC- granular bedding,joint from HC -01 to end
SEW 0721A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
measurements of cap of sewer MH-21.1
160 mm dia upvc ( MH-21.1) 00 PM 00 AM Engineer
pipe laying &

Inspection for
gravel surround for HC -02 to S. Bala
HFC- granular bedding, from HC -02 to end
SEW 0722A house connection line Area 6 end cap of 15-Nov-14 01:30: 15-Nov-14 09:30: Ji, Sr. A 11/22/2014
joint measurements cap of sewer MH-21.1
160 mm dia upvc ( MH-21.1) 00 PM 00 AM Engineer
of pipe laying &
Inspection of
excavation and S. BalaJi,
HFC-
DR 0039 prepared formation for no. G-7 Area 1 G-7 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
the Storm Water 00 AM 00 AM Engineer
double Gully

Inspection of fixing
S. BalaJi,
HFC- external waterproofing
DR 0040 no. G-7 Area 1 G-7 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
for the Storm Water
00 AM 00 AM Engineer
double Gully

Inspection of placing
S. BalaJi,
HFC- of the precast Gully
DR 0041 no. G-7 Double gully Area 1 G-7 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
for the Storm Water
00 AM 00 AM Engineer
Drainage Works

for 160mm uPVC


Inspection and joint S. BalaJi,
HFC- Drainage Line for the
DR 0042 measurement of pipe Area 1 G-7 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
connection portion of
laying & fittings 00 AM 00 AM Engineer
double Gully No -7

Inspection of fixing
S. BalaJi,
HFC- external waterproofing
DR 0043 no. G-5 Area 1 G-5 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
for the Storm Water
00 AM 00 AM Engineer
double Gully

for 160mm uPVC


Inspection and joint S. BalaJi,
HFC- Drainage Line for the
DR 0044 measurement of pipe Area 1 G-5 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
connection portion of
laying & fittings 00 AM 00 AM Engineer
double Gully No -5

Inspection for
fire fighting line from S. BalaJi,
HFC- excavation and 2+030 to
FF 003 chanaige 2+030 to Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/7/2014
prepared formation for 1+940
1+940 00 AM 00 AM Engineer
250 mm dia HDPE

Inspection for
Irrigation line from S. BalaJi,
HFC- excavation and 1+060 to
IRR 0077 chainage 1+060 to Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/7/2014
prepared formation for 0+950
0+950 00 AM 00 AM Engineer
200 mm dia upvc

Inspection of shutter,
S. BalaJi,
HFC- reinforcement and Yard
SEW 0727 for Sewer MH-2 Yard Area 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
concreting for base Area
00 AM 00 AM Engineer
slab with benching

Inspection of shutter,
S. BalaJi,
HFC- reinforcement and Yard
SEW 0728 for Sewer MH-1A Yard Area 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
concreting for base Area
00 AM 00 AM Engineer
slab with benching

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and S. BalaJi,
HFC- from chainage 0+150 0+150 to
SEW 0729 prepared formation for Area 7 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/18/2014
to 0+050 0+050
200 mm dia HDPE 00 AM 00 AM Engineer
sewer pressure line

Inspection for
excavation and S. BalaJi,
HFC- from chainage 0+880 0+880 to
SEW 0730 prepared formation for Area 5 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/13/2014
to 0+850 0+850
200 mm dia HDPE 00 AM 00 AM Engineer
sewer pressure line

Inspection for
granular bedding, for connection portion of 200mm dia upvc S. BalaJi,
HFC- of pipe laying and MH-16.2
SEW 0731 laying of (including st. specials sewer line to MH- Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/22/2014
gravel surrounding (0+108.28)
geotextile,joint 1nos) 16.2 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc S. BalaJi,
HFC- of pipe laying and MH-16.3
SEW 0732 laying of (including st. specials sewer line to MH- Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/22/2014
gravel surrounding (0+063.63)
geotextile,joint 3nos) 16.3 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc S. BalaJi,
HFC- of pipe laying and MH-16.1
SEW 0733 laying of (including st. specials sewer line to MH- Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
gravel surrounding (0+040.00)
geotextile,joint 1nos) 16.1 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-8.3 S. BalaJi,
HFC- of pipe laying and
SEW 0734 laying of (including st. specials sewer line to MH- Area 6 ( 0+125.50 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
gravel surrounding
geotextile,joint 1nos) 8.3 ) 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-8.2 S. BalaJi,
HFC- of pipe laying and
SEW 0735 laying of (including st. specials sewer line to MH- Area 6 ( 0+069.2 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
gravel surrounding
geotextile,joint 3nos) 8.2 3) 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-8.1 S. BalaJi,
HFC- of pipe laying and
SEW 0736 laying of (including st. specials sewer line to MH- Area 6 ( 0+041.37 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/4/2014
gravel surrounding
geotextile,joint 1nos) 8.1 2) 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion S. BalaJi,
HFC- of pipe laying and of 200mm dia upvc MH-23
SEW 0737 laying of (including st. specials Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/22/2014
gravel surrounding sewer line to MH-23 (1+990.00)
geotextile,joint 1nos) 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion S. BalaJi,
HFC- of pipe laying and of 200mm dia upvc MH-22
SEW 0738 laying of (including st. specials Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. Revised 11/22/2014
gravel surrounding sewer line to MH-22 (1+906.31)
geotextile,joint 1nos) 00 AM 00 AM Engineer
measurement
Inspection for
granular bedding, for connection portion S. BalaJi,
HFC- of pipe laying and of 200mm dia upvc MH-21
SEW 0739 laying of (including st. specials Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 11/22/2014
gravel surrounding sewer line to MH-21 (1+846.86)
geotextile,joint 2nos) 00 AM 00 AM Engineer
measurement
MH-8.3 to
Inspection for 5th MH-8.2 ,
S. BalaJi,
HFC- layer back filling for from MH: 8.3 to MH: CH
SEW 0740 Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/13/2014
200 mm dia Sewer 8.2 0+125.50
00 AM 00 AM Engineer
line &CH
0+069.25

MH-8.2 to
Inspection for 5th MH-8.1 ,
S. BalaJi,
HFC- layer back filling for from MH: 8.2 to MH: CH
SEW 0741 Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/13/2014
200 mm dia Sewer 8.1 0+69.25
00 AM 00 AM Engineer
line &CH
0+041.377

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-8.2 to
Inspection for 5th
MH-9 , CH S. BalaJi,
HFC- layer back filling for
SEW 0742 from MH: 8.2 to MH: 9 Area 6 0+69.23 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/13/2014
200 mm dia Sewer
&CH 00 AM 00 AM Engineer
line
1+160.82

Visual inspection of S. BalaJi,


HFC- MH-18
SEW 0743 1st layer surruonding Sewerage MH-18 Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/7/2014
(1+645.43)
back filling around 00 AM 00 AM Engineer

Visual inspection of S. BalaJi,


HFC- MH-19
SEW 0744 1st layer surruonding Sewerage MH-19 Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/7/2014
(1+728.89)
back filling around 00 AM 00 AM Engineer

Visual inspection of S. BalaJi,


HFC- MH-20
SEW 0745 1st layer surruonding Sewerage MH-20 Area 6 15-Nov-14 011:30: 15-Nov-14 09:30: Sr. A 12/7/2014
(1+811.63)
back filling around 00 AM 00 AM Engineer

Inspection for external S. BalaJi,


HFC- 01:30:
SEW 0400A water proofing for the Area 1 DC 15-Nov-14 02:30: 15-Nov-14 Sr. AN 11/18/2014
00
wall of sewer DC 00 PM Engineer
PM
for sewer line of
house connection 160 HC-3 to S. BalaJi,
HFC- Inspection for 01:30:
SEW 0500A mm dia upvc from Area 6 HC-4 (MH- 15-Nov-14 02:30: 15-Nov-14 Sr. Revised 12/3/2014
granular bedding 00
HC-3 - HC-04 of MH- 25) 00 PM Engineer
PM
25
for sewer line of
house connection 160 HC-3 to S. BalaJi,
HFC- Inspection of granular 01:30:
SEW 0508A mm dia upvc from Area 6 HC-4 (MH- 15-Nov-14 02:30: 15-Nov-14 Sr. Revised 12/4/2014
surround 00
HC-03 - HC-04 of MH- 25) 00 PM Engineer
PM
25
MH-18 to
Inspection of 5th
MH-17 S. BalaJi,
HFC- layer backfilling for 01:30:
SEW 0644A from MH-18 to MH-17 Area 6 (1+645.43 15-Nov-14 02:30: 15-Nov-14 Sr. A 12/13/2014
200mm dia uPVC 00
to 00 PM Engineer
sewer line PM
1+562.05 )
MH-16 to
Inspection for 4th
MH-17 S. BalaJi,
HFC- layer backfilling for 01:30:
SEW 0645A from MH-16 to MH-17 Area 6 ( 1+518.64 15-Nov-14 02:30: 15-Nov-14 Sr. A 12/13/2014
sewer line 200 mm 00
to 00 PM Engineer
UPVC PM
1+562.05)

MH 16.2 to
Inspection for 5th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.2 to MH- 01:30:
SEW 0641A Area 6 16.3( 0+10 15-Nov-14 02:30: 15-Nov-14 Sr. A 12/13/2014
sewer line 200mm dia 16.3 00
8.28 to 00 PM Engineer
uPVC PM
0+063.63 )

MH 16.3 to
Inspection for 5th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.3 to MH- 01:30:
SEW 0642A Area 6 16.1( 0+0 15-Nov-14 02:30: 15-Nov-14 Sr. A 12/13/2014
sewer line 200mm dia 16.1 00
63.63 to 00 PM Engineer
uPVC PM
0+040.00)

MH 16.3 to
Inspection for 5th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.3 to MH- 01:30:
SEW 0643A Area 6 17( 0+063 15-Nov-14 02:30: 15-Nov-14 Sr. A 12/13/2014
sewer line 200mm dia 17 00
.63 to 00 PM Engineer
uPVC PM
1+562.05)
MH-16 to
Inspection for 5th
MH-17 S. BalaJi,
HFC- layer backfilling for 01:30:
SEW 0746 from MH-16 to MH-17 Area 6 ( 1+518.64 15-Nov-14 04:30: 15-Nov-14 Sr. A 12/9/2014
sewer line 200 mm 00
to 00 PM Engineer
UPVC PM
1+562.05)

MH 16.2 to
Inspection for 6th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.2 to MH- 01:30:
SEW 0747 Area 6 16.3( 0+10 15-Nov-14 04:30: 15-Nov-14 Sr. A 12/9/2014
sewer line 200mm dia 16.3 00
8.28 to 00 PM Engineer
uPVC PM
0+063.63 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH 16.3 to
Inspection for 6th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.3 to MH- 01:30:
SEW 0748 Area 6 16.1( 0+0 15-Nov-14 04:30: 15-Nov-14 Sr. A 12/11/2014
sewer line 200mm dia 16.1 00
63.63 to 00 PM Engineer
uPVC PM
0+040.00)

MH 16.3 to
Inspection for 6th
MH- S. BalaJi,
HFC- layer backfilling for from MH-16.3 to MH- 01:30:
SEW 0749 Area 6 17( 0+063 15-Nov-14 04:30: 15-Nov-14 Sr. A 12/13/2014
sewer line 200mm dia 17 00
.63 to 00 PM Engineer
uPVC PM
1+562.05)
MH-18 to
Inspection of 6th
MH-17 S. BalaJi,
HFC- layer backfilling for 01:30:
SEW 0750 from MH-18 to MH-17 Area 6 (1+645.43 16-Nov-14 04:30: 15-Nov-14 Sr. A 12/11/2014
200mm dia uPVC 00
to 00 PM Engineer
sewer line PM
1+562.05 )
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-2.1
SEW 0751 proofing (Polyprimes Area 9 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.1 (0+135.14)
B + Bitustic xl + 00 AM 00 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-2.2
SEW 0752 proofing (Polyprimes Area 9 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.2 (0+198.46)
B + Bitustic xl + 00 AM 00 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-2.3
SEW 0753 proofing (Polyprimes Area 9 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.3 (0+267.57)
B + Bitustic xl + 00 AM 00 AM Engineer
bituboard) for
Inspection for
external water MH-2.4 S. BalaJi,
HFC- base & wall of sewer
SEW 0754 proofing (Polyprimes Area 9 ( 0+335.62 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.4
B + Bitustic xl + ) 00 AM 00 AM Engineer
bituboard) for
Inspection for
external water MH-2.5 S. BalaJi,
HFC- base & wall of sewer
SEW 0755 proofing (Polyprimes Area 9 (0+405.24 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.5
B + Bitustic xl + ) 00 AM 00 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-2.6
SEW 0756 proofing (Polyprimes Area 9 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 11/18/2014
manhole no. MH-2.6 (0+474.95)
B + Bitustic xl + 00 AM 00 AM Engineer
bituboard) for
MH 19 to
Inspection for 6th
MH 18 S. BalaJi,
HFC- layer backfilling for From MH-19 to MH-
SEW 0646A Area 6 (1+728.89 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 12/13/2014
sewer line 200mm dia 18
to 00 AM 00 AM Engineer
uPVC
1+645.43 )
MH 20 to
Inspection for 6th
MH 19 S. BalaJi,
HFC- layer backfilling for From MH-20 to MH-
SEW 0647A Area 6 ( 1+811.63 16-Nov-14 09:30: 16-Nov-14 08:30: Sr. A 12/13/2014
sewer line 200mm dia 19
TO 00 AM 00 AM Engineer
uPVC
1+728.89 )
MH 19 to
Inspection for 7th
MH 18 S. BalaJi,
HFC- layer backfilling for From MH-19 to MH-
SEW 0757 Area 6 (1+728.89 16-Nov-14 01:30: 16-Nov-14 08:30: Sr. A 12/9/2014
sewer line 200mm dia 18
to 00 PM 00 AM Engineer
uPVC
1+645.43 )
MH 20 to
Inspection for 7th
MH 19 S. BalaJi,
HFC- layer backfilling for From MH-20 to MH-
SEW 0758 Area 6 ( 1+811.63 16-Nov-14 01:30: 16-Nov-14 08:30: Sr. A 12/9/2014
sewer line 200mm dia 19
TO 00 PM 00 AM Engineer
uPVC
1+728.89 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of
excavation and S. BalaJi,
HFC-
DR 0045 prepared formation for no. G-5 Area 1 G-5 16-Nov-14 9:30:0 16-Nov-14 08:30: Sr. AN 11/18/2014
the Storm Water 0 AM 00 AM Engineer
double Gully

Inspection of placing
S. BalaJi,
HFC- of the precast Gully
DR 0046 no. G-5 Area 1 G-5 16-Nov-14 9:30:0 16-Nov-14 08:30: Sr. A 11/23/2014
for the Storm Water
0 AM 00 AM Engineer
Drainage Double gully

Inspection for
Irrigation line from S. BalaJi,
HFC- excavation and 1+000 to
IRR 0078 chainage 1+000 to Area 9 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. A 12/7/2014
prepared formation for 1+100
1+100 0 AM 00 AM Engineer
110 mm dia upvc

Inspection for
fire fighting line from S. BalaJi,
HFC- excavation and 1+180 to
FF 004 chanaige 1+180 to Area 9 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. A 12/4/2014
prepared formation for 1+280
1+280 0 AM 00 AM Engineer
200 mm dia HDPE

Inspection for
excavation and S. BalaJi,
HFC- from CHainage 2+050 2+050 to
WD 0013 prepared formation of Area 6 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. AN 12/7/2014
- 2+160 2+160
100 mm dia GRE 0 AM 00 AM Engineer
water line
Inspection and joint
measurement of pipe S. BalaJi,
HFC- from ch 0+790 to 0+790 to
SEW 0759 laying for 200 mm dia Area 7 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. A 11/23/2014
0+850 0+850
HDPE Sewer 0 AM 00 AM Engineer
pressure line
Inspection of fixing
S. BalaJi,
HFC- precasted cover slab
SEW 0760 Area 1 DC 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. A 11/18/2014
for Discharge
0 AM 00 AM Engineer
chamber

Inspection for 1st Irrigation tranmission S. BalaJi,


HFC- 0+740 to
IRR 0079 layer backfilling for line from chainage Area 1 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. AN 11/18/2014
0+840
150mm dia uPVC 0+740 to 0+840 0 AM 00 AM Engineer

Inspection for S. BalaJi,


HFC- MH-1.7
SEW 0761 excavation and for Sewerage MH-1.7 Area 7 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. C 12/4/2014
(0+347.29)
prepared formation 0 AM 00 AM Engineer

Inspection and joint road crossing Duct S. BalaJi,


HFC- 2x10W 150mm dia (remaining
ED 0013 measurement of pipe No.1 at ch (remaining portion) Area 1 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. AN 11/23/2014
upvc addittional HV portion)
laying for 10+108.605 0 AM 00 AM Engineer

Inspection and joint road crossing Duct S. BalaJi,


HFC- 2x4W 150mm dia (remaining
ED 0014 measurement of pipe No.1 at ch (remaining portion) Area 1 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. AN 11/23/2014
upvc addittional LV portion)
laying for 10+107.681 0 AM 00 AM Engineer

Inspection for
excavation and S. BalaJi,
HFC- from CHainage 0+080 0+080 to
WD 0014 prepared formation of Area 9 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. A 12/4/2014
to 0+180 0+180
100 mm dia GRE 0 AM 00 AM Engineer
water line
Inspection and joint
measurement of pipe S. BalaJi,
HFC- from ch 0+850 to 0+850 to
SEW 0762 laying for 200 mm dia Area 5 16-Nov-14 11:30:0 16-Nov-14 08:30: Sr. AN 12/4/2014
0+880 0+880
HDPE Sewer 0 AM 00 AM Engineer
pressure line

Visual inspection of S. BalaJi,


HFC- MH-18
SEW 0763 2nd layer surruonding Sewerage MH-18 Area 6 16-Nov-14 1:30:0 16-Nov-14 11:30: Sr. A 12/13/2014
(1+645.43)
back filling around 0 PM 00 AM Engineer

Visual inspection of S. BalaJi,


HFC- MH-19
SEW 0764 2nd layer surruonding Sewerage MH-19 Area 6 16-Nov-14 1:30:0 16-Nov-14 11:30: Sr. A 1/21/2015
(1+728.89)
back filling around 0 PM 00 AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual inspection of S. BalaJi,


HFC- MH-20
SEW 0765 2nd layer surruonding Sewerage MH-20 Area 6 16-Nov-14 1:30:0 16-Nov-14 11:30: Sr. A 1/21/2015
(1+811.63)
back filling around 0 PM 00 AM Engineer

S. BalaJi,
HFC- Inspection of blinding MH-1.7 01:30:
SEW 0766 for Sewerage MH-1.7 Area 7 16-Nov-14 2:30:0 16-Nov-14 Sr. C 12/4/2014
concrete (0+347.29) 00
0 PM Engineer
PM

above of blinding S. BalaJi,


HFC- Inspection for water MH-1.7 01:30:
SEW 0767 concrete for sewer Area 7 16-Nov-14 3:30:0 16-Nov-14 Sr. A 12/4/2014
proofing (0+347.29) 00
manhole MH-1.7 0 PM Engineer
PM
Inspection for placing
S. BalaJi,
HFC- & fixing precasted MH-1.7 01:30:
SEW 0768 for Sewer MH-1.7 16-Nov-14 3:30:0 16-Nov-14 Sr. A 12/4/2014
sewer manhole (base) (0+347.29) 00
0 PM Engineer
PM
Inspection for
S. BalaJi,
HFC- excavation and sewerage line from MH-16 to 01:30:
SEW 0769 Area 6 17-Nov-14 8:30:0 16-Nov-14 Sr. Revised 11/22/2014
prepared formation of MH-16 to MH-15 MH-15 00
0 AM Engineer
200mm dia UPVC PM
Inspection for
excavation and S. BalaJi,
HFC- from CHainage 0+180 0+180 to
WD 0015 prepared formation of Area 9 17-Nov-14 8:30:0 17-Nov-14 08:30: Sr. AN 12/7/2014
to 0+480 0+480
100 mm dia GRE 0 AM 00 AM Engineer
water line
Inspection for
Irrigation line from S. BalaJi,
HFC- excavation and 1+100 to
IRR 0080 chainage 1+100 to Area 9 17-Nov-14 09:30: 17-Nov-14 08:30: Sr. A 12/4/2014
prepared formation for 1+400
1+400 00 AM 00 AM Engineer
110 mm dia upvc

Inspection for
fire fighting line from S. BalaJi,
HFC- excavation and 1+280 to
FF 005 chanaige 1+280 to Area 9 17-Nov-14 9:30:0 17-Nov-14 08:30: Sr. A 1/15/2015
prepared formation for 1+580
1+580 0 AM 00 AM Engineer
200 mm dia HDPE

Inspection of shutter S. BalaJi,


HFC- portion for storm
DR 0047 & concreting for the G-5 & G-7 Area 1 G-5,G7 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. AN 12/17/2014
water double gully
gully connection 0 AM 00 AM Engineer

Inspection of 3rd S. BalaJi,


HFC- for 200 mm dia HDPE 1+460 to
SEW 0770 layer back filling with Area 1 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. A 12/13/2014
Sewer pressure line 1+540
warning tape 0 AM 00 AM Engineer

Inspection for 2nd


Irrigation tranmission S. BalaJi,
HFC- layer backfilling with 0+740 to
IRR 0081 line from chainage Area 1 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. A 12/13/2014
warning tape for 0+840
0+740 to 0+840 0 AM 00 AM Engineer
150mm dia uPVC
Inspection of sand
S. BalaJi,
HFC- surround for 200 mm from ch 0+850 to 0+850 to
SEW 0771 Area 5 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. A 12/4/2014
dia HDPE Sewer 0+880 0+880
0 AM 00 AM Engineer
pressure line
Inspection of 1st layer
S. BalaJi,
HFC- back filling for 200 from ch 0+850 to 0+850 to
SEW 0772 Area 5 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. A 11/24/2014
mm dia HDPE Sewer 0+880 0+880
0 AM 00 AM Engineer
pressure line
Inspection of sand
S. BalaJi,
HFC- surround for 200 mm from ch 0+790 to 0+790 to
SEW 0773 Area 7 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. Revised 12/3/2014
dia HDPE Sewer 0+850 0+850
0 AM 00 AM Engineer
pressure line
Inspection of 1st layer
S. BalaJi,
HFC- back filling for 200 from ch 0+790 to 0+790 to
SEW 0774 Area 7 17-Nov-14 11:30:0 17-Nov-14 08:30: Sr. Revised 12/4/2014
mm dia HDPE Sewer 0+850 0+850
0 AM 00 AM Engineer
pressure line
Inspection and joint
measurement of pipe S. BalaJi,
HFC- from ch 0+720 to 0+720 to
SEW 0775 laying for 200 mm dia Area 7 17-Nov-14 01:00: 17-Nov-14 11:30: Sr. Revised 12/3/2014
0+440 0+440
HDPE Sewer 00 PM 00 AM Engineer
pressure line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

for the wall of


Inspection of shutter, Sewerage house S. BalaJi,
HFC- HC-03 of
SEW 0776 water stopper & connection chamber Area 6 17-Nov-14 01:00: 17-Nov-14 11:30: Sr. Revised 12/3/2014
(MH-23)
concreting HC-03 of Sewerage 00 PM 00 AM Engineer
Manhole MH-23
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-1.7.5
SEW 0777 proofing (Polyprimes Area 5 17-Nov-14 02:30: 17-Nov-14 1:30:0 Sr. A 11/24/2014
manhole no. MH-1.7.5 (0+107.65)
B + Bitustic xl + 00 PM 0 PM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-1.7.6
SEW 0778 proofing (Polyprimes Area 5 17-Nov-14 02:30: 17-Nov-14 1:30:0 Sr. Revised 11/24/2014
manhole no. MH-1.7.6 (0+057.37)
B + Bitustic xl + 00 PM 0 PM Engineer
bituboard) for
Inspection for
S. BalaJi,
HFC- shuttering & Yard
DR 0048 at precast yard area Yard area 17-Nov-14 0330:0 17-Nov-14 1:30:0 Sr. AN 12/9/2014
concreting for Gully- Area
0 PM 0 PM Engineer
02 nos
Inspection for
excavation and S. BalaJi,
HFC- from CHainage 0+480 0+480 to
WD 0016 prepared formation of Area 9 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. Revised 12/4/2014
to 0+550 0+550
100 mm dia GRE 0 AM 0 AM Engineer
water line
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+060 to BalaJi,R.
IRR 0082 chainage 1+060 to Area 6 20-Nov-14 1:30:0 20-Nov-14 10:30: Revised 12/7/2014
laying for 200 mm dia 0+950 K, Sr.
0+950 0 PM 00 AM
upvc Engineer
Inspection & joint
Irrigation line from S. BalaJi,
HFC- measurement of pipe 1+000 to
IRR 0083 chainage 1+000 to Area 9 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 12/3/2014
laying for 110 mm dia 1+100
1+100 0 AM 0 AM Engineer
upvc
Inspection & joint
Irrigation line from S. BalaJi,
HFC- measurement of pipe 1+100 to
IRR 0084 chainage 1+100 to Area 9 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 12/3/2014
laying for 110 mm dia 1+200
1+200 0 AM 0 AM Engineer
upvc
Inspection & joint
Irrigation line from S. BalaJi,
HFC- measurement of pipe 1+200 to
IRR 0085 chainage 1+200 to Area 9 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 1/25/2015
laying for 110 mm dia 1+310
1+310 0 AM 0 AM Engineer
upvc
Inspection & joint
S. BalaJi,
HFC- measurement of pipe from CHainage 0+080 0+080 to
WD 0017 Area 9 18-Nov-14 10.30: 18-Nov-14 9:30:0 Sr. AN 12/3/2014
laying for 100 mm dia to 0+180 0+180
00 AM 0 AM Engineer
GRE water line
Inspection & joint
S. BalaJi,
HFC- measurement of pipe from CHainage 0+180 0+180 to
WD 0018 Area 9 18-Nov-14 10.30: 18-Nov-14 9:30:0 Sr. AN 12/3/2014
laying for 100 mm dia to 0+280 0+280
00 AM 0 AM Engineer
GRE water line
Inspection & joint
S. BalaJi,
HFC- measurement of pipe from CHainage 0+280 0+280 to
WD 0019 Area 9 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 12/3/2014
laying for 100 mm dia to 0+390 0+390
0 AM 0 AM Engineer
GRE water line
Inspection of fixing
S. BalaJi,
HFC- internal GRP HC-1&HC-
SEW 0779 HC-1 & HC-02 Area 1 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. Revised 30-11-2014
lamination for house 2
0 AM 0 AM Engineer
connection chember

S. BalaJi,
HFC- Inspection of 4th & for 200 mm dia HDPE 1+460 to
SEW 0780 Area 1 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. Revised 12/3/2014
final layer back filling Sewer pressure line 1+540
0 AM 0 AM Engineer

Inspection for 3rd & Irrigation tranmission S. BalaJi,


HFC- 0+740 to
IRR 0086 final layer backfilling line from chainage Area 1 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. Revised 12/3/2014
0+840
for 150mm dia uPVC 0+740 to 0+840 0 AM 0 AM Engineer

Inspection for fixing of S. BalaJi,


HFC-
DR 0049 precasted cover slab G-5 &G-7 Area 1 G-5 &G-7 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 12/3/2014
for double gully no 0 AM 0 AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
external water MH-1.7.4 S. BalaJi,
HFC- base & wall of sewer
SEW 0781 proofing (Polyprimes Area 7 ( 0+004.60 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 11/23/2014
manhole no. MH-1.7.4
B + Bitustic xl + ) 0 AM 0 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-1.8
SEW 0782 proofing (Polyprimes Area 8 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 11/23/2014
manhole no. MH-1.8 (0+038.55)
B + Bitustic xl + 0 AM 0 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-1.9
SEW 0783 proofing (Polyprimes Area 8 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 11/23/2014
manhole no. MH-1.9 (0+070.00)
B + Bitustic xl + 0 AM 0 AM Engineer
bituboard) for
Inspection for
external water S. BalaJi,
HFC- base & wall of sewer MH-1.10
SEW 0784 proofing (Polyprimes Area 8 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 11/23/2014
manhole no. MH-1.10 (0+101.62)
B + Bitustic xl + 0 AM 0 AM Engineer
bituboard) for

Inspection of laying joint measurement of for 200 mm dia upvc S. BalaJi,


HFC- MH-16 to
SEW 0785 geotextile, gravel pipe laying and sewerage line from Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/22/2014
MH-15
bedding, grannular surround MH-16 to MH-15 0 AM 0 AM Engineer

Inspection for gravel surround for


S. BalaJi,
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to
SEW 0786 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 MH-23 MH-23
0 AM 0 AM Engineer
pipe laying & mm dia upvc
Inspection for gravel surround for
HC -01 to S. BalaJi,
HFC- granular bedding, joint sewer house from HC -01 to HC-2
SEW 0787 Area 6 HC-2 of 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 of sewer (MH-23)
( MH-23) 0 AM 0 AM Engineer
pipe laying & mm dia upvc
Inspection for gravel surround for
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -03 to sewer HC -03 to
SEW 0788 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 MH-23 MH-23
0 AM 0 AM Engineer
pipe laying & mm dia upvc
Inspection for gravel surround for HC -03 to
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -03 to end end cap of
SEW 0789 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 11/23/2014
measurements of connection line 160 cap of sewer ( MH-23) sewer
0 AM 0 AM Engineer
pipe laying & mm dia upvc ( MH-23)
Inspection for gravel surround for HC -02 to
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -02 to end end cap of
SEW 0790 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 cap of sewer ( MH-23) sewer
0 AM 0 AM Engineer
pipe laying & mm dia upvc ( MH-23)
Inspection for gravel surround for HC -01 to
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -01 to end end cap of
SEW 0791 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 cap of sewer ( MH-23) sewer
0 AM 0 AM Engineer
pipe laying & mm dia upvc ( MH-23)
Inspection for gravel surround for
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to
SEW 0792 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. Revised 11/24/2014
measurements of connection line 160 MH-22 MH-22
0 AM 0 AM Engineer
pipe laying & mm dia upvc
Inspection for gravel surround for
HC -01 to S. BalaJi,
HFC- granular bedding, joint sewer house from HC -01 to HC-2
SEW 0793 Area 6 HC-2 of 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 of sewer (MH-22)
( MH-22) 0 AM 0 AM Engineer
pipe laying & mm dia upvc
Inspection for gravel surround for HC -02 to
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -02 to end end cap of
SEW 0794 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 cap of sewer ( MH-22) sewer
0 AM 0 AM Engineer
pipe laying & mm dia upvc ( MH-22)
Inspection for gravel surround for HC -01 to
S. BalaJi,
HFC- granular bedding, joint sewer house from HC -01 to end end cap of
SEW 0795 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. AN 11/23/2014
measurements of connection line 160 cap of sewer ( MH-22) sewer
0 AM 0 AM Engineer
pipe laying & mm dia upvc ( MH-22)
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.6 S. BalaJi,
HFC- of pipe laying and
SEW 0796 laying of (including st. specials sewer line to MH- Area 9 ( 0+474.98 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 1nos) 2.6 ) 0 AM 0 AM Engineer
measurement

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.5 S. BalaJi,
HFC- of pipe laying and
SEW 0797 laying of (including st. specials sewer line to MH- Area 9 ( 0+405.24 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 2nos) 2.5 ) 0 AM 0 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.4 S. BalaJi,
HFC- of pipe laying and
SEW 0798 laying of (including st. specials sewer line to MH- Area 9 ( 0+335.52 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 2nos) 2.4 ) 0 AM 0 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.3 S. BalaJi,
HFC- of pipe laying and
SEW 0799 laying of (including st. specials sewer line to MH- Area 9 ( 0+267.57 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 2nos) 2.3 ) 0 AM 0 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.2 S. BalaJi,
HFC- of pipe laying and
SEW 0800 laying of (including st. specials sewer line to MH- Area 9 ( 0+198.48 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 2nos) 2.2 ) 0 AM 0 AM Engineer
measurement
Inspection for
granular bedding, for connection portion of 200mm dia upvc MH-2.1 S. BalaJi,
HFC- of pipe laying and
SEW 0801 laying of (including st. specials sewer line to MH- Area 9 ( 0+135.14 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/4/2014
gravel surrounding
geotextile,joint 2nos) 2.1 ) 0 AM 0 AM Engineer
measurement
Inspection for
excavation and S. BalaJi,
HFC- from CHainage 2+050 2+050 to
WD 0020 prepared formation of Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/17/2014
to 1+900 1+900
100 mm dia GRE 0 AM 0 AM Engineer
water line
Inspection for
excavation and S. BalaJi,
HFC- from CHainage 1+900 1+900 to
WD 0021 prepared formation of Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Sr. A 12/17/2014
to 1+770 1+770
100 mm dia GRE 0 AM 0 AM Engineer
water line
Inspection & joint
S. BalaJi,
HFC- measurement of pipe from CHainage 2+050 2+050 to
WD 0022 Area 6 18-Nov-14 1.30:0 18-Nov-14 9:30:0 Sr. Revised 12/4/2014
laying for 100 mm dia to 1+900 1+900
0 PM 0 AM Engineer
GRE water line
Inspection & joint
S. BalaJi,
HFC- measurement of pipe from CHainage 1+900 1+900 to
WD 0023 Area 6 18-Nov-14 1.30:0 18-Nov-14 9:30:0 Sr. Revised 12/4/2014
laying for 100 mm dia to 1+770 1+770
0 PM 0 AM Engineer
GRE water line
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+050 2+050 to BalaJi,R.
WD 0024 Area 6 18-Nov-14 11.30:0 18-Nov-14 9:30:0 Revised 12/3/2014
laying for 100 mm dia to 2+160 2+160 K, Sr.
0 AM 0 AM
GRE water line Engineer

Inspection of 2nd road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 009A layer back filling with No.1 at ch Area 1 18-Nov-14 03.30: 18-Nov-14 1:30:0 A 12/17/2014
upvc addittional HV 5 Engineer
warning tape for 10+108.605 00 PM 0 PM

Inspection of 2nd road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 0010A layer back filling with No.1 at ch Area 1 18-Nov-14 03.30: 18-Nov-14 1:30:0 A 12/17/2014
upvc addittional LV 1 Engineer
warning tape for 10+107.681 00 PM 0 PM

Inspection of 3rd & road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
ED 0011A final layer back filling No.1 at ch Area 1 18-Nov-14 03.30: 18-Nov-14 1:30:0 Revised 12/4/2014
upvc addittional HV 5 Engineer
for 10+108.605 00 PM 0 PM

Inspection of 3rd & road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
ED 0012A final layer back filling No.1 at ch Area 1 18-Nov-14 03.30: 18-Nov-14 1:30:0 Revised 12/4/2014
upvc addittional LV 1 Engineer
for 10+107.681 00 PM 0 PM

Inspection for shutter,


Irrigatio Irrigation
HFC- reinforcement & Irrigation & fire Kiran, Sr.
IRR 0087 n pump pump 18-Nov-14 03.30: 18-Nov-14 1:30:0 AN 12/13/2014
concreting for raft fighting reservoir Engineer
station station 00 PM 0 PM
foundation of

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
sewera
shuttering , for the wall of sewerage
HFC- ge Kiran, Sr.
SEW 0802 reinfocement & sewerage pump pump 18-Nov-14 03.30: 18-Nov-14 1:30:0 AN 1/4/2015
pump Engineer
pouring concrete (2nd station station 00 PM 0 PM
station
stage)
MH-1.10 -
Inspection for 5th
MH-1.9 ,
HFC- layer back filling for between MH: 1.10 - Kiran, Sr.
SEW 0803 Area 8 CH 0+ 19-Nov-14 09.30: 19-Nov-14 8:30:0 A 12/13/2014
200 mm dia Sewer MH: 1.9 Engineer
101.62 & 00 AM 0 AM
line
CH 0+070
MH-1.9 -
Inspection for 5th
MH-1.8 ,
HFC- layer back filling for between MH: 1.9 - Kiran, Sr.
SEW 0804 Area 8 CH 0+070 19-Nov-14 09.30: 19-Nov-14 8:30:0 A 12/13/2014
200 mm dia Sewer MH: 1.8 Engineer
& CH 00 AM 0 AM
line
0+038.65
MH-1.8 -
Inspection for 5th MH-1.7 ,
HFC- layer back filling for between MH: 1.8 - CH 0 + Kiran, Sr.
SEW 0805 Area 8 19-Nov-14 09.30: 19-Nov-14 8:30:0 A 12/13/2014
200 mm dia Sewer MH: 1.7 374.25 Engineer
00 AM 0 AM
line &CH
0+347.29
from MH:
Inspection for 5th
from MH: 1.7 to ch 1.7 to ch
HFC- layer back filling for Kiran, Sr.
SEW 0806 0+320 towards MH: Area 7 0+320 19-Nov-14 09.30: 19-Nov-14 8:30:0 A 12/13/2014
250 mm dia Sewer Engineer
1.7.1 towards 00 AM 0 AM
line
MH: 1.7.1
Inspection for S.
HFC- excavation and sewerage line from MH-14 to BalaJi,R.
SEW 0807 Area 6 19-Nov-14 10.30: 19-Nov-14 8:30:0 Revised 12/3/2014
prepared formation of MH-14 to MH-15 MH-15 M, Sr.
00 AM 0 AM
200mm dia UPVC Engineer
Inspection for S.
HFC- excavation and irrigation transmission 0+880 to BalaJi,R.
IRR 004A Area 1 20-Nov-14 10.30: 20-Nov-14 8:30:0 A 12/18/2014
prepared formation for line 0+904 M, Sr.
00 AM 0 AM
150mm dia uPVC Engineer
Inspection of
S.
excavation & 1+600.00
HFC- BalaJi,R.
SEW 008A prepared formation, pressure sewer line Area 1 to 20-Nov-14 10.30: 20-Nov-14 8:30:0 Revised 12/4/2014
M, Sr.
bedding for 315mm 1+630.00 00 AM 0 AM
Engineer
dia upvc
Inspection of shutter,
S.
water stopper & MH-25
HFC- BalaJi,R.
SEW 0387A concreting for the wall MH-25 Area 6 ( 2+107.50 20-Nov-14 10.30: 20-Nov-14 8:30:0 Revised 1/4/2015
M, Sr.
of Sewerage Manhole ) 00 AM 0 AM
Engineer
MH-25

Inspection for precast S.


MH-24
HFC- sewer manhole (base) BalaJi,R.
SEW 0379A MH-24 Area 6 ( 2+052.75 20-Nov-14 10.30: 20-Nov-14 8:30:0 Revised 12/7/2014
placing including M, Sr.
) 00 AM 0 AM
alignment and level Engineer

Inspection for
S.
excavation and
HFC- from Chainage 0+550 0+550 to BalaJi,R.
WD 0025 prepared formation of Area 9 20-Nov-14 11.30:0 20-Nov-14 10:30: Revised 12/3/2014
to 0+650 0+650 K, Sr.
100 mm dia GRE 0 AM 00 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 0+650 0+650 to BalaJi,R.
WD 0026 prepared formation of Area 9 20-Nov-14 11.30:0 20-Nov-14 10:30: Revised 12/3/2014
to 0+750 0+750 K, Sr.
100 mm dia GRE 0 AM 00 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 0+750 0+750 to BalaJi,R.
WD 0027 prepared formation of Area 9 20-Nov-14 11.30:0 20-Nov-14 10:30: Revised 12/3/2014
to 0+830 0+830 K, Sr.
100 mm dia GRE 0 AM 00 AM
Engineer
water line
Inspection & joint S.
HFC- measurement of pipe from Chainage 0+390 0+390 to BalaJi,R.
WD 0028 Area 9 20-Nov-14 01.30: 20-Nov-14 10:30: AN 12/7/2014
laying for 100 mm dia to 0+480 0+480 K, Sr.
00 PM 00 AM
GRE water line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection & joint S.


HFC- measurement of pipe from Chainage 0+480 0+480 to BalaJi,R.
WD 0029 Area 9 20-Nov-14 01.30: 20-Nov-14 10:30: AN 12/7/2014
laying for 100 mm dia to 0+550 0+550 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 0+550 0+550 to BalaJi,R.
WD 0030 Area 9 20-Nov-14 01.30: 20-Nov-14 10:30: AN 12/7/2014
laying for 100 mm dia to 0+650 0+650 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 0+650 0+650 to BalaJi,R.
WD 0031 Area 9 20-Nov-14 01.30: 20-Nov-14 10:30: AN 12/7/2014
laying for 100 mm dia to 0+750 0+750 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 0+750 0+750 to BalaJi,R.
WD 0032 Area 9 20-Nov-14 01.30: 20-Nov-14 10:30: AN 12/7/2014
laying for 100 mm dia to 0+830 0+830 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+160 to BalaJi,R.
IRR 0088 chainage 1+160 to Area 6 20-Nov-14 1:30:0 20-Nov-14 10:30: Revised 12/7/2014
laying for 200 mm dia 1+060 K, Sr.
1+060 0 PM 00 AM
upvc Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+290 to BalaJi,R.
IRR 0089 chainage 1+290 to Area 6 20-Nov-14 1:30:0 20-Nov-14 10:30: Revised 12/7/2014
laying for 200 mm dia 1+160 K, Sr.
1+160 0 PM 00 AM
upvc Engineer
Inspection for water sewera S.
sewerage
HFC- proofing (Polyprimes the base of sewerage ge :30:00 BalaJi,R.
SEW 0808 pump 22-Nov-14 22-Nov-14 08:30: A 11/24/2014
B + Bitustic xl + pumping station pump AM K, Sr.
station 00 AM
bituboard) for station Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.5 to BalaJi,R.
SEW 0809 excavation & sewer line from MH Area 7 22-Nov-14 9:30:0 22-Nov-14 08:30: A 12/9/2014
MH-1.6 K, Sr.
prepared formation for -1.5 to MH-1.6 0 AM 00 AM
Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+950 to BalaJi,R.
IRR 0090 chainage 0+950 to Area 6 22-Nov-14 1:30:0 22-Nov-14 11:30: A 12/13/2014
prepared formation for 0+870 K, Sr.
0+870 0 PM 00 AM
200 mm dia upvc Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 0+950 to BalaJi,R.
IRR 0091 chainage 0+950 to Area 6 22-Nov-14 2:30:0 22-Nov-14 11:30: Revised 12/4/2014
laying for 200 mm dia 0+870 K, Sr.
0+880 0 PM 00 AM
upvc Engineer
from MH: 3
Inspection for S.
from MH: 3 to ch to ch
HFC- excavation and BalaJi,R.
SEW 0810 0+771.83 towards Area 6 0+771.83 23-Nov-14 930:00 23-Nov-14 8:30:0 A 12/9/2014
prepared formation of K, Sr.
MH: 2 towards AM 0 AM
200mm dia UPVC Engineer
MH: 2
Inspection for S.
HFC- excavation and sewerage line from MH-16 to BalaJi,R.
SEW 0769A Area 6 23-Nov-14 930:00 23-Nov-14 8:30:0 Revised 12/7/2014
prepared formation of MH-16 to MH-15 MH-15 K, Sr.
AM 0 AM
200mm dia UPVC Engineer
S.
Inspection of laying joint measurement of for 250 mm dia upvc
HFC- MH-1.5 to BalaJi,R.
SEW 0811 geotextile, gravel pipe laying and sewerage line from Area 7 23-Nov-14 930:00 23-Nov-14 8:30:0 Revised 12/3/2014
MH-1.6 K, Sr.
bedding, grannular surround MH-1.5 to MH-1.6 AM 0 AM
Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
DR 0050 at precast yard area Yard area 23-Nov-14 930:00 23-Nov-14 8:30:0 Revised 12/4/2014
concreting for Gully- Area K, Sr.
AM 0 AM
04 nos Engineer
Inspection for
S.
excavation and
HFC- from Chainage 2+460 2+460 to BalaJi,R.
WD 0033 prepared formation of Area 6 27-Nov-14 01.30: 27-Nov-14 8:30:0 A 12/17/2014
to 2+560 2+560 K, Sr.
100 mm dia GRE 00 PM 0 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 2+270 2+270 to BalaJi,R.
WD 0034 prepared formation of Area 6 23-Nov-14 11.30:0 23-Nov-14 8:30:0 A 12/17/2014
to 2+360 2+360 K, Sr.
100 mm dia GRE 0 AM 0 AM
Engineer
water line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection & joint S.


HFC- measurement of pipe from Chainage 2+270 2+270 to BalaJi,R.
WD 0035 Area 6 23-Nov-14 11.30:0 23-Nov-14 8:30:0 Revised 12/3/2014
laying for 100 mm dia to 2+360 2+360 K, Sr.
0 AM 0 AM
GRE water line Engineer
Inspection and joint
S.
measurement of pipe
HFC- from chainage 0+880 0+880 to BalaJi,R.
SEW 0812 laying for 200 mm dia Area 5 23-Nov-14 11.30:0 23-Nov-14 8:30:0 Revised 12/3/2014
to 0+920 0+920 K, Sr.
HDPE Sewer 0 AM 0 AM
Engineer
pressure line
S.
Inspection for
HFC- MH-1.5 BalaJi,R.
SEW 0813 excavation and for Sewerage MH-1.5 Area 7 23-Nov-14 11.30:0 23-Nov-14 8:30:0 Revised 12/3/2014
(0+424.48) K, Sr.
prepared formation 0 AM 0 AM
Engineer
S.
Inspection for
HFC- MH-3 BalaJi,R.
SEW 0814 excavation and for Sewerage MH-3 Area 6 23-Nov-14 11.30:0 23-Nov-14 8:30:0 A 12/13/2014
(0+811.83) K, Sr.
prepared formation 0 AM 0 AM
Engineer
Inspection for S.
HFC- excavation and MH: 3 to BalaJi,R.
SEW 0815 from MH: 3 to MH: 4 Area 6 23-Nov-14 11.30:0 23-Nov-14 8:30:0 A 2/17/2015
prepared formation of MH: 4 K, Sr.
0 AM 0 AM
200mm dia UPVC Engineer

Inspection for
S.
excavation and
HFC- from chainage 0+380 0+380 to BalaJi,R.
SEW 0705A prepared formation for Area 7 23-Nov-14 11.30:0 23-Nov-14 8:30:0 A 12/17/2014
to 0+280 0+280 K, Sr.
200 mm dia HDPE 0 AM 0 AM
Engineer
sewer pressure line

Inspection for
S.
excavation and
HFC- from chainage 0+280 0+280 to BalaJi,R.
SEW 0726A prepared formation for Area 7 23-Nov-14 1.30:0 23-Nov-14 11:30: A 12/17/2014
to 0+150 0+150 K, Sr.
200 mm dia HDPE 0 PM 00 AM
Engineer
sewer pressure line

Inspection for
S.
excavation and
HFC- from chainage 0+150 0+150 to BalaJi,R.
SEW 0729A prepared formation for Area 7 23-Nov-14 1.30:0 23-Nov-14 11:30: AN 12/7/2014
to 0+050 0+050 K, Sr.
200 mm dia HDPE 0 PM 00 AM
Engineer
sewer pressure line

Inspection for S.
HFC- deflection test from MH 2.10 to MH MH 2.10 to 01:30: BalaJi,R.
DR 0051 Storm water line Area 7 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
(preliminary) for 500 2.9 MH 2.9 00 K, Sr.
0 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.9 to MH MH 2.9 to 01:30: BalaJi,R.
DR 0052 Storm water line Area 7 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
(preliminary) for 500 2.8 MH 2.8 00 K, Sr.
0 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.8 to MH MH 2.8 to 01:30: BalaJi,R.
DR 0053 Storm water line Area 7 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
(preliminary) for 500 2.7 MH 2.7 00 K, Sr.
0 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.6 to MH MH2.6 to 01:30: BalaJi,R.
DR 0054 Storm water line Area 7 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
(preliminary) for 500 2.7 MH 2.7 00 K, Sr.
0 PM
mm dia GRP PM Engineer
MH 20 to
S.
Inspection for Air test MH 19
HFC- From MH-20 to MH- Area 6 ( 01:30: BalaJi,R.
0816 for Sewer line of ( 1+811.63 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
SEW 19 IR-1 ) 00 K, Sr.
200mm dia upvc TO 0 PM
PM Engineer
1+728.89 )
MH-21 to
S.
Inspection for Air test MH-20
HFC- Area 6 01:30: BalaJi,R.
0817 for Sewer line of from MH-21 to MH-20 (1+846.86 23-Nov-14 2.30:0 23-Nov-14 A 12/4/2014
SEW (IR-1) 00 K, Sr.
200mm dia upvc to 0 PM
PM Engineer
1+811.63 )
S.
HFC- Inspection for pouring MH-1.5 01:30: BalaJi,R.
0818 for Sewerage MH-1.5 Area 7 23-Nov-14 2.30:0 23-Nov-14 AN 12/11/2014
SEW of blinding concrete (0+424.48) 00 K, Sr.
0 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for 250 mm dia upvc
HFC- MH -1.5 to 01:30: BalaJi,R.
0819 excavation & sewer line from MH Area 7 23-Nov-14 2.30:0 23-Nov-14 Revised 12/3/2014
SEW MH-1.4 00 K, Sr.
prepared formation for -1.5 to MH-1.4 0 PM
PM Engineer
Inspection for S.
gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to end 01:30: BalaJi,R.
0711A house connection line Area 6 end cap of 23-Nov-14 2.30:0 23-Nov-14 Revised 12/3/2014
SEW joint measurements cap of sewer MH-24 00 K, Sr.
160 mm dia upvc ( MH-24) 0 PM
of pipe laying & PM Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 1+180 to 03:30: BalaJi,R.
006 chanaige 1+180 to Area 9 24-Nov-14 2.30:0 23-Nov-14 AN 12/7/2014
FF laying for 200 mm dia 1+280 00 K, Sr.
1+280 0 PM
HDPE PM Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 1+280 to 03:30: BalaJi,R.
007 chanaige 1+280 to Area 9 24-Nov-14 2.30:0 23-Nov-14 AN 12/7/2014
FF laying for 200 mm dia 1+500 00 K, Sr.
1+500 0 PM
HDPE PM Engineer

MH-1.14,
MH-1.13 ,
MH-1.12 &
MH-1.11 [ (
for base & wall of
Inspection for water 0+439.70),
HFC- Sewer Manhole MH- Area 8 ( Kiran, Sr.
0334A proofi ng (polyprime (0+356.00) 24-Nov-14 10.30: 24-Nov-14 08:30: AN 12/4/2014
SEW 1.14, MH-1.13 , MH- IR-3 ) Engineer
SB+Bitustick XL) , 00 AM 00 AM
1.12 & MH-1.11
( 0+268.79
)&
( 0+185.70
)]

Visual Inspection for S.


MH-
HFC- 2nd layer surruonding BalaJi,R.
0820 MH-21.1,21.2,21.3 Area 6 21.1,21.2,2 24-Nov-14 2.30:0 24-Nov-14 08:30: A 11/26/2014
SEW back filling around K, Sr.
1.3 0 PM 00 AM
sewer Engineer
Visual Inspection for S.
MH-
HFC- 1st layer surruonding BalaJi,R.
0821 MH-16.1,16.2,16.3 Area 6 16.1,16.2,1 24-Nov-14 2.30:0 24-Nov-14 08:30: A 11/26/2014
SEW back filling around K, Sr.
6.3 0 PM 00 AM
sewer Engineer
Visual Inspection for S.
MH-
HFC- 2nd layer surruonding BalaJi,R.
0822 MH-16.1,16.2,16.3 Area 6 16.1,16.2,1 24-Nov-14 2.30:0 24-Nov-14 08:30: AN 12/4/2014
SEW back filling around K, Sr.
6.3 0 PM 00 AM
sewer Engineer
Visual Inspection for S.
HFC- 1st layer surruonding MH- BalaJi,R.
0823 MH-8.1,8.2,8.3 Area 6 24-Nov-14 2.30:0 24-Nov-14 08:30: A 11/26/2014
SEW back filling around 8.1,8.2,8.3 K, Sr.
0 PM 00 AM
sewer Engineer
Visual Inspection for S.
HFC- 2nd layer surruonding MH- BalaJi,R.
0824 MH-8.1,8.2,8.3 ` Area 6 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW back filling around 8.1,8.2,8.3 K, Sr.
0 PM 00 AM
sewer Engineer
Visual Inspection for S.
MH-
HFC- 1st layer surruonding BalaJi,R.
0825 MH-25,24,23,22 Area 6 25,24,23,2 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW back filling around K, Sr.
2 0 PM 00 AM
sewer Engineer
Visual Inspection for S.
MH-
HFC- 2nd layer surruonding BalaJi,R.
0826 MH-25,24,23,22 Area 6 25,24,23,2 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW back filling around K, Sr.
2 0 PM 00 AM
sewer Engineer
Inspection for 3rd S.
HFC- layer surruonding MH-23 BalaJi,R.
0827 MH-23 Area 6 24-Nov-14 2.30:0 24-Nov-14 08:30: Revised 12/3/2014
SEW back filling around (1+990.00) K, Sr.
0 PM 00 AM
sewer Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc BalaJi,R.
0828 1st layer back filling Area 6 HC-1 of 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW from HC-2 to HC-1 of K, Sr.
of sewer (MH-21.2) 0 PM 00 AM
(MH-21.2) Engineer
S.
Visual Inspection for house connection line
HFC- HC-1 to BalaJi,R.
0829 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 08:30: A 11/26/2014
SEW MH-21.2 K, Sr.
of sewer HC-1 to MH-21.2 0 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

house connection line S.


Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0830 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW HC-1 to end cap of K, Sr.
of sewer ( MH-21.2) 0 PM 00 AM
( MH-21.2) Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0831 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW HC-2 to end cap of K, Sr.
of sewer ( MH-21.2) 0 PM 00 AM
( MH-21.2) Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0832 1st layer back filling Area 6 HC-1 of 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW HC-2 to HC-1 of ( MH- K, Sr.
of sewer ( MH-21.1) 0 PM 00 AM
21.1) Engineer
S.
Visual Inspection for house connection line
HFC- HC-1 to BalaJi,R.
0833 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 08:30: A 12/4/2014
SEW MH-21.1 K, Sr.
of sewer HC-1 to MH-21.1 0 PM 00 AM
Engineer
house connection line S.
Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0834 1st layer back filling Area 6 end cap of 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW HC-1 to end cap of K, Sr.
of sewer ( MH-21.1) 00 AM 00 AM
( MH-21.1) Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0835 1st layer back filling Area 6 end cap of 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW HC-2 to end cap of K, Sr.
of sewer ( MH-21.1) 00 AM 00 AM
( MH-21.1) Engineer
house connection line S.
Visual Inspection for HC-4 to
HFC- 160 mm dia upvc from BalaJi,R.
0836 1st layer back filling Area 6 HC-3 of 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW HC-4 to HC-3 of ( MH- K, Sr.
of sewer ( MH-25) 00 AM 00 AM
25) Engineer
S.
Visual Inspection for house connection line
HFC- HC-4 to BalaJi,R.
0837 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW MH-25 K, Sr.
of sewer HC-4 to MH-25 00 AM 00 AM
Engineer
house connection line S.
Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0838 1st layer back filling Area 6 HC-2 of 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW HC-1 to HC-2 of ( MH- K, Sr.
of sewer ( MH-25) 00 AM 00 AM
25) Engineer
S.
Visual Inspection for house connection line
HFC- HC-2 to BalaJi,R.
0839 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW MH-25 K, Sr.
of sewer HC-2 to MH-25 00 AM 00 AM
Engineer
house connection line S.
Visual Inspection for HC-4 to
HFC- 160 mm dia upvc from BalaJi,R.
0840 2nd layer back filling Area 6 HC-3 of 24-Nov-14 11.00:0 24-Nov-14 08:30: A 12/1/2014
SEW HC-4 to HC-3 of ( MH- K, Sr.
of sewer ( MH-25) 0 AM 00 AM
25) Engineer
S.
Visual Inspection for house connection line
HFC- HC-4 to BalaJi,R.
0841 2nd layer back filling 160 mm dia upvc from Area 6 24-Nov-14 11.00:0 24-Nov-14 08:30: A 12/4/2014
SEW MH-25 K, Sr.
of sewer HC-4 to MH-25 0 AM 00 AM
Engineer
house connection line S.
Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0842 2nd layer back filling Area 6 HC-2 of 24-Nov-14 11.00:0 24-Nov-14 08:30: A 12/4/2014
SEW HC-1 to HC-2 of ( MH- K, Sr.
of sewer ( MH-25) 0 AM 00 AM
25) Engineer
S.
Visual Inspection for house connection line
HFC- HC-2 to BalaJi,R.
0843 2nd layer back filling 160 mm dia upvc from Area 6 24-Nov-14 11.00:0 24-Nov-14 08:30: A 12/4/2014
SEW MH-25 K, Sr.
of sewer HC-2 to MH-25 0 AM 00 AM
Engineer
Visual Inspection for house connection HC- S.
HFC- 1st layer surrounding chamber HC- 1,HC,2,HC BalaJi,R.
0844 Area 6 24-Nov-14 9.30:0 24-Nov-14 08:30: A 12/4/2014
SEW back filling around 1,HC,2,HC-3,HC-4 of -3,HC-4 of K, Sr.
0 AM 00 AM
sewer (MH-24) (MH-24) Engineer
Visual Inspection for house connection HC- S.
HFC- 2nd layer surrounding chamber HC- 1,HC,2,HC BalaJi,R.
0845 Area 6 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW back filling around 1,HC,2,HC-3 of (MH- -3,HC-4 of K, Sr.
00 AM 00 AM
sewer 24) (MH-24) Engineer
MH: 3 to
for 200 mm dia upvc S.
Inspection of laying joint measurement of ch
HFC- sewerage line from BalaJi,R.
0846 geotextile, gravel pipe laying and Area 6 0+771.83 24-Nov-14 10.30: 24-Nov-14 08:30: A 12/4/2014
SEW MH: 3 to ch 0+771.83 K, Sr.
bedding, grannular surround towards 00 AM 00 AM
towards MH: 2 Engineer
MH: 2

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation and
HFC- from Chainage 1+770 1+770 to BalaJi,R.
0036 prepared formation of Area 6 24-Nov-14 9.30:0 24-Nov-14 8:30:0 A 12/13/2014
WD to 1+630 1+630 K, Sr.
100 mm dia GRE 0 AM 0 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 2+360 2+360 to BalaJi,R.
0037 prepared formation of Area 6 24-Nov-14 9.30:0 24-Nov-14 8:30:0 A 12/13/2014
WD to 2+460 2+460 K, Sr.
100 mm dia GRE 0 AM 0 AM
Engineer
water line
Inspection & joint S.
HFC- measurement of pipe from Chainage 1+770 1+770 to BalaJi,R.
0038 Area 6 24-Nov-14 11.30:0 24-Nov-14 8:30:0 Revised 12/3/2014
WD laying for 100 mm dia to 1+630 1+630 K, Sr.
0 AM 0 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+360 2+360 to BalaJi,R.
0039 Area 6 24-Nov-14 11.30:0 24-Nov-14 8:30:0 Revised 12/3/2014
WD laying for 100 mm dia to 2+460 2+460 K, Sr.
0 AM 0 AM
GRE water line Engineer
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0847 laying of (including st. specials sewer line to MH- Area 7 MH-1.7 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1.7 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0848 laying of (including st. specials sewer line to MH- Area 8 MH-1.8 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1.8 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0849 laying of (including st. specials sewer line to MH- Area 8 MH-1.9 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1.9 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0850 laying of (including st. specials sewer line to MH- Area 8 MH-1.10 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1.10 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0851 laying of (including st. specials sewer line to MH- Area 8 MH-1.11 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 1nos) 1.11 0 AM 0 AM
Engineer
measurement
MH-18 to
S.
Inspection for Air test MH-17
HFC- BalaJi,R.
0852 for Sewer line of from MH-18 to MH-17 Area 6 (1+645.43 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW K, Sr.
200mm dia upvc to 0 AM 0 AM
Engineer
1+562.05 )
MH 19 to
S.
Inspection for Air test MH 18
HFC- From MH-19 to MH- BalaJi,R.
0853 for Sewer line of Area 6 (1+728.89 24-Nov-14 11.30:0 24-Nov-14 8:30:0 A 12/4/2014
SEW 18 K, Sr.
200mm dia upvc to 0 AM 0 AM
Engineer
1+645.43 )
house connection line S.
Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0854 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-1 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0855 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-2 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-3 to
HFC- 160 mm dia upvc from BalaJi,R.
0856 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-3 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-4 to
HFC- 160 mm dia upvc from BalaJi,R.
0857 1st layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-4 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

house connection line S.


Visual Inspection for HC-1 to
HFC- 160 mm dia upvc from BalaJi,R.
0858 2nd layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/21/2014
SEW HC-1 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0859 2nd layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW HC-2 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-3 to
HFC- 160 mm dia upvc from BalaJi,R.
0860 2nd layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW HC-3 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-4 to
HFC- 160 mm dia upvc from BalaJi,R.
0861 2nd layer back filling Area 6 end cap of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 AN 12/13/2014
SEW HC-4 to end cap of K, Sr.
of sewer ( MH-25) 0 PM 0 AM
( MH-25) Engineer
house connection line S.
Visual Inspection for HC-3 to
HFC- 160 mm dia upvc from BalaJi,R.
0862 1st layer back filling Area 6 HC-4 of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-3 to HC-4 of ( MH- K, Sr.
of sewer ( MH-24) 0 PM 0 AM
24) Engineer
S.
Visual Inspection for house connection line
HFC- HC-3 to BalaJi,R.
0863 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW MH-24 K, Sr.
of sewer HC-3 to MH-24 0 PM 0 AM
Engineer
S.
Visual Inspection for house connection line
HFC- HC-2 to BalaJi,R.
0864 1st layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW MH-24 K, Sr.
of sewer HC-2 to MH-24 0 PM 0 AM
Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0865 1st layer back filling Area 6 HC-1 of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW HC-2 to HC-1 of ( MH- K, Sr.
of sewer ( MH-24) 0 PM 0 AM
24) Engineer
house connection line S.
Visual Inspection for HC-3 to
HFC- 160 mm dia upvc from BalaJi,R.
0866 2nd layer back filling Area 6 HC-4 of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW HC-3 to HC-4 of ( MH- K, Sr.
of sewer ( MH-24) 0 PM 0 AM
24) Engineer
S.
Visual Inspection for house connection line
HFC- HC-3 to BalaJi,R.
0867 2nd layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW MH-24 K, Sr.
of sewer HC-3 to MH-24 0 PM 0 AM
Engineer
house connection line S.
Visual Inspection for HC-2 to
HFC- 160 mm dia upvc from BalaJi,R.
0868 2nd layer back filling Area 6 HC-1 of 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW HC-2 to HC-1 of ( MH- K, Sr.
of sewer ( MH-24) 0 PM 0 AM
24) Engineer
S.
Visual Inspection for house connection line
HFC- HC-2 to BalaJi,R.
0869 2nd layer back filling 160 mm dia upvc from Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW MH-24 K, Sr.
of sewer HC-2 to MH-24 0 PM 0 AM
Engineer
Visual Inspection for house connection HC- S.
HFC- 1st layer surrounding chamber HC- 1,HC,2,HC BalaJi,R.
0870 Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW back filling around 1,HC,2,HC-3,HC-4 of -3,HC-4 of K, Sr.
0 PM 0 AM
sewer (MH-24) (MH-24) Engineer
Visual Inspection for house connection HC- S.
HFC- 2nd layer surrounding chamber HC- 1,HC,2,HC BalaJi,R.
0871 Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW back filling around 1,HC,2,HC-3,HC-4 of -3,HC-4 of K, Sr.
0 PM 0 AM
sewer (MH-25) (MH-25) Engineer

HC-1 to
end cap of
( MH-
24) ,HC-2
house connection line to end cap S.
Visual Inspection for
HFC- 160 mm dia upvc from HC-2 to end cap of HC-3 to end cap of HC-4 to end cap of of ( MH-24) BalaJi,R.
0872 1st layer back filling Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW HC-1 to end cap of ( MH-24) , ( MH-24) , ( MH-24) ,HC-3 to K, Sr.
of sewer 0 PM 0 AM
( MH-24) , end cap of Engineer
( MH-
24) ,HC-4
to end cap
of ( MH-24)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

HC-1 to
end cap of
( MH-
24) ,HC-2
house connection line to end cap S.
Visual Inspection for
HFC- 160 mm dia upvc from HC-2 to end cap of HC-3 to end cap of HC-4 to end cap of of ( MH-24) BalaJi,R.
0873 2nd layer back filling Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 1/15/2015
SEW HC-1 to end cap of ( MH-24) , ( MH-24) , ( MH-24) ,HC-3 to K, Sr.
of sewer 0 PM 0 AM
( MH-24) , end cap of Engineer
( MH-
24) ,HC-4
to end cap
of ( MH-24)

HC-1 to
HC-2 of
house connection line S.
Visual Inspection for ( MH-
HFC- 160 mm dia upvc from BalaJi,R.
0874 1st layer back filling HC-2 to MH-23 , HC-3 to MH-23 , Area 6 23) ,HC-2 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW HC-1 to HC-2 of ( MH- K, Sr.
of sewer to MH- 0 PM 0 AM
23) , Engineer
23 ,HC-3
to MH-23
Visual Inspection for house connection HC- S.
HFC- 2nd layer surrounding chamber HC- 1,HC,2,HC BalaJi,R.
0875 Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/13/2014
SEW back filling around 1,HC,2,HC-3 of (MH- -3 of (MH- K, Sr.
0 PM 0 AM
sewer 23) 23) Engineer

HC-1 to
end cap of
( MH-
house connection line S.
Visual Inspection for 23) ,HC-2
HFC- 160 mm dia upvc from HC-2 to end cap of HC-3 to end cap of BalaJi,R.
0876 1st layer back filling Area 6 to end cap 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW HC-1 to end cap of ( MH-23) , ( MH-23) , K, Sr.
of sewer of ( MH-23) 0 PM 0 AM
( MH-23) , Engineer
,HC-3 to
end cap of
( MH-23)

HC-1 to
house connection line S.
Visual Inspection for HC-2 of
HFC- 160 mm dia upvc from BalaJi,R.
0877 1st layer back filling HC-2 to MH-22 , Area 6 ( MH- 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/1/2014
SEW HC-1 to HC-2 of ( MH- K, Sr.
of sewer 22) ,HC-2 0 PM 0 AM
22) , Engineer
to MH-22
Visual Inspection for S.
house connection
HFC- 1st layer surrounding HC-1,HC,2 BalaJi,R.
0878 chamber HC-1,HC-2 Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW back filling around of (MH-24) K, Sr.
of (MH-22) 0 PM 0 AM
sewer Engineer
HC-1 to
end cap of
house connection line S.
Visual Inspection for ( MH-
HFC- 160 mm dia upvc from HC-2 to end cap of BalaJi,R.
0879 1st layer back filling Area 6 22) ,HC-2 24-Nov-14 2.30:0 24-Nov-14 1:30:0 A 12/4/2014
SEW HC-1 to end cap of ( MH-22) K, Sr.
of sewer to end cap 0 PM 0 AM
( MH-22) , Engineer
of ( MH-22)

HC-1 , HC-
Inspection for 02 of (MH- S.
HFC- excavation & HC-1 , HC-02 of (MH- HC-1 , HC-02 of (MH- 21.1)& HC- BalaJi,R.
0880 Area 6 24-Nov-14 2.30:0 24-Nov-14 1:30:0 revised 12/3/2014
SEW formation for house 21.1) 21.2) 1 , HC-02 K, Sr.
0 PM 0 AM
connection chamber of (MH- Engineer
21.2)

Inspection for MH-03 to S.


HFC- from MH-03 to
excavation and abutment- BalaJi,R.
ITS/D 0016 abutment-1(10+200 to Area 1 24-Nov-14 2.30:0 24-Nov-14 1:30:0 Revised 12/3/2014
prepared formation for 1(10+200 K, Sr.
IC 10+290) 0 PM 0 AM
4WXD54 DU Duct line to 10+290) Engineer

S.
Inspection for Air test
HFC- MH-25 to BalaJi,R.
0723A for Sewer line of from MH-25 to MH-24 Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW MH-24 K, Sr.
200mm dia upvc 0 AM 0 AM
Engineer
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and BalaJi,R.
0881 laying of (including straight. sewer line to MH- Area 7 MH-1.7 .2 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.7.2 0 AM 0 AM
Engineer
measurement

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and BalaJi,R.
0882 laying of (including straight. sewer line to MH- Area 7 MH-1.7.3 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.7.3 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and BalaJi,R.
0883 laying of (including straight. sewer line to MH- Area 7 MH-1.7 .4 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.7.4 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0884 laying of (including straight. sewer line to MH- Area 5 MH-1.7.5 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.7.5 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0885 laying of (including straight. sewer line to MH- Area 5 MH-1.7 .6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 1nos) 1.7.6 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0886 laying of (including straight. sewer line to MH- Area 8 MH-1.12 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.12 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0887 laying of (including straight. sewer line to MH- Area 8 MH-1.13 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 2nos) 1.13 0 AM 0 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 200mm dia upvc
HFC- of pipe laying and BalaJi,R.
0888 laying of (including straight. sewer line to MH- Area 8 MH-1.14 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint specials 1nos) 1.14 0 AM 0 AM
Engineer
measurement
Visual Inspection for S.
house connection
HFC- 2nd layer surrounding HC-4 of BalaJi,R.
0889 chamber HC-4 of Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 1/15/2015
SEW back filling around (MH-24) K, Sr.
(MH-24) 0 AM 0 AM
sewer Engineer
S.
Inspection of laying joint measurement of
HFC- for 200 mm dia upvc MH: 3 to BalaJi,R.
0890 geotextile, gravel pipe laying and Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW from MH: 3 to MH: 4 MH: 4 K, Sr.
bedding, grannular surround 0 AM 0 AM
Engineer
S.
Inspection of laying joint measurement of for 250 mm dia upvc
HFC- MH -1.5 to BalaJi,R.
0891 geotextile, gravel pipe laying and sewer line from MH Area 7 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW MH-1.4 K, Sr.
bedding, grannular surround -1.5 to MH-1.4 0 AM 0 AM
Engineer
S.
HFC- Inspection for pouring MH-3 BalaJi,R.
0892 for Sewerage MH-3 Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 1/15/2015
SEW of blinding concrete (0+811.83) K, Sr.
0 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-1.5 BalaJi,R.
0893 concrete for sewer Area 7 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW proofing + Screed (0+424.48) K, Sr.
manhole MH-1.5 0 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-3 BalaJi,R.
0894 concrete for sewer Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW proofing (0+811.83) K, Sr.
manhole MH-3 0 AM 0 AM
Engineer
from MH:
Inspection for 6th S.
from MH: 1.7 to ch 1.7 to ch
HFC- layer back filling for BalaJi,R.
0895 0+320 towards MH: Area 7 0+320 26-Nov-14 9.30:0 26-Nov-14 1:30:0 A
SEW 250 mm dia Sewer K, Sr.
1.7.1 towards 0 AM 0 PM
line Engineer
MH: 1.7.1
for the wall of S.
Inspection of shutter,
HFC- Sewerage chamber HC-01 of BalaJi,R.
0604A water stopper & Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 AN 1/21/2015
SEW HC-01 of Sewerage (MH-24) K, Sr.
concreting 0 AM 0 AM
Manhole MH-24 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation &
HFC- from MH 2.10 to MH MH 2.10 to BalaJi,R.
0017B formation for 500mm Area 7 25-Nov-14 9.30:0 25-Nov-14 8:30:0 revised 7-12-0214
DR 2.9 MH 2.9 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
Inspection for
S.
excavation &
HFC- from MH 2.9 to MH MH 2.9 to BalaJi,R.
0018B formation for 500mm Area 7 25-Nov-14 9.30:0 25-Nov-14 8:30:0 revised 7-12-0214
DR 2.8 MH 2.8 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
Inspection for
S.
excavation &
HFC- from MH 2.8 to MH MH 2.8 to BalaJi,R.
0019B formation for 500mm Area 7 25-Nov-14 9.30:0 25-Nov-14 8:30:0 revised 7-12-0214
DR 2.7 MH 2.7 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0055 at precast yard area Yard area 25-Nov-14 9.30:0 25-Nov-14 8:30:0 AN 1/4/2015
DR concreting for Gully- Area K, Sr.
0 AM 0 AM
04 nos Engineer

Inspection for shutter, for storm water MH S.


HFC- reinforcement & (01 nos type- G) & (01 Yard BalaJi,R.
0056 Yard area 25-Nov-14 9.30:0 25-Nov-14 8:30:0 AN 12/17/2014
DR concreting for cover nos type- H) at Area K, Sr.
0 AM 0 AM
slab precast yard area Engineer

MH-
Visual Inspection for 2.1,MH- S.
MH-2.1,MH-2.2,MH-
HFC- 1st layer surrounding 2.2,MH- BalaJi,R.
0896 2.3,MH-2.4,MH- Area 9 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW back filling around 2.3,MH- K, Sr.
2.5,MH2.6 0 AM 0 AM
sewer 2.4,MH- Engineer
2.5,MH2.6
S.
Inspection for Air test
HFC- from MH-21.2 to MH- MH-21.2 to BalaJi,R.
0897 for Sewer line of Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW 21.3 MH-21.3 K, Sr.
200mm dia upvc 0 AM 0 AM
Engineer
S.
Inspection for Air test
HFC- from MH-21.3 to MH- MH-21.3 to BalaJi,R.
0898 for Sewer line of Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/4/2014
SEW 21.1 MH-21.1 K, Sr.
200mm dia upvc 0 AM 0 AM
Engineer
Inspection for
S.
excavation and
HFC- from Chainage 1+630 1+630 to BalaJi,R.
0040 prepared formation of Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/13/2014
WD to 1+570 1+570 K, Sr.
100 mm dia GRE 0 AM 0 AM
Engineer
water line

Inspection for S.
fire fighting line from
HFC- excavation and 2+450 to BalaJi,R.
008 chanaige 2+450 to Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 A 12/17/2014
FF prepared formation for 2+600 K, Sr.
2+600 0 AM 0 AM
250 mm dia HDPE Engineer

Inspection & joint S.


fire fighting line from
HFC- measurement of pipe 2+350 to BalaJi,R.
009 chanaige 2+350 to Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 AN 12/23/2014
FF laying for 250 mm dia 2+130 K, Sr.
2+130 0 AM 0 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 2+130 to BalaJi,R.
0010 chanaige 2+130 to Area 6 25-Nov-14 9.30:0 25-Nov-14 8:30:0 AN 12/23/2014
FF laying for 250 mm dia 2+030 K, Sr.
2+030 0 AM 0 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 2+450 to BalaJi,R.
0011 chanaige 2+450 to Area 6 25-Nov-14 11.30:0 25-Nov-14 8:30:0 AN 12/8/2014
FF laying for 250 mm dia 2+600 K, Sr.
2+600 0 AM 0 AM
HDPE Engineer
Inspection and joint
S.
measurement of pipe
HFC- from chainage 0+280 0+280 to BalaJi,R.
0899 laying for 200 mm dia Area 7 25-Nov-14 1.30:0 25-Nov-14 11:30: AN 12/8/2014
SEW to 0+150 0+150 K, Sr.
HDPE Sewer 0 PM 00 AM
Engineer
pressure line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint


S.
measurement of pipe
HFC- from chainage 0+150 0+150 to BalaJi,R.
0900 laying for 200 mm dia Area 7 25-Nov-14 1.30:0 25-Nov-14 11:30: AN 12/8/2014
SEW to 0+050 0+050 K, Sr.
HDPE Sewer 0 PM 00 AM
Engineer
pressure line
Inspection and joint
S.
measurement of pipe
HFC- from chainage 0+380 0+380 to BalaJi,R.
0901 laying for 200 mm dia Area 7 25-Nov-14 1.30:0 25-Nov-14 11:30: AN 12/8/2014
SEW to 0+280 0+280 K, Sr.
HDPE Sewer 0 PM 00 AM
Engineer
pressure line
Inspection for sand S.
HFC- surround for 200 mm from chainage 0+720 0+720 to BalaJi,R.
0902 Area 7 25-Nov-14 1.30:0 25-Nov-14 11:30: A 12/4/2014
SEW dia HDPE sewer to 0+440 0+440 K, Sr.
0 PM 00 AM
pressure line Engineer

HC-1 to
end cap
(MH-25)
HC-2 to
Inspection for
end cap S.
excavation and
HFC- from HC-1 to end cap HC-2 to end cap HC-3 to end cap HC-4 to end cap (MH-25), BalaJi,R.
0903 formation for sewer Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (MH-25) (MH-25), (MH-25), (MH-25) HC-3 to K, Sr.
House connection line 00 AM 00 AM
end cap Engineer
160 mm dia upvc
(MH-25),
HC-4 to
end cap
(MH-25)

HC-1 to
end cap
(MH-24)
HC-2 to
Inspection for
end cap S.
excavation and
HFC- from HC-1 to end cap HC-2 to end cap HC-3 to end cap HC-4 to end cap (MH-24), BalaJi,R.
0904 formation for sewer Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: Revised 12/4/2014
SEW (MH-24) (MH-24), (MH-24), (MH-24) HC-3 to K, Sr.
House connection line 00 AM 00 AM
end cap Engineer
160 mm dia upvc
(MH-24),
HC-4 to
end cap
(MH-24)

HC-1 to
end cap
Inspection for (MH-23)
S.
excavation and HC-2 to
HFC- from HC-1 to end cap HC-2 to end cap HC-3 to end cap BalaJi,R.
0905 formation for sewer Area 6 end cap 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (MH-23) (MH-23), (MH-23) K, Sr.
House connection line (MH-23), 00 AM 00 AM
Engineer
160 mm dia upvc HC-3 to
end cap
(MH-23)

HC-1 to
Inspection for
end cap S.
excavation and
HFC- from HC-1 to end cap HC-2 to end cap (MH-22) BalaJi,R.
0906 formation for sewer Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (MH-22) (MH-22) HC-2 to K, Sr.
House connection line 00 AM 00 AM
end cap Engineer
160 mm dia upvc
(MH-22)

HC-1 to
Inspection for
end cap S.
excavation and
HFC- from HC-1 to end cap HC-2 to end cap (MH-21.1) BalaJi,R.
0907 formation for sewer Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (MH-21.1) (MH-21.1) HC-2 to K, Sr.
House connection line 00 AM 00 AM
end cap Engineer
160 mm dia upvc
(MH-21.1)

HC-1 to
Inspection for
end cap S.
excavation and
HFC- from HC-1 to end cap HC-2 to end cap (MH-21.2) BalaJi,R.
0908 formation for sewer Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (MH-21.2) (MH-21.2) HC-2 to K, Sr.
House connection line 00 AM 00 AM
end cap Engineer
160 mm dia upvc
(MH-21.2)
S.
Inspection for Air test
HFC- MH-24 to BalaJi,R.
0576B for Sewer line of from MH-24 to MH-23 Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW MH-23 K, Sr.
200mm dia upvc 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for Air test
HFC- MH-23 to BalaJi,R.
0577B for Sewer line of from MH-23 to MH-22 Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW MH-22 K, Sr.
200mm dia upvc 00 AM 00 AM
Engineer
S.
Inspection for Air test
HFC- MH-21 to BalaJi,R.
0909 for Sewer line of from MH-21 to MH-22 Area 6 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW MH-22 K, Sr.
200mm dia upvc 00 AM 00 AM
Engineer
Inspection for placing
S.
& fixing precast
HFC- MH-1.5 BalaJi,R.
0910 sewer manhole (base) for Sewerage MH-1.5 Area 7 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW (0+424.48) K, Sr.
including alignment 00 AM 00 AM
Engineer
and level
MH -1.4 S.
Inspection for
HFC- for sewer MH -1.6 & (0+480) & BalaJi,R.
0911 excavation & Area 7 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/13/2014
SEW MH-1.4 MH-1.6 K, Sr.
prepared formation 00 AM 00 AM
(0+374.25) Engineer
MH: 3 to
Visua Inspection for S.
from MH: 3 to ch ch
HFC- 1st layer back fiiling BalaJi,R.
0912 0+771.83 towards Area 6 0+771.83 26-Nov-14 09.30: 26-Nov-14 08:30: A 12/4/2014
SEW of 200mm dia Upvc K, Sr.
MH: 2 towards 00 AM 00 AM
sewer line Engineer
MH: 2
S.
Inspection of laying joint measurement of for 250 mm dia upvc
HFC- MH-1.5 to BalaJi,R.
0811A geotextile, gravel pipe laying and sewerage line from Area 7 26-Nov-14 09.30: 26-Nov-14 08:30: AN 12/24/2014
SEW MH-1.6 K, Sr.
bedding, grannular surround MH-1.5 to MH-1.6 00 AM 00 AM
Engineer
MH-1.10 -
Inspection for 6th S.
MH-1.9 ,
HFC- layer back filling for from MH: 1.10 to MH: BalaJi,R.
0913 Area 8 CH 0+ 26-Nov-14 02.30: 26-Nov-14 01:30: Revised 12/4/2014
SEW 200 mm dia Sewer 1.9 K, Sr.
101.62 & 00 PM 00 AM
line Engineer
CH 0+070
MH-1.9 -
Inspection for 6th S.
MH-1.8 ,
HFC- layer back filling for from MH: 1.9 to MH: BalaJi,R.
0914 Area 8 CH 0+070 26-Nov-14 02.30: 26-Nov-14 01:30: Revised 12/3/2014
SEW 200 mm dia Sewer 1.8 K, Sr.
& CH 00 PM 00 AM
line Engineer
0+038.65
MH-1.8 -
Inspection for 6th MH-1.7 , S.
HFC- layer back filling for from MH: 1.8 to MH: CH 0 + BalaJi,R.
0915 Area 8 26-Nov-14 02.30: 26-Nov-14 01:30: A 12/13/2014
SEW 200 mm dia Sewer 1.7 374.25 K, Sr.
00 PM 00 AM
line &CH Engineer
0+347.29

MH-16.2 to
S.
Inspection for air test MH-16.3
HFC- from MH-16.2 to MH- Area 6 BalaJi,R.
0916 for sewer line 200mm (0+108.28 26-Nov-14 02.30: 26-Nov-14 01:30: A 12/7/2014
SEW 16.3 (IR-1) K, Sr.
dia uPVC to 00 PM 00 AM
Engineer
0+063.63)

MH-16.3 to
S.
Inspection for air test MH-16.1
HFC- from MH-16.3 to MH- Area 6 BalaJi,R.
0917 for sewer line 200mm (0+063.63 26-Nov-14 02.30: 26-Nov-14 01:30: A 12/7/2014
SEW 16.1 (IR-1) K, Sr.
dia uPVC to 00 PM 00 AM
Engineer
0+040.00)

Visual inspection for S.


HFC- 1st layer back filling MH: 3 to BalaJi,R.
0918 from MH: 3 to MH: 4 Area 6 27-Nov-14 09.00: 27-Nov-14 08:30: A 12/4/2014
SEW for 200 mm dia Upvc MH: 4 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual inspection for S.
HFC- 2nd layer back filling MH: 3 to BalaJi,R.
0919 from MH: 3 to MH: 4 Area 6 27-Nov-14 09.00: 27-Nov-14 08:30: A 12/18/2014
SEW for 200 mm dia Upvc MH: 4 K, Sr.
00 AM 00 AM
sewer line Engineer
MH: 3 to
Visual Inspection for S.
from MH: 3 to ch ch
HFC- 2nd layer back fiiling BalaJi,R.
0920 0+771.83 towards Area 6 0+771.83 27-Nov-14 09.00: 27-Nov-14 08:30: A 12/18/2014
SEW of 200mm dia Upvc K, Sr.
MH: 2 towards 00 AM 00 AM
sewer line Engineer
MH: 2

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual inspection for S.


HFC- 1st layer back filling from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0921 Area 7 27-Nov-14 09.00: 27-Nov-14 08:30: A 12/7/2014
SEW for 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual inspection for S.
HFC- 2nd layer back filling from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0922 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/4/2014
SEW for 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual inspection for S.
HFC- 1st layer back filling from MH -1.5 to MH- MH -1.5 to BalaJi,R.
0923 Area 7 27-Nov-14 09.00: 27-Nov-14 08:30: A 12/4/2014
SEW for 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual inspection for S.
HFC- 2nd layer back filling from MH -1.5 to MH- MH -1.5 to BalaJi,R.
0924 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/4/2014
SEW for 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from MH 2.10 to MH MH 2.10 to BalaJi,R.
0057 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/7/2014
DR for 500mm dia GRP 2.9 MH 2.9 K, Sr.
00 AM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from MH 2.9 to MH MH 2.9 to BalaJi,R.
0058 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/7/2014
DR for 500mm dia GRP 2.8 MH 2.8 K, Sr.
00 AM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from MH 2.8 to MH MH 2.8 to BalaJi,R.
0059 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/7/2014
DR for 500mm dia GRP 2.7 MH 2.7 K, Sr.
00 AM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from MH 2.7 to MH MH 2.7 to BalaJi,R.
0060 Area 7 27-Nov-14 09.30: 27-Nov-14 08:30: A 12/7/2014
DR for 500mm dia GRP 2.6 MH 2.6 K, Sr.
00 AM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.10 to MH MH 2.10 to BalaJi,R.
0061 Area 7 27-Nov-14 12.0:0 27-Nov-14 08:30: Revised 12/4/2014
DR for 500mm dia GRP 2.9 MH 2.9 K, Sr.
0 PM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.9 to MH MH 2.9 to BalaJi,R.
0062 Area 7 27-Nov-14 12.0:0 27-Nov-14 08:30: Revised 12/4/2014
DR for 500mm dia GRP 2.8 MH 2.8 K, Sr.
0 PM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.8 to MH MH 2.8 to BalaJi,R.
0063 Area 7 27-Nov-14 12.0:0 27-Nov-14 08:30: Revised 12/4/2014
DR for 500mm dia GRP 2.7 MH 2.7 K, Sr.
0 PM 00 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.7 to MH MH 2.7 to BalaJi,R.
0064 Area 7 27-Nov-14 12.0:0 27-Nov-14 08:30: Revised 12/4/2014
DR for 500mm dia GRP 2.6 MH 2.6 K, Sr.
0 PM 00 AM
storm water Line Engineer
MH-15 S.
Inspection for
HFC- for Sewerage MH-15 (0+480.69) BalaJi,R.
0925 excavation and Area 6 27-Nov-14 10.0:0 27-Nov-14 08:30: A 12/18/2014
SEW & MH-16 & MH-16 K, Sr.
prepared formation 0 AM 00 AM
(1+518.64) Engineer
S.
Inspection for 200 mm dia upvc
HFC- MH -15 to BalaJi,R.
0926 excavation & sewer line from MH Area 6 27-Nov-14 11.0:00 27-Nov-14 08:30: A 12/18/2014
SEW MH-14 K, Sr.
prepared formation for -15 to MH-14 AM 00 AM
Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.4 to BalaJi,R.
0927 excavation & sewer line from MH Area 7 27-Nov-14 11.0:00 27-Nov-14 08:30: A 12/18/2014
SEW MH-1.3 K, Sr.
prepared formation for -1.4 to MH-1.3 AM 00 AM
Engineer
S.
Inspection of shutter,
HFC- MH-1.5 3.0:00 BalaJi,R.
0928 water stopper & of Sewerage MH-1.5 Area 7 27-Nov-14 27-Nov-14 08:30: AN 12/18/2014
SEW (0+424.48) PM K, Sr.
concreting for the wall 00 AM
Engineer

Inspection for shutter, for storm water MH S.


HFC- reinforcement & (01 nos type- J) & (01 Yard BalaJi,R.
0065 Yard area 27-Nov-14 9.30:0 27-Nov-14 8:30:0 A 12/18/2014
DR concreting for cover nos type- H) at Area K, Sr.
0 AM 0 AM
slab precast yard area Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

for the cover slab of S.


Inspection of
HFC- Sewer House Yard BalaJi,R.
0929 shutter,reinforcement Yard area 27-Nov-14 9.30:0 27-Nov-14 8:30:0 AN 1/4/2015
SEW Connection chamber Area K, Sr.
and concreting 0 AM 0 AM
Type B ( 2 no. ) Engineer
Inspection and joint MH-03 to S.
HFC- from MH-03 to
measurement of pipe abutment- BalaJi,R.
ITS/D 0017 abutment-1(10+200 to Area 1 27-Nov-14 10.30: 27-Nov-14 8:30:0 A 12/3/2014
laying for 4WXD54 1(10+200 K, Sr.
IC 10+290) 00 AM 0 AM
DU Duct line to 10+290) Engineer
MH no.
4WXD54 Etislat duct 54657 JRC
S.
Inspection for from MH no. 54657 14) to
HFC- BalaJi,R.
0015 excavation and JRC 14) to Abutmant- Area 1 Abutmant- 27-Nov-14 10.30: 27-Nov-14 8:30:0 A 12/17/2014
ETC K, Sr.
prepared formation for 1 (ch 10+200 to 1 (ch 00 AM 0 AM
Engineer
10+280) 10+200 to
10+280)

MH no.
4WXD54 Etislat duct 54657 JRC
S.
Inspection and joint from MH no. 54657 14) to
HFC- BalaJi,R.
0016 measurement of pipe JRC 14) to Abutmant- Area 1 Abutmant- 27-Nov-14 11.30:0 27-Nov-14 8:30:0 A 12/3/2014
ETC K, Sr.
laying for 1 (ch 10+200 to 1 (ch 0 AM 0 AM
Engineer
10+250) 10+200 to
10+250)
from ch 0+060 to S.
Inspection and joint CH 0+
HFC- for 225 mm dia GRE 0+160 in area 4 over BalaJi,R.
002A measurement of pipe Area 4 060 to 0+ 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
WD water line the bridge RHS K, Sr.
laying 160 0 PM 00 AM
towards Island Engineer
Inspection and joint
S.
measurement for pipe
HFC- from CHainage 0+445 0+445 - BalaJi,R.
005A laying of 150 mm dia Area 7 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
WD - 0+700 0+0700 K, Sr.
GRE potable water 0 PM 00 AM
Engineer
line
Inspection and joint
S.
measurement for pipe
HFC- from CHainage 0+445 0+445 - BalaJi,R.
005B laying of 150 mm dia Area 7 24-Dec-14 1.30:0 24-Dec-14 11:30: C 12/28/2014
WD - 0+700 0+0700 K, Sr.
GRE potable water 0 PM 00 AM
Engineer
line
Inspection for
S.
excavation and
HFC- from CHainage 0+545 0+545- 0+ BalaJi,R.
006A prepared formation of Area 7 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
WD - 0+445 445 K, Sr.
150 mm dia GRE 0 PM 00 AM
Engineer
potable water line

Inspection and joint from CHainage 0+160 S.


HFC- measurement for pipe - 0+560 over the 0+160 to BalaJi,R.
007A Area 4 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
WD laying of 225 mm dia bridge RHS towards 0+560 K, Sr.
0 PM 00 AM
GRE water line island Engineer

from ch 1+120 to S.
Inspection and joint
HFC- for 225 mm dia GRE 0+940 in area 4 over CH 1+120 BalaJi,R.
009A measurement of pipe Area 4 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
WD water line the bridge LHS to 0+940 K, Sr.
laying 0 PM 00 AM
towards Island Engineer
Abutment
1 to 2 S.
Inspection and joint duct 4WxD54 from
HFC- (10+323.2 BalaJi,R.
008B measurement for abutment 1 to Area 4 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
ETC to K, Sr.
laying of Etisalat abutment 2 0 PM 00 AM
10+825.00 Engineer
)
Inspection and joint abutment- S.
HFC-
measurement of pipe from abutment-1 to 1 to BalaJi,R.
ITS/D 003A Area 4 29-Nov-14 1.30:0 29-Nov-14 11:30: Revised 12/4/2014
laying for 4w x D54 abutment-2 abutment- K, Sr.
IC 0 PM 00 AM
DU duct pipe line 2 Engineer
inspection for 4th S.
HFC- layer backfilling for 1+680 BalaJi,R.
0477A Area 1 27-Nov-14 1.30:0 27-Nov-14 11:30: RR 12/4/2014
SEW 315mm upvc sewer to1+723.33 K, Sr.
0 PM 00 AM
line Engineer

Inspection for MH-03 to S.


HFC- from MH-03 to
excavation and abutment- BalaJi,R.
ITS/D 0016A abutment-1(10+200 to Area 1 27-Nov-14 1.30:0 27-Nov-14 11:30: A 12/17/2014
prepared formation for 1(10+200 K, Sr.
IC 10+290) 0 PM 00 AM
4WXD54 DU Duct line to 10+290) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection and joint
HFC- for 100 mm dia GRE from Chainage 2+460 2+460 to BalaJi,R.
0041 measurement of pipe Area 6 27-Nov-14 01.30: 27-Nov-14 8:30:0 Revised 12/4/2014
WD water line to 2+560 2+560 K, Sr.
laying 00 PM 0 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 2+600 to BalaJi,R.
0012 chanaige 2+600 to Area 6 27-Nov-14 01.30: 27-Nov-14 8:30:0 AN 12/17/2014
FF prepared formation for 2+750 K, Sr.
2+750 00 PM 0 AM
250 mm dia HDPE Engineer

Inspection & joint S.


fire fighting line from
HFC- measurement of pipe 2+600 to BalaJi,R.
0013 chanaige 2+600 to Area 6 27-Nov-14 01.30: 27-Nov-14 8:30:0 AN 12/4/2014
FF laying for 250 mm dia 2+750 K, Sr.
2+750 00 PM 0 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 2+030 to BalaJi,R.
0014 chanaige 2+030 to Area 6 27-Nov-14 01.30: 27-Nov-14 8:30:0 AN 12/23/2014
FF laying for 250 mm dia 1+920 K, Sr.
1+920 00 PM 0 AM
HDPE Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to BalaJi,R.
0792A Area 6 29-Nov-14 01.30: 29-Nov-14 8:30:0 Revised 12/4/2014
SEW measurements of connection line 160 MH-22 MH-22 K, Sr.
00 PM 0 AM
pipe laying & mm dia upvc Engineer
Inspection for
S.
external water
HFC- base & wall of sewer MH-1.7.6 BalaJi,R.
0778A proofing (Polyprimes Area 5 29-Nov-14 01.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW manhole no. MH-1.7.6 (0+057.37) K, Sr.
B + Bitustic xl + 00 PM 0 AM
Engineer
bituboard) for
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-22 BalaJi,R.
0738A laying of (including st. specials Area 6 29-Nov-14 01.30: 29-Nov-14 8:30:0 Revised 12/4/2014
SEW gravel surrounding sewer line to MH-22 (1+906.31) K, Sr.
geotextile,joint 1nos) 00 PM 0 AM
Engineer
measurement
MH-8.3 to
MH-8.2 , S.
Inspection for Air test
HFC- from MH: 8.3 to MH: CH BalaJi,R.
0930 for Sewer line of Area 6 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW 8.2 0+125.50 K, Sr.
200mm dia upvc 00 AM 0 AM
&CH Engineer
0+069.25

MH-8.2 to
MH-8.1 , S.
Inspection for Air test
HFC- from MH: 8.2 to MH: CH BalaJi,R.
0931 for Sewer line of Area 6 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW 8.1 0+69.25 K, Sr.
200mm dia upvc 00 AM 0 AM
&CH Engineer
0+041.377
S.
Inspection of laying joint measurement of 200 mm dia upvc
HFC- MH -15 to BalaJi,R.
0932 geotextile, gravel pipe laying and sewer line from MH Area 6 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW MH-14 K, Sr.
bedding, grannular surround -15 to MH-14 00 AM 0 AM
Engineer
S.
Inspection of laying joint measurement of 250 mm dia upvc
HFC- MH -1.4 to BalaJi,R.
0933 geotextile, gravel pipe laying and sewer line from MH Area 7 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW MH-1.3 K, Sr.
bedding, grannular surround -1.4 to MH-1.3 00 AM 0 AM
Engineer
Inspection of S.
with GRP preformed MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0066 benching for Storm 1.3,718.08 29-Nov-14 09.30: 29-Nov-14 8:30:0 AN 1/4/2015
DR and concreting for Area K, Sr.
water MH-1.3 type -H 29 00 AM 0 AM
base slab Engineer
Inspection of S.
with GRP preformed MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0067 benching for Storm 3.1,0+085. 29-Nov-14 09.30: 29-Nov-14 8:30:0 AN 1/4/2015
DR and concreting for Area K, Sr.
water MH-3.1 type -H 8111 00 AM 0 AM
base slab Engineer
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0068 for Storm water MH- 3.2,0+044. 29-Nov-14 09.30: 29-Nov-14 8:30:0 Revised 12/4/2014
DR and concreting for Area K, Sr.
3.2 type -H 1358 00 AM 0 AM
base slab Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

HC-03 of
(MH
25),HC-03
of ( MH
house connection 24),HC- S.
Inspection of fixing HC-1 of Sewer MH-
HFC- chamber base HC-03 HC-1,HC-2,HC-3 of 1,HC- BalaJi,R.
0934 and placing precasted 22 & HC-2 of Sewer Area 6 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW of Sewer MH 25,HC- Sewer MH 23 2,HC-3 of ( K, Sr.
sewerage MH-21.2 00 AM 0 AM
03 of Sewer MH 24 MH Engineer
23),HC-1
of (MH-22)
& HC-2 of
(MH-21.2)

S.
Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0935 excavation & sewer line from MH Area 6 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/17/2014
SEW MH-14 K, Sr.
prepared formation for -13 to MH-14 00 AM 0 AM
Engineer
MH-2.2 to
S.
200mm dia uPVC MH-2.1
HFC- Inspection for Air test Area 9 BalaJi,R.
0936 from MH-2.2 to MH- (0+198.46 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW for Sewer line of (IR-4) K, Sr.
2.1 to 00 AM 0 AM
Engineer
0+135.14)
MH-2.3 to
S.
200mm dia uPVC MH-2.2
HFC- Inspection for Air test Area 9 BalaJi,R.
0937 from MH-2.2 to MH- ( 0+267.57 29-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW for Sewer line of (IR-4) K, Sr.
2.3 to 00 AM 0 AM
Engineer
0+198.46)
MH-2.3 to
S.
MH-2.4
HFC- Inspection for Air test 200mm uPVC from Area 9 BalaJi,R.
0938 (0+267.57 30-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW for Sewer line of MH-2.3 to MH-2.4 (IR-4) K, Sr.
to 00 AM 0 AM
Engineer
0+198.46)
MH-2.5 &
S.
MH-2.4
HFC- Inspection for Air test 200mm uPVC from Area 9 BalaJi,R.
0939 (0+405.24 30-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW for Sewer line of MH-2.5 to MH-2.4 (IR-4) K, Sr.
to 00 AM 0 AM
Engineer
0+335.52)
MH-2.6 to
S.
MH-2.5
HFC- Inspection for Air test 200mm uPVC from Area 9 BalaJi,R.
0940 (0+474.95 30-Nov-14 09.30: 29-Nov-14 8:30:0 A 12/4/2014
SEW for Sewer line of MH-2.6 to MH-2.5 (IR-4) K, Sr.
to 00 AM 0 AM
Engineer
0+405.24)
MH-8.2 To
MH-9 S.
HFC- Inspection for Air test 200mm uPVC from Area 6 ( ( 0+069.23 BalaJi,R.
0941 29-Nov-14 09.30: 29-Nov-14 8:30:0 Revised 12/3/2014
SEW for Sewer line of MH-8.2 to MH-9 IR-1 ) to K, Sr.
00 AM 0 AM
1+150.82 Engineer
)
S.
Inspection of sand
HFC- From ch 0+080 to 0+080 to BalaJi,R.
0042 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+180 0+180 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+180 to 0+180 to BalaJi,R.
0043 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+280 0+280 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+280 to 0+280 to BalaJi,R.
0044 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+390 0+390 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+390 to 0+390 to BalaJi,R.
0045 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+480 0+480 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+480 to 0+480 to BalaJi,R.
0046 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+550 0+550 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of sand
HFC- From ch 0+550 to 0+550 to BalaJi,R.
0047 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+650 0+650 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+650 to 0+650 to BalaJi,R.
0048 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+750 0+750 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection of sand
HFC- From ch 0+750 to 0+750 to BalaJi,R.
0049 surround for 100 mm Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
WD 0+830 0+830 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Inspection of sand S.
HFC- surround for 110 mm From ch 1+000 to 1+000 to BalaJi,R.
0092 Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
IRR dia Upvc Irrigation 1+100 1+100 K, Sr.
00 PM 00 AM
line Engineer
Inspection of sand S.
HFC- surround for 110 mm From ch 1+100 to 1+100 to BalaJi,R.
0093 Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
IRR dia Upvc Irrigation 1+200 1+200 K, Sr.
00 PM 00 AM
line Engineer
Inspection of sand S.
HFC- surround for 110 mm From ch 1+200 to 1+200 to BalaJi,R.
0094 Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
IRR dia Upvc Irrigation 1+390 1+390 K, Sr.
00 PM 00 AM
line Engineer
Inspection of sand S.
HFC- surround for 200 mm From ch 1+180 to 1+180 to BalaJi,R.
0015 Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
FF dia HDPE fire fighting 1+280 1+280 K, Sr.
00 PM 00 AM
line Engineer
Inspection of sand S.
HFC- surround for 200 mm From ch 1+280 to 1+280 to BalaJi,R.
0016 Area 9 29-Nov-14 01.30: 29-Nov-14 11:30: AN 12/4/2014
FF dia HDPE fire fighting 1+580 1+580 K, Sr.
00 PM 00 AM
line Engineer
MH-03 to S.
HFC- Inspection of sand from MH-03 to
abutment- BalaJi,R.
ITS/D 0018 surround for 4WXD54 abutment-1(10+200 to Area 1 29-Nov-14 01.30: 29-Nov-14 11:30: A 12/4/2014
1(10+200 K, Sr.
IC DU Duct line 10+290) 00 PM 00 AM
to 10+290) Engineer
MH no.
54657 JRC
from MH no. 54657 S.
Inspection of sand 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0017 surround for 4WXD54 Area 1 Abutmant- 29-Nov-14 01.30: 29-Nov-14 11:30: A 12/4/2014
ETC 1 (ch 10+200 to K, Sr.
Etisalat Duct line 1 (ch 00 PM 00 AM
10+250) Engineer
10+200 to
10+250)

MH no.
Inspection of 54657 JRC
from MH no. 54657 S.
excavation and 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0018 prepared formation for Area 1 Abutmant- 29-Nov-14 01.30: 29-Nov-14 11:30: Revised 12/4/2014
ETC 1 (ch 10+250 to K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 PM 00 AM
10+310) Engineer
line 10+250 to
10+320)

MH no.
54657 JRC
Inspection and joint from MH no. 54657 S.
14) to
HFC- measurement of pipe JRC 14) to Abutmant- BalaJi,R.
0019 Area 1 Abutmant- 29-Nov-14 01.30: 29-Nov-14 11:30: Revised 12/4/2014
ETC laying for 4WXD54 1 (ch 10+250 to K, Sr.
1 (ch 00 PM 00 AM
Etisalat Duct line 10+310) Engineer
10+250 to
10+310)

MH no.
54657 JRC
from MH no. 54657 S.
Inspection of sand 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0020 surround for 4WXD54 Area 1 Abutmant- 29-Nov-14 01.30: 29-Nov-14 11:30: Revised 12/4/2014
ETC 1 (ch 10+250 to K, Sr.
Etisalat Duct line 1 (ch 00 PM 00 AM
10+310) Engineer
10+250 to
10+310)

Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and BalaJi,R.
0942 laying of (including st. specials sewer line to MH- Area 7 MH-1.7 .1 29-Nov-14 01.30: 29-Nov-14 11:30: A 12/4/2014
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1.7.1 00 PM 00 AM
Engineer
measurement

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewera S.
Visual inspection of sewerage
HFC- sewerage pump ge BalaJi,R.
0943 1st layer surruonding pump 29-Nov-14 01.30: 29-Nov-14 11:30: A 12/4/2014
SEW station pump K, Sr.
back filling around station 00 PM 00 AM
station Engineer
sewera S.
Visual inspection of sewerage
HFC- sewerage pump ge BalaJi,R.
0944 2nd layer surruonding pump 29-Nov-14 02.30: 29-Nov-14 11:30: AN 2/4/2015
SEW station pump K, Sr.
back filling around station 00 PM 00 AM
station Engineer
Inspection for
S.
external water
HFC- base & wall of sewer MH-23 BalaJi,R.
0945 proofing (Polyprimes Area 6 29-Nov-14 02.30: 29-Nov-14 11:30: A 12/4/2014
SEW manhole no. MH-23 (0+990.00) K, Sr.
B + Bitustic xl + 00 PM 00 AM
Engineer
bituboard) for

Inspection of shutter, S.
HFC- reinforcement and Yard BalaJi,R.
0946 for Sewer MH-16.1 Yard Area 29-Nov-14 02.30: 29-Nov-14 11:30: Revised 12/4/2014
SEW concreting for base Area K, Sr.
00 PM 00 AM
slab with benching Engineer

S.
Inspection of shutter,
HFC- MH-16.1 BalaJi,R.
0947 water stopper & of Sewerage MH-16.1 Area 6 30-Nov-14 02.30: 29-Nov-14 11:30: Revised 12/4/2014
SEW (0+040.00) K, Sr.
concreting for the wall 00 PM 00 AM
Engineer
for the wall of
S.
Inspection of shutter, Seweragehouse
HFC- HC-03 of BalaJi,R.
0948 water stopper & connection chamber Area 6 29-Nov-14 02.30: 29-Nov-14 11:30: Revised 12/4/2014
SEW (MH-24) K, Sr.
concreting HC-03 of Sewerage 00 PM 00 AM
Engineer
Manhole MH-24

Inspection for S.
fire fighting line from
HFC- excavation and 2+850 to BalaJi,R.
0017 chainage 2+850 to Area 6 29-Nov-14 02.30: 29-Nov-14 11:30: A 1/15/2015
FF prepared formation for 2+750 K, Sr.
2+750 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection & joint S.


fire fighting line from
HFC- measurement of pipe 2+850 to BalaJi,R.
0018 chainage 2+850 to Area 6 1-Dec-14 03.30: 29-Nov-14 08:30: AN 12/8/2014
FF laying for 250 mm dia 2+750 K, Sr.
2+750 00 PM 00 AM
HDPE Engineer
Visual Inspection for S.
HFC- 2nd layer surrounding BalaJi,R.
0949 MH-2.1 Area 9 MH-2.1 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0950 MH-2.1 Area 9 MH-2.1 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Visual Inspection for S.
HFC- 2nd layer surrounding BalaJi,R.
0951 MH-2.2 Area 9 MH-2.2 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0952 MH-2.3 Area 9 ,MH-2.3 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Visual Inspection for S.
HFC- 2nd layer surrounding BalaJi,R.
0953 MH-2.4 Area 9 MH-2.4 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0954 MH-2.4 Area 9 MH-2.4 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Visual Inspection for S.
HFC- 2nd layer surrounding BalaJi,R.
0955 ,MH-2.5 Area 9 MH-2.5 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0956 ,MH-2.5 Area 9 MH-2.5 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection for S.


HFC- 2nd layer surrounding BalaJi,R.
0957 ,MH-2.6 Area 9 MH-2.6 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0958 ,MH-2.6 Area 9 MH-2.6 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for 3rd S.
HFC- layer surrounding BalaJi,R.
0959 MH-2.2 Area 9 MH-2.2 29-Nov-14 03.30: 29-Nov-14 1:30:0 A 12/17/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
visual Inspection for S.
HFC- 2nd layer surrounding BalaJi,R.
0960 MH-2.3 Area 9 ,MH-2.3 29-Nov-14 04.30: 29-Nov-14 1:30:0 A 12/4/2014
SEW back filling around K, Sr.
00 PM 0 PM
sewer Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0069 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 A 1/15/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0070 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 1/4/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0071 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 1/15/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0072 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 1/15/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0073 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 1/4/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0074 at precast yard area Yard area 30-Nov-14 02.30: 30-Nov-14 8:30:0 A 1/15/2015
DR concreting for Gully- Area K, Sr.
00 PM 0 AM
02nos Engineer
S.
Inspection of laying joint measurement of 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0961 geotextile, gravel pipe laying and sewer line from MH Area 6 30-Nov-14 09.30: 30-Nov-14 8:30:0 A 12/8/2014
SEW MH-14 K, Sr.
bedding, grannular surround for -13 to MH-14 00 AM 0 AM
Engineer
Inspection for
S.
excavation and
HFC- from Chainage 2+560 2+560 to BalaJi,R.
0050 prepared formation of Area 6 30-Nov-14 11.30:0 30-Nov-14 8:30:0 Revised 12/4/2014
WD to 2+760 2+760 K, Sr.
100 mm dia GRE 0 AM 0 AM
Engineer
water line
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+560 2+560 to BalaJi,R.
0051 Area 6 30-Nov-14 01.30: 30-Nov-14 8:30:0 Revised 12/4/2014
WD laying for 100 mm dia to 2+760 2+760 K, Sr.
00 PM 0 AM
GRE water line Engineer
& irrigation reservoir
Inspection for shutter, S.
wall and pumping Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0095 station wall (wall no: n pump pump 30-Nov-14 02.30: 30-Nov-14 8:30:0 Revised 12/4/2014
IRR concreting for fire K, Sr.
W1) &(wall no: station station 00 PM 0 AM
fighting Engineer
W3,W4)
MH -13 S.
Inspection for
HFC- for sewer MH -13 & (1+366.36) BalaJi,R.
0962 excavation & Area 6 30-Nov-14 09.30: 30-Nov-14 8:30:0 AN 1/15/2015
SEW MH-14 & MH-14 K, Sr.
prepared formation 00 AM 0 AM
(1+425.89) Engineer
MH -13 S.
HFC- Inspection for pouring for sewer MH -13 & (1+366.36) BalaJi,R.
0963 Area 6 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 12/18/2014
SEW of blinding concrete MH-14 & MH-14 K, Sr.
00 PM 0 AM
(1+425.89) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -1.4 S.
HFC- Inspection for pouring for sewer MH -1.6 & (0+480) & BalaJi,R.
0964 Area 7 30-Nov-14 02.30: 30-Nov-14 8:30:0 AN 12/18/2014
SEW of blinding concrete MH-1.4 MH-1.6 K, Sr.
00 PM 0 AM
(0+374.25) Engineer
S.
Inspection of 3rd layer
HFC- MH-18 BalaJi,R.
0965 surruonding back Sewerage MH-18 Area 6 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/17/2014
SEW (1+645.43) K, Sr.
filling around 00 AM 0 AM
Engineer
S.
Inspection of 3rd layer
HFC- MH-19 BalaJi,R.
0966 surruonding back Sewerage MH-19 Area 6 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/17/2014
SEW (1+728.89) K, Sr.
filling around 00 AM 0 AM
Engineer
S.
Inspection of 3rd layer
HFC- MH-20 BalaJi,R.
0967 surruonding back Sewerage MH-20 Area 6 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/17/2014
SEW (1+811.63) K, Sr.
filling around 00 AM 0 AM
Engineer
S.
Inspection for 3rd MH-
HFC- BalaJi,R.
0968 layer surruonding Sewerage MH-24 Area 6 24(2+052. 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/17/2014
SEW K, Sr.
back filling around 75) 00 AM 0 AM
Engineer
S.
Inspection for 3rd
HFC- MH-25 BalaJi,R.
0969 layer surruonding Sewerage MH-25 Area 6 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/17/2014
SEW (2+107.50) K, Sr.
back filling around 00 AM 0 AM
Engineer
MH-1.8 -
MH-1.7 , S.
Inspection for air test
HFC- from MH: 1.8 to MH: CH 0 + BalaJi,R.
0970 for 200 mm dia upvc Area 8 30-Nov-14 011.30: 30-Nov-14 9:30:0 A 12/4/2014
SEW 1.7 374.25 K, Sr.
Sewer line 00 AM 0 AM
&CH Engineer
0+347.29
MH-1.10 to
S.
Inspection for air test MH-1.9
HFC- from MH-1.10 to MH- BalaJi,R.
0971 for 200 mm dia upvc Area 8 (0+101.62 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.9 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+070.00)
MH-1.9 to
S.
Inspection for air test MH-1.8
HFC- from MH-1.9 to MH- BalaJi,R.
0972 for 200 mm dia upvc Area 8 ( 0+070.00 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.8 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+038.55)

MH-1.11 to
S.
Inspection for air test MH-1.12
HFC- from MH-1.11 to MH- BalaJi,R.
0973 for 200 mm dia upvc Area 8 (0+185.7 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.12 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+101.62)

MH-1.11 to
S.
Inspection for air test MH-1.12
HFC- from MH-1.11 to MH- BalaJi,R.
0974 for 200 mm dia upvc Area 8 (0+185.7 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.10 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+101.62)

MH-1.12 to
S.
Inspection for air test MH 1.13
HFC- from MH-1.12 to MH BalaJi,R.
0975 for 200 mm dia upvc Area 8 (0+268.79 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.13 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+356.0)

MH-1.13 to
S.
Inspection for air test MH-1.14
HFC- from MH-1.13 to MH- BalaJi,R.
0976 for 200 mm dia upvc Area 8 (0+356.00 30-Nov-14 01.30: 30-Nov-14 11:30: A 12/4/2014
SEW 1.14 K, Sr.
Sewer line to 00 PM 00 AM
Engineer
0+439.70)

S.
HFC- Inspection for pouring MH-15 BalaJi,R.
0977 for Sewerage MH-15 Area 6 30-Nov-14 01.30: 30-Nov-14 11:30: AN 1/4/2014
SEW of blinding concrete (0+480.69) K, Sr.
00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection of MH-03 to S.


HFC- from MH-03 to
1st layer back filling abutment- 01:30: BalaJi,R.
ITS/D 0019 abutment-1(10+200 to Area 1 30-Nov-14 03.30: 30-Nov-14 Revised 12/4/2014
with warning tape for 1(10+200 00 K, Sr.
IC 10+290) 00 PM
4WXD54 DU Duct line to 10+290) PM Engineer

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- 01:30: BalaJi,R.
0021 with warning tape for Area 1 Abutmant- 30-Nov-14 03.30: 30-Nov-14 Revised 12/4/2014
ETC 1 (ch 10+250 to 00 K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 PM
10+310) PM Engineer
line 10+250 to
10+310)

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- 01:30: BalaJi,R.
0022 with warning tape for Area 1 Abutmant- 30-Nov-14 03.30: 30-Nov-14 Revised 12/4/2014
ETC 1 (ch 10+200 to 00 K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 PM
10+250) PM Engineer
line 10+200 to
10+250)

Inspection for
S.
excavation and
HFC- from Chainage 2+760 2+760 to 01:30: BalaJi,R.
0052 prepared formation of Area 6 30-Nov-14 03.30: 30-Nov-14 Revised 12/4/2014
WD to 2+840 2+840 00 K, Sr.
100 mm dia GRE 00 PM
PM Engineer
water line
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+180 to 0+180 to 01:30: BalaJi,R.
0053 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+280 0+280 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+280 to 0+280 to 01:30: BalaJi,R.
0054 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+390 0+390 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+390 to 0+390 to 01:30: BalaJi,R.
0055 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+480 0+480 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+480 to 0+480 to 01:30: BalaJi,R.
0056 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+550 0+550 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+550 to 0+550 to 01:30: BalaJi,R.
0057 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+650 0+650 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+650 to 0+650 to 01:30: BalaJi,R.
0058 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+750 0+750 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+750 to 0+750 to 01:30: BalaJi,R.
0059 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+830 0+830 00 K, Sr.
00 PM
water line PM Engineer
Inspection for placing
S.
& fixing precast
HFC- MH-3 01:30: BalaJi,R.
0978 sewer manhole (base) for Sewerage MH-3 Area 6 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
SEW (0+811.83) 00 K, Sr.
including alignment 00 PM
PM Engineer
and level
Visual Inspection of S.
HFC- 1st layer back filling From ch 0+080 to 0+080 to 01:30: BalaJi,R.
0060 Area 9 30-Nov-14 03.30: 30-Nov-14 A 12/4/2014
WD for 100 mm dia GRE 0+180 0+180 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+080 to 0+080 to BalaJi,R.
0061 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: A 12/7/2014
WD for 100 mm dia GRE 0+180 0+180 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 1+000 to 1+000 to BalaJi,R.
0096 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/4/2014
IRR for 110 mm dia Upvc 1+100 1+100 K, Sr.
0 AM 00 AM
Irrigation line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection of S.
HFC- 1st layer back filling From ch 1+100 to 1+100 to BalaJi,R.
0097 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/4/2014
IRR for 110 mm dia Upvc 1+200 1+200 K, Sr.
0 AM 00 AM
Irrigation line Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 1+200 to 1+200 to BalaJi,R.
0098 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/4/2014
IRR for 110 mm dia Upvc 1+310 1+310 K, Sr.
0 AM 00 AM
Irrigation line Engineer

Visual Inspection of S.
HFC- 1st layer back filling From ch 1+180 to 1+180 to BalaJi,R.
0019 Area 9 1-Dec-14 11.30:0 29-Nov-14 08:30: A 12/4/2014
FF for 200 mm dia HDPE 1+280 1+280 K, Sr.
0 PM 00 AM
fire fighting line Engineer

Visual Inspection of S.
HFC- 1st layer back filling From ch 1+280 to 1+280 to BalaJi,R.
0020 Area 9 1-Dec-14 11.30:0 29-Nov-14 08:30: A 12/4/2014
FF for 200 mm dia HDPE 1+580 1+580 K, Sr.
0 PM 00 AM
fire fighting line Engineer

Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+180 to 1+180 to BalaJi,R.
0021 Area 9 1-Dec-14 01.30: 29-Nov-14 08:30: A 12/7/2014
FF for 200 mm dia HDPE 1+280 1+280 K, Sr.
00 PM 00 AM
fire fighting line Engineer

Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+280 to 1+280 to BalaJi,R.
0022 Area 9 1-Dec-14 01.30: 29-Nov-14 08:30: A 12/7/2014
FF for 200 mm dia HDPE 1+580 1+580 K, Sr.
00 PM 00 AM
fire fighting line Engineer

Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+000 to 1+000 to BalaJi,R.
0099 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/7/2014
IRR for 110 mm dia Upvc 1+100 1+100 K, Sr.
0 AM 00 AM
Irrigation line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+100 to 1+100 to BalaJi,R.
0100 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/7/2014
IRR for 110 mm dia Upvc 1+200 1+200 K, Sr.
0 AM 00 AM
Irrigation line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+200 to 1+200 to BalaJi,R.
0101 Area 9 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/7/2014
IRR for 110 mm dia Upvc 1+310 1+310 K, Sr.
0 AM 00 AM
Irrigation line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+180 to 0+180 to BalaJi,R.
0062 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: A 12/7/2014
WD for 100 mm dia GRE 0+280 0+280 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+280 to 0+280 to BalaJi,R.
0063 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: A 12/7/2014
WD for 100 mm dia GRE 0+390 0+390 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+390 to 0+390 to BalaJi,R.
0064 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: Revised 12/4/2014
WD for 100 mm dia GRE 0+480 0+480 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+480 to 0+480 to BalaJi,R.
0065 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: Revised 12/4/2014
WD for 100 mm dia GRE 0+550 0+550 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+550 to 0+550 to BalaJi,R.
0066 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: Revised 12/4/2014
WD for 100 mm dia GRE 0+650 0+650 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+650 to 0+650 to BalaJi,R.
0067 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: Revised 12/4/2014
WD for 100 mm dia GRE 0+750 0+750 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+750 to 0+750 to BalaJi,R.
0068 Area 9 1-Dec-14 03.30: 1-Dec-14 08:30: Revised 12/4/2014
WD for 100 mm dia GRE 0+830 0+830 K, Sr.
00 PM 00 AM
water line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0979 excavation & sewer line from MH Area 6 1-Dec-14 11.30:0 1-Dec-14 08:30: Revised 12/4/2014
SEW MH-12 K, Sr.
prepared formation for -13 to MH-12 0 AM 00 AM
Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.3 to BalaJi,R.
0980 excavation & sewer line from MH Area 7 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/4/2014
SEW MH-1.2 K, Sr.
prepared formation for -1.3 to MH-1.2 0 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0981 geotextile, gravel pipe laying and sewer line from MH Area 6 1-Dec-14 1.30:0 1-Dec-14 08:30: Revised 12/4/2014
SEW MH-12 K, Sr.
bedding, grannular surround for -13 to MH-12 0 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of 250 mm dia upvc
HFC- MH -1.3 to BalaJi,R.
0982 geotextile, gravel pipe laying and sewer line from MH Area 7 1-Dec-14 1.30:0 1-Dec-14 08:30: A 12/8/2014
SEW MH-1.2 K, Sr.
bedding, grannular surround for -1.3 to MH-1.2 0 PM 00 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 2+850 to BalaJi,R.
0023 chainage 2+850 to Area 6 1-Dec-14 11.30:0 1-Dec-14 08:30: AN 1/24/2015
FF prepared formation for 2+950 K, Sr.
2+950 0 AM 00 AM
250 mm dia HDPE Engineer

Inspection & joint S.


fire fighting line from
HFC- measurement of pipe 2+850 to BalaJi,R.
0024 chainage 2+850 to Area 6 1-Dec-14 11.30:0 1-Dec-14 08:30: AN 12/8/2014
FF laying for 250 mm dia 2+950 K, Sr.
2+950 0 AM 00 AM
HDPE Engineer
Inspection for S.
HFC- excavation and irrigation transmission 0+845 to 0 BalaJi,R.
0102 Area 1 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/18/2014
IRR prepared formation for line +872 K, Sr.
0 AM 00 AM
150mm dia uPVC Engineer
Inspection and joint S.
HFC- measurement of pipe irrigation transmission 0+830 to 0 BalaJi,R.
0103 Area 1 1-Dec-14 11.30:0 1-Dec-14 08:30: AN 12/9/2014
IRR laying for 150mm dia line +872 K, Sr.
0 AM 00 AM
uPVC Engineer
sewera S.
Inspection of 3rd sewerage
HFC- sewerage pump ge BalaJi,R.
0983 layer surruonding pump 1-Dec-14 11.30:0 1-Dec-14 08:30: Revised 12/6/2014
SEW station pump K, Sr.
back filling around station 0 AM 00 AM
station Engineer
Inspection for
S.
excavation &
HFC- from MH 2.6 to MH MH 2.6 to BalaJi,R.
0075 formation for 600mm Area 7 1-Dec-14 11.30:0 1-Dec-14 08:30: A 12/8/2014
DR 2.5 MH 2.5 K, Sr.
dia GRP storm water 0 AM 00 AM
Engineer
Line
Inspection for 3rd S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0984 Area 7 1-Dec-14 1.30:0 1-Dec-14 11:30: A 1/4/2015
SEW 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
0 PM 00 AM
sewer line Engineer
Inspection for 3rd S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to BalaJi,R.
0985 Area 7 1-Dec-14 1.30:0 1-Dec-14 11:30: A 1/4/2015
SEW 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
0 PM 00 AM
sewer line Engineer
Inspection for
excavation and S.
HC-01 to
HFC- prepared formation for of Sewer Manhole , from HC-01 to HC- BalaJi,R.
0986 Area 9 HC-02 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 02 K, Sr.
(MH-2.6) 0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

Inspection for
excavation and S.
HFC- prepared formation for of Sewer Manhole from HC-02 to MH- HC-02 to BalaJi,R.
0987 Area 9 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 2.6 MH-2.6 K, Sr.
0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

Inspection for
excavation and S.
HFC- prepared formation for of Sewer Manhole HC-03 to BalaJi,R.
0988 from HC-03 to MH-2.6 Area 9 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 MH-2.6 K, Sr.
0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
excavation and S.
HC-01 to
HFC- prepared formation for of Sewer Manhole from HC-01 to end BalaJi,R.
0989 Area 9 end cap 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 cap K, Sr.
(MH-2.6) 0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

Inspection for
excavation and S.
HC-02 to
HFC- prepared formation for of Sewer Manhole from HC-02 to end BalaJi,R.
0990 Area 9 end cap 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 cap K, Sr.
(MH-2.6) 0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

Inspection for
excavation and S.
HC-03 to
HFC- prepared formation for of Sewer Manhole from HC-03 to end BalaJi,R.
0991 Area 9 end cap 1-Dec-14 1.30:0 1-Dec-14 11:30: A 12/8/2014
SEW sewer House MH-2.6 cap K, Sr.
(MH-2.6) 0 PM 00 AM
connection line 160 Engineer
mm dia Upvc

Inspection for S.
fire fighting line from
HFC- excavation and 2+950 to 03:30: BalaJi,R.
0025 chainage 2+950 to Area 6 1-Dec-14 3.30:0 1-Dec-14 AN 12/25/2014
FF prepared formation for 3+160 00 K, Sr.
3+160 0 PM
250 mm dia HDPE PM Engineer

Inspection for
S.
excavation and
HFC- from Chainage 1+570 1+570 to BalaJi,R.
0069 prepared formation of Area 6 3-Dec-14 11.30:0 3-Dec-14 08:30: A 1/4/2015
WD to 1+460 1+460 K, Sr.
100 mm dia GRE 0 AM 00 AM
Engineer
water line
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0076 for Storm water MH- 1.5,0+642. 7-Dec-14 11.30:0 7-Dec-14 08:30: AN 1/4/2015
DR and concreting for Area K, Sr.
1.5 type -H 5091 0 AM 00 AM
base slab Engineer
Inspection for
S.
excavation &
HFC- from MH 2.4 to MH MH 2.4 to BalaJi,R.
0077 formation for 600mm Area 7 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
DR 2.5 MH 2.5 K, Sr.
dia GRP storm water 00 AM 00 AM
Engineer
Line
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0078 excavation and Area 7 2.5,0+276. 3-Dec-14 10.30: 3-Dec-14 08:30: AN 1/4/2015
DR MH 2.5 K, Sr.
prepared formation for 2135 00 AM 00 AM
Engineer
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0079 excavation and Area 7 2.4,0+342. 3-Dec-14 10.30: 3-Dec-14 08:30: AN 1/4/2015
DR MH 2.4 K, Sr.
prepared formation for 1374 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of 250 mm dia upvc
HFC- MH -1.2 to BalaJi,R.
0992 geotextile, gravel pipe laying and sewer line from MH Area 7 4-Dec-14 10.30: 4-Dec-14 08:30: A 12/9/2014
SEW MH-1.1 K, Sr.
bedding, grannular surround for -1.2 to MH-1.1 00 AM 00 AM
Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.2 to BalaJi,R.
0993 excavation & sewer line from MH Area 7 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/18/2014
SEW MH-1.1 K, Sr.
prepared formation for -1.2 to MH-1.1 00 AM 00 AM
Engineer
S.
Inspection for
HFC- MH-1.2 BalaJi,R.
0994 excavation and for Sewerage MH-1.2 Area 7 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/18/2014
SEW (0+590.00) K, Sr.
prepared formation 00 AM 00 AM
Engineer
S.
Inspection for
HFC- MH-1.1 BalaJi,R.
0995 excavation and for Sewerage MH-1.1 Area 7 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/30/2014
SEW (0+645.93) K, Sr.
prepared formation 00 AM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling from MH -1.4 to MH- MH -1.4 to BalaJi,R.
0996 Area 7 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/4/2014
SEW 250 mm dia upvc 1.3 MH-1.3 K, Sr.
00 AM 00 AM
sewer line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160
HFC- from HC-02 to MH- HC-02 to BalaJi,R.
0997 excavation and mm dia Upvc of Area 9 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW 2.4 MH-2.6 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160
HFC- from HC-03 to MH- HC-03 to BalaJi,R.
0998 excavation and mm dia Upvc of Area 9 3-Dec-14 10.30: 3-Dec-14 08:30: AN 12/8/2014
SEW 2.4 MH-2.4 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- BalaJi,R.
0999 excavation and mm dia Upvc of from HC-01 to HC-2 Area 9 HC-2 (MH- 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- 2.4) 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- from HC-01 to end BalaJi,R.
1000 excavation and mm dia Upvc of Area 9 end cap 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.4) 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- from HC-02 to end BalaJi,R.
1001 excavation and mm dia Upvc of Area 9 end cap 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.4) 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160 HC-03 to
HFC- from HC-03 to end BalaJi,R.
1002 excavation and mm dia Upvc of Area 9 end cap 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.4) 00 AM 00 AM
Engineer
2.4
sewer House
S.
Inspection for connection line 160
HFC- from HC-01 to MH- HC-01 to BalaJi,R.
1003 excavation and mm dia Upvc of Area 9 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW 2.5 MH-2.5 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 00 AM
Engineer
2.5
sewer House
S.
Inspection for connection line 160 HC-01
HFC- BalaJi,R.
1004 excavation and mm dia Upvc of from HC-01 to HC-2 Area 9 toHC-2 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.5) 00 AM 00 AM
Engineer
2.5
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- from HC-01 to end BalaJi,R.
1005 excavation and mm dia Upvc of Area 9 end cap 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.5) 00 AM 00 AM
Engineer
2.5
sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- from HC-02 to end BalaJi,R.
1006 excavation and mm dia Upvc of Area 9 end cap 3-Dec-14 10.30: 3-Dec-14 08:30: A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.5) 00 AM 00 AM
Engineer
2.5
Visual Inspection of S.
HFC- 2nd layer back filling from MH -1.4 to MH- MH -1.4 to BalaJi,R.
1007 Area 7 3-Dec-14 11.30:0 3-Dec-14 08:30: A 12/7/2014
SEW 250 mm dia upvc 1.3 MH-1.3 K, Sr.
0 AM 00 AM
sewer line Engineer
S.
Inspection of 4th layer
HFC- MH-18 011:3 BalaJi,R.
1008 surruonding back Sewerage MH-18 Area 6 3-Dec-14 01.30: 3-Dec-14 A 1/4/2015
SEW (1+645.43) 0:00 K, Sr.
filling around 00 PM
AM Engineer
S.
Inspection of 4th layer
HFC- MH-19 011:3 BalaJi,R.
1009 surruonding back Sewerage MH-19 Area 6 3-Dec-14 01.30: 3-Dec-14 A 1/4/2015
SEW (1+728.89) 0:00 K, Sr.
filling around 00 PM
AM Engineer
S.
Inspection of 4th layer
HFC- MH-20 011:3 BalaJi,R.
1010 surruonding back Sewerage MH-20 Area 6 3-Dec-14 01.30: 3-Dec-14 A 1/4/2015
SEW (1+811.63) 0:00 K, Sr.
filling around 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
visual Inspection of
HFC- MH-21.1 011:3 BalaJi,R.
1011 1st layer surruonding Sewerage MH-21.1 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+046.93) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-21.2 011:3 BalaJi,R.
1012 1st layer surruonding Sewerage MH-21.2 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+117.69) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-21.3 011:3 BalaJi,R.
1013 1st layer surruonding Sewerage MH-21.3 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+070.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-21.1 011:3 BalaJi,R.
1014 2nd layer surruonding Sewerage MH-21.1 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+046.93) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-21.2 011:3 BalaJi,R.
1015 2nd layer surruonding Sewerage MH-21.2 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+117.69) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-21.3 011:3 BalaJi,R.
1016 2nd layer surruonding Sewerage MH-21.3 Area 6 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+070.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7 011:3 BalaJi,R.
1017 1st layer surruonding Sewerage MH-1.7 Area 7 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+347.29) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.8 011:3 BalaJi,R.
1018 1st layer surruonding Sewerage MH-1.8 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+38.65) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.9 011:3 BalaJi,R.
1019 1st layer surruonding Sewerage MH-1.9 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+070.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.10 011:3 BalaJi,R.
1020 1st layer surruonding Sewerage MH-1.10 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+101.62) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.11 011:3 BalaJi,R.
1021 1st layer surruonding Sewerage MH-1.11 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+185.70) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.12 011:3 BalaJi,R.
1022 1st layer surruonding Sewerage MH-1.12 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+268.79) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.13 011:3 BalaJi,R.
1023 1st layer surruonding Sewerage MH-1.13 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+356.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.14 011:3 BalaJi,R.
1024 1st layer surruonding Sewerage MH-1.14 Area 8 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+439.70) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7 011:3 BalaJi,R.
1025 2nd layer surruonding Sewerage MH-1.7 Area 7 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+347.29) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.8 011:3 BalaJi,R.
1026 2nd layer surruonding Sewerage MH-1.8 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+38.65) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.9 011:3 BalaJi,R.
1027 2nd layer surruonding Sewerage MH-1.9 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+070.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
visual Inspection of
HFC- MH-1.10 011:3 BalaJi,R.
1028 2nd layer surruonding Sewerage MH-1.10 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+101.62) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.11 011:3 BalaJi,R.
1029 2nd layer surruonding Sewerage MH-1.11 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+185.70) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.12 011:3 BalaJi,R.
1030 2nd layer surruonding Sewerage MH-1.12 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+268.79) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.13 011:3 BalaJi,R.
1031 2nd layer surruonding Sewerage MH-1.13 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+356.00) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.14 011:3 BalaJi,R.
1032 2nd layer surruonding Sewerage MH-1.14 Area 8 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+439.70) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.1 011:3 BalaJi,R.
1033 1st layer surruonding Sewerage MH-1.7.1 Area 7 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+244.90) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.2 011:3 BalaJi,R.
1034 1st layer surruonding Sewerage MH-1.7.2 Area 7 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+162.32) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.3 011:3 BalaJi,R.
1035 1st layer surruonding Sewerage MH-1.7.3 Area 7 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+078.78) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.4 011:3 BalaJi,R.
1036 1st layer surruonding Sewerage MH-1.7.4 Area 5 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+004.60) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.5 011:3 BalaJi,R.
1037 1st layer surruonding Sewerage MH-1.7.5 Area 5 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+107.65) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.6 011:3 BalaJi,R.
1038 1st layer surruonding Sewerage MH-1.7.6 Area 5 3-Dec-14 01.30: 3-Dec-14 A 12/8/2014
SEW (0+067.35) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.1 011:3 BalaJi,R.
1039 2nd layer surruonding Sewerage MH-1.7.1 Area 7 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+244.90) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.2 011:3 BalaJi,R.
1040 2nd layer surruonding Sewerage MH-1.7.2 Area 7 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+162.32) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.3 011:3 BalaJi,R.
1041 2nd layer surruonding Sewerage MH-1.7.3 Area 7 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+078.78) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.4 011:3 BalaJi,R.
1042 2nd layer surruonding Sewerage MH-1.7.4 Area 5 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+004.60) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.5 011:3 BalaJi,R.
1043 2nd layer surruonding Sewerage MH-1.7.5 Area 5 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+107.65) 0:00 K, Sr.
back filling around 00 PM
AM Engineer
S.
visual Inspection of
HFC- MH-1.7.6 011:3 BalaJi,R.
1044 2nd layer surruonding Sewerage MH-1.7.6 Area 5 3-Dec-14 02.30: 3-Dec-14 A 12/8/2014
SEW (0+067.35) 0:00 K, Sr.
back filling around 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.4
to MH- S.
Inspection for air test
HFC- from MH-1.7.4 to MH- Area 5 1.7.5 011:3 BalaJi,R.
1045 for 200 mm dia upvc 3-Dec-14 01.30: 3-Dec-14 A 12/4/2014
SEW 1.7.5 (IR-1) ( 0+004.60 0:00 K, Sr.
Sewer line 00 PM
to AM Engineer
0+107.65)

MH-1.7.5
to MH- S.
Inspection for air test
HFC- from MH-1.7.5 to MH- Area 5 1.7.6 011:3 BalaJi,R.
1046 for 200 mm dia upvc 3-Dec-14 01.30: 3-Dec-14 A 12/4/2014
SEW 1.7.6 (IR-1) ( 0+107.65 0:00 K, Sr.
Sewer line 00 PM
to AM Engineer
0+057.37)

Inspection of 2nd road crossing Duct


HFC- 2x10W 150mm dia 10+108.60 Kiran, Sr.
009B layer back filling with No.1 at ch Area 1 3-Dec-14 03.30: 3-Dec-14 1:30:0 A 12/7/2014
ED upvc addittional HV 5 Engineer
warning tape for 10+108.605 00 PM 0 PM

Inspection of 2nd road crossing Duct


HFC- 2x4W 150mm dia 10+107.68 Kiran, Sr.
0010B layer back filling with No.1 at ch Area 1 3-Dec-14 03.30: 3-Dec-14 1:30:0 A 12/7/2014
ED upvc addittional LV 1 Engineer
warning tape for 10+107.681 00 PM 0 PM

S.
above of blinding
HFC- Inspection for water MH-14 BalaJi,R.
1047 concrete for sewer Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/9/2014
SEW proofing (1+425.89) K, Sr.
manhole MH-14 00 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-15 BalaJi,R.
1048 concrete for sewer Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/9/2014
SEW proofing (0+480.69) K, Sr.
manhole MH-15 00 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-1.6 BalaJi,R.
1049 concrete for sewer Area 7 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/9/2014
SEW proofing + Screed (0+374.25) K, Sr.
manhole MH-1.6 00 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH -1.4 BalaJi,R.
1050 concrete for sewer Area 7 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/9/2014
SEW proofing (0+480) K, Sr.
manhole MH-1.4 00 AM 0 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-1.3 BalaJi,R.
1051 concrete for sewer Area 7 4-Dec-14 10.30: 4-Dec-14 8:30:0 Revised 12/10/2014
SEW proofing + Screed (0+534.69) K, Sr.
manhole MH-1.3 00 AM 0 AM
Engineer
Inspection for S.
HFC- excavation and sewerage line from MH-14 to BalaJi,R.
0807A Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/9/2014
SEW prepared formation of MH-14 to MH-15 MH-15 K, Sr.
00 AM 0 AM
200mm dia UPVC Engineer
Inspection and joint
S.
measurement of pipe
HFC- from chainage 0+880 0+880 to BalaJi,R.
0812A laying for 200 mm dia Area 5 4-Dec-14 10.30: 4-Dec-14 8:30:0 Revised 12/10/2014
SEW to 0+920 0+920 K, Sr.
HDPE Sewer 00 AM 0 AM
Engineer
pressure line
S.
HFC- Inspection of 4th & for 200 mm dia HDPE 1+460 to BalaJi,R.
0780A Area 1 4-Dec-14 10.30: 4-Dec-14 8:30:0 Revised 12/10/2014
SEW final layer back filling Sewer pressure line 1+540 K, Sr.
00 AM 0 AM
Engineer
Inspection and joint
S.
measurement of pipe
HFC- from ch 0+720 to 0+720 to BalaJi,R.
0775A laying for 200 mm dia Area 7 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/11/2014
SEW 0+440 0+440 K, Sr.
HDPE Sewer 00 AM 0 AM
Engineer
pressure line
Inspection of sand S.
HFC- surround for 200 mm from ch 0+790 to 0+790 to BalaJi,R.
0773A Area 7 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/9/2014
SEW dia HDPE Sewer 0+850 0+850 K, Sr.
00 AM 0 AM
pressure line Engineer
S.
Inspection for 3rd & Irrigation tranmission
HFC- 0+740 to BalaJi,R.
0086A final layer backfilling line from chainage Area 1 4-Dec-14 10.30: 4-Dec-14 8:30:0 Revised 12/10/2014
IRR 0+840 K, Sr.
for 150mm dia uPVC 0+740 to 0+840 00 AM 0 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection & joint S.


HFC- measurement of pipe from Chainage 2+360 2+360 to BalaJi,R.
0039A Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/24/2014
WD laying for 100 mm dia to 2+460 2+460 K, Sr.
00 AM 0 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 1+770 1+770 to BalaJi,R.
0038A Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/15/2014
WD laying for 100 mm dia to 1+630 1+630 K, Sr.
00 AM 0 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+270 2+270 to BalaJi,R.
0035A Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/23/2014
WD laying for 100 mm dia to 2+360 2+360 K, Sr.
00 AM 0 AM
GRE water line Engineer
Inspection of
S.
excavation and
HFC- 1+560 to BalaJi,R.
1052 prepared formation for Area 1 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/18/2014
SEW 1+587 K, Sr.
200mm HDPE sewer 00 AM 0 AM
Engineer
pressure line

Inspection for
S.
excavation and
HFC- from chainage 0+920 0+920 to BalaJi,R.
0666A prepared formation for Area 5 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/13/2014
SEW to 0+875 0+875 K, Sr.
200 mm dia HDPE 00 AM 0 AM
Engineer
sewer pressure line

sewer House
S.
Inspection for connection line 160
HFC- from HC-01 to MH- HC-01 to BalaJi,R.
1053 excavation and mm dia Upvc of Area 9 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW 2.3 MH-2.3 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 0 AM
Engineer
2.3
S.
Inspection and joint
HFC- for 100 mm dia GRE from Chainage 2+460 2+460 to BalaJi,R.
0041A measurement of pipe Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 Revised 12/8/2014
WD water line to 2+560 2+560 K, Sr.
laying 00 AM 0 AM
Engineer
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- BalaJi,R.
1054 excavation and mm dia Upvc of from HC-01 to HC-2 Area 9 HC-2 (MH- 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- 2.3) 00 AM 0 AM
Engineer
2.3
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- from HC-01 to end BalaJi,R.
1055 excavation and mm dia Upvc of Area 9 End cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.3) 00 AM 0 AM
Engineer
2.3
sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- from HC-02 to end BalaJi,R.
1056 excavation and mm dia Upvc of Area 9 End cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.3) 00 AM 0 AM
Engineer
2.3
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- BalaJi,R.
1057 excavation and mm dia Upvc of from HC-01 to HC-2 Area 9 HC-2 (MH- 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- 2.2) 00 AM 0 AM
Engineer
2.2
sewer House
S.
Inspection for connection line 160
HFC- from HC-02 to mH- HC-01 to BalaJi,R.
1058 excavation and mm dia Upvc of Area 9 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW 2.2 MH-2.2 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 0 AM
Engineer
2.2
sewer House
S.
Inspection for connection line 160
HFC- from HC-03 to mH- HC-03 to BalaJi,R.
1059 excavation and mm dia Upvc of Area 9 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW 2.2 MH-2.2 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 0 AM
Engineer
2.2
sewer House
S.
Inspection for connection line 160 HC-03 to
HFC- from HC-03 to end BalaJi,R.
1060 excavation and mm dia Upvc of Area 9 end cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.2) 00 AM 0 AM
Engineer
2.2

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- from HC-02 to end BalaJi,R.
1061 excavation and mm dia Upvc of Area 9 end cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.2) 00 AM 0 AM
Engineer
2.2
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- from HC-01 to end BalaJi,R.
1062 excavation and mm dia Upvc of Area 9 end cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-2.2) 00 AM 0 AM
Engineer
2.2
sewer House
S.
Inspection for connection line 160
HFC- from HC-02 to mH- HC-02 to BalaJi,R.
1063 excavation and mm dia Upvc of Area 9 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW 2.1 MH-2.1 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 0 AM
Engineer
2.1
sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- BalaJi,R.
1064 excavation and mm dia Upvc of from HC-02 to HC-1 Area 9 HC-1 (MH- 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- 2.1) 00 AM 0 AM
Engineer
2.1
sewer House
S.
Inspection for connection line 160 HC-01 to
HFC- from HC-01 to end BalaJi,R.
1065 excavation and mm dia Upvc of Area 9 End cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.1) 00 AM 0 AM
Engineer
2.1
sewer House
S.
Inspection for connection line 160 HC-02 to
HFC- from HC-02 to end BalaJi,R.
1066 excavation and mm dia Upvc of Area 9 End cap 4-Dec-14 10.30: 4-Dec-14 8:30:0 A 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-2.1) 00 AM 0 AM
Engineer
2.1
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+060 to BalaJi,R.
0082A chainage 1+060 to Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/13/2014
IRR laying for 200 mm dia 0+950 K, Sr.
0+950 00 AM 0 AM
upvc Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+160 to BalaJi,R.
0088A chainage 1+160 to Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/13/2014
IRR laying for 200 mm dia 1+060 K, Sr.
1+060 00 AM 0 AM
upvc Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+290 to BalaJi,R.
0089A chainage 1+290 to Area 6 4-Dec-14 10.30: 4-Dec-14 8:30:0 AN 12/13/2014
IRR laying for 200 mm dia 1+160 K, Sr.
1+160 00 AM 0 AM
upvc Engineer
Inspection and joint
S.
measurement of pipe
HFC- 1+560 to BalaJi,R.
1067 laying for 200mm from 1+560 to 1+587 Area 1 4-Dec-14 11.30:0 4-Dec-14 8:30:0 A 12/9/2014
SEW 1+587 K, Sr.
HDPE sewer pressure 0 AM 0 AM
Engineer
line
S.
Inspection for
HFC- sewer manhole MH- MH-1.3 BalaJi,R.
1068 excavation and Area 7 4-Dec-14 11.30:0 4-Dec-14 8:30:0 A 1/4/2015
SEW 1.3 (0+534.69) K, Sr.
prepared formation for 0 AM 0 AM
Engineer
S.
HFC- Inspection for pouring for sewer manhole MH-1.3 BalaJi,R.
1069 Area 7 4-Dec-14 3.30:0 4-Dec-14 8:30:0 Revised 12/10/2014
SEW of blinding concrete MH-1.3 (0+534.69) K, Sr.
0 PM 0 AM
Engineer
Inspection of 1st layer S.
HFC- back filling for 200 from ch 0+790 to 0+790 to BalaJi,R.
0774A Area 7 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/9/2014
SEW mm dia HDPE Sewer 0+850 0+850 K, Sr.
00 AM 0 AM
pressure line Engineer

Inspection for HC-02 to


S.
excavation and From HC-02 to Existing
HFC- BalaJi,R.
0515A prepared formation Existing MH Area 1 MH 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/28/2014
SEW K, Sr.
for 315 mm dia Upvc S19/24/10A/5 S19/24/10 00 AM 0 AM
Engineer
Sewer force main line A/5

S.
Inspection for
HFC- MH-1.5 BalaJi,R.
0813A excavation and for Sewerage MH-1.5 Area 7 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/9/2014
SEW (0+424.48) K, Sr.
prepared formation 00 AM 0 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection and joint
HFC- for 100 mm dia GRE from Chainage 2+460 2+460 to BalaJi,R.
0041B measurement of pipe Area 6 24-Dec-14 10.30: 24-Dec-14 8:30:0 AN 1/6/2015
WD water line to 2+560 2+560 K, Sr.
laying 00 AM 0 AM
Engineer
Inspection for
S.
excavation and
HFC- from CHainage 0+480 0+480 to BalaJi,R.
0016A prepared formation of Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/28/2014
WD to 0+550 0+550 K, Sr.
100 mm dia GRE 00 AM 0 AM
Engineer
water line
S.
Inspection of laying joint measurement of 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0981A geotextile, gravel pipe laying and sewer line from MH Area 6 6-Dec-14 4.30:0 6-Dec-14 8:30:0 AN 12/11/2014
SEW MH-12 K, Sr.
bedding, grannular surround for -13 to MH-12 0 PM 0 AM
Engineer
Inspection for S.
gravel surround for (Kindly see description of HC -02 to
HFC- granular bedding, from HC -02 to end BalaJi,R.
0711B house connection line RFA 710 & 711, both are Area 6 end cap of 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/11/2014
SEW joint measurements cap of sewer MH-24 different) K, Sr.
160 mm dia upvc ( MH-24) 00 AM 0 AM
of pipe laying & Engineer

HC-1 to
end cap
(MH-24)
HC-2 to
Inspection for
end cap S.
excavation and (Please see attached
HFC- from HC-1 to end cap HC-2 to end cap HC-3 to end cap HC-4 to end cap (MH-24), BalaJi,R.
0904A formation for sewer RFA no 421 is for HC Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/11/2014
SEW (MH-24) (MH-24), (MH-24), (MH-24) Chamber excavation) HC-3 to K, Sr.
House connection line 00 AM 0 AM
end cap Engineer
160 mm dia upvc
(MH-24),
HC-4 to
end cap
(MH-24)

Inspection for placing


S.
& fixing precast
HFC- MH-15 BalaJi,R.
1070 sewer manhole (base) for Sewerage MH-15 Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/10/2014
SEW (0+480.69) K, Sr.
including alignment 00 AM 0 AM
Engineer
and level
Inspection for placing
S.
& fixing precast
HFC- MH-14 BalaJi,R.
1071 sewer manhole (base) for sewer MH-14 Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/10/2014
SEW (1+425.89) K, Sr.
including alignment 00 AM 0 AM
Engineer
and level
S.
Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
0979A excavation & sewer line from MH Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 1/4/2015
SEW MH-12 K, Sr.
prepared formation for -13 to MH-12 00 AM 0 AM
Engineer
& irrigation reservoir
Inspection for shutter, S.
wall and pumping Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0095A station wall (wall no: n pump pump 6-Dec-14 02.30: 6-Dec-14 8:30:0 Revised 12/9/2014
IRR concreting for fire K, Sr.
W1) &(wall no: station station 00 PM 0 AM
fighting Engineer
W3,W4)
Inspection for
S.
excavation and
HFC- from Chainage 2+560 2+560 to BalaJi,R.
0050A prepared formation of Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 2/17/2015
WD to 2+760 2+760 K, Sr.
100 mm dia GRE 00 AM 0 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 2+760 2+760 to BalaJi,R.
0052A prepared formation of Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 2/4/2015
WD to 2+840 2+840 K, Sr.
100 mm dia GRE 00 AM 0 AM
Engineer
water line
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+750 to 0+750 to BalaJi,R.
0068A Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
WD for 100 mm dia GRE 0+830 0+830 K, Sr.
00 AM 0 AM
water line Engineer
Inspection & joint S.
HFC- measurement of pipe from CHainage 2+050 2+050 to BalaJi,R.
0022A Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/24/2014
WD laying for 100 mm dia to 1+900 1+900 K, Sr.
00 AM 0 AM
GRE water line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection & joint S.


HFC- measurement of pipe from CHainage 1+900 1+900 to BalaJi,R.
0023A Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/24/2014
WD laying for 100 mm dia to 1+770 1+770 K, Sr.
00 AM 0 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+050 2+050 to BalaJi,R.
0024A Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 12/23/2014
WD laying for 100 mm dia to 2+160 2+160 K, Sr.
00 AM 0 AM
GRE water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+480 to 0+480 to BalaJi,R.
0065A Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
WD for 100 mm dia GRE 0+550 0+550 K, Sr.
00 AM 0 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+650 to 0+650 to BalaJi,R.
0067A Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
WD for 100 mm dia GRE 0+750 0+750 K, Sr.
00 AM 0 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+550 to 0+550 to BalaJi,R.
0066A Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
WD for 100 mm dia GRE 0+650 0+650 K, Sr.
00 AM 0 AM
water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 0+390 to 0+390 to BalaJi,R.
0064A Area 9 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
WD for 100 mm dia GRE 0+480 0+480 K, Sr.
00 AM 0 AM
water line Engineer

Visual Inspection of MH-03 to S.


HFC- from MH-03 to
1st layer back filling abutment- BalaJi,R.
ITS/D 0019A abutment-1(10+200 to Area 1 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/11/2014
with warning tape for 1(10+200 K, Sr.
IC 10+290) 00 AM 0 AM
4WXD54 DU Duct line to 10+290) Engineer

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0022A with warning tape for Area 1 Abutmant- 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/10/2014
ETC 1 (ch 10+200 to K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 AM 0 AM
10+250) Engineer
line 10+200 to
10+250)

MH no.
Inspection of 54657 JRC
from MH no. 54657 S.
excavation and 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0018A prepared formation for Area 1 Abutmant- 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/10/2014
ETC 1 (ch 10+250 to K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 AM 0 AM
10+310) Engineer
line 10+250 to
10+320)

MH no.
54657 JRC
Inspection and joint from MH no. 54657 S.
14) to
HFC- measurement of pipe JRC 14) to Abutmant- BalaJi,R.
0019A Area 1 Abutmant- 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/10/2014
ETC laying for 4WXD54 1 (ch 10+250 to K, Sr.
1 (ch 00 AM 0 AM
Etisalat Duct line 10+310) Engineer
10+250 to
10+320)
S.
Inspection of 3rd & road crossing Duct
HFC- 2x10W 150mm dia 10+108.60 BalaJi,R.
0011B final layer back filling No.1 at ch Area 1 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/10/2014
ED upvc addittional HV 5 K, Sr.
for 10+108.605 00 AM 0 AM
Engineer
S.
Inspection of 3rd & road crossing Duct
HFC- 2x4W 150mm dia 10+107.68 BalaJi,R.
0012B final layer back filling No.1 at ch Area 1 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/10/2014
ED upvc addittional LV 1 K, Sr.
for 10+107.681 00 AM 0 AM
Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 0+950 to BalaJi,R.
0091A chainage 0+950 to Area 6 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/18/2014
IRR laying for 200 mm dia 0+870 K, Sr.
0+870 00 AM 0 AM
upvc Engineer
MH-1.7.3
to MH- S.
Inspection for air test
HFC- from MH-1.7.3 to MH- Area 7 1.7.2 BalaJi,R.
0153A for sewer line 250mm 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
SEW 1.7.2 (IR-1) (0+078.78 K, Sr.
dia uPVC 00 AM 0 AM
to Engineer
0+162.32)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH no.
54657 JRC
from MH no. 54657 S.
Inspection of sand 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0020A surround for 4WXD54 Area 1 Abutmant- 6-Dec-14 10.30: 6-Dec-14 8:30:0 Revised 12/16/2014
ETC 1 (ch 10+250 to K, Sr.
Etisalat Duct line 1 (ch 00 AM 0 AM
10+310) Engineer
10+250 to
10+310)

MH-1.7.3
to MH- S.
Inspection for air test
HFC- from MH-1.7.3 to MH- Area 7 1.7.4 BalaJi,R.
1072 for sewer line 250mm 6-Dec-14 10.30: 6-Dec-14 8:30:0 A 12/8/2014
SEW 1.7.4 (IR-1) ( 0+078.78 K, Sr.
dia uPVC 00 AM 0 AM
TO Engineer
0+004.60 )
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0068A for Storm water MH- 3.2,0+044. 6-Dec-14 10.30: 6-Dec-14 8:30:0 AN 1/15/2015
DR and concreting for Area K, Sr.
3.2 type -H 1358 00 AM 0 AM
base slab Engineer
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to BalaJi,R.
1073 excavation and mm dia Upvc of Area 8 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW 1.8 MH-1.8 K, Sr.
prepared formation for Sewer Manhole MH- 0 PM 00 AM
Engineer
1.8
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1074 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-1.8) 0 PM 00 AM
Engineer
1.8
sewer House
S.
Inspection for connection line 160
HFC- from HC -02 to MH- HC -02 to BalaJi,R.
1075 excavation and mm dia Upvc of Area 8 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW 1.10 MH-1.10 K, Sr.
prepared formation for Sewer Manhole MH- 0 PM 00 AM
Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1076 excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 0 PM 00 AM
Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1077 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 0 PM 00 AM
Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1078 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 0 PM 00 AM
Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1079 excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 0 PM 00 AM
Engineer
1.11
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1080 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 0 PM 00 AM
Engineer
1.11
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1081 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 0 PM 00 AM
Engineer
1.11
sewer House
S.
Inspection for connection line 160
HFC- from HC -02 to MH- HC -02 to BalaJi,R.
1082 excavation and mm dia Upvc of Area 8 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW 1.11 MH-1.11 K, Sr.
prepared formation for Sewer Manhole MH- 0 PM 00 AM
Engineer
1.11

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1083 excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 0 PM 00 AM
Engineer
1.12
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1084 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 0 PM 00 AM
Engineer
1.12
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1085 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 0 PM 00 AM
Engineer
1.12
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to BalaJi,R.
1086 excavation and mm dia Upvc of Area 8 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW 1.12 MH-1.12 K, Sr.
prepared formation for Sewer Manhole MH- 0 PM 00 AM
Engineer
1.12
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1087 excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 0 PM 00 AM
Engineer
1.13
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1088 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 0 PM 00 AM
Engineer
1.13
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1089 excavation and mm dia Upvc of Area 8 end cap 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 0 PM 00 AM
Engineer
1.13
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to BalaJi,R.
1090 excavation and mm dia Upvc of Area 8 6-Dec-14 2.30:0 6-Dec-14 11:30: Revised 12/8/2014
SEW 1.13 MH-1.13 K, Sr.
prepared formation for Sewer Manhole MH- 0 PM 00 AM
Engineer
1.13
S.
Inspection for 250 mm dia upvc
HFC- MH -1.1 to BalaJi,R.
1091 excavation & sewer line from MH Area 7 6-Dec-14 4.30:0 6-Dec-14 11:30: A 1/4/2015
SEW MH-1 K, Sr.
prepared formation for -1.1 to MH-1 0 PM 00 AM
Engineer
S.
Inspection and joint fire fighting line from
HFC- 2+950 to BalaJi,R.
0026 measurement for 250 chainage 2+950 to Area 6 6-Dec-14 3.30:0 6-Dec-14 11:30: AN 12/11/2014
FF 3+050 K, Sr.
mm dia HDPE 3+050 0 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 1+310 to 1+310 to 01:30: BalaJi,R.
0104 Area 9 6-Dec-14 3.30:0 6-Dec-14 AN 12/9/2014
IRR for 110 mm dia Upvc 1+390 1+390 00 K, Sr.
0 PM
Irrigation line PM Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+310 to 1+310 to 01:30: BalaJi,R.
0105 Area 9 6-Dec-14 3.30:0 6-Dec-14 AN 12/9/2014
IRR for 110 mm dia Upvc 1+390 1+390 00 K, Sr.
0 PM
Irrigation line PM Engineer
tape for 110 mm dia S.
Inspection of 3rd &
HFC- Upvc Irrigation line 1+100 to 01:30: BalaJi,R.
0106 final layer back filling Area 9 6-Dec-14 3.30:0 6-Dec-14 A 1/4/2015
IRR From ch 1+100 to 1+200 00 K, Sr.
with warning 0 PM
1+200 PM Engineer
tape for 110 mm dia S.
Inspection of 3rd &
HFC- Upvc Irrigation line 1+200 to 01:30: BalaJi,R.
0107 final layer back filling Area 9 6-Dec-14 3.30:0 6-Dec-14 A 1/4/2015
IRR From ch 1+200 to 1+390 00 K, Sr.
with warning 0 PM
1+390 PM Engineer
tape for 110 mm dia S.
Inspection of 3rd &
HFC- Upvc Irrigation line 1+000 to 01:30: BalaJi,R.
0108 final layer back filling Area 9 6-Dec-14 3.30:0 6-Dec-14 A 1/4/2015
IRR From ch 1+000 to 1+100 00 K, Sr.
with warning 0 PM
1+100 PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 3rd & for 200 mm dia HDPE
HFC- 1+180 to BalaJi,R.
0027 final layer back filling fire fighting line From Area 9 6-Dec-14 3.30:0 6-Dec-14 11:30: A 1/4/2015
FF 1+280 K, Sr.
with warning tape ch 1+180 to 1+280 0 PM 00 AM
Engineer
S.
Inspection of 3rd & for 200 mm dia HDPE
HFC- 1+280 to BalaJi,R.
0028 final layer back filling fire fighting line From Area 9 6-Dec-14 3.30:0 6-Dec-14 11:30: A 1/4/2015
FF 1+580 K, Sr.
with warning tape ch 1+280 to 1+580 0 PM 00 AM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+080 to BalaJi,R.
0070 final layer back filling water line From ch Area 9 6-Dec-14 4.30:0 6-Dec-14 2:30:0 A 1/4/2015
WD 0+180 K, Sr.
with warning tape 0+080 to 0+180 0 PM 0 PM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+180 to BalaJi,R.
0071 final layer back filling water line From ch Area 9 6-Dec-14 4.30:0 6-Dec-14 2:30:0 A 1/4/2015
WD 0+280 K, Sr.
with warning tape 0+180 to 0+280 0 PM 0 PM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+280 to BalaJi,R.
0072 final layer back filling water line From ch Area 9 6-Dec-14 4.30:0 6-Dec-14 2:30:0 A 1/4/2015
WD 0+390 K, Sr.
with warning tape 0+280 to 0+390 0 PM 0 PM
Engineer
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0080 for Storm water MH- 1.6,0+604. 7-Dec-14 11.30:0 7-Dec-14 08:30: AN 1/4/2015
DR and concreting for Area K, Sr.
1.6 type -H 5817 0 AM 00 AM
base slab Engineer
Inspection for placing
S.
& fixing precast
HFC- MH -1.4 BalaJi,R.
1092 sewer manhole (base) for sewer MH-1.4 Area 7 7-Dec-14 11.30:0 7-Dec-14 08:30: AN 12/9/2014
SEW (0+480) K, Sr.
including alignment 0 AM 00 AM
Engineer
and level
Inspection for placing
S.
& fixing precast
HFC- MH-1.6 BalaJi,R.
1093 sewer manhole (base) for sewer MH -1.6 Area 7 7-Dec-14 11.30:0 7-Dec-14 08:30: A 12/9/2014
SEW (0+374.25) K, Sr.
including alignment 0 AM 00 AM
Engineer
and level
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-3 BalaJi,R.
1094 laying of (including st. specials Area 6 7-Dec-14 11.30:0 7-Dec-14 08:30: A 12/11/2014
SEW gravel surrounding sewer line to MH-3 (0+811.83) K, Sr.
geotextile,joint 2nos) 0 AM 00 AM
Engineer
measurement
S.
Inspection for
HFC- MH -12 BalaJi,R.
1095 excavation & for sewer MH -12 Area 6 7-Dec-14 11.30:0 7-Dec-14 08:30: A 3012-2014
SEW (1+323.64) K, Sr.
prepared formation 0 AM 00 AM
Engineer
S.
HFC- Inspection for pouring MH -12 BalaJi,R.
1096 for sewer MH -12 Area 6 7-Dec-14 03.30: 7-Dec-14 08:30: AN 1/4/2015
SEW of blinding concrete (1+323.64) K, Sr.
00 PM 00 AM
Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0050A at precast yard area Yard area 7-Dec-14 11.30:0 7-Dec-14 08:30: AN 1/4/2015
DR concreting for Gully- Area K, Sr.
0 AM 00 AM
04 nos Engineer
HC-1,HC- S.
Inspection for
HFC- for House connection HC-1,HC-2,HC-3 of 2,HC-3 of BalaJi,R.
1097 excavation & Area 9 7-Dec-14 11.30:0 7-Dec-14 08:30: A 12/9/2014
SEW chambers of MH-2.6 Sewer MH 2.6 Sewer MH K, Sr.
prepared formation 0 AM 00 AM
2.6 Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1098 excavation & Area 9 of Sewer 7-Dec-14 11.30:0 7-Dec-14 08:30: A 12/9/2014
SEW chambers of MH-2.5 MH 2.5 K, Sr.
prepared formation MH 2.5 0 AM 00 AM
Engineer
HC-1,HC- S.
Inspection for
HFC- for House connection HC-1,HC-2,HC-3 of 2,HC-3 of BalaJi,R.
1099 excavation & Area 9 7-Dec-14 11.30:0 7-Dec-14 08:30: A 12/9/2014
SEW chambers of MH-2.4 Sewer MH 2.4 Sewer MH K, Sr.
prepared formation 0 AM 00 AM
2.4 Engineer
HC-1,HC- S.
HFC- Inspection for pouring for House connection HC-1,HC-2,HC-3 of 2,HC-3 of BalaJi,R.
1100 Area 9 7-Dec-14 12.30: 7-Dec-14 08:30: AN 12/30/2014
SEW of blinding concrete chambers of MH-2.6 Sewer MH 2.6 Sewer MH K, Sr.
00 AM 00 AM
2.6 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1101 Area 9 of Sewer 7-Dec-14 12.30: 7-Dec-14 08:30: AN 12/30/2014
SEW of blinding concrete chambers of MH-2.5 MH 2.5 K, Sr.
MH 2.5 00 AM 00 AM
Engineer
HC-1,HC- S.
HFC- Inspection for pouring for House connection HC-1,HC-2,HC-3 of 2,HC-3 of BalaJi,R.
1102 Area 9 7-Dec-14 12.30: 7-Dec-14 08:30: AN 12/30/2014
SEW of blinding concrete chambers of MH-2.4 Sewer MH 2.4 Sewer MH K, Sr.
00 AM 00 AM
2.4 Engineer
S.
Inspection for air test from MH:
HFC- from MH: 1.7 to MH: BalaJi,R.
1103 for 250 mm dia upvc Area 7 1.7 to MH: 7-Dec-14 10.30: 7-Dec-14 08:30: A 12/9/2014
SEW 1.7.1 K, Sr.
Sewer line 1.7.1 00 AM 00 AM
Engineer
MH-1.7.2
to MH- S.
Inspection for air test
HFC- from MH-1.7.2 to MH- 1.7.1 BalaJi,R.
1104 for 250 mm dia upvc Area 7 7-Dec-14 10.30: 7-Dec-14 08:30: A 12/9/2014
SEW 1.7.1 ( 0+162.32 K, Sr.
Sewer line 00 AM 00 AM
to Engineer
0+244.9)

of 150 mm dia upvc X


Inspection for S.
450 bend for irrigation 0+870.315
HFC- excavation and BalaJi,R.
0109 transmission line at Area 1 & 7-Dec-14 1.30:0 7-Dec-14 11:30: AN 12/13/2014
IRR prepared formation for K, Sr.
0+870.315 & 0+863.490 0 PM 00 AM
thrust block Engineer
0+863.490

of 150 mm dia upvc X


Inspection for shutter, S.
450 bend for irrigation 0+870.315
HFC- reinforcement & BalaJi,R.
0110 transmission line at Area 1 & 7-Dec-14 03.30: 7-Dec-14 11:30: AN 1/5/2015
IRR concreting for thrust K, Sr.
0+870.315 & 0+863.490 00 PM 00 AM
block Engineer
0+863.490

S.
Inspection for HC-1,HC-
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1105 excavation & Area 9 2of Sewer 7-Dec-14 01.30: 7-Dec-14 11:30: A 12/11/2014
SEW chambers of MH-2.1 MH 2.1 K, Sr.
prepared formation MH 2.1 00 PM 00 AM
Engineer
HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3 of ,HC-3 of BalaJi,R.
1106 excavation & Area 9 7-Dec-14 01.30: 7-Dec-14 11:30: A 12/9/2014
SEW chambers of MH-2.2 Sewer MH 2.2 Sewer MH K, Sr.
prepared formation 00 PM 00 AM
2.2 Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1107 excavation & Area 9 of Sewer 7-Dec-14 01.30: 7-Dec-14 11:30: A 12/9/2014
SEW chambers of MH-2.3 MH 2.3 K, Sr.
prepared formation MH 2.3 00 PM 00 AM
Engineer
S.
HC-1,HC-
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1108 Area 9 2of Sewer 7-Dec-14 03.30: 7-Dec-14 11:30: AN 3012-2014
SEW of blinding concrete chambers of MH-2.1 MH 2.1 K, Sr.
MH 2.1 00 PM 00 AM
Engineer
HC-1,HC-2 S.
HFC- Inspection for pouring for House connection HC-1,HC-2 ,HC-3 of ,HC-3 of BalaJi,R.
1109 Area 9 7-Dec-14 03.30: 7-Dec-14 11:30: AN 3012-2014
SEW of blinding concrete chambers of MH-2.2 Sewer MH 2.2 Sewer MH K, Sr.
00 PM 00 AM
2.2 Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1110 Area 9 of Sewer 7-Dec-14 03.30: 7-Dec-14 11:30: AN 3012-2014
SEW of blinding concrete chambers of MH-2.3 MH 2.3 K, Sr.
MH 2.3 00 PM 00 AM
Engineer

Inspection for shutter, S.


fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0111 reservoir and B4,B5,C4,C5,D4,D5,E n pump pump 7-Dec-14 03.30: 7-Dec-14 11:30: AN 1/5/2015
IRR concreting for column K, Sr.
pumping station 4,E5,F5 (9 nos) station station 00 PM 00 AM
(type C1) of Engineer

sewera S.
Inspection of 3rd sewerage
HFC- sewerage pump ge BalaJi,R.
0983A layer surruonding pump 7-Dec-14 03.30: 7-Dec-14 11:30: A 1/4/2015
SEW station pump K, Sr.
back filling around station 00 PM 00 AM
station Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.5 to BalaJi,R.
0819A excavation & sewer line from MH Area 7 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/4/2015
SEW MH-1.4 K, Sr.
prepared formation for -1.5 to MH-1.4 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for
HFC- MH-4 BalaJi,R.
1111 excavation and for Sewerage MH-4 Area 6 8-Dec-14 01.30: 8-Dec-14 08:30: A 1/4/2015
SEW (0+861.72) K, Sr.
prepared formation 00 PM 00 AM
Engineer
Inspection for S.
HFC- excavation and MH: 4 to BalaJi,R.
1112 from MH: 4 to MH: 5 Area 6 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/4/2015
SEW prepared formation of MH: 5 K, Sr.
00 PM 00 AM
200mm dia UPVC Engineer
S.
Inspection for fixing for irrigation
HFC- BalaJi,R.
0064A of of 150 mm dia upvc transmission line at Area 1 1+003.052 8-Dec-14 09.30: 8-Dec-14 08:30: AN 12/15/2014
IRR K, Sr.
X450 bend chanaige 1+003.052 00 AM 00 AM
Engineer
S.
Inspection for HC-1of
HFC- for House connection HC-1 of Sewer MH- BalaJi,R.
1113 excavation & Area 8 Sewer MH 8-Dec-14 01.30: 8-Dec-14 08:30: A 12/11/2014
SEW chambers of MH-1.8 1.8 K, Sr.
prepared formation 1.8 00 PM 00 AM
Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1114 excavation & Area 8 of Sewer 8-Dec-14 01.30: 8-Dec-14 08:30: A 12/11/2014
SEW chambers of MH-1.10 MH 1.10 K, Sr.
prepared formation MH 1.8 00 PM 00 AM
Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1115 excavation & Area 8 of Sewer 8-Dec-14 01.30: 8-Dec-14 08:30: A 12/11/2014
SEW chambers of MH-1.11 MH 1.11 K, Sr.
prepared formation MH 1.11 00 PM 00 AM
Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1116 excavation & Area 8 of Sewer 8-Dec-14 01.30: 8-Dec-14 08:30: A 12/11/2014
SEW chambers of MH-1.12 MH 1.12 K, Sr.
prepared formation MH-1.12 00 PM 00 AM
Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1117 excavation & Area 8 of Sewer 8-Dec-14 01.30: 8-Dec-14 08:30: A 12/11/2014
SEW chambers of MH-1.13 MH 1.13 K, Sr.
prepared formation MH 1.13 00 PM 00 AM
Engineer
S.
HC-1of
HFC- Inspection for pouring for House connection HC-1 of Sewer MH- BalaJi,R.
1118 Area 8 Sewer MH 8-Dec-14 03.30: 8-Dec-14 08:30: AN 1/15/2015
SEW of blinding concrete chambers of MH-1.8 1.8 K, Sr.
1.8 00 PM 00 AM
Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1119 Area 8 of Sewer 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/17/2015
SEW of blinding concrete chambers of MH-1.10 MH 1.10 K, Sr.
MH 1.8 00 PM 00 AM
Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1120 Area 8 of Sewer 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/17/2015
SEW of blinding concrete chambers of MH-1.11 MH 1.11 K, Sr.
MH 1.11 00 PM 00 AM
Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1121 Area 8 of Sewer 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/17/2015
SEW of blinding concrete chambers of MH-1.12 MH 1.12 K, Sr.
MH-1.12 00 PM 00 AM
Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1122 Area 8 of Sewer 8-Dec-14 03.30: 8-Dec-14 08:30: A 1/17/2015
SEW of blinding concrete chambers of MH-1.13 MH 1.13 K, Sr.
MH 1.13 00 PM 00 AM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+390 to BalaJi,R.
0073 final layer back filling water line From ch Area 9 8-Dec-14 4.30:0 8-Dec-14 10:30: A 1/4/2015
WD 0+480 K, Sr.
with warning tape 0+390 to 0+480 0 PM 00 AM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+480 to BalaJi,R.
0074 final layer back filling water line From ch Area 9 8-Dec-14 4.30:0 8-Dec-14 10:30: A 1/4/2015
WD 0+550 K, Sr.
with warning tape 0+480 to 0+550 0 PM 00 AM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+550 to BalaJi,R.
0075 final layer back filling water line From ch Area 9 8-Dec-14 4.30:0 8-Dec-14 10:30: A 1/4/2015
WD 0+650 K, Sr.
with warning tape 0+550 to 0+650 0 PM 00 AM
Engineer
S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+650 to BalaJi,R.
0076 final layer back filling water line From ch Area 9 8-Dec-14 4.30:0 8-Dec-14 10:30: A 1/4/2015
WD 0+750 K, Sr.
with warning tape 0+650 to 0+750 0 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 3rd & for 100 mm dia GRE
HFC- 0+750 to BalaJi,R.
0077 final layer back filling water line From ch Area 9 8-Dec-14 4.30:0 8-Dec-14 10:30: A 1/4/2015
WD 0+830 K, Sr.
with warning tape 0+750 to 0+830 0 PM 00 AM
Engineer
Inspection for 4th S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to BalaJi,R.
1123 Area 7 8-Dec-14 2.30:0 8-Dec-14 10:30: A 1/4/2015
SEW 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
0 PM 00 AM
sewer line Engineer
Inspection of 3rd S.
HFC- layer back filling 250 from MH -1.4 to MH- MH -1.4 to BalaJi,R.
1124 Area 7 8-Dec-14 2.30:0 8-Dec-14 10:30: A 1/4/2015
SEW mm dia upvc sewer 1.3 MH-1.3 K, Sr.
0 PM 00 AM
line Engineer
Inspection for sand S.
HFC- surround for 200 mm 1+560 to BalaJi,R.
1125 from 1+560 to 1+587 Area 1 8-Dec-14 2.30:0 8-Dec-14 10:30: AN 12/11/2014
SEW dia HDPE sewer 1+587 K, Sr.
0 PM 00 AM
pressure line Engineer
S.
Inspection of laying joint measurement of for 600mm dia GRP
HFC- MH 2.4 to BalaJi,R.
0081 geotextile, gravel pipe laying and Storm water line from Area 7 8-Dec-14 4.30:0 8-Dec-14 10:30: A 12/18/2014
DR MH 2.5 K, Sr.
bedding, grannular surround MH2.4 to MH 2.5 0 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 600mm dia GRP
HFC- MH 2.6 to BalaJi,R.
0082 geotextile, gravel pipe laying and Storm water line from Area 7 8-Dec-14 4.30:0 8-Dec-14 10:30: Revised 12/10/2014
DR MH 2.5 K, Sr.
bedding, grannular surround MH-2.6 to MH- 2.5 0 PM 00 AM
Engineer
S.
Inspection for sand
HFC- from CHainage 2+050 2+050 to BalaJi,R.
0078 surround for 100 mm Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
WD - 2+160 2+160 K, Sr.
dia GRE water line 0 PM 0 PM
Engineer
S.
Inspection for sand
HFC- from CHainage 2+050 2+050 to BalaJi,R.
0079 surround for 100 mm Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
WD to 1+900 1+900 K, Sr.
dia GRE water line 0 PM 0 PM
Engineer
S.
Inspection for sand
HFC- from CHainage 1+900 1+900 to BalaJi,R.
0080 surround for 100 mm Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
WD to 1+770 1+770 K, Sr.
dia GRE water line 0 PM 0 PM
Engineer
S.
Inspection for sand
HFC- from Chainage 1+770 1+770 to BalaJi,R.
0081 surround for 100 mm Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 A 12/4/2014
WD to 1+630 1+630 K, Sr.
dia GRE water line 0 PM 0 PM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 2+450 to BalaJi,R.
0029 surround for 250 mm chanaige 2+450 to Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
FF 2+600 K, Sr.
dia HDPE 2+600 0 PM 0 PM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 2+600 to BalaJi,R.
0030 surround for 250 mm chanaige 2+600 to Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
FF 2+750 K, Sr.
dia HDPE 2+750 0 PM 0 PM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 2+850 to BalaJi,R.
0031 surround for 250 mm chainage 2+850 to Area 6 8-Dec-14 4.30:0 8-Dec-14 2:30:0 AN 12/11/2014
FF 2+750 K, Sr.
dia HDPE 2+750 0 PM 0 PM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from CHainage 2+050 2+050 to BalaJi,R.
0082 Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
WD for 100 mm dia GRE - 2+160 2+160 K, Sr.
0 AM 0 PM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from CHainage 2+050 2+050 to BalaJi,R.
0083 Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
WD for 100 mm dia GRE to 1+900 1+900 K, Sr.
0 AM 0 PM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from CHainage 1+900 1+900 to BalaJi,R.
0084 Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
WD for 100 mm dia GRE to 1+770 1+770 K, Sr.
0 AM 0 PM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 1+770 1+770 to BalaJi,R.
0085 Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
WD for 100 mm dia GRE to 1+630 1+630 K, Sr.
0 AM 0 PM
water line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection of fire fighting line from
HFC- 2+450 to BalaJi,R.
0032 1st layer back filling chanaige 2+450 to Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
FF 2+600 K, Sr.
for 250 mm dia HDPE 2+600 0 AM 0 PM
Engineer
S.
visual inspection of fire fighting line from
HFC- 2+600 to BalaJi,R.
0033 1st layer back filling chanaige 2+600 to Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
FF 2+750 K, Sr.
for 250 mm dia HDPE 2+750 0 AM 0 PM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+850 to BalaJi,R.
0034 1st layer back filling chainage 2+850 to Area 6 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/13/2014
FF 2+750 K, Sr.
for 250 mm dia HDPE 2+750 0 AM 0 PM
Engineer
Inspection of sand S.
HFC- surround for 200 mm form ch 1+540 - 1+540 - BalaJi,R.
1126 Area 1 9-Dec-14 11.30:0 8-Dec-14 2:30:0 AN 12/11/2014
SEW dia HDPE Sewer 1+560 1+560 K, Sr.
0 AM 0 PM
pressure line Engineer
Inspection of shutter
S.
and pouring of
HFC- irrigation transmission 0+835.22 BalaJi,R.
0112 concrete for concrete Area 1 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
IRR line to 0 +863 K, Sr.
surround of 150mm 0 AM 0 AM
Engineer
dia uPVC

Inspection of shutter, S.
HFC- water stopper & MH-3 BalaJi,R.
1127 for Sewerage MH-3 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/17/2015
SEW concreting for the wall (0+811.83) K, Sr.
0 AM 0 AM
of Sewerage Manhole Engineer

Inspection for 3rd S.


HFC- layer surruonding MH-23 BalaJi,R.
0827A MH-23 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 12/30/2014
SEW back filling around (1+990.00) K, Sr.
0 AM 0 AM
sewer Engineer
S.
Inspection of 3rd
HFC- MH-1.7.2 BalaJi,R.
1128 layer surruonding Sewerage MH-1.7.2 Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+162.32) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.7.3 BalaJi,R.
1129 layer surruonding Sewerage MH-1.7.3 Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 3012-2014
SEW (0+078.78) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.7 BalaJi,R.
1130 layer surruonding Sewerage MH-1.7 Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 3012-2014
SEW (0+347.29) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.8 BalaJi,R.
1131 layer surruonding Sewerage MH-1.8 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 3012-2014
SEW (0+38.65) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.9 BalaJi,R.
1132 layer surruonding Sewerage MH-1.9 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+070.00) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.10 BalaJi,R.
1133 layer surruonding Sewerage MH-1.10 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+101.62) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.11 BalaJi,R.
1134 layer surruonding Sewerage MH-1.11 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+185.70) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.12 BalaJi,R.
1135 layer surruonding Sewerage MH-1.12 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 12/30/2014
SEW (0+268.79) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.13 BalaJi,R.
1136 layer surruonding Sewerage MH-1.13 Area 8 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+356.00) K, Sr.
back filling around 0 AM 0 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 5th layer
HFC- MH-18 BalaJi,R.
1137 surruonding back Sewerage MH-18 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (1+645.43) K, Sr.
filling around 0 AM 0 AM
Engineer
S.
Inspection of 5th layer
HFC- MH-19 BalaJi,R.
1138 surruonding back Sewerage MH-19 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (1+728.89) K, Sr.
filling around 0 AM 0 AM
Engineer
S.
Inspection of 5th layer
HFC- MH-20 BalaJi,R.
1139 surruonding back Sewerage MH-20 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (1+811.63) K, Sr.
filling around 0 AM 0 AM
Engineer
S.
Inspection for 4th MH-
HFC- BalaJi,R.
1140 layer surruonding Sewerage MH-24 Area 6 24(2+052. 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW K, Sr.
back filling around 75) 0 AM 0 AM
Engineer
S.
Inspection for 4th
HFC- MH-25 BalaJi,R.
1141 layer surruonding Sewerage MH-25 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (2+107.50) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection for 4th
HFC- MH-23 BalaJi,R.
1142 layer surruonding MH-23 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (1+990.00) K, Sr.
back filling around 0 AM 0 AM
Engineer
Inspection for 3rd S.
HFC- layer surruonding BalaJi,R.
1143 MH-22 Area 6 MH-22 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW back filling around K, Sr.
0 AM 0 AM
sewer Engineer
S.
Inspection of 3rd
HFC- MH-21.1 BalaJi,R.
1144 layer surruonding Sewerage MH-21.1 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+046.93) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-21.2 BalaJi,R.
1145 layer surruonding Sewerage MH-21.2 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+117.69) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-21.3 BalaJi,R.
1146 layer surruonding Sewerage MH-21.3 Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+070.00) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.7.1 BalaJi,R.
1147 layer surruonding Sewerage MH-1.7.1 Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/4/2015
SEW (0+244.90) K, Sr.
back filling around 0 AM 0 AM
Engineer
S.
Inspection of laying joint measurement of 250mm dia upvc
HFC- MH -1.1 to BalaJi,R.
1148 geotextile, gravel pipe laying and sewer line from MH- Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 12/13/2014
SEW MH-1 K, Sr.
bedding, grannular surround for 1.1 to MH-1 0 AM 0 AM
Engineer
Inspection for
S.
excavation &
HFC- from MH 2.10 to MH MH 2.10 to BalaJi,R.
0017C formation for 500mm Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 1/4/2015
DR 2.9 MH 2.9 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
Inspection for
S.
excavation &
HFC- from MH 2.9 to MH MH 2.9 to BalaJi,R.
0018C formation for 500mm Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 1/4/2015
DR 2.8 MH 2.8 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
Inspection for
S.
excavation &
HFC- from MH 2.8 to MH MH 2.8 to BalaJi,R.
0019C formation for 500mm Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 1/4/2015
DR 2.7 MH 2.7 K, Sr.
dia GRP storm water 0 AM 0 AM
Engineer
Line
HC-1 , HC-
Inspection for 02 of (MH- S.
HFC- excavation & HC-1 , HC-02 of (MH- HC-1 , HC-02 of (MH- 21.1)& HC- BalaJi,R.
0880A Area 6 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 1/12/2015
SEW formation for house 21.1) 21.2) 1 , HC-02 K, Sr.
0 AM 0 AM
connection chamber of (MH- Engineer
21.2)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.9 -
Inspection for 6th S.
MH-1.8 ,
HFC- layer back filling for from MH: 1.9 to MH: BalaJi,R.
0914A Area 8 CH 0+070 9-Dec-14 11.30:0 9-Dec-14 8:30:0 Revised 12/17/2014
SEW 200 mm dia Sewer 1.8 K, Sr.
& CH 0 AM 0 AM
line Engineer
0+038.65
MH-1.10 -
Inspection for 6th S.
MH-1.9 ,
HFC- layer back filling for from MH: 1.10 to MH: BalaJi,R.
0913A Area 8 CH 0+ 9-Dec-14 11.30:0 9-Dec-14 8:30:0 UR
SEW 200 mm dia Sewer 1.9 K, Sr.
101.62 & 0 AM 0 AM
line Engineer
CH 0+070
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.10 to MH MH 2.10 to BalaJi,R.
0061A Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 AN 12/13/2014
DR for 500mm dia GRP 2.9 MH 2.9 K, Sr.
0 AM 0 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.9 to MH MH 2.9 to BalaJi,R.
0062A Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 12/13/2014
DR for 500mm dia GRP 2.8 MH 2.8 K, Sr.
0 AM 0 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.8 to MH MH 2.8 to BalaJi,R.
0063A Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 12/13/2014
DR for 500mm dia GRP 2.7 MH 2.7 K, Sr.
0 AM 0 AM
storm water Line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH 2.7 to MH MH 2.7 to BalaJi,R.
0064A Area 7 9-Dec-14 11.30:0 9-Dec-14 8:30:0 A 12/13/2014
DR for 500mm dia GRP 2.6 MH 2.6 K, Sr.
0 AM 0 AM
storm water Line Engineer
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement Yard BalaJi,R.
0083 for Storm water MH- 2.8,0+127. 9-Dec-14 01.30: 9-Dec-14 11:30: AN 1/5/2015
DR and concreting for Area K, Sr.
2.8 type -H 9895 00 PM 00 AM
base slab Engineer
Inspection for S.
HFC- excavation and MH: 5 to BalaJi,R.
1149 from MH: 5 to MH: 6 Area 6 9-Dec-14 01.30: 9-Dec-14 11:30: A 1/4/2015
SEW prepared formation of MH: 6 K, Sr.
00 PM 00 AM
200mm dia UPVC Engineer
sewer House
HC -01 to S.
Inspection for connection line 160
HFC- from HC -01 to MH- MH-1.7.1 BalaJi,R.
1150 excavation and mm dia Upvc of & HC -01 to end cap Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/15/2014
SEW 1.7.1 & HC -01 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
to end cap Engineer
1..7.1
sewer House
HC -01 to S.
Inspection for connection line 160
HFC- from HC -01 to MH- MH-1.7.3 BalaJi,R.
1151 excavation and mm dia Upvc of & HC -01 to end cap Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: A 12/17/2014
SEW 1.7.3 & HC -01 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
to end cap Engineer
1..7.3
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to BalaJi,R.
1152 excavation and mm dia Upvc of Area 8 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/3/2014
SEW 1.14 MH-1.14 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
1.14
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1153 excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/3/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.14) 00 PM 00 AM
Engineer
1.14
sewer House HC -01 to
S.
Inspection for connection line 160 end cap,
HFC- from HC -01 to end BalaJi,R.
1154 excavation and mm dia Upvc of & HC -02 to end cap Area 8 HC-2 to 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/3/2014
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- end cap 00 PM 00 AM
Engineer
1.14 ( MH-1.14)
S.
Inspection for HC-1,HC-
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1155 excavation & Area 8 2of Sewer 9-Dec-14 01.30: 9-Dec-14 11:30: A 12/11/2014
SEW chambers of MH-1.14 MH 1.14 K, Sr.
prepared formation MH 1.14 00 PM 00 AM
Engineer
S.
Inspection for HC-1 of
HFC- for House connection HC-1 of Sewer MH BalaJi,R.
1156 excavation & Area 7 Sewer MH 9-Dec-14 01.30: 9-Dec-14 11:30: A 12/15/2014
SEW chambers of MH-1.7.1 1.7.1 K, Sr.
prepared formation 1.7.1 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for HC-1 of
HFC- for House connection HC-1 of Sewer MH BalaJi,R.
1157 excavation & Area 7 Sewer MH 9-Dec-14 01.30: 9-Dec-14 11:30: A 12/17/2014
SEW chambers of MH-1.7.3 1.7.3 K, Sr.
prepared formation 1.7.3 00 PM 00 AM
Engineer
S.
HFC- Inspection for pouring MH-1.1 BalaJi,R.
1158 for Sewerage MH-1.1 Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: A 1/17/2015
SEW of blinding concrete (0+645.93) K, Sr.
00 PM 00 AM
Engineer
S.
HFC- Inspection for pouring MH-1.2 BalaJi,R.
1159 for Sewerage MH-1.2 Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: A 1/17/2015
SEW of blinding concrete (0+590.00) K, Sr.
00 PM 00 AM
Engineer
Inspection for
S.
waterproofing above of blinding
HFC- MH-1.1 BalaJi,R.
1160 (Polyprime SB + concrete for sewer for Sewerage MH-1.1 Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/11/2014
SEW (0+645.93) K, Sr.
Bitustic XL + manhole 00 PM 00 AM
Engineer
Bituboard)
Inspection for
S.
waterproofing above of blinding
HFC- MH-1.2 BalaJi,R.
1161 (Polyprime SB + concrete for sewer for Sewerage MH-1.2 Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/11/2014
SEW (0+590.00) K, Sr.
Bitustic XL + manhole 00 PM 00 AM
Engineer
Bituboard)
Inspection for
S.
waterproofing
HFC- for the base of MH-3 BalaJi,R.
1162 (Polyprime SB + Area 6 9-Dec-14 01.30: 9-Dec-14 11:30: AN 12/11/2014
SEW Sewerage MH-3 (0+811.83) K, Sr.
Bitustic XL + 00 PM 00 AM
Engineer
Bituboard)
S.
Inspection for 200 mm dia upvc
HFC- MH -11 to BalaJi,R.
1163 excavation & sewer line from MH Area 6 9-Dec-14 01.30: 9-Dec-14 11:30: A 1/4/2015
SEW MH-12 K, Sr.
prepared formation for -11 to MH-12 00 PM 00 AM
Engineer
S.
for 250 mm dia upvc
HFC- Visual Inspection for MH -1.2 to BalaJi,R.
1164 sewer line from MH Area 7 9-Dec-14 01.30: 9-Dec-14 11:30: A 12/11/2014
SEW 1st layer back filling MH-1.1 K, Sr.
-1.2 to MH-1.1 00 PM 00 AM
Engineer
S.
for 250 mm dia upvc
HFC- Visual Inspection for MH -1.2 to BalaJi,R.
1165 sewer line from MH Area 7 9-Dec-14 02.30: 9-Dec-14 11:30: A 12/11/2014
SEW 2nd layer back filling MH-1.1 K, Sr.
-1.2 to MH-1.1 00 PM 00 AM
Engineer
S.
for 250 mm dia upvc
HFC- Inspection for 3rd MH -1.2 to BalaJi,R.
1166 sewer line from MH Area 7 9-Dec-14 04.30: 9-Dec-14 11:30: A 1/4/2015
SEW layer back filling MH-1.1 K, Sr.
-1.2 to MH-1.1 00 PM 00 AM
Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 1+570 1+570 to BalaJi,R.
0086 Area 6 9-Dec-14 04.30: 9-Dec-14 11:30: AN 12/15/2014
WD laying for 100 mm dia to 1+460 1+460 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 1+630 1+630 to BalaJi,R.
0087 Area 6 9-Dec-14 04.30: 9-Dec-14 11:30: AN 12/15/2014
WD laying for 100 mm dia to 1+570 1+570 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection for
S.
excavation and
HFC- from Chainage 1+300 1+300 to BalaJi,R.
0088 prepared formation of Area 6 10-Dec-14 01.30: 9-Dec-14 11:30: A 1/12/2015
WD to 1+460 1+460 K, Sr.
100 mm dia GRE 00 PM 00 AM
Engineer
water line

Inspection for S.
fire fighting line from
HFC- excavation and 2+360 to 02:30: BalaJi,R.
0035 chanaige 2+360 to Area 6 10-Dec-14 04.30: 9-Dec-14 A 1/4/2015
FF prepared formation for 2+450 00 K, Sr.
2+450 00 PM
250 mm dia HDPE PM Engineer

S.
Inspection of sand fire fighting line from
HFC- 2+030 to 02:30: BalaJi,R.
0036 surround for 250 mm chanaige 2+030 to Area 6 10-Dec-14 04.30: 9-Dec-14 AN 12/11/2014
FF 1+920 00 K, Sr.
dia HDPE 1+920 00 PM
PM Engineer
S.
Inspection of sand fire fighting line from
HFC- 2+130 to 02:30: BalaJi,R.
0037 surround for 250 mm chanaige 2+130 to Area 6 10-Dec-14 04.30: 9-Dec-14 AN 12/13/2014
FF 2+030 00 K, Sr.
dia HDPE 2+030 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of sand fire fighting line from
HFC- 2+350 to 02:30: BalaJi,R.
0038 surround for 250 mm chanaige 2+350 to Area 6 10-Dec-14 04.30: 9-Dec-14 AN 12/13/2014
FF 2+130 00 K, Sr.
dia HDPE 2+130 00 PM
PM Engineer
Inspection for S.
HFC- excavation and of 200 mm dia upvc 02:30: BalaJi,R.
0113 wo-1 Area 6 1+129.91 10-Dec-14 04.30: 9-Dec-14 A 1/4/2015
IRR prepared formation for Irrigation line 00 K, Sr.
00 PM
washout chamber PM Engineer

Inspection for shutter, S.


fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- reinforcement & 02:30: BalaJi,R.
0114 reservoir and B6,C6,D6,E6,F6,G5, n pump pump 10-Dec-14 04.30: 9-Dec-14 Revised 12/16/2014
IRR concreting for column 00 K, Sr.
pumping station G6,H5,H6 (9 nos) station station 00 PM
(type C1) of PM Engineer

& irrigation reservoir


Inspection for shutter, S.
wall and pumping Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0095B station wall (wall no: n pump pump 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/11/2014
IRR concreting for fire K, Sr.
W1) &(wall no: station station :00 AM 00 AM
fighting Engineer
W3,W4)
gravel surround for
Inspection for S.
sewer house
HFC- granular bedding, joint from HC -02 to MH- HC -02 to BalaJi,R.
1167 connection line 160 Area 9 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of 2.6 MH-2.6 K, Sr.
mm dia upvc of sewer :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house
HFC- granular bedding, joint from HC -03 to MH- HC -03 to BalaJi,R.
1168 connection line 160 Area 9 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of 2.6 MH-2.6 K, Sr.
mm dia upvc of sewer :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint BalaJi,R.
1169 connection line 160 from HC -01 to HC-2 Area 9 HC-2 (MH- 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of K, Sr.
mm dia upvc of sewer 2.6) :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint from HC -01 to end BalaJi,R.
1170 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.6) :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house HC -02 to
HFC- granular bedding, joint from HC -02 to end BalaJi,R.
1171 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.6) :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house HC -03 to
HFC- granular bedding, joint from HC -03 to end BalaJi,R.
1172 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.6) :00 AM 00 AM
pipe laying & Engineer
MH-2.6
gravel surround for
Inspection for S.
sewer house
HFC- granular bedding, joint from HC -01 to MH- HC -01 to BalaJi,R.
1173 connection line 160 Area 9 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of 2.5 MH-2.5 K, Sr.
mm dia upvc of sewer :00 AM 00 AM
pipe laying & Engineer
MH-2.5
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint BalaJi,R.
1174 connection line 160 from HC -01 to HC-2 Area 9 HC-2 (MH- 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of K, Sr.
mm dia upvc of sewer 2.5) :00 AM 00 AM
pipe laying & Engineer
MH-2.5
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint from HC -01 to end BalaJi,R.
1175 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.5) :00 AM 00 AM
pipe laying & Engineer
MH-2.5
gravel surround for
Inspection for S.
sewer house HC -02 to
HFC- granular bedding, joint from HC -02 to end BalaJi,R.
1176 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.5) :00 AM 00 AM
pipe laying & Engineer
MH-2.5

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

gravel surround for


Inspection for S.
sewer house
HFC- granular bedding, joint from HC -02 to MH- HC -02 to BalaJi,R.
1177 connection line 160 Area 9 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of 2.4 MH-2.4 K, Sr.
mm dia upvc of sewer :00 AM 00 AM
pipe laying & Engineer
MH-2.4
gravel surround for
Inspection for S.
sewer house
HFC- granular bedding, joint from HC -03 to MH- HC -03 to BalaJi,R.
1178 connection line 160 Area 9 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/17/2014
SEW measurements of 2.4 MH-2.4 K, Sr.
mm dia upvc of sewer :00 AM 00 AM
pipe laying & Engineer
MH-2.4
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint BalaJi,R.
1179 connection line 160 from HC -01 to HC-2 Area 9 HC-2 (MH- 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of K, Sr.
mm dia upvc of sewer 2.4) :00 AM 00 AM
pipe laying & Engineer
MH-2.4
gravel surround for
Inspection for S.
sewer house HC -01 to
HFC- granular bedding, joint from HC -01 to end BalaJi,R.
1180 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.4) :00 AM 00 AM
pipe laying & Engineer
MH-2.4
gravel surround for
Inspection for S.
sewer house HC -02 to
HFC- granular bedding, joint from HC -02 to end BalaJi,R.
1181 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.4) :00 AM 00 AM
pipe laying & Engineer
MH-2.4
gravel surround for
Inspection for S.
sewer house HC -03 to
HFC- granular bedding, joint from HC -03 to end BalaJi,R.
1182 connection line 160 Area 9 end cap 10-Dec-14 010.30 10-Dec-14 09:30: A 12/17/2014
SEW measurements of cap K, Sr.
mm dia upvc of sewer (MH-2.4) :00 AM 00 AM
pipe laying & Engineer
MH-2.4
Inspection and joint
S.
measurement of pipe
HFC- in area- 4 from ch 0+920 to BalaJi,R.
0517B laying for 200 mm dia Area 4 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW 0+920 - 1+150 1+150 K, Sr.
HDPE Sewer force :00 AM 00 AM
Engineer
main line
Inspection for S.
HFC- excavation and irrigation transmission 0+730 to 0 BalaJi,R.
0115 Area 1 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/18/2014
IRR prepared formation for line +750 K, Sr.
:00 AM 00 AM
150mm dia uPVC Engineer
S.
Inspection and joint
HFC- irrigation transmission 0+730 to 0 BalaJi,R.
0116 measurement for Area 1 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/18/2014
IRR line +750 K, Sr.
150mm dia uPVC :00 AM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- of 250 mm dia HDPE 2+240 BalaJi,R.
0039 prepared formation for Area 6 10-Dec-14 010.30 10-Dec-14 09:30: A 1/4/2015
FF fire fighting line (W0-3) K, Sr.
washout chamber :00 AM 00 AM
Engineer
(wo-3)
Inspection for
S.
excavation and
HFC- of 250 mm dia HDPE 2+600 BalaJi,R.
0040 prepared formation for Area 6 10-Dec-14 010.30 10-Dec-14 09:30: A 1/4/2015
FF fire fighting line (Wo-04) K, Sr.
washout chamber :00 AM 00 AM
Engineer
(wo-4)
Inspection for
S.
waterproofing above of blinding
HFC- MH -12 BalaJi,R.
1183 (Polyprime SB + concrete for sewer Area 6 10-Dec-14 010.30 10-Dec-14 09:30: A 12/11/2014
SEW (1+323.64) K, Sr.
Bitustic XL + manhole MH-12 :00 AM 00 AM
Engineer
Bituboard)
Inspection for
S.
waterproofing above of blinding
HFC- MH -13 BalaJi,R.
1184 (Polyprime SB + concrete for sewer Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/11/2014
SEW (1+366.36) K, Sr.
Bitustic XL + manhole MH-13 :00 AM 00 AM
Engineer
Bituboard)
S.
HFC- Inspection for external for the base of sewer MH-14 BalaJi,R.
1185 Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/11/2014
SEW water proofing manhole MH-14 (1+425.89) K, Sr.
:00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
HFC- Inspection for external for the base of sewer MH-15 BalaJi,R.
1186 Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/11/2014
SEW water proofing manhole MH-15 (0+480.69) K, Sr.
:00 AM 00 AM
Engineer
for the wall of S.
Inspection of shutter,
HFC- Sewerage chamber HC-02 of BalaJi,R.
0702A water stopper & Area 6 10-Dec-14 010.30 10-Dec-14 09:30: A 1/21/2015
SEW HC-02 of Sewerage (MH-23) K, Sr.
concreting :00 AM 00 AM
Manhole MH-23 Engineer
for sewer line of
S.
house connection 160 HC-3 to
HFC- Inspection for BalaJi,R.
0500B mm dia upvc from Area 6 HC-4 (MH- 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW granular bedding K, Sr.
HC-3 - HC-04 of MH- 25) :00 AM 00 AM
Engineer
25
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-22 BalaJi,R.
0738B laying of (including st. specials Area 6 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW gravel surrounding sewer line to MH-22 (1+906.31) K, Sr.
geotextile,joint 1nos) :00 AM 00 AM
Engineer
measurement
for sewer line of
S.
house connection 160 HC-3 to
HFC- Inspection of granular BalaJi,R.
0508B mm dia upvc from Area 6 HC-4 (MH- 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/13/2014
SEW surround K, Sr.
HC-03 - HC-04 of MH- 25) :00 AM 00 AM
Engineer
25
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to BalaJi,R.
0792B Area 6 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW measurements of connection line 160 MH-22 MH-22 K, Sr.
:00 AM 00 AM
pipe laying & mm dia upvc Engineer
S.
Inspection of shutter,
HFC- MH-16.1 BalaJi,R.
0947A water stopper & of Sewerage MH-16.1 Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 1/15/2015
SEW (0+040.00) K, Sr.
concreting for the wall :00 AM 00 AM
Engineer

Inspection of shutter, S.
HFC- reinforcement and Yard BalaJi,R.
0946A for Sewer MH-16.1 Yard Area 10-Dec-14 010.30 10-Dec-14 09:30: A 1/15/2015
SEW concreting for base Area K, Sr.
:00 AM 00 AM
slab with benching Engineer

for sewer line of S.


Inspection and joint
HFC- house connection 160 MH: 25 - BalaJi,R.
0502B measurement of pipe Area 6 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW mm dia upvc from HC-02 K, Sr.
laying :00 AM 00 AM
MH: 25 - HC-02 Engineer
for sewer line of S.
Inspection and joint
HFC- house connection 160 MH: 24 - BalaJi,R.
0503B measurement of pipe Area 6 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/10/2014
SEW mm dia upvc from HC-03 K, Sr.
laying :00 AM 00 AM
MH: 24 - HC-03 Engineer

Inspection for precast S.


MH-24
HFC- sewer manhole (base) BalaJi,R.
0379B MH-24 Area 6 ( 2+052.75 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/10/2014
SEW placing including K, Sr.
) :00 AM 00 AM
alignment and level Engineer

Inspection for S.
HFC- excavation and sewerage line from MH-16 to BalaJi,R.
0769B Area 6 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
SEW prepared formation of MH-16 to MH-15 MH-15 K, Sr.
:00 AM 00 AM
200mm dia UPVC Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+560 2+560 to BalaJi,R.
0051A Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 12/18/2014
WD laying for 100 mm dia to 2+740 2+740 K, Sr.
:00 AM 00 AM
GRE water line Engineer
Abutment
1 to 2 S.
Inspection and joint duct 4WxD54 from
HFC- (10+323.2 BalaJi,R.
008C measurement for abutment 1 to Area 4 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/13/2014
ETC to K, Sr.
laying of Etisalat abutment 2 :00 AM 00 AM
10+825.00 Engineer
)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0021A with warning tape for Area 1 Abutmant- 10-Dec-14 010.30 10-Dec-14 09:30: Revised 12/16/2014
ETC 1 (ch 10+250 to K, Sr.
4WXD54 Etisalat Duct 1 (ch :00 AM 00 AM
10+310) Engineer
line 10+250 to
10+310)

for the wall of


S.
Inspection of shutter, Seweragehouse
HFC- HC-03 of BalaJi,R.
0948A water stopper & connection chamber Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 1/10/2015
SEW (MH-24) K, Sr.
concreting HC-03 of Sewerage :00 AM 00 AM
Engineer
Manhole MH-24
Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard BalaJi,R.
0084 2.7,0+174. 10-Dec-14 010.30 10-Dec-14 09:30: AN 1/4/2015
DR and concreting for MH 2.7 type -H Area K, Sr.
7024 :00 AM 00 AM
base slab Engineer
S.
Inspection of shutter,
HFC- for the wall of sewer MH-1.6 BalaJi,R.
1187 water stopper & Area 7 10-Dec-14 010.30 10-Dec-14 09:30: AN 1/4/2015
SEW manhole MH-1.6 (0+374.25) K, Sr.
concreting :00 AM 00 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 3+280 to BalaJi,R.
0041 chainage 3+280 to Area 6 10-Dec-14 010.30 10-Dec-14 09:30: AN 1/15/2015
FF prepared formation for 3+160 K, Sr.
3+160 :00 AM 00 AM
250 mm dia HDPE Engineer

Inspection for gravel surround for S.


HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1188 Area 9 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 2.1 MH-2.1 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house BalaJi,R.
1189 from HC -02 to HC-1 Area 9 HC-1 (MH- 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 K, Sr.
2.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1190 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
(MH-2.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1191 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap (MH-2.1) K, Sr.
(MH-2.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1192 Area 9 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 2.2 MH-2.2 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -03 to MH- HC -03 to BalaJi,R.
1193 Area 9 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 2.2 MH-2.2 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house BalaJi,R.
1194 from HC -01 to HC-02 Area 9 HC-02 10-Dec-14 011.30: 10-Dec-14 09:30: A 12/17/2014
SEW measurements of connection line 160 K, Sr.
(MH-2.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1195 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
(MH-2.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1196 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
(MH-2.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end BalaJi,R.
1197 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
(MH-2.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to BalaJi,R.
1198 Area 9 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 2.3 MH-2.3 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for gravel surround for S.


HC -01 to
HFC- granular bedding, joint sewer house BalaJi,R.
1199 from HC -01 to HC-02 Area 9 HC-02 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 K, Sr.
( MH-2.3) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1200 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
( MH-2.3) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1201 Area 9 end cap 10-Dec-14 011.30: 10-Dec-14 09:30: AN 12/17/2014
SEW measurements of connection line 160 cap K, Sr.
( MH-2.3) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1202 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.1) 00 K, Sr.
sewerage of Sewer MH 2.1 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1203 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.1) 00 K, Sr.
sewerage of Sewer MH 2.1 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1204 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.2) 00 K, Sr.
sewerage of Sewer MH 2.2 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1205 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.2) 00 K, Sr.
sewerage of Sewer MH 2.2 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-03 of 01:30: BalaJi,R.
1206 and placing precasted chamber base HC-03 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.2) 00 K, Sr.
sewerage of Sewer MH 2.2 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1207 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.3) 00 K, Sr.
sewerage of Sewer MH 2.3 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1208 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.3) 00 K, Sr.
sewerage of Sewer MH 2.3 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1209 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.4) 00 K, Sr.
sewerage of Sewer MH 2.4 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1210 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2015
SEW ( MH 2.4) 00 K, Sr.
sewerage of Sewer MH 2.4 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-03 of 01:30: BalaJi,R.
1211 and placing precasted chamber base HC-03 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/17/2014
SEW ( MH 2.4) 00 K, Sr.
sewerage of Sewer MH 2.4 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1212 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.5) 00 K, Sr.
sewerage of Sewer MH 2.5 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1213 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.5) 00 K, Sr.
sewerage of Sewer MH 2.5 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-01 of 01:30: BalaJi,R.
1214 and placing precasted chamber base HC-01 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.6) 00 K, Sr.
sewerage of Sewer MH 2.6 00 PM
PM Engineer
S.
Inspection of fixing house connection
HFC- HC-02 of 01:30: BalaJi,R.
1215 and placing precasted chamber base HC-02 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.6) 00 K, Sr.
sewerage of Sewer MH 2.6 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of fixing house connection
HFC- HC-03 of 01:30: BalaJi,R.
1216 and placing precasted chamber base HC-03 Area 9 10-Dec-14 04.30: 10-Dec-14 A 12/15/2014
SEW ( MH 2.6) 00 K, Sr.
sewerage of Sewer MH 2.6 00 PM
PM Engineer
Inspection of shutter, S.
gate valve chamber
HFC- reinforcement & Yard 01:30: BalaJi,R.
0042 for 250 mm dia HDPE Gate valve no IV-01 IV-01 10-Dec-14 04.30: 10-Dec-14 AN 1/5/2015
FF concreting of base Area 00 K, Sr.
fire fighting line 00 PM
for gate valve PM Engineer
Inspection of shutter, S.
gate valve chamber
HFC- reinforcement & Yard 01:30: BalaJi,R.
0043 for 250 mm dia HDPE Gate valve no IV-02 IV-02 10-Dec-14 04.30: 10-Dec-14 AN 1/5/2015
FF concreting of base for Area 00 K, Sr.
fire fighting line 00 PM
gate valve PM Engineer
S.
Inspection of fixing
HFC- base for sewer MH-1.3 01:30: BalaJi,R.
1217 and placing precasted Area 7 10-Dec-14 04.30: 10-Dec-14 A 12/13/2014
SEW manhole MH-1.3 (0+534.69) 00 K, Sr.
sewerage 00 PM
PM Engineer
S.
Inspection of fixing
HFC- base for sewer MH-1.2 01:30: BalaJi,R.
1218 and placing precasted Area 7 10-Dec-14 04.30: 10-Dec-14 A 12/13/2014
SEW manhole MH-1.2 (0+590.00) 00 K, Sr.
sewerage 00 PM
PM Engineer
sewera S.
Inspection of 4th layer sewerage
HFC- sewerage pump ge 01:30: BalaJi,R.
1219 surruonding back pump 10-Dec-14 04.30: 10-Dec-14 A 1/4/2015
SEW station pump 00 K, Sr.
filling around station 00 PM
station PM Engineer
S.
Inspection for 200 mm dia upvc
HFC- MH -11 to 01:30: BalaJi,R.
1220 excavation & sewer line from MH Area 6 10-Dec-14 04.30: 10-Dec-14 A 1/4/2015
SEW MH-10 00 K, Sr.
prepared formation for -11 to MH-10 00 PM
PM Engineer
S.
Inspection for
HFC- MH -11 01:30: BalaJi,R.
1221 excavation & sewer MH -11 Area 6 10-Dec-14 04.30: 10-Dec-14 A 1/4/2015
SEW (1.266.48) 00 K, Sr.
prepared formation for 00 PM
PM Engineer
S.
Inspection for 5th MH-
HFC- BalaJi,R.
1222 layer surruonding Sewerage MH-24 Area 6 24(2+052. 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW K, Sr.
back filling around 75) 00 AM 00 AM
Engineer
S.
Inspection for 5th
HFC- MH-23 BalaJi,R.
1223 layer surruonding MH-23 Area 6 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW (1+990.00) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- BalaJi,R.
1224 layer surruonding MH-22 Area 6 MH-22 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-21.1 BalaJi,R.
1225 layer surruonding Sewerage MH-21.1 Area 6 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW (0+046.93) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-21.2 BalaJi,R.
1226 layer surruonding Sewerage MH-21.2 Area 6 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW (0+117.69) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-21.3 BalaJi,R.
1227 layer surruonding Sewerage MH-21.3 Area 6 11-Dec-14 09.30: 11-Dec-14 08:30: A 1/4/2015
SEW (0+070.00) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection for fixing of
HFC- BalaJi,R.
1228 cover & frame for G-5 &G-7 Area 1 G-5 &G-7 11-Dec-14 09.30: 11-Dec-14 08:30: A 12/18/2014
SEW K, Sr.
double gully 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 250 mm dia upvc
HFC- MH-1.5 to BalaJi,R.
0811B geotextile, gravel pipe laying and sewerage line from Area 7 11-Dec-14 09.30: 11-Dec-14 08:30: C
SEW MH-1.6 K, Sr.
bedding, grannular surround MH-1.5 to MH-1.6 00 AM 00 AM
Engineer
for the wall of
S.
Inspection of shutter, Sewerage house
HFC- HC-03 of BalaJi,R.
0776A water stopper & connection chamber Area 6 11-Dec-14 09.30: 11-Dec-14 08:30: AN 1/10/2015
SEW (MH-23) K, Sr.
concreting HC-03 of Sewerage 00 AM 00 AM
Engineer
Manhole MH-23

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of laying joint measurement of for 200 mm dia upvc
HFC- MH -11 to BalaJi,R.
1229 geotextile, gravel pipe laying and sewer line from MH Area 6 11-Dec-14 01.30: 11-Dec-14 10:30: AN 12/15/2014
SEW MH-12 K, Sr.
bedding, grannular surround -11 to MH-12 00 PM 00 AM
Engineer
Inspection for S.
gate valve chamber
HFC- excavation and BalaJi,R.
0044 for 250 mm dia HDPE Gate valve no IV-25 Area 6 IV-25 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
FF prepared formation K, Sr.
fire fighting line 00 PM 00 AM
for gate valve Engineer
Inspection for S.
gate valve chamber
HFC- excavation and BalaJi,R.
0045 for 250 mm dia HDPE Gate valve no IV-26 Area 6 IV-26 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
FF prepared formation K, Sr.
fire fighting line 00 PM 00 AM
for gate valve Engineer
Inspection for S.
gate valve chamber
HFC- excavation and BalaJi,R.
0046 for 250 mm dia HDPE Gate valve no IV-27 Area 6 IV-27 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
FF prepared formation K, Sr.
fire fighting line 00 PM 00 AM
for gate valve Engineer
Inspection for S.
gate valve chamber
HFC- excavation and BalaJi,R.
0047 for 250 mm dia HDPE Gate valve no IV-28 Area 6 IV-28 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
FF prepared formation K, Sr.
fire fighting line 00 PM 00 AM
for gate valve Engineer
S.
Inspection and joint fire fighting line from
HFC- 2+360 to BalaJi,R.
0048 measurement for 250 chanaige 2+360 to Area 6 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
FF 2+450 K, Sr.
mm dia HDPE 2+450 00 PM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- from Chainage 2+160 2+160 to BalaJi,R.
0089 prepared formation of Area 6 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/12/2015
WD to 2+270 2+270 K, Sr.
100 mm dia GRE 00 PM 00 AM
Engineer
water line
S.
Inspection of shutter,
HFC- for the wall of sewer MH -1.4 BalaJi,R.
1230 water stopper & Area 7 11-Dec-14 01.30: 11-Dec-14 10:30: A 1/4/2015
SEW manhole MH-1.4 (0+480) K, Sr.
concreting 00 PM 00 AM
Engineer
S.
Inspection for external & irrigation reservoir Irrigatio Irrigation
HFC- BalaJi,R.
0117 waterproofing for fire and pumping station n pump pump 11-Dec-14 010.30 11-Dec-14 09:30: AN 12/16/2014
IRR K, Sr.
fighting wall (wall no: W3,W4) station station :00 AM 00 AM
Engineer
S.
Visual Inspection for 250 mm dia upvc
HFC- MH -1.3 to BalaJi,R.
1231 1st layer back filling sewer line from MH Area 7 11-Dec-14 010.30 11-Dec-14 09:30: AN 12/18/2014
SEW MH-1.2 K, Sr.
for -1.3 to MH-1.2 :00 AM 00 AM
Engineer
S.
Visual Inspection for 250 mm dia upvc
HFC- MH -1.3 to BalaJi,R.
1232 2ndlayer back filling sewer line from MH Area 7 11-Dec-14 010.30 11-Dec-14 09:30: AN 12/18/2014
SEW MH-1.2 K, Sr.
for -1.3 to MH-1.2 :00 AM 00 AM
Engineer
S.
250 mm dia upvc
HFC- Inspection for 3rd MH -1.3 to BalaJi,R.
1233 sewer line from MH Area 7 11-Dec-14 010.30 11-Dec-14 09:30: A 1/12/2015
SEW layer back filling for MH-1.2 K, Sr.
-1.3 to MH-1.2 :00 AM 00 AM
Engineer
S.
250 mm dia upvc
HFC- Inspection for 4th MH -1.3 to BalaJi,R.
1234 sewer line from MH Area 7 11-Dec-14 02.30: 11-Dec-14 11:30: A 1/12/2015
SEW layer back filling for MH-1.2 K, Sr.
-1.3 to MH-1.2 00 PM 00 AM
Engineer
Inspection of 4th S.
HFC- layer back filling 250 from MH -1.4 to MH- MH -1.4 to BalaJi,R.
1235 Area 7 11-Dec-14 02.30: 11-Dec-14 11:30: A 1/4/2015
SEW mm dia upvc sewer 1.3 MH-1.3 K, Sr.
00 PM 00 AM
line Engineer
Inspection for 4th S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to BalaJi,R.
1236 Area 7 11-Dec-14 02.30: 11-Dec-14 11:30: A 1/4/2015
SEW 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for 5th S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to BalaJi,R.
1237 Area 7 11-Dec-14 02.30: 11-Dec-14 11:30: A 1/4/2015
SEW 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
00 PM 00 AM
sewer line Engineer
sewera S.
Inspection of 5th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1238 surruonding back pump 13-Dec-14 02.30: 13-Dec-14 11:30: A 1/4/2015
SEW station pump K, Sr.
filling around station 00 PM 00 AM
station Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewera S.
Inspection of 6th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1239 surruonding back pump 13-Dec-14 04.30: 13-Dec-14 11:30: A 1/21/2015
SEW station pump K, Sr.
filling around station 00 PM 00 AM
station Engineer
S.
Inspection of laying joint measurement of for 600mm dia GRP
HFC- MH 2.6 to BalaJi,R.
0082A geotextile, gravel pipe laying and Storm water line from Area 7 13-Dec-14 04.30: 13-Dec-14 08:30: AN 1/4/2015
DR MH 2.5 K, Sr.
bedding, grannular surround MH-2.6 to MH- 2.5 00 PM 00 AM
Engineer
S.
HFC- Inspection for pouring for sewer manhole MH-1.3 BalaJi,R.
01069A Area 7 13-Dec-14 04.30: 13-Dec-14 08:30: AN 12/30/2014
SEW of blinding concrete MH-1.3 (0+534.69) K, Sr.
00 PM 00 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-1.3 BalaJi,R.
1051A concrete for sewer Area 7 13-Dec-14 04.30: 13-Dec-14 08:30: AN 1/4/2015
SEW proofing (0+534.69) K, Sr.
manhole MH-1.3 00 PM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer surrounding MH-21 BalaJi,R.
1240 Manhole MH-21 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 12/24/2014
SEW back filling around (1+846.86) K, Sr.
00 PM 00 AM
sewer Manhole Engineer

Visual Inspection for S.


HFC- 2nd layer surrounding MH-21 BalaJi,R.
1241 Manhole MH-21 Area 6 13-Dec-14 02.30: 13-Dec-14 08:30: AN 12/24/2014
SEW back filling around (1+846.86) K, Sr.
00 PM 00 AM
sewer Manhole Engineer

Inspection for 3rd S.


HFC- layer surrounding MH-21 BalaJi,R.
1242 Manhole MH-21 Area 6 13-Dec-14 03.30: 13-Dec-14 08:30: A 1/17/2015
SEW back filling around (1+846.86) K, Sr.
00 PM 00 AM
sewer Manhole Engineer
Inspection for 4th S.
HFC- layer surrounding MH-21 BalaJi,R.
1243 Manhole MH-21 Area 6 13-Dec-14 04.30: 13-Dec-14 08:30: A 1/4/2015
SEW back filling around (1+846.86) K, Sr.
00 PM 00 AM
sewer Manhole Engineer
S.
Inspection of 6th layer
HFC- MH-18 BalaJi,R.
1244 surruonding back Sewerage MH-18 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW (1+645.43) K, Sr.
filling around 00 PM 00 AM
Engineer
S.
Inspection of 6th layer
HFC- MH-19 BalaJi,R.
1245 surruonding back Sewerage MH-19 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW (1+728.89) K, Sr.
filling around 00 PM 00 AM
Engineer
S.
Inspection of 6th layer
HFC- MH-20 BalaJi,R.
1246 surruonding back Sewerage MH-20 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW (1+811.63) K, Sr.
filling around 00 PM 00 AM
Engineer
MH-18 to
Inspection of 7th S.
MH-17
HFC- layer backfilling for BalaJi,R.
1247 from MH-18 to MH-17 Area 6 (1+645.43 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW 200mm dia uPVC K, Sr.
to 00 PM 00 AM
sewer line Engineer
1+562.05 )
MH 19 to
Inspection for 8th S.
MH 18
HFC- layer backfilling for From MH-19 to MH- BalaJi,R.
1248 Area 6 (1+728.89 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW sewer line 200mm dia 18 K, Sr.
to 00 PM 00 AM
uPVC Engineer
1+645.43 )
MH 20 to
Inspection for 8th S.
MH 19
HFC- layer backfilling for From MH-20 to MH- BalaJi,R.
1249 Area 6 ( 1+811.63 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW sewer line 200mm dia 19 K, Sr.
TO 00 PM 00 AM
uPVC Engineer
1+728.89 )

Inspection for S.
fire fighting line from
HFC- excavation and 3+280 to BalaJi,R.
0049 chainage 3+280 to Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/12/2015
FF prepared formation for 3+500 K, Sr.
3+500 00 PM 00 AM
250 mm dia HDPE Engineer

S.
Inspection of sand fire fighting line from
HFC- 2+360 to BalaJi,R.
0050 surround for 250 mm chanaige 2+360 to Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: AN 12/21/2014
FF 2+450 K, Sr.
dia HDPE 2+450 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection of fire fighting line from
HFC- 2+360 to BalaJi,R.
0051 1st layer back filling chanaige 2+360 to Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: Revised 12/17/2014
FF 2+450 K, Sr.
for 250 mm dia HDPE 2+450 00 PM 00 AM
Engineer
S.
Inspection of blinding
HFC- of 250 mm dia HDPE 2+240 BalaJi,R.
0052 concrete for washout Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: AN 1/5/2015
FF fire fighting line (W0-3) K, Sr.
chamber (wo-3) 00 PM 00 AM
Engineer
S.
Inspection of blinding
HFC- of 250 mm dia HDPE 2+600 BalaJi,R.
0053 concrete for washout Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: AN 1/5/2015
FF fire fighting line (Wo-04) K, Sr.
chamber (wo-4) 00 PM 00 AM
Engineer
S.
Inspection for
HFC- MH-5 BalaJi,R.
1250 excavation and for Sewerage MH-5 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: AN 12/17/2014
SEW (0+911.85) K, Sr.
prepared formation 00 PM 00 AM
Engineer
S.
HFC- Inspection for pouring MH-5 BalaJi,R.
1251 for Sewerage MH-5 Area 6 13-Dec-14 01.30: 13-Dec-14 08:30: A 1/4/2015
SEW of blinding concrete (0+911.85) K, Sr.
00 PM 00 AM
Engineer
S.
HFC- Inspection for pouring MH-4 BalaJi,R.
1252 for Sewerage MH-4 Area 6 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/4/2015
SEW of blinding concrete (0+861.72) K, Sr.
00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-15 BalaJi,R.
1253 laying of (including st. specials Area 6 13-Dec-14 02.30: 13-Dec-14 08:30: AN 12/13/2014
SEW gravel surrounding sewer line to MH-15 (0+480.69) K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-14 BalaJi,R.
1254 laying of (including st. specials Area 6 13-Dec-14 02.30: 13-Dec-14 08:30: AN 12/18/2014
SEW gravel surrounding sewer line to MH-14 (1+425.89) K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
Inspection for 3rd S.
HFC- layer back filling for from MH 2.10 to MH MH 2.10 to BalaJi,R.
0085 Area 7 13-Dec-14 02.30: 13-Dec-14 08:30: A 1/4/2015
DR 500mm dia GRP 2.9 MH 2.9 K, Sr.
00 PM 00 AM
storm water Line Engineer
Inspection for 3rd S.
HFC- layer back filling for from MH 2.9 to MH MH 2.9 to BalaJi,R.
0086 Area 7 13-Dec-14 02.30: 13-Dec-14 08:30: A 1/4/2015
DR 500mm dia GRP 2.8 MH 2.8 K, Sr.
00 PM 00 AM
storm water Line Engineer
Inspection for 3rd S.
HFC- layer back filling for from MH 2.8 to MH MH 2.8 to BalaJi,R.
0087 Area 7 13-Dec-14 02.30: 13-Dec-14 08:30: A 1/4/2015
DR 500mm dia GRP 2.7 MH 2.7 K, Sr.
00 PM 00 AM
storm water Line Engineer
Inspection for 3rd S.
HFC- layer back filling for from MH 2.7 to MH MH 2.7 to BalaJi,R.
0088 Area 7 13-Dec-14 02.30: 13-Dec-14 08:30: A 1/4/2015
DR 500mm dia GRP 2.6 MH 2.6 K, Sr.
00 PM 00 AM
storm water Line Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1255 chamber of MH-1.12 HC-1, (MH 1.12) Area 8 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/5/2015
SEW base of Sewer House 1.12) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1256 chamber of MH-1.12 HC-2, (MH 1.12) Area 8 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/5/2015
SEW base of Sewer House 1.12) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1257 chamber of MH-1.13 HC-1, (MH 1.13) Area 8 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/5/2015
SEW base of Sewer House 1.13) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1258 chamber of MH-1.13 HC-2, (MH 1.13) Area 8 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/5/2015
SEW base of Sewer House 1.13) K, Sr.
00 PM 00 AM
Connections Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement BalaJi,R.
0089 for Storm water MH- Arae 7 2.9,0+81.7 13-Dec-14 02.30: 13-Dec-14 08:30: AN 1/5/2015
DR and concreting for K, Sr.
2.9 type -H 331 00 PM 00 AM
base slab Engineer

Inspection for shutter, S.


fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0114A reservoir and B6,C6,D6,E6,F6,G5, n pump pump 11-Dec-14 010.30 11-Dec-14 09:30: A 1/21/2015
IRR concreting for column K, Sr.
pumping station G6,H5,H6 (9 nos) station station :00 AM 00 AM
(type C1) of Engineer

Inspection for
S.
excavation &
HFC- from MH 2.1 to MH MH 2.1 to 01.30: BalaJi,R.
0090 formation for 700mm Area 8 13-Dec-14 04.30: 13-Dec-14 A 1/4/2015
DR 2.2 MH 2.2 00 K, Sr.
dia GRP storm water 00 PM
PM Engineer
Line
Inspection for
S.
excavation &
HFC- from MH 2.2 to MH MH 2.2 to 01.30: BalaJi,R.
0091 formation for 700mm Area 8 13-Dec-14 04.30: 13-Dec-14 A 1/4/2015
DR 2.3 MH 2.3 00 K, Sr.
dia GRP storm water 00 PM
PM Engineer
Line
Inspection for S.
HFC- shuttering & Yard 01.30: BalaJi,R.
0092 at precast yard area Yard area 13-Dec-14 04.30: 13-Dec-14 AN 1/5/2015
DR concreting for Gully- Area 00 K, Sr.
00 PM
04 nos PM Engineer
MH-
Inspection for shutter, 2.4,0+342. S.
for storm water MH & (01 nos type- H for
HFC- reinforcement & Yard 1374 & 01.30: BalaJi,R.
0093 (01 nos type- J for MH-1.2) at precast 13-Dec-14 04.30: 13-Dec-14 AN 1/5/2015
DR concreting for cover Area MH- 00 K, Sr.
MH-2.4) yard area 00 PM
slab 1.2,0+756. PM Engineer
2347
Inspection for placing S.
HFC- & fixing precast MH-1.1 BalaJi,R.
1259 for Sewerage MH-1.1 Area 7 14-Dec-14 11.30:0 14-Dec-14 08.30: A 12/15/2014
SEW sewer manhole (base) (0+645.93) K, Sr.
0 AM 00 AM
Engineer
MH -9 ,CH
S.
Inspection for 200 mm dia upvc 1+150.82
HFC- Area BalaJi,R.
0543A excavation and sewer line from MH to MH-10, 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW 6(IR-1) K, Sr.
formation for -9 to MH-10 CH 0 AM 00 AM
Engineer
1+215.06
S.
for sewer house HC-3 to
HFC- Inspection for from HC-3 to HC-4 (The work has been BalaJi,R.
0500C connection line 160 Area 6 HC-4 (MH- 14-Dec-14 11.30:0 14-Dec-14 08.30: A 12/28/2014
SEW granular bedding (MH-25) done) K, Sr.
mm dia upvc 25) 0 AM 00 AM
Engineer
Please check &
gravel surround for S.
approve for granular HC-3 to
HFC- sewer house from HC-3 to HC-4 (The work has been BalaJi,R.
0500C bedding, joint Area 6 HC-4 (MH- 22-Dec-14 011.30: 22-Dec-14 08.30: RR 12/28/2014
SEW connection line 160 (MH-25) done) K, Sr.
measurements of 25) 00 AM 00 AM
mm dia upvc Engineer
pipe laying &
for sewer line of S.
Inspection and joint
HFC- house connection 160 MH: 25 - BalaJi,R.
0502C measurement of pipe Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/28/2014
SEW mm dia upvc from HC-02 K, Sr.
laying 0 AM 00 AM
MH: 25 - HC-02 Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-22 BalaJi,R.
0738C laying of (including st. specials Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/28/2014
SEW gravel surrounding sewer line to MH-22 (1+906.31) K, Sr.
geotextile,joint 1nos) 0 AM 00 AM
Engineer
measurement
Inspection for S.
HFC- excavation and sewerage line from MH-16 to BalaJi,R.
0769C Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/24/2014
SEW prepared formation of MH-16 to MH-15 MH-15 K, Sr.
0 AM 00 AM
200mm dia UPVC Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to BalaJi,R.
0792C Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/28/2014
SEW measurements of connection line 160 MH-22 MH-22 K, Sr.
0 AM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.2
to MH- S.
Inspection for mirror
HFC- from MH-1.7.2 to MH- 1.7.1 BalaJi,R.
1260 test for 250 mm dia Area 7 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.7.1 ( 0+162.32 K, Sr.
upvc Sewer line 0 AM 00 AM
to Engineer
0+244.9)

MH-1.7.3
to MH- S.
Inspection for mirror
HFC- from MH-1.7.3 to MH- Area 7 1.7.2 BalaJi,R.
1261 test for 250 mm dia 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.7.2 (IR-1) (0+078.78 K, Sr.
upvc Sewer line 0 AM 00 AM
to Engineer
0+162.32)

MH-1.7.3
to MH- S.
Inspection for mirror
HFC- from MH-1.7.3 to MH- Area 7 1.7.4 BalaJi,R.
1262 test for 250 mm dia 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.7.4 (IR-1) ( 0+078.78 K, Sr.
upvc Sewer line 0 AM 00 AM
TO Engineer
0+004.60 )

MH-1.7.4
to MH- S.
Inspection for mirror
HFC- from MH-1.7.4 to MH- Area 5 1.7.5 BalaJi,R.
1263 test for 200 mm dia 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.7.5 (IR-1) ( 0+004.60 K, Sr.
upvc Sewer line 0 AM 00 AM
to Engineer
0+107.65)

MH-1.7.5
to MH- S.
Inspection for mirror
HFC- from MH-1.7.5 to MH- Area 5 1.7.6 BalaJi,R.
1264 test for 200 mm dia 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.7.6 (IR-1) ( 0+107.65 K, Sr.
upvc Sewer line 0 AM 00 AM
to Engineer
0+057.37)

MH-1.11 to
S.
Inspection for mirror MH-1.12
HFC- from MH-1.11 to MH- BalaJi,R.
1265 test for 200 mm dia Area 8 (0+185.7 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.12 K, Sr.
upvc Sewer line to 0 AM 00 AM
Engineer
0+101.62)

MH-1.11 to
S.
Inspection for mirror MH-1.12
HFC- from MH-1.11 to MH- BalaJi,R.
1266 test for 200 mm dia Area 8 (0+185.7 14-Dec-14 11.30:0 14-Dec-14 08.30: C 12/18/2014
SEW 1.10 K, Sr.
upvc Sewer line to 0 AM 00 AM
Engineer
0+101.62)

MH-1.12 to
S.
Inspection for mirror MH 1.13
HFC- from MH-1.12 to MH BalaJi,R.
1267 test for 200 mm dia Area 8 (0+268.79 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.13 K, Sr.
upvc Sewer line to 0 AM 00 AM
Engineer
0+356.0)

MH-1.13 to
S.
Inspection for mirror MH-1.14
HFC- from MH-1.13 to MH- BalaJi,R.
1268 test for 200 mm dia Area 8 (0+356.00 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 1.14 K, Sr.
upvc Sewer line to 0 AM 00 AM
Engineer
0+439.70)

S.
Inspection for mirror
HFC- from MH-21.2 to MH- MH-21.2 to BalaJi,R.
1269 test for 200 mm dia Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 21.3 MH-21.3 K, Sr.
upvc Sewer line 0 AM 00 AM
Engineer
S.
Inspection for mirror As per
HFC- from MH-21.3 to MH- from MH-21.3 to MH- BalaJi,R.
1270 test for 200 mm dia Area 6 attached 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW 21.1 22 K, Sr.
upvc Sewer line Sketch 0 AM 00 AM
Engineer
S.
Inspection for mirror As per
HFC- From MH-8.3 to MH- From MH-8.2 to MH- From MH-8.2 to MH- Area 6 ( BalaJi,R.
1271 test for 200 mm dia attached 15-Dec-14 11.30:0 15-Dec-14 08.30: Revised 12/18/2014
SEW 8.2 8.1 9 IR-1 ) K, Sr.
upvc Sewer line Sketch 0 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-21 to
S.
Inspection for mirror MH-20
HFC- Area 6 BalaJi,R.
1272 test for 200 mm dia from MH-21 to MH-20 (1+846.86 14-Dec-14 11.30:0 14-Dec-14 08.30: C 12/18/2014
SEW (IR-1) K, Sr.
upvc Sewer line to 0 AM 00 AM
Engineer
1+811.63 )
Inspection for S.
HFC- mandrel test for 200 MH-24 to BalaJi,R.
1273 from MH-24 to MH-23 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW mm dia upvc Sewer MH-23 K, Sr.
0 AM 00 AM
line Engineer
Inspection for S.
HFC- mandrel test for 200 MH-23 to BalaJi,R.
1274 from MH-23 to MH-22 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW mm dia upvc Sewer MH-22 K, Sr.
0 AM 00 AM
line Engineer
Inspection for S.
HFC- mandrel test for 200 MH-21 to BalaJi,R.
1275 from MH-21 to MH-22 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW mm dia upvc Sewer MH-22 K, Sr.
0 AM 00 AM
line Engineer
Inspection for S.
HFC- mandrel test for 200 MH-25 to BalaJi,R.
1276 from MH-25 to MH-24 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/18/2014
SEW mm dia upvc Sewer MH-24 K, Sr.
0 AM 00 AM
line Engineer
S.
HFC- Inspection for pouring MH-16 BalaJi,R.
1277 for Sewerage MH-16 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 1/5/2015
SEW of blinding concrete (1+518.64) K, Sr.
0 AM 00 AM
Engineer
S.
HFC- Inspection for pouring MH -11 BalaJi,R.
1278 for sewer MH -11 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 1/5/2015
SEW of blinding concrete (1.266.48) K, Sr.
0 AM 00 AM
Engineer
Inspection and S.
HFC- prepared formation of 250 mm dia HDPE BalaJi,R.
0054 Area 6 AV-2 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/12/2015
FF for air valve chamber fire fighting line K, Sr.
0 AM 00 AM
(AV-2) Engineer
Inspection of 1st layer S.
HFC- back filling for 200 form ch 1+560 - 1+560 - BalaJi,R.
1279 Area 1 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW mm dia HDPE Sewer 1+587 1+587 K, Sr.
0 AM 00 AM
pressure line Engineer
Inspection for S.
chamber for 250 mm
HFC- excavation and BalaJi,R.
0055 dia HDPE fire fighting Gate valve no IV-21 Area 6 IV-21 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/12/2015
FF prepared formation K, Sr.
line 0 AM 00 AM
for gate valve Engineer
S.
Inspection for placing
HFC- MH -13 BalaJi,R.
1280 and fixing for sewer for MH-13 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 12/17/2014
SEW (1+366.36) K, Sr.
MH base 0 AM 00 AM
Engineer
S.
Inspection for placing
HFC- MH -12 BalaJi,R.
1281 and fixing for sewer for MH-12 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 12/17/2014
SEW (1+323.64) K, Sr.
MH base 0 AM 00 AM
Engineer
sewera S.
Inspection of 7th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1282 surruonding back pump 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 12/17/2014
SEW station pump K, Sr.
filling around station 0 AM 00 AM
station Engineer
sewera S.
Inspection of 8th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1283 surruonding back pump 14-Dec-14 11.30:0 14-Dec-14 08.30: Revised 1/4/2015
SEW station pump K, Sr.
filling around station 0 AM 00 AM
station Engineer
Inspection for 5th S.
HFC- layer surrounding MH-21 BalaJi,R.
1284 Manhole MH-21 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW back filling around (1+846.86) K, Sr.
0 AM 00 AM
sewer Manhole Engineer
S.
Inspection for 5th
HFC- MH-23 BalaJi,R.
1285 layer surruonding MH-23 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW (1+990.00) K, Sr.
back filling around 0 AM 00 AM
Engineer
S.
Inspection of 5th
HFC- BalaJi,R.
1286 layer surruonding MH-22 Area 6 MH-22 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW K, Sr.
back filling around 0 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 5th
HFC- MH-21.1 BalaJi,R.
1287 layer surruonding Sewerage MH-21.1 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW (0+046.93) K, Sr.
back filling around 0 AM 00 AM
Engineer
S.
Inspection of 5th
HFC- MH-21.2 BalaJi,R.
1288 layer surruonding Sewerage MH-21.2 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW (0+117.69) K, Sr.
back filling around 0 AM 00 AM
Engineer
S.
Inspection of 5th
HFC- MH-21.3 BalaJi,R.
1289 layer surruonding Sewerage MH-21.3 Area 6 14-Dec-14 11.30:0 14-Dec-14 08.30: A 1/4/2015
SEW (0+070.00) K, Sr.
back filling around 0 AM 00 AM
Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1290 Area 8 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 1.10 MH-1.10 K, Sr.
0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1291 Area 8 HC-01 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 (MH-1.10) K, Sr.
(MH-1.10) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-01 to
HFC- granular bedding, joint sewer house from HC-01 to end BalaJi,R.
1292 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.10) K, Sr.
(MH-1.10) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-02 to
HFC- granular bedding, joint sewer house from HC-02 to end BalaJi,R.
1293 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.10) K, Sr.
(MH-1.10) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1294 Area 8 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 1.11 MH-1.11 K, Sr.
0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1295 Area 8 HC-01 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/17/2014
SEW measurements of connection line 160 (MH-1.11) K, Sr.
(MH-1.11) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-01 to
HFC- granular bedding, joint sewer house from HC-01 to end BalaJi,R.
1296 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.11) K, Sr.
(MH-1.11) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-02 to
HFC- granular bedding, joint sewer house from HC-02 to end BalaJi,R.
1297 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/17/2014
SEW measurements of connection line 160 cap (MH-1.11) K, Sr.
(MH-1.11) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to BalaJi,R.
1298 Area 8 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 1.12 MH-1.12 K, Sr.
0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1299 Area 8 HC-01 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 (MH-1.12) K, Sr.
(MH-1.12) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-01 to
HFC- granular bedding, joint sewer house from HC-01 to end BalaJi,R.
1300 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.12) K, Sr.
(MH-1.12) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-02 to
HFC- granular bedding, joint sewer house from HC-02 to end BalaJi,R.
1301 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.12) K, Sr.
(MH-1.12) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to BalaJi,R.
1302 Area 8 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 1.13 MH-1.13 K, Sr.
0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1303 Area 8 HC-01 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 (MH-1.13) K, Sr.
(MH-1.13) 0 AM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for gravel surround for S.


HC-01 to
HFC- granular bedding, joint sewer house from HC-01 to end BalaJi,R.
1304 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.13) K, Sr.
(MH-1.13) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-02 to
HFC- granular bedding, joint sewer house from HC-02 to end BalaJi,R.
1305 Area 8 end cap 14-Dec-14 11.30:0 14-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.13) K, Sr.
(MH-1.13) 0 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH -12 011.3 BalaJi,R.
1306 laying of (including st. specials Area 6 15-Dec-14 04.30: 14-Dec-14 AN 12/23/2014
SEW gravel surrounding sewer line to MH-12 (1+323.64) 0:00 K, Sr.
geotextile,joint 2nos) 00 PM
AM Engineer
measurement
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH -13 011.3 BalaJi,R.
1307 laying of (including st. specials Area 6 15-Dec-14 04.30: 14-Dec-14 AN 12/24/2014
SEW gravel surrounding sewer line to MH-13 (1+366.36) 0:00 K, Sr.
geotextile,joint 2nos) 00 PM
AM Engineer
measurement
S.
Inspection for
HFC- MH-6 011.3 BalaJi,R.
1308 excavation and sewer manhole MH-6 Area 6 15-Dec-14 04.30: 14-Dec-14 A 1/12/2015
SEW (0+968.98) 0:00 K, Sr.
prepared formation for 00 PM
AM Engineer
S.
Inspection for
HFC- MH-9 011.3 BalaJi,R.
1309 excavation and sewer manhole MH-9 Area 6 15-Dec-14 04.30: 14-Dec-14 A 1/12/2015
SEW (1+150.82) 0:00 K, Sr.
prepared formation for 00 PM
AM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-1.2 011.3 BalaJi,R.
1310 MH-1.2 Area 7 15-Dec-14 04.30: 14-Dec-14 AN 1/15/2015
SEW concreting for the wall (0+590.00) 0:00 K, Sr.
00 PM
of Sewerage Manhole AM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-1.1 011.3 BalaJi,R.
1311 MH-1.1 Area 7 15-Dec-14 04.30: 14-Dec-14 AN 1/15/2015
SEW concreting for the wall (0+645.93) 0:00 K, Sr.
00 PM
of Sewerage Manhole AM Engineer

Inspection for
S.
excavation and
HFC- from Chainage 1+300 1+300 to 011.3 BalaJi,R.
0090 prepared formation of Area 6 15-Dec-14 04.30: 14-Dec-14 A 1/12/2015
WD to 1+070 1+070 0:00 K, Sr.
100 mm dia GRE 00 PM
AM Engineer
water line
the base of gate valve S.
Inspection for shutter,
HFC- chamber for 250 mm Yard 011.3 BalaJi,R.
0056 reinforcement & Gate valve no IV-25 IV-25 15-Dec-14 04.30: 14-Dec-14 AN 1/15/2015
FF dia HDPE fire fighting Area 0:00 K, Sr.
concreting for 00 PM
line AM Engineer
the base of gate valve S.
Inspection for shutter,
HFC- chamber for 250 mm Yard 011.3 BalaJi,R.
0057 reinforcement & Gate valve no IV-26 IV-26 15-Dec-14 04.30: 14-Dec-14 AN 1/15/2015
FF dia HDPE fire fighting Area 0:00 K, Sr.
concreting for 00 PM
line AM Engineer

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard 2+600 011.3 BalaJi,R.
0058 concreting for the wo-4 15-Dec-14 04.30: 14-Dec-14 AN 1/15/2015
FF fighting line Area (Wo-04) 0:00 K, Sr.
base of washout 00 PM
AM Engineer
chamber for

S.
Inspection for MH
HFC- Storm water drainage 02.30: BalaJi,R.
0094 excavation and Area 8 2.2,0+030. 15-Dec-14 01.30: 14-Dec-14 A 1/4/2015
DR MH 2.2 00 K, Sr.
prepared formation for 2095 00 PM
PM Engineer
S.
Inspection for MH
HFC- Storm water drainage 02.30: BalaJi,R.
0095 excavation and Area 8 2.3,0+063. 15-Dec-14 01.30: 14-Dec-14 A 1/4/2015
DR MH 2.3 00 K, Sr.
prepared formation for 213 00 PM
PM Engineer
Inspection for
S.
excavation &
HFC- from MH 2.3 to MH MH 2.3 to 02.30: BalaJi,R.
0096 formation for 700mm Area 8 14-Dec-14 04.30: 14-Dec-14 A 1/4/2015
DR 2.4 MH 2.4 00 K, Sr.
dia GRP storm water 00 PM
PM Engineer
Line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-1.7.1 S.
Inspection for mirror
HFC- From MH-1.7.1 to Area 7 to MH-1.7 02.30: BalaJi,R.
1312 test for 250 mm dia 14-Dec-14 04.30: 14-Dec-14 Revised 12/18/2014
SEW MH-1.7 (IR-1) (0+244.9 00 K, Sr.
upvc Sewer line 00 PM
to 0+320) PM Engineer
S.
Inspection of laying joint measurement of 200mm dia upvc
HFC- MH: 4 to BalaJi,R.
1313 geotextile, gravel pipe laying and sewer line from MH-4 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
SEW MH: 5 K, Sr.
bedding, grannular surround for to MH-5 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of 200mm dia upvc
HFC- MH: 5 to BalaJi,R.
1314 geotextile, gravel pipe laying and sewer line from MH-5 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/18/2014
SEW MH: 6 K, Sr.
bedding, grannular surround for to MH-6 00 AM 00 AM
Engineer
S.
Inspection for external
HFC- sewer manhole MH- MH-1.5 BalaJi,R.
1315 waterproofing for the Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/23/2014
SEW 1.5 (0+424.48) K, Sr.
base & wall of 00 AM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH-1.5 BalaJi,R.
1316 laying of (including st. specials sewer line to MH- Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/18/2014
SEW gravel surrounding (0+424.48) K, Sr.
geotextile,joint 2nos) 1.5 00 AM 00 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH-1.6 BalaJi,R.
1317 laying of (including st. specials sewer line to MH- Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/24/2014
SEW gravel surrounding (0+374.25) K, Sr.
geotextile,joint 1nos) 1.6 00 AM 00 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH -1.4 BalaJi,R.
1318 laying of (including st. specials sewer line to MH- Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/13/2014
SEW gravel surrounding (0+480) K, Sr.
geotextile,joint 1nos) 1.4 00 AM 00 AM
Engineer
measurement
S.
above of blinding
HFC- Inspection for water MH -11 BalaJi,R.
1319 concrete for sewer Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/13/2014
SEW proofing (1.266.48) K, Sr.
manhole MH-11 00 AM 00 AM
Engineer
S.
Inspection for external
HFC- sewer manhole MH- MH-1.3 BalaJi,R.
1320 water proofing for the Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/13/2014
SEW 1.3 (0+534.69) K, Sr.
base of 00 AM 00 AM
Engineer
S.
above of blinding
HFC- Inspection for water MH-16 BalaJi,R.
1321 concrete for sewer Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/13/2014
SEW proofing (1+518.64) K, Sr.
manhole MH-16 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.7 BalaJi,R.
1322 layer surruonding Sewerage MH-1.7 Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+347.29) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.8 BalaJi,R.
1323 layer surruonding Sewerage MH-1.8 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+38.65) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.9 BalaJi,R.
1324 layer surruonding Sewerage MH-1.9 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+070.00) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.10 BalaJi,R.
1325 layer surruonding Sewerage MH-1.10 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+101.62) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.11 BalaJi,R.
1326 layer surruonding Sewerage MH-1.11 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
SEW (0+185.70) K, Sr.
back filling around 00 AM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.12 BalaJi,R.
1327 layer surruonding Sewerage MH-1.12 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+268.79) K, Sr.
back filling around 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 4th
HFC- MH-1.13 BalaJi,R.
1328 layer surruonding Sewerage MH-1.13 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (0+356.00) K, Sr.
back filling around 00 AM 00 AM
Engineer
Inspection for 4th S.
HFC- layer back filling for from MH 2.10 to MH MH 2.10 to BalaJi,R.
0097 Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
DR 500mm dia GRP 2.9 MH 2.9 K, Sr.
00 AM 00 AM
storm water Line Engineer
Inspection for 4th S.
HFC- layer back filling for from MH 2.9 to MH MH 2.9 to BalaJi,R.
0098 Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
DR 500mm dia GRP 2.8 MH 2.8 K, Sr.
00 AM 00 AM
storm water Line Engineer
Inspection for 4th S.
HFC- layer back filling for from MH 2.8 to MH MH 2.8 to BalaJi,R.
0099 Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
DR 500mm dia GRP 2.7 MH 2.7 K, Sr.
00 AM 00 AM
storm water Line Engineer
Inspection for 4th S.
HFC- layer back filling for from MH 2.7 to MH MH 2.7 to BalaJi,R.
0100 Area 7 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
DR 500mm dia GRP 2.6 MH 2.6 K, Sr.
00 AM 00 AM
storm water Line Engineer
S.
gate valve chamber
HFC- Inspection for pouring BalaJi,R.
0059 for 250 mm dia HDPE Gate valve no IV-25 Area 6 IV-25 15-Dec-14 01.30: 15-Dec-14 08.30: AN 1/5/2015
FF of bliding concrete for K, Sr.
fire fighting line 00 AM 00 AM
Engineer
S.
gate valve chamber
HFC- Inspection for pouring BalaJi,R.
0060 for 250 mm dia HDPE Gate valve no IV-26 Area 6 IV-26 15-Dec-14 01.30: 15-Dec-14 08.30: AN 1/5/2015
FF of bliding concrete for K, Sr.
fire fighting line 00 AM 00 AM
Engineer
S.
gate valve chamber
HFC- Inspection for pouring BalaJi,R.
0061 for 250 mm dia HDPE Gate valve no IV-27 Area 6 IV-27 15-Dec-14 01.30: 15-Dec-14 08.30: AN 1/5/2015
FF of bliding concrete for K, Sr.
fire fighting line 00 AM 00 AM
Engineer
S.
gate valve chamber
HFC- Inspection for pouring BalaJi,R.
0062 for 250 mm dia HDPE Gate valve no IV-28 Area 6 IV-28 15-Dec-14 01.30: 15-Dec-14 08.30: AN 1/5/2015
FF of bliding concrete for K, Sr.
fire fighting line 00 AM 00 AM
Engineer
S.
Inspection and joint fire fighting line from
HFC- 3+160 to BalaJi,R.
0063 measurement for 250 chainage 3+160 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/23/2014
FF 3+280 K, Sr.
mm dia HDPE 3+280 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+450 to BalaJi,R.
0064 2nd layer back filling chanaige 2+450 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 2+600 K, Sr.
for 250 mm dia HDPE 2+600 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+600 to BalaJi,R.
0065 2nd layer back filling chanaige 2+600 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 2+750 K, Sr.
for 250 mm dia HDPE 2+750 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+850 to BalaJi,R.
0066 2nd layer back filling chainage 2+850 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 2+750 K, Sr.
for 250 mm dia HDPE 2+750 00 AM 00 AM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 2+850 to BalaJi,R.
0067 surround for 250 mm chainage 2+850 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 3+050 K, Sr.
dia HDPE 3+050 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+850 to BalaJi,R.
0068 1st layer back filling chainage 2+850 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 3+050 K, Sr.
for 250 mm dia HDPE 3+050 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+030 to BalaJi,R.
0069 1st layer back filling chanaige 2+030 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 1+920 K, Sr.
for 250 mm dia HDPE 1+920 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+130 to BalaJi,R.
0070 1st layer back filling chanaige 2+130 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 2+030 K, Sr.
for 250 mm dia HDPE 2+030 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection of fire fighting line from
HFC- 2+350 to BalaJi,R.
0071 1st layer back filling chanaige 2+350 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
FF 2+130 K, Sr.
for 250 mm dia HDPE 2+130 00 AM 00 AM
Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from CHainage 2+050 2+050 to BalaJi,R.
0091 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
WD for 100 mm dia GRE - 2+160 2+160 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from CHainage 2+050 2+050 to BalaJi,R.
0092 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
WD for 100 mm dia GRE to 1+900 1+900 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from CHainage 1+900 1+900 to BalaJi,R.
0093 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
WD for 100 mm dia GRE to 1+770 1+770 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 1+770 1+770 to BalaJi,R.
0094 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
WD for 100 mm dia GRE to 1+630 1+630 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection of sand Irrigation line from
HFC- 1+160 to BalaJi,R.
0118 surround for 200 mm chainage 1+160 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
IRR 1+060 K, Sr.
dia upvc 1+060 00 AM 00 AM
Engineer
S.
Inspection of sand Irrigation line from
HFC- 1+270 to BalaJi,R.
0119 surround for 200 mm chainage 1+270 to Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
IRR 1+160 K, Sr.
dia upvc 1+160 00 AM 00 AM
Engineer
S.
Inspection for
HFC- MH-7 BalaJi,R.
1329 excavation and sewer manhole MH-7 Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
SEW (1+032.78) K, Sr.
prepared formation for 00 AM 00 AM
Engineer
S.
Inspection for
HFC- sewer manhole MH- MH-10 BalaJi,R.
1330 excavation and Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
SEW 10 (1+215.06) K, Sr.
prepared formation for 00 AM 00 AM
Engineer
S.
Inspection for
HFC- sewer manhole MH- MH-17 BalaJi,R.
1331 excavation and Area 6 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/4/2015
SEW 17 (1+562.82) K, Sr.
prepared formation for 00 AM 00 AM
Engineer
MH no.
4WXD54 Etislat duct 54657 JRC
S.
Inspection for from MH no. 54657 14) to
HFC- BalaJi,R.
0023 excavation and JRC 14) to Abutmant- Area 1 Abutmant- 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
ETC K, Sr.
prepared formation for 1 (ch 10+200 to 1 (ch 00 AM 00 AM
Engineer
10+150) 10+200 to
10+150)

Inspection for MH-03 to S.


HFC- from MH-03 to
excavation and abutment- BalaJi,R.
ITS/D 0020 abutment-1(10+200 to Area 1 15-Dec-14 01.30: 15-Dec-14 08.30: A 1/12/2015
prepared formation for 1(10+200 K, Sr.
IC 10+160) 00 AM 00 AM
4WXD54 DU Duct line to 10+160) Engineer

S.
Inspection for 1st Irrigation tranmission
HFC- 0+840 to BalaJi,R.
0120 layer backfilling for line from chainage Area 1 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
IRR 0+872 K, Sr.
150mm dia uPVC 0+840 to 0+872 00 AM 00 AM
Engineer
Inspection of 2nd S.
HFC- layer back filling for form ch 1+560 - 1+560 - BalaJi,R.
1332 Area 1 15-Dec-14 01.30: 15-Dec-14 08.30: A 12/21/2014
SEW 200 mm dia HDPE 1+587 1+587 K, Sr.
00 AM 00 AM
Sewer pressure line Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to BalaJi,R.
1333 Area 8 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 1.14 MH-1.14 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1334 Area 8 HC-01 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 (MH-1.14) K, Sr.
(MH-1.14) 00 AM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for gravel surround for S.


HC-01 to
HFC- granular bedding, joint sewer house from HC-01 to end BalaJi,R.
1335 Area 8 end cap 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.14) K, Sr.
(MH-1.14) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC-02 to
HFC- granular bedding, joint sewer house from HC-02 to end BalaJi,R.
1336 Area 8 end cap 15-Dec-14 01.30: 15-Dec-14 08.30: AN 12/18/2014
SEW measurements of connection line 160 cap (MH-1.14) K, Sr.
(MH-1.14) 00 AM 00 AM
pipe laying & mm dia upvc Engineer

MH -4 ,CH
S.
Inspection for 200 mm dia upvc 0+861.72
HFC- 01.30: BalaJi,R.
0538A excavation (1st sewer line from MH Area 6 to MH-5, 15-Dec-14 04.30: 15-Dec-14 C
SEW 00 K, Sr.
lowering step) for -4 to MH-5 CH 00 AM
PM Engineer
0+911.85

MH -6 ,CH
S.
Inspection for 200 mm dia upvc 0+968.96
HFC- 01.30: BalaJi,R.
0540A. excavation (1st sewer line from MH Area 6 to MH-7, 15-Dec-14 04.30: 15-Dec-14 AN 12/18/2014
SEW 00 K, Sr.
lowering step) for -6 to MH-07 CH 00 AM
PM Engineer
1+032.78

MH -7 ,CH
S.
Inspection for 200 mm dia upvc 1+032.78
HFC- 01.30: BalaJi,R.
0541A excavation (1st sewer line from MH Area 6 to MH-8, 15-Dec-14 04.30: 15-Dec-14 C
SEW 00 K, Sr.
lowering step) for -7 to MH-8 CH 00 AM
PM Engineer
1+086.48

MH -6 ,CH
S.
Inspection for 200 mm dia upvc 0+968.96
HFC- 01.30: BalaJi,R.
1337 excavation and sewer line from MH Area 6 to MH-7, 15-Dec-14 04.30: 15-Dec-14 A 1/12/2015
SEW 00 K, Sr.
prepared formation for -6 to MH-07 CH 00 AM
PM Engineer
1+032.78
MH -7 ,CH
S.
Inspection for 200 mm dia upvc 1+032.78
HFC- 01.30: BalaJi,R.
1338 excavation and sewer line from MH Area 6 to MH-8, 15-Dec-14 04.30: 15-Dec-14 A 1/12/2015
SEW 00 K, Sr.
prepared formation for -7 to MH-8 CH 00 AM
PM Engineer
1+086.48
Inspection for S.
HFC- shuttering & Yard 01.30: BalaJi,R.
0101 at precast yard area Yard area 15-Dec-14 04.30: 15-Dec-14 AN 1/15/2015
DR concreting for Gully- Area 00 K, Sr.
00 AM
04 nos PM Engineer
S.
Inspection for 3rd & Irrigation tranmission
HFC- 0+740 to 01.30: BalaJi,R.
0086B final layer backfilling line from chainage Area 1 16-Dec-14 01.30: 15-Dec-14 Revised 12/22/2014
IRR 0+840 00 K, Sr.
for 150mm dia uPVC 0+740 to 0+840 00 AM
PM Engineer
S.
HFC- Inspection of 4th & for 200 mm dia HDPE 1+460 to 01.30: BalaJi,R.
0780B Area 1 16-Dec-14 01.30: 15-Dec-14 Revised 12/22/2014
SEW final layer back filling Sewer pressure line 1+540 00 K, Sr.
00 AM
PM Engineer
Inspection of
S.
excavation & (as per your comment 1+600.00
HFC- 01.30: BalaJi,R.
008B prepared formation, pressure sewer line approved sketch Area 1 to 16-Dec-14 01.30: 15-Dec-14 AN 12/28/2014
SEW 00 K, Sr.
bedding for 315mm attached) 1+630.00 00 AM
PM Engineer
dia upvc

Inspection for S.
fire fighting line from
HFC- excavation and 0+760 to 01.30: BalaJi,R.
0072 chanaige 0+760 to Area 7 16-Dec-14 01.30: 15-Dec-14 A 1/12/2015
FF prepared formation for 0+880 00 K, Sr.
0+880 00 AM
250 mm dia HDPE PM Engineer

Inspection for S.
water line from
HFC- excavation and 0+340 to 01.30: BalaJi,R.
0095 chanaige 0+340 to Area 7 16-Dec-14 01.30: 15-Dec-14 A 1/21/2015
WD prepared formation for 0+140 00 K, Sr.
0+140 00 AM
150 mm dia GRE PM Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+560 to 01.30: BalaJi,R.
0121 chanaige 0+560 to Area 7 16-Dec-14 01.30: 15-Dec-14 A 1/12/2015
IRR prepared formation for 0+680 00 K, Sr.
0+680 00 AM
200 mm dia upvc PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 1st layer Irrigation line from
HFC- 1+160 to 01.30: BalaJi,R.
0122 back filling for 200 chainage 1+160 to Area 6 16-Dec-14 01.30: 15-Dec-14 AN 12/18/2014
IRR 1+060 00 K, Sr.
mm dia upvc 1+060 00 AM
PM Engineer
S.
Inspection of 1st layer Irrigation line from
HFC- 1+270 to 01.30: BalaJi,R.
0123 back filling for 200 chainage 1+270 to Area 6 16-Dec-14 01.30: 15-Dec-14 AN 12/18/2014
IRR 1+160 00 K, Sr.
mm dia upvc 1+160 00 AM
PM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1339 chamber of MH-1.14 HC-1, (MH 1.14) Area 8 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House 1.14) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1340 chamber of MH-1.14 HC-2, (MH 1.14) Area 8 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House 1.14) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1341 chamber of MH-2.6 HC-1, (MH 2.6) Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House 2.6) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1342 chamber of MH-2.6 HC-2, (MH 2.6) Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House 2.6) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1343 chamber of MH-2.5 HC-1, (MH 2.5) Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House 2.5) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1344 chamber of MH-2.5 HC-2, (MH 2.5) Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: AN 12/30/2014
SEW wall of Sewer House 2.5) K, Sr.
00 PM 00 AM
Connection Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0102 of blinding concrete Area 7 2.4,0+342. 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR MH 2.4 K, Sr.
for 1374 00 PM 00 AM
Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0103 of blinding concrete Area 8 2.2,0+030. 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR MH 2.2 K, Sr.
for 2095 00 PM 00 AM
Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0104 of blinding concrete Area 8 2.3,0+063. 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR MH 2.3 K, Sr.
for 213 00 PM 00 AM
Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1345 chamber of MH-1.11 HC-2, (MH 1.11) Area 8 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House 1.11) K, Sr.
00 PM 00 AM
Connection Engineer
S.
Inspection for pouring
HFC- sewer manhole MH- MH-10 BalaJi,R.
1346 of blinding concrete Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW 10 (1+215.06) K, Sr.
for 00 PM 00 AM
Engineer
S.
Inspection for pouring
HFC- sewer manhole MH- MH-17 BalaJi,R.
1347 of blinding concrete Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
SEW 17 (1+562.82) K, Sr.
for 00 PM 00 AM
Engineer
Inspection for 2nd S.
Irrigation tranmission
HFC- layer backfilling with 0+840 to BalaJi,R.
0124 line from chainage Area 1 16-Dec-14 01.30: 16-Dec-14 08.30: A 12/21/2014
IRR warning tape for 0+872 K, Sr.
0+840 to 0+872 00 PM 00 AM
150mm dia uPVC Engineer

Inspection of 3rd & S.


HFC- final layer back filling form ch 1+560 - 1+560 - BalaJi,R.
1348 Area 1 16-Dec-14 01.30: 16-Dec-14 08.30: Revised 12/22/2014
SEW for 200 mm dia HDPE 1+587 1+587 K, Sr.
00 PM 00 AM
Sewer pressure line Engineer

Inspection and joint MH-03 to S.


HFC- from MH-03 to
measurement of pipe abutment- BalaJi,R.
ITS/D 0021 abutment-1(10+200 to Area 1 16-Dec-14 01.30: 16-Dec-14 08.30: Revised 12/22/2014
laying for 4WXD54 1(10+200 K, Sr.
IC 10+160) 00 PM 00 AM
DU Duct line to 10+160) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH-03 to S.
HFC- Inspection for sand from MH-03 to
abutment- BalaJi,R.
ITS/D 0022 surround for 4WXD54 abutment-1(10+200 to Area 1 16-Dec-14 02.30: 16-Dec-14 08.30: Revised 12/22/2014
1(10+200 K, Sr.
IC DU Duct line 10+160) 00 PM 00 AM
to 10+160) Engineer
Visual Inspection for MH-03 to S.
HFC- from MH-03 to
1st layer back filling abutment- BalaJi,R.
ITS/D 0023 abutment-1(10+200 to Area 1 16-Dec-14 03.30: 16-Dec-14 08.30: Revised 12/22/2014
for 4WXD54 DU Duct 1(10+200 K, Sr.
IC 10+160) 00 PM 00 AM
line to 10+160) Engineer
S.
Inspection of sand
HFC- from Chainage 1+570 1+570 to BalaJi,R.
0096 surround for 100 mm Area 6 16-Dec-14 09.30: 16-Dec-14 08.30: AN 12/21/2014
WD to 1+460 1+460 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
S.
Inspection of sand
HFC- from Chainage 1+630 1+630 to BalaJi,R.
0097 surround for 100 mm Area 6 16-Dec-14 09.30: 16-Dec-14 08.30: AN 12/21/2014
WD to 1+570 1+570 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
S.
Inspection of sand
HFC- from Chainage 2+270 2+270 to BalaJi,R.
0098 surround for 100 mm Area 6 16-Dec-14 09.30: 16-Dec-14 08.30: AN 12/21/2014
WD to 2+360 2+360 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard BalaJi,R.
0105 3.0,0+133. 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR and concreting for MH 3.0 type -H Area K, Sr.
2178 00 PM 00 AM
base slab Engineer
Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard BalaJi,R.
0106 2.1,0+000. 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR and concreting for MH 2.1 type -j Area K, Sr.
873 00 PM 00 AM
base slab Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0107 at precast yard area Yard area 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/15/2015
DR concreting for Gully- Area K, Sr.
00 PM 00 AM
04 nos Engineer
Inspection for S.
HFC- deflection test from MH 2.4 to MH MH 2.4 to BalaJi,R.
0108 Storm water line Area 7 16-Dec-14 01.30: 16-Dec-14 08.30: Revised 1/4/2015
DR (preliminary) for 600 2.5 MH 2.5 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test from MH 2.5 to MH MH 2.5 to BalaJi,R.
0109 Storm water line Area 7 16-Dec-14 01.30: 16-Dec-14 08.30: AN 1/4/2015
DR (preliminary) for 600 2.6 MH 2.6 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
S.
for 100 mm dia GRE
HFC- Inspection of 4th 0+390 to BalaJi,R.
0099 water line From ch Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD layer back filling 0+480 K, Sr.
0+390 to 0+480 00 PM 00 AM
Engineer
S.
for 100 mm dia GRE
HFC- Inspection of 4th 0+480 to BalaJi,R.
0100 water line From ch Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD layer back filling 0+550 K, Sr.
0+480 to 0+550 00 PM 00 AM
Engineer
S.
for 100 mm dia GRE
HFC- Inspection of 4th 0+550 to BalaJi,R.
0101 water line From ch Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD layer back filling 0+650 K, Sr.
0+550 to 0+650 00 PM 00 AM
Engineer
S.
for 100 mm dia GRE
HFC- Inspection of 4th 0+650 to BalaJi,R.
0102 water line From ch Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD layer back filling 0+750 K, Sr.
0+650 to 0+750 00 PM 00 AM
Engineer
S.
for 100 mm dia GRE
HFC- Inspection of 4th 0+750 to BalaJi,R.
0103 water line From ch Area 9 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD layer back filling 0+830 K, Sr.
0+750 to 0+830 00 PM 00 AM
Engineer

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping BalaJi,R.
0125 Highlighted portion n pump pump 16-Dec-14 01.30: 16-Dec-14 08.30: Revised 12/22/2014
IRR concreting for fire station wall (wall no: K, Sr.
station station 00 PM 00 AM
fighting W1,W1A,W3,W4) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint S.


HFC- measurement of pipe from Chainage 1+300 1+300 to BalaJi,R.
0104 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: AN 12/22/2014
WD laying for 100 mm dia to 1+460 1+460 K, Sr.
00 PM 00 AM
GRE water line Engineer

Inspection for Descriton of WD-105 is S.


water line from
HFC- excavation and replacement of same wd 0+140 to BalaJi,R.
0105 chanaige 0+140 to due to doubling RFA Area 7 18-Dec-14 01.30: 18-Dec-14 08.30: A 1/12/2015
WD prepared formation for 105 submitted on 16-12- 0+090 K, Sr.
0+090 2014 00 PM 00 AM
150 mm dia GRE Engineer
Visual Inspection of S.
HFC- 1st layer back filling from Chainage 2+270 2+270 to BalaJi,R.
0106 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 12/21/2014
WD for 100 mm dia GRE to 2+360 2+360 K, Sr.
00 PM 00 AM
water line Engineer
Inspection of 3rd layer
S.
back filling with
HFC- from CHainage 2+050 2+050 to BalaJi,R.
0107 warning tape for 100 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD to 1+900 1+900 K, Sr.
mm dia GRE water 00 PM 00 AM
Engineer
line
Inspection of 3rd layer
S.
back filling with
HFC- from CHainage 1+900 1+900 to BalaJi,R.
0108 warning tape for 100 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
WD to 1+770 1+770 K, Sr.
mm dia GRE water 00 PM 00 AM
Engineer
line
Visaul Inspection of S.
HFC- 1st layer back filling from Chainage 1+630 1+630 to BalaJi,R.
0109 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: AN 12/17/2014
WD for 100 mm dia GRE to 1+570 1+570 K, Sr.
00 PM 00 AM
water line Engineer
Visaul Inspection of S.
HFC- 2nd layer back filling from Chainage 1+630 1+630 to BalaJi,R.
0110 Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 12/21/2014
WD for 100 mm dia GRE to 1+570 1+570 K, Sr.
00 PM 00 AM
water line Engineer
Inspection and joint Descriton of WD-111 is S.
HFC- measurement of pipe from Chainage 1+300 replacement of same wd 1+300 to BalaJi,R.
0111 111 submitted on 16-12- due to doubling RFA Area 6 18-Dec-14 01.30: 18-Dec-14 08.30: A 12/22/2014
WD laying for 100 mm dia to 1+070 1+070 K, Sr.
2014 00 PM 00 AM
GRE water line Engineer
Inspection and joint Descriton of WD-112 is S.
water line from
HFC- measurement of pipe replacement of same wd 0+360 to 01.30: BalaJi,R.
0112 chanaige 0+350 to due to doubling RFA Area 7 21-Dec-14 01.30: 21-Dec-14 AN 12/24/2014
WD laying for 150 mm dia 112 submitted on 16-12- 0+140 00 K, Sr.
0+140 2014 00 PM
GRE PM Engineer
Inspection of 3rd S.
fire fighting line from
HFC- layer back filling with 2+450 to BalaJi,R.
0073 chanaige 2+450 to Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
FF warning tape for 250 2+600 K, Sr.
2+600 00 PM 00 AM
mm dia HDPE Engineer
Inspection of 3rd S.
fire fighting line from
HFC- layer back filling with 2+600 to BalaJi,R.
0074 chanaige 2+600 to Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 1/12/2015
FF warning tape for 250 2+750 K, Sr.
2+750 00 PM 00 AM
mm dia HDPE Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+130 to BalaJi,R.
0075 2nd layer back filling chanaige 2+130 to Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 12/21/2014
FF 2+030 K, Sr.
for 250 mm dia HDPE 2+030 00 PM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+350 to BalaJi,R.
0076 2nd layer back filling chanaige 2+350 to Area 6 16-Dec-14 01.30: 16-Dec-14 08.30: A 12/21/2014
FF 2+130 K, Sr.
for 250 mm dia HDPE 2+130 00 PM 00 AM
Engineer
Inspection for 5th
S.
layer back filling for
HFC- from MH 2.10 to MH MH 2.10 to 01.30: BalaJi,R.
0110 500mm dia GRP Area 7 16-Dec-14 04.30: 16-Dec-14 A 1/12/2015
DR 2.9 MH 2.9 00 K, Sr.
storm water Line with 00 PM
PM Engineer
warning tape
Inspection for 5th S.
HFC- layer back filling for from MH 2.9 to MH MH 2.9 to 01.30: BalaJi,R.
0111 Area 7 16-Dec-14 04.30: 16-Dec-14 A 1/12/2015
DR 500mm dia GRP 2.8 MH 2.8 00 K, Sr.
00 PM
storm water Line PM Engineer
Inspection for 5th S.
HFC- layer back filling for from MH 2.8 to MH MH 2.8 to 01.30: BalaJi,R.
0112 Area 7 16-Dec-14 04.30: 16-Dec-14 A 1/12/2015
DR 500mm dia GRP 2.7 MH 2.7 00 K, Sr.
00 PM
storm water Line PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 5th S.


HFC- layer back filling for from MH 2.7 to MH MH 2.7 to 01.30: BalaJi,R.
0113 Area 7 16-Dec-14 04.30: 16-Dec-14 A 1/12/2015
DR 500mm dia GRP 2.6 MH 2.6 00 K, Sr.
00 PM
storm water Line PM Engineer
Inspection of S.
with GRP benching MH-
HFC- shutter,reinforcement 01.30: BalaJi,R.
0114 for Storm water MH- Area 7 1.7,0+566. 16-Dec-14 04.30: 16-Dec-14 AN 1/15/2015
DR and concreting for 00 K, Sr.
1.7 type -H 7517 00 PM
base slab PM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1349 chamber of MH-2.4 HC-1, (MH 2.4) Area 9 17-Dec-14 01.30: 17-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.4) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1350 chamber of MH-2.4 HC-2, (MH 2.4) Area 9 17-Dec-14 01.30: 17-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.4) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-3 ( MH BalaJi,R.
1351 chamber of MH-2.4 HC-3, (MH 2.4) Area 9 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/23/2014
SEW wall of Sewer House 2.4) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1352 chamber of MH-2.3 HC-1, (MH 2.3) Area 9 17-Dec-14 01.30: 17-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House 2.3) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of 5th S.
HFC- layer back filling 250 from MH -1.4 to MH- MH -1.4 to BalaJi,R.
1353 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW mm dia upvc sewer 1.3 MH-1.3 K, Sr.
00 PM 00 AM
line Engineer
Inspection for 5th S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to BalaJi,R.
1354 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for 6th S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to BalaJi,R.
1355 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for 6th S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to BalaJi,R.
1356 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 PM 00 AM
sewer line Engineer
S.
Inspection of 4th
HFC- MH-1.7.1 BalaJi,R.
1357 layer surruonding Sewerage MH-1.7.1 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW (0+244.90) K, Sr.
back filling around 00 PM 00 AM
Engineer
S.
Inspection of 4th
HFC- MH-1.7.3 BalaJi,R.
1358 layer surruonding Sewerage MH-1.7.3 Area 7 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW (0+078.78) K, Sr.
back filling around 00 PM 00 AM
Engineer
S.
Inspection of 3rd
HFC- MH-1.7.4 BalaJi,R.
1359 layer surruonding Sewerage MH-1.7.4 Area 5 17-Dec-14 01.30: 17-Dec-14 08.30: A 1/12/2015
SEW (0+004.60) K, Sr.
back filling around 00 PM 00 AM
Engineer
MH -9 ,CH
S.
Inspection of laying joint measurement of for 200 mm dia upvc 1+150.82
HFC- Area BalaJi,R.
1360 geotextile, gravel pipe laying and sewer line from MH to MH-10, 17-Dec-14 01.30: 17-Dec-14 08.30: A 12/22/2014
SEW 6(IR-1) K, Sr.
bedding, grannular surround -9 to MH-10 CH 00 PM 00 AM
Engineer
1+215.06
S.
Inspection for placing
HFC- MH-17 BalaJi,R.
1361 & fixing precast base MH-17 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: A 12/22/2014
SEW (1+562.82) K, Sr.
of sewer manhole 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- MH-16 BalaJi,R.
1362 & fixing precast base MH-16 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: A 12/22/2014
SEW (1+518.64) K, Sr.
of sewer manhole 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH no.
4WXD54 Etislat duct 54657 JRC
S.
Inspection and joint from MH no. 54657 14) to
HFC- BalaJi,R.
0024 measurement of pipe JRC 14) to Abutmant- Area 1 Abutmant- 17-Dec-14 01.30: 17-Dec-14 08.30: Revised 12/22/2014
ETC K, Sr.
laying for 1 (ch 10+200 to 1 (ch 00 PM 00 AM
Engineer
10+150) 10+200 to
10+150)

for 200 mm dia HDPE S.


Inspection and joint
HFC- sewer pressure line 0+720 to BalaJi,R.
1363 measurement of pipe Area 5 17-Dec-14 01.30: 17-Dec-14 08.30: Revised 12/21/2014
SEW from chainage 0+720 0+850 K, Sr.
laying 00 PM 00 AM
to 0+850 Engineer

for 250 mm dia HDPE S.


Inspection and joint
HFC- fire fighting line from 3+280 to BalaJi,R.
0077 measurement of pipe Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/23/2014
FF chainage 3+280 to 3+450 K, Sr.
laying 00 PM 00 AM
3+450 Engineer

Inspection for S.
HFC- waterproofing for 250 mm dia HDPE Gate valve no-IV- IV-25 & IV- BalaJi,R.
0078 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/21/2014
FF (Primer) for gate valve fire fighting line 25,IV-26 26 K, Sr.
00 PM 00 AM
chamber blinding Engineer

Inspection for S.
HFC- waterproofing for 250 mm dia HDPE Gate valve no-IV- IV-27 & IV- BalaJi,R.
0079 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/21/2014
FF (Primer) for gate valve fire fighting line 27,IV-28 28 K, Sr.
00 PM 00 AM
chamber blinding Engineer

Inspection for S.
HFC- waterproofing of 250 mm dia HDPE 2+240 BalaJi,R.
0080 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/21/2014
FF (Primer) for washout fire fighting line (W0-3) K, Sr.
00 PM 00 AM
chamber blinding Engineer
Inspection for S.
HFC- waterproofing of 250 mm dia HDPE 2+600 BalaJi,R.
0081 Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/21/2014
FF (Primer) for washout fire fighting line (Wo-04) K, Sr.
00 PM 00 AM
chamber blinding Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+360 to BalaJi,R.
0051A 1st layer back filling chanaige 2+360 to Area 6 17-Dec-14 01.30: 17-Dec-14 08.30: A 12/21/2014
FF 2+450 K, Sr.
for 250 mm dia HDPE 2+450 00 PM 00 AM
Engineer
gravel surround for
Inspection for S.
sewer house
HFC- granular bedding, joint from HC -03 to MH- HC -03 to BalaJi,R.
1178A connection line 160 Area 8 17-Dec-14 01.30: 17-Dec-14 08.30: AN 12/28/2014
SEW measurements of 2.4 MH-2.4 K, Sr.
mm dia upvc of sewer 00 PM 00 AM
pipe laying & Engineer
MH-2.4
sewera S.
Inspection of 7th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1282A surruonding back pump 17-Dec-14 01.30: 17-Dec-14 08.30: Revised 1/25/2015
SEW station pump K, Sr.
filling around station 00 PM 00 AM
station Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0082 & concreting for the AV-1 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
base of air valve 00 PM 00 AM
Engineer
chamber (AV-1)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0083 & concreting for the AV-2 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
base of air valve 00 PM 00 AM
Engineer
chamber (AV-2)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0084 & concreting for the AV-3 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
base of air valve 00 PM 00 AM
Engineer
chamber (AV-3)

for the base of S.


Inspection of
HFC- washout chamber Yard 2+240 BalaJi,R.
0085 shutter,reinforcement 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
FF (wo-3) for 250 mm dia Area (W0-3) K, Sr.
& concreting 00 PM 00 AM
HDPE fire fighting line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of shutter,
HFC- MH -13 BalaJi,R.
1364 water stopper & of sewer MH-13 Area 6 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
SEW (1+366.36) K, Sr.
concreting for the wall 00 PM 00 AM
Engineer
S.
Inspection of shutter,
HFC- MH-14 BalaJi,R.
1365 water stopper & of sewer MH-14 Area 6 17-Dec-14 04.30: 17-Dec-14 01.30: AN 1/10/2015
SEW (1+425.89) K, Sr.
concreting for the wall 00 PM 00 AM
Engineer
Inspection and joint
S.
measurement of pipe
HFC- from chainage 0+880 0+880 to BalaJi,R.
0812B laying for 200 mm dia Area 5 18-Dec-14 04.30: 18-Dec-14 08.30: AN 12/23/2014
SEW to 0+920 0+920 K, Sr.
HDPE Sewer 00 PM 00 AM
Engineer
pressure line
S.
Inspection of laying joint measurement of 200 mm dia upvc
HFC- MH -11 to BalaJi,R.
1366 geotextile, gravel pipe laying and sewer line from MH Area 6 17-Dec-14 04.30: 17-Dec-14 01.30: AN 12/21/2014
SEW MH-10 K, Sr.
bedding, grannular surround for -11 to MH-10 00 PM 00 AM
Engineer
S.
Inspection of 3rd & road crossing Duct
HFC- 2x10W 150mm dia 10+108.60 BalaJi,R.
0011C final layer back filling No.1 at ch Area 1 18-Dec-14 04.30: 18-Dec-14 08.30: Revised 12/23/2014
ED upvc addittional HV 5 K, Sr.
for 10+108.605 00 PM 00 AM
Engineer
S.
Inspection of 3rd & road crossing Duct
HFC- 2x4W 150mm dia 10+107.68 BalaJi,R.
0012C final layer back filling No.1 at ch Area 1 18-Dec-14 04.30: 18-Dec-14 08.30: Revised 12/23/2014
ED upvc addittional LV 1 K, Sr.
for 10+107.681 00 PM 00 AM
Engineer

Inspection for precast S.


MH-24
HFC- sewer manhole (base) BalaJi,R.
0379C MH-24 Area 6 ( 2+052.75 18-Dec-14 04.30: 18-Dec-14 08.30: Revised 12/28/2014
SEW placing including K, Sr.
) 00 PM 00 AM
alignment and level Engineer

for sewer line of S.


Inspection and joint
HFC- house connection 160 MH: 24 - BalaJi,R.
0503C measurement of pipe Area 6 18-Dec-14 04.30: 18-Dec-14 08.30: AN 12/28/2014
SEW mm dia upvc from HC-03 K, Sr.
laying 00 PM 00 AM
MH: 24 - HC-03 Engineer
Inspection for
excavation and S.
of Sewer Manhole
HFC- prepared formation for MH-24 to BalaJi,R.
0418B MH-24, from MH-24 to Area 6 18-Dec-14 04.30: 18-Dec-14 08.30: AN 12/28/2014
SEW sewer House HC-02 K, Sr.
HC-02 00 PM 00 AM
connection line 160 Engineer
mm dia
S.
Inspection of laying joint measurement of for 700mm dia GRP
HFC- MH 2.2 to BalaJi,R.
0115 geotextile, gravel pipe laying and Storm water line from Area 8 18-Dec-14 10.30: 18-Dec-14 08.30: AN 12/22/2014
DR MH 2.3 K, Sr.
bedding, grannular surround MH-2.2 to MH- 2.3 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 700mm dia GRP
HFC- MH 2.3 to BalaJi,R.
0116 geotextile, gravel pipe laying and Storm water line from Area 8 18-Dec-14 10.30: 18-Dec-14 08.30: AN 12/22/2014
DR MH 2.4 K, Sr.
bedding, grannular surround MH-2.3 to MH- 2.4 00 AM 00 AM
Engineer

Please check &


from MH -1.4 to MH- S.
approve after
HFC- for 250 mm dia upvc 1.5 as commented by MH -1.4 to BalaJi,R.
0553A completion of Area 7 18-Dec-14 10.30: 18-Dec-14 08.30: C
SEW sewer line you in previous IR- MH-1.5 K, Sr.
excavation (1st 00 AM 00 AM
553 Engineer
lowering step)

Please check &


from MH -1.5 to MH- S.
approve after
HFC- for 250 mm dia upvc 1.6 as commented by MH -1.5 to BalaJi,R.
0554A completion of Area 7 18-Dec-14 10.30: 18-Dec-14 08.30: AN 12/24/2014
SEW sewer line you in previous IR- MH-1.6 K, Sr.
excavation (1st 00 AM 00 AM
554 Engineer
lowering step)
Please check & MH -2 ,CH
S.
approve after from MH -2 to MH-3 0+742.88
HFC- for 200 mm dia upvc Area BalaJi,R.
0539A completion of as commented by you to MH-03, 18-Dec-14 10.30: 18-Dec-14 08.30: C 12/24/2014
SEW sewer line 6(IR-4) K, Sr.
excavation (1st in previous IR-539 CH 00 AM 00 AM
Engineer
lowering step) 0+811.85

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -13
Please check &
,CH S.
approve after from MH -13 to MH-14
HFC- for 200 mm dia upvc Area 1+386.36 BalaJi,R.
0547A completion of as commented by you 18-Dec-14 10.30: 18-Dec-14 08.30: C 12/24/2014
SEW sewer line 6(IR-1) to MH-14, K, Sr.
excavation (1st in previous IR-547 00 AM 00 AM
CH Engineer
lowering step)
1+425.89

MH -10
Please check &
,CH S.
approve after from MH -10 to MH-11
HFC- for 200 mm dia upvc 1+215.06 BalaJi,R.
0544A completion of as commented by you Area 6 18-Dec-14 10.30: 18-Dec-14 08.30: C
SEW sewer line to MH-11, K, Sr.
excavation (1st in previous IR-544 00 AM 00 AM
CH Engineer
lowering step)
1+266.48

Inspection for S.
fire fighting line from
HFC- excavation and 0+880 to BalaJi,R.
0086 chanaige 0+880 to Area 7 18-Dec-14 10.30: 18-Dec-14 08.30: A 1/12/2015
FF prepared formation for 1+010 K, Sr.
1+010 00 AM 00 AM
250 mm dia HDPE Engineer

S.
Inspection for 200 mm dia upvc
HFC- MH -8 to BalaJi,R.
1367 excavation and sewer line from MH Area 6 18-Dec-14 10.30: 18-Dec-14 08.30: A 1/12/2015
SEW MH-9 K, Sr.
prepared formation for -8 to MH-9 00 AM 00 AM
Engineer
S.
Inspection for
HFC- MH-8, CH BalaJi,R.
1368 excavation and sewer MH -8 Area 6 18-Dec-14 10.30: 18-Dec-14 08.30: Revised 1/20/2015
SEW 1+086.48 K, Sr.
prepared formation for 00 AM 00 AM
Engineer
S.
Inspection for pouring
HFC- MH-6 BalaJi,R.
1369 of blinding concrete sewer manhole MH-6 Area 6 18-Dec-14 10.30: 18-Dec-14 08.30: AN 1/10/2015
SEW (0+968.98) K, Sr.
for 00 AM 00 AM
Engineer
S.
Inspection for pouring
HFC- MH-7 BalaJi,R.
1370 of blinding concrete sewer manhole MH-7 Area 6 18-Dec-14 10.30: 18-Dec-14 08.30: A 1/21/2015
SEW (1+032.78) K, Sr.
for 00 AM 00 AM
Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1371 chamber of MH-2.3 HC-2, (MH 2.3) Area 9 18-Dec-14 10.30: 18-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.3) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1372 chamber of MH-2.2 HC-1, (MH 2.2) Area 9 18-Dec-14 10.30: 18-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.2) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1373 chamber of MH-2.2 HC-2, (MH 2.2) Area 9 18-Dec-14 10.30: 18-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.2) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-3 ( MH BalaJi,R.
1374 chamber of MH-2.2 HC-3, (MH 2.2) Area 9 18-Dec-14 10.30: 18-Dec-14 08.30: AN 1/10/2015
SEW wall of Sewer House 2.2) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+680 to BalaJi,R.
0126 chainage 0+680 to Area 7 18-Dec-14 02.30: 18-Dec-14 08.30: A 1/12/2015
IRR prepared formation for 0+820 K, Sr.
0+820 00 PM 00 AM
200 mm dia upvc Engineer
Inspection for 3rd S.
MH-
HFC- layer surruonding 010.3 BalaJi,R.
1375 MH-8.1 ` Area 6 8.1,0+041. 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
SEW back filling around 0:00 K, Sr.
372 00 PM
sewer AM Engineer
Inspection for 3rd S.
MH-
HFC- layer surruonding 010.3 BalaJi,R.
1376 MH-8.2 ` Area 6 8.2,0+069. 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
SEW back filling around 0:00 K, Sr.
23 00 PM
sewer AM Engineer
Inspection for 3rd S.
HFC- layer surruonding MH-8.3, 010.3 BalaJi,R.
1377 MH-8.3 ` Area 6 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
SEW back filling around 0+125.50 0:00 K, Sr.
00 PM
sewer AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for MH
HFC- Storm water drainage 010.3 BalaJi,R.
0117 excavation and Area 7 1.13,0+355 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
DR MH 1.13 0:00 K, Sr.
prepared formation for .0432 00 PM
AM Engineer
Inspection for
S.
excavation &
HFC- from MH 2.4 to MH MH 2.4 to 010.3 BalaJi,R.
0118 formation for 700mm Area 7 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
DR 1.13 MH 1.13 0:00 K, Sr.
dia GRP storm water 00 PM
AM Engineer
Line
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH-1.1 010.3 BalaJi,R.
1378 laying of (including st. specials sewer line to MH- Area 7 18-Dec-14 02.30: 18-Dec-14 A 1/12/2015
SEW gravel surrounding (0+645.93) 0:00 K, Sr.
geotextile,joint 2nos) 1.1 00 PM
AM Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH-1.2 010.3 BalaJi,R.
1379 laying of (including st. specials sewer line to MH- Area 7 18-Dec-14 02.30: 18-Dec-14 A 12/22/2014
SEW gravel surrounding (0+590.00) 0:00 K, Sr.
geotextile,joint 2nos) 1.2 00 PM
AM Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and MH-1.3 010.3 BalaJi,R.
1380 laying of (including st. specials sewer line to MH- Area 7 18-Dec-14 02.30: 18-Dec-14 A 12/22/2014
SEW gravel surrounding (0+534.69) 0:00 K, Sr.
geotextile,joint 2nos) 1.3 00 PM
AM Engineer
measurement
Inspection of shutter, S.
gate valve chamber
HFC- reinforcement & Yard BalaJi,R.
0087 for 250 mm dia HDPE Gate valve no IV-01 IV-01 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF concreting of wall for Area K, Sr.
fire fighting line 00 PM 00 AM
gate valve Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0088 & concreting for the AV-1 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
wall of air valve 00 PM 00 AM
Engineer
chamber (AV-1)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0089 & concreting for the AV-4 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
base of air valve 00 PM 00 AM
Engineer
chamber (AV-4)
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard BalaJi,R.
0090 & concreting for the AV-5 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF fire fighting line Area K, Sr.
base of air valve 00 PM 00 AM
Engineer
chamber (AV-5)
S.
Inspection of sand
HFC- from ch 0+380 to 0+380 to BalaJi,R.
1381 surround for 200 mm sewer pressure line Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: AN 12/23/2014
SEW 0+050 0+050 K, Sr.
dia HDPE 00 PM 00 AM
Engineer
S.
Visual Inspection of
HFC- from ch 0+380 to 0+380 to BalaJi,R.
1382 1st layer back filling sewer pressure line Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: AN 12/23/2014
SEW 0+050 0+050 K, Sr.
for 200 mm dia HDPE 00 PM 00 AM
Engineer
S.
Visual Inspection of
HFC- from ch 0+720 to 0+720 to BalaJi,R.
1383 1st layer back filling sewer pressure line Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: AN 12/23/2014
SEW 0+440 0+440 K, Sr.
for 200 mm dia HDPE 00 PM 00 AM
Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1384 chamber of MH-2.1 HC-1, (MH 2.1) Area 9 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
SEW wall of Sewer House 2.1) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1385 chamber of MH-2.1 HC-2, (MH 2.1) Area 9 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
SEW wall of Sewer House 2.1) K, Sr.
00 PM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-3 ( MH BalaJi,R.
1386 chamber of MH-2.6 HC-3, (MH 2.6) Area 9 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
SEW wall of Sewer House 2.6) K, Sr.
00 PM 00 AM
Connection Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of laying joint measurement of for 700mm dia GRP
HFC- MH 2.1 to BalaJi,R.
0119 geotextile, gravel pipe laying and Storm water line from Area 8 20-Dec-14 02.30: 20-Dec-14 09.30: AN 12/22/2014
DR MH 2.2 K, Sr.
bedding, grannular surround MH-2.1 to MH- 2.2 00 PM 00 AM
Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0120 at precast yard area Yard area 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
DR concreting for Gully- Area K, Sr.
00 PM 00 AM
04 nos Engineer
Inspection of 6th S.
HFC- layer back filling 250 from MH -1.4 to MH- MH -1.4 to BalaJi,R.
1387 Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: A 1/12/2015
SEW mm dia upvc sewer 1.3 MH-1.3 K, Sr.
00 PM 00 AM
line Engineer
Inspection for 7th S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to BalaJi,R.
1388 Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: A 1/12/2015
SEW 250 mm dia Upvc 1.4 MH-1.4 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for 7th S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to BalaJi,R.
1389 Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: A 1/12/2015
SEW 250 mm dia Upvc 1.6 MH-1.6 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for 5th S.
HFC- layer back filling for from MH -1.3 to MH- MH -1.3 to BalaJi,R.
1390 Area 7 20-Dec-14 02.30: 20-Dec-14 09.30: A 1/12/2015
SEW 250 mm dia Upvc 1.2 MH-1.2 K, Sr.
00 PM 00 AM
sewer line Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0091 for 250 mm dia HDPE Gate valve no IV-27 IV-27 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
base of Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0092 for 250 mm dia HDPE Gate valve no IV-28 IV-28 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/10/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
base of Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0093 for 250 mm dia HDPE Gate valve no IV-21 IV-21 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/12/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
base of Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0094 & concreting for the AV-2 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/12/2015
FF fire fighting line Area K, Sr.
wall of air valve 00 PM 00 AM
Engineer
chamber (AV-2)

for the wall of S.


Inspection of
HFC- washout chamber Yard 2+240 BalaJi,R.
0095 shutter,reinforcement 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/12/2015
FF (wo-3) for 250 mm dia Area (W0-3) K, Sr.
& concreting 00 PM 00 AM
HDPE fire fighting line Engineer

Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0096 for 250 mm dia HDPE Gate valve no IV-22 IV-22 20-Dec-14 02.30: 20-Dec-14 09.30: Revised 12/28/2014
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
base of Engineer

Inspection of shutter, S.
HFC- water stopper & MH -12 BalaJi,R.
1391 MH-12 Area 6 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/12/2015
SEW concreting for the wall (1+323.64) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & MH-15 BalaJi,R.
1392 MH-15 Area 6 20-Dec-14 02.30: 20-Dec-14 09.30: AN 1/12/2015
SEW concreting for the wall (0+480.69) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1393 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW 2.1 MH-2.1 00 K, Sr.
of sewer sewer MH-2.1 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- 01.30: BalaJi,R.
1394 1st layer back filling 160 mm dia upvc of from HC -02 to HC-1 Area 9 HC-1 (MH- 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW 00 K, Sr.
of sewer sewer MH-2.1 2.1) 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1395 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.1 (MH-2.1) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1396 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.1 (MH-2.1) 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1397 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 2.2 MH-2.2 00 K, Sr.
of sewer sewer MH-2.2 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 01.30: BalaJi,R.
1398 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/30/2014
SEW 2.2 MH-2.2 00 K, Sr.
of sewer sewer MH-2.2 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 01.30: BalaJi,R.
1399 1st layer back filling 160 mm dia upvc of from HC -01 to HC-02 Area 9 HC-02 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1400 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1401 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 01.30: BalaJi,R.
1402 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/30/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -01 to MH- HC -01 to 01.30: BalaJi,R.
1403 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 2.3 MH-2.3 00 K, Sr.
of sewer sewer MH-2.3 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 01.30: BalaJi,R.
1404 1st layer back filling 160 mm dia upvc of from HC -01 to HC-02 Area 9 HC-02 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1405 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1406 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1407 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 2.4 MH-2.4 00 K, Sr.
of sewer sewer MH-2.4 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 01.30: BalaJi,R.
1408 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 2.4 MH-2.4 00 K, Sr.
of sewer sewer MH-2.4 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 01.30: BalaJi,R.
1409 1st layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 00 K, Sr.
of sewer sewer MH-2.4 2.4) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1410 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1411 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 01.30: BalaJi,R.
1412 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -01 to MH- HC -01 to 01.30: BalaJi,R.
1413 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 2.5 MH-2.5 00 K, Sr.
of sewer sewer MH-2.5 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 01.30: BalaJi,R.
1414 1st layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 00 K, Sr.
of sewer sewer MH-2.5 2.5) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1415 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.5 (MH-2.5) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1416 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.5 (MH-2.5) 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1417 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW 2.6 MH-2.6 00 K, Sr.
of sewer sewer MH-2.6 00 PM
PM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 01.30: BalaJi,R.
1418 1st layer back filling 160 mm dia upvc of Area 9 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 2.6 MH-2.6 00 K, Sr.
of sewer sewer MH-2.6 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 01.30: BalaJi,R.
1419 1st layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW 00 K, Sr.
of sewer sewer MH-2.6 2.6) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1420 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1421 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/24/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
PM Engineer
S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 01.30: BalaJi,R.
1422 1st layer back filling 160 mm dia upvc of Area 9 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
PM Engineer
S.
Inspection of 2nd Irrigation line from
HFC- 1+160 to 01.30: BalaJi,R.
0127 layer back filling for chainage 1+160 to Area 6 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
IRR 1+060 00 K, Sr.
200 mm dia upvc 1+060 00 PM
PM Engineer
S.
Inspection of 2nd Irrigation line from
HFC- 1+270 to 01.30: BalaJi,R.
0128 layer back filling for chainage 1+270 to Area 6 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
IRR 1+160 00 K, Sr.
200 mm dia upvc 1+160 00 PM
PM Engineer
S.
Inspection for sand Irrigation line from
HFC- 0+950 to 01.30: BalaJi,R.
0129 surround for 200 mm chainage 0+950 to Area 6 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
IRR 0+870 00 K, Sr.
dia upvc 0+870 00 PM
PM Engineer
S.
Inspection for sand Irrigation line from
HFC- 1+060 to 01.30: BalaJi,R.
0130 surround for 200 mm chainage 1+060 to Area 6 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
IRR 0+950 00 K, Sr.
dia upvc 0+950 00 PM
PM Engineer
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to 01.30: BalaJi,R.
1073A excavation and mm dia Upvc of Area 8 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 1.8 MH-1.8 00 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM
PM Engineer
1.8

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1074A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- (MH-1.8) 00 PM
PM Engineer
1.8
sewer House
S.
Inspection for connection line 160
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1075A excavation and mm dia Upvc of Area 8 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 1.10 MH-1.10 00 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM
PM Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- 01.30: BalaJi,R.
1076A excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 00 PM
PM Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1077A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 00 PM
PM Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1078A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.10) 00 PM
PM Engineer
1.10
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- 01.30: BalaJi,R.
1079A excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 00 PM
PM Engineer
1.11
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1080A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 00 PM
PM Engineer
1.11
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1081A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.11) 00 PM
PM Engineer
1.11
sewer House
S.
Inspection for connection line 160
HFC- from HC -02 to MH- HC -02 to 01.30: BalaJi,R.
1082A excavation and mm dia Upvc of Area 8 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 1.11 MH-1.11 00 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM
PM Engineer
1.11
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- 01.30: BalaJi,R.
1083A excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 00 PM
PM Engineer
1.12
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1084A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 00 PM
PM Engineer
1.12
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1085A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.12) 00 PM
PM Engineer
1.12
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to 01.30: BalaJi,R.
1086A excavation and mm dia Upvc of Area 8 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 1.12 MH-1.12 00 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM
PM Engineer
1.12

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- 01.30: BalaJi,R.
1087A excavation and mm dia Upvc of from HC -01 to HC-2 Area 8 HC-2 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 00 PM
PM Engineer
1.13
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end 01.30: BalaJi,R.
1088A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 00 PM
PM Engineer
1.13
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end 01.30: BalaJi,R.
1089A excavation and mm dia Upvc of Area 8 end cap 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW cap 00 K, Sr.
prepared formation for Sewer Manhole MH- ( MH-1.13) 00 PM
PM Engineer
1.13
sewer House
S.
Inspection for connection line 160
HFC- from HC -01 to MH- HC -01 to 01.30: BalaJi,R.
1090A excavation and mm dia Upvc of Area 8 20-Dec-14 02.30: 20-Dec-14 AN 12/28/2014
SEW 1.13 MH-1.13 00 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM
PM Engineer
1.13
Inspection for water sewera S.
the wall of sewerage sewerage
HFC- proofing (Polyprimes ge 01.30: BalaJi,R.
1423 pumping station (1st pump 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW B + Bitustic xl + pump 00 K, Sr.
stage) station 00 PM
bituboard) for station PM Engineer
Inspection for water sewera S.
the wall of sewerage sewerage
HFC- proofing (Polyprimes ge 01.30: BalaJi,R.
1424 pumping station (2nd pump 20-Dec-14 02.30: 20-Dec-14 AN 12/23/2014
SEW B + Bitustic xl + pump 00 K, Sr.
stage) station 00 PM
bituboard) for station PM Engineer
sewer House
S.
Inspection for connection line 160
HFC- HC -02 to BalaJi,R.
1425 excavation and mm dia Upvc of from HC -02 to MH-18 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/26/2015
SEW MH-18 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160
HFC- HC -04 to BalaJi,R.
1426 excavation and mm dia Upvc of from HC -04 to MH-18 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW MH-18 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1427 excavation and mm dia Upvc of from HC -01 to HC-02 Area 6 HC-02 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- BalaJi,R.
1428 excavation and mm dia Upvc of from HC -03 to HC-04 Area 6 HC-04 21-Dec-14 02.30: 21-Dec-14 08.30: A 12/28/2014
SEW K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1429 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1430 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- from HC -03 to end BalaJi,R.
1431 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18
sewer House
S.
Inspection for connection line 160 HC -04 to
HFC- from HC -04 to end BalaJi,R.
1432 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-18) 00 PM 00 AM
Engineer
18

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160
HFC- HC -02 to BalaJi,R.
1433 excavation and mm dia Upvc of from HC -02 to MH-19 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW MH-19 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160
HFC- HC -04 to BalaJi,R.
1434 excavation and mm dia Upvc of from HC -04 to MH-19 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW MH-19 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1435 excavation and mm dia Upvc of from HC -01 to HC-02 Area 6 HC-02 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- BalaJi,R.
1436 excavation and mm dia Upvc of from HC -03 to HC-04 Area 6 HC-04 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1437 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1438 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- from HC -03 to end BalaJi,R.
1439 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160 HC -04 to
HFC- from HC -04 to end BalaJi,R.
1440 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- (MH-19) 00 PM 00 AM
Engineer
19
sewer House
S.
Inspection for connection line 160
HFC- HC -02 to BalaJi,R.
1441 excavation and mm dia Upvc of from HC -02 to MH-20 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW MH-20 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160
HFC- HC -04 to BalaJi,R.
1442 excavation and mm dia Upvc of from HC -04 to MH-20 Area 6 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW MH-20 K, Sr.
prepared formation for Sewer Manhole MH- 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- BalaJi,R.
1443 excavation and mm dia Upvc of from HC -01 to HC-02 Area 6 HC-02 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- BalaJi,R.
1444 excavation and mm dia Upvc of from HC -03 to HC-04 Area 6 HC-04 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1445 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/17/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1446 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160 HC -03 to
HFC- from HC -03 to end BalaJi,R.
1447 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20
sewer House
S.
Inspection for connection line 160 HC -04 to
HFC- from HC -04 to end BalaJi,R.
1448 excavation and mm dia Upvc of Area 6 end cap 21-Dec-14 02.30: 21-Dec-14 08.30: A 1/15/2015
SEW cap K, Sr.
prepared formation for Sewer Manhole MH- ( MH-20) 00 PM 00 AM
Engineer
20
This is already S.
Inspection for fixing of so is being
HFC- approved with SEW- BalaJi,R.
0121 cover & frame for G-5 &G-7 resubmitted with Area 1 G-5 &G-7 21-Dec-14 02.30: 21-Dec-14 08.30: AN 12/24/2014
DR 1228, gully belongs to K, Sr.
double gully correct code DR-121 00 PM 00 AM
dranaige work Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1449 chamber of MH-1.11 HC-1, (MH 1.11) Area 8 21-Dec-14 011.30: 21-Dec-14 08.30: AN 1/5/2014
SEW base of Sewer House 1.11) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1450 chamber of MH-1.11 HC-1, (MH 1.11) Area 8 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/12/2015
SEW wall of Sewer House 1.11) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1451 chamber of MH-1.11 HC-2, (MH 1.11) Area 8 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/12/2015
SEW wall of Sewer House 1.11) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 ( MH BalaJi,R.
1452 chamber of MH-1.12 HC-1, (MH 1.12) Area 8 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/12/2015
SEW wall of Sewer House 1.12) K, Sr.
00 AM 00 AM
Connection Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 ( MH BalaJi,R.
1453 chamber of MH-1.12 HC-2, (MH 1.12) Area 8 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/12/2015
SEW wall of Sewer House 1.12) K, Sr.
00 AM 00 AM
Connection Engineer
S.
Inspection for placing
HFC- MH-5 BalaJi,R.
1454 & fixing of sewer Sewerage MH-5 Area 6 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW (0+911.85) K, Sr.
manhole base of 00 AM 00 AM
Engineer
S.
Inspection for placing
HFC- MH-4 BalaJi,R.
1455 & fixing of sewer for Sewerage MH-4 Area 6 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW (0+861.72) K, Sr.
manhole base of 00 AM 00 AM
Engineer
MH -6 ,CH
S.
Inspection of laying joint measurement of 200 mm dia upvc 0+968.96
HFC- BalaJi,R.
1456 geotextile, gravel pipe laying and sewer line from MH-6 Area 6 to MH-7, 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW K, Sr.
bedding, grannular surround for to NH- 7 CH 00 AM 00 AM
Engineer
1+032.78
S.
Visual inspection for 200mm dia upvc
HFC- MH: 4 to BalaJi,R.
1457 1st layer back filling sewer line from MH-4 Area 6 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW MH: 5 K, Sr.
for to MH-5 00 AM 00 AM
Engineer
S.
Visual inspection for 200mm dia upvc
HFC- MH: 4 to BalaJi,R.
1458 2nd layer back filling sewer line from MH-4 Area 6 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW MH: 5 K, Sr.
for to MH-5 00 AM 00 AM
Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0122 at precast yard area Yard area 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/12/2015
DR concreting for Gully- Area K, Sr.
00 AM 00 AM
02 nos Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-16 BalaJi,R.
1459 laying of (including st. specials Area 6 21-Dec-14 011.30: 21-Dec-14 08.30: A 12/24/2014
SEW gravel surrounding sewer line to MH-16 (1+518.64) K, Sr.
geotextile,joint 2nos) 00 AM 00 AM
Engineer
measurement

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation &
HFC- from MH 2.10 to MH MH 2.10 to BalaJi,R.
0123 prepared formation for Area 7 21-Dec-14 011.30: 21-Dec-14 08.30: AN 1/20/2015
DR 2.11 MH-2.11 K, Sr.
500mm dia GRP 00 AM 00 AM
Engineer
storm water Line
Inspection for S.
MH 2.11 ,
HFC- excavation & storm water drainage BalaJi,R.
0124 Area 7 0+158.096 21-Dec-14 011.30: 21-Dec-14 08.30: A 1/15/2015
DR prepared formation for MH-2.11 K, Sr.
1 00 AM 00 AM
Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard 011.3 BalaJi,R.
0097 & concreting for the AV-3 21-Dec-14 02.30: 21-Dec-14 AN 1/25/2015
FF fire fighting line Area 0:00 K, Sr.
wall of air valve 00 PM
AM Engineer
chamber (AV-3)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard 011.3 BalaJi,R.
0098 & concreting for the AV-4 21-Dec-14 02.30: 21-Dec-14 AN 1/25/2015
FF fire fighting line Area 0:00 K, Sr.
wall of air valve 00 PM
AM Engineer
chamber (AV-4)
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard 011.3 BalaJi,R.
0099 & concreting for the AV-5 21-Dec-14 02.30: 21-Dec-14 Revised 12/28/2014
FF fire fighting line Area 0:00 K, Sr.
wall of air valve 00 PM
AM Engineer
chamber (AV-5)
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard 011.3 BalaJi,R.
0100 & concreting for the AV-6 21-Dec-14 02.30: 21-Dec-14 A 1/12/2015
FF fire fighting line Area 0:00 K, Sr.
base of air valve 00 PM
AM Engineer
chamber (AV-6)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard 011.3 BalaJi,R.
0101 & concreting for the AV-7 21-Dec-14 02.30: 21-Dec-14 AN 1/12/2015
FF fire fighting line Area 0:00 K, Sr.
base of air valve 00 PM
AM Engineer
chamber (AV-7)
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard 011.3 BalaJi,R.
0102 & concreting for the AV-6 21-Dec-14 02.30: 21-Dec-14 Revised 12/28/2014
FF fire fighting line Area 0:00 K, Sr.
wall of air valve 00 PM
AM Engineer
chamber (AV-6)
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard 011.3 BalaJi,R.
0103 & concreting for the AV-7 21-Dec-14 02.30: 21-Dec-14 Revised 12/28/2014
FF fire fighting line Area 0:00 K, Sr.
wall of air valve 00 PM
AM Engineer
chamber (AV-7)
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+760 to 01.30: BalaJi,R.
0104 chanaige 0+800 to Area 7 21-Dec-14 04.30: 21-Dec-14 AN 12/24/2014
FF laying for 250 mm dia 0+880 00 K, Sr.
0+880 00 PM
HDPE PM Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+880 to 01.30: BalaJi,R.
0105 chanaige 0+880 to Area 7 21-Dec-14 04.30: 21-Dec-14 AN 12/24/2014
FF laying for 250 mm dia 1+010 00 K, Sr.
1+010 00 PM
HDPE PM Engineer
Inspection and joint S.
Irrigation line from
HFC- measurement of pipe 0+560 to 01.30: BalaJi,R.
0131 chanaige 0+560 to Area 7 21-Dec-14 04.30: 21-Dec-14 AN 12/24/2014
IRR laying for 200 mm dia 0+680 00 K, Sr.
0+680 00 PM
upvc PM Engineer
Inspection and joint S.
Irrigation line from
HFC- measurement of pipe 0+680 to 01.30: BalaJi,R.
0132 chainage 0+680 to Area 7 21-Dec-14 04.30: 21-Dec-14 AN 12/24/2014
IRR laying for 200 mm dia 0+820 00 K, Sr.
0+820 00 PM
upvc PM Engineer
Inspection and joint S.
water line from
HFC- measurement of pipe 0+140 to 01.30: BalaJi,R.
0113 chanaige 0+140 to Area 7 21-Dec-14 04.30: 21-Dec-14 AN 12/24/2014
WD laying for 150 mm dia 0+090 00 K, Sr.
0+090 00 PM
GRE PM Engineer
from ch 1+120 to S.
Inspection and joint
HFC- for 225 mm dia GRE 0+940 in area 4 over CH 1+120 02.30: BalaJi,R.
009B measurement of pipe Area 4 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
WD water line the bridge LHS to 0+940 00 K, Sr.
laying 00 PM
towards Island PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

from ch 0+060 to S.
Inspection and joint CH 0+
HFC- for 225 mm dia GRE 0+160 in area 4 over 02.30: BalaJi,R.
002B measurement of pipe Area 4 060 to 0+ 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
WD water line the bridge RHS 00 K, Sr.
laying 160 00 PM
towards Island PM Engineer

Inspection and joint from CHainage 0+160 S.


HFC- measurement for pipe - 0+560 over the 0+160 to 02.30: BalaJi,R.
007B Area 4 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
WD laying of 225 mm dia bridge RHS towards 0+560 00 K, Sr.
00 PM
GRE water line island PM Engineer

Abutment
1 to 2 S.
Inspection and joint duct 4WxD54 from
HFC- (10+323.2 02.30: BalaJi,R.
008D measurement for abutment 1 to Area 4 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
ETC to 00 K, Sr.
laying of Etisalat abutment 2 00 PM
10+825.00 PM Engineer
)
Inspection and joint abutment- S.
HFC-
measurement of pipe from abutment-1 to 1 to 02.30: BalaJi,R.
ITS/D 003B Area 4 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
laying for 4w x D54 abutment-2 abutment- 00 K, Sr.
IC 00 PM
DU duct pipe line 2 PM Engineer
Inspection and joint
S.
measurement of pipe
HFC- in area- 4 from ch 0+920 to 02.30: BalaJi,R.
0517C laying for 200 mm dia Area 4 21-Dec-14 04.30: 21-Dec-14 Revised 12/28/2014
SEW 0+920 - 1+150 1+150 00 K, Sr.
HDPE Sewer force 00 PM
PM Engineer
main line
Inspection and joint S.
HFC- measurement of pipe Irrigation line From ch 0-200 to 01.30: BalaJi,R.
0133 Area 4 22-Dec-14 04.30: 22-Dec-14 Revised 12/28/2014
IRR laying for 150 mm dia 0-200 to 0+700 0+700 00 K, Sr.
00 PM
GRE PM Engineer
S.
Inspection for external MH-
HFC- of sewer MH- BalaJi,R.
1460 waterproofing for the Area 6 16.1,16.2,1 22-Dec-14 09.30: 22-Dec-14 08.30: AN 12/24/2014
SEW 16.1,16.2,16.3 K, Sr.
base & wall 6.3 00 AM 00 AM
Engineer
S.
HFC- Inspection for MH-1.7 BalaJi,R.
1461 for Sewerage MH-1.7 Area 7 22-Dec-14 09.30: 22-Dec-14 08.30: AN 1/15/2015
SEW concreting of wall (0+347.29) K, Sr.
00 AM 00 AM
Engineer
MH-
Inspection for external S.
1.7,MH-
HFC- waterproofing for MH-1.7,MH-MH- BalaJi,R.
0333A Area 7 MH- 22-Dec-14 09.30: 22-Dec-14 08.30: AN 12/24/2014
SEW base & wall of Sewer 1.7.2,MH-1.7.3 K, Sr.
1.7.2,MH- 00 AM 00 AM
Manhole Engineer
1.7.3

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping 01.30: BalaJi,R.
0125A Highlighted portion n pump pump 22-Dec-14 04.30: 22-Dec-14 AN 1/24/2015
IRR concreting for fire station wall (wall no: 00 K, Sr.
station station 00 PM
fighting W1,W1A,W3,W4) PM Engineer

S.
Inspection of 4th fire fighting line from
HFC- 2+850 to 01.30: BalaJi,R.
0106 layer back filling for chainage 2+850 to Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/12/2015
FF 2+750 00 K, Sr.
250 mm dia HDPE 2+750 00 PM
PM Engineer
S.
Inspection for for washuot chamber
HFC- WO,0+29. 01.30: BalaJi,R.
0114 excavation & for 150mm dia GRE at ch 0+29.78 Area 7 22-Dec-14 01.30: 22-Dec-14 AN 1/20/2015
WD 78 00 K, Sr.
prepared formation water line 00 PM
PM Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 2+850 to 01.30: BalaJi,R.
0107 layer back filling for chainage 2+850 to Area 6 22-Dec-14 01.30: 22-Dec-14 Revised 12/23/2014
FF 2+750 00 K, Sr.
250 mm dia HDPE 2+750 00 PM
PM Engineer
S.
Inspection for for gate valve
HFC- 01.30: BalaJi,R.
0134 excavation & chamber for 200mm gate vlave no IV-5 Area 7 IV-5 22-Dec-14 01.30: 22-Dec-14 AN 1/20/2015
IRR 00 K, Sr.
prepared formation dia upvc Irrigation line 00 PM
PM Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+850 to 01.30: BalaJi,R.
0108 2nd layer back filling chainage 2+850 to Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/23/2014
FF 3+050 00 K, Sr.
for 250 mm dia HDPE 3+050 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 3rd fire fighting line from
HFC- 2+850 to 01.30: BalaJi,R.
0109 layer back filling for chainage 2+850 to Area 6 22-Dec-14 02.30: 22-Dec-14 A 1/17/2015
FF 3+050 00 K, Sr.
250 mm dia HDPE 3+050 00 PM
PM Engineer
S.
Inspection of 4th fire fighting line from
HFC- 2+850 to 01.30: BalaJi,R.
0110 layer back filling for chainage 2+850 to Area 6 22-Dec-14 04.30: 22-Dec-14 AN 1/17/2015
FF 3+050 00 K, Sr.
250 mm dia HDPE 3+050 00 PM
PM Engineer
Inspection of 4th S.
fire fighting line from
HFC- layer back filling with 2+450 to 01.30: BalaJi,R.
0111 chanaige 2+450 to Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/12/2015
FF warning tape for 250 2+600 00 K, Sr.
2+600 00 PM
mm dia HDPE PM Engineer
Inspection of 4th S.
fire fighting line from
HFC- layer back filling with 2+600 to 01.30: BalaJi,R.
0112 chanaige 2+600 to Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/12/2015
FF warning tape for 250 2+750 00 K, Sr.
2+750 00 PM
mm dia HDPE PM Engineer
S.
Inspection for sand fire fighting line from
HFC- 3+050 to 01.30: BalaJi,R.
0113 surround for 250 mm chainage 3+050 to Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/23/2014
FF 3+280 00 K, Sr.
dia HDPE 3+280 00 PM
PM Engineer
S.
Inspection for sand fire fighting line from
HFC- 3+280 to 01.30: BalaJi,R.
0114 surround for 250 mm chainage 3+280 to Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/23/2014
FF 3+450 00 K, Sr.
dia HDPE 3+450 00 PM
PM Engineer
S.
Inspection for sand
HFC- from Chainage 1+300 1+300 to 01.30: BalaJi,R.
0115 surround for 100 mm Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/23/2014
WD to 1+460 1+460 00 K, Sr.
dia GRE water line 00 PM
PM Engineer
S.
Inspection for sand
HFC- from Chainage 1+300 1+300 to 01.30: BalaJi,R.
0116 surround for 100 mm Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/23/2014
WD to 1+070 1+070 00 K, Sr.
dia GRE water line 00 PM
PM Engineer
S.
Inspection for sand
HFC- from Chainage 1+170 1+170 to 01.30: BalaJi,R.
0117 surround for 100 mm Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/28/2014
WD to 1+070 1+070 00 K, Sr.
dia GRE water line 00 PM
PM Engineer
Inspection of 3rd S.
HFC- layer back filling for from Chainage 1+630 1+630 to 01.30: BalaJi,R.
0118 Area 6 22-Dec-14 01.30: 22-Dec-14 Revised 12/28/2014
WD 100 mm dia GRE to 1+570 1+570 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 1st layer back filling from Chainage 1+460 1+460 to 01.30: BalaJi,R.
0119 Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/28/2014
WD for 100 mm dia GRE to 1+570 1+570 00 K, Sr.
00 PM
water line PM Engineer
Visual Inspection of S.
HFC- 2nd layer back filling from Chainage 1+460 1+460 to 01.30: BalaJi,R.
0120 Area 6 22-Dec-14 01.30: 22-Dec-14 AN 12/28/2014
WD for 100 mm dia GRE to 1+570 1+570 00 K, Sr.
00 PM
water line PM Engineer
Inspection of 3rd S.
HFC- layer back filling for from Chainage 1+460 1+460 to 01.30: BalaJi,R.
0121 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/17/2015
WD 100 mm dia GRE to 1+570 1+570 00 K, Sr.
00 PM
water line PM Engineer
Inspection for 3rd S.
HFC- layer back filling for from Chainage 1+770 1+770 to 01.30: BalaJi,R.
0122 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/17/2015
WD 100 mm dia GRE to 1+630 1+630 00 K, Sr.
00 PM
water line PM Engineer
Inspection for 4th S.
HFC- layer back filling for from Chainage 1+770 1+770 to 01.30: BalaJi,R.
0123 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/17/2015
WD 100 mm dia GRE to 1+630 1+630 00 K, Sr.
00 PM
water line PM Engineer
Inspection of 4th layer
S.
back filling with
HFC- from CHainage 2+050 2+050 to 01.30: BalaJi,R.
0124 warning tape for 100 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/21/2015
WD to 1+900 1+900 00 K, Sr.
mm dia GRE water 00 PM
PM Engineer
line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of 4th layer


S.
back filling with
HFC- from CHainage 1+900 1+900 to 01.30: BalaJi,R.
0125 warning tape for 100 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/21/2015
WD to 1+770 1+770 00 K, Sr.
mm dia GRE water 00 PM
PM Engineer
line
Inspection for 3rd S.
HFC- layer back filling for from CHainage 2+050 2+050 to 01.30: BalaJi,R.
0126 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/17/2015
WD 100 mm dia GRE - 2+160 2+160 00 K, Sr.
00 PM
water line PM Engineer
Inspection for 4th S.
HFC- layer back filling for from CHainage 2+050 2+050 to 01.30: BalaJi,R.
0127 Area 6 22-Dec-14 01.30: 22-Dec-14 A 1/21/2015
WD 100 mm dia GRE - 2+160 2+160 00 K, Sr.
00 PM
water line PM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2, (MH BalaJi,R.
1462 chamber of MH-2.1 HC-2, (MH 2.1) Area 9 23-Dec-14 01.30: 23-Dec-14 08.30: A 1/12/2015
SEW base of Sewer House 2.1) K, Sr.
00 PM 00 aM
Connections Engineer
Inspection of shutter S.
HC-1,HC-
HFC- and concreting for the HC-1,HC-2,HC-3 BalaJi,R.
1463 chamber of MH-2.2 Area 9 2,HC-3 23-Dec-14 01.30: 23-Dec-14 08.30: A 1/12/2015
SEW base of Sewer House (MH 2.2) K, Sr.
(MH 2.2) 00 PM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 BalaJi,R.
1464 chamber of MH-2.3 HC-1,HC-2 (MH 2.3) Area 9 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House (MH 2.3) K, Sr.
00 PM 00 aM
Connections Engineer
Inspection of shutter S.
HC-1,HC-
HFC- and concreting for the HC-1,HC-2,HC-3 BalaJi,R.
1465 chamber of MH-2.4 Area 9 2,HC-3 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House (MH 2.4) K, Sr.
(MH 2.4) 00 PM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 BalaJi,R.
1466 chamber of MH-2.5 HC-1,HC-2 (MH 2.5) Area 9 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/21/2015
SEW base of Sewer House (MH 2.5) K, Sr.
00 PM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2,HC-3 HC-1,HC-2 BalaJi,R.
1467 chamber of MH-2.6 Area 9 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/21/2015
SEW base of Sewer House (MH 2.6) (MH 2.5) K, Sr.
00 PM 00 aM
Connections Engineer
S.
HC-1,HC-2
HFC- Inspection for pouring for House connection HC-1,HC-2 of Sewer BalaJi,R.
1468 Area 8 of Sewer 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/15/2015
SEW of blinding concrete chambers of MH-1.14 MH 1.14 K, Sr.
MH 1.14 00 PM 00 aM
Engineer
MH-8, CH S.
Inspection for pouring
HFC- 1+086.48 BalaJi,R.
1469 of blinding concrete sewer MH -8 & MH -9 Area 6 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/21/2015
SEW & MH-9 K, Sr.
for 00 PM 00 aM
(1+150.82) Engineer
S.
Inspection for
HFC- MH-8, CH BalaJi,R.
1470 waterproofing above sewer MH -8 23-Dec-14 01.30: 23-Dec-14 08.30: AN 12/28/2014
SEW 1+086.48 K, Sr.
blinding concrete of 00 PM 00 aM
Engineer
S.
Inspection for
HFC- MH-9, CH BalaJi,R.
1471 waterproofing above sewer MH -9 23-Dec-14 01.30: 23-Dec-14 08.30: AN 12/28/2014
SEW 1+150.82) K, Sr.
blinding concrete of 00 PM 00 aM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-5 BalaJi,R.
1472 laying of (including st. specials Area 6 23-Dec-14 01.30: 23-Dec-14 08.30: AN 12/24/2014
SEW gravel surrounding sewer line to MH-5 (0+911.85) K, Sr.
geotextile,joint 2nos) 00 PM 00 aM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-4 BalaJi,R.
1473 laying of (including st. specials Area 6 23-Dec-14 01.30: 23-Dec-14 08.30: AN 12/24/2014
SEW gravel surrounding sewer line to MH-4 (0+861.72) K, Sr.
geotextile,joint 2nos) 00 PM 00 aM
Engineer
measurement
Inspection for
S.
excavation &
HFC- from MH 2.11 to MH MH 2.11 BalaJi,R.
0125 prepared formation for Area 5 23-Dec-14 01.30: 23-Dec-14 08.30: AN 1/20/2015
DR 3.0 to MH 3.0 K, Sr.
315mm dia upvc 00 PM 00 aM
Engineer
storm water Line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation &
HFC- from MH 3.0 to MH MH 3.0 to BalaJi,R.
0126 prepared formation for Area 5 23-Dec-14 01.30: 23-Dec-14 08.30: AN 2/4/2015
DR 3.1 MH 3.1 K, Sr.
315mm dia upvc 00 PM 00 aM
Engineer
storm water Line

Inspection of shutter, S.
HFC- water stopper & MH-17 BalaJi,R.
1474 MH-17 Area 6 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW concreting for the wall (1+562.82) K, Sr.
:00 AM 00 aM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & MH-16 BalaJi,R.
1475 MH-16 Area 6 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW concreting for the wall (1+518.64) K, Sr.
:00 AM 00 aM
of Sewerage Manhole Engineer

Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 BalaJi,R.
1476 chamber of MH-1.10 HC-1,HC-2 (MH 1.10) Area 8 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House (MH 1.10) K, Sr.
:00 AM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 BalaJi,R.
1477 chamber of MH-1.10 HC-1,HC-2 (MH 1.10) Area 8 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House (MH 1.10) K, Sr.
:00 AM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 BalaJi,R.
1478 chamber of MH-1.13 HC-1,HC-2 (MH 1.13) Area 8 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW wall of Sewer House (MH 1.13) K, Sr.
:00 AM 00 aM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 (MH BalaJi,R.
1479 chamber of MH-1.8 HC-1 (MH 1.8) Area 8 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/15/2015
SEW base of Sewer House 1.8) K, Sr.
:00 AM 00 aM
Connections Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+820 to BalaJi,R.
0135 chainage 0+820 to Area 7 23-Dec-14 010.30 23-Dec-14 08.30: Revised 1/20/2015
IRR prepared formation for 0+890 K, Sr.
0+890 :00 AM 00 aM
200 mm dia upvc Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 1+010 to BalaJi,R.
0115 chanaige 1+010 to Area 7 23-Dec-14 010.30 23-Dec-14 08.30: A 1/17/2015
FF prepared formation for 1+080 K, Sr.
1+080 :00 AM 00 aM
250 mm dia HDPE Engineer

S.
Visual Inspection of
HFC- from ch 0+720 to 0+720 to BalaJi,R.
1480 2nd layer back filling sewer pressure line Area 7 23-Dec-14 010.30 23-Dec-14 08.30: AN 12/28/2014
SEW 0+440 0+440 K, Sr.
for 200 mm dia HDPE :00 AM 00 aM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+030 to BalaJi,R.
0116 2nd layer back filling chanaige 2+030 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: AN 12/28/2014
FF 1+920 K, Sr.
for 250 mm dia HDPE 1+920 :00 AM 00 aM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 1+060 to BalaJi,R.
0136 1st layer back filling chainage 1+060 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: Revised 12/28/2014
IRR 0+980 K, Sr.
for 200 mm dia upvc 0+980 :00 AM 00 aM
Engineer
Visual Inspection for S.
Irrigation line from
HFC- 2nd layer back filling 1+060 to BalaJi,R.
0137 chainage 1+060 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: Revised 12/28/2014
IRR with warning tape for 0+980 K, Sr.
0+980 :00 AM 00 aM
200 mm dia upvc Engineer
Inspection of 3rd layer S.
Irrigation line from
HFC- back filling with 1+270 to BalaJi,R.
0138 chainage 1+270 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: A 1/25/2015
IRR warning tape for 200 1+160 K, Sr.
1+160 :00 AM 00 aM
mm dia upvc Engineer
Inspection of 3rd layer S.
Irrigation line from
HFC- back filling with 1+160 to BalaJi,R.
0139 chainage 1+160 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: Revised 12/28/2014
IRR warning tape for 200 1+060 K, Sr.
1+060 :00 AM 00 aM
mm dia upvc Engineer
Inspection of 3rd layer S.
fire fighting line from
HFC- back filling with 2+130 to BalaJi,R.
0117 chanaige 2+130 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: AN 1/25/2015
FF warning tape for 250 2+030 K, Sr.
2+030 :00 AM 00 aM
mm dia HDPE Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of 3rd layer S.


fire fighting line from
HFC- back filling with 2+350 to BalaJi,R.
0118 chanaige 2+350 to Area 6 23-Dec-14 010.30 23-Dec-14 08.30: Revised 12/28/2014
FF warning tape for 250 2+130 K, Sr.
2+130 :00 AM 00 aM
mm dia HDPE Engineer
Inspection of shutter
S.
and pouring of
HFC- irrigation transmission 0+750 to 0 010.3 BalaJi,R.
0140 concrete for concrete Area 1 23-Dec-14 01.30: 23-Dec-14 AN 12/15/2015
IRR line +730 0:00 K, Sr.
surround of 150mm 00 PM
AM Engineer
dia uPVC
S.
Inspection of 7th layer
HFC- MH-18 010.3 BalaJi,R.
1481 surruonding back Sewerage MH-18 Area 6 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW (1+645.43) 0:00 K, Sr.
filling around 00 PM
AM Engineer
S.
Inspection of 7th layer
HFC- MH-19 010.3 BalaJi,R.
1482 surruonding back Sewerage MH-19 Area 6 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW (1+728.89) 0:00 K, Sr.
filling around 00 PM
AM Engineer
S.
Inspection of 7th layer
HFC- MH-20 010.3 BalaJi,R.
1483 surruonding back Sewerage MH-20 Area 6 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW (1+811.63) 0:00 K, Sr.
filling around 00 PM
AM Engineer
Inspection of 7th S.
HFC- layer back filling 250 from MH -1.4 to MH- MH -1.4 to 010.3 BalaJi,R.
1484 Area 7 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW mm dia upvc sewer 1.3 MH-1.3 0:00 K, Sr.
00 PM
line AM Engineer
Inspection for 8th S.
HFC- layer back filling for from MH -1.5 to MH- MH -1.5 to 010.3 BalaJi,R.
1485 Area 7 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW 250 mm dia Upvc 1.4 MH-1.4 0:00 K, Sr.
00 PM
sewer line AM Engineer
Inspection for 8th S.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to 010.3 BalaJi,R.
1486 Area 7 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
SEW 250 mm dia Upvc 1.6 MH-1.6 0:00 K, Sr.
00 PM
sewer line AM Engineer
Inspection for 6th S.
HFC- layer back filling for from MH -1.3 to MH- MH -1.3 to 010.3 BalaJi,R.
1487 Area 7 23-Dec-14 01.30: 23-Dec-14 Revised 1/20/2015
SEW 250 mm dia Upvc 1.2 MH-1.2 0:00 K, Sr.
00 PM
sewer line AM Engineer
S.
for 250 mm dia upvc
HFC- Inspection for 4th MH -1.2 to 010.3 BalaJi,R.
1488 sewer line from MH Area 7 23-Dec-14 01.30: 23-Dec-14 Revised 1/20/2015
SEW layer back filling MH-1.1 0:00 K, Sr.
-1.2 to MH-1.1 00 PM
AM Engineer
S.
for 250 mm dia upvc
HFC- Inspection for 5th MH -1.2 to 010.3 BalaJi,R.
1489 sewer line from MH Area 7 23-Dec-14 01.30: 23-Dec-14 AN 1/20/2015
SEW layer back filling MH-1.1 0:00 K, Sr.
-1.2 to MH-1.1 00 PM
AM Engineer
S.
Inspection for MH
HFC- Storm water drainage 010.3 BalaJi,R.
0127 waterproofing over Area 7 2.4,0+342. 23-Dec-14 01.30: 23-Dec-14 AN 12/28/2014
DR MH 2.4 0:00 K, Sr.
the blinding of 1374 00 PM
AM Engineer
S.
Inspection for MH
HFC- Storm water drainage 010.3 BalaJi,R.
0128 waterproofing over Area 8 2.2,0+030. 23-Dec-14 01.30: 23-Dec-14 AN 12/28/2014
DR MH 2.2 0:00 K, Sr.
the blinding of 2095 00 PM
AM Engineer
S.
Inspection for MH
HFC- Storm water drainage 010.3 BalaJi,R.
0129 waterproofing over Area 8 2.3,0+063. 23-Dec-14 01.30: 23-Dec-14 AN 12/28/2014
DR MH 2.3 0:00 K, Sr.
the blinding of 213 00 PM
AM Engineer
S.
Inspection of sand
HFC- from Chainage 2+530 2+530 to 010.3 BalaJi,R.
0128 surround for 100 mm Area 6 23-Dec-14 01.30: 23-Dec-14 Revised 12/28/2014
WD to 2+610 2+610 0:00 K, Sr.
dia GRE water line 00 PM
AM Engineer
Inspection of S.
water line from
HFC- excavation and 0+020 to 010.3 BalaJi,R.
0129 chanaige 0+020 to Area 7 25-Dec-14 01.30: 25-Dec-14 A 1/17/2015
WD prepared formation for 0+090 0:00 K, Sr.
0+090 00 PM
150 mm dia GRE AM Engineer
HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1490 excavation & Area 6 24-Dec-14 09.30: 24-Dec-14 08.30: Revised 1/20/2015
SEW chambers of MH-18 4 of Sewer MH 18 4 of Sewer K, Sr.
prepared formation 00 AM 00 AM
MH 18 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1491 excavation & Area 6 24-Dec-14 09.30: 24-Dec-14 08.30: Revised 1/20/2015
SEW chambers of MH-19 4 of Sewer MH 19 4 of Sewer K, Sr.
prepared formation 00 AM 00 AM
MH 19 Engineer
HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1492 excavation & Area 6 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/20/2015
SEW chambers of MH-20 4 of Sewer MH 20 4 of Sewer K, Sr.
prepared formation 00 AM 00 AM
MH 20 Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1493 shutter,reinforcement Sewer MH-25 (Type- Area 6 MH-25 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1494 shutter,reinforcement Sewer MH-24 (Type- Area 6 MH-24 24-Dec-14 09.30: 24-Dec-14 08.30: A 1/20/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1495 shutter,reinforcement Sewer MH-23 (Type- Area 6 MH-23 24-Dec-14 09.30: 24-Dec-14 08.30: A 1/15/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1496 shutter,reinforcement Sewer MH-22 (Type- Area 6 MH-22 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1497 shutter,reinforcement Sewer MH-21 (Type- Area 6 MH-21 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting B) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- MH-20 BalaJi,R.
1498 shutter,reinforcement Sewer MH-20 (Type- Area 6 24-Dec-14 09.30: 24-Dec-14 08.30: RO 9/8/2015
SEW (1+811.63) K, Sr.
and concreting B) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- MH-19 BalaJi,R.
1499 shutter,reinforcement Sewer MH-19 (Type- Area 6 24-Dec-14 09.30: 24-Dec-14 08.30: A 1/15/2015
SEW (1+728.89) K, Sr.
and concreting C) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1500 shutter,reinforcement Sewer MH-18 (Type- Area 6 MH-18 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting C) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1501 shutter,reinforcement Sewer MH-21.1 Area 6 MH-21. 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1502 shutter,reinforcement Sewer MH-21.2 Area 6 MH-21.2 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1503 shutter,reinforcement Sewer MH-21.3 Area 6 MH-21.3 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1504 shutter,reinforcement Sewer MH-16.1 Area 6 MH-16.1 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1505 shutter,reinforcement Sewer MH-16.2 Area 6 MH-16.2 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1506 shutter,reinforcement Sewer MH-16.3 Area 6 MH-16.3 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting (Type-A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1507 shutter,reinforcement Sewer MH-8.1 (Type- Area 6 MH-8.1 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1508 shutter,reinforcement Sewer MH-8.2 (Type- Area 6 MH-8.2 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer
S.
Inspection of for the cover slab of
HFC- BalaJi,R.
1509 shutter,reinforcement Sewer MH-8.3 (Type- Area 6 MH-8.3 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW K, Sr.
and concreting A) 00 AM 00 AM
Engineer

for the cover slab of


MH-1.7,
Sewer MH-1.7 (Type- S.
Inspection of MH-1.7.1,
HFC- C), MH-1.7.1 (Type- BalaJi,R.
1510 shutter,reinforcement Area 7 MH-1.7.2, 24-Dec-14 09.30: 24-Dec-14 08.30: A 1/15/2015
SEW b), MH-1.7.2 (Type-b), K, Sr.
and concreting MH-1.7.3, 00 AM 00 AM
MH-1.7.3 (Type-A), Engineer
MH-1.7.4
MH-1.7.4 (Type-A)

for the cover slab of S.


Inspection of
HFC- Sewer MH- MH-1.7.5, BalaJi,R.
1511 shutter,reinforcement Area 5 24-Dec-14 09.30: 24-Dec-14 08.30: A 9/8/2015
SEW 1.7.5(Type-A), MH- MH-1.7.6 K, Sr.
and concreting 00 AM 00 AM
1.7.6(Type-A) Engineer

for the cover slab of MH-


Sewer MH-1.8 (Type- 1.8,MH-
b),MH-1.9(Type- 1.9,MH- S.
Inspection of
HFC- B),MH-1.10(Type- 1.10,MH- BalaJi,R.
1512 shutter,reinforcement Area 8 24-Dec-14 09.30: 24-Dec-14 08.30: AN 1/15/2015
SEW B),MH-1.11(Type- 1.11,MH- K, Sr.
and concreting 00 AM 00 AM
A),MH-1.12(Type- 1.12,MH- Engineer
A),MH-1.13(Type- 1.13,MH-
A),MH-1.14(Type-A) 1.14

for the cover slab of


MH-2.1,
Sewer MH-2.1(type-
MH-2.2, S.
Inspection of b) , MH-2.2(type-A),
HFC- MH-2.3, BalaJi,R.
1513 shutter,reinforcement MH-2.3(type-A), MH- Area 8 24-Dec-14 09.30: 24-Dec-14 08.30: A 1/15/2013
SEW MH-2.4, K, Sr.
and concreting 2.4(type-A), MH- 00 AM 00 AM
MH-2.5, Engineer
2.5(type-A), MH-
MH-2.6
2.6(type-A)

MH -7 ,CH
S.
Inspection of laying joint measurement of 200 mm dia upvc 1+032.78
HFC- BalaJi,R.
1514 geotextile, gravel pipe laying and sewer line from MH Area 6 to MH-8, 24-Dec-14 09.30: 24-Dec-14 08.30: AN 12/28/2014
SEW K, Sr.
bedding, grannular surround for -7 to MH-8 CH 00 AM 00 AM
Engineer
1+086.48

MH no.
4WXD54 Etislat duct 54657 JRC
S.
Inspection and joint from MH no. 54657 14) to
HFC- BalaJi,R.
0024A measurement of pipe JRC 14) to Abutmant- Area 1 Abutmant- 24-Dec-14 09.30: 25-Dec-14 08.30: AN 12/28/2014
ETC K, Sr.
laying for 1 (ch 10+200 to 1 (ch 00 AM 00 AM
Engineer
10+150) 10+200 to
10+150)
Visual Inspection for MH-03 to S.
HFC- from MH-03 to
1st layer back filling abutment- BalaJi,R.
ITS/D 0023A abutment-1(10+200 to Area 1 24-Dec-14 04.30: 24-Dec-14 08.30: AN 12/4/2014
for 4WXD54 DU Duct 1(10+200 K, Sr.
IC 10+160) 00 PM 00 AM
line to 10+160) Engineer
MH-03 to S.
HFC- Inspection for sand from MH-03 to
abutment- BalaJi,R.
ITS/D 0022A surround for 4WXD54 abutment-1(10+200 to Area 1 24-Dec-14 09.30: 24-Dec-14 08.30: AN 12/4/2014
1(10+200 K, Sr.
IC DU Duct line 10+160) 00 AM 00 AM
to 10+160) Engineer
Inspection and joint MH-03 to S.
HFC- from MH-03 to
measurement of pipe abutment- BalaJi,R.
ITS/D 0021A abutment-1(10+200 to Area 1 24-Dec-14 09.30: 24-Dec-14 08.30: AN 12/28/2014
laying for 4WXD54 1(10+200 K, Sr.
IC 10+160) 00 AM 00 AM
DU Duct line to 10+160) Engineer
Inspection for
S.
excavation and
HFC- from Chainage 0+550 0+550 to 010.3 BalaJi,R.
0025A prepared formation of Area 9 24-Dec-14 01.30: 24-Dec-14 Revised 12/28/2014
WD to 0+650 0+650 0:00 K, Sr.
100 mm dia GRE 00 PM
AM Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 0+650 0+650 to 010.3 BalaJi,R.
0026A prepared formation of Area 9 24-Dec-14 01.30: 24-Dec-14 Revised 12/28/2014
WD to 0+750 0+750 0:00 K, Sr.
100 mm dia GRE 00 PM
AM Engineer
water line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation and
HFC- from Chainage 0+750 0+750 to 010.3 BalaJi,R.
0027A prepared formation of Area 9 24-Dec-14 01.30: 24-Dec-14 Revised 12/28/2014
WD to 0+830 0+830 0:00 K, Sr.
100 mm dia GRE 00 PM
AM Engineer
water line
Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard 010.3 BalaJi,R.
0130 1.13,0+355 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
DR and concreting for MH 1.13 type -J Area 0:00 K, Sr.
.0432 00 PM
base slab AM Engineer
Inspection for S.
HFC- shuttering & Yard 010.3 BalaJi,R.
0131 at precast yard area Yard area 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
DR concreting for Gully- Area 0:00 K, Sr.
00 PM
04 nos AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from MH-2.2 to MH- MH 2.2 to 010.3 BalaJi,R.
0132 Area 8 25-Dec-14 03.30: 25-Dec-14 AN 12/28/2014
DR for 700mm dia GRP 2.3 MH 2.3 0:00 K, Sr.
00 PM
storm water Line AM Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from MH-2.2 to MH- MH 2.2 to 010.3 BalaJi,R.
0133 Area 8 25-Dec-14 04.30: 25-Dec-14 AN 12/28/2014
DR for 700mm dia GRP 2.3 MH 2.3 0:00 K, Sr.
00 PM
storm water Line AM Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard 010.3 BalaJi,R.
0119 for 250 mm dia HDPE Gate valve no IV-25 IV-25 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
FF & concreting for the Area 0:00 K, Sr.
fire fighting line 00 PM
wall of AM Engineer
Inspection for of gate valve S.
HFC- shutter,reinforcement chamber for 250 mm Yard 010.3 BalaJi,R.
0120 Gate valve no IV-26 IV-26 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
FF & concreting for the dia HDPE fire fighting Area 0:00 K, Sr.
00 PM
wall of line AM Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard 010.3 BalaJi,R.
0121 for 250 mm dia HDPE Gate valve no IV-27 IV-27 24-Dec-14 01.30: 24-Dec-14 Revised 12/28/2014
FF & concreting for the Area 0:00 K, Sr.
fire fighting line 00 PM
wall of AM Engineer
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard 010.3 BalaJi,R.
0122 for 250 mm dia HDPE Gate valve no IV-28 IV-28 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
FF & concreting for the Area 0:00 K, Sr.
fire fighting line 00 PM
wall of AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 250 mm dia HDPE 010.3 BalaJi,R.
0123 Area 6 AV-2 24-Dec-14 01.30: 24-Dec-14 AN 1/15/2015
FF for air valve chamber fire fighting line 0:00 K, Sr.
00 PM
(AV-2) AM Engineer
S.
Inspection for sand fire fighting line from
HFC- 0+760 to BalaJi,R.
0124 surround for 250 mm chanaige 0+800 to Area 7 27-Dec-14 09.30: 27-Dec-14 08.30: AN 12/28/2014
FF 0+880 K, Sr.
dia HDPE 0+880 00 AM 00 AM
Engineer
S.
Inspection for sand fire fighting line from
HFC- 0+880 to BalaJi,R.
0125 surround for 250 mm chanaige 0+880 to Area 7 27-Dec-14 09.30: 27-Dec-14 08.30: AN 12/28/2015
FF 1+010 K, Sr.
dia HDPE 1+010 00 AM 00 AM
Engineer
S.
Inspection for sand water line from
HFC- 0+360 to 010.3 BalaJi,R.
0130 surround for 150 mm chanaige 0+320 to Area 7 24-Dec-14 01.30: 24-Dec-14 AN 12/28/2014
WD 0+140 0:00 K, Sr.
dia GRE 0+140 00 PM
AM Engineer
S.
Inspection for sand water line from
HFC- 0+140 to 010.3 BalaJi,R.
0131 surround for 150 mm chanaige 0+140 to Area 7 24-Dec-14 01.30: 24-Dec-14 AN 12/28/2014
WD 0+090 0:00 K, Sr.
dia GRE 0+090 00 PM
AM Engineer
S.
Inspection for sand Irrigation line from
HFC- 0+560 to 010.3 BalaJi,R.
0141 surround for 200 mm chanaige 0+560 to Area 7 24-Dec-14 01.30: 24-Dec-14 AN 12/28/2014
IRR 0+680 0:00 K, Sr.
dia upvc 0+680 00 PM
AM Engineer
S.
Inspection for sand Irrigation line from
HFC- 0+680 to 010.3 BalaJi,R.
0142 surround for 200 mm chainage 0+680 to Area 7 24-Dec-14 01.30: 24-Dec-14 AN 12/28/2014
IRR 0+820 0:00 K, Sr.
dia upvc 0+820 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1515 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW 2.1 MH-2.1 0:00 K, Sr.
of sewer sewer MH-2.1 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for house connection line HC -02 to
HFC- 011.3 BalaJi,R.
1516 2nd layer back filling 160 mm dia upvc of from HC -02 to HC-1 Area 9 HC-1 (MH- 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.1 2.1) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1517 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.1 (MH-2.1) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1518 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.1 (MH-2.1) 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1519 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.2 MH-2.2 0:00 K, Sr.
of sewer sewer MH-2.2 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 011.3 BalaJi,R.
1520 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.2 MH-2.2 0:00 K, Sr.
of sewer sewer MH-2.2 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 011.3 BalaJi,R.
1521 2nd layer back filling 160 mm dia upvc of from HC -01 to HC-02 Area 9 HC-02 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1522 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1523 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 011.3 BalaJi,R.
1524 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.2 (MH-2.2) 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -01 to MH- HC -01 to 011.3 BalaJi,R.
1525 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.3 MH-2.3 0:00 K, Sr.
of sewer sewer MH-2.3 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 011.3 BalaJi,R.
1526 2nd layer back filling 160 mm dia upvc of from HC -01 to HC-02 Area 9 HC-02 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1527 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1528 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.3 ( MH-2.3) 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1529 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.4 MH-2.4 0:00 K, Sr.
of sewer sewer MH-2.4 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 011.3 BalaJi,R.
1530 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.4 MH-2.4 0:00 K, Sr.
of sewer sewer MH-2.4 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 011.3 BalaJi,R.
1531 2nd layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.4 2.4) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1532 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1533 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 011.3 BalaJi,R.
1534 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.4 (MH-2.4) 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -01 to MH- HC -01 to 011.3 BalaJi,R.
1535 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.5 MH-2.5 0:00 K, Sr.
of sewer sewer MH-2.5 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 011.3 BalaJi,R.
1536 2nd layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.5 2.5) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1537 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.5 (MH-2.5) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1538 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.5 (MH-2.5) 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1539 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.6 MH-2.6 0:00 K, Sr.
of sewer sewer MH-2.6 00 PM
AM Engineer
S.
Visual Inspection for house connection line
HFC- from HC -03 to MH- HC -03 to 011.3 BalaJi,R.
1540 2nd layer back filling 160 mm dia upvc of Area 9 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 2.6 MH-2.6 0:00 K, Sr.
of sewer sewer MH-2.6 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- 011.3 BalaJi,R.
1541 2nd layer back filling 160 mm dia upvc of from HC -01 to HC-2 Area 9 HC-2 (MH- 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0:00 K, Sr.
of sewer sewer MH-2.6 2.6) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -01 to
HFC- from HC -01 to end 011.3 BalaJi,R.
1542 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -02 to
HFC- from HC -02 to end 011.3 BalaJi,R.
1543 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
AM Engineer
S.
Visual Inspection for house connection line HC -03 to
HFC- from HC -03 to end 011.3 BalaJi,R.
1544 2nd layer back filling 160 mm dia upvc of Area 9 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW cap 0:00 K, Sr.
of sewer sewer MH-2.6 (MH-2.6) 00 PM
AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1545 Area 8 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line 1.10 MH-1.10 0:00 K, Sr.
00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC -02 to
HFC- 1st layer back filling from HC -02 to HC-01 011.3 BalaJi,R.
1546 Area 8 HC-01 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line (MH-1.10) 0:00 K, Sr.
(MH-1.10) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-01 to
HFC- 1st layer back filling from HC-01 to end 011.3 BalaJi,R.
1547 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.10) 0:00 K, Sr.
(MH-1.10) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-02 to
HFC- 1st layer back filling from HC-02 to end 011.3 BalaJi,R.
1548 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.10) 0:00 K, Sr.
(MH-1.10) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from HC -02 to MH- HC -02 to 011.3 BalaJi,R.
1549 Area 8 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line 1.11 MH-1.11 0:00 K, Sr.
00 PM
160mm diaupvc AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection for S.


HC -02 to
HFC- 1st layer back filling from HC -02 to HC-01 011.3 BalaJi,R.
1550 Area 8 HC-01 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line (MH-1.11) 0:00 K, Sr.
(MH-1.11) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-01 to
HFC- 1st layer back filling from HC-01 to end 011.3 BalaJi,R.
1551 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.11) 0:00 K, Sr.
(MH-1.11) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-02 to
HFC- 1st layer back filling from HC-02 to end 011.3 BalaJi,R.
1552 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.11) 0:00 K, Sr.
(MH-1.11) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from HC -01 to MH- HC -01 to 011.3 BalaJi,R.
1553 Area 8 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line 1.12 MH-1.12 0:00 K, Sr.
00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC -02 to
HFC- 1st layer back filling from HC -02 to HC-01 011.3 BalaJi,R.
1554 Area 8 HC-01 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line (MH-1.12) 0:00 K, Sr.
(MH-1.12) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-01 to
HFC- 1st layer back filling from HC-01 to end 011.3 BalaJi,R.
1555 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.12) 0:00 K, Sr.
(MH-1.12) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-02 to
HFC- 1st layer back filling from HC-02 to end 011.3 BalaJi,R.
1556 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.12) 0:00 K, Sr.
(MH-1.12) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from HC -01 to MH- HC -01 to 011.3 BalaJi,R.
1557 Area 8 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line 1.13 MH-1.13 0:00 K, Sr.
00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC -02 to
HFC- 1st layer back filling from HC -02 to HC-01 011.3 BalaJi,R.
1558 Area 8 HC-01 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line (MH-1.13) 0:00 K, Sr.
(MH-1.13) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-01 to
HFC- 1st layer back filling from HC-01 to end 011.3 BalaJi,R.
1559 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.13) 0:00 K, Sr.
(MH-1.13) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-02 to
HFC- 1st layer back filling from HC-02 to end 011.3 BalaJi,R.
1560 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW of sewer HC line cap (MH-1.13) 0:00 K, Sr.
(MH-1.13) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HFC- 1st layer back filling from HC -01 to MH- HC -01 to 011.3 BalaJi,R.
1561 Area 8 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW of sewer HC line 1.14 MH-1.14 0:00 K, Sr.
00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC -02 to
HFC- 1st layer back filling from HC -02 to HC-01 011.3 BalaJi,R.
1562 Area 8 HC-01 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW of sewer HC line (MH-1.14) 0:00 K, Sr.
(MH-1.14) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-01 to
HFC- 1st layer back filling from HC-01 to end 011.3 BalaJi,R.
1563 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW of sewer HC line cap (MH-1.14) 0:00 K, Sr.
(MH-1.14) 00 PM
160mm diaupvc AM Engineer
Visual Inspection for S.
HC-02 to
HFC- 1st layer back filling from HC-02 to end 011.3 BalaJi,R.
1564 Area 8 end cap 24-Dec-14 02.30: 24-Dec-14 AN 12/30/2014
SEW of sewer HC line cap (MH-1.14) 0:00 K, Sr.
(MH-1.14) 00 PM
160mm diaupvc AM Engineer
S.
Inspection for external
HFC- MH-1.7.1 , 011.3 BalaJi,R.
1565 water proofing for the of Sewrage MH-1.7.1 Area 7 24-Dec-14 02.30: 24-Dec-14 AN 12/28/2014
SEW 0+244.9 0:00 K, Sr.
base & wall 00 PM
AM Engineer
sewera S.
Inspection of 9th layer sewerage
HFC- sewerage pump ge 011.3 BalaJi,R.
1566 surruonding back pump 24-Dec-14 02.30: 24-Dec-14 Revised 1/4/2015
SEW station pump 0:00 K, Sr.
filling around station 00 PM
station AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewera S.
Inspection of 10th sewerage
HFC- sewerage pump ge 011.3 BalaJi,R.
1567 layer surruonding pump 24-Dec-14 02.30: 24-Dec-14 Revised 1/4/2015
SEW station pump 0:00 K, Sr.
back filling around station 00 PM
station AM Engineer
sewera S.
Inspection of 11th sewerage
HFC- sewerage pump ge 011.3 BalaJi,R.
1568 layer surruonding pump 25-Dec-14 02.30: 24-Dec-14 Revised 1/4/2015
SEW station pump 0:00 K, Sr.
back filling around station 00 PM
station AM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1,HC-2 011.3 BalaJi,R.
1569 chamber of MH-1.14 HC-1,HC-2 (MH 1.14) Area 8 24-Dec-14 02.30: 24-Dec-14 AN 1/15/2015
SEW wall of Sewer House (MH 1.14) 0:00 K, Sr.
00 PM
Connection AM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-1 (MH 011.3 BalaJi,R.
1570 chamber of MH-1.8 HC-1 (MH 1.18) Area 8 24-Dec-14 02.30: 24-Dec-14 UR
SEW wall of Sewer House 1.8) 0:00 K, Sr.
00 PM
Connection AM Engineer
S.
Inspection of for the cover slab of
HFC- MH-1.3 011.3 BalaJi,R.
1571 shutter,reinforcement Sewer MH-1.3 (Type- Area 7 24-Dec-14 04.30: 24-Dec-14 AN 1/15/2015
SEW (0+534.69) 0:00 K, Sr.
and concreting C) 00 PM
AM Engineer
S.
Inspection for placing
HFC- sewer manhole MH- MH -11 BalaJi,R.
1572 & fixing of sewer Area 6 25-Dec-14 04.30: 25-Dec-14 08.30: A 12/28/2014
SEW 11 (1.266.48) K, Sr.
manhole base for 00 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 200 mm dia upvc
HFC- MH -8 to BalaJi,R.
1573 geotextile, gravel pipe laying and sewer line from MH Area 6 25-Dec-14 04.30: 25-Dec-14 08.30: AN 12/30/2014
SEW MH-9 K, Sr.
bedding, grannular surround -8 to MH-9 00 PM 00 AM
Engineer
S.
Inspection for 3rd & Irrigation tranmission
HFC- 0+740 to 011.3 BalaJi,R.
0086C final layer backfilling line from chainage Area 1 24-Dec-14 04.30: 24-Dec-14 A 1/12/2015
IRR 0+840 0:00 K, Sr.
for 150mm dia uPVC 0+740 to 0+840 00 PM
AM Engineer
MH no.
Inspection of 54657 JRC
from MH no. 54657 S.
excavation and 14) to
HFC- JRC 14) to Abutmant- 011.3 BalaJi,R.
0018B prepared formation for Area 1 Abutmant- 25-Dec-14 09.30: 25-Dec-14 A 1/21/2015
ETC 1 (ch 10+250 to 0:00 K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 AM
10+310) AM Engineer
line 10+250 to
10+320)

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir 011.3 BalaJi,R.
0143 n pump pump 25-Dec-14 09.30: 25-Dec-14 Revised 1/4/2015
IRR (Polyprimes, bitustick and pumping station 0:00 K, Sr.
station station 00 AM
xl+ bituboard) wall (wall no: W1) AM Engineer

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- 011.3 BalaJi,R.
0022B with warning tape for Area 1 Abutmant- 25-Dec-14 09.30: 25-Dec-14 AN 1/4/2014
ETC 1 (ch 10+200 to 0:00 K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 AM
10+250) AM Engineer
line 10+200 to
10+250)

MH: 3 to
Inspection for 3rd S.
from MH: 3 to ch ch
HFC- layer back fiiling of 011.3 BalaJi,R.
1574 0+771.83 towards Area 6 0+771.83 28-Dec-14 11.30:0 28-Dec-14 Revised 1/10/2015
SEW 200mm dia Upvc 0:00 K, Sr.
MH: 2 towards 0 AM
sewer line AM Engineer
MH: 2
inspection for 3rd S.
HFC- layer back filling for MH: 3 to 011.3 BalaJi,R.
1575 from MH: 3 to MH: 4 Area 6 28-Dec-14 11.30:0 28-Dec-14 Revised 1/10/2015
SEW 200 mm dia Upvc MH: 4 0:00 K, Sr.
0 AM
sewer line AM Engineer
MH-18 to
Inspection of 8th S.
MH-17
HFC- layer backfilling for 011.3 BalaJi,R.
1576 from MH-18 to MH-17 Area 6 (1+645.43 28-Dec-14 11.30:0 28-Dec-14 A 1/20/2015
SEW 200mm dia uPVC 0:00 K, Sr.
to 0 AM
sewer line AM Engineer
1+562.05 )

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -9 ,CH
S.
Visual Inspection for for 200 mm dia upvc 1+150.82
HFC- Area 011.3 BalaJi,R.
1577 1st layer back filling sewer line from MH to MH-10, 28-Dec-14 11.30:0 28-Dec-14 AN 1/4/2015
SEW 6(IR-1) 0:00 K, Sr.
for -9 to MH-10 CH 0 AM
AM Engineer
1+215.06
MH -9 ,CH
S.
Visual Inspection for for 200 mm dia upvc 1+150.82
HFC- Area 011.3 BalaJi,R.
1578 2nd layer back filling sewer line from MH to MH-10, 28-Dec-14 11.30:0 28-Dec-14 AN 1/4/2015
SEW 6(IR-1) 0:00 K, Sr.
for -9 to MH-10 CH 0 AM
AM Engineer
1+215.06
Inspection of fixing S.
HFC- internal GRP HC-1&HC- 011.3 BalaJi,R.
0779A HC-1 & HC-02 Area 1 25-Dec-14 09.30: 25-Dec-14 A 1/5/2015
SEW lamination for house 2 0:00 K, Sr.
00 AM
connection chember AM Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 3+500 to BalaJi,R.
0126 chainage 3+500 to Area 6 25-Dec-14 09.30: 25-Dec-14 09.30: A 1/17/2015
FF prepared formation for 3+700 K, Sr.
3+700 00 AM 00 AM
250 mm dia HDPE Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 1+900 to BalaJi,R.
0127 chanaige 1+900 to Area 6 25-Dec-14 09.30: 25-Dec-14 09.30: A 1/24/2015
FF prepared formation for 1+690 K, Sr.
1+690 00 AM 00 AM
250 mm dia HDPE Engineer

Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0128 for 250 mm dia HDPE Gate valve no IV-21 IV-21 25-Dec-14 09.30: 25-Dec-14 09.30: A 1/21/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 AM 00 AM
wall of Engineer
Inspection for
S.
excavation and
HFC- from Chainage 1+070 1+070 to BalaJi,R.
0132 prepared formation of Area 6 25-Dec-14 09.30: 25-Dec-14 08.30: A 1/17/2015
WD to 0+930 0+930 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line

MH no.
54657 JRC
Inspection and joint from MH no. 54657 S.
14) to
HFC- measurement of pipe JRC 14) to Abutmant- 011.3 BalaJi,R.
0019B Area 1 Abutmant- 25-Dec-14 09.30: 25-Dec-14 A 12/28/2014
ETC laying for 4WXD54 1 (ch 10+250 to 0:00 K, Sr.
1 (ch 00 AM
Etisalat Duct line 10+310) AM Engineer
10+250 to
10+310)
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0134 waterproofing above Area 7 2.8,0+127. 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR MH 2.8 K, Sr.
blinding concrete of 98.95 :00 AM 00 AM
Engineer
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0135 waterproofing above Area 7 2.9,0+081. 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR MH 2.9 K, Sr.
blinding concrete of 7331 :00 AM 00 AM
Engineer
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0136 waterproofing above Area 7 2.10,0+034 25-Dec-14 010.30 25-Dec-14 09.30: A 12/28/2014
DR MH 2.10 K, Sr.
blinding concrete of .4192 :00 AM 00 AM
Engineer
S.
MH
HFC- Inspection for placing Storm water drainage BalaJi,R.
0137 Area 7 2.8,0+127. 25-Dec-14 010.30 25-Dec-14 09.30: A 12/28/2014
DR & fixing for base of MH 2.8 K, Sr.
98.95 :00 AM 00 AM
Engineer
S.
MH
HFC- Inspection for placing Storm water drainage BalaJi,R.
0138 Area 7 2.9,0+081. 25-Dec-14 010.30 25-Dec-14 09.30: A 12/28/2014
DR & fixing for base of MH 2.9 K, Sr.
7331 :00 AM 00 AM
Engineer
S.
MH
HFC- Inspection for placing Storm water drainage BalaJi,R.
0139 Area 7 2.10,0+034 25-Dec-14 010.30 25-Dec-14 09.30: Revised 12/28/2014
DR & fixing for base of MH 2.10 K, Sr.
.4192 :00 AM 00 AM
Engineer
Inspection of S.
with GRP benching
HFC- shutter,reinforcement Yard BalaJi,R.
0140 for storm water MH 1.11 25-Dec-14 010.30 25-Dec-14 09.30: AN 1/17/2015
DR and concreting for area K, Sr.
drainage MH-1.11 :00 AM 00 AM
base slab Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0141 at precast yard area Yard area 25-Dec-14 010.30 25-Dec-14 09.30: AN 1/17/2015
DR concreting for Gully- Area K, Sr.
:00 AM 00 AM
03nos Engineer
S.
for 600mm dia GRP
HFC- Visual Inspection of MH 2.4 to BalaJi,R.
0142 Storm water line from Area 7 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR 1st layer back filling MH 2.5 K, Sr.
MH2.4 to MH 2.5 :00 AM 00 AM
Engineer
S.
for 600mm dia GRP
HFC- Visual Inspection of MH 2.6 to BalaJi,R.
0143 Storm water line from Area 7 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR 1st layer back filling MH 2.5 K, Sr.
MH-2.6 to MH- 2.5 :00 AM 00 AM
Engineer
S.
for 600mm dia GRP
HFC- Visual Inspection of MH 2.4 to BalaJi,R.
0144 Storm water line from Area 7 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR 2nd layer back filling MH 2.5 K, Sr.
MH2.4 to MH 2.5 :00 AM 00 AM
Engineer
S.
for 600mm dia GRP
HFC- Visual Inspection of MH 2.6 to BalaJi,R.
0145 Storm water line from Area 7 25-Dec-14 010.30 25-Dec-14 09.30: AN 12/28/2014
DR 2nd layer back filling MH 2.5 K, Sr.
MH-2.6 to MH- 2.5 :00 AM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- from Chainage 2+840 2+840 to BalaJi,R.
0133 prepared formation of Area 6 25-Dec-14 010.30 25-Dec-14 09.30: A 1/17/2015
WD to 2+960 2+960 K, Sr.
100 mm dia GRE :00 AM 00 AM
Engineer
water line
S.
Visual Inspection for fire fighting line from
HFC- 0+800 to BalaJi,R.
0129 1st layer back filling chanaige 0+800 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
FF 0+880 K, Sr.
for 250 mm dia HDPE 0+880 :00 AM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 0+880 to BalaJi,R.
0130 2nd layer back filling chanaige 0+880 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
FF 1+010 K, Sr.
for 250 mm dia HDPE 1+010 :00 AM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+560 to BalaJi,R.
0144 1st layer back filling chanaige 0+560 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
IRR 0+680 K, Sr.
for 200 mm dia upvc 0+680 :00 AM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+680 to BalaJi,R.
0145 2nd layer back filling chainage 0+680 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
IRR 0+820 K, Sr.
for 200 mm dia upvc 0+820 :00 AM 00 AM
Engineer
S.
Visual Inspection for water line from
HFC- 0+140 to BalaJi,R.
0134 1st layer back filling chanaige 0+140 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
WD 0+090 K, Sr.
for 150 mm dia GRE 0+090 :00 AM 00 AM
Engineer
S.
Visual Inspection for water line from
HFC- 0+320 to BalaJi,R.
0135 2nd layer back filling chanaige 0+320 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
WD 0+140 K, Sr.
for 150 mm dia GRE 0+140 :00 AM 00 AM
Engineer
S.
Visual Inspection for water line from
HFC- 0+320 to BalaJi,R.
0136 1st layer back filling chanaige 0+320 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
WD 0+140 K, Sr.
for 150 mm dia GRE 0+140 :00 AM 00 AM
Engineer
S.
Visual Inspection for water line from
HFC- 0+140 to BalaJi,R.
0137 2nd layer back filling chanaige 0+140 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
WD 0+090 K, Sr.
for 150 mm dia GRE 0+090 :00 AM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+680 to BalaJi,R.
0146 1st layer back filling chainage 0+680 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
IRR 0+820 K, Sr.
for 200 mm dia upvc 0+820 :00 AM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+560 to BalaJi,R.
0147 2nd layer back filling chanaige 0+560 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
IRR 0+680 K, Sr.
for 200 mm dia upvc 0+680 :00 AM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 0+880 to BalaJi,R.
0131 1st layer back filling chanaige 0+880 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
FF 1+010 K, Sr.
for 250 mm dia HDPE 1+010 :00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for fire fighting line from
HFC- 0+800 to BalaJi,R.
0132 2nd layer back filling chanaige 0+800 to Area 7 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
FF 0+880 K, Sr.
for 250 mm dia HDPE 0+880 :00 AM 00 AM
Engineer
Inspection of S.
with GRP benching MH
HFC- shutter,reinforcement BalaJi,R.
0146 for Storm water MH- Area 7 2.10,0+034 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR and concreting for K, Sr.
2.10 .4192 :00 AM 00 AM
base slab Engineer
S.
Inspection for pouring MH 2.11 ,
HFC- storm water drainage BalaJi,R.
0147 of blinding concrete Area 7 0+158.096 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR MH-2.11 K, Sr.
for 1 :00 AM 00 AM
Engineer
S.
Inspection for MH
HFC- Storm water drainage BalaJi,R.
0148 excavation & Area 5 3.0,0+133. 27-Dec-14 010.30 27-Dec-14 09.30: A 1/20/2015
DR MH 3.0 K, Sr.
formation for 2178 :00 AM 00 AM
Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0149 of blinding concrete Area 5 3.0,0+133. 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR MH 3.0 K, Sr.
for 2178 :00 AM 00 AM
Engineer
S.
Inspection for MH-
HFC- Storm water drainage BalaJi,R.
0150 excavation & Area 5 3.1,0+085. 27-Dec-14 010.30 27-Dec-14 09.30: A 1/20/2015
DR MH 3.1 K, Sr.
formation for 8111 :00 AM 00 AM
Engineer
S.
Inspection for pouring MH-
HFC- Storm water drainage BalaJi,R.
0151 of blinding concrete Area 5 3.1,0+085. 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR MH 3.1 K, Sr.
for 8111 :00 AM 00 AM
Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0152 of blinding concrete Area 7 1.13,0+355 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR MH 1.13 K, Sr.
for .0432 :00 AM 00 AM
Engineer
S.
Inspection for pouring MH
HFC- Storm water drainage BalaJi,R.
0153 of blinding concrete Area 7 2.5,0+276. 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
DR MH 2.5 K, Sr.
for 2135 :00 AM 00 AM
Engineer
Inspection for S.
HFC- shuttering & Yard BalaJi,R.
0154 at precast yard area Yard area 27-Dec-14 010.30 27-Dec-14 09.30: AN 1/17/2015
DR concreting for Gully- Area K, Sr.
:00 AM 00 AM
03 nos Engineer

Inspection of shutter, S.
HFC- water stopper & (1st lift )for Sewerage MH-4 BalaJi,R.
1579 Area 6 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
SEW concreting for the wall MH-4 (0+861.72) K, Sr.
:00 AM 00 AM
of Sewerage Manhole Engineer

S.
Visual Inspection for 200 mm dia upvc
HFC- MH -11 to BalaJi,R.
1580 1st layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/30/2014
SEW MH-10 K, Sr.
for -11 to MH-10 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -11 to BalaJi,R.
1581 2nd layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/30/2014
SEW MH-10 K, Sr.
for -11 to MH-10 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
1582 1st layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-12 K, Sr.
for -13 to MH-12 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
1583 2nd layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-12 K, Sr.
for -13 to MH-12 :00 AM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 3rd MH -13 to BalaJi,R.
1584 sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: A 1/20/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
1585 1st layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-14 K, Sr.
for -13 to MH-14 :00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for 200 mm dia upvc
HFC- MH -13 to BalaJi,R.
1586 2nd layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-14 K, Sr.
for -13 to MH-14 :00 AM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 3rd MH -13 to BalaJi,R.
1587 sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
SEW layer back filling for MH-14 K, Sr.
-13 to MH-14 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -15 to BalaJi,R.
1588 1st layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/30/2014
SEW MH-14 K, Sr.
for -15 to MH-14 :00 AM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -15 to BalaJi,R.
1589 2nd layer back filling sewer line from MH Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/30/2014
SEW MH-14 K, Sr.
for -15 to MH-14 :00 AM 00 AM
Engineer
S.
Visual Inspection for for 200 mm dia upvc
HFC- MH-16 to BalaJi,R.
1590 1st layer back filling sewerage line from Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-15 K, Sr.
for MH-16 to MH-15 :00 AM 00 AM
Engineer
S.
Visual Inspection for for 200 mm dia upvc
HFC- MH-16 to BalaJi,R.
1591 2nd layer back filling sewerage line from Area 6 27-Dec-14 010.30 27-Dec-14 09.30: AN 12/28/2014
SEW MH-15 K, Sr.
for MH-16 to MH-15 :00 AM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 3rd MH-16 to BalaJi,R.
1592 sewerage line from Area 6 27-Dec-14 010.30 27-Dec-14 09.30: A 1/21/2015
SEW layer back filling for MH-15 K, Sr.
MH-16 to MH-15 :00 AM 00 AM
Engineer
Inspection & joint S.
HFC- measurement of pipe from Chainage 2+270 2+270 to BalaJi,R.
0138 Area 6 27-Dec-14 01.30: 27-Dec-14 09.30: AN 1/4/2015
WD laying for 100 mm dia to 2+160 2+160 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection for
S.
waterproofing
HFC- for 250 mm dia HDPE BalaJi,R.
0133 (Primer) for air valve Area 6 AV-2 27-Dec-14 01.30: 27-Dec-14 09.30: A 1/4/2015
FF fire fighting line K, Sr.
chamber bliding (AV- 00 PM 00 AM
Engineer
2)

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard BalaJi,R.
0134 concreting for the WO-01 WO-01 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
FF fighting line Area K, Sr.
base of washout 00 PM 00 AM
Engineer
chamber for

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard BalaJi,R.
0135 concreting for the WO-02 WO-02 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/21/2015
FF fighting line Area K, Sr.
base of washout 00 PM 00 AM
Engineer
chamber for

Inspection for 1st for fire fighting & S.


Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0148 n pump pump 27-Dec-14 01.30: 27-Dec-14 09.30: AN 1/5/2015
IRR back filling for the and pumping station K, Sr.
station station 00 PM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 2nd for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0149 n pump pump 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/5/2015
IRR back filling for the and pumping station K, Sr.
station station 00 PM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection of 3rd S.
HFC- layer back filling with from ch 0+720 to 0+720 to BalaJi,R.
1593 sewer pressure line Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/24/2015
SEW warning tape for 200 0+440 0+440 K, Sr.
00 PM 00 AM
mm dia HDPE Engineer
Inspection for 3rd S.
fire fighting line from
HFC- layer back filling with 0+880 to BalaJi,R.
0136 chanaige 0+880 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
FF warning tape for 250 1+010 K, Sr.
1+010 00 PM 00 AM
mm dia HDPE Engineer
Inspection for 3rd S.
Irrigation line from
HFC- layer back filling with 0+680 to BalaJi,R.
0150 chainage 0+680 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
IRR warning tape for 200 0+820 K, Sr.
0+820 00 PM 00 AM
mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 3rd S.


Irrigation line from
HFC- layer back filling with 0+560 to BalaJi,R.
0151 chanaige 0+560 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/25/2015
IRR warning tape for 200 0+680 K, Sr.
0+680 00 PM 00 AM
mm dia upvc Engineer
Inspection for 3rd S.
water line from
HFC- layer back filling with 0+320 to BalaJi,R.
0139 chanaige 0+320 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
WD warning tape for 150 0+140 K, Sr.
0+140 00 PM 00 AM
mm dia GRE Engineer
Inspection for 3rd S.
water line from
HFC- layer back filling with 0+140 to BalaJi,R.
0140 chanaige 0+140 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/25/2015
WD warning tape for 150 0+090 K, Sr.
0+090 00 PM 00 AM
mm dia GRE Engineer
Inspection for 3rd S.
fire fighting line from
HFC- layer back filling with 0+800 to BalaJi,R.
0137 chanaige 0+800 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
FF warning tape for 250 0+880 K, Sr.
0+880 00 PM 00 AM
mm dia HDPE Engineer
S.
HFC- Inspection for placing MH-9, CH BalaJi,R.
1594 sewer MH -9 27-Dec-14 04.30: 27-Dec-14 09.30: A 12/30/2014
SEW & fixing base of 1+150.82) K, Sr.
00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH -11 BalaJi,R.
1595 laying of (including st. specials Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 12/30/2014
SEW gravel surrounding sewer line to MH-11 (1.266.48) K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
HC-1,HC-2 S.
HFC- Inspection for pouring for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1596 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
SEW of bliding concrete for chambers of MH-18 4 of Sewer MH 18 4 of Sewer K, Sr.
00 PM 00 AM
MH 18 Engineer
HC-1,HC-2 S.
HFC- Inspection for pouring for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1597 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
SEW of bliding concrete for chambers of MH-19 4 of Sewer MH 19 4 of Sewer K, Sr.
00 PM 00 AM
MH 19 Engineer
S.
200 mm dia upvc
HFC- Inspection for 3rd MH -11 to BalaJi,R.
1598 sewer line from MH Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
SEW layer back filling for MH-10 K, Sr.
-11 to MH-10 00 PM 00 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 0+700 to BalaJi,R.
0138 chanaige 0+700 to Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
FF prepared formation for 0+860 K, Sr.
0+860 (Line-1) 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection for
S.
excavation and
HFC- from Chainage 2+960 2+960 to BalaJi,R.
0141 prepared formation of Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/21/2015
WD to 3+030 3+030 K, Sr.
100 mm dia GRE 00 PM 00 AM
Engineer
water line

Inspection for S.
fire fighting line from
HFC- excavation and 1+690 to BalaJi,R.
0139 chanaige 1+690 to Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/21/2015
FF prepared formation for 1+610 K, Sr.
1+610 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0140 for 250 mm dia HDPE Gate valve no IV-24 IV-24 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
base of Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -5 to BalaJi,R.
1599 1st layer back filling sewer line from MH Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 12/30/2014
SEW MH-6 K, Sr.
for -5 to MH-6 00 PM 00 AM
Engineer
S.
Visual Inspection for 200 mm dia upvc
HFC- MH -5 to BalaJi,R.
1600 2nd layer back filling sewer line from MH Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 12/30/2014
SEW MH-6 K, Sr.
for -5 to MH-6 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 3rd MH -5 to BalaJi,R.
1601 sewer line from MH Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
SEW layer back filling for MH-6 K, Sr.
-5 to MH-6 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for S.
Irrigation line from
HFC- excavation and 0+870 to BalaJi,R.
0152 chainage 0+870 to Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
IRR prepared formation for 0+700 K, Sr.
0+700 00 PM 00 AM
200 mm dia upvc Engineer

Inspection of shutter, S.
HFC- water stopper & (1st lift )for Sewerage MH-5 BalaJi,R.
1602 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
SEW concreting for the wall MH-5 (0+911.85) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

Inspection for
S.
excavation &
HFC- from MH 1.10 to MH MH 1.10 to BalaJi,R.
0155 prepared formation for Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
DR 1.11 MH-1.11 K, Sr.
700mm dia GRP 00 PM 00 AM
Engineer
storm water Line
Inspection for
S.
excavation &
HFC- from MH 1.11 to MH MH 1.11 to BalaJi,R.
0156 prepared formation for Area 7 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/20/2015
DR 1.12 MH-1.12 K, Sr.
700mm dia GRP 00 PM 00 AM
Engineer
storm water Line
Inspection of shutter S.
HFC- and concreting for the HC1,HC-2, BalaJi,R.
1603 chamber of MH-18 HC1,HC-2, (MH 18) Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
SEW base of Sewer House (MH 18) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC3,HC-4, BalaJi,R.
1604 chamber of MH-19 HC3,HC-4, (MH 19) Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/25/2015
SEW base of Sewer House (MH 19) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -02 to BalaJi,R.
1605 from HC -02 to MH-18 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 MH-18 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -04 to BalaJi,R.
1606 from HC -04 to MH-18 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: A 1/10/2015
SEW measurements of connection line 160 MH-18 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house BalaJi,R.
1607 from HC -01 to HC-02 Area 6 HC-02 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house BalaJi,R.
1608 from HC -03 to HC-04 Area 6 HC-04 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1609 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1610 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end BalaJi,R.
1611 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: Revised 1/8/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -04 to
HFC- granular bedding, joint sewer house from HC -04 to end BalaJi,R.
1612 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -02 to BalaJi,R.
1613 from HC -02 to MH-19 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: Revised 1/8/2015
SEW measurements of connection line 160 MH-19 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -04 to BalaJi,R.
1614 from HC -04 to MH-19 Area 6 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 MH-19 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for gravel surround for S.


HC -01 to
HFC- granular bedding, joint sewer house BalaJi,R.
1615 from HC -01 to HC-02 Area 6 HC-02 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house BalaJi,R.
1616 from HC -03 to HC-04 Area 6 HC-04 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1617 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1618 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end BalaJi,R.
1619 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -04 to
HFC- granular bedding, joint sewer house from HC -04 to end BalaJi,R.
1620 Area 6 end cap 27-Dec-14 04.30: 27-Dec-14 09.30: AN 1/4/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-19) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
MH no.
54657 JRC
from MH no. 54657 S.
Inspection of sand 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0020B surround for 4WXD54 Area 1 Abutmant- 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/4/2015
ETC 1 (ch 10+250 to K, Sr.
Etisalat Duct line 1 (ch :00 AM 00 AM
10+310) Engineer
10+250 to
10+310)

MH no.
Visual Inspection of 54657 JRC
from MH no. 54657 S.
1st layer back filling 14) to
HFC- JRC 14) to Abutmant- BalaJi,R.
0021B with warning tape for Area 1 Abutmant- 28-Dec-14 01.30: 28-Dec-14 09.30: AN 1/4/2014
ETC 1 (ch 10+250 to K, Sr.
4WXD54 Etisalat Duct 1 (ch 00 PM 00 AM
10+310) Engineer
line 10+250 to
10+310)
S.
for 600mm dia GRP
HFC- Inspection of 3rd MH 2.6 to BalaJi,R.
0157 Storm water line from Area 7 28-Dec-14 010.30 28-Dec-14 09.30: A 1/21/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.6 to MH- 2.5 :00 AM 00 AM
Engineer
Inspection and joint S.
HFC- measurement for 100 from Chainage 2+350 2+350 to BalaJi,R.
0142 Area 6 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/6/2015
WD mm dia GRE water to 2+390 2+390 K, Sr.
:00 AM 00 AM
line Engineer
for 250 mm dia HDPE S.
Inspection and joint
HFC- fire fighting line from 3+050 to BalaJi,R.
0141 measurement of pipe Area 6 28-Dec-14 010.30 28-Dec-14 09.30: AN 12/30/2014
FF chainage 3+050 to 3+160 K, Sr.
laying :00 AM 00 AM
3+160 Engineer
S.
for 600mm dia GRP
HFC- Inspection of 3rd MH 2.4 to BalaJi,R.
0158 Storm water line from Area 7 28-Dec-14 010.30 28-Dec-14 09.30: A 1/21/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.4 to MH- 2.5 :00 AM 00 AM
Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 3+450 to BalaJi,R.
0142 chanaige 3+450 to Area 6 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/4/2015
FF laying for 250 mm dia 3+700 K, Sr.
3+700 :00 AM 00 AM
HDPE Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 3+700 to BalaJi,R.
0143 chanaige 3+700 to Area 6 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
FF prepared formation for 3+810 K, Sr.
3+810 :00 AM 00 AM
250 mm dia HDPE Engineer

Inspection and joint S.


HFC- measurement for 100 from Chainage 1+070 1+070 to BalaJi,R.
0143 Area 6 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/4/2015
WD mm dia GRE water to 0+930 0+930 K, Sr.
:00 AM 00 AM
line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation and
HFC- from Chainage 0+930 0+930 to BalaJi,R.
0144 prepared formation of Area 6 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
WD to 0+830 0+830 K, Sr.
100 mm dia GRE :00 AM 00 AM
Engineer
water line
Inspection for
S.
excavation &
HFC- from MH 1.10 to MH MH 1.10 to BalaJi,R.
0159 prepared formation for Area 7 28-Dec-14 010.30 28-Dec-14 09.30: A 1/21/2015
DR 1.9 MH-1.9 K, Sr.
600mm dia GRP :00 AM 00 AM
Engineer
storm water Line
S.
Inspection for MH -1.9,
HFC- Storm water drainage BalaJi,R.
0160 excavation & Area 7 0+488.787 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
DR MH 1.9 K, Sr.
formation for 3 :00 AM 00 AM
Engineer
S.
Inspection for MH -1.10,
HFC- Storm water drainage BalaJi,R.
0161 excavation & Area 7 0+488.582 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
DR MH 1.10 K, Sr.
formation for 7 :00 AM 00 AM
Engineer
S.
Inspection for MH -1.11,
HFC- Storm water drainage BalaJi,R.
0162 excavation & Area 7 0+403.472 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
DR MH 1.11 K, Sr.
formation for 9 :00 AM 00 AM
Engineer
S.
Inspection for MH -1.12,
HFC- Storm water drainage BalaJi,R.
0163 excavation & Area 7 0+372.381 28-Dec-14 010.30 28-Dec-14 09.30: A 1/20/2015
DR MH 1.12 K, Sr.
formation for 8 :00 AM 00 AM
Engineer
S.
for 700mm dia GRP
HFC- Visual Inspection of MH 2.3 to BalaJi,R.
0164 Storm water line from Area 8 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/4/2015
DR 1st layer back filling MH 2.4 K, Sr.
MH-2.3 to MH- 2.4 :00 AM 00 AM
Engineer
S.
for 700mm dia GRP
HFC- Visual Inspection of MH 2.1 to BalaJi,R.
0165 Storm water line from Area 8 28-Dec-14 010.30 28-Dec-14 09.30: AN 1/4/2015
DR 1st layer back filling MH 2.2 K, Sr.
MH-2.1 to MH- 2.2 :00 AM 00 AM
Engineer
S.
for 700mm dia GRP
HFC- Visual Inspection of MH 2.3 to BalaJi,R.
0166 Storm water line from Area 8 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
DR 2nd layer back filling MH 2.4 K, Sr.
MH-2.3 to MH- 2.4 00 AM 00 AM
Engineer
S.
for 700mm dia GRP
HFC- Visual Inspection of MH 2.1 to BalaJi,R.
0167 Storm water line from Area 8 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
DR 2nd layer back filling MH 2.2 K, Sr.
MH-2.1 to MH- 2.2 00 AM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-9, CH BalaJi,R.
1621 laying of (including st. specials Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 12/30/2014
SEW gravel surrounding sewer line to MH-9 1+150.82) K, Sr.
geotextile,joint 2nos) 00 AM 00 AM
Engineer
measurement
S.
Inspection for external
HFC- MH-9, CH BalaJi,R.
1622 waterproofing for the Sewer MH-9 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW 1+150.82) K, Sr.
base of 00 AM 00 AM
Engineer
S.
Inspection for external
HFC- MH -13 BalaJi,R.
1623 waterproofing for the for MH-13 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW (1+366.36) K, Sr.
base & wall of 00 AM 00 AM
Engineer
S.
Inspection for external
HFC- MH -12 BalaJi,R.
1624 waterproofing for the for MH-12 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW (1+323.64) K, Sr.
base & wall of 00 AM 00 AM
Engineer
S.
HFC- Inspection for external for the wall of sewer MH-14 BalaJi,R.
1625 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW water proofing manhole MH-14 (1+425.89) K, Sr.
00 AM 00 AM
Engineer
S.
HFC- Inspection for external for the wall of sewer MH-15 BalaJi,R.
1626 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW water proofing manhole MH-15 (0+480.69) K, Sr.
00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for external
HFC- MH-17 BalaJi,R.
1627 waterproofing for the MH-17 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW (1+562.82) K, Sr.
base & wall of 00 AM 00 AM
Engineer
S.
Inspection for external
HFC- MH-16 BalaJi,R.
1628 waterproofing for the MH-16 Area 6 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2015
SEW (1+518.64) K, Sr.
base & wall of 00 AM 00 AM
Engineer
MH no.
4WXD54 Etislat duct 54657 JRC
S.
from MH no. 54657 14) to
HFC- Inspection for sand BalaJi,R.
0025 JRC 14) to Abutmant- Area 1 Abutmant- 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2014
ETC surround for K, Sr.
1 (ch 10+200 to 1 (ch 00 AM 00 AM
Engineer
10+150) 10+200 to
10+150)

MH no.
4WXD54 Etislat duct 54657 JRC
S.
from MH no. 54657 14) to
HFC- Visula Inspection for BalaJi,R.
0026 JRC 14) to Abutmant- Area 1 Abutmant- 28-Dec-14 011.30: 28-Dec-14 09.30: AN 1/4/2014
ETC 1st layer back filling K, Sr.
1 (ch 10+200 to 1 (ch 00 AM 00 AM
Engineer
10+150) 10+200 to
10+150)

MH 19 to
Inspection for 9th S.
MH 18
HFC- layer backfilling for From MH-19 to MH- BalaJi,R.
1629 Area 6 (1+728.89 28-Dec-14 011.30: 28-Dec-14 09.30: A 1/20/2015
SEW sewer line 200mm dia 18 K, Sr.
to 00 AM 00 AM
uPVC Engineer
1+645.43 )
MH 20 to
Inspection for 9th S.
MH 19
HFC- layer backfilling for From MH-20 to MH- BalaJi,R.
1630 Area 6 ( 1+811.63 28-Dec-14 011.30: 28-Dec-14 09.30: Revised 1/10/2015
SEW sewer line 200mm dia 19 K, Sr.
TO 00 AM 00 AM
uPVC Engineer
1+728.89 )

100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
of 100 mm dia GRE X 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- excavation and 11.250 bend,100 mm Area 6, 01.30: BalaJi,R.
0145 450 bend,100 mm dia dia GRE X 11.250 water line at R/A 2 attached 28-Dec-14 02.30: 28-Dec-14 AN 1/4/2015
WD prepared formation for dia GRE X 11.250 R/A 2 00 K, Sr.
GRE X 11.250 bend bend,100 mm dia (7nos) Sketch 00 PM
thrust block bend PM Engineer
GRE X 11.250 bend,

of 100 mm dia GRE X 100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
22.50 bend,100 mm 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- excavation and 11.250 bend,100 mm Area 6, 01.30: BalaJi,R.
0146 dia GRE X 11.250 dia GRE X 11.250 water line at R/A 2 attached 28-Dec-14 02.30: 28-Dec-14 AN 1/4/2015
WD prepared formation for dia GRE X 11.250 R/A 2 00 K, Sr.
bend,100 mm dia bend,100 mm dia (8nos) Sketch 00 PM
thrust block bend PM Engineer
GRE X 11.250 bend GRE X 11.250 bend,

Inspection of shutter S.
HFC- & concreting for the (2nd lift )for Sewerage MH-4 01.30: BalaJi,R.
1631 Area 6 28-Dec-14 02.30: 28-Dec-14 AN 1/25/2015
SEW wall of Sewerage MH-4 (0+861.72) 00 K, Sr.
00 PM
Manhole PM Engineer
Inspection of shutter S.
HFC- & concreting for the (2nd lift )for Sewerage MH-5 01.30: BalaJi,R.
1632 Area 6 28-Dec-14 02.30: 28-Dec-14 AN 1/17/2015
SEW wall of Sewerage MH-5 (0+911.85) 00 K, Sr.
00 PM
Manhole PM Engineer
Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard 01.30: BalaJi,R.
0168 2.2,0+030. 28-Dec-14 02.30: 28-Dec-14 AN 1/25/2015
DR and concreting for MH 2.2 type -j Area 00 K, Sr.
2095 00 PM
base slab PM Engineer

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping 01.30: BalaJi,R.
0153 n pump pump 28-Dec-14 02.30: 28-Dec-14 Revised 1/4/2015
IRR concreting for fire station wall (wall no: 00 K, Sr.
station station 00 PM
fighting W2 ) PM Engineer

S.
for 600mm dia GRP
HFC- Inspection of 4th MH 2.6 to BalaJi,R.
0169 Storm water line from Area 7 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.6 to MH- 2.5 00 PM 00 AM
Engineer
S.
for 600mm dia GRP
HFC- Inspection of 4th MH 2.4 to BalaJi,R.
0170 Storm water line from Area 7 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.4 to MH- 2.5 00 PM 00 AM
Engineer
A Dutco Balfour Beatty Company WI PM 015/May 2014
PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation and
HFC- from Chainage 1+560 1+560 to BalaJi,R.
0147 prepared formation of Area 7 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
WD to 1+710 1+710 K, Sr.
150 mm dia GRE 00 PM 00 AM
Engineer
water line

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard BalaJi,R.
0144 concreting for the WO-01 WO-01 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/17/2015
FF fighting line Area K, Sr.
wall of washout 00 PM 00 AM
Engineer
chamber for

Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0145 for 250 mm dia HDPE Gate valve no IV-24 IV-24 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/17/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
wall of Engineer
S.
Visual Inspection for Irrigation line from
HFC- 1+060 to BalaJi,R.
0136A 1st layer back filling chainage 1+060 to Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
IRR 0+980 K, Sr.
for 200 mm dia upvc 0+980 00 PM 00 AM
Engineer
Visual Inspection for S.
Irrigation line from
HFC- 2nd layer back filling 1+060 to BalaJi,R.
0137A chainage 1+060 to Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
IRR with warning tape for 0+980 K, Sr.
0+980 00 PM 00 AM
200 mm dia upvc Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 250 mm dia HDPE Yard BalaJi,R.
0103A & concreting for the AV-7 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/25/2015
FF fire fighting line Area K, Sr.
wall of air valve 00 PM 00 AM
Engineer
chamber (AV-7)
Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard BalaJi,R.
0121A for 250 mm dia HDPE Gate valve no IV-27 IV-27 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/17/2015
FF & concreting for the Area K, Sr.
fire fighting line 00 PM 00 AM
wall of Engineer
Inspection of 3rd S.
HFC- layer back filling for from Chainage 1+630 1+630 to BalaJi,R.
0118A Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
WD 100 mm dia GRE to 1+570 1+570 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection of sand
HFC- from Chainage 2+530 2+530 to BalaJi,R.
0128A surround for 100 mm Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
WD to 2+610 2+610 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Inspection of 3rd layer S.
Irrigation line from
HFC- back filling with 1+160 to BalaJi,R.
0139A chainage 1+160 to Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
IRR warning tape for 200 1+060 K, Sr.
1+060 00 PM 00 AM
mm dia upvc Engineer
Inspection and joint S.
water line from
HFC- measurement of pipe 0+020 to BalaJi,R.
0148 chanaige 0+020 to Area 7 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/6/2015
WD laying for for 150 mm 0+090 K, Sr.
0+090 00 PM 00 AM
dia GRE Engineer
S.
Inspection for placing
HFC- sewer manhole MH- MH-10 BalaJi,R.
1633 & fixing of sewer Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/4/2015
SEW 10 (1+215.06) K, Sr.
manhole base for 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- MH-6 BalaJi,R.
1634 & fixing of sewer sewer manhole MH-6 Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/4/2015
SEW (0+968.98) K, Sr.
manhole base for 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- MH-8, CH BalaJi,R.
1635 & fixing of sewer sewer MH -8 Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/4/2015
SEW 1+086.48 K, Sr.
manhole base for 00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-6 BalaJi,R.
1636 laying of (including st. specials Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
SEW gravel surrounding sewer line to MH-6 (0+968.98) K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-8, CH BalaJi,R.
1637 laying of (including st. specials Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/5/2015
SEW gravel surrounding sewer line to MH-8 1+086.48 K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
S.
for 200 mm dia upvc
HFC- Visual Inspection for MH -11 to BalaJi,R.
1638 sewer line from MH Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
SEW 1st layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Visual Inspection for MH -11 to BalaJi,R.
1639 sewer line from MH Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
SEW 2nd layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 3rd MH -11 to BalaJi,R.
1640 sewer line from MH Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 4/8/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
MH -9 ,CH
S.
for 200 mm dia upvc 1+150.82
HFC- Inspection for 3rd Area BalaJi,R.
1641 sewer line from MH to MH-10, 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
SEW layer back filling 6(IR-1) K, Sr.
-9 to MH-10 CH 00 PM 00 AM
Engineer
1+215.06
S.
200 mm dia upvc
HFC- Inspection for 3rd MH -15 to BalaJi,R.
1642 sewer line from MH Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
SEW layer back filling MH-14 K, Sr.
-15 to MH-14 00 PM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 4th MH-16 to BalaJi,R.
1643 sewerage line from Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
SEW layer back filling for MH-15 K, Sr.
MH-16 to MH-15 00 PM 00 AM
Engineer
Inspection of
S.
shutter,reinforcement MH
HFC- Storm water drainage Yard BalaJi,R.
0171 and concreting for 2.3,0+063. 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/25/2015
DR MH 2.3 Area K, Sr.
base slab with GRP 213 00 PM 00 AM
Engineer
benching
Inspection and joint S.
HFC- measurement of pipe from Chainage 2+740 2+740 to BalaJi,R.
0149 Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
WD laying for 100 mm dia to 2+840 2+840 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 2+840 2+840 to BalaJi,R.
0150 Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
WD laying for 100 mm dia to 2+960 2+960 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 2+960 2+960 to BalaJi,R.
0151 Area 6 29-Dec-14 02.30: 29-Dec-14 08.30: AN 1/4/2015
WD laying for 100 mm dia to 3+030 3+030 K, Sr.
00 PM 00 AM
GRE water line Engineer
S.
HFC- Inspection of 4th & for 200 mm dia HDPE 1+460 to BalaJi,R.
0780C Area 1 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
SEW final layer back filling Sewer pressure line 1+540 K, Sr.
00 PM 00 AM
Engineer

Inspection of 3rd & S.


HFC- final layer back filling form ch 1+560 - 1+560 - BalaJi,R.
1348A Area 1 29-Dec-14 02.30: 29-Dec-14 08.30: Revised 1/5/2015
SEW for 200 mm dia HDPE 1+587 1+587 K, Sr.
00 PM 00 AM
Sewer pressure line Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 1+540 to BalaJi,R.
0146 chanaige 1+540 to Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/25/2015
FF prepared formation for 1+610 K, Sr.
1+610 00 AM 00 AM
250 mm dia HDPE Engineer

sewera S.
Inspection of 12th sewerage
HFC- sewerage pump ge BalaJi,R.
1644 layer surruonding pump 29-Dec-14 02.30: 29-Dec-14 08.30: Revised 1/4/2015
SEW station pump K, Sr.
back filling around station 00 PM 00 AM
station Engineer
sewera S.
Inspection of 13th sewerage
HFC- sewerage pump ge BalaJi,R.
1645 layer surruonding pump 29-Dec-14 02.30: 29-Dec-14 08.30: Revised 1/4/2015
SEW station pump K, Sr.
back filling around station 00 PM 00 AM
station Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewera S.
Inspection of 14th sewerage
HFC- sewerage pump ge BalaJi,R.
1646 layer surruonding pump 30-Dec-14 011.30: 29-Dec-14 08.30: Revised 1/4/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
Inspection for sewera S.
sewerage
HFC- excavation & pump station valve ge BalaJi,R.
1647 pump 29-Dec-14 02.30: 29-Dec-14 08.30: Revised 1/4/2015
SEW preparation of chamber pump K, Sr.
station 00 PM 00 AM
formation for sewer station Engineer
MH-16 to
Inspection for 6th S.
MH-17
HFC- layer backfilling for BalaJi,R.
1648 from MH-16 to MH-17 Area 6 ( 1+518.64 29-Dec-14 02.30: 29-Dec-14 08.30: A 1/20/2015
SEW sewer line 200 mm K, Sr.
to 00 PM 00 AM
UPVC Engineer
1+562.05)
Inspection for
S.
excavation & for 150 mm dia upvc
HFC- IV- 09, BalaJi,R.
0154 prepared formation for Irrigation transmission Area 1 30-Dec-14 09.30: 30-Dec-14 08.30: A 1/20/2015
IRR 0+735.037 K, Sr.
Isolation valve line 00 AM 00 AM
Engineer
chamber
Inspection for
S.
excavation and
HFC- from Chainage 3+030 3+030 to BalaJi,R.
0152 prepared formation of Area 6 30-Dec-14 09.30: 30-Dec-14 08.30: AN 1/24/2015
WD to 3+110 3+110 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line
Inspection for S.
Irrigation line from
HFC- excavation and 0+680 to BalaJi,R.
0155 chainage 0+680 to Area 6 30-Dec-14 09.30: 30-Dec-14 08.30: A 1/25/2015
IRR prepared formation for 0+610 K, Sr.
0+610 00 AM 00 AM
200 mm dia upvc Engineer
S.
Inspection of
HFC- for the cover slab of MH-4 BalaJi,R.
1649 shutter,reinforcement Area 6 30-Dec-14 09.30: 30-Dec-14 08.30: AN 1/25/2015
SEW Sewer MH-4 (Type-D) (0+861.72) K, Sr.
and concreting 00 AM 00 AM
Engineer
Inspection for
S.
excavation &
HFC- from MH 1.8 to MH MH 1.8 to BalaJi,R.
0172 prepared formation for Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR 1.9 MH-1.9 K, Sr.
600mm dia GRP 00 AM 00 AM
Engineer
storm water Line
Inspection for
S.
excavation &
HFC- from MH 1.8 to MH MH 1.8 to BalaJi,R.
0173 prepared formation for Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR 1.7 MH-1.7 K, Sr.
500mm dia GRP 00 AM 00 AM
Engineer
storm water Line
Inspection for
S.
excavation &
HFC- from MH 1.6 to MH MH 1.6 to BalaJi,R.
0174 prepared formation for Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR 1.7 MH-1.7 K, Sr.
500mm dia GRP 00 AM 00 AM
Engineer
storm water Line
S.
Inspection for MH -1.6,
HFC- Storm water drainage BalaJi,R.
0175 excavation & Area 7 0+604.581 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR MH 1.6 K, Sr.
formation for 7 00 AM 00 AM
Engineer
S.
Inspection for MH -1.7,
HFC- Storm water drainage BalaJi,R.
0176 excavation & Area 7 0+566.751 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR MH 1.7 K, Sr.
formation for 7 00 AM 00 AM
Engineer
S.
Inspection for
HFC- Storm water drainage MH -1.8, BalaJi,R.
0177 excavation & Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/24/2015
DR MH 1.8 0+528.952 K, Sr.
formation for 00 AM 00 AM
Engineer
Inspection of
S.
shutter,reinforcement MH -1.12,
HFC- Storm water drainage Yard BalaJi,R.
0178 and concreting for 0+372.381 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
DR MH 1.12 Area K, Sr.
base slab with GRP 8 00 AM 00 AM
Engineer
benching
Inspection of
S.
shutter,reinforcement
HFC- Storm water drainage Yard MH -1.8, BalaJi,R.
0179 and concreting for 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
DR MH 1.8 Area 0+528.952 K, Sr.
base slab with GRP 00 AM 00 AM
Engineer
benching

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter, S.
HFC- water stopper & sewer manhole MH- MH -11 BalaJi,R.
1650 Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
SEW concreting for the wall 11 (1.266.48) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

S.
Inspection of
HFC- for the cover slab of MH -11 BalaJi,R.
1651 shutter,reinforcement Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
SEW Sewer MH-11 (1.266.48) K, Sr.
and concreting 00 AM 00 AM
Engineer
HC-1,HC-2 S.
HFC- Inspection for pouring for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1652 Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
SEW of blinding concrete chambers of MH-20 4 of Sewer MH 20 4 of Sewer K, Sr.
00 AM 00 AM
MH 20 Engineer
Inspection of shutter S.
HFC- and concreting for the HC3,HC-4, BalaJi,R.
1653 chamber of MH-18 HC3,HC-4, (MH 18) Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
SEW base of Sewer House (MH 18) K, Sr.
00 AM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC1,HC-2, BalaJi,R.
1654 chamber of MH-19 HC1,HC-2, (MH 19) Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/17/2015
SEW base of Sewer House (MH 19) K, Sr.
00 AM 00 AM
Connections Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 0+860 to BalaJi,R.
0147 chanaige 0+860 to Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/25/2015
FF prepared formation for 0+920 K, Sr.
0+920 (Line-1) RHS 00 AM 00 AM
250 mm dia HDPE Engineer

Inspection for
S.
excavation and
HFC- from Chainage 1+710 1+710 to BalaJi,R.
0153 prepared formation of Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/24/2015
WD to 1+760 line 1 1+760 K, Sr.
150 mm dia GRE 00 AM 00 AM
Engineer
water line
S.
Inspection of laying joint measurement of for 500mm dia GRP
HFC- MH 2.10 to BalaJi,R.
0180 geotextile, gravel pipe laying and Storm water line from Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
DR MH-2.11 K, Sr.
bedding, grannular surround MH-2.10 to MH- 2.11 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 315mm dia upvc
HFC- MH 2.11 BalaJi,R.
0181 geotextile, gravel pipe laying and Storm water line from Area 5 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
DR to MH 3.0 K, Sr.
bedding, grannular surround MH-2.11 to MH- 3.0 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of for 315mm dia upvc
HFC- MH 3.0 to BalaJi,R.
0182 geotextile, gravel pipe laying and Storm water line from Area 5 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
DR MH 3.1 K, Sr.
bedding, grannular surround MH-3.0 to MH- 3.1 00 AM 00 AM
Engineer
Inspection for 3rd S.
HFC- layer back filling for from MH-2.2 to MH- from MH-2.2 to MH- MH 2.2 to BalaJi,R.
0183 Area 8 30-Dec-14 011.30: 30-Dec-14 08.30: A 1/20/2015
DR 700mm dia GRP 2.3 2.3 MH 2.3 K, Sr.
00 AM 00 AM
storm water Line Engineer
MH -7 ,CH
S.
Visual Inspection for 200 mm dia upvc 1+032.78
HFC- BalaJi,R.
1655 1st layer back filling sewer line from MH Area 6 to MH-8, 30-Dec-14 011.30: 30-Dec-14 08.30: A 8/31/2015
SEW K, Sr.
for -7 to MH-8 CH 00 AM 00 AM
Engineer
1+086.48
MH -6 ,CH
S.
Visual Inspection for 200 mm dia upvc 0+968.96
HFC- BalaJi,R.
1656 1st layer back filling sewer line from MH-6 Area 6 to MH-7, 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW K, Sr.
for to NH- 7 CH 00 AM 00 AM
Engineer
1+032.78
S.
Visual Inspection for for 200 mm dia upvc
HFC- MH -8 to BalaJi,R.
1657 1st layer back filling sewer line from MH Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW MH-9 K, Sr.
for -8 to MH-9 00 AM 00 AM
Engineer
MH -7 ,CH
S.
Visual Inspection for 200 mm dia upvc 1+032.78
HFC- BalaJi,R.
1658 2nd layer back filling sewer line from MH Area 6 to MH-8, 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW K, Sr.
for -7 to MH-8 CH 00 AM 00 AM
Engineer
1+086.48

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -6 ,CH
S.
Visual Inspection for 200 mm dia upvc 0+968.96
HFC- BalaJi,R.
1659 2nd layer back filling sewer line from MH-6 Area 6 to MH-7, 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW K, Sr.
for to NH- 7 CH 00 AM 00 AM
Engineer
1+032.78
S.
Visual Inspection for for 200 mm dia upvc
HFC- MH -8 to BalaJi,R.
1660 2nd layer back filling sewer line from MH Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW MH-9 K, Sr.
for -8 to MH-9 00 AM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-10 BalaJi,R.
1661 laying of (including st. specials Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/4/2015
SEW gravel surrounding sewer line to MH-10 (1+215.06) K, Sr.
geotextile,joint 2nos) 00 AM 00 AM
Engineer
measurement
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 0+700 to BalaJi,R.
0148 chanaige 0+700 to Area 7 30-Dec-14 03.30: 30-Dec-14 08.30: AN 1/6/2015
FF laying for 250 mm dia 0+860 K, Sr.
0+860 (Line-1) RHS 00 PM 00 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 0+860 to BalaJi,R.
0149 chanaige 0+860 to Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/10/2015
FF laying for 250 mm dia 0+920 K, Sr.
0+920 (Line-1) 00 AM 00 AM
HDPE Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 1+710 1+710 to BalaJi,R.
0154 Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/6/2015
WD laying for 150 mm dia to 1+760 line 2 RHS 1+760 K, Sr.
00 AM 00 AM
GRE water line Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 1+010 to BalaJi,R.
0150 chanaige 1+010 to Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/6/2015
FF laying for 250 mm dia 1+080 K, Sr.
1+080 LINE 2 LHS 00 AM 00 AM
HDPE Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 0+820 to BalaJi,R.
0156 chainage 0+820 to Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/6/2015
IRR laying for 200 mm dia 0+890 K, Sr.
0+890 00 AM 00 AM
upvc Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 1+560 1+560 to BalaJi,R.
0155 Area 7 30-Dec-14 011.30: 30-Dec-14 08.30: AN 1/6/2015
WD laying for 150 mm dia to 1+710 LINE 2 RHS 1+710 K, Sr.
00 AM 00 AM
GRE water line Engineer
Inspection for
S.
excavation and
HFC- from Chainage 3+030 3+030 to BalaJi,R.
0156 prepared formation of Area 6 30-Dec-14 09.30: 30-Dec-14 08.30: AN 1/10/2015
WD to 3+110 3+110 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line

Inspection for S.
fire fighting line from
HFC- excavation and 1+540 to BalaJi,R.
0151 chanaige 1+540 to Area 6 30-Dec-14 011.30: 30-Dec-14 08.30: C 1/4/2014
FF prepared formation for 1+610 K, Sr.
1+610 00 AM 00 AM
250 mm dia HDPE Engineer

Inspection and joint S.


fire fighting line from
HFC- measurement of pipe 1+540 to BalaJi,R.
0152 chanaige 1+540 to Area 6 6-Jan-15 011.30: 6-Jan-15 08.30: Revised 1/12/2015
FF laying for 250 mm dia 1+610 K, Sr.
1+610 00 AM 00 AM
HDPE Engineer
S.
Inspection of 3rd & road crossing Duct
HFC- 2x10W 150mm dia 10+108.60 BalaJi,R.
0011D final layer back filling No.1 at ch Area 1 14-Jan-14 02.30: 14-Jan-14 08.30: A 1/28/2015
ED upvc addittional HV 5 K, Sr.
for 10+108.605 00 PM 00 AM
Engineer
S.
Inspection of 3rd & road crossing Duct
HFC- 2x4W 150mm dia 10+107.68 BalaJi,R.
0012D final layer back filling No.1 at ch Area 1 14-Jan-14 02.30: 14-Jan-14 08.30: A 1/28/2015
ED upvc addittional LV 1 K, Sr.
for 10+107.681 00 PM 00 AM
Engineer

100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
of 100 mm dia GRE X 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- installation, 11.250 bend,100 mm Area 6, BalaJi,R.
0157 450 bend,100 mm dia dia GRE X 11.250 water line at R/A 2 attached 30-Dec-14 02.30: 30-Dec-14 08.30: Revised 1/25/2015
WD &concreting of thrust dia GRE X 11.250 R/A 2 K, Sr.
GRE X 11.250 bend bend,100 mm dia (7nos) Sketch 00 PM 00 AM
block for bend Engineer
GRE X 11.250 bend,

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

of 100 mm dia GRE X 100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
22.50 bend,100 mm 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- installation, 11.250 bend,100 mm Area 6, BalaJi,R.
0158 dia GRE X 11.250 dia GRE X 11.250 water line at R/A 2 attached 30-Dec-14 02.30: 30-Dec-14 08.30: Revised 1/25/2015
WD &concreting of thrust dia GRE X 11.250 R/A 2 K, Sr.
bend,100 mm dia bend,100 mm dia (8nos) Sketch 00 PM 00 AM
block for bend Engineer
GRE X 11.250 bend GRE X 11.250 bend,

Inspection and joint S.


Irrigation line from
HFC- measurement of pipe 0+700 to BalaJi,R.
0157 chainage 0+700 to Area 6 31-Dec-14 011..30 31-Dec-14 08.30: AN 1/12/2015
IRR laying for 200 mm dia 0+610 K, Sr.
0+610 :00 AM 00 AM
upvc Engineer
Inspection for 3rd for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0158 n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: A 1/25/2015
IRR back filling for the and pumping station K, Sr.
station station :00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 4th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0159 n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: A 1/25/2015
IRR back filling for the and pumping station K, Sr.
station station :00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 5th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0160 n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: Revised 1/4/2015
IRR back filling for the and pumping station K, Sr.
station station :00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0161 n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: AN 1/6/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station :00 AM 00 AM
xl+ bituboard) wall (wall no: W3) Engineer

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0162 n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: AN 1/6/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station :00 AM 00 AM
xl+ bituboard) wall (wall no: W1a) Engineer

Inspection for 1st S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0163 irrigation reservoir n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: Revised 1/7/2015
IRR back filling for the K, Sr.
and pumping station station station :00 AM 00 AM
wall of W3 Engineer
Inspection for 2nd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0164 irrigation reservoir n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: Revised 1/7/2015
IRR back filling for the K, Sr.
and pumping station station station :00 AM 00 AM
wall of W3 Engineer
Inspection for 3rd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0165 irrigation reservoir n pump pump 31-Dec-14 011..30 31-Dec-14 08.30: Revised 1/7/2015
IRR back filling for the K, Sr.
and pumping station station station :00 AM 00 AM
wall of W3 Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 0+930 0+930 to BalaJi,R.
0159 Area 6 31-Dec-14 011..30 31-Dec-14 08.30: AN 1/6/2015
WD laying of 100 mm dia to 0+830 0+830 K, Sr.
:00 AM 00 AM
GRE water line Engineer
Inspection for
S.
excavation &
HFC- from MH 1.6 to MH MH 1.6 to BalaJi,R.
0184 prepared formation for Area 7 31-Dec-14 011..30 31-Dec-14 08.30: A 1/24/2015
DR 1.5 MH-1.5 K, Sr.
500mm dia GRP :00 AM 00 AM
Engineer
storm water Line
S.
Inspection for MH -1.5,
HFC- Storm water drainage BalaJi,R.
0185 excavation & Area 7 0+0642.50 31-Dec-14 011..30 31-Dec-14 08.30: A 1/24/2015
DR MH 1.5 K, Sr.
formation for 91 :00 AM 00 AM
Engineer
S.
Inspection for placing
HFC- MH-7 BalaJi,R.
1662 & fixing sewer base sewer manhole MH-7 Area 6 31-Dec-14 011..30 31-Dec-14 08.30: A 1/6/2015
SEW (1+032.78) K, Sr.
of :00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 700mm dia GRP from MH 1.10 to MH MH 1.10 to BalaJi,R.
0186 geotextile, gravel pipe laying and Area 7 31-Dec-14 04..30: 31-Dec-14 08.30: AN 1/10/2015
DR Storm water 1.11 MH-1.11 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of laying joint measurement of
HFC- for 700mm dia GRP from MH 1.11 to MH MH 1.11 to BalaJi,R.
0187 geotextile, gravel pipe laying and Area 7 31-Dec-14 04..30: 31-Dec-14 08.30: A 1/10/2015
DR Storm water 1.12 MH-1.12 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 700mm dia GRP from MH 2.4 to MH MH 2.4 to BalaJi,R.
0188 geotextile, gravel pipe laying and Area 7 31-Dec-14 04..30: 31-Dec-14 08.30: Revised 1/8/2015
DR Storm water 1.13 MH 1.13 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 3+700 to BalaJi,R.
0153 chanaige 3+700 to Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: A 1/10/2015
FF laying for 250 mm dia 3+810 K, Sr.
3+790 00 AM 00 AM
HDPE Engineer
Inspection for
S.
excavation & fire fighting line from
HFC- 0+150 to BalaJi,R.
0154 preparation of chanaige 0+150 to Area 8 5-Jan-15 011.30: 5-Jan-15 08.30: A 1/25/2015
FF 0+350 K, Sr.
formation for 250 mm 0+350 00 AM 00 AM
Engineer
dia HDPE
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -02 to 011.3 BalaJi,R.
1663 from HC -02 to MH-20 Area 6 31-Dec-14 04..30: 31-Dec-14 AN 1/6/2015
SEW measurements of connection line 160 MH-20 0:00 K, Sr.
00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -04 to 011.3 BalaJi,R.
1664 from HC -04 to MH-20 Area 6 31-Dec-14 04..30: 31-Dec-14 Revised 1/8/2015
SEW measurements of connection line 160 MH-20 0:00 K, Sr.
00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house 011.3 BalaJi,R.
1665 from HC -01 to HC-02 Area 6 HC-02 31-Dec-14 04..30: 31-Dec-14 AN 1/10/2015
SEW measurements of connection line 160 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house 011.3 BalaJi,R.
1666 from HC -03 to HC-04 Area 6 HC-04 31-Dec-14 04..30: 31-Dec-14 A 1/10/2015
SEW measurements of connection line 160 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end 011.3 BalaJi,R.
1667 Area 6 end cap 31-Dec-14 04..30: 31-Dec-14 AN 1/6/2015
SEW measurements of connection line 160 cap 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end 011.3 BalaJi,R.
1668 Area 6 end cap 31-Dec-14 04..30: 31-Dec-14 AN 1/6/2015
SEW measurements of connection line 160 cap 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end 011.3 BalaJi,R.
1669 Area 6 end cap 31-Dec-14 04..30: 31-Dec-14 AN 1/6/2015
SEW measurements of connection line 160 cap 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer
Inspection for gravel surround for S.
HC -04 to
HFC- granular bedding, joint sewer house from HC -04 to end 011.3 BalaJi,R.
1670 Area 6 end cap 31-Dec-14 04..30: 31-Dec-14 AN 1/6/2015
SEW measurements of connection line 160 cap 0:00 K, Sr.
( MH-20) 00 PM
pipe laying & mm dia upvc AM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-9, CH 011.3 BalaJi,R.
1671 sewer MH -9 Area 6 31-Dec-14 04..30: 31-Dec-14 Revised 1/25/2015
SEW concreting for the wall 1+150.82) 0:00 K, Sr.
00 PM
of Sewerage Manhole AM Engineer

Inspection of S.
with GRP benching MH -1.9,
HFC- shutter,reinforcement Yard 011.3 BalaJi,R.
0189 for Storm water 0+488.787 31-Dec-14 04..30: 31-Dec-14 Revised 1/25/2015
DR and concreting for Area 0:00 K, Sr.
drainage MH 1.9 3 00 PM
base slab AM Engineer
Inspection of S.
with GRP benching MH
HFC- shutter,reinforcement Yard 011.3 BalaJi,R.
0190 for Storm water 2.5,0+276. 31-Dec-14 04..30: 31-Dec-14 Revised 1/25/2015
DR and concreting for Area 0:00 K, Sr.
drainage MH 2.5 2135 00 PM
base slab AM Engineer
Inspection for pouring S.
for 150 mm dia upvc
HFC- of bliding concrete for IV- 09, BalaJi,R.
0166 Irrigation transmission Area 1 5-Jan-15 09.30: 5-Jan-15 08.30: Revised 1/25/2015
IRR Isolation valve 0+735.037 K, Sr.
line 00 AM 00 AM
chamber Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0167 n pump pump 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/6/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station 00 AM 00 AM
xl+ bituboard) wall (wall no: W4) Engineer

Inspection for 1st S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0168 irrigation reservoir n pump pump 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/5/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 2nd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0169 irrigation reservoir n pump pump 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/5/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 3rd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0170 irrigation reservoir n pump pump 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/5/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 4th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0171 irrigation reservoir n pump pump 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/5/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for S.
200 mm dia HDPE
HFC- excavation & 1+587.454 BalaJi,R.
1672 sewer line From CH Area 1 4-Jan-15 09.30: 4-Jan-15 08.30: AN 1/25/2015
SEW formation for to 1+445 K, Sr.
1+587.454 to 1+445 00 AM 00 AM
protection slab of Engineer
S.
Inspection for 200 mm dia upvc
HFC- MH -2 to BalaJi,R.
1673 excavation & sewer line from MH Area 9 4-Jan-15 04.30: 4-Jan-15 08.30: A 1/24/2015
SEW MH-2.1 K, Sr.
prepared formation for -2 to MH-2.1 00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH-7 BalaJi,R.
1674 laying of (including st. specials Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: AN 1/6/2015
SEW gravel surrounding sewer line to MH-7 (1+032.78) K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
S.
Inspection of
HFC- for the cover slab of MH-9, CH BalaJi,R.
1675 shutter,reinforcement Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: Revised 1/25/2015
SEW Sewer MH-9 (Type-D) 1+150.82) K, Sr.
and concreting 00 PM 00 AM
Engineer
MH -7 ,CH
S.
200 mm dia upvc 1+032.78
HFC- Inspection for 3rd BalaJi,R.
1676 sewer line from MH Area 6 to MH-8, 4-Jan-15 04.30: 4-Jan-15 08.30: A 1/25/2015
SEW layer back filling for K, Sr.
-7 to MH-8 CH 00 PM 00 AM
Engineer
1+086.48
S.
for 200 mm dia upvc
HFC- Inspection for 4th MH -11 to BalaJi,R.
1677 sewer line from MH Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: RO 9/8/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 4th MH -13 to BalaJi,R.
1678 sewer line from MH Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: RO 9/8/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 4th MH -13 to BalaJi,R.
1679 sewer line from MH Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: RO 9/8/2015
SEW layer back filling for MH-14 K, Sr.
-13 to MH-14 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 4th MH -15 to BalaJi,R.
1680 sewer line from MH Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: A 1/24/2015
SEW layer back filling MH-14 K, Sr.
-15 to MH-14 00 PM 00 AM
Engineer

Inspection of shutter, S.
HFC- water stopper & of Sewerage Manhole MH-6 BalaJi,R.
1681 Area 6 4-Jan-15 04.30: 4-Jan-15 08.30: Revised 1/25/2015
SEW concreting for the wall MH-6 ( 1lift) (0+968.98) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0143A n pump pump 4-Jan-15 04.30: 4-Jan-15 08.30: Revised 1/10/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station 00 PM 00 AM
xl+ bituboard) wall (wall no: W1) Engineer

Inspection for MH-03 to S.


HFC- from MH-03 to
excavation and abutment- BalaJi,R.
ITS/D 0024 abutment-1(10+290 to Area 1 4-Jan-15 04.30: 4-Jan-15 08.30: AN 1/25/2015
prepared formation for 1(10+290 K, Sr.
IC 10+300) 00 PM 00 AM
4WXD54 DU Duct line to 10+300) Engineer

Inspection and joint MH-03 to S.


HFC- from MH-03 to
measurement of pipe abutment- BalaJi,R.
ITS/D 0025 abutment-1(10+280 to Area 1 4-Jan-15 04.30: 4-Jan-15 08.30: AN 1/10/2015
laying for 4WXD54 1(10+280 K, Sr.
IC 10+292) 00 PM 00 AM
DU Duct line to 10+292) Engineer

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping BalaJi,R.
0153A n pump pump 4-Jan-15 04.30: 4-Jan-15 08.30: Revised 1/6/2015
IRR concreting for fire station wall (wall no: K, Sr.
station station 00 PM 00 AM
fighting W2 ) Engineer

Inspection for 5th for fire fighting & S.


Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0160A n pump pump 4-Jan-15 04.30: 4-Jan-15 08.30: A 1/26/2015
IRR back filling for the and pumping station K, Sr.
station station 00 PM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
S.
Inspection for sand fire fighting line from
HFC- 0+700 to BalaJi,R.
0155 surround for 250 mm chanaige 0+700 to Area 7 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
FF 0+860 K, Sr.
dia HDPE 0+860 (Line-1) RHS 00 AM 00 AM
Engineer
S.
Inspection of sand
HFC- from Chainage 1+560 1+560 to BalaJi,R.
0160 surround for 150 mm Area 7 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
WD to 1+710 LINE 2 RHS 1+710 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0172 at grid A n pump pump 5-Jan-15 011.30: 5-Jan-15 08.30: Revised 1/10/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station 00 AM 00 AM
xl+ bituboard) wall (wall no: W1) Engineer

Inspection for 1st S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0173 irrigation reservoir n pump pump 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 2nd S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0174 irrigation reservoir n pump pump 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 3rd S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0175 irrigation reservoir n pump pump 5-Jan-15 011.30: 5-Jan-15 08.30: A 1/25/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

S.
for gate valve
HFC- Inspection for pouring BalaJi,R.
0176 chamber for 200mm gate vlave no IV-5 Area 7 IV-5 5-Jan-15 011.30: 5-Jan-15 08.30: Revised 1/25/2015
IRR of blinding concrete K, Sr.
dia upvc Irrigation line 00 AM 00 AM
Engineer
S.
for washuot chamber
HFC- Inspection for pouring WO,0+29. BalaJi,R.
0161 for 150mm dia GRE at ch 0+29.78 Area 7 5-Jan-15 011.30: 5-Jan-15 08.30: Revised 1/25/2015
WD of blinding concrete 78 K, Sr.
water line 00 AM 00 AM
Engineer
S.
Inspection for sand
HFC- from CHainage 2+160 2+160 - BalaJi,R.
0162 surround for 100 mm Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
WD - 2+270 2+270 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
Inspection for 1st S.
HFC- layer back filling for from CHainage 2+160 2+160 - BalaJi,R.
0163 Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/8/2015
WD 100 mm dia GRE - 2+270 2+270 K, Sr.
00 AM 00 AM
water line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of laying joint measurement of 250mm dia upvc
HFC- (Remaining last MH -1.1 to BalaJi,R.
1682 geotextile, gravel pipe laying and sewer line from MH- Area 7 5-Jan-15 011.30: 5-Jan-15 08.30: A 1/10/2015
SEW portion) MH-1 K, Sr.
bedding, grannular surround for 1.1 to MH-1 00 AM 00 AM
Engineer

Inspection of shutter, S.
HFC- water stopper & sewer manhole MH- MH-10 BalaJi,R.
1683 Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall 10 (1+215.06) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

S.
Inspection of for the cover slab of
HFC- MH-10 BalaJi,R.
1684 shutter,reinforcement Sewer MH-10 (Type- Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/28/2015
SEW (1+215.06) K, Sr.
and concreting D) 00 AM 00 AM
Engineer

Inspection of shutter, S.
HFC- water stopper & of Sewerage Manhole MH-6 BalaJi,R.
1685 Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall MH-6 ( 2nd lift) (0+968.98) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter HC-1,HC-2 S.


HFC- and concreting for the House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- BalaJi,R.
1686 Area 6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/28/2015
SEW base of Sewer House chambers of MH-20 4 of Sewer MH 20 4 of Sewer K, Sr.
00 AM 00 AM
Connections MH 20 Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard BalaJi,R.
0099A & concreting for the AV-5 5-Jan-15 011.30: 5-Jan-15 08.30: Revised 1/25/2015
FF fire fighting line Area K, Sr.
wall of air valve 00 AM 00 AM
Engineer
chamber (AV-5)
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard BalaJi,R.
0102A & concreting for the AV-6 5-Jan-15 011.30: 5-Jan-15 08.30: AN 1/25/2015
FF fire fighting line Area K, Sr.
wall of air valve 00 AM 00 AM
Engineer
chamber (AV-6)
S.
for 700mm dia GRP
HFC- Inspection of 3rd MH 2.1 to 01.30: BalaJi,R.
0191 Storm water line from Area 8 5-Jan-15 02.30: 5-Jan-15 A 1/25/2015
DR layer back filling MH 2.2 00 K, Sr.
MH-2.1 to MH- 2.2 00 PM
PM Engineer
Inspection for 4th S.
HFC- layer back filling for from MH-2.2 to MH- MH 2.2 to 01.30: BalaJi,R.
0192 Area 8 5-Jan-15 02.30: 5-Jan-15 A 1/26/2015
DR 700mm dia GRP 2.3 MH 2.3 00 K, Sr.
00 PM
storm water Line PM Engineer
S.
200 mm dia upvc
HFC- Inspection for 5th MH -13 to BalaJi,R.
1687 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 5th MH -13 to BalaJi,R.
1688 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-14 K, Sr.
-13 to MH-14 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 5th MH -15 to BalaJi,R.
1689 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for MH-14 K, Sr.
-15 to MH-14 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 4th MH -11 to BalaJi,R.
1690 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for MH-10 K, Sr.
-11 to MH-10 00 PM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 3rd MH -8 to BalaJi,R.
1691 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-9 K, Sr.
-8 to MH-9 00 PM 00 AM
Engineer
inspection for 4th S.
HFC- layer back filling for MH: 3 to BalaJi,R.
1692 from MH: 3 to MH: 4 Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW 200 mm dia Upvc MH: 4 K, Sr.
00 PM 00 AM
sewer line Engineer
S.
200 mm dia upvc
HFC- Inspection for 4th MH -5 to BalaJi,R.
1693 sewer line from MH Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for MH-6 K, Sr.
-5 to MH-6 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
200mm dia upvc
HFC- Inspection for 3rd MH: 4 to BalaJi,R.
1694 sewer line from MH-4 Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/25/2015
SEW layer back filling for MH: 5 K, Sr.
to MH-5 00 PM 00 AM
Engineer
MH -6 ,CH
S.
200 mm dia upvc 0+968.96
HFC- Inspection for 3rd BalaJi,R.
1695 sewer line from MH-6 Area 6 to MH-7, 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for K, Sr.
to NH- 7 CH 00 PM 00 AM
Engineer
1+032.78
S.
Inspection for sand Irrigation line from
HFC- 0+820 to BalaJi,R.
0177 surround for 200 mm chainage 0+820 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/8/2015
IRR 0+890 K, Sr.
dia upvc 0+890 00 PM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+820 to BalaJi,R.
0178 1st layer back filling chainage 0+820 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/10/2015
IRR 0+890 K, Sr.
for 200 mm dia upvc 0+890 00 PM 00 AM
Engineer
S.
Inspection for sand water line from
HFC- 0+020 to BalaJi,R.
0164 surround for 150 mm chanaige 0+020 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/8/2015
WD 0+090 K, Sr.
dia GRE 0+090 00 PM 00 AM
Engineer
S.
Visual Inspection for water line from
HFC- 0+020 to BalaJi,R.
0165 1st layer back filling chanaige 0+020 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/10/2015
WD 0+090 K, Sr.
for 150 mm dia GRE 0+090 00 PM 00 AM
Engineer
S.
Inspection for sand fire fighting line from
HFC- 1+010 to BalaJi,R.
0156 surround for 250 mm chanaige 1+010 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/8/2015
FF 1+080 K, Sr.
dia HDPE 1+080 LINE 2 LHS 00 PM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 1+010 to BalaJi,R.
0157 1st layer back filling chanaige 1+010 to Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/10/2015
FF 1+080 K, Sr.
for 250 mm dia HDPE 1+080 LINE 2 LHS 00 PM 00 AM
Engineer
Inspection sand S.
HFC- surround for 200 mm from chainage 0+880 0+880 to BalaJi,R.
1696 Area 5 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/8/2015
SEW dia HDPE Sewer to 0+920 0+920 K, Sr.
00 PM 00 AM
pressure line Engineer
Visual Inspection 1st S.
HFC- layer back filling for from chainage 0+880 0+880 to BalaJi,R.
1697 Area 5 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/10/2015
SEW 200 mm dia HDPE to 0+920 0+920 K, Sr.
00 PM 00 AM
Sewer pressure line Engineer
joint measurement of S.
Inspection of laying 200 mm dia upvc
HFC- pipe laying and MH -2 to BalaJi,R.
1698 geotextile, gravel sewer line from MH Area 9 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/10/2015
SEW grannular surround MH-2.1 K, Sr.
bedding, -2 to MH-2.1 00 PM 00 AM
for Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 3+030 3+030 to BalaJi,R.
0166 Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/12/2015
WD laying for 100 mm dia to 3+110 3+110 K, Sr.
00 PM 00 AM
GRE water line Engineer
S.
for 600mm dia GRP
HFC- Inspection of 5th MH 2.6 to BalaJi,R.
0193 Storm water line from Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.6 to MH- 2.5 00 PM 00 AM
Engineer
S.
for 600mm dia GRP
HFC- Inspection of 5th MH 2.4 to BalaJi,R.
0194 Storm water line from Area 7 6-Jan-15 02.30: 6-Jan-15 08.30: A 1/25/2015
DR layer back filling MH 2.5 K, Sr.
MH-2.4 to MH- 2.5 00 PM 00 AM
Engineer
Inspection of shutter S.
HFC- and concreting for the HC1,HC-2, BalaJi,R.
1699 chamber of MH-18 HC1,HC-2, (MH 18) Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/28/2015
SEW wall of Sewer House (MH 18) K, Sr.
00 PM 00 AM
Connections Engineer
Inspection of shutter S.
HFC- and concreting for the HC3,HC-4, BalaJi,R.
1700 chamber of MH-19 HC3,HC-4, (MH 19) Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/28/2015
SEW wall of Sewer House (MH 19) K, Sr.
00 PM 00 AM
Connections Engineer
S.
Inspection of
HFC- for the cover slab of MH-6 BalaJi,R.
1701 shutter,reinforcement Area 6 6-Jan-15 02.30: 6-Jan-15 08.30: AN 1/28/2015
SEW Sewer MH-6 (Type-D) (0+968.98) K, Sr.
and concreting 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard 2+600 BalaJi,R.
0158 concreting for the wo-4 6-Jan-15 02.30: 6-Jan-15 08.30: Revised 1/25/2015
FF fighting line Area (Wo-04) K, Sr.
wall of washout 00 PM 00 AM
Engineer
chamber for

Inspection of shutter S.
HFC- and concreting for the HC3 (MH 011.3 BalaJi,R.
1702 chamber of MH-18 HC3, (MH 18) Area 6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
SEW wall of Sewer House 18) 0:00 K, Sr.
00 PM
Connections AM Engineer
S.
Inspection for pouring MH -1.7,
HFC- Storm water drainage 011.3 BalaJi,R.
0195 of blinding concrete Area 7 0+566.751 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.7 0:00 K, Sr.
for 7 00 PM
AM Engineer
S.
Inspection for pouring
HFC- Storm water drainage MH -1.8, 011.3 BalaJi,R.
0196 of blinding concrete Area 7 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.8 0+528.952 0:00 K, Sr.
for 00 PM
AM Engineer
S.
Inspection for pouring MH -1.9,
HFC- Storm water drainage 011.3 BalaJi,R.
0197 of blinding concrete Area 7 0+488.787 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.9 0:00 K, Sr.
for 3 00 PM
AM Engineer
S.
Inspection for pouring MH -1.10,
HFC- Storm water drainage 011.3 BalaJi,R.
0198 of blinding concrete Area 7 0+488.582 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.10 0:00 K, Sr.
for 7 00 PM
AM Engineer
S.
Inspection for pouring MH -1.11,
HFC- Storm water drainage 011.3 BalaJi,R.
0199 of blinding concrete Area 7 0+403.472 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.11 0:00 K, Sr.
for 9 00 PM
AM Engineer
S.
Inspection for pouring MH -1.12,
HFC- Storm water drainage 011.3 BalaJi,R.
0200 of blinding concrete Area 7 0+372.381 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.12 0:00 K, Sr.
for 8 00 PM
AM Engineer
S.
Inspection for pouring MH -1.5,
HFC- Storm water drainage 011.3 BalaJi,R.
0201 of blinding concrete Area 7 0+0642.50 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
DR MH 1.5 0:00 K, Sr.
for 91 00 PM
AM Engineer
S.
Inspection for pouring MH -1.6,
HFC- Storm water drainage 011.3 BalaJi,R.
0202 of blinding concrete Area 7 0+604.581 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
DR MH 1.6 0:00 K, Sr.
for 7 00 PM
AM Engineer
Inspection of shutter S.
HFC- and concreting for the HC1 (MH 011.3 BalaJi,R.
1703 chamber of MH-19 HC1 (MH 19) Area 6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
SEW wall of Sewer House 19) 0:00 K, Sr.
00 PM
Connections AM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-4, (MH 011.3 BalaJi,R.
1704 chamber of MH-18 HC-4 (MH 18) Area 6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
SEW wall of Sewer House 18) 0:00 K, Sr.
00 PM
Connections AM Engineer
Inspection of shutter S.
HFC- and concreting for the HC-2 (MH 011.3 BalaJi,R.
1705 chamber of MH-19 HC-2 (MH 19) Area 6 6-Jan-15 02.30: 6-Jan-15 AN 2/1/2015
SEW wall of Sewer House 19) 0:00 K, Sr.
00 PM
Connections AM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-7 011.3 BalaJi,R.
1706 sewer manhole MH-7 Area 6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
SEW concreting for the wall (1+032.78) 0:00 K, Sr.
00 PM
of Sewerage Manhole AM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-8, CH 011.3 BalaJi,R.
1707 sewer MH -8 Area 6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
SEW concreting for the wall 1+086.48 0:00 K, Sr.
00 PM
of Sewerage Manhole AM Engineer

Inspection for 4th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding 011.3 BalaJi,R.
0179 irrigation reservoir n pump pump 6-Jan-15 02.30: 6-Jan-15 A 1/26/2015
IRR back filling for the 0:00 K, Sr.
and pumping station station station 00 PM
wall of (W1) at grid -A AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of S.
HFC- shutter,reinforcement Storm water drainage Yard 011.3 BalaJi,R.
0203 MH 2.6 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
DR and concreting for MH 2.6 Area 0:00 K, Sr.
00 PM
base slab AM Engineer
Inspection of S.
HFC- shutter,reinforcement Storm water drainage Yard 011.3 BalaJi,R.
0204 MH 1.10 6-Jan-15 02.30: 6-Jan-15 AN 1/28/2015
DR and concreting for MH 1.10 Area 0:00 K, Sr.
00 PM
base slab AM Engineer
S.
Inspection of
HFC- for cover slab of MH-7 02.30: BalaJi,R.
1708 shutter,reinforcement Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/28/2015
SEW sewer manhole MH-7 (1+032.78) 00 K, Sr.
and concreting 00 PM
PM Engineer
S.
Inspection of
HFC- for cover slab of MH-8, CH 02.30: BalaJi,R.
1709 shutter,reinforcement Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/28/2015
SEW sewer MH -8 1+086.48 00 K, Sr.
and concreting 00 PM
PM Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 1+060 1+060 to 02.30: BalaJi,R.
0167 Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/10/2015
WD laying for 100 mm dia to 1+070 1+070 00 K, Sr.
00 PM
GRE water line PM Engineer
S.
Inspection for sand
HFC- from Chainage 0+930 0+930 to 02.30: BalaJi,R.
0168 surround for 100 mm Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/8/2015
WD to 0+830 0+830 00 K, Sr.
dia GRE water line 00 PM
PM Engineer
S.
Inspection for sand
HFC- from Chainage 0+930 0+930 to 02.30: BalaJi,R.
0169 surround for 100 mm Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/8/2015
WD to 1+070 1+070 00 K, Sr.
dia GRE water line 00 PM
PM Engineer
S.
Visual Inspection of fire fighting line from
HFC- 2+360 to 02.30: BalaJi,R.
0159 2nd layer back filling chanaige 2+360 to Area 6 6-Jan-15 04.30: 6-Jan-15 AN 1/8/2015
FF 2+450 00 K, Sr.
for 250 mm dia HDPE 2+450 00 PM
PM Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 2+360 to 02.30: BalaJi,R.
0160 layer back filling for chanaige 2+360 to Area 6 6-Jan-15 04.30: 6-Jan-15 A 1/25/2015
FF 2+450 00 K, Sr.
250 mm dia HDPE 2+450 00 PM
PM Engineer
S.
Inspection for sand fire fighting line from
HFC- 3+450 to 02.30: BalaJi,R.
0161 surround for 250 mm chanaige 3+450 to Area 6 6-Jan-15 04.30: 6-Jan-15 A 1/10/2015
FF 3+700 00 K, Sr.
dia HDPE 3+700 00 PM
PM Engineer
S.
Inspection for sand fire fighting line from
HFC- 3+700 to 02.30: BalaJi,R.
0162 surround for 250 mm chanaige 3+700 to Area 6 6-Jan-15 04.30: 6-Jan-15 A 1/10/2015
FF 3+810 00 K, Sr.
dia HDPE 3+810 00 PM
PM Engineer
Inspection for
S.
excavation & fire fighting line from
HFC- 0+350 to 02.30: BalaJi,R.
0163 preparation of chanaige 0+350 to Area 8 6-Jan-15 04.30: 6-Jan-15 A 1/26/2015
FF 0+520 00 K, Sr.
formation for 250 mm 0+520 00 PM
PM Engineer
dia HDPE
Inspection for S.
HFC- deflection test from MH 2.1 to MH MH 2.1 to 02.30: BalaJi,R.
0205 Storm water line Area 8 6-Jan-15 04.30: 6-Jan-15 A 1/15/2015
DR (preliminary) for 700 2.2 MH 2.2 00 K, Sr.
00 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.2 to MH MH 2.2 to 02.30: BalaJi,R.
0206 Storm water line Area 8 6-Jan-15 04.30: 6-Jan-15 A 1/15/2015
DR (preliminary) for 700 2.3 MH 2.3 00 K, Sr.
00 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.3 to MH MH 2.3 to 02.30: BalaJi,R.
0207 Storm water line Area 8 6-Jan-15 04.30: 6-Jan-15 A 1/15/2015
DR (preliminary) for 700 2.4 MH 2.4 00 K, Sr.
00 PM
mm dia GRP PM Engineer
Inspection for S.
HFC- deflection test from MH 2.4 to MH MH 2.4 to 02.30: BalaJi,R.
0108A Storm water line Area 7 6-Jan-15 04.30: 6-Jan-15 A 1/15/2015
DR (preliminary) for 600 2.5 MH 2.5 00 K, Sr.
00 PM
mm dia GRP PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of shutter,
S.
water stopper & MH-25
HFC- BalaJi,R.
0387B concreting for the wall MH-25 Area 6 ( 2+107.50 7-Jan-15 09.30: 6-Jan-15 08.30: A 3/22/2015
SEW K, Sr.
of Sewerage Manhole ) 00 AM 00 AM
Engineer
MH-25
S.
Inspection of shutter, for fire fighting & Irrigatio Irrigation
HFC- for projection slope 01.30: BalaJi,R.
0180 reinforecement & irrigation reservoir n pump pump 7-Jan-15 04.30: 7-Jan-15 AN 1/28/2015
IRR area on sump portion 00 K, Sr.
casting concrete and pumping station station station 00 AM
PM Engineer

Inspection for 5th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0181 irrigation reservoir n pump pump 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/26/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

S.
Visual Inspection for fire fighting line from
HFC- 3+450 to BalaJi,R.
0164 1st layer back filling chanaige 3+450 to Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/10/2015
FF 3+700 K, Sr.
for 250 mm dia HDPE 3+700 00 AM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 3+700 to BalaJi,R.
0165 1st layer back filling chanaige 3+700 to Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/10/2015
FF 3+810 K, Sr.
for 250 mm dia HDPE 3+810 00 AM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 0+930 0+930 to BalaJi,R.
0170 Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/10/2015
WD for 100 mm dia GRE to 0+830 0+830 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 0+930 0+930 to BalaJi,R.
0171 Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/10/2015
WD for 100 mm dia GRE to 1+070 1+070 K, Sr.
00 AM 00 AM
water line Engineer
S.
200mm dia upvc
HFC- Inspection for 4th MH: 4 to BalaJi,R.
1710 sewer line from MH-4 Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/25/2015
SEW layer back filling for MH: 5 K, Sr.
to MH-5 00 AM 00 AM
Engineer
MH -6 ,CH
S.
200 mm dia upvc 0+968.96
HFC- Inspection for 4th BalaJi,R.
1711 sewer line from MH-6 Area 6 to MH-7, 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/26/2015
SEW layer back filling for K, Sr.
to NH- 7 CH 00 AM 00 AM
Engineer
1+032.78
MH-16 to
Inspection for 7th S.
MH-17
HFC- layer backfilling for BalaJi,R.
1712 from MH-16 to MH-17 Area 6 ( 1+518.64 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/26/2015
SEW sewer line 200 mm K, Sr.
to 00 AM 00 AM
UPVC Engineer
1+562.05)
Inspection for 3rd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0170A irrigation reservoir n pump pump 7-Jan-15 09.30: 6-Jan-15 08.30: A 3/2/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 4th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0171A irrigation reservoir n pump pump 7-Jan-15 09.30: 6-Jan-15 08.30: A 1/26/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
MH-18 to
Inspection of 9th S.
MH-17
HFC- layer backfilling for BalaJi,R.
1713 from MH-18 to MH-17 Area 6 (1+645.43 7-Jan-15 09.30: 6-Jan-15 08.30: Revised 2/25/2015
SEW 200mm dia uPVC K, Sr.
to 00 AM 00 AM
sewer line Engineer
1+562.05 )
Visual Inspection of S.
HFC- 1st layer surrunding MH-17 BalaJi,R.
1714 MH-17 Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: Revised 2/25/2015
SEW backfilling around (1+562.82) K, Sr.
00 AM 00 AM
Sewer Engineer
Visual Inspection of S.
HFC- 2nd layer surrunding MH-17 BalaJi,R.
1715 MH-17 Area 6 7-Jan-15 09.30: 6-Jan-15 08.30: Revised 2/25/2015
SEW backfilling around (1+562.82) K, Sr.
00 AM 00 AM
Sewer Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0208 & fixing of storm water Area 8 2.3,0+063. 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/10/2015
DR MH 2.3 K, Sr.
manhole base for 213 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0209 & fixing of storm water Area 8 2.2,0+030. 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/10/2015
DR MH 2.2 K, Sr.
manhole base for 2095 00 PM 00 AM
Engineer
sewer House HC -02 to
S.
Inspection for connection line 160 MH-16.1 &
HFC- from HC -02 to MH- & from HC -02 to BalaJi,R.
1716 excavation and mm dia Upvc of Area 6 HC -02 to 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/25/2015
SEW 16.1 HC-01 K, Sr.
prepared formation for Sewer Manhole MH- HC-01 00 PM 00 AM
Engineer
16.1 (16.1)
sewer House HC -01 to
S.
Inspection for connection line 160 end cap &
HFC- from HC -01 to end & from HC -02 to end BalaJi,R.
1717 excavation and mm dia Upvc of Area 6 HC -02 to 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/25/2015
SEW cap cap K, Sr.
prepared formation for Sewer Manhole MH- end cap 00 PM 00 AM
Engineer
16.1 (16.1)
sewer House HC -02 to
S.
Inspection for connection line 160 MH-16.2 &
HFC- from HC -02 to MH- & from HC -02 to BalaJi,R.
1718 excavation and mm dia Upvc of Area 6 HC -02 to 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/25/2015
SEW 16.2 HC-01 K, Sr.
prepared formation for Sewer Manhole MH- HC-01 00 PM 00 AM
Engineer
16.2 (16.2)
sewer House HC -01 to
S.
Inspection for connection line 160 end cap &
HFC- from HC -01 to end & from HC -02 to end BalaJi,R.
1719 excavation and mm dia Upvc of Area 6 HC -02 to 7-Jan-15 03.30: 6-Jan-15 08.30: A 2/24/2015
SEW cap cap K, Sr.
prepared formation for Sewer Manhole MH- end cap 00 PM 00 AM
Engineer
16.2 (16.2)
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1720 excavation & Area 6 of Sewer 7-Jan-15 03.30: 6-Jan-15 08.30: A 1/25/2015
SEW chambers of MH-16.1 MH 16.1 K, Sr.
prepared formation MH 16.1 00 PM 00 AM
Engineer
S.
Inspection for HC-1,HC-2
HFC- for House connection HC-1,HC-2 of Sewer BalaJi,R.
1721 excavation & Area 6 of Sewer 7-Jan-15 03.30: 6-Jan-15 08.30: AN 1/25/2015
SEW chambers of MH-16.2 MH 16.2 K, Sr.
prepared formation MH 16.2 00 PM 00 AM
Engineer
inspection for 5th S.
HFC- layer back filling for MH: 3 to 011.3 BalaJi,R.
1722 from MH: 3 to MH: 4 Area 6 7-Jan-15 01.30: 6-Jan-15 A 1/25/2015
SEW 200 mm dia Upvc MH: 4 0:00 K, Sr.
00 PM
sewer line AM Engineer
inspection for 5th S.
200 mm dia upvc
HFC- layer back filling for MH -5 to 011.3 BalaJi,R.
1723 sewer line from MH Area 6 7-Jan-15 01.30: 6-Jan-15 A 1/25/2015
SEW 200 mm dia Upvc MH-6 0:00 K, Sr.
-5 to MH-6 00 PM
sewer line AM Engineer
Visual inspection for S.
HFC- 1st layer back filling MH -2 to 011.3 BalaJi,R.
1724 from MH -2 to MH-2.1 Area 9 7-Jan-15 01.30: 6-Jan-15 AN 1/8/2015
SEW for 200 mm dia Upvc MH-2.1 0:00 K, Sr.
00 PM
sewer line AM Engineer
Visual inspection for S.
HFC- 2nd layer back filling MH -2 to 011.3 BalaJi,R.
1725 from MH -2 to MH-2.1 Area 9 7-Jan-15 01.30: 6-Jan-15 AN 1/8/2015
SEW for 200 mm dia Upvc MH-2.1 0:00 K, Sr.
00 PM
sewer line AM Engineer
S.
Inspection of laying joint measurement of
HFC- for 600mm dia GRP from MH 1.10 to MH MH 1.10 to 011.3 BalaJi,R.
0210 geotextile, gravel pipe laying and Area 7 7-Jan-15 04.30: 6-Jan-15 AN 1/12/2015
DR Storm water 1.9 MH-1.9 0:00 K, Sr.
bedding, grannular surround 00 PM
AM Engineer
S.
Inspection of laying joint measurement of
HFC- for 600mm dia GRP from MH 1.8 to MH MH 1.8 to 011.3 BalaJi,R.
0211 geotextile, gravel pipe laying and Area 7 7-Jan-15 04.30: 6-Jan-15 AN 1/12/2015
DR Storm water 1.9 MH-1.9 0:00 K, Sr.
bedding, grannular surround 00 PM
AM Engineer
Inspection for
S.
excavation &
HFC- from MH 3.1 to MH MH 3.1 to 011.3 BalaJi,R.
0212 prepared formation for Area 5 7-Jan-15 04.30: 6-Jan-15 A 1/25/2015
DR 3.2 MH 3.2 0:00 K, Sr.
315mm dia upvc 00 PM
AM Engineer
storm water Line

Inspection for S.
MH
HFC- excavation & 011.3 BalaJi,R.
0213 MH 3.2 Area 5 3.2,0+044. 7-Jan-15 04.30: 6-Jan-15 A 1/25/2015
DR prepared formation for 0:00 K, Sr.
1358 00 PM
storm water drainage AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of shutter, Irrigatio Irrigation
HFC- 011.3 BalaJi,R.
0182 reinforecement & BW1 (6 nos) n pump pump 7-Jan-15 04.30: 6-Jan-15 AN 1/28/2015
IRR 0:00 K, Sr.
concreting of wall station station 00 PM
AM Engineer
Inspection for
S.
excavation and
HFC- from Chainage 0+550 0+550 to BalaJi,R.
0025B prepared formation of Area 9 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
WD to 0+650 0+650 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 0+650 0+650 to BalaJi,R.
0026B prepared formation of Area 9 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
WD to 0+750 0+750 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line
Inspection for
S.
excavation and
HFC- from Chainage 0+750 0+750 to BalaJi,R.
0027B prepared formation of Area 9 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
WD to 0+830 0+830 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping BalaJi,R.
0153B n pump pump 8-Jan-15 011.30: 8-Jan-15 08.30: Revised 1/26/2015
IRR concreting for fire station wall (wall no: K, Sr.
station station 00 AM 00 AM
fighting W2 ) Engineer

Visual Inspection for S.


HFC- 2nd layer back filling from Chainage 2+160 2+160 - BalaJi,R.
0172 Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/10/2015
WD for 100 mm dia GRE - 2+270 2+270 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection of 4th fire fighting line from
HFC- 2+360 to BalaJi,R.
0166 layer back filling for chanaige 2+360 to Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
FF 2+450 K, Sr.
250 mm dia HDPE 2+450 00 AM 00 AM
Engineer
Inspection for 5th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0183 irrigation reservoir n pump pump 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 6th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0184 irrigation reservoir n pump pump 8-Jan-15 04.30: 8-Jan-15 08.30: A 1/26/2015
IRR back filling for the K, Sr.
and pumping station station station 00 PM 00 AM
wall of (W4,W1a) Engineer
Inspection for S.
HFC- excavation and 250 mm dia HDPE fire washout chamber no- BalaJi,R.
0167 Area 8 WO-01 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
FF prepared formation of fighting line WO-01 K, Sr.
00 AM 00 AM
washout chamber for Engineer
Inspection for
S.
excavation and
HFC- 250 mm dia HDPE fire gate valve chamber BalaJi,R.
0168 prepared formation of Area 8 IV-11 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
FF fighting line no-IV-11 K, Sr.
gate valve chamber 00 AM 00 AM
Engineer
for
Inspection for
S.
excavation and
HFC- 250 mm dia HDPE fire gate valve chamber BalaJi,R.
0169 prepared formation of Area 8 IV-10 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
FF fighting line no-IV-10 K, Sr.
gate valve chamber 00 AM 00 AM
Engineer
for
S.
200 mm dia upvc
HFC- Inspection for 6th MH -13 to BalaJi,R.
1726 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 AM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 6th MH -13 to BalaJi,R.
1727 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-14 K, Sr.
-13 to MH-14 00 AM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 6th MH -15 to BalaJi,R.
1728 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-14 K, Sr.
-15 to MH-14 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
200 mm dia upvc
HFC- Inspection for 5th MH -11 to BalaJi,R.
1729 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-10 K, Sr.
-11 to MH-10 00 AM 00 AM
Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 4th MH -8 to BalaJi,R.
1730 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH-9 K, Sr.
-8 to MH-9 00 AM 00 AM
Engineer
MH -7 ,CH
S.
200 mm dia upvc 1+032.78
HFC- Inspection for 4th BalaJi,R.
1731 sewer line from MH Area 6 to MH-8, 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for K, Sr.
-7 to MH-8 CH 00 AM 00 AM
Engineer
1+086.48
S.
for 200 mm dia upvc
HFC- Inspection for 5th MH -11 to BalaJi,R.
1732 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 AM 00 AM
Engineer
MH -9 ,CH
S.
for 200 mm dia upvc 1+150.82
HFC- Inspection for 4th Area BalaJi,R.
1733 sewer line from MH to MH-10, 8-Jan-15 011.30: 8-Jan-15 08.30: Revised 1/25/2015
SEW layer back filling 6(IR-1) K, Sr.
-9 to MH-10 CH 00 AM 00 AM
Engineer
1+215.06
S.
200mm dia upvc
HFC- Inspection for 5th MH: 4 to BalaJi,R.
1734 sewer line from MH-4 Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for MH: 5 K, Sr.
to MH-5 00 AM 00 AM
Engineer
MH -6 ,CH
S.
200 mm dia upvc 0+968.96
HFC- Inspection for 5th BalaJi,R.
1735 sewer line from MH-6 Area 6 to MH-7, 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW layer back filling for K, Sr.
to NH- 7 CH 00 AM 00 AM
Engineer
1+032.78
inspection for 6th S.
HFC- layer back filling for MH: 3 to BalaJi,R.
1736 from MH: 3 to MH: 4 Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW 200 mm dia Upvc MH: 4 K, Sr.
00 AM 00 AM
sewer line Engineer
inspection for 6th S.
200 mm dia upvc
HFC- layer back filling for MH -5 to BalaJi,R.
1737 sewer line from MH Area 6 8-Jan-15 011.30: 8-Jan-15 08.30: A 1/26/2015
SEW 200 mm dia Upvc MH-6 K, Sr.
-5 to MH-6 00 AM 00 AM
sewer line Engineer
S.
Inspection of shutter,
HFC- of sewer MH-14 (2nd MH-14 BalaJi,R.
1738 water stopper & Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW lift) (1+425.89) K, Sr.
concreting for the wall 00 AM 00 AM
Engineer

Inspection of shutter, S.
HFC- water stopper & MH-15 BalaJi,R.
1739 MH-15 (2nd lift) Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall (0+480.69) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & MH-16 BalaJi,R.
1740 MH-16 (2nd lift) Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall (1+518.64) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & MH-3 BalaJi,R.
1741 MH-3 (2nd lift) Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 2/1/2015
SEW concreting for the wall (0+811.83) K, Sr.
00 AM 00 AM
of Sewerage Manhole Engineer

Inspection of
S.
shutter,reinforcement
HFC- MH-15 BalaJi,R.
1742 and concreting for MH-15 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW (0+480.69) K, Sr.
cover slab of Sewer 00 AM 00 AM
Engineer
manhole
Inspection of
S.
shutter,reinforcement
HFC- MH-16 BalaJi,R.
1743 and concreting for MH-16 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW (1+518.64) K, Sr.
cover slab of Sewer 00 AM 00 AM
Engineer
manhole

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of
S.
shutter,reinforcement
HFC- MH-3 BalaJi,R.
1744 and concreting for MH-3 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW (0+811.83) K, Sr.
cover slab of Sewer 00 AM 00 AM
Engineer
manhole
Inspection of
S.
shutter,reinforcement
HFC- MH-14 BalaJi,R.
1745 and concreting for MH-14 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW (1+425.89) K, Sr.
cover slab of Sewer 00 AM 00 AM
Engineer
manhole
S.
Inspection for sand
HFC- from Chainage 1+060 1+060 to BalaJi,R.
0173 surround for 100 mm Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD to 1+070 1+070 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 1+060 1+060 to BalaJi,R.
0174 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 1+070 1+070 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st & 2nd layer back from Chainage 1+070 1+070 to BalaJi,R.
0175 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
WD filling for 100 mm dia to 1+460 1+460 K, Sr.
00 AM 00 AM
GRE water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 0+930 0+930 to BalaJi,R.
0176 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
WD for 100 mm dia GRE to 1+070 1+070 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection for sand
HFC- from Chainage 2+360 2+360 to BalaJi,R.
0177 surround for 100 mm Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/12/2015
WD to 2+460 2+460 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+360 2+360 to BalaJi,R.
0178 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
WD for 100 mm dia GRE to 2+460 2+460 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 2+360 2+360 to BalaJi,R.
0179 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 2+460 2+460 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection for sand
HFC- from Chainage 2+460 2+460 to BalaJi,R.
0180 surround for 100 mm Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD to 2+530 2+530 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+460 2+460 to BalaJi,R.
0181 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 2+530 2+530 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 2+460 2+460 to BalaJi,R.
0182 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 2+530 2+530 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+530 2+530 to BalaJi,R.
0183 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 2+610 2+610 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 2+530 2+530 to BalaJi,R.
0184 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/12/2015
WD for 100 mm dia GRE to 2+610 2+610 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for
S.
1st & 2nd layer back
HFC- from Chainage 3+050 3+050 to BalaJi,R.
0170 filling for 250 mm dia Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
FF to 3+450 3+450 K, Sr.
HDPE fire fighitng 00 AM 00 AM
Engineer
line
S.
Visual Inspection for fire fighting line from
HFC- 3+450 to BalaJi,R.
0171 2nd layer back filling chanaige 3+450 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
FF 3+700 K, Sr.
for 250 mm dia HDPE 3+700 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection for fire fighting line from
HFC- 3+700 to BalaJi,R.
0172 2nd layer back filling chanaige 3+700 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/21/2015
FF 3+810 K, Sr.
for 250 mm dia HDPE 3+810 00 AM 00 AM
Engineer
Inspection for
S.
excavation &
HFC- from MH 3.2 to MH MH 3.2 to BalaJi,R.
0214 prepared formation for Area 5 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/25/2015
DR 3.3 MH 3.3 K, Sr.
250mm dia upvc 00 AM 00 AM
Engineer
storm water Line
Inspection of shutter S.
HC-3,HC-4
HFC- and concreting for the House connection HC-3,HC-4 of Sewer BalaJi,R.
1746 Area 6 of Sewer 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/28/2015
SEW wall of Sewer House chambers of MH-20 MH 20 K, Sr.
MH 20 00 AM 00 AM
Connections Engineer
sewera S.
Inspection of 8th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1283A surruonding back pump 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
SEW station pump K, Sr.
filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 9th layer sewerage
HFC- sewerage pump ge BalaJi,R.
1566A surruonding back pump 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/12/2015
SEW station pump K, Sr.
filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 10th sewerage
HFC- sewerage pump ge BalaJi,R.
1567A layer surruonding pump 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/12/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 11th sewerage
HFC- sewerage pump ge BalaJi,R.
1568A layer surruonding pump 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/12/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 12th sewerage
HFC- sewerage pump ge BalaJi,R.
1644A layer surruonding pump 10-Jan-15 011.30: 10-Jan-15 08.30: AN 1/12/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 13th sewerage
HFC- sewerage pump ge BalaJi,R.
1645A layer surruonding pump 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
sewera S.
Inspection of 14th sewerage
HFC- sewerage pump ge BalaJi,R.
1646A layer surruonding pump 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
SEW station pump K, Sr.
back filling around station 00 AM 00 AM
station Engineer
Inspection for sewera S.
sewerage
HFC- excavation & pump station valve ge BalaJi,R.
1647A pump 10-Jan-15 011.30: 10-Jan-15 08.30: Revised 1/25/2015
SEW preparation of chamber pump K, Sr.
station 00 AM 00 AM
formation for sewer station Engineer
Inspection for
S.
excavation and
HFC- from CHainage 0+640 0+640 - BalaJi,R.
0185 prepared formation of Area 7 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
WD - 0+540 (Line-2) 0+540 K, Sr.
150 mm dia GRE 00 AM 00 AM
Engineer
potable water line
Inspection for S.
HFC- excavation and 250 mm dia HDPE fire washout chamber no- BalaJi,R.
0173 Area 7 WO-06 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
FF prepared formation of fighting line WO-06 K, Sr.
00 AM 00 AM
washout chamber for Engineer
Inspection for
S.
excavation & fire fighting line from
HFC- 0+460 to BalaJi,R.
0174 preparation of chanaige 0+460 to Area 7 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
FF 0+560 K, Sr.
formation for 250 mm 0+560 (Line-2) 00 AM 00 AM
Engineer
dia HDPE
Inspection for S.
Irrigation line from
HFC- excavation and 0+270 to BalaJi,R.
0185 chainage 0+270 to Area 7 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
IRR prepared formation for 0+370 K, Sr.
0+370 (line-2) 00 AM 00 AM
200 mm dia upvc Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+950 to BalaJi,R.
0186 1st layer back filling chainage 0+950 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/13/2015
IRR 0+870 K, Sr.
for 200 mm dia upvc 0+870 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection 2nd S.


HFC- layer back filling for from chainage 0+880 0+880 to BalaJi,R.
1747 Area 5 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/28/2015
SEW 200 mm dia HDPE to 0+920 0+920 K, Sr.
00 AM 00 AM
Sewer pressure line Engineer

S.
Inspection of 5th fire fighting line from
HFC- including warning 2+360 to BalaJi,R.
0175 layer back filling for chanaige 2+360 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
FF tape 2+450 K, Sr.
250 mm dia HDPE 2+450 00 AM 00 AM
Engineer
Inspection for 3rd
S.
layer back filling with
HFC- from Chainage 2+160 2+160 - BalaJi,R.
0186 warning tape for 100 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 1/26/2015
WD - 2+270 2+270 K, Sr.
mm dia GRE water 00 AM 00 AM
Engineer
line
Inspection for 5th & S.
HFC- final layer back filling from CHainage 2+160 2+160 - BalaJi,R.
0187 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 2/1/2015
WD for 100 mm dia GRE - 1+770 1+770 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection of 5th & fire fighting line from
HFC- 2+450 to BalaJi,R.
0176 final layer back filling chainage 2+450 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 2/1/2015
FF 2+750 K, Sr.
for 250 mm dia HDPE 2+750 00 AM 00 AM
Engineer
S.
Inspection of 5th & fire fighting line from
HFC- 2+750 to BalaJi,R.
0177 final layer back filling chainage 2+750 to Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: Revised 1/18/2014
FF 3+050 K, Sr.
for 250 mm dia HDPE 3+050 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 315mm dia upvc from MH 3.1 to MH MH 3.1 to BalaJi,R.
0215 geotextile, gravel pipe laying and Area 5 10-Jan-15 04.30: 10-Jan-15 08.30: A 1/13/2015
DR Storm water line 3.2 MH 3.2 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
Inspection for 5th & S.
HFC- final layer back filling from Chainage 1+770 1+770 to BalaJi,R.
0188 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: Revised 1/18/2015
WD for 100 mm dia GRE to 1+630 1+630 K, Sr.
00 AM 00 AM
water line Engineer
Inspection of 3rd layer S.
HFC- back filling for 100 from Chainage 1+630 1+630 to BalaJi,R.
0189 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: UR
WD mm dia GRE water to 1+570 1+570 K, Sr.
00 AM 00 AM
line Engineer
Inspection of 4th layer S.
HFC- back filling for 100 from Chainage 1+630 1+630 to BalaJi,R.
0190 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 2/1/2015
WD mm dia GRE water to 1+570 1+570 K, Sr.
00 AM 00 AM
line Engineer
Inspection for 5th & S.
HFC- final layer back filling from Chainage 1+630 1+630 to BalaJi,R.
0191 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: Revised 1/18/2015
WD for 100 mm dia GRE to 1+570 1+570 K, Sr.
00 AM 00 AM
water line Engineer
Inspection of 4th S.
HFC- layer back filling for from Chainage 1+460 1+460 to BalaJi,R.
0192 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: A 2/1/2015
WD 100 mm dia GRE to 1+570 1+570 K, Sr.
00 AM 00 AM
water line Engineer
Inspection for 5th & S.
HFC- final layer back filling from Chainage 1+460 1+460 to BalaJi,R.
0193 Area 6 10-Jan-15 011.30: 10-Jan-15 08.30: Revised 1/18/2015
WD for 100 mm dia GRE to 1+570 1+570 K, Sr.
00 AM 00 AM
water line Engineer

Inspection for S.
HFC- excavation & BalaJi,R.
0216 MH 3.3 Area 5 MH 3.3 10-Jan-15 04.30: 10-Jan-15 08.30: A 1/26/2015
DR prepared formation for K, Sr.
00 PM 00 AM
storm water drainage Engineer

Inspection for shutter,


S.
reinforcement&
HFC- Yard BalaJi,R.
0217 concreting for cover MH-2.6 Type -H MH-2.6 11-Jan-15 04.30: 11-Jan-15 08.30: AN 1/28/2015
DR Area K, Sr.
slab for storm water 00 PM 00 AM
Engineer
drainage MH-2.6

Inspection and joint abutment- S.


HFC-
measurement of pipe from abutment-1 to 1 to BalaJi,R.
ITS/D 003C Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 1/18/2015
laying for 4w x D54 abutment-2 abutment- K, Sr.
IC 00 AM 00 AM
DU duct pipe line 2 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Abutment
1 to 2 S.
Inspection and joint duct 4WxD54 from
HFC- (10+323.2 BalaJi,R.
008E measurement for abutment 1 to Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/19/2015
ETC to K, Sr.
laying of Etisalat abutment 2 00 AM 00 AM
10+825.00 Engineer
)
from ch 1+120 to S.
Inspection and joint
HFC- for 225 mm dia GRE 0+940 in area 4 over CH 1+120 BalaJi,R.
009C measurement of pipe Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/17/2015
WD water line the bridge LHS to 0+940 K, Sr.
laying 00 AM 00 AM
towards Island Engineer
from ch 0+060 to S.
Inspection and joint CH 0+
HFC- for 225 mm dia GRE 0+160 in area 4 over BalaJi,R.
002C measurement of pipe Area 4 060 to 0+ 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/17/2015
WD water line the bridge RHS K, Sr.
laying 160 00 AM 00 AM
towards Island Engineer

Inspection and joint from CHainage 0+160 S.


HFC- measurement for pipe - 0+560 over the 0+160 to BalaJi,R.
007C Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/17/2015
WD laying of 225 mm dia bridge RHS towards 0+560 K, Sr.
00 AM 00 AM
GRE water line island Engineer

S.
Inspection for sand fire fighting line from
HFC- 0+860 to BalaJi,R.
0178 surround for 250 mm chanaige 0+860 to Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/13/2015
FF 0+920 K, Sr.
dia HDPE 0+920 (Line-1 RHS) 00 AM 00 AM
Engineer
S.
Inspection for sand
HFC- from Chainage 1+710 1+710 to BalaJi,R.
0194 surround for150 mm Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/13/2015
WD to 1+760 line 2 RHS 1+760 K, Sr.
dia GRE water line 00 AM 00 AM
Engineer

Inspection for 6th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0187 irrigation reservoir n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/26/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 7th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0188 irrigation reservoir n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/1/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 7th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0189 irrigation reservoir n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/1/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 6th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0190 n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/26/2015
IRR back filling for the and pumping station K, Sr.
station station 00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 7th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0191 n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/1/2015
IRR back filling for the and pumping station K, Sr.
station station 00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection and joint
S.
measurement of pipe
HFC- in area- 4 from ch 0+920 to BalaJi,R.
0517D laying for 200 mm dia Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/17/2015
SEW 0+920 - 1+150 1+150 K, Sr.
HDPE Sewer force 00 AM 00 AM
Engineer
main line
Inspection and joint S.
HFC- measurement of pipe Irrigation line From ch 0-200 to BalaJi,R.
0133A Area 4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/17/2015
IRR laying for 150 mm dia 0-200 to 0+700 0+700 K, Sr.
00 AM 00 AM
GRE Engineer
inspection for 3rd S.
HFC- layer back filling for MH: 3 to BalaJi,R.
1575A from MH: 3 to MH: 4 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: Revised 2/9/2015
SEW 200 mm dia Upvc MH: 4 K, Sr.
00 AM 00 AM
sewer line Engineer
Inspection for 3rd S.
HFC- layer back fiiling of MH: 3 to BalaJi,R.
1574A from MH: 3 to MH: 2 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: Revised 2/10/2015
SEW 200mm dia Upvc MH: 2 K, Sr.
00 AM 00 AM
sewer line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of S.
MH-
HFC- shutter,water stoper & Sewer MH-13 (2nd BalaJi,R.
1748 Area 6 13(1+366. 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW concreting for the wall lift) K, Sr.
36) 00 AM 00 AM
of Engineer
Inspection of S.
MH-
HFC- shutter,water stoper & Sewer MH-12 (2nd BalaJi,R.
1749 Area 6 12(1+323. 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW concreting for the wall lift) K, Sr.
64) 00 AM 00 AM
of Engineer
Inspection of S.
MH-
HFC- shutter,water stoper & BalaJi,R.
1750 Sewer MH-11 (2nd lift) Area 6 11(1+266.4 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW concreting for the wall K, Sr.
8) 00 AM 00 AM
of Engineer
Inspection of S.
MH-
HFC- shutter,reinforcement BalaJi,R.
1751 Sewer MH-13 Area 6 13(1+366. 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW & concreting for the K, Sr.
36) 00 AM 00 AM
cover slab of Engineer
Inspection of S.
MH-
HFC- shutter,reinforcement BalaJi,R.
1752 Sewer MH-12 Area 6 12(1+323. 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW & concreting for the K, Sr.
64) 00 AM 00 AM
cover slab of Engineer
Inspection of 5th layer S.
HFC- back filling for 200 MH-8 to BalaJi,R.
1753 From MH-8 to MH-9 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/28/2015
SEW mm dia upvc sewer MH-9 K, Sr.
00 AM 00 AM
line Engineer
Inspection of 7th layer S.
HFC- back filling for 200 From MH-13 to MH- MH-13 to BalaJi,R.
1754 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: Revised 2/9/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 AM 00 AM
line Engineer
Inspection of 7th layer S.
HFC- back filling for 200 From MH-15 to MH- MH-15 to BalaJi,R.
1755 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/26/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 AM 00 AM
line Engineer
Inspection of 6th layer S.
HFC- back filling for 200 MH-11 to BalaJi,R.
1756 From MH-11 to MH-10 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/26/2015
SEW mm dia upvc sewer MH-10 K, Sr.
00 AM 00 AM
line Engineer
Inspection of 5th layer S.
HFC- back filling for 200 From MH-16 to MH- MH-16 to BalaJi,R.
1757 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/9/2015
SEW mm dia upvc sewer 15 MH-15 K, Sr.
00 AM 00 AM
line Engineer
Inspection for placing S.
200 mm dia HDPE
HFC- & concreting with 1+587.454 BalaJi,R.
1758 Sewr line from ch Area 1 11-Jan-15 011.30: 11-Jan-15 08.30: AN 2/1/2015
SEW reinforcement for to 1+445 K, Sr.
1+587.454 to 1+445 00 AM 00 AM
protection slab of Engineer
S.
Inspection of laying joint measurement of
HFC- for 250mm dia upvc from MH 3.2 to MH MH 3.2 to BalaJi,R.
0218 geotextile, gravel pipe laying and Area 5 11-Jan-15 04.30: 11-Jan-15 08.30: AN 12/13/2015
DR Storm water line 3.3 MH 3.3 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
S.
Inspection for pouring
HFC- BalaJi,R.
0219 of bliding concrete for MH 3.2 Area 5 MH 3.2 11-Jan-15 04.30: 11-Jan-15 08.30: AN 2/1/2015
DR K, Sr.
storm water drainage 00 PM 00 AM
Engineer
S.
Inspection for pouring
HFC- BalaJi,R.
0220 of bliding concrete for MH 3.3 Area 5 MH 3.3 11-Jan-15 04.30: 11-Jan-15 08.30: AN 2/1/2015
DR K, Sr.
storm water drainage 00 PM 00 AM
Engineer
Inspection for
S.
excavation &
HFC- from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0221 prepared formation for Area 7 11-Jan-15 04.30: 11-Jan-15 08.30: A 1/26/2015
DR 1.4 MH-1.4 K, Sr.
500 mm dia GRP 00 PM 00 AM
Engineer
storm water line

Inspection for S.
HFC- excavation & BalaJi,R.
0222 MH 1.4 Area 7 MH-1.4 11-Jan-15 02.30: 11-Jan-15 08.30: A 1/26/2015
DR prepared formation for K, Sr.
00 PM 00 AM
storm water drainage Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
excavation &
HFC- MH-3.3 to BalaJi,R.
0223 prepared formation for from MH-3.3 to IC-03 Area 5 11-Jan-15 02.30: 11-Jan-15 08.30: A 1/26/2015
DR IC-03 K, Sr.
200 mm dia GRP 00 PM 00 AM
Engineer
storm water line
& irrigation reservoir
Inspection for shutter, S.
wall and pumping Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0095C station wall (wall no: n pump pump 11-Jan-15 011.30: 11-Jan-15 08.30: Revised 1/15/2015
IRR concreting for fire K, Sr.
W1) &(wall no: station station 00 AM 00 AM
fighting Engineer
W3,W4)
Inspection for
S.
excavation and
HFC- 0+600 to BalaJi,R.
0192 prepared formation for ch 0+600 to 0+510 Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/1/2015
IRR 0+510 K, Sr.
200 mm dia upvc 00 AM 00 AM
Engineer
Irrigation line from
Inspection and joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 0+840 to BalaJi,R.
0179 chanaige 0+840 to chainage, copy Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: AN 1/17/2015
FF laying for 250 mm dia 0+860 K, Sr.
0+860 (line-1 RHS) attached) 00 AM 00 AM
HDPE Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+700 to BalaJi,R.
0180 1st layer back filling chainage 0+700 to Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/15/2015
FF 0+860 K, Sr.
for 250 mm dia HDPE 0+860 (line-1 RHS) 00 AM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+860 to BalaJi,R.
0181 1st layer back filling chainage 0+860 to Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/15/2015
FF 0+920 K, Sr.
for 250 mm dia HDPE 0+920 (line-1 ) 00 AM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- from Chainage 3+110 3+110 to BalaJi,R.
0195 prepared formation for Area 6 11-Jan-15 011.30: 11-Jan-15 08.30: A 2/1/2015
WD to 3+190 3+190 K, Sr.
100 mm dia GRE 00 AM 00 AM
Engineer
water line
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 1+560 1+560 to BalaJi,R.
0196 Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/15/2015
WD for 150 mm dia GRE to 1+710 line 2 RHS 1+710 K, Sr.
00 AM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 1+710 1+710 to BalaJi,R.
0197 Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/15/2015
WD for 150 mm dia GRE to 1+760 line 2 RHS 1+760 K, Sr.
00 AM 00 AM
water line Engineer
S.
Inspection for 250 mm dia upvc
HFC- MH -1.6 to BalaJi,R.
0555A excavation & sewer line from MH Area 7 11-Jan-15 011.30: 11-Jan-15 08.30: A 1/26/2015
SEW MH-1.7 K, Sr.
prepared formation for -1.6 to MH-1.7 00 AM 00 AM
Engineer

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0172A at grid A n pump pump 12-Jan-15 01.30: 12-Jan-15 08.30: AN 1/17/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station 00 PM 00 AM
xl+ bituboard) wall (wall no: W1) Engineer

Inspection for external for fire fighting & S.


Irrigatio Irrigation
HFC- waterproofing irrigation reservoir BalaJi,R.
0143B n pump pump 12-Jan-15 01.30: 12-Jan-15 08.30: AN 1/17/2015
IRR (Polyprimes, bitustick and pumping station K, Sr.
station station 00 PM 00 AM
xl+ bituboard) wall (wall no: W1) Engineer

Inspection for gravel surround for S.


HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end BalaJi,R.
1611A Area 6 end cap 12-Jan-15 01.30: 12-Jan-15 08.30: Revised 1/18/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -02 to BalaJi,R.
1613A from HC -02 to MH-19 Area 6 12-Jan-15 01.30: 12-Jan-15 08.30: AN 1/15/2015
SEW measurements of connection line 160 MH-19 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -04 to BalaJi,R.
1664A from HC -04 to MH-20 Area 6 12-Jan-15 01.30: 12-Jan-15 08.30: AN 1/15/2015
SEW measurements of connection line 160 MH-20 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1759 of blinding concrete Area 6 of sewer 12-Jan-15 011.30: 12-Jan-15 08.30: AN 2/1/2015
SEW chambers of MH-16.1 MH-16.1 K, Sr.
for MH-16.1 00 AM 00 AM
Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1760 of blinding concrete Area 6 of sewer 12-Jan-15 011.30: 12-Jan-15 08.30: AN 2/1/2015
SEW chambers of MH-16.2 MH-16.2 K, Sr.
for MH-16.2 00 AM 00 AM
Engineer
S.
Inspection for shutter HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1761 & concreting for the Area 6 of sewer 12-Jan-15 011.30: 12-Jan-15 08.30: AN 2/1/2015
SEW chambers of MH-20 MH-20 K, Sr.
wall of sewer MH-20 00 AM 00 AM
Engineer
Inspection for S.
HFC- excavation and MH: 1 to BalaJi,R.
1762 from MH: 1 to MH: 1A Area 6 12-Jan-15 01.30: 12-Jan-15 08.30: A 1/26/2015
SEW prepared formation of MH: 1A K, Sr.
00 PM 00 AM
250mm dia UPVC Engineer
Inspection for MH: 3 to S.
HFC- excavation and from MH: 3 to MH: 2 MH: 2 BalaJi,R.
1763 Area 6 12-Jan-15 01.30: 12-Jan-15 08.30: A 2/1/2015
SEW prepared formation of (Remaining portion) (Remainin K, Sr.
00 PM 00 AM
200mm dia UPVC g portion) Engineer

Inspection for S.
HFC- excavation and from ch 1+530 to 1+530 to BalaJi,R.
0182 Area 6 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
FF prepared formation 1+420 1+420 K, Sr.
00 AM 00 AM
for 250 mm dia HDPE Engineer

S.
HFC- Visual inspection for for 315mm dia upvc from MH 3.1 to MH MH 3.1 to BalaJi,R.
0224 Area 5 12-Jan-15 011.30: 12-Jan-15 08.30: AN 1/13/2015
DR 1st layer back filling Storm water line 3.2 MH 3.2 K, Sr.
00 AM 00 AM
Engineer
S.
HFC- Visual inspection for for 315mm dia upvc from MH 3.1 to MH MH 3.1 to BalaJi,R.
0225 Area 5 12-Jan-15 011.30: 12-Jan-15 08.30: AN 1/15/2015
DR 2nd layer back filling Storm water line 3.2 MH 3.2 K, Sr.
00 AM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- from CHainage 0+540 0+540 - BalaJi,R.
006B prepared formation of Area 7 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
WD - 0+410 (LINE-2) 0+410 K, Sr.
150 mm dia GRE 00 AM 00 AM
Engineer
potable water line
Inspection for
S.
excavation and
HFC- 250 mm dia HDPE fire gate valve chamber BalaJi,R.
0183 prepared formation of Area 7 IV-7 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
FF fighting line no-IV-7 K, Sr.
gate valve chamber 00 AM 00 AM
Engineer
for
Inspection for S.
HFC- excavation and for 250 mm dia HDPE air valve chamber no- BalaJi,R.
0184 Area 7 AV-4 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
FF prepared formation of fire fighting line AV-4 K, Sr.
00 AM 00 AM
air valve chamber for Engineer
Inspection for
S.
excavation & fire fighting line from
HFC- 0+560 to BalaJi,R.
0185 preparation of chanaige 0+560 to Area 7 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/4/2015
FF 0+690 K, Sr.
formation for 250 mm 0+690 (Line-2) 00 AM 00 AM
Engineer
dia HDPE
Inspection for
S.
excavation and
HFC- 250 mm dia HDPE fire gate valve chamber BalaJi,R.
0186 prepared formation of Area 7 IV-9 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
FF fighting line no-IV-9 K, Sr.
gate valve chamber 00 AM 00 AM
Engineer
for
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+460 to 08.30: BalaJi,R.
0187 chanaige 0+460 to Area 7 12-Jan-15 02.30: 12-Jan-15 AN 1/15/2015
FF laying for 250 mm dia 0+560 00 K, Sr.
0+560 (Line-2) 00 PM
HDPE PM Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+370 to BalaJi,R.
0193 chainage 0+370 to Area 7 12-Jan-15 011.30: 12-Jan-15 08.30: A 2/1/2015
IRR prepared formation for 0+500 K, Sr.
0+500 (line-2) 00 AM 00 AM
200 mm dia upvc Engineer
gravel surround for S.
Inspection and joint HC-3 to
HFC- sewer house from HC-3 to HC-4 BalaJi,R.
1764 measurements of Area 6 HC-4 (MH- 12-Jan-15 011.30: 12-Jan-15 08.30: Revised 2/9/2015
SEW connection line 160 (MH-25) K, Sr.
pipe laying & 25) 00 AM 00 AM
mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 1st S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0163A irrigation reservoir n pump pump 12-Jan-15 011.30: 12-Jan-15 08.30: AN 1/15/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of W1,W3 Engineer
Inspection for 2nd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0164A irrigation reservoir n pump pump 12-Jan-15 011.30: 12-Jan-15 08.30: AN 1/15/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of W1,W3 Engineer
Inspection for 3rd S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0165A irrigation reservoir n pump pump 12-Jan-15 011.30: 12-Jan-15 08.30: AN 1/28/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of W3 Engineer

Inspection for shutter,


S.
reinforcement & for 150 mm dia upvc
HFC- IV- 09, 01.30: BalaJi,R.
0194 concreting for the Irrigation transmission Area 1 12-Jan-15 02.30: 12-Jan-15 AN 1/28/2015
IRR 0+735.037 00 K, Sr.
base of Isolation valve line 00 PM
PM Engineer
chamber

joint measurement of MH: 3 to S.


Inspection of laying From MH: 3 to MH:
HFC- pipe laying and 200 mm dia upvc MH: 2 01.30: BalaJi,R.
1765 geotextile, gravel 2 (Remaining Area 6 12-Jan-15 02.30: 12-Jan-15 AN 1/15/2015
SEW grannular surround sewer line (Remainin 00 K, Sr.
bedding, portion) 00 PM
for g portion) PM Engineer

Inspection for S.
HFC- excavation and 01.30: BalaJi,R.
0226 IC-03 Area 5 IC-.03 12-Jan-15 02.30: 12-Jan-15 A 1/26/2015
DR prepared formation for 00 K, Sr.
00 PM
inspection chamber PM Engineer

S.
Inspection for MH -1.6,
HFC- Storm water drainage 08.30: BalaJi,R.
0227 waterproofing above Area 7 0+604.581 13-Jan-15 02.30: 13-Jan-15 AN 1/15/2015
DR MH 1.6 00 K, Sr.
blinding concrete of 7 00 PM
PM Engineer
S.
Inspection for MH -1.7,
HFC- Storm water drainage 08.30: BalaJi,R.
0228 waterproofing above Area 7 0+566.751 13-Jan-15 02.30: 13-Jan-15 AN 1/15/2015
DR MH 1.7 00 K, Sr.
blinding concrete of 7 00 PM
PM Engineer
S.
Inspection for
HFC- Storm water drainage MH -1.8, 08.30: BalaJi,R.
0229 waterproofing above Area 7 13-Jan-15 02.30: 13-Jan-15 AN 1/15/2015
DR MH 1.8 0+528.952 00 K, Sr.
blinding concrete of 00 PM
PM Engineer
S.
Inspection for MH -1.9,
HFC- Storm water drainage 08.30: BalaJi,R.
0230 waterproofing above Area 7 0+488.787 13-Jan-15 02.30: 13-Jan-15 AN 1/15/2015
DR MH 1.9 00 K, Sr.
blinding concrete of 3 00 PM
PM Engineer
S.
Inspection for MH -1.10,
HFC- Storm water drainage BalaJi,R.
0231 waterproofing above Area 7 0+488.582 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR MH 1.10 K, Sr.
blinding concrete of 7 00 PM 00 AM
Engineer
S.
Inspection for MH -1.11,
HFC- Storm water drainage BalaJi,R.
0232 waterproofing above Area 7 0+403.472 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR MH 1.11 K, Sr.
blinding concrete of 9 00 PM 00 AM
Engineer
S.
Inspection for MH -1.12,
HFC- Storm water drainage BalaJi,R.
0233 waterproofing above Area 7 0+372.381 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR MH 1.12 K, Sr.
blinding concrete of 8 00 PM 00 AM
Engineer
S.
Inspection for
HFC- BalaJi,R.
0234 waterproofing above MH 3.2 Area 5 MH 3.2 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR K, Sr.
blinding concrete of 00 PM 00 AM
Engineer
S.
Inspection for
HFC- BalaJi,R.
0235 waterproofing above MH 3.3 Area 5 MH 3.3 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR K, Sr.
blinding concrete of 00 PM 00 AM
Engineer
Inspection and joint
S.
measurement of pipe
HFC- from CHainage 0+640 0+640 - BalaJi,R.
0198 laying for 150 mm dia Area 7 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
WD - 0+540 (Line-2) 0+540 K, Sr.
GRE potable water 00 PM 00 AM
Engineer
line

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint S.


Irrigation line from
HFC- measurement of pipe 0+270 to BalaJi,R.
0195 chainage 0+270 to Area 7 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
IRR laying for 250 mm dia 0+370 K, Sr.
0+370 (line-2) 00 PM 00 AM
upvc Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+160 to BalaJi,R.
0188 chanaige 0+160 to Area 8 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/17/2015
FF laying for 250 mm dia 0+350 K, Sr.
0+350 00 PM 00 AM
HDPE Engineer
S.
Inspection of 7th fire fighting line from
HFC- 2+360 to BalaJi,R.
0189 layer back filling for chanaige 2+360 to Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: RR 9/8/2015
FF 2+450 K, Sr.
250 mm dia HDPE 2+450 00 PM 00 AM
Engineer
Inspection for 4th &
S.
final layer back filling
HFC- from Chainage 2+160 2+160 - BalaJi,R.
0199 with warning tape for Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/28/2015
WD - 2+270 2+270 K, Sr.
100 mm dia GRE 00 PM 00 AM
Engineer
water line
Inspection for 5th
S.
layer back filling with
HFC- from Chainage 2+160 2+160 - BalaJi,R.
0200 warning tape for 100 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 9/8/2015
WD - 2+270 2+270 K, Sr.
mm dia GRE water 00 PM 00 AM
Engineer
line
Inspection and joint
S.
measurement of pipe
HFC- 0+610 to BalaJi,R.
0196 laying for 200 mm dia ch 0+610 to 0+510 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/21/2015
IRR 0+510 K, Sr.
upvc Irrigation line 00 PM 00 AM
Engineer
from
Inspection for 3rd S.
HFC- layer back filling for from Chainage 3+050 3+050 to BalaJi,R.
0190 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 5/27/2015
FF 250 mm dia HDPE to 3+450 3+450 K, Sr.
00 PM 00 AM
fire fighitng line Engineer
Inspection for 3rd S.
fire fighting line from
HFC- layer back filling for 3+450 to BalaJi,R.
0191 chanaige 3+450 to Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/28/2015
FF 250 mm dia HDPE 3+700 K, Sr.
3+700 00 PM 00 AM
fire fighitng line Engineer
Inspection for 3rd S.
fire fighting line from
HFC- layer back filling for 3+700 to BalaJi,R.
0192 chanaige 3+700 to Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/28/2015
FF 250 mm dia HDPE 3+810 K, Sr.
3+810 00 PM 00 AM
fire fighitng line Engineer
Inspection for S.
HFC- 3rdlayer back filling from Chainage 1+070 1+070 to BalaJi,R.
0201 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/28/2015
WD for 100 mm dia GRE to 1+460 1+460 K, Sr.
00 PM 00 AM
water line Engineer
Inspection for 3rd S.
HFC- layer back filling for from Chainage 0+930 0+930 to BalaJi,R.
0202 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/28/2015
WD 100 mm dia GRE to 1+070 1+070 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 0+930 0+930 to BalaJi,R.
0203 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
WD for 100 mm dia GRE to 0+830 0+830 K, Sr.
00 PM 00 AM
water line Engineer
Inspection for 3rd S.
HFC- layer back filling for from Chainage 0+930 0+930 to BalaJi,R.
0204 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/28/2015
WD 100 mm dia GRE to 0+830 0+830 K, Sr.
00 PM 00 AM
water line Engineer

Inspection for S.
HFC-
excavation and MH-01 to BalaJi,R.
ITS/D 0026 from MH-01 to MH-02 Area 1 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/25/2015
prepared formation for MH-02 K, Sr.
IC 00 PM 00 AM
4WXD54 DU Duct line Engineer

Inspection and joint S.


HFC-
measurement of pipe MH-01 to BalaJi,R.
ITS/D 0027 from MH-01 to MH-02 Area 1 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/21/2015
laying for 4WXD54 MH-02 K, Sr.
IC 00 PM 00 AM
DU Duct line Engineer
S.
HFC- inspection for 3rd for 315mm dia upvc from MH 3.1 to MH MH 3.1 to BalaJi,R.
0236 Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/26/2015
DR layer back filling Storm water line 3.2 MH 3.2 K, Sr.
00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
HFC- Visual inspection for for 250mm dia upvc from MH 3.2 to MH MH 3.2 to BalaJi,R.
0237 Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR 1st layer back filling Storm water line 3.3 MH 3.3 K, Sr.
00 PM 00 AM
Engineer
S.
HFC- Visual inspection for for 315mm dia upvc from MH 3.2 to MH MH 3.2 to BalaJi,R.
0238 Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR 2nd layer back filling Storm water line 3.3 MH 3.3 K, Sr.
00 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 500mm dia GRP from MH 1.8 to MH- MH 1.8 to BalaJi,R.
0239 geotextile, gravel pipe laying and Area 7 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR Storm water line 1.7 MH-1.7 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 500mm dia GRP from MH 1.6 to MH- MH 1.6 to BalaJi,R.
0240 geotextile, gravel pipe laying and Area 7 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR Storm water line 1.7 MH-1.7 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer
Inspection 3rd layer S.
HFC- back filling for 200 from chainage 0+880 0+880 to BalaJi,R.
1766 Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/26/2015
SEW mm dia HDPE Sewer to 0+920 0+920 K, Sr.
00 PM 00 AM
pressure line Engineer
visual Inspection 1st for 200 mm dia S.
HFC- layer & final back HDPE Sewer 1+587.454 BalaJi,R.
1767 Area 1 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/17/2015
SEW filling for fixing of pressure line from to 1+470 K, Sr.
00 PM 00 AM
protection slab 1+587.454 to 1+470 Engineer
joint measurement of S.
Inspection of laying 250 mm dia upvc
HFC- pipe laying and MH: 1 to BalaJi,R.
1768 geotextile, gravel sewer line from MH Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/17/2015
SEW grannular surround MH: 1A K, Sr.
bedding, -1 to MH-1A 00 PM 00 AM
for Engineer
joint measurement of S.
Inspection of laying 250 mm dia upvc
HFC- pipe laying and MH -1.6 to BalaJi,R.
1769 geotextile, gravel sewer line from MH Area 7 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/17/2015
SEW grannular surround MH-1.7 K, Sr.
bedding, -1.6 to MH-1.7 00 PM 00 AM
for Engineer
Inspection and joint
S.
measurement of pipe Irrigation line from
HFC- 0+870 to BalaJi,R.
0197 laying for 200 mm dia chainage 0+870 to Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/24/2015
IRR 0+700 K, Sr.
upvc Irrigation line 0+700 00 PM 00 AM
Engineer
from
S.
for 315mm dia upvc
HFC- Visual inspection for MH 2.11 BalaJi,R.
0241 Storm water line from Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/15/2015
DR 1st layer back filling to MH 3.0 K, Sr.
MH-2.11 to MH- 3.0 00 PM 00 AM
Engineer
S.
for 315mm dia upvc
HFC- Visual inspection for MH 3.0 to BalaJi,R.
0242 Storm water line from Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: A 1/15/2015
DR 1st layer back filling MH 3.1 K, Sr.
MH-3.0 to MH- 3.1 00 PM 00 AM
Engineer
S.
for 315mm dia upvc
HFC- Visual inspection for MH 2.11 BalaJi,R.
0243 Storm water line from Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR 2nd layer back filling to MH 3.0 K, Sr.
MH-2.11 to MH- 3.0 00 PM 00 AM
Engineer
S.
for 315mm dia upvc
HFC- Visual inspection for MH 3.0 to BalaJi,R.
0244 Storm water line from Area 5 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/15/2015
DR 2nd layer back filling MH 3.1 K, Sr.
MH-3.0 to MH- 3.1 00 PM 00 AM
Engineer

Inspection of shutter, S.
HFC- water stopper & MH-9, CH BalaJi,R.
1770 sewer MH -9 (2nd lift) Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall 1+150.82) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & sewer manhole MH- MH-10 BalaJi,R.
1771 Area 6 13-Jan-15 02.30: 13-Jan-15 08.30: AN 1/28/2015
SEW concreting for the wall 10 (2nd lift) (1+215.06) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

Inspection of S.
MH
HFC- shutter,reinforcement Storm water drainage Yard BalaJi,R.
0245 2.4,0+342. 14-Jan-15 011.30: 14-Jan-15 08.30: AN 1/28/2015
DR and concreting for MH 2.4 area K, Sr.
1374 00 AM 00 AM
base slab Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of S.
MH 2.11 ,
HFC- shutter,reinforcement storm water drainage Yard BalaJi,R.
0246 0+158.096 14-Jan-15 011.30: 14-Jan-15 08.30: AN 1/28/2015
DR and concreting for MH-2.11 area K, Sr.
1 00 AM 00 AM
base slab Engineer

Inspection for shutter, S.


for storm water MH & (01 nos type- J for
HFC- reinforcement & Yard BalaJi,R.
0247 (01 nos type- H for MH-2.3) at precast MH-2.5,2.3 14-Jan-15 011.30: 14-Jan-15 08.30: AN 2/1/2015
DR concreting for cover Area K, Sr.
MH-2.5) yard area 00 AM 00 AM
slab Engineer

for 250 mm dia HDPE S.


Inspection for 4th
HFC- fire fighitng line from 3+050 to BalaJi,R.
0193 layer back filling with Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
FF Chainage 3+050 to 3+450 K, Sr.
warning tape 00 AM 00 AM
3+450 Engineer
for 250 mm dia HDPE
S.
Inspection for 4th fire fighitng line fire
HFC- 3+450 to BalaJi,R.
0194 layer back filling with fighting line from Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
FF 3+700 K, Sr.
warning tape chanaige 3+450 to 00 AM 00 AM
Engineer
3+700
for 250 mm dia HDPE
S.
Inspection for 4th fire fighitng line fire
HFC- 3+700 to BalaJi,R.
0195 layer back filling with fighting line from Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
FF 3+810 K, Sr.
warning tape chanaige 3+700 to 00 AM 00 AM
Engineer
3+810
for 100 mm dia GRE S.
Inspection for 4th
HFC- water line from 1+070 to BalaJi,R.
0205 with warning tape Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
WD Chainage 1+070 to 1+460 K, Sr.
layer back filling 00 AM 00 AM
1+460 Engineer
for 100 mm dia GRE S.
Inspection for 4th
HFC- water line from 0+930 to BalaJi,R.
0206 with warning tape Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
WD Chainage 0+930 to 1+070 K, Sr.
layer back filling 00 AM 00 AM
1+070 Engineer
for 100 mm dia GRE S.
Inspection for 4th
HFC- water line from 0+930 to BalaJi,R.
0207 with warning tape Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
WD Chainage 0+930 to 0+830 K, Sr.
layer back filling 00 AM 00 AM
0+830 Engineer
for 200 mm dia
S.
Inspection 4th & final HDPE Sewer
HFC- 0+880 to BalaJi,R.
1772 with warning tape pressure line from Area 5 14-Jan-15 011.30: 14-Jan-15 08.30: A 1/28/2015
SEW 0+920 K, Sr.
layer back filling chainage 0+880 to 00 AM 00 AM
Engineer
0+920
S.
Inspection 4th & final for 200 mm dia
HFC- from ch 0+720 to 0+720 to BalaJi,R.
1773 with warning tape HDPE Sewer Area 7 14-Jan-15 011.30: 14-Jan-15 08.30: A 1/28/2015
SEW 0+440 0+440 K, Sr.
layer back filling pressure line 00 AM 00 AM
Engineer
Inspection for S.
HFC- excavation and MH: 1 to BalaJi,R.
1774 from MH: 1 to MH: 2 Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
SEW prepared formation of MH: 2 K, Sr.
00 AM 00 AM
200mm dia UPVC Engineer
Inspection for S.
HFC- excavation and MH: BalaJi,R.
1775 MH: 1 Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/1/2015
SEW prepared formation for 1,0+720.88 K, Sr.
00 AM 00 AM
sewer manhole Engineer
Inspection for S.
HFC- excavation and MH: BalaJi,R.
1776 MH: 2 Area 6 14-Jan-15 011.30: 14-Jan-15 08.30: A 2/10/2015
SEW prepared formation for 2,0+740.88 K, Sr.
00 AM 00 AM
sewer manhole Engineer

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping BalaJi,R.
0153C n pump pump 14-Jan-15 011.30: 14-Jan-15 08.30: Revised 1/15/2015
IRR concreting for fire station wall (wall no: K, Sr.
station station 00 AM 00 AM
fighting W2 ) Engineer

Inspection for pourng S.


HFC- of blinding concrete BalaJi,R.
0248 IC-03 Area 5 IC-.03 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/28/2015
DR for inspection K, Sr.
00 AM 00 AM
chamber Engineer
Inspection for pourng S.
HFC- of blinding concrete BalaJi,R.
0249 MH 1.4 Area 7 MH-1.4 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/28/2015
DR for storm water K, Sr.
00 AM 00 AM
drainage Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of laying joint measurement of
HFC- for 200mm dia upvc From MH-3.3 to IC- MH-3.3 to BalaJi,R.
0250 geotextile, gravel pipe laying and Area 5 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/17/2015
DR Storm water line 03 IC-03 K, Sr.
bedding, grannular surround 00 AM 00 AM
Engineer
joint measurement of S.
Inspection of laying
HFC- pipe laying and 200 mm dia upvc MH: 1 to BalaJi,R.
1777 geotextile, gravel from MH: 1 to MH: 2 Area 6 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/17/2015
SEW grannular surround sewer line MH: 2 K, Sr.
bedding, 00 AM 00 AM
for Engineer
S.
Inspection of laying joint measurement of
HFC- for 500mm dia GRP from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0251 geotextile, gravel pipe laying and Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/17/2015
DR Storm water line 1.4 MH-1.4 K, Sr.
bedding, grannular surround 00 AM 00 AM
Engineer
S.
Inspection of laying joint measurement of
HFC- for 500mm dia GRP from MH 1.6 to MH MH 1.6 to BalaJi,R.
0252 geotextile, gravel pipe laying and Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/17/2015
DR Storm water line 1.5 MH-1.5 K, Sr.
bedding, grannular surround 00 AM 00 AM
Engineer

Inspection for 8th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0198 irrigation reservoir n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 8th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0199 irrigation reservoir n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/28/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for 8th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0200 n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
IRR back filling for the and pumping station K, Sr.
station station 00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 4th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0201 irrigation reservoir n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of W3 .`w1 Engineer
Inspection for 5th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0202 irrigation reservoir n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: AN 2/4/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of W3 ,W1 Engineer
S.
Inspection of for cover slab of
HFC- MH-17 BalaJi,R.
1778 shutter,reinforcement sewer manhole MH- Area 6 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/28/2015
SEW (1+562.82) K, Sr.
and concreting 17 00 AM 00 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 1+500 to BalaJi,R.
0196 chanaige 1+500 to Area 9 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/4/2015
FF prepared formation for 1+630 K, Sr.
1+630 00 AM 00 AM
200 mm dia HDPE Engineer

Inspection of
S.
excavation and
HFC- for 200 mm dia HDPE BalaJi,R.
0197 prepared formation for Area 9 AV-6 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/4/2015
FF fire fighting line K, Sr.
air valve chamber 00 AM 00 AM
Engineer
(AV-6)
Inspection for
S.
excavation and
HFC- 200 mm dia HDPE fire gate valve chamber BalaJi,R.
0198 prepared formation of Area 9 IV-8 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/4/2015
FF fighting line no-IV-8 K, Sr.
gate valve chamber 00 AM 00 AM
Engineer
for
Inspection for S.
Irrigation line from
HFC- excavation and 1+320 to BalaJi,R.
0203 chainage 1+320 to Area 9 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
IRR prepared formation for 1+440 K, Sr.
1+440 00 AM 00 AM
110 mm dia upvc Engineer
S.
Inspection for for gate valve
HFC- BalaJi,R.
0204 excavation & chamber for 110mm gate vlave no IV-7 Area 9 IV-7 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/4/2015
IRR K, Sr.
prepared formation dia upvc Irrigation line 00 AM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter,


S.
reinforcement&
HFC- Storm water drainage Yard BalaJi,R.
0253 concreting for cover MH 1.10 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/28/2015
DR MH 1.10 type-J Area K, Sr.
slab for storm water 00 AM 00 AM
Engineer
drainage

Inspection for S.
Irrigation line from
HFC- excavation and 0+340 to BalaJi,R.
0205 chainage 0+340 to Area 6 15-Jan-15 011.30: 15-Jan-15 08.30: Revised 1/21/2015
IRR prepared formation for 0+510 K, Sr.
0+510 00 AM 00 AM
200 mm dia upvc Engineer

Inspection for S.
HFC- excavation and from ch 1+300 to 1+300 to BalaJi,R.
0199 Area 6 15-Jan-15 011.30: 15-Jan-15 08.30: Revised 1/21/2015
FF prepared formation 1+420 1+420 K, Sr.
00 AM 00 AM
for 250 mm dia HDPE Engineer

Inspection for shutter,


S.
reinforcement & Irrigatio Irrigation
HFC- & irrigation reservoir BalaJi,R.
0206 concreting for the n pump pump 15-Jan-15 011.30: 15-Jan-15 08.30: Revised 1/19/2015
IRR and pumping station K, Sr.
suspended slab fire station station 00 AM 00 AM
Engineer
fighting

Inspection for S.
water line from
HFC- excavation and 0+330 to BalaJi,R.
0208 chanaige 0+330 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
WD prepared formation for 0+380 K, Sr.
0+380 line-2 00 AM 00 AM
150 mm dia GRE Engineer
Inspection for
S.
excavation & fire fighting line from
HFC- 0+460 to BalaJi,R.
0200 preparation of chanaige 0+460 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/21/2015
FF 0+410 K, Sr.
formation for 250 mm 0+410 (Line-2) 00 AM 00 AM
Engineer
dia HDPE
S.
Inspection for sand fire fighting line from
HFC- 0+150 to BalaJi,R.
0201 surround for 250 mm chanaige 0+150 to Area 8 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/24/2015
FF 0+350 K, Sr.
dia HDPE 0+350 00 AM 00 AM
Engineer
Inspection and joint
S.
measurement of pipe
HFC- from CHainage 0+540 0+540 - BalaJi,R.
0209 laying of 150 mm dia Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/21/2015
WD - 0+420 (LINE-2) 0+420 K, Sr.
GRE potable water 00 AM 00 AM
Engineer
line
Inspection sand S.
HFC- surround for 150 mm from CHainage 0+640 0+640 - BalaJi,R.
0210 Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/24/2015
WD dia GRE potable - 0+540 (Line-2) 0+540 K, Sr.
00 AM 00 AM
water line Engineer
Inspection excavation
S.
and prepared
HFC- from CHainage 0+640 0+640 - BalaJi,R.
0211 formation for 150 mm Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/21/2015
WD - 0+690 (Line-2) 0+690 K, Sr.
dia GRE potable 00 AM 00 AM
Engineer
water line
Inspection and joint S.
Irrigation line from
HFC- measurement of pipe 0+370 to BalaJi,R.
0207 chainage 0+370 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/21/2015
IRR laying for 250 mm dia 0+490 K, Sr.
0+490 (line-2) 00 AM 00 AM
upvc Engineer
S.
Inspection sand Irrigation line from
HFC- 0+270 to BalaJi,R.
0208 surround for 250 mm chainage 0+270 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/24/2015
IRR 0+370 K, Sr.
dia upvc 0+370 (line-2) 00 AM 00 AM
Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+270 to BalaJi,R.
0209 chainage 0+270 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/21/2015
IRR prepared formation for 0+220 K, Sr.
0+220 (line-2) 00 AM 00 AM
250 mm dia upvc Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 1+560 1+560 to BalaJi,R.
0212 Area 7 20-Jan-15 20-Jan-15 08.30: AN 1/27/2015
WD for 150 mm dia GRE to 1+710 line 2 RHS 1+710 K, Sr.
00 AM
water line Engineer
Inspection for
S.
Shutter, reiforcement for 150 mm dia upvc
HFC- IV9,0+735. BalaJi,R.
0210 & concreting for the Irrigation transmission Area 1 15-Jan-15 011.30: 15-Jan-15 08.30: A 3/22/2015
IRR 037 K, Sr.
wall of Isolation valve line 00 AM 00 AM
Engineer
chamber

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for sand fire fighting line from
HFC- 0+460 to BalaJi,R.
0202 surround for 250 mm chanaige 0+460 to Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: AN 1/24/2015
FF 0+560 K, Sr.
dia HDPE 0+560 (Line-2) 00 AM 00 AM
Engineer
Inspection for S.
HFC- excavation and from CHainage 0+530 0+530 - BalaJi,R.
0211 Area 7 15-Jan-15 011.30: 15-Jan-15 08.30: A 2/1/2015
IRR prepared formation for - 0+560 (Line-2) 0+560 K, Sr.
00 AM 00 AM
200 mm dia upvc Engineer

Inspection for 10th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0212 irrigation reservoir n pump pump 17-Jan-15 011.30: 11-Jan-15 08.30: A 2/4/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for S.
of gate valve chamber gate valve chamber IV-24,IV-
HFC- shutter,reinforcement Yard BalaJi,R.
0203 for 250 mm dia HDPE no IV-24,IV-25,IV-26, 25,IV-26, 17-Jan-15 011.30: 17-Jan-15 08.30: A 3/25/2015
FF & concreting for cover area K, Sr.
fire fighting line IV-27 (4 nos) IV-27 00 AM 00 AM
slab Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1779 Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 16.1 MH-16.1 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1780 Area 6 HC-01 of ( 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 of ( MH-16.1) K, Sr.
MH-16.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1781 Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 cap of ( MH-16.1) K, Sr.
( MH-16.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1782 Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 cap of ( MH-16.1) K, Sr.
( MH-16.1) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to BalaJi,R.
1783 Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 16.2 MH-16.2 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1784 Area 6 HC-01 of ( 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 of ( MH-16.2) K, Sr.
MH-16.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1785 Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 cap of ( MH-16.2) K, Sr.
( MH-16.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1786 Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW measurements of connection line 160 cap of ( MH-16.2) K, Sr.
( MH-16.2) 00 AM 00 AM
pipe laying & mm dia upvc Engineer
sewer House
S.
Inspection for connection line 160
HFC- HC -02 to BalaJi,R.
1787 excavation and mm dia Upvc of from HC -02 to MH-17 Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: Revised 1/18/2015
SEW MH-17 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 00 AM
Engineer
17
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to HC-01 BalaJi,R.
1788 excavation and mm dia Upvc of Area 6 HC-01 of ( 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/1/2015
SEW of ( MH-17) K, Sr.
prepared formation for Sewer Manhole MH- MH-17) 00 AM 00 AM
Engineer
17
sewer House
S.
Inspection for connection line 160 HC -02 to
HFC- from HC -02 to end BalaJi,R.
1789 excavation and mm dia Upvc of Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/1/2015
SEW cap of ( MH-17) K, Sr.
prepared formation for Sewer Manhole MH- ( MH-17) 00 AM 00 AM
Engineer
17
sewer House
S.
Inspection for connection line 160 HC -01 to
HFC- from HC -01 to end BalaJi,R.
1790 excavation and mm dia Upvc of Area 6 end cap of 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/1/2015
SEW cap of ( MH-17) K, Sr.
prepared formation for Sewer Manhole MH- ( MH-17) 00 AM 00 AM
Engineer
17

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House S.
Inspection for HC-01 &
HFC- connection chambers HC-01 & HC-02 (MH- BalaJi,R.
1791 excavation and Area 6 HC-02 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/1/2015
SEW of Sewer Manhole 17) K, Sr.
prepared formation for (MH-17) 00 AM 00 AM
MH-17 Engineer
Visual Inspection for S.
HFC- 1st layer back filling MH: 1 to BalaJi,R.
1792 from MH: 1 to MH: 2 Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/21/2015
SEW for 200mm dia UPVC MH: 2 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling MH: 1 to BalaJi,R.
1793 from MH: 1 to MH: 2 Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/20/2015
SEW for 200mm dia UPVC MH: 2 K, Sr.
00 AM 00 AM
sewer line Engineer
Visual Inspection for S.
HFC- 1st layer back filling MH: 1 to BalaJi,R.
1794 from MH: 1 to MH: 1A Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/24/2015
SEW for 250mm dia UPVC MH: 1A K, Sr.
00 AM 00 AM
sewer line Engineer
Visual Inspection for S.
HFC- 2nd layer back filling MH: 1 to BalaJi,R.
1795 from MH: 1 to MH: 1A Area 6 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/20/2015
SEW for 250mm dia UPVC MH: 1A K, Sr.
00 AM 00 AM
sewer line Engineer
Inspection for 9th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0213 irrigation reservoir n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/4/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer

Inspection for 9th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0214 irrigation reservoir n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/4/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W1) at grid -A Engineer

Inspection for 10th S.


for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0215 irrigation reservoir n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/10/2015
IRR back filling for the K, Sr.
and pumping station station station 00 AM 00 AM
wall of (W4,W1a) Engineer
Inspection for S.
HFC- excavation and BalaJi,R.
1796 MH: 1A Area 6 MH: 1A 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/9/2015
SEW prepared formation for K, Sr.
00 AM 00 AM
sewer manhole Engineer
for sewer House S.
HC-01 &
HFC- Inspection for pouring connection chambers HC-01 & HC-02 (MH- BalaJi,R.
1797 Area 6 HC-02 17-Jan-15 011.30: 17-Jan-15 08.30: AN 2/1/2015
SEW of blinding concrete of Sewer Manhole 17) K, Sr.
(MH-17) 00 AM 00 AM
MH-17 Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1798 of concrete for the Area 6 of sewer 17-Jan-15 011.30: 17-Jan-15 08.30: AN 2/1/2015
SEW chambers of MH-16.1 MH-16.1 K, Sr.
base of MH-16.1 00 AM 00 AM
Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1799 of concrete for the Area 6 of sewer 17-Jan-15 011.30: 17-Jan-15 08.30: AN 2/1/2015
SEW chambers of MH-16.2 MH-16.2 K, Sr.
base of MH-16.2 00 AM 00 AM
Engineer
Inspection for 8th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0216 n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/1/2015
IRR back filling for the and pumping station K, Sr.
station station 00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
Inspection for 9th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0217 n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: A 2/4/2015
IRR back filling for the and pumping station K, Sr.
station station 00 AM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer

for 200 mm dia HDPE S.


Inspection and joint
HFC- sewer pressure line 0+720 to BalaJi,R.
1363A measurement of pipe Area 5 17-Jan-15 011.30: 17-Jan-15 08.30: Revised 1/18/2015
SEW from chainage 0+720 0+850 K, Sr.
laying 00 AM 00 AM
to 0+850 Engineer

& irrigation reservoir


Inspection for shutter, S.
wall and pumping Irrigatio Irrigation
HFC- reinforcement & BalaJi,R.
0095D station wall (wall no: n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/19/2015
IRR concreting for fire K, Sr.
W1) &(wall no: station station 00 AM 00 AM
fighting Engineer
W3,W4)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter, & irrigation reservoir S.


Irrigatio Irrigation
HFC- reinforcement & wall and pumping BalaJi,R.
0153D n pump pump 17-Jan-15 011.30: 17-Jan-15 08.30: AN 1/19/2015
IRR concreting for fire station wall (wall no: K, Sr.
station station 00 AM 00 AM
fighting W2 ) Engineer

Visual Inspection for S.


HFC- 2nd layer back filling from Chainage 1+710 1+710 to BalaJi,R.
0213 Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/24/2015
WD for 150 mm dia GRE to 1+760 line 2 RHS 1+760 K, Sr.
00 PM 00 AM
water line Engineer
S.
Visual Inspection for water line from
HFC- 0+020 to BalaJi,R.
0214 2nd layer back filling chanaige 0+020 to Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/24/2015
WD 0+090 K, Sr.
for 150 mm dia GRE 0+090 00 PM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+700 to BalaJi,R.
0204 2nd layer back filling chainage 0+700 to Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/24/2015
FF 0+860 K, Sr.
for 250 mm dia HDPE 0+860 (line-1 RHS) 00 PM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+860 to BalaJi,R.
0205 2nd layer back filling chainage 0+860 to Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/24/2015
FF 0+920 K, Sr.
for 250 mm dia HDPE 0+920 (line-1 ) 00 PM 00 AM
Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+350 to BalaJi,R.
0206 chanaige 0+350 to Area 8 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/21/2015
FF laying for 250 mm dia 0+490 K, Sr.
0+490 00 PM 00 AM
HDPE Engineer
S.
Visual Inspection for fire fighting line from
HFC- 1+010 to BalaJi,R.
0207 2nd layer back filling chanaige 1+010 to Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: AN 1/24/2015
FF 1+080 K, Sr.
for 250 mm dia HDPE 1+080 LINE 2 LHS 00 PM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+820 to BalaJi,R.
0218 2nd layer back filling chainage 0+820 to Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: A 1/20/2015
IRR 0+890 K, Sr.
for 200 mm dia upvc 0+890 00 PM 00 AM
Engineer
Visual Inspection for S.
HFC- 2nd layer back filling from Chainage 1+560 1+560 to BalaJi,R.
0215 Area 7 18-Jan-15 04.30: 18-Jan-15 08.30: A 1/20/2015
WD for 150 mm dia GRE to 1+710 line 2 RHS 1+710 K, Sr.
00 PM 00 AM
water line Engineer
Inspection of 3rd layer S.
fire fighting line from
HFC- back filling with 2+350 to BalaJi,R.
0118A chanaige 2+350 to Area 6 18-Jan-15 04.30: 18-Jan-15 08.30: AN 2/15/2015
FF warning tape for 250 2+130 K, Sr.
2+130 00 PM 00 AM
mm dia HDPE Engineer
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house from HC -02 to sewer HC -02 to BalaJi,R.
0792D Area 6 18-Jan-15 011.30: 18-Jan-15 08.30: Revised 9/8/2015
SEW measurements of connection line 160 MH-22 MH-22 K, Sr.
00 AM 00 AM
pipe laying & mm dia upvc Engineer
S.
Inspection for placing
HFC- BalaJi,R.
0254 & fixing of storm water MH 3.2 Area 5 MH 3.2 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR K, Sr.
manhole base of 00 PM 00 AM
Engineer
S.
Inspection for placing MH-
HFC- Storm water drainage BalaJi,R.
0255 & fixing of storm water Area 5 3.1,0+085. 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR MH 3.1 K, Sr.
manhole base of 8111 00 PM 00 AM
Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0256 & fixing of storm water Area 5 3.0,0+133. 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR MH 3.0 K, Sr.
manhole base of 2178 00 PM 00 AM
Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0257 & fixing of storm water Area 7 2.5,0+276. 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR MH 2.5 K, Sr.
manhole base of 2135 00 PM 00 AM
Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0258 & fixing of storm water Area 7 2.6,0+225. 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR MH 2.6 K, Sr.
manhole base of 6435 00 PM 00 AM
Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0259 & fixing of storm water Area 7 2.7,0+174. 18-Jan-15 01.30: 18-Jan-15 08.30: AN 1/25/2015
DR MH 2.7 K, Sr.
manhole base of 7024 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for 3rd &
HFC- for 250 mm dia upvc from MH 3.2 to MH MH 3.2 to BalaJi,R.
0260 final with warning tape Area 5 18-Jan-15 01.30: 18-Jan-15 08.30: Revised 1/25/2015
DR Storm water line 3.3 MH 3.3 K, Sr.
layer back filling 00 PM 00 AM
Engineer
S.
inspection for 4th
HFC- for 315mm dia upvc from MH 3.1 to MH MH 3.1 to BalaJi,R.
0261 layer back filling with Area 5 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/14/2015
DR Storm water line 3.2 MH 3.2 K, Sr.
warning tape 00 PM 00 AM
Engineer
S.
Inspection for 3rd for 315mm dia upvc
HFC- MH 2.11 BalaJi,R.
0262 layer back filling with Storm water line from Area 5 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/14/2015
DR to MH 3.0 K, Sr.
warning tape MH-2.11 to MH- 3.0 00 PM 00 AM
Engineer
S.
Inspection for 3rd for 315mm dia upvc
HFC- MH 3.0 to BalaJi,R.
0263 layer back filling with Storm water line from Area 5 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/14/2015
DR MH 3.1 K, Sr.
warning tape MH-3.0 to MH- 3.1 00 PM 00 AM
Engineer
S.
Inspection of 4th for 700mm dia GRP
HFC- MH 2.1 to BalaJi,R.
0264 layer back filling with Storm water line from Area 8 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
DR MH 2.2 K, Sr.
warning tape MH-2.1 to MH- 2.2 00 PM 00 AM
Engineer
Inspection for 5th
S.
layer back filling with
HFC- from MH-2.2 to MH- MH 2.2 to BalaJi,R.
0265 warning tape for Area 8 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
DR 2.3 MH 2.3 K, Sr.
700mm dia GRP 00 PM 00 AM
Engineer
storm water Line
S.
Inspection of 3rd for 700mm dia GRP
HFC- MH 2.3 to BalaJi,R.
0266 layer back filling with Storm water line from Area 8 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
DR MH 2.4 K, Sr.
warning tape MH-2.3 to MH- 2.4 00 PM 00 AM
Engineer
MH: 3 to
Inspection for 4th S.
from MH: 3 to ch ch
HFC- layer back fiiling of BalaJi,R.
1800 0+771.83 towards Area 6 0+771.83 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
SEW 200mm dia Upvc K, Sr.
MH: 2 towards 00 PM 00 AM
sewer line Engineer
MH: 2
S.
200mm dia upvc
HFC- Inspection for 6th MH: 4 to BalaJi,R.
1801 sewer line from MH-4 Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
SEW layer back filling for MH: 5 K, Sr.
to MH-5 00 PM 00 AM
Engineer
MH -6 ,CH
S.
200 mm dia upvc 0+968.96
HFC- Inspection for 6th BalaJi,R.
1802 sewer line from MH-6 Area 6 to MH-7, 18-Jan-15 01.30: 18-Jan-15 08.30: A 1/28/2015
SEW layer back filling for K, Sr.
to NH- 7 CH 00 PM 00 AM
Engineer
1+032.78
inspection for 7th S.
HFC- layer back filling for MH: 3 to BalaJi,R.
1803 from MH: 3 to MH: 4 Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
SEW 200 mm dia Upvc MH: 4 K, Sr.
00 PM 00 AM
sewer line Engineer
inspection for 7th S.
200 mm dia upvc
HFC- layer back filling for MH -5 to BalaJi,R.
1804 sewer line from MH Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
SEW 200 mm dia Upvc MH-6 K, Sr.
-5 to MH-6 00 PM 00 AM
sewer line Engineer
MH -7 ,CH
S.
200 mm dia upvc 1+032.78
HFC- Inspection for 5th BalaJi,R.
1805 sewer line from MH Area 6 to MH-8, 18-Jan-15 01.30: 18-Jan-15 08.30: Revised 1/25/2015
SEW layer back filling for K, Sr.
-7 to MH-8 CH 00 PM 00 AM
Engineer
1+086.48
S.
for 200 mm dia upvc
HFC- Inspection for 6th MH -11 to BalaJi,R.
1806 sewer line from MH Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: Revised 1/28/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 7th MH -13 to BalaJi,R.
1807 sewer line from MH Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: A 2/1/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 PM 00 AM
Engineer
Inspection of 6th layer S.
HFC- back filling for 200 MH-8 to BalaJi,R.
1808 From MH-8 to MH-9 Area 6 18-Jan-15 01.30: 18-Jan-15 08.30: Revised 1/25/2015
SEW mm dia upvc sewer MH-9 K, Sr.
00 PM 00 AM
line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of 5th & fire fighting line from
HFC- 2+750 to BalaJi,R.
0177A final layer back filling chainage 2+750 to Area 6 19-Jan-15 01.30: 18-Jan-15 08.30: AN 2/15/2015
FF 3+050 K, Sr.
for 250 mm dia HDPE 3+050 00 PM 00 AM
Engineer
Inspection for 5th S.
HFC- ( final layer) back from Chainage 1+770 1+770 to BalaJi,R.
0188A Area 6 19-Jan-15 01.30: 18-Jan-15 08.30: A 2/8/2015
WD filling for 100 mm dia to 1+630 1+630 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection for 5th S.
HFC- ( final layer) back from Chainage 1+630 1+630 to BalaJi,R.
0191A Area 6 19-Jan-15 01.30: 18-Jan-15 08.30: A 2/8/2015
WD filling for 100 mm dia to 1+570 1+570 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection for 5th D.
HFC- ( final layer) back from Chainage 1+460 1+460 to Suresh,R
0193A Area 6 19-Jan-15 01.30: 18-Jan-15 08.30: A 2/8/2015
WD filling for 100 mm dia to 1+570 1+570 .K, Sr.
00 PM 00 AM
GRE water line Engineer
S.
Inspection for pouring
HFC- MH: BalaJi,R.
1809 of blinding concrete MH: 1 Area 6 18-Jan-15 03.30: 18-Jan-15 01.30: AN 2/1/2015
SEW 1,0+720.88 K, Sr.
for sewer manhole 00 PM 00 AM
Engineer
S.
Inspection for pouring
HFC- MH: 01.30: BalaJi,R.
1810 of blinding concrete MH: 2 Area 6 18-Jan-15 03.30: 18-Jan-15 AN 2/1/2015
SEW 2,0+740.88 00 K, Sr.
for sewer manhole 00 PM
PM Engineer
Inspection for S.
HFC- waterproofing for MH: 01.30: BalaJi,R.
1811 MH: 1 Area 6 18-Jan-15 04.30: 18-Jan-15 AN 1/25/2015
SEW blinding concrete of 1,0+720.88 00 K, Sr.
00 PM
sewer manhole PM Engineer
Inspection for S.
HFC- waterproofing for MH: 01.30: BalaJi,R.
1812 MH: 2 Area 6 18-Jan-15 04.30: 18-Jan-15 C
SEW blinding concrete of 2,0+740.88 00 K, Sr.
00 PM
sewer manhole PM Engineer
S.
Inspection of shutter MH
HFC- Storm water drainage 01.30: BalaJi,R.
0267 & concreting for the Area 7 2.6,0+225. 18-Jan-15 04.30: 18-Jan-15 AN 2/10/2015
DR MH 2.6 00 K, Sr.
wall of 6435 00 PM
PM Engineer
Inspection of shutter S.
MH
HFC- & concreting for the 01.30: BalaJi,R.
0268 MH 2.5 Area 7 2.5,0+276. 18-Jan-15 04.30: 18-Jan-15 AN 2/10/2015
DR wall of storm water 00 K, Sr.
2135 00 PM
manhole PM Engineer

Inspection for shutter,


S.
reinforcement&
HFC- Yard 01.30: BalaJi,R.
0269 concreting for base MH 3.3 MH- 3.3 18-Jan-15 04.30: 18-Jan-15 AN 2/1/2015
DR Area 00 K, Sr.
slab for storm water 00 PM
PM Engineer
drainage

S.
Visual inspection of MH
HFC- Storm water drainage 08.30: BalaJi,R.
0270 2nd layer surrounding Area 7 2.8,0+127. 21-Jan-15 04.30: 21-Jan-15 Revised 2/9/2015
DR MH 2.8 00 K, Sr.
back filling around 98.95 00 PM
PM Engineer
Inspection for
S.
excavation and
HFC- from Chainage 3+190 3+190 to 01.30: BalaJi,R.
0216 prepared formation for Area 6 18-Jan-15 01.30: 18-Jan-15 A 2/10/2015
WD to 3+370 3+370 00 K, Sr.
100 mm dia GRE 00 PM
PM Engineer
water line

Inspection of shutter, S.
HFC- water stopper & MH-17 BalaJi,R.
1813 MH-17 (2nd lift) Area 6 19-Jan-15 01.30: 19-Jan-15 08.30: AN 2/1/2015
SEW concreting for the wall (1+562.82) K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

sewer House
S.
Inspection for connection line 160
HFC- HC -02 to BalaJi,R.
1787A excavation and mm dia Upvc of from HC -02 to MH-17 Area 6 19-Jan-15 09.30: 19-Jan-15 08.30: A 3/3/2015
SEW MH-17 K, Sr.
prepared formation for Sewer Manhole MH- 00 AM 00 AM
Engineer
17

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter,


S.
reinforcement & Irrigatio Irrigation
HFC- & irrigation reservoir BalaJi,R.
0206A concreting for the n pump pump 19-Jan-15 09.30: 19-Jan-15 08.30: Revised 1/21/2015
IRR and pumping station K, Sr.
suspended slab fire station station 00 AM 00 AM
Engineer
fighting

for 100 mm dia GRE S.


HFC- Inspection for 5th water line from 1+070 to BalaJi,R.
0217 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: A 2/8/2015
WD layer back filling Chainage 1+070 to 1+460 K, Sr.
00 PM 00 AM
1+460 Engineer
for 100 mm dia GRE S.
HFC- Inspection for (5th & water line from 0+930 to BalaJi,R.
0218 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 1/28/2015
WD final ) layer back filling Chainage 0+930 to 1+070 K, Sr.
00 PM 00 AM
1+070 Engineer
for 100 mm dia GRE S.
HFC- Inspection for (5th & water line from 0+930 to BalaJi,R.
0219 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 1/28/2015
WD final ) layer back filling Chainage 0+930 to 0+830 K, Sr.
00 PM 00 AM
0+830 Engineer
for 250 mm dia HDPE S.
HFC- Inspection for (5th & fire fighitng line from 3+050 to BalaJi,R.
0208 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: A 2/8/2015
FF final ) layer back filling Chainage 3+050 to 3+450 K, Sr.
00 PM 00 AM
3+450 Engineer
for 250 mm dia HDPE
S.
fire fighitng line fire
HFC- Inspection for (5th & 3+450 to BalaJi,R.
0209 fighting line from Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 1/28/2015
FF final ) layer back filling 3+700 K, Sr.
chanaige 3+450 to 00 PM 00 AM
Engineer
3+700
for 250 mm dia HDPE
S.
fire fighitng line fire
HFC- Inspection for (5th & 3+700 to BalaJi,R.
0210 fighting line from Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 1/28/2015
FF final ) layer back filling 3+810 K, Sr.
chanaige 3+700 to 00 PM 00 AM
Engineer
3+810
S.
Visual Inspection for fire fighting line from
HFC- 0+150 to BalaJi,R.
0211 1st layer back filling chanaige 0+150 to Area 8 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/27/2015
FF 0+350 K, Sr.
for 250 mm dia HDPE 0+350 00 PM 00 AM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 0+350 to BalaJi,R.
0212 surround for 250 mm chanaige 0+350 to Area 8 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
FF 0+520 K, Sr.
dia HDPE 0+520 00 PM 00 AM
Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+460 to BalaJi,R.
0213 chanaige 0+460 to Area 7 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/21/2015
FF laying for 250 mm dia 0+420 K, Sr.
0+420 (Line-2) 00 PM 00 AM
HDPE Engineer
Inspection and joint S.
Irrigation line from
HFC- measurement of pipe 0+270 to BalaJi,R.
0219 chainage 0+270 to Area 7 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/21/2015
IRR laying for 250 mm dia 0+220 K, Sr.
0+220 (line-2) 00 PM 00 AM
upvc Engineer
Inspection and joint
S.
measurement of pipe
HFC- from CHainage 0+640 0+640 - BalaJi,R.
0220 laying for 150 mm dia Area 7 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/21/2015
WD - 0+690 (Line-2) 0+690 K, Sr.
GRE potable water 00 PM 00 AM
Engineer
line
Inspection for gravel surround for S.
HFC- granular bedding, joint sewer house HC -02 to BalaJi,R.
1814 from HC -02 to MH-17 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
SEW measurements of connection line 160 MH-17 K, Sr.
00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to HC-01 BalaJi,R.
1815 Area 6 HC-01 of ( 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
SEW measurements of connection line 160 of ( MH-17) K, Sr.
MH-17) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1816 Area 6 end cap of 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
SEW measurements of connection line 160 cap of ( MH-17) K, Sr.
( MH-17) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
Inspection for gravel surround for S.
HC -01 to
HFC- granular bedding, joint sewer house from HC -01 to end BalaJi,R.
1817 Area 6 end cap of 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
SEW measurements of connection line 160 cap of ( MH-17) K, Sr.
( MH-17) 00 PM 00 AM
pipe laying & mm dia upvc Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for
HFC- BalaJi,R.
1818 blinding concrete for MH: 1A Area 6 MH: 1A 21-Jan-15 010.30 21-Jan-15 09.30: AN 2/1/2015
SEW K, Sr.
sewer manhole :00 AM 00 AM
Engineer
Inspection for gravel surround for S.
HC -02 to
HFC- granular bedding, joint sewer house from HC -02 to end BalaJi,R.
1191A Area 9 end cap 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/25/2015
SEW measurements of connection line 160 cap (MH-2.1) K, Sr.
(MH-2.1) 00 PM 00 AM
pipe laying & mm dia upvc Engineer

Inspection excavation
as per S.
and prepared
HFC- as per highlighted in highlighted BalaJi,R.
0221 formation of steel Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: A 2/10/2015
WD drawing (line-7) in drawing K, Sr.
sleeve for 100 mm 00 PM 00 AM
(line-7) Engineer
dia GRE water line

Inspection for S.
HFC- excavation and 250 mm dia HDPE fire washout chamber no- BalaJi,R.
0214 Area 6 WO-05 20-Jan-15 03.30: 20-Jan-15 09.30: A 2/24/2015
FF prepared formation of fighting line WO-05 K, Sr.
00 PM 00 AM
washout chamber for Engineer
Inspection for S.
HFC- excavation and for 250 mm dia HDPE BalaJi,R.
0215 Area 6 AV-3 20-Jan-15 03.30: 20-Jan-15 09.30: A 2/25/2015
FF prepared formation of fire fighting line K, Sr.
00 PM 00 AM
air valve chamber for Engineer
S.
Inspection for for gate valve
HFC- BalaJi,R.
0220 excavation & chamber for 200mm gate vlave no IV-1 Area 6 IV-1 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 2/7/2015
IRR K, Sr.
prepared formation dia upvc Irrigation line 00 PM 00 AM
Engineer
S.
Inspection for for gate valve
HFC- BalaJi,R.
0221 excavation & chamber for 200mm gate vlave no IV-2 Area 6 IV-2 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 2/7/2015
IRR K, Sr.
prepared formation dia upvc Irrigation line 00 PM 00 AM
Engineer
S.
Inspection for for washout chamber
HFC- BalaJi,R.
0222 excavation & for 200mm dia upvc WO-02 Area 6 WO-02 20-Jan-15 03.30: 20-Jan-15 09.30: Revised 1/27/2015
IRR K, Sr.
prepared formation Irrigation line 00 PM 00 AM
Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 3+120 3+120 to BalaJi,R.
0222 Area 6 20-Jan-15 03.30: 20-Jan-15 09.30: AN 1/21/2015
WD laying for 100 mm dia to 3+190 3+190 K, Sr.
00 PM 00 AM
GRE water line Engineer
S.
Inspection for external MH
HFC- Storm water drainage 08.30: BalaJi,R.
0271 waterporrofing for the Area 7 2.7,0+174. 21-Jan-15 04.30: 21-Jan-15 AN 1/25/2015
DR MH 2.7 00 K, Sr.
base 7024 00 PM
PM Engineer
S.
Inspection for external MH
HFC- Storm water drainage 08.30: BalaJi,R.
0272 waterporrofing for the Area 7 2.8,0+127. 21-Jan-15 04.30: 21-Jan-15 AN 1/25/2015
DR MH 2.8 00 K, Sr.
base 98.95 00 PM
PM Engineer
S.
Visual inspection of MH
HFC- Storm water drainage 08.30: BalaJi,R.
0273 1st layer surrounding Area 7 2.7,0+174. 21-Jan-15 04.30: 21-Jan-15 AN 1/25/2015
DR MH 2.7 00 K, Sr.
back filling around 7024 00 PM
PM Engineer
S.
Visual inspection of MH
HFC- Storm water drainage 08.30: BalaJi,R.
0274 1st layer surrounding Area 7 2.8,0+127. 21-Jan-15 04.30: 21-Jan-15 AN 1/25/2015
DR MH 2.8 00 K, Sr.
back filling around 98.95 00 PM
PM Engineer
S.
Visual inspection of MH
HFC- Storm water drainage 08.30: BalaJi,R.
0275 2nd layer surrounding Area 7 2.7,0+174. 21-Jan-15 04.30: 21-Jan-15 Revised 2/9/2015
DR MH 2.7 00 K, Sr.
back filling around 7024 00 PM
PM Engineer
S.
Inspection for placing MH
HFC- Storm water drainage 08.30: BalaJi,R.
0276 & fixing of storm water Area 7 1.13,0+355 21-Jan-15 04.30: 21-Jan-15 Revised 2/10/2015
DR MH 1.13 00 K, Sr.
manhole base of .0432 00 PM
PM Engineer
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 2+840 chainage, copy 2+840 to BalaJi,R.
0223 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
WD laying for 100 mm dia to 2+850 attached for your 2+850 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint (recover of deduction S.


HFC- measurement of pipe from Chainage 2+740 chainage, copy 2+740 to BalaJi,R.
0224 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: A 1/26/2015
WD laying for 100 mm dia to 2+780 attached for your 2+780 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 1+560 chainage, copy 1+560 to BalaJi,R.
0225 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
WD laying for 100 mm dia to 1+570 attached for your 1+570 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 0+795 chainage, copy 0+795 to BalaJi,R.
0226 Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
WD laying for 100 mm dia to 0+830 attached for your 0+830 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 0+380 chainage, copy 0+380 to BalaJi,R.
0227 Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/27/2015
WD laying for 100 mm dia to 0+430 attached for your 0+430 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection for (recover of deduction S.
HFC- excavation & from Chainage 0+390 chainage, copy 0+380 to BalaJi,R.
0228 Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: A 2/8/2015
WD formation 100 mm dia to 0+480 attached for your 0+430 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 0+080 chainage, copy 0+080 to BalaJi,R.
0229 Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/27/2015
WD laying for 100 mm dia to 0+90 attached for your 0+90 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
Inspection for 6th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0223 irrigation reservoir n pump pump 21-Jan-15 03.30: 21-Jan-15 09.30: A 2/10/2015
IRR back filling for the K, Sr.
and pumping station station station 00 PM 00 AM
wall of W3 ,W1 Engineer
Inspection for 7th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0224 irrigation reservoir n pump pump 21-Jan-15 03.30: 21-Jan-15 09.30: A 2/10/2015
IRR back filling for the K, Sr.
and pumping station station station 00 PM 00 AM
wall of W3 ,W1 Engineer
Inspection & joint S.
Irrigation line from
HFC- measurement of pipe 1+310 to BalaJi,R.
0225 chainage 1+320 to Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: A 1/25/2015
IRR laying for 110 mm dia 1+450 K, Sr.
1+440 00 PM 00 AM
upvc Engineer
S.
Inspection for placing
HFC- MH: BalaJi,R.
1819 & fixing of sewer MH: 1 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW 1,0+720.88 K, Sr.
manhloe base of 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- MH: BalaJi,R.
1820 & fixing of sewer MH: 2 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW 2,0+740.88 K, Sr.
manhloe base of 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- BalaJi,R.
1821 & fixing of sewer MH: 1A Area 6 MH: 1A 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW K, Sr.
manhloe base of 00 PM 00 AM
Engineer
Inspection for MH: 1A to S.
HFC- excavation and from MH: 1A to sewer sewer BalaJi,R.
1822 Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: A 2/10/2015
SEW prepared formation of pump station pump K, Sr.
00 PM 00 AM
250mm dia UPVC station Engineer
S.
Inspection for placing MH
HFC- Storm water drainage BalaJi,R.
0277 & fixing of storm water Area 7 2.4,0+342. 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
DR MH 2.4 K, Sr.
manhloe base of 1374 00 PM 00 AM
Engineer
S.
Inspection for placing
HFC- Storm water drainage MH -1.8, BalaJi,R.
0278 & fixing of storm water Area 7 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
DR MH 1.8 0+528.952 K, Sr.
manhloe base of 00 PM 00 AM
Engineer
S.
Inspection for placing MH -1.9,
HFC- Storm water drainage BalaJi,R.
0279 & fixing of storm water Area 7 0+488.787 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
DR MH 1.9 K, Sr.
manhole base of 3 00 PM 00 AM
Engineer
S.
Inspection for placing MH -1.10,
HFC- Storm water drainage BalaJi,R.
0280 & fixing of storm water Area 7 0+488.582 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
DR MH 1.10 type-J K, Sr.
manhole base of 7 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for placing MH -1.11,
HFC- Storm water drainage BalaJi,R.
0281 & fixing of storm water Area 7 0+403.472 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
DR MH 1.11 K, Sr.
manhole base of 9 00 PM 00 AM
Engineer
S.
Inspection for placing MH -1.12,
HFC- Storm water drainage BalaJi,R.
0282 & fixing of storm water Area 7 0+372.381 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
DR MH 1.12 K, Sr.
manhole base of 8 00 PM 00 AM
Engineer

Inspection excavation
S.
and prepared
HFC- as per highlighted in 0+420 to BalaJi,R.
0230 formation of steel Area 9 21-Jan-15 03.30: 21-Jan-15 09.30: AN 2/10/2015
WD drawing 420 K, Sr.
sleeve for 100 mm 00 PM 00 AM
Engineer
dia GRE water line

Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH: BalaJi,R.
1823 laying of (including st. specials Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW gravel surrounding sewer line to MH-1 1,0+720.88 K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion
HFC- of pipe laying and of 200mm dia upvc MH: BalaJi,R.
1824 laying of (including st. specials Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW gravel surrounding sewer line to MH-2 2,0+740.88 K, Sr.
geotextile,joint 2nos) 00 PM 00 AM
Engineer
measurement
Inspection and joint (recover of deduction S.
HFC- measurement of pipe from Chainage 0+080 chainage, copy 0+080 to BalaJi,R.
0231 Area 7 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/26/2015
WD laying for 150 mm dia to 0+100 (LHS) attached for your 0+100 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer

1+050 to
1+070,1+1
Inspection and joint from Chainage 1+050 from Chainage 1+230 (due to deduction It was submitted on 40 to S.
see attached
HFC- measurement of pipe to 1+070 (LHS),from to 1+235 (LHS), from from IR-08, copy 21-01-2015, after 1+165 , BalaJi,R.
0232 previous attachment Area 8 21-Jan-15 03.30: 21-Jan-15 09.30: AN 6/10/2015
WD laying for 150 mm dia Chainage 1+140 to Chainage 1+310 to attached for your elapsed 137 days ,till 1+230 to K, Sr.
of submittal IR-232 00 PM 00 AM
GRE water line 1+165 (LHS) 1+320 (LHS) ease reference) now unreturned 1+235, Engineer
1+310 to
1+320

Inspection and joint (recover of deduction S.


HFC- measurement of pipe from Chainage 1+750 chainage, copy 1+750 to BalaJi,R.
0233 Area 7 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/27/2015
WD laying for 150 mm dia to 1+760 (RHS) attached for your 1+760 K, Sr.
00 PM 00 AM
GRE water line ease reference) Engineer
S.
Inspection for external MH
HFC- Storm water drainage BalaJi,R.
0283 waterporrofing for the Area 7 2.9,0+081. 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
DR MH 2.9 K, Sr.
base 7331 00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion of 250mm dia upvc
HFC- of pipe laying and BalaJi,R.
1825 laying of (including st. specials sewer line to MH- Area 6 MH: 1A 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW gravel surrounding K, Sr.
geotextile,joint 2nos) 1A 00 PM 00 AM
Engineer
measurement
joint measurement of MH: 1A to S.
Inspection of laying
HFC- pipe laying and 250 mm dia upvc from MH: 1A to sewer BalaJi,R.
1826 geotextile, gravel Area 6 21-Jan-15 03.30: 21-Jan-15 09.30: AN 1/25/2015
SEW grannular surround sewer line sewer pump station pump K, Sr.
bedding, 00 PM 00 AM
for station Engineer
S.
Visual Inspection for fire fighting line from
HFC- 0+350 to BalaJi,R.
0216 1st layer back filling chanaige 0+350 to Area 8 21-Jan-15 04.30: 21-Jan-15 09.30: AN 1/28/2015
FF 0+520 K, Sr.
for 250 mm dia HDPE 0+520 00 PM 00 AM
Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 0+700 to BalaJi,R.
0217 layer back filling for chainage 0+700 to Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/10/2015
FF 0+860 K, Sr.
250 mm dia HDPE 0+860 (line-1 RHS) 00 PM 00 AM
Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 0+860 to BalaJi,R.
0218 layer back filling for chainage 0+860 to Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/10/2015
FF 0+920 K, Sr.
250 mm dia HDPE 0+920 (line-1 ) 00 PM 00 AM
Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 1+010 to BalaJi,R.
0219 layer back filling for chanaige 1+010 to Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/18/2015
FF 1+080 K, Sr.
250 mm dia HDPE 1+080 LINE 2 LHS 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 3rd S.


HFC- layer back filling for from Chainage 1+560 1+560 to BalaJi,R.
0234 Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/10/2015
WD 150 mm dia GRE to 1+710 line 2 RHS 1+710 K, Sr.
00 PM 00 AM
water line Engineer
Inspection for 3rd S.
HFC- layer back filling for from Chainage 1+710 1+710 to BalaJi,R.
0235 Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/10/2015
WD 150 mm dia GRE to 1+760 line 2 RHS 1+760 K, Sr.
00 PM 00 AM
water line Engineer
Inspection for 3rd S.
water line from
HFC- layer back filling for 0+020 to BalaJi,R.
0236 chainage 0+020 to Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: AN 2/10/2015
WD 150 mm dia GRE 0+090 K, Sr.
0+090 00 PM 00 AM
water line Engineer
(recover of deduction S.
Inspection for 3rd Irrigation line from
HFC- chainage, copy 0+820 to BalaJi,R.
0226 layer back filling for chainage 0+820 to Area 7 21-Jan-15 04.30: 21-Jan-15 09.30: A 2/10/2015
IRR attached for your 0+890 K, Sr.
200 mm dia upvc 0+890 00 PM 00 AM
ease reference) Engineer
Inspection for between S.
line -1 (RHS)
HFC- excavation and for 100 mm dia GRE bend (8 nos) 45 0
22.50
ch 2+350 BalaJi,R.
0237 Between ch 2+350 to Area 6 21-Jan-15 04.30: 21-Jan-15 09.30: AN 1/26/2015
WD prepared formation for water line bend (4 nos) to 2+900 at K, Sr.
2+900 at area 6 00 PM 00 AM
thrust block area 6 Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1827 of concrete for the Area 6 of sewer 21-Jan-15 04.30: 21-Jan-15 09.30: A 3/22/2015
SEW chambers of MH-17 MH-17 K, Sr.
base of MH-17 00 PM 00 AM
Engineer

Inspection for shutter,


S.
reinforcement & Irrigatio Irrigation
HFC- & irrigation reservoir BalaJi,R.
0206B concreting for the n pump pump 21-Jan-15 02.30: 21-Jan-15 09.30: AN 2/8/2015
IRR and pumping station K, Sr.
suspended slab fire station station 00 PM 00 AM
Engineer
fighting

Inspection of shutter, S.
HFC- reinforcement and Yard MH: BalaJi,R.
1828 for Sewer MH-1 22-Jan-15 09.30: 22-Jan-15 09.30: A 3/22/2015
SEW concreting for base Area 1,0+720.88 K, Sr.
00 AM 00 AM
slab with benching Engineer

Inspection and joint S.


Irrigation line from
HFC- measurement of pipe 0+810 to BalaJi,R.
0227 chainage 0+810 to Area 7 22-Jan-15 09.30: 22-Jan-15 09.30: AN 1/26/2015
IRR laying for 200 mm dia 0+820 K, Sr.
0+820 00 AM 00 AM
upvc Engineer
MH -7 ,CH
S.
200 mm dia upvc 1+032.78
HFC- Inspection for 6th BalaJi,R.
1829 sewer line from MH Area 6 to MH-8, 22-Jan-15 011.30: 22-Jan-15 09.30: Revised 1/25/2015
SEW layer back filling for K, Sr.
-7 to MH-8 CH 00 AM 00 AM
Engineer
1+086.48
Inspection of 7th layer S.
HFC- back filling for 200 MH-8 to BalaJi,R.
1830 From MH-8 to MH-9 Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: Revised 1/25/2015
SEW mm dia upvc sewer MH-9 K, Sr.
00 AM 00 AM
line Engineer
MH -9 ,CH
S.
for 200 mm dia upvc 1+150.82
HFC- Inspection for 5th BalaJi,R.
1831 sewer line from MH Area 6 to MH-10, 22-Jan-15 011.30: 22-Jan-15 09.30: Revised 1/25/2015
SEW layer back filling K, Sr.
-9 to MH-10 CH 00 AM 00 AM
Engineer
1+215.06
Inspection of 7th layer S.
HFC- back filling for 200 MH-11 to BalaJi,R.
1832 From MH-11 to MH-10 Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: Revised 1/25/2015
SEW mm dia upvc sewer MH-10 K, Sr.
00 AM 00 AM
line Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 7th MH -11 to BalaJi,R.
1833 sewer line from MH Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: Revised 1/28/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 AM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 8th MH -13 to BalaJi,R.
1834 sewer line from MH Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: A 2/9/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 AM 00 AM
Engineer
Inspection of 8th layer S.
HFC- back filling for 200 From MH-13 to MH- MH-13 to BalaJi,R.
1835 Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: A 2/10/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 AM 00 AM
line Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of 8th layer S.


HFC- back filling for 200 From MH-15 to MH- MH-15 to BalaJi,R.
1836 Area 6 22-Jan-15 011.30: 22-Jan-15 09.30: A 2/11/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 AM 00 AM
line Engineer

Inspection excavation as per


S.
and prepared highlighted
HFC- as per highlighted in BalaJi,R.
0238 formation of steel Area 8 in drawing 22-Jan-15 01.30: 22-Jan-15 09.30: A 2/10/2015
WD drawing K, Sr.
sleeve for 150 mm (near to 00 PM 00 AM
Engineer
dia GRE water line 0+940)

Inspection excavation as per


S.
and prepared highlighted
HFC- as per highlighted in BalaJi,R.
0239 formation of steel Area 5 in drawing 22-Jan-15 01.30: 22-Jan-15 09.30: AN 2/10/2015
WD drawing K, Sr.
sleeve for 150 mm (near to 00 PM 00 AM
Engineer
dia GRE water line 0+920)

Inspection & joint S.


fire fighting line from
HFC- measurement of pipe 1+520 to BalaJi,R.
0220 chanaige 1+520 to Area 9 22-Jan-15 01.30: 22-Jan-15 09.30: A 1/27/2015
FF laying for 200 mm dia 1+630 K, Sr.
1+630 00 PM 00 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from
HFC- measurement of pipe 1+730 to BalaJi,R.
0221 chanaige 1+730 to Area 6 22-Jan-15 01.30: 22-Jan-15 09.30: A 1/26/2015
FF laying for 250 mm dia 1+620 K, Sr.
1+620 00 PM 00 AM
HDPE Engineer
S.
Inspection for 1st fire fighting line from
HFC- 0+460 to BalaJi,R.
0222 layer back filling for chanaige 0+460 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/25/2015
FF 0+560 K, Sr.
250 mm dia HDPE 0+560 (Line-2) 00 PM 00 AM
Engineer
S.
Inspection of sand fire fighting line from
HFC- 0+460 to BalaJi,R.
0223 surround for 250 mm chanaige 0+460 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/26/2015
FF 0+410 K, Sr.
dia HDPE 0+410 (Line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+460 to BalaJi,R.
0224 1st layer back filling chanaige 0+460 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/27/2015
FF 0+410 K, Sr.
for 250 mm dia HDPE 0+410 (Line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 0+150 to BalaJi,R.
0225 2nd layer back filling chanaige 0+150 to Area 8 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/25/2015
FF 0+350 K, Sr.
for 250 mm dia HDPE 0+350 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling from CHainage 0+640 0+640 - BalaJi,R.
0240 Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/25/2015
WD for 150 mm dia GRE - 0+540 (Line-2) 0+540 K, Sr.
00 PM 00 AM
potable water line Engineer
Inspection of sand S.
HFC- surround for 150 mm from CHainage 0+640 0+640 - BalaJi,R.
0241 Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/26/2015
WD dia GRE potable - 0+690 (Line-2) 0+690 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection of S.
HFC- 1st layer back filling from CHainage 0+640 0+640 - BalaJi,R.
0242 Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/27/2015
WD for 150 mm dia GRE - 0+690 (Line-2) 0+690 K, Sr.
00 PM 00 AM
potable water line Engineer
S.
Visual Inspection of Irrigation line from
HFC- 0+270 to BalaJi,R.
0228 1st layer back filling chainage 0+270 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: A 1/25/2015
IRR 0+370 K, Sr.
for 250 mm dia upvc 0+370 (line-2) 00 PM 00 AM
Engineer
S.
Inspection of sand Irrigation line from
HFC- 0+270 to BalaJi,R.
0229 surround for 250 mm chainage 0+270 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/26/2015
IRR 0+220 K, Sr.
dia upvc 0+220 (line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection of Irrigation line from
HFC- 0+270 to BalaJi,R.
0230 1st layer back filling chainage 0+270 to Area 7 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/27/2015
IRR 0+220 K, Sr.
for 250 mm dia upvc 0+220 (line-2) 00 PM 00 AM
Engineer
between S.
Inspection for shutter line -1 (RHS)
HFC- for 100 mm dia GRE bend (8 nos) 45 0
22.50
ch 2+350 BalaJi,R.
0243 & concreting for thrust Between ch 2+350 to Area 6 22-Jan-15 01.30: 22-Jan-15 09.30: A 3/22/2015
WD water line bend (4 nos) to 2+900 at K, Sr.
block 2+900 at area 6 00 PM 00 AM
area 6 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1837 of concrete for the Area 6 of sewer 22-Jan-15 01.30: 22-Jan-15 09.30: AN 2/10/2015
SEW chambers of MH-16.1 MH-16.1 K, Sr.
wall of MH-16.1 00 PM 00 AM
Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer BalaJi,R.
1838 of concrete for the Area 6 of sewer 22-Jan-15 01.30: 22-Jan-15 09.30: AN 2/10/2015
SEW chambers of MH-16.2 MH-16.2 K, Sr.
wall of MH-16.2 00 PM 00 AM
Engineer
S.
Inspection of
HFC- for the cover slab of MH-5 BalaJi,R.
1839 shutter,reinforcement Area 6 22-Jan-15 01.30: 22-Jan-15 09.30: AN 2/10/2015
SEW Sewer MH-5 (Type-D) (0+911.85) K, Sr.
and concreting 00 PM 00 AM
Engineer
S.
Inspection for placing MH -1.7,
HFC- Storm water drainage BalaJi,R.
0284 & fixing of storm water Area 7 0+566.751 22-Jan-15 01.30: 22-Jan-15 09.30: AN 1/25/2015
DR MH 1.7 K, Sr.
manhole base of 7 00 PM 00 AM
Engineer
S.
Inspection for for air valve chamber
HFC- BalaJi,R.
0231 excavation & for 200mm dia upvc air vlave no AV-02 Area 6 AV-02 26-Jan-15 01.30: 26-Jan-15 09.30: A 2/10/2015
IRR K, Sr.
prepared formation Irrigation line 00 PM 00 AM
Engineer

Inspection for S.
fire fighting line from
HFC- excavation and 0+700 to 010.3 BalaJi,R.
0226 chanaige 0+700 to Area 7 22-Jan-15 02.30: 22-Jan-15 A 2/18/2015
FF prepared formation for 0+610 0:00 K, Sr.
0+610 (Line-1) RHS 00 PM
250 mm dia HDPE AM Engineer

1+014 to S.
Inspection for
HFC- for 150mm dia upvc From ch 1+014 to 450 From ch 1+019 to 450 bend , 010.3 BalaJi,R.
0232 excavation & Area 1 22-Jan-15 02.30: 22-Jan-15 Revised 1/26/2015
IRR Irrigation line bend 900 bend 1+019 to 0:00 K, Sr.
prepared formation 00 PM
900 bend AM Engineer
S.
for air valve chamber
HFC- Inspection pouring of 010.3 BalaJi,R.
0233 for 250mm dia upvc air vlave no AV-02 Area 7 AV-02 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
IRR blinding concrete 0:00 K, Sr.
Irrigation line 00 PM
AM Engineer
S.
for gate valve
HFC- Inspection pouring of 010.3 BalaJi,R.
0234 chamber for 110mm gate vlave no IV-7 Area 9 IV-7 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
IRR blinding concrete 0:00 K, Sr.
dia upvc Irrigation line 00 PM
AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 250 mm dia HDPE fire gate valve chamber 010.3 BalaJi,R.
0227 Area 7 IV-9 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF gate valve chamber fighting line no-IV-9 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 250 mm dia HDPE fire gate valve chamber 010.3 BalaJi,R.
0228 Area 8 IV-11 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF gate valve chamber fighting line no-IV-11 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 250 mm dia HDPE fire gate valve chamber 010.3 BalaJi,R.
0229 Area 8 IV-10 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF gate valve chamber fighting line no-IV-10 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 200 mm dia HDPE fire gate valve chamber 010.3 BalaJi,R.
0230 Area 9 IV-8 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF gate valve chamber fighting line no-IV-8 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete 250 mm dia HDPE fire washout chamber no- 010.3 BalaJi,R.
0231 Area 7 WO-06 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF for washout chamber fighting line WO-06 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete 250 mm dia HDPE fire washout chamber no- 010.3 BalaJi,R.
0232 Area 8 WO-01 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF for washout chamber fighting line WO-01 0:00 K, Sr.
00 PM
for AM Engineer
Inspection of
S.
Inspection for pouring
HFC- for 200 mm dia HDPE 010.3 BalaJi,R.
0233 of blinding concrete Area 9 AV-6 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF fire fighting line 0:00 K, Sr.
for air valve chamber 00 PM
AM Engineer
(AV-6)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for pouring S.


HFC- of blinding concrete for 250 mm dia HDPE air valve chamber no- 010.3 BalaJi,R.
0234 Area 7 AV-4 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF for air valve chamber fire fighting line AV-4 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for pouring S.
HFC- of blinding concrete of 250 mm dia HDPE fire gate valve chamber 010.3 BalaJi,R.
0235 Area 7 IV-7 22-Jan-15 02.30: 22-Jan-15 AN 2/10/2015
FF gate valve chamber fighting line no-IV-7 0:00 K, Sr.
00 PM
for AM Engineer
Inspection for 450 bend at & 900 bend at S.
of 150 mm dia upvc As per
HFC- excavation and coordinate E- coordinate E- 010.3 BalaJi,R.
0235 for irrigation Area 1 attached 24-Jan-15 010.30 24-Jan-15 Revised 1/26/2015
IRR prepared formation for 490710.762, N- 490713.494, N- 0:00 K, Sr.
transmission line sketch :00 AM
thrust block 2788550.632 2788554.642 AM Engineer
Inspection for 6th S.
HFC- layer back filling for from MH -1.3 to MH- MH -1.3 to 010.3 BalaJi,R.
1487A Area 7 24-Jan-15 010.30 24-Jan-15 A 1/26/2015
SEW 250 mm dia Upvc 1.2 MH-1.2 0:00 K, Sr.
:00 AM
sewer line AM Engineer
S.
Inspection for
HFC- MH-8, CH 010.3 BalaJi,R.
1368A excavation and sewer MH -8 Area 6 24-Jan-15 010.30 24-Jan-15 A 1/26/2015
SEW 1+086.48 0:00 K, Sr.
prepared formation for :00 AM
AM Engineer
HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- 010.3 BalaJi,R.
1491A excavation & Area 6 24-Jan-15 010.30 24-Jan-15 A 1/26/2015
SEW chambers of MH-19 4 of Sewer MH 19 4 of Sewer 0:00 K, Sr.
prepared formation :00 AM
MH 19 AM Engineer
HC-1,HC-2 S.
Inspection for
HFC- for House connection HC-1,HC-2 ,HC-3,HC- ,HC-3,HC- 010.3 BalaJi,R.
1490A excavation & Area 6 24-Jan-15 010.30 24-Jan-15 AN 1/27/2015
SEW chambers of MH-18 4 of Sewer MH 18 4 of Sewer 0:00 K, Sr.
prepared formation :00 AM
MH 18 AM Engineer
S.
for 250 mm dia upvc
HFC- Inspection for 4th MH -1.2 to 010.3 BalaJi,R.
1488A sewer line from MH Area 7 24-Jan-15 010.30 24-Jan-15 A 1/26/2015
SEW layer back filling MH-1.1 0:00 K, Sr.
-1.2 to MH-1.1 :00 AM
AM Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+820 to 010.3 BalaJi,R.
0135A chainage 0+820 to Area 7 24-Jan-15 010.30 24-Jan-15 AN 1/26/2015
IRR prepared formation for 0+890 0:00 K, Sr.
0+890 :00 AM
200 mm dia upvc AM Engineer
Inspection of S.
with benching for
HFC- shutter,reinforcement Yard BalaJi,R.
0285 Storm water MH-1.4 MH-1.4 24-Jan-15 010.30 24-Jan-15 09.30: A 3/22/2015
DR and concreting for area K, Sr.
type -H :00 AM 00 AM
base slab Engineer
S.
Inspection for placing MH -1.6,
HFC- Storm water drainage BalaJi,R.
0286 & fixing of storm water Area 7 0+604.581 24-Jan-15 010.30 24-Jan-15 09.30: AN 1/25/2015
DR MH 1.6 K, Sr.
manhole base of 7 :00 AM 00 AM
Engineer
S.
Inspection for placing MH -1.5,
HFC- Storm water drainage BalaJi,R.
0287 & fixing of storm water Area 7 0+0642.50 24-Jan-15 010.30 24-Jan-15 09.30: AN 1/25/2015
DR MH 1.5 K, Sr.
manhole base of 91 :00 AM 00 AM
Engineer
S.
Inspection for placing
HFC- Storm water drainage BalaJi,R.
0288 & fixing of storm water Area 7 MH-1.4 24-Jan-15 04.30: 24-Jan-15 09.30: AN 1/25/2015
DR MH 1.4 K, Sr.
manhole base of 00 PM 00 AM
Engineer

Inspection for S.
fire fighting line from 0+000 to
HFC- excavation and 010.3 BalaJi,R.
0236 chanaige 0+000 to Area 7 0+020 22-Jan-15 02.30: 22-Jan-15 Revised 1/27/2015
FF prepared formation for 0:00 K, Sr.
0+020 (Line-5) (Line-5) 00 PM
250 mm dia HDPE AM Engineer

Inspection for S.
fire fighting line from 0+548 to
HFC- excavation and 010.3 BalaJi,R.
0237 chanaige 0+548 to Area 8 0+610 22-Jan-15 02.30: 22-Jan-15 Revised 1/27/2015
FF prepared formation for 0:00 K, Sr.
0+610 (Line-1) (Line-1) 00 PM
250 mm dia HDPE AM Engineer

Inspection for (recover of deduction S.


Irrigation line from
HFC- excavation and chainage, copy 0+680 to 010.3 BalaJi,R.
0236 chainage 0+680 to Area 6 24-Jan-15 010.30 24-Jan-15 AN 1/26/2015
IRR prepared formation for attached for your 0+700 0:00 K, Sr.
0+700 :00 AM
200 mm dia upvc ease reference) AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for S.
HFC- deflection test Storm water line from MH-1.5 to BalaJi,R.
0289 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 500 MH-1.5 to MH-1.4 MH-1.4 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.6 to BalaJi,R.
0290 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 500 MH 1.6 to MH 1.5 MH-1.5 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.8 to BalaJi,R.
0291 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 600 MH 1.8 to MH 1.9 MH-1.9 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.8 to BalaJi,R.
0292 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 500 MH 1.8 to MH 1.7 MH-1.7 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.6 to BalaJi,R.
0293 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 500 MH 1.6 to MH 1.7 MH-1.7 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.10 to BalaJi,R.
0294 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 600 MH 1.10 to MH 1.9 MH-1.9 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.10 to BalaJi,R.
0295 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: A 2/4/2015
DR (preliminary) for 700 MH 1.10 to MH 1.11 MH-1.11 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 1.11 to BalaJi,R.
0296 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: A 2/4/2015
DR (preliminary) for 700 MH 1.11 to MH 1.12 MH-1.12 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 1+540 to 010.3 BalaJi,R.
0152A chanaige 1+540 to Area 6 24-Jan-15 02.30: 24-Jan-15 AN 1/27/2015
FF laying for 250 mm dia 1+610 0:00 K, Sr.
1+610 00 PM
HDPE AM Engineer
Inspection for S.
fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- prepared formation for 010.3 BalaJi,R.
0237 reservoir and E1,F1,G1,H1,J1,E2,F n pump pump 24-Jan-15 03.30: 24-Jan-15 AN 1/27/2015
IRR column (type C1 & 0:00 K, Sr.
pumping station 2,J2 (8 nos) station station 00 PM
C2) 8 nos of AM Engineer
Inspection of sand S.
HFC- surround for 110 mm From ch 1+390 to (the copy is attached 1+390 to 010.3 BalaJi,R.
0238 Area 9 24-Jan-15 03.30: 24-Jan-15 AN 1/27/2015
IRR dia Upvc Irrigation 1+450 of previous segment) 1+450 0:00 K, Sr.
00 PM
line AM Engineer
Visual Inspection of S.
HFC- 1st layer back filling From ch 1+390 to (the copy is attached 1+390 to 010.3 BalaJi,R.
0239 Area 9 24-Jan-15 04.30: 24-Jan-15 AN 1/27/2015
IRR for 110 mm dia Upvc 1+450 of previous segment) 1+450 0:00 K, Sr.
00 PM
Irrigation line AM Engineer
Inspection for S.
HFC- deflection test Storm water line from MH 2.10 to BalaJi,R.
0297 Area 7 24-Jan-15 04.30: 24-Jan-15 09.30: AN 2/4/2015
DR (preliminary) for 500 MH 2.10 to MH 2.11 MH-2.11 K, Sr.
00 PM 00 AM
mm dia GRP Engineer

Inspection for S.
fire fighting line from (recover of deduction
HFC- excavation and 1+900 to BalaJi,R.
0238 chanaige 1+900 to chainage, copy Area 6 25-Jan-15 01.30: 25-Jan-15 09.30: AN 1/27/2015
FF prepared formation for 1+940 K, Sr.
1+940 attached) 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection and joint S.


fire fighting line from (recover of deduction
HFC- measurement of pipe 2+030 to BalaJi,R.
0239 chanaige 2+030 to chainage, copy Area 6 25-Jan-15 01.30: 25-Jan-15 09.30: AN 1/27/2015
FF laying for 250 mm dia 2+040 K, Sr.
2+040 attached) 00 PM 00 AM
HDPE Engineer
Across
Inspection for S.
fire fighting line (Line- from
HFC- excavation and BalaJi,R.
0240 4) across from area 7 area 7 Lline-04 25-Jan-15 010.30 25-Jan-15 09.30: A 2/18/2015
FF prepared formation for K, Sr.
to area 8 to area :00 AM 00 AM
250 mm dia HDPE Engineer
8

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for S.
of gate valve chamber gate valve chamber IV-8,IV-
HFC- shutter,reinforcement Yard BalaJi,R.
0242 for 250 mm dia HDPE no IV-8,IV-9,IV-10, IV- 9,IV-10, IV- 25-Jan-15 01.30: 25-Jan-15 09.30: A 3/8/2015
FF & concreting for cover area K, Sr.
fire fighting line 11 (4 nos) 11 00 PM 00 AM
slab Engineer
The approved copy
Inspection and joint S.
of its rear & onward
HFC- measurement of pipe From chainage 3+110 (recover of deduction 3+110 to 01.30: BalaJi,R.
0244 segment is attached Area 6 25-Jan-15 02.30: 25-Jan-15 AN 1/27/2015
WD laying for 100 mm dia to 3+120 chainage) 3+120 00 K, Sr.
for your ease 00 PM
GRE water line PM Engineer
reference)

as per
highlighted
Inspection excavation
as per highlighted in in drawing S.
and prepared
HFC- drawing towards towards BalaJi,R.
0245 formation of steel (half portion RHS) Area 1 25-Jan-15 01.30: 25-Jan-15 09.30: AN 2/15/2015
WD abutment-1 at abutment- K, Sr.
sleeve for 225 mm 00 PM 00 AM
approax ch- 0+610 1 at Engineer
dia GRE water line
approax
ch- 0+610

S.
Inspection for
HFC- for 150mm dia upvc from chainage 0+740 0+740 to BalaJi,R.
0240 excavation & Area 1 25-Jan-15 01.30: 25-Jan-15 09.30: A 2/15/2015
IRR Irrigation line to 0+720 0+720 K, Sr.
prepared formation 00 PM 00 AM
Engineer
MH-03 to
Inspection for from MH-03 to abutment- S.
HFC-
excavation and abutment-1( 10+300 1( 10+300 BalaJi,R.
ITS/D 0028 Area 1 25-Jan-15 01.30: 25-Jan-15 09.30: A 2/17/2015
prepared formation for to half of road to half of K, Sr.
IC 00 PM 00 AM
4WXD54 DU Duct line crossing) road Engineer
crossing)

Inspection for S.
11.250 bend at approax 0+560,
HFC- excavation and of 200 mm for 11.250 bend at BalaJi,R.
0241 ch 0+560, 11.250 bend line-2 Area 7 0+550, 25-Jan-15 01.30: 25-Jan-15 09.30: A 2/15/2015
IRR prepared formation for irrigation line approax ch 0+538, K, Sr.
at approax ch 0+550 0+538, 00 PM 00 AM
thrust block Engineer
Inspection for S.
of 110 mm for
HFC- excavation and 450 bend at approax BalaJi,R.
0242 irrigation transmission Area 9 ch 1+330 25-Jan-15 01.30: 25-Jan-15 09.30: A 2/17/2015
IRR prepared formation for ch 1+330 K, Sr.
line 00 PM 00 AM
thrust block Engineer

Inspection for shutter, S.


of gate valve chamber
HFC- reinforcement & gate vlave no IV-6 & Yard BalaJi,R.
0243 for 110mm dia upvc IV-6 & IV-7 25-Jan-15 01.30: 25-Jan-15 09.30: A 3/8/2015
IRR concreting for the IV-7 Area K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for shutter, S.


of gate valve chamber
HFC- reinforcement & Yard BalaJi,R.
0244 for 150mm dia upvc gate vlave no IV-8 IV-8 25-Jan-15 01.30: 25-Jan-15 09.30: A 3/8/2015
IRR concreting for the Area K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for shutter, S.


of washout chamber
HFC- reinforcement & Yard BalaJi,R.
0245 for 200mm dia upvc WO-3 WO-3 25-Jan-15 01.30: 25-Jan-15 09.30: A 3/8/2015
IRR concreting for the Area K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for shutter, S.


of washout chamber
HFC- reinforcement & Yard BalaJi,R.
0246 for 110mm dia upvc WO-4 WO-4 25-Jan-15 01.30: 25-Jan-15 09.30: AN 2/16/2015
IRR concreting for the Area K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for shutter, S.


of air valve chamber
HFC- reinforcement & Yard BalaJi,R.
0247 for 200mm dia upvc AV-2 AV-2 25-Jan-15 01.30: 25-Jan-15 09.30: AN 2/16/2015
IRR concreting for the Area K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for shutter, S.


of air valve chamber
HFC- reinforcement & Yard AV-3 & AV- BalaJi,R.
0248 for 250mm dia upvc AV-3 & AV-4 25-Jan-15 01.30: 25-Jan-15 09.30: AN 2/16/2015
IRR concreting for the Area 4 K, Sr.
Irrigation line 00 PM 00 AM
base Engineer

Inspection for S.
chamber for 250 mm
HFC- excavation and BalaJi,R.
0243 dia HDPE fire fighting Gate valve no IV-24 Area 6 IV-24 25-Jan-15 02.30: 25-Jan-15 01.30: AN 2/15/2015
FF prepared formation K, Sr.
line 00 PM 00 AM
for gate valve Engineer
A Dutco Balfour Beatty Company WI PM 015/May 2014
PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 10th for fire fighting & S.


Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir 01.30: BalaJi,R.
0249 n pump pump 25-Jan-15 02.30: 25-Jan-15 AN 2/10/2015
IRR back filling for the and pumping station 00 K, Sr.
station station 00 PM
wall of W1 W1 (Length 32.2 m) PM Engineer
Inspection for 8th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding 01.30: BalaJi,R.
0250 irrigation reservoir n pump pump 25-Jan-15 02.30: 25-Jan-15 AN 5/13/2015
IRR back filling for the 00 K, Sr.
and pumping station station station 00 PM
wall of W3 ,W1 PM Engineer

Inspection of shutter, S.
HFC- water stopper & MH: 01.30: BalaJi,R.
1840 MH: 1 (1st lift) Area 6 25-Jan-15 04.30: 25-Jan-15 AN 2/16/2015
SEW concreting for the wall 1,0+720.88 00 K, Sr.
00 PM
of Sewerage Manhole PM Engineer

Inspection of shutter, S.
HFC- water stopper & MH: 02.30: BalaJi,R.
1841 MH: 2 (1st lift) Area 6 25-Jan-15 04.30: 25-Jan-15 AN 2/16/2015
SEW concreting for the wall 2,0+740.88 00 K, Sr.
00 PM
of Sewerage Manhole PM Engineer

Inspection for
S.
excavation &
HFC- from MH 1.12 to MH MH 1.12 to 02.30: BalaJi,R.
0298 prepared formation for Area 7 25-Jan-15 04.30: 25-Jan-15 A 2/4/2015
DR 1.13 MH-1.13 00 K, Sr.
700mm dia GRP 00 PM
PM Engineer
storm water Line
S.
Inspection of shutter MH
HFC- Storm water drainage 02.30: BalaJi,R.
0299 & concreting for the Area 7 2.4,0+342. 25-Jan-15 04.30: 25-Jan-15 AN 2/16/2015
DR MH 2.4 00 K, Sr.
wall of 1374 00 PM
PM Engineer
S.
Inspection of shutter MH
HFC- Storm water drainage BalaJi,R.
0300 & concreting for the Area 8 2.3,0+063. 25-Jan-15 04.30: 25-Jan-15 02.30: AN 2/16/2015
DR MH 2.3 K, Sr.
wall of 213 00 PM 00 AM
Engineer
Inspection of laying S.
2W x150mm Irrigation road
HFC- warning tape & 1st BalaJi,R.
071A uPVC+1wx300mm dia crossing Duct No. 11 Area 1 10+087.74 26-Jan-15 04.30: 26-Jan-15 08.30: A 8/31/2015
IRR (final layer back filling K, Sr.
upvc at ch 10+87.065 00 PM 00 AM
for Engineer
Inspection and joint S.
Irrigation line from
HFC- measurement of pipe 1+310 to BalaJi,R.
0251 chainage 1+310 to Area 9 27-Jan-15 02.30: 25-Jan-15 08.30: AN 1/27/2015
IRR laying for 110 mm dia 1+320 K, Sr.
1+320 00 PM 00 AM
upvc Engineer

Inspection for precast S.


MH-24
HFC- sewer manhole (base) BalaJi,R.
0379D MH-24 Area 6 ( 2+052.75 26-Jan-15 04.30: 26-Jan-15 08.30: A 9/7/2015
SEW placing including K, Sr.
) 00 PM 00 AM
alignment and level Engineer

Inspection for gravel surround for S.


HC -03 to
HFC- granular bedding, joint sewer house from HC -03 to end BalaJi,R.
1611B Area 6 end cap 26-Jan-15 04.30: 26-Jan-15 08.30: Revised 2/14/2015
SEW measurements of connection line 160 cap K, Sr.
(MH-18) 00 PM 00 AM
pipe laying & mm dia upvc Engineer
S.
Inspection for for washout chamber
HFC- BalaJi,R.
0252 excavation & for 200mm dia upvc WO-01 Area 6 WO-01 26-Jan-15 02.30: 26-Jan-15 08.30: A 9/8/2015
IRR K, Sr.
prepared formation Irrigation line 00 PM 00 AM
Engineer
S.
for washout chamber
HFC- Inspection for pouring BalaJi,R.
0253 for 200mm dia upvc WO-01 Area 6 WO-01 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
IRR of blinding concrete K, Sr.
Irrigation line 00 PM 00 AM
Engineer
S.
Inspection for for air valve chamber
HFC- BalaJi,R.
0254 excavation & for 200mm dia upvc AV-01 Area 6 AV-01 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
IRR K, Sr.
prepared formation Irrigation line 00 PM 00 AM
Engineer
S.
for air valve chamber
HFC- Inspection for pouring BalaJi,R.
0255 for 200mm dia upvc AV-01 Area 6 AV-01 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
IRR of blinding concrete K, Sr.
Irrigation line 00 PM 00 AM
Engineer
S.
Inspection for pouring chamber for 250 mm
HFC- BalaJi,R.
0244 of blinding concrete dia HDPE fire fighting Gate valve no IV-21 Area 6 IV-21 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
FF K, Sr.
for gate valve line 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for pouring chamber for 250 mm
HFC- BalaJi,R.
0245 of blinding concrete dia HDPE fire fighting Gate valve no IV-24 Area 6 IV-24 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
FF K, Sr.
for gate valve line 00 PM 00 AM
Engineer
S.
fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- Inspection of blinding BalaJi,R.
0256 reservoir and E1,F1,G1,H1,J1,E2,F n pump pump 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/16/2015
IRR concrete for footing K, Sr.
pumping station 2,J2 (8 nos) station station 00 PM 00 AM
Engineer

Inspection of
S.
waterproofing fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- BalaJi,R.
0257 (Polyprimes, bitustick reservoir and E1,F1,G1,H1,J1,E2,F n pump pump 26-Jan-15 02.30: 26-Jan-15 08.30: AN 2/4/2015
IRR K, Sr.
xl+ bituboard) for pumping station 2,J2 (8 nos) station station 00 PM 00 AM
Engineer
footing of

S.
Inspection for 3rd fire fighting line from
HFC- 0+150 to BalaJi,R.
0246 layer back filling for chanaige 0+150 to Area 8 26-Jan-15 02.30: 26-Jan-15 08.30: A 2/15/2015
FF 0+350 K, Sr.
250 mm dia HDPE 0+350 00 PM 00 AM
Engineer
S.
Visual Inspection for fire fighting line from
HFC- 0+350 to BalaJi,R.
0247 2nd layer back filling chanaige 0+350 to Area 8 26-Jan-15 02.30: 26-Jan-15 08.30: AN 1/27/2015
FF 0+520 K, Sr.
for 250 mm dia HDPE 0+520 00 PM 00 AM
Engineer
Inspection for
Irrigation road S.
excavation and
HFC- crossing duct no IRR- Duct no- BalaJi,R.
0258 prepared formation Area 1 26-Jan-15 02.30: 26-Jan-15 08.30: A 2/17/2015
IRR 01 (Half portion RHS) IRR-01 K, Sr.
for 1wx300mm dia 00 PM 00 AM
at ch 10+305.78 Engineer
upvc
Inspection and joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 3+790 to BalaJi,R.
0248 chanaige 3+790 to chainage, copy Area 6 26-Jan-15 02.30: 26-Jan-15 08.30: AN 1/27/2015
FF laying for 250 mm dia 3+810 K, Sr.
3+810 attached) 00 PM 00 AM
HDPE Engineer
S.
Inspection for fire fighting line from
HFC- 1+940 to BalaJi,R.
0249 pressure test of 250 chanaige 1+940 to Area 6 9-Feb-15 02.30: 9-Feb-15 08.30: AN 2/15/2015
FF 2+360 K, Sr.
mm dia HDPE 2+360 00 PM 00 AM
Engineer
S.
Inspection for for air valve chamber
HFC- BalaJi,R.
0259 excavation & for 250mm dia upvc air vlave no AV-04 Area 7 AV-04 26-Jan-15 02.30: 26-Jan-15 08.30: A 9/8/2015
IRR K, Sr.
prepared formation Irrigation line 00 PM 00 AM
Engineer
Inspection for 3rd S.
HFC- with warning tape for 250 mm dia upvc from MH 3.2 to MH MH 3.2 to 010.3 BalaJi,R.
0260A Area 5 26-Jan-15 04.30: 26-Jan-15 Revised 2/9/2015
DR layer back filling as Storm water line 3.3 MH 3.3 0:00 K, Sr.
00 PM
final AM Engineer
S.
Inspection of laying joint measurement of
HFC- for 700mm dia GRP from MH 1.12 to MH- MH 1.12 to 010.3 BalaJi,R.
0301 geotextile, gravel pipe laying and Area 7 26-Jan-15 04.30: 26-Jan-15 AN 2/7/2015
DR Storm water line 1.13 MH-1.13 0:00 K, Sr.
bedding, grannular surround 00 PM
AM Engineer
S.
Inspection for pouring HC-1,HC-2
HFC- house connection HC-1,HC-2 of sewer 010.3 BalaJi,R.
1842 of concrete for the Area 6 of sewer 26-Jan-15 04.30: 26-Jan-15 AN 2/16/2015
SEW chambers of MH-17 MH-17 0:00 K, Sr.
wall of MH-17 00 PM
AM Engineer
Inspection for
S.
excavation and from Chainage 1+460
HFC- 1+460 to BalaJi,R.
0246 prepared formation of to 1+560 (line-2, Area 7 26-Jan-15 01.30: 26-Jan-15 09.30: AN 2/17/2015
WD 1+560 K, Sr.
150 mm dia GRE RHS) 00 PM 00 AM
Engineer
water line
Inspection for shutter, S.
fire fighting & irrigation in grid of Irrigatio Irrigation
HFC- reiforcement & 01.30: BalaJi,R.
0260 reservoir and E1,F1,G1,H1,J1,E2,F n pump pump 26-Jan-15 02.30: 26-Jan-15 AN 2/11/2015
IRR concreting for footing 00 K, Sr.
pumping station 2,J2 (8 nos C1,C2) station station 00 PM
of PM Engineer
Inspection of sand S.
HFC- surround for 200 mm From ch 1+580 to (previous approved 1+580 to 01.30: BalaJi,R.
0250 Area 9 26-Jan-15 02.30: 26-Jan-15 AN 1/27/2015
FF dia HDPE fire fighting 1+640 copy attached) 1+640 00 K, Sr.
00 PM
line PM Engineer
Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+310 to 1+310 to 01.30: BalaJi,R.
0261 Area 9 26-Jan-15 02.30: 26-Jan-15 AN 1/27/2015
IRR for 110 mm dia Upvc 1+450 1+450 00 K, Sr.
00 PM
Irrigation line PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for shutter, 450 bend at S.


of 150 mm dia upvc As per
HFC- reinforcement & coordinate E- 01.30: BalaJi,R.
0262 for irrigation Area 1 attached 26-Jan-15 02.30: 26-Jan-15 A 2/25/2015
IRR concreting for thrust 490710.762, N- 00 K, Sr.
transmission line sketch 00 PM
block 2788550.632 PM Engineer

Inspection for shutter, in grid -3a of fire S.


Irrigatio Irrigation
HFC- reinforcement & fighting & irrigation 01.30: BalaJi,R.
0263 n pump pump 26-Jan-15 04.30: 26-Jan-15 Revised 2/4/2015
IRR concreting for parapet reservoir and pumping 00 K, Sr.
station station 00 PM
wall (half portion) station PM Engineer

Inspection and joint S.


HFC- measurement of pipe From chainage 0+320 0+320 to BalaJi,R.
0247 Line-2 (LHS) Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
WD laying for 150 mm dia to 0+370 0+370 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection and joint S.
0+530 -
HFC- measurement of pipe from CHainage 0+540 BalaJi,R.
0264 Area 7 0+590 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/31/2015
IRR laying for 200 mm dia - 0+600 (Line-2) K, Sr.
(Line-2) 00 PM 00 AM
upvc Engineer

Inspection of shutter, S.
HFC- water stopper & MH: BalaJi,R.
1843 MH: 1 (2nd lift) Area 6 ` 04.30: 27-Jan-15 08.30: AN 2/16/2015
SEW concreting for the wall 1,0+720.88 K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

Inspection of shutter, S.
HFC- water stopper & MH: BalaJi,R.
1844 MH: 2 (2nd lift) Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/16/2015
SEW concreting for the wall 2,0+740.88 K, Sr.
00 PM 00 AM
of Sewerage Manhole Engineer

S.
Inspection of
HFC- for cover slab of MH: BalaJi,R.
1845 shutter,reinforcement 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/16/2015
SEW sewer MH -1 1,0+720.88 K, Sr.
and concreting 00 PM 00 AM
Engineer
S.
Inspection of
HFC- for cover slab of MH: BalaJi,R.
1846 shutter,reinforcement 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/16/2015
SEW sewer MH -2 2,0+740.88 K, Sr.
and concreting 00 PM 00 AM
Engineer
Inspection of 7th layer S.
HFC- back filling for 200 MH-11 to BalaJi,R.
1832A From MH-11 to MH-10 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: Revised 2/9/2015
SEW mm dia upvc sewer MH-10 K, Sr.
00 PM 00 AM
line Engineer
Inspection of 8th layer S.
HFC- back filling for 200 MH-11 to BalaJi,R.
1847 From MH-11 to MH-10 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: Revised 2/9/2015
SEW mm dia upvc sewer MH-10 K, Sr.
00 PM 00 AM
line Engineer
S.
for 200 mm dia upvc
HFC- Inspection for 8th MH -11 to BalaJi,R.
1848 sewer line from MH Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: Revised 2/9/2015
SEW layer back filling MH-12 K, Sr.
-11 to MH-12 00 PM 00 AM
Engineer
S.
200 mm dia upvc
HFC- Inspection for 9th MH -13 to BalaJi,R.
1849 sewer line from MH Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW layer back filling for MH-12 K, Sr.
-13 to MH-12 00 PM 00 AM
Engineer
Inspection of 9th layer S.
HFC- back filling for 200 From MH-13 to MH- MH-13 to BalaJi,R.
1850 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 PM 00 AM
line Engineer
Inspection of 9th layer S.
HFC- back filling for 200 From MH-15 to MH- MH-15 to BalaJi,R.
1851 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/15/2015
SEW mm dia upvc sewer 14 MH-14 K, Sr.
00 PM 00 AM
line Engineer
Inspection of 6th layer S.
HFC- back filling for 200 From MH-16 to MH- MH-16 to BalaJi,R.
1852 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/15/2015
SEW mm dia upvc sewer 15 MH-15 K, Sr.
00 PM 00 AM
line Engineer
1+014 to S.
Inspection for
HFC- for 150mm dia upvc From ch 1+014 to 450 From ch 1+019 to 450 bend , BalaJi,R.
0232A excavation & Area 1 27-Jan-15 04.30: 27-Jan-15 08.30: Revised 2/7/2015
IRR Irrigation line bend 900 bend 1+019 to K, Sr.
prepared formation 00 PM 00 AM
900 bend Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for 450 bend at & 900 bend at S.


of 150 mm dia upvc As per
HFC- excavation and coordinate E- coordinate E- BalaJi,R.
0235A for irrigation Area 1 attached 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/7/2015
IRR prepared formation for 490710.762, N- 490713.494, N- K, Sr.
transmission line sketch 00 PM 00 AM
thrust block 2788550.632 2788554.642 Engineer
Inspection and joint S.
HFC- measurement of pipe from Chainage 3+200 3+200 to BalaJi,R.
0248 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
WD laying for 100 mm dia to 3+360 3+360 K, Sr.
00 PM 00 AM
GRE water line Engineer
Inspection and joint S.
fire fighting line from
HFC- measurement of pipe 0+560 to BalaJi,R.
0251 chanaige 0+560 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF laying for 250 mm dia 0+610 K, Sr.
0+610 (Line-2) 00 PM 00 AM
HDPE Engineer
Inspection for 9th S.
for fire fighting & Irrigatio Irrigation
HFC- layer surrounding BalaJi,R.
0265 irrigation reservoir n pump pump 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/23/2015
IRR back filling for the K, Sr.
and pumping station station station 00 PM 00 AM
wall of W3 ,W1 Engineer
Inspection for 11th for fire fighting & S.
Irrigatio Irrigation
HFC- layer surrounding irrigation reservoir BalaJi,R.
0266 n pump pump 27-Jan-15 04.30: 27-Jan-15 08.30: Revised 2/4/2015
IRR back filling for the and pumping station K, Sr.
station station 00 PM 00 AM
wall of W1 W1 (Length 32.2 m) Engineer
S.
Visual Inspection of Irrigation line from
HFC- 0+270 to BalaJi,R.
0267 2nd layer back filling chainage 0+270 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
IRR 0+220 K, Sr.
for 250 mm dia upvc 0+220 (line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection of Irrigation line from
HFC- 0+270 to BalaJi,R.
0268 2nd layer back filling chainage 0+270 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
IRR 0+370 K, Sr.
for 250 mm dia upvc 0+370 (line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection of fire fighting line from
HFC- 0+460 to BalaJi,R.
0252 2nd layer back filling chanaige 0+460 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
FF 0+410 K, Sr.
for 250 mm dia HDPE 0+410 (Line-2) 00 PM 00 AM
Engineer
S.
Inspection for 2nd fire fighting line from
HFC- 0+460 to BalaJi,R.
0253 layer back filling for chanaige 0+460 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
FF 0+560 K, Sr.
250 mm dia HDPE 0+560 (Line-2) 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 2nd layer back filling from CHainage 0+640 0+640 - BalaJi,R.
0249 Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
WD for 150 mm dia GRE - 0+540 (Line-2) 0+540 K, Sr.
00 PM 00 AM
potable water line Engineer
Visual Inspection of S.
HFC- 2nd layer back filling from CHainage 0+640 0+640 - BalaJi,R.
0250 Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 1/28/2015
WD for 150 mm dia GRE - 0+690 (Line-2) 0+690 K, Sr.
00 PM 00 AM
potable water line Engineer
Inspection for S.
Irrigation line from
HFC- excavation and 0+119 to BalaJi,R.
0269 chainage 0+119 to Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
IRR prepared formation for 0+220 K, Sr.
0+220 (line-2) 00 PM 00 AM
250 mm dia upvc Engineer
Inspection for 5th S.
HFC- layer back fiiling of MH: 3 to BalaJi,R.
1853 from MH: 3 to MH: 2 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW 200mm dia Upvc MH: 2 K, Sr.
00 PM 00 AM
sewer line Engineer
inspection for 8th S.
HFC- layer back filling for MH: 3 to BalaJi,R.
1854 from MH: 3 to MH: 4 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW 200 mm dia Upvc MH: 4 K, Sr.
00 PM 00 AM
sewer line Engineer
inspection for 8th S.
200 mm dia upvc
HFC- layer back filling for MH -5 to BalaJi,R.
1855 sewer line from MH Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW 200 mm dia Upvc MH-6 K, Sr.
-5 to MH-6 00 PM 00 AM
sewer line Engineer
S.
200mm dia upvc
HFC- Inspection for 7th MH: 4 to BalaJi,R.
1856 sewer line from MH-4 Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW layer back filling for MH: 5 K, Sr.
to MH-5 00 PM 00 AM
Engineer
MH -6 ,CH
S.
200 mm dia upvc 0+968.96
HFC- Inspection for 7th BalaJi,R.
1857 sewer line from MH-6 Area 6 to MH-7, 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
SEW layer back filling for K, Sr.
to NH- 7 CH 00 PM 00 AM
Engineer
1+032.78

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for
S.
exposing & removal of
HFC- MH-3.2 to BalaJi,R.
0302 storm water line 250 MH-3.2 to 3.3 Area 5 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
DR 3.3 K, Sr.
mm dia( due to clash) 00 PM 00 AM
Engineer
From
Inspection for S.
Irrigation line from 0+000 to
HFC- excavation and BalaJi,R.
0270 chainage 0+000 to Area 5 0+030 27-Jan-15 04.30: 27-Jan-15 08.30: A 2/17/2015
IRR prepared formation for K, Sr.
0+030 (line-3) (line-3) 00 PM 00 AM
250 mm dia upvc Engineer
Inspection and joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 0+410 to BalaJi,R.
0254 chanaige 0+410 to chainage, copy Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/8/2015
FF laying for 250 mm dia 0+420 K, Sr.
0+420 (Line-2) attached) 00 PM 00 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 0+910 to BalaJi,R.
0255 chanaige 0+910 to chainage, copy Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/8/2015
FF laying for 250 mm dia 0+920 K, Sr.
0+920 (Line-1) attached) 00 PM 00 AM
HDPE Engineer

Inspection for S.
fire fighting line from (recover of deduction
HFC- excavation and 1+010 to BalaJi,R.
0256 chanaige 1+010 to chainage, copy Area 7 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF prepared formation for 1+020 K, Sr.
1+020 attached) 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection for S.
fire fighting line from (recover of deduction
HFC- excavation and 3+500 to BalaJi,R.
0257 chainage 3+500 to chainage, copy Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF prepared formation for 3+550 K, Sr.
3+550 attached) 00 PM 00 AM
250 mm dia HDPE Engineer

Inspection for S.
fire fighting line from (recover of deduction
HFC- excavation and 2+450 to BalaJi,R.
0258 chanaige 2+450 to chainage, copy Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF prepared formation for 2+460 K, Sr.
2+460 attached) 00 PM 00 AM
250 mm dia HDPE Engineer

S.
Inspection and joint fire fighting line from (recover of deduction
HFC- 2+450 to BalaJi,R.
0259 measurement for 250 chanaige 2+450 to chainage, copy Area 6 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF 2+460 K, Sr.
mm dia HDPE 2+460 attached) 00 PM 00 AM
Engineer
Inspection and joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 0+150 to BalaJi,R.
0260 chanaige 0+150 to chainage, copy Area 8 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF laying for 250 mm dia 0+160 K, Sr.
0+160 attached) 00 PM 00 AM
HDPE Engineer
Inspection and joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 0+490 to BalaJi,R.
0261 chanaige 0+490 to chainage, copy Area 8 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF laying for 250 mm dia 0+520 K, Sr.
0+520 attached) 00 PM 00 AM
HDPE Engineer
Inspection & joint S.
fire fighting line from (recover of deduction
HFC- measurement of pipe 1+180 to BalaJi,R.
0262 chanaige 1+180 to chainage, copy Area 9 27-Jan-15 04.30: 27-Jan-15 08.30: AN 2/1/2015
FF laying for 200 mm dia 1+190 K, Sr.
1+190 attached) 00 PM 00 AM
HDPE Engineer
Inspection for S.
gravel surround for HC -04 to
HFC- granular bedding, joint from HC -04 to end BalaJi,R.
0707B house connection line As per new Drawing Area 6 end cap of 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
SEW measurements of cap of sewer MH-25 K, Sr.
160 mm dia upvc ( MH-25) 00 PM 00 AM
pipe laying & Engineer
Inspection for S.
gravel surround for HC -02 to
HFC- granular bedding, from HC -02 to end BalaJi,R.
0709B house connection line As per new Drawing Area 6 end cap of 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
SEW joint measurements cap of sewer MH-25 K, Sr.
160 mm dia upvc ( MH-25) 00 PM 00 AM
of pipe laying & Engineer
Visual Inspection for S.
HFC- 1st layer back fillimg from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0303 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.4 MH-1.4 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 1st layer back fillimg from MH 1.6 to MH MH 1.6 to BalaJi,R.
0304 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.5 MH-1.5 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 1st layer back fillimg from MH 1.6 to MH MH 1.6 to BalaJi,R.
0305 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.7 MH-1.7 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection for S.


HFC- 1st layer back fillimg from MH 1.8 to MH MH 1.8 to BalaJi,R.
0306 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.9 MH-1.9 K, Sr.
00 PM 00 AM
600 mm dia GRP Engineer
Visual Inspection for S.
HFC- 1st layer back fillimg from MH 1.8 to MH MH 1.8 to BalaJi,R.
0307 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.7 MH-1.7 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Inspection for 1st S.
HFC- layer back fillimg for from MH 1.10 to MH MH 1.10 to BalaJi,R.
0308 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR storm water line 700 1.11 MH-1.11 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Inspection for 1st S.
HFC- layer back fillimg for from MH 1.11 to MH MH 1.11 to BalaJi,R.
0309 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR storm water line 700 1.12 MH-1.12 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Visual Inspection for S.
HFC- 1st layer back fillimg from MH 1.10 to MH MH 1.10 to BalaJi,R.
0310 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.9 MH-1.9 K, Sr.
00 PM 00 AM
600 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH-1.5 to MH- MH-1.5 to BalaJi,R.
0311 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.4 MH-1.4 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.6 to MH MH 1.6 to BalaJi,R.
0312 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.5 MH-1.5 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.6 to MH MH 1.6 to BalaJi,R.
0313 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.7 MH-1.7 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.8 to MH MH 1.8 to BalaJi,R.
0314 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.9 MH-1.9 K, Sr.
00 PM 00 AM
600 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.8 to MH MH 1.8 to BalaJi,R.
0315 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.7 MH-1.7 K, Sr.
00 PM 00 AM
500 mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.10 to MH MH 1.10 to BalaJi,R.
0316 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR for storm water line 1.11 MH-1.11 K, Sr.
00 PM 00 AM
700 mm dia GRP Engineer
Inspection for 2nd S.
HFC- layer back fillimg for from MH 1.11 to MH MH 1.11 to BalaJi,R.
0317 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/1/2015
DR storm water line 700 1.12 MH-1.12 K, Sr.
00 PM 00 AM
mm dia GRP Engineer
Visual Inspection for S.
HFC- 2nd layer back fillimg from MH 1.10 to MH MH 1.10 to BalaJi,R.
0318 Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: UR
DR for storm water line 1.9 MH-1.9 K, Sr.
00 PM 00 AM
600 mm dia GRP Engineer

Inspection of
S.
concrete encasement
HFC- HC-02 to BalaJi,R.
1858 for 160 mm dia upvc From HC-02 to MH-18 Area 6 28-Jan-15 04.30: 28-Jan-15 08.30: AN 3/2/2015
SEW MH-18 K, Sr.
House connection 00 PM 00 AM
Engineer
Sewer line

Inspection of
S.
concrete encasement
HFC- HC-04 to BalaJi,R.
1859 for 160 mm dia upvc From HC-04 to MH-19 Area 6 28-Jan-15 04.30: 28-Jan-15 08.30: AN 3/2/2015
SEW MH-19 K, Sr.
House connection 00 PM 00 AM
Engineer
Sewer line

S.
Inspection of laying joint measurement of
HFC- for 700mm dia GRP from MH 2.4 to MH MH 2.4 to BalaJi,R.
0188A geotextile, gravel pipe laying and Area 7 28-Jan-15 04.30: 28-Jan-15 08.30: AN 2/4/2015
DR Storm water 1.13 MH 1.13 K, Sr.
bedding, grannular surround 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection of shutter MH
HFC- Storm water drainage BalaJi,R.
0319 & concreting for the Area 8 2.2,0+030. 28-Jan-15 04.30: 28-Jan-15 08.30: A 3/22/2015
DR MH 2.2 K, Sr.
wall of 2095 00 PM 00 AM
Engineer

Inspection for shutter,


S.
reinforcement &
HFC- 250 mm dia HDPE fire Yard 2+600 01.30: BalaJi,R.
0158A concreting for the wo-4 28-Jan-15 04.30: 28-Jan-15 AN 1/4/2015
FF fighting line Area (Wo-04) 00 K, Sr.
wall of washout 00 PM
PM Engineer
chamber for

Inspection for S.
gate valve chamber
HFC- shutter,reinforcement Yard 01.30: BalaJi,R.
096A for 250 mm dia HDPE Gate valve no IV-22 IV-22 28-Jan-15 04.30: 28-Jan-15 Revised 2/7/2015
FF & concreting for the Area 00 K, Sr.
fire fighting line 00 PM
base of PM Engineer
Inspection of
S.
shutter,reinforcement
HFC- for 200 mm dia HDPE Yard 01.30: BalaJi,R.
0099B & concreting for the AV-5 28-Jan-15 04.30: 28-Jan-15 AN 1/4/2015
FF fire fighting line Area 00 K, Sr.
wall of air valve 00 PM
PM Engineer
chamber (AV-5)
Inspection of S.
with GRP benching MH -1.9,
HFC- shutter,reinforcement Yard 01.30: BalaJi,R.
0189A for Storm water 0+488.787 28-Jan-15 04.30: 28-Jan-15 AN 2/1/2015
DR and concreting for Area 00 K, Sr.
drainage MH 1.9 3 00 PM
base slab PM Engineer
Inspection of S.
with GRP benching MH
HFC- shutter,reinforcement Yard 01.30: BalaJi,R.
0190A for Storm water 2.5,0+276. 28-Jan-15 04.30: 28-Jan-15 AN 2/1/2015
DR and concreting for Area 00 K, Sr.
drainage MH 2.5 2135 00 PM
base slab PM Engineer

Inspection of shutter, S.
HFC- water stopper & MH-9, CH 01.30: BalaJi,R.
1671A sewer MH -9 Area 6 28-Jan-15 04.30: 28-Jan-15 AN 2/1/2015
SEW concreting for the wall 1+150.82) 00 K, Sr.
00 PM
of Sewerage Manhole PM Engineer

S.
Inspection of
HFC- for the cover slab of MH-9, CH 01.30: BalaJi,R.
1675A shutter,reinforcement Area 6 28-Jan-15 04.30: 28-Jan-15 AN 2/1/2015
SEW Sewer MH-9 (Type-D) 1+150.82) 00 K, Sr.
and concreting 00 PM
PM Engineer

Inspection of shutter, S.
HFC- water stopper & of Sewerage Manhole MH-6 01.30: BalaJi,R.
1681A Area 6 28-Jan-15 04.30: 28-Jan-15 AN 2/1/2015
SEW concreting for the wall MH-6 ( 1lift) (0+968.98) 00 K, Sr.
00 PM
of Sewerage Manhole PM Engineer

of 100 mm dia GRE X 100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
22.50 bend,100 mm 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- installation, 11.250 bend,100 mm Area 6, 01.30: BalaJi,R.
0158A dia GRE X 11.250 dia GRE X 11.250 water line at R/A 2 attached 28-Jan-15 04.30: 28-Jan-15 AN 2/4/2015
WD &concreting of thrust dia GRE X 11.250 R/A 2 00 K, Sr.
bend,100 mm dia bend,100 mm dia (8nos) Sketch 00 PM
block for bend PM Engineer
GRE X 11.250 bend GRE X 11.250 bend,

100 mm dia GRE X


Inspection for 100 mm dia GRE X S.
of 100 mm dia GRE X 11.250 bend,100 mm for 100 mm dia GRE As per
HFC- installation, 11.250 bend,100 mm Area 6, 01.30: BalaJi,R.
0157A 450 bend,100 mm dia dia GRE X 11.250 water line at R/A 2 attached 28-Jan-15 04.30: 28-Jan-15 AN 2/4/2015
WD &concreting of thrust dia GRE X 11.250 R/A 2 00 K, Sr.
GRE X 11.250 bend bend,100 mm dia (7nos) Sketch 00 PM
block for bend PM Engineer
GRE X 11.250 bend,

S.
for washuot chamber
HFC- Inspection for pouring WO,0+29. 01.30: BalaJi,R.
0161A for 150mm dia GRE at ch 0+29.78 Area 7 28-Jan-15 04.30: 28-Jan-15 AN 2/4/2015
WD of blinding concrete 78 00 K, Sr.
water line 00 PM
PM Engineer
Inspection for pouring S.
for 150 mm dia upvc
HFC- of bliding concrete for IV- 09, 01.30: BalaJi,R.
0166A Irrigation transmission Area 1 28-Jan-15 04.30: 28-Jan-15 AN 2/4/2015
IRR Isolation valve 0+735.037 00 K, Sr.
line 00 PM
chamber PM Engineer
S.
Inspection for for washout chamber
HFC- 01.30: BalaJi,R.
0222A excavation & for 200mm dia upvc WO-02 Area 6 WO-02 28-Jan-15 04.30: 28-Jan-15 A 3/15/2015
IRR 00 K, Sr.
prepared formation Irrigation line 00 PM
PM Engineer
S.
for gate valve
HFC- Inspection for pouring 01.30: BalaJi,R.
0176A chamber for 200mm gate vlave no IV-5 Area 7 IV-5 28-Jan-15 04.30: 28-Jan-15 AN 2/4/2015
IRR of blinding concrete 00 K, Sr.
dia upvc Irrigation line 00 PM
PM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection for sand S.


HFC- surround for 150 mm from CHainage 0+540 0+540 - BalaJi,R.
0252 Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD dia GRE potable - 0+420 (LINE-2) 0+420 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from CHainage 0+540 0+540 - BalaJi,R.
0253 Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 150 mm dia GRE - 0+420 (LINE-2) 0+420 K, Sr.
00 PM 00 AM
potable water line Engineer
S.
Inspection for sand Irrigation line from
HFC- 0+370 to BalaJi,R.
0271 surround for 250 mm chainage 0+370 to Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR 0+490 K, Sr.
dia upvc 0+490 (line-2) 00 PM 00 AM
Engineer
S.
Visual Inspection for Irrigation line from
HFC- 0+370 to BalaJi,R.
0272 1st layer back filling chainage 0+370 to Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR 0+490 K, Sr.
for 250 mm dia upvc 0+490 (line-2) 00 PM 00 AM
Engineer
Inspection and joint S.
fire fighting line from 0+610 to
HFC- measurement of pipe BalaJi,R.
0263 chanaige 0+610 to Area 7 0+690 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/1/2015
FF laying for 250 mm dia K, Sr.
0+690 (Line-2) (Line-2) 00 PM 00 AM
HDPE Engineer
Inspection for
S.
excavation & fire fighting line from 0+690 to
HFC- BalaJi,R.
0264 preparation of chanaige 0+690 to Area 7 0+800 29-Jan-15 04.30: 29-Jan-15 09.30: A 2/25/2015
FF K, Sr.
formation for 250 mm 0+800 (Line-2) (Line-2) 00 PM 00 AM
Engineer
dia HDPE
Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+310 to 1+310 to BalaJi,R.
0273 Area 9 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR for 110 mm dia Upvc 1+450 1+450 K, Sr.
00 PM 00 AM
Irrigation line Engineer

Visual Inspection of S.
HFC- 1st layer back filling From ch 1+580 to 1+580 to BalaJi,R.
0265 Area 9 29-Jan-15 04.30: 29-Jan-15 09.30: AN 1/4/2015
FF for 200 mm dia HDPE 1+640 1+640 K, Sr.
00 PM 00 AM
fire fighting line Engineer

Inspection of sand S.
HFC- surround for 200 mm 0+610 to BalaJi,R.
0274 ch 0+610 to 0+510 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR dia upvc Irrigation line 0+510 K, Sr.
00 PM 00 AM
from Engineer
Inspection of sand S.
Irrigation line from
HFC- surround for 200 mm 0+870 to BalaJi,R.
0275 chainage 0+870 to Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR dia upvc Irrigation line 0+700 K, Sr.
0+700 00 PM 00 AM
from Engineer
Inspection of sand S.
Irrigation line from
HFC- surround for 200 mm 0+700 to BalaJi,R.
0276 chainage 0+700 to Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR dia upvc Irrigation line 0+610 K, Sr.
0+610 00 PM 00 AM
from Engineer
S.
Inspection of sand
HFC- from Chainage 2+610 2+610 to BalaJi,R.
0254 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 2+780 2+780 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+610 2+610 to BalaJi,R.
0255 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 2+780 2+780 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection for sand
HFC- from Chainage 2+780 2+780 to BalaJi,R.
0256 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 2+840 2+840 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection for sand
HFC- from Chainage 2+840 2+840 to BalaJi,R.
0257 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 2+960 2+960 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
S.
Inspection for sand
HFC- from Chainage 2+960 2+960 to BalaJi,R.
0258 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 3+030 3+030 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Visual Inspection for S.


HFC- 1st layer back filling from Chainage 2+780 2+780 to BalaJi,R.
0259 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 2+840 2+840 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+840 2+840 to BalaJi,R.
0260 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 2+960 2+960 K, Sr.
00 PM 00 AM
water line Engineer
Visual Inspection for S.
HFC- 1st layer back filling from Chainage 2+960 2+960 to BalaJi,R.
0261 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 3+030 3+030 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection of sand
HFC- from Chainage 3+030 3+030 to BalaJi,R.
0262 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 3+110 3+110 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling from Chainage 3+030 3+030 to BalaJi,R.
0263 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 3+110 3+110 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection of sand
HFC- From chainage 3+110 3+110 to BalaJi,R.
0264 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 3+120 3+120 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling From chainage 3+110 3+110 to BalaJi,R.
0265 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 3+120 3+120 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection of sand
HFC- from Chainage 3+120 3+120 to BalaJi,R.
0266 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 3+190 3+190 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling from Chainage 3+120 3+120 to BalaJi,R.
0267 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 3+190 3+190 K, Sr.
00 PM 00 AM
water line Engineer
S.
Inspection of sand
HFC- from Chainage 3+190 3+190 to BalaJi,R.
0268 surround for 100 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD to 3+320 3+320 K, Sr.
dia GRE water line 00 PM 00 AM
Engineer
Visual Inspection of S.
HFC- 1st layer back filling from Chainage 3+190 3+190 to BalaJi,R.
0269 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
WD for 100 mm dia GRE to 3+320 3+320 K, Sr.
00 PM 00 AM
water line Engineer
Inspection & joint S.
HFC- measurement of pipe from ch 1+540 to 1+540 to BalaJi,R.
0266 Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 1/4/2015
FF laying for 250 mm dia 1+420 1+420 K, Sr.
00 PM 00 AM
HDPE Engineer
S.
Inspection of sand
HFC- from ch 1+540 to 1+540 to BalaJi,R.
0267 surround for 250 mm Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: AN 1/4/2015
FF 1+420 1+420 K, Sr.
dia HDPE 00 PM 00 AM
Engineer
Inspection for
S.
excavation and
HFC- 250 mm dia HDPE fire gate valve chamber IV-14 & IV- BalaJi,R.
0268 prepared formation of Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: A 2/25/2015
FF fighting line no-IV-14 & IV-15 15 K, Sr.
gate valve chamber 00 PM 00 AM
Engineer
for
S.
Inspection for 4th fire fighting line from
HFC- 0+150 to BalaJi,R.
0269 layer back filling for chanaige 0+150 to Area 8 29-Jan-15 04.30: 29-Jan-15 09.30: A 2/25/2015
FF 0+350 K, Sr.
250 mm dia HDPE 0+350 00 PM 00 AM
Engineer
S.
Inspection for 3rd fire fighting line from
HFC- 0+350 to BalaJi,R.
0270 layer back filling for chanaige 0+350 to Area 8 29-Jan-15 04.30: 29-Jan-15 09.30: A 2/25/2015
FF 0+520 K, Sr.
250 mm dia HDPE 0+520 00 PM 00 AM
Engineer
S.
Inspection & joint
HFC- for 150mm dia upvc from chainage 0+740 0+740 to BalaJi,R.
0277 measurement of pipe Area 1 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/4/2015
IRR Irrigation line to 0+720 0+720 K, Sr.
laying 00 PM 00 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for for washuot chamber
HFC- BalaJi,R.
0270 excavation & for 150mm dia GRE at ch 1+160 Area 8 WO,1-160 29-Jan-15 04.30: 29-Jan-15 09.30: A 2/25/2015
WD K, Sr.
prepared formation water line 00 PM 00 AM
Engineer

Inspection and joint S.


from Chainage 1+460
HFC- meassurement of pipe 1+460 to BalaJi,R.
0271 to 1+560 (line-2, Area 7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/1/2015
WD laying of 150 mm dia 1+560 K, Sr.
RHS) 00 PM 00 AM
GRE water line Engineer

for 250 mm dia HDPE


S.
fire fighitng line fire
HFC- Inspection for (5th & 3+700 to BalaJi,R.
0210A fighting line from Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: Revised 2/7/2015
FF final ) layer back filling 3+810 K, Sr.
chanaige 3+700 to 00 PM 00 AM
Engineer
3+810
for 250 mm dia HDPE
S.
fire fighitng line fire
HFC- Inspection for (5th & 3+450 to BalaJi,R.
0209A fighting line from Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: Revised 2/7/2015
FF final ) layer back filling 3+700 K, Sr.
chanaige 3+450 to 00 PM 00 AM
Engineer
3+700
for 100 mm dia GRE S.
HFC- Inspection for (5th & water line from 0+930 to BalaJi,R.
0218A Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: Revised 2/7/2015
WD final ) layer back filling Chainage 0+930 to 1+070 K, Sr.
00 PM 00 AM
1+070 Engineer
for 100 mm dia GRE S.
HFC- Inspection for (5th & water line from 0+930 to BalaJi,R.
0219A Area 6 29-Jan-15 04.30: 29-Jan-15 09.30: Revised 2/7/2015
WD final ) layer back filling Chainage 0+930 to 0+830 K, Sr.
00 PM 00 AM
0+830 Engineer
S.
MH
HFC- Inspection for placing Storm water drainage BalaJi,R.
0139A Area 7 2.10,0+034 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/9/2015
DR & fixing for base of MH 2.10 K, Sr.
.4192 00 PM 00 AM
Engineer
S.
Inspection for shutter MH
HFC- Storm water drainage BalaJi,R.
0320 & concreting for the Area 7 2.10,0+034 29-Jan-15 04.30: 29-Jan-15 09.30: A 3/25/2015
DR MH 2.10 K, Sr.
wall of .4192 00 PM 00 AM
Engineer
S.
Inspection for shutter MH
HFC- Storm water drainage BalaJi,R.
0321 & concreting for the Area 7 2.8,0+127. 29-Jan-15 04.30: 29-Jan-15 09.30: A 3/22/2015
DR MH 2.8 K, Sr.
wall of 98.95 00 PM 00 AM
Engineer
S.
Inspection for shutter MH
HFC- Storm water drainage BalaJi,R.
0322 & concreting for the Area 7 2.7,0+174. 29-Jan-15 04.30: 29-Jan-15 09.30: AN 3/3/2015
DR MH 2.7 K, Sr.
wall of 7024 00 PM 00 AM
Engineer
S.
Inspection for shutter MH -1.11,
HFC- Storm water drainage BalaJi,R.
0323 & concreting for the Area 7 0+403.472 29-Jan-15 04.30: 29-Jan-15 09.30: AN 3/3/2015
DR MH 1.11 K, Sr.
wall of 9 00 PM 00 AM
Engineer
S.
Inspection for shutter MH -1.10,
HFC- Storm water drainage BalaJi,R.
0324 & concreting for the Area 7 0+488.582 29-Jan-15 04.30: 29-Jan-15 09.30: AN 3/3/2015
DR MH 1.10 K, Sr.
wall of 7 00 PM 00 AM
Engineer
Inspection for
S.
granular bedding, for connection portion of 500mm dia GRP
HFC- of pipe laying and BalaJi,R.
0325 laying of (including st. specials Storm water liner Area 7 MH-1.7 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/1/2015
DR gravel surrounding K, Sr.
geotextile,joint 2nos) line to MH-1.7 00 PM 00 AM
Engineer
measurement
Inspection for
S.
granular bedding, for connection portion of 500mm dia GRP
HFC- of pipe laying and BalaJi,R.
0326 laying of (including st. specials Storm water liner Area 7 MH-1.8 29-Jan-15 04.30: 29-Jan-15 09.30: AN 2/1/2015
DR gravel surrounding K, Sr.
geotextile,joint 2nos) line to MH-1.8 00 PM 00 AM
Engineer
measurement
S.
Inspection of 3rd Irrigation line from
HFC- 0+270 to 011.3 BalaJi,R.
0278 layer back filling for chainage 0+270 to Area 7 29-Jan-15 04.30: 29-Jan-15 AN 2/24/2015
IRR 0+370 0:00 K, Sr.
250 mm dia upvc 0+370 (line-2) 00 PM
AM Engineer
S.
Inspection for 4th Irrigation line from
HFC- 0+820 to 011.3 BalaJi,R.
0279 layer back filling for chainage 0+820 to Area 7 29-Jan-15 04.30: 29-Jan-15 Revised 2/7/2015
IRR 0+890 0:00 K, Sr.
200 mm dia upvc 0+890 00 PM
AM Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection of 3rd S.
HFC- layer back filling for From ch 1+310 to (Including warning 1+310 to 011.3 BalaJi,R.
0280 Area 9 29-Jan-15 04.30: 29-Jan-15 AN 2/24/2015
IRR 110 mm dia Upvc 1+450 tape) 1+450 0:00 K, Sr.
00 PM
Irrigation line AM Engineer
Inspection of 3rd S.
0+540 -
HFC- layer back filling for from CHainage 0+540 011.3 BalaJi,R.
0272 Area 7 0+690 29-Jan-15 04.30: 29-Jan-15 A 2/24/2015
WD 150 mm dia GRE - 0+690 (Line-2) 0:00 K, Sr.
(Line-2) 00 PM
potable water line AM Engineer
Inspection for 4th S.
water line from
HFC- layer back filling for (Including warning 0+020 to 011.3 BalaJi,R.
0273 chainage 0+020 to Area 7 29-Jan-15 04.30: 29-Jan-15 A 2/24/2015
WD 150 mm dia GRE tape) 0+090 0:00 K, Sr.
0+090 00 PM
water line AM Engineer
Inspection for 4th S.
HFC- layer back filling for from Chainage 1+560 1+560 to 011.3 BalaJi,R.
0274 Area 7 29-Jan-15 04.30: 29-Jan-15 A 2/24/2015
WD 150 mm dia GRE to 1+760 line 2 RHS 1+760 0:00 K, Sr.
00 PM
water line AM Engineer
S.
Inspection of 3rd fire fighting line from
HFC- 0+460 to 011.3 BalaJi,R.
0271 layer back filling for chanaige 0+460 to Area 7 29-Jan-15 04.30: 29-Jan-15 A 2/24/2015
FF 0+410 0:00 K, Sr.
250 mm dia HDPE 0+410 (Line-2) 00 PM
AM Engineer
S.
Inspection of 4th fire fighting line from
HFC- 1+010 to 011.3 BalaJi,R.
0272 layer back filling for chanaige 1+010 to Area 7 29-Jan-15 04.30: 29-Jan-15 Revised 2/7/2015
FF 1+080 0:00 K, Sr.
250 mm dia HDPE 1+080 LINE 2 LHS 00 PM
AM Engineer
S.
Inspection of 4th fire fighting line from
HFC- (Including warning 0+700 to 011.3 BalaJi,R.
0273 layer back filling for chainage 0+700 to Area 7 29-Jan-15 04.30: 29-Jan-15 A 2/24/2015
FF tape) 0+920 0:00 K, Sr.
250 mm dia HDPE 0+920 (line-1 RHS) 00 PM
AM Engineer

Visual Inspection of S.
HFC- 2nd layer back filling From ch 1+580 to 1+580 to 011.3 BalaJi,R.
0274 Area 9 29-Jan-15 04.30: 29-Jan-15 A 2/8/2015
FF for 200 mm dia HDPE 1+640 1+640 0:00 K, Sr.
00 PM
fire fighting line AM Engineer

S.
Please check the From HC-03 to MH-
As per BalaJi,D.
HFC- back drop for Sewer 2.2, HC-01 to MH-2.3, As per attached
1860 Area 9 attached 31-Jan-15 01.30: 31-Jan-15 08.30: Suresh, AN 2/4/2015
SEW Manhole MH-2.1,MH- HC-02 to MH-2.4, HC- Sketch
Sketch 00 PM 00 AM Sr.
2.2,MH-2.3,MH-2.4 03 to MH-2.4
Engineer
S.
Inspection for shutter, of air valve chamber BalaJi,D.
HFC- Yard AV-3 & AV-
0281 reinforcement & for 250mm dia upvc AV-3 & AV-4 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, Revised 1/5/2015
IRR Area 4
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter, of air valve chamber BalaJi,D.
HFC- Yard
0282 reinforcement & for 200mm dia upvc AV-2 AV-2 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 3/2/2015
IRR Area
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter, of washout chamber BalaJi,D.
HFC- Yard
0283 reinforcement & for 200mm dia upvc WO-3 WO-3 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
IRR Area
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter, of washout chamber BalaJi,D.
HFC- Yard
0284 reinforcement & for 110mm dia upvc WO-4 WO-4 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, A 3/22/2015
IRR Area
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter, of gate valve chamber BalaJi,D.
HFC- gate vlave no IV-6 & Yard
0285 reinforcement & for 110mm dia upvc IV-6 & IV-7 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/18/2015
IRR IV-7 Area
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter, of gate valve chamber BalaJi,D.
HFC- Yard
0286 reinforcement & for 150mm dia upvc gate vlave no IV-8 IV-8 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 4/14/2015
IRR Area
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

as per
highlighted
S.
Inspection of fixing of as per highlighted in in drawing
BalaJi,D.
HFC- steel sleeve for 225 drawing towards towards
0275 (half portion RHS) Area 1 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/4/2015
WD mm dia GRE water abutment-1 at abutment-
00 PM 00 AM Sr.
line approax ch- 0+610 1 at
Engineer
approax
ch- 0+610

MH-03 to
S.
from MH-03 to abutment-
HFC- Inspection & joint BalaJi,D.
abutment-1( 10+300 1( 10+300
ITS/D 0029 measurement for Area 1 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/2/2015
to half of road to half of
IC 4WXD54 DU Duct line 00 PM 00 AM Sr.
crossing) road
Engineer
crossing)
Inspection of S.
excavation and BalaJi,D.
HFC- from ch 1+460 to 1+460 to
1861 prepared formation for Area 1 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/8/2015
SEW 1+430 1+430
200mm HDPE sewer 00 PM 00 AM Sr.
pressure line Engineer
S.
Inspection of
BalaJi,D.
HFC- excavation & for 200mm HDPE
1862 at ch 1+460 Area 1 GV-01 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/10/2015
SEW prepared formation of sewer pressure line
00 PM 00 AM Sr.
gate valve chamber
Engineer
Inspection for S.
excavation & BalaJi,D.
HFC- from MH 3.2 to MH MH 3.2 to
0327 prepared formation for (as per new drawing) Area 5 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 5/17/2015
DR 3.3 MH 3.3
250mm dia upvc 00 PM 00 AM Sr.
storm water Line Engineer
as per S.
Inspection placing &
highlighted BalaJi,D.
HFC- fixing of steel sleeve as per highlighted in
0276 Area 8 in drawing 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/4/2015
WD for 150 mm dia GRE drawing
(near to 00 PM 00 AM Sr.
water line
0+920) Engineer
as per S.
Inspection placing &
highlighted BalaJi,D.
HFC- fixing of steel sleeve as per highlighted in
0277 Area 5 in drawing 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/4/2015
WD for 150 mm dia GRE drawing
(near to 00 PM 00 AM Sr.
water line
0+940) Engineer
Inspection for S.
excavation and BalaJi,D.
HFC- from CHainage 0+080 (Recover of diduction 0+080 to
0278 prepared formation of Area 9 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/8/2015
WD to 0+085 chaiange) 0+085
100 mm dia GRE 00 PM 00 AM Sr.
water line Engineer
S.
Inspection for fixing of
BalaJi,D.
HFC- steel sleeve for 100 as per highlighted in 0+420 to
0279 Area 9 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/4/2015
WD mm dia GRE water drawing 420
00 PM 00 AM Sr.
line
Engineer
S.
Inspection for fixing of as per
( al ready checked & again is being BalaJi,D.
HFC- steel sleeve for 100 as per highlighted in highlighted
0280 verified through RFA submitted due to Area 6 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/8/2015
WD mm dia GRE water drawing (line-7) in drawing
no HFC-FF-241 wrong code 00 PM 00 AM Sr.
line (line-7)
Engineer
Inspection for S.
Area 8
excavation and BalaJi,D.
HFC- & few 1+300
0281 prepared formation of from 1+300 to1+460 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
WD portion to1+460
150 mm dia GRE 00 PM 00 AM Sr.
of area7
water line Engineer
S.
Inspection and joint Irrigation road
BalaJi,D.
HFC- measurement of pipe crossing duct no IRR- Duct no-
0287 Area 1 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 2/10/2015
IRR laying for 1wx300mm 01 (Half portion RHS) IRR-01
00 PM 00 AM Sr.
dia upvc at ch 10+305.78
Engineer
S.
Inspection for
fire fighting line from BalaJi,D.
HFC- excavation and 0+520 to
0275 chanaige 0+520 to Area 8 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
FF prepared formation for 0+548
0+548 00 PM 00 AM Sr.
250 mm dia HDPE
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection & joint
fire fighting line from BalaJi,D.
HFC- measurement of pipe 0+550 to
0276 chanaige 0+550 to line -2 LHS Area 7 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 1/4/2015
FF laying for 250 mm dia 0+560
0+560 00 PM 00 AM Sr.
HDPE
Engineer
S.
Inspection for pouring
BalaJi,D.
HFC- of concrete of for the 200 mm dia HDPE fire gate valve chamber Yard
0277 IV-8 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, AN 3/2/2015
FF base of gate valve fighting line no-IV-8 Area
00 PM 00 AM Sr.
chamber for
Engineer
S.
Inspection for
fire fighting line from 0+000 to BalaJi,D.
HFC- excavation and
0236A chanaige 0+000 to Area 7 0+020 31-Jan-15 011.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
FF prepared formation for
0+020 (Line-5) (Line-5) 00 PM 00 AM Sr.
250 mm dia HDPE
Engineer
S.
Inspection for shutter,
fire fighting & irrigation in grid of Irrigatio Irrigation BalaJi,D.
HFC- reiforcement &
0288 reservoir and E1,F1,G1,H1,J1,E2,F n pump pump 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, AN 3/2/2015
IRR concreting for column
pumping station 2,J2 (8 nos C1,C2) station station 00 PM 00 AM Sr.
Starter
Engineer
S.
for 200 mm dia upvc BalaJi,D.
HFC- Inspection for 7th MH -11 to
1833A sewer line from MH Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling MH-12
-11 to MH-12 00 PM 00 AM Sr.
Engineer
S.
for 200 mm dia upvc BalaJi,D.
HFC- Inspection for 6th MH -11 to
1806A sewer line from MH Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling MH-12
-11 to MH-12 00 PM 00 AM Sr.
Engineer
S.
200 mm dia upvc BalaJi,D.
HFC- Inspection for 10th MH -13 to
1863 sewer line from MH Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
SEW layer back filling for MH-12
-13 to MH-12 00 PM 00 AM Sr.
Engineer
S.
Inspection of 10th
BalaJi,D.
HFC- layer back filling for From MH-13 to MH- MH-13 to
1864 Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
Inspection of 10th
BalaJi,D.
HFC- layer back filling for From MH-15 to MH- MH-15 to
1865 Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
Inspection of 7th layer
BalaJi,D.
HFC- back filling for 200 From MH-16 to MH- MH-16 to
1866 Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, A 2/24/2015
SEW mm dia upvc sewer 15 MH-15
00 PM 00 AM Sr.
line
Engineer
S.
Inspection of 9th layer
BalaJi,D.
HFC- back filling for 200 MH-11 to
1867 From MH-11 to MH-10 Area 6 31-Jan-15 02.30: 31-Jan-15 08.30: Suresh, Revised 2/9/2015
SEW mm dia upvc sewer MH-10
00 PM 00 AM Sr.
line
Engineer
Inspection and joint S.
measurement of pipe Irrigation line from (recover of deduction BalaJi,D.
HFC- 0+870 to
0289 laying for 200 mm dia chainage 0+870 to LINE-1 chainage, copy Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR 0+880
upvc Irrigation line 0+880 attached) 00 PM 00 AM Sr.
from Engineer
S.
Inspection for
Irrigation line from (recover of deduction BalaJi,D.
HFC- excavation and 0+970 to
0290 chainage 0+970 to chainage, copy Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR prepared formation for 0+980
0+980 attached) 00 PM 00 AM Sr.
200 mm dia upvc
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Inspection and joint S.


measurement of pipe BalaJi,D.
HFC- from chainage 0+380 0+380 to
0291 laying for 200 mm dia Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, Revised 2/5/2015
IRR to 0+510 0+510
upvc Irrigation line 00 PM 00 AM Sr.
from Engineer
S.
Inspection & joint
Irrigation line from (recover of deduction BalaJi,D.
HFC- measurement of pipe 0+880 to
0292 chainage 0+880 to LINE-2 chainage, copy Area 7 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR laying for 200 mm dia 0+890
0+890 attached) 00 PM 00 AM Sr.
upvc
Engineer
S.
Inspection & joint
Irrigation line from (recover of deduction BalaJi,D.
HFC- measurement of pipe 0+270 to
0293 chainage 0+270 to LINE-2 chainage, copy Area 7 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR laying for 250 mm dia 0+280
0+280 attached) 00 PM 00 AM Sr.
upvc
Engineer
S.
Inspection & joint
Irrigation line from (recover of deduction BalaJi,D.
HFC- measurement of pipe 0+830 to
0294 chainage 0+830 to chainage, copy Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/5/2015
IRR laying for 150 mm dia 0+838
0+838 attached) 00 PM 00 AM Sr.
upvc
Engineer
0+880 to S.
Inspection & joint Irrigation line from
(recover of deduction 0+884.80 BalaJi,D.
HFC- measurement of pipe chainage 0+880 to
0295 chainage, copy Area 1 & 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, Revised 2/4/2015
IRR laying for 150 mm dia 0+884.80 & 0+897.55
attached) 0+897.55 00 PM 00 AM Sr.
upvc to 0+904
to 0+904 Engineer
S.
Inspection for final Irrigation line from (recover of deduction BalaJi,D.
HFC- al ready checked this 0+840 to
0296 layer back filling for chainage 0+840 to chainage, copy Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 9/8/2015
IRR is due to deduction 0+845
150 mm dia upvc 0+845 attached) 00 PM 00 AM Sr.
Engineer
S.
Inspection & joint
Irrigation line from (recover of deduction BalaJi,D.
HFC- measurement of pipe 0+938 to
0297 chainage 0+938 to chainage, copy Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/9/2015
IRR laying for 150 mm dia 0+945
0+945 attached) 00 PM 00 AM Sr.
upvc
Engineer
S.
Inspection & joint
Irrigation line from (recover of deduction BalaJi,D.
HFC- measurement of pipe 1+440 to
0298 chainage 1+440 to line-2 chainage, copy Area 9 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR laying for 110 mm dia 1+450
1+450 attached) 00 PM 00 AM Sr.
upvc
Engineer
S.
Inspection for Irrigation line from (recover of deduction BalaJi,D.
HFC- 0+750 to
0299 concrete encasement chainage 0+750 to chainage, copy Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
IRR 0+751
for 150 mm dia upvc 0+751 attached) 00 PM 00 AM Sr.
Engineer
Inspection and joint S.
measurement of pipe BalaJi,D.
HFC- from ch 1+460 - 1+460 -
1868 laying for 200 mm dia Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/8/2015
SEW 1+430 1+430
HDPE Sewer 00 PM 00 AM Sr.
pressure line Engineer
Inspection of shutter S.
and pouring of BalaJi,D.
HFC- irrigation transmission 0+720 to 0
0300 concrete for concrete Area 1 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/2/2015
IRR line +740
surround of 150mm 00 PM 00 AM Sr.
dia uPVC Engineer
S.
Inspection for shutter, 900 bend at
of 150 mm dia upvc As per BalaJi,D.
HFC- reinforcement & coordinate E-
0301 for irrigation As per new Drawing Area 1 attached 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/2/2015
IRR concreting for thrust 490713.494, N-
transmission line sketch 00 PM 00 AM Sr.
block 2788554.642
Engineer
S.
Inspection for Isolation valve
BalaJi,D.
HFC- Shutter, reiforcement chamber for 150 mm Yard IV9,0+735.
0302 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/2/2015
IRR & concreting for the dia upvc Irrigation Area 037
00 PM 00 AM Sr.
cover slab of transmission line
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for
gate valve chamber BalaJi,D.
HFC- Shutter, reiforcement Yard
1869 for 200mm HDPE at ch 1+460 GV-01 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 3/8/2015
SEW & concreting for the Area
sewer pressure line 00 PM 00 AM Sr.
cover slab of
Engineer
S.
Inspection for
BalaJi,D.
HFC- pouring of blinding for 200mm HDPE
1870 at ch 1+460 Area 1 GV-01 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/2/2015
SEW concrete of gate valve sewer pressure line
00 PM 00 AM Sr.
chamber
Engineer
S.
Inspection for
Irrigation line from BalaJi,D.
HFC- excavation and 0+380 to
0205A chainage 0+380 to Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, Revised 2/5/2015
IRR prepared formation for 0+510
0+510 00 PM 00 AM Sr.
200 mm dia upvc
Engineer

Inspection of shutter, S.
reinforcement & BalaJi,D.
HFC- for 200mm HDPE Yard
1871 concreting for the at ch 1+460 GV-01 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 3/22/2015
SEW sewer pressure line Area
base of gate valve 00 PM 00 AM Sr.
chamber Engineer

S.
Inspection of shutter,
BalaJi,D.
HFC- reinforcement & for 200mm HDPE Yard
1872 at ch 1+460 GV-01 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/2/2015
SEW concreting for the wall sewer pressure line Area
00 PM 00 AM Sr.
of gate valve chamber
Engineer

S.
Inspection for placing BalaJi,D.
HFC- for 200mm HDPE
1873 & fixing of precasted at ch 1+460 area 1 GV-01 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/2/2015
SEW sewer pressure line
gate valve chamber 00 PM 00 AM Sr.
Engineer
S.
Inspection for BalaJi,D.
HFC-
1874 concreting for the wall MH: 1A (lift-1) Area 6 MH: 1A 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/3/2015
SEW
of sewer manhloe 00 PM 00 AM Sr.
Engineer
S.
Inspection for BalaJi,D.
HFC-
1875 concreting for the wall MH: 1A (lift-2) Area 6 MH: 1A 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 3/3/2015
SEW
of sewer manhloe 00 PM 00 AM Sr.
Engineer
S.
Inspection for MH-9 to
BalaJi,D.
HFC- excvation & prepared from MH-9 to MH-8.2 MH-8.2
1876 Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, Revised 2/10/2015
SEW formation for 200 mm (Remaining portion) (Remainin
00 PM 00 AM Sr.
dia upvs sewer line g portion)
Engineer
S.
MH-9 to
Inspection of laying joint measurement of from MH-9 to MH- BalaJi,D.
HFC- for 200 mm dia upvc MH-8.2
1877 geotextile, gravel pipe laying and 8.2 (Remaining Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, Revised 2/10/2015
SEW sewer line (Remainin
bedding, grannular surround portion) 00 PM 00 AM Sr.
g portion)
Engineer
sewer House S.
HC-01 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to MH- & HC-01 to end cap MH-8.1 &
1878 excavation and mm dia Upvc of Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 2/24/2015
SEW 8.1 of (MH-8.1) HC-01 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end cap
8.1 Engineer
sewer House HC-01 to S.
Inspection for connection line 160 MH-8.2 & BalaJi,D.
HFC- from HC-01 to MH- from HC-01 to HC-
1879 excavation and mm dia Upvc of Area 6 HC-01 to 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 2/24/2015
SEW 8.2 02 of MH-8.2
prepared formation for Sewer Manhole MH- HC-02 of 00 PM 00 AM Sr.
8.2 MH-8.2 Engineer
HC-01 to
sewer House S.
end cap
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to end from HC-02 to end (MH-8.2)
1880 excavation and mm dia Upvc of Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 2/24/2015
SEW cap (MH-8.2) cap (MH8.2) HC-02 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end cap
8.2 Engineer
(MH8.2)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House HC-02 to S.


Inspection for connection line 160 MH-8.3 & BalaJi,D.
HFC- from HC-02 to MH- & HC-01 to HC-02
1881 excavation and mm dia Upvc of Area 6 HC-01 to 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 2/24/2015
SEW 8.3 of (MH-8.3)
prepared formation for Sewer Manhole MH- HC-02 of 00 PM 00 AM Sr.
8.3 (MH-8.3) Engineer
HC-01 to
sewer House S.
end cap
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to end from HC-02 to end (MH-8.3)
1882 excavation and mm dia Upvc of Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 2/24/2015
SEW cap (MH-8.3) cap (MH-8.3) HC-02 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end cap
8.3 Engineer
(MH-8.3)

HC-
01(MH-
Inspection for S.
HC-01(MH-8.1),HC- 8.1),HC-1&
excavation and house connection BalaJi,D.
HFC- 1& HC-02 of (MH-8.2) HC-02 of
1883 prepared formation for chambers of MH-8.1, Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/24/2015
SEW & HC-1& HC-02 of (MH-8.2) &
house connection MH-8.2 & MH-8.3 00 PM 00 AM Sr.
(MH-8.3) HC-1&
chambers Engineer
HC-02 of
(MH-8.3)

S.
Inspection for external
BalaJi,D.
HFC- waterproofing the MH:
1884 MH: 1 Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
SEW base & wall of 1,0+720.88
00 PM 00 AM Sr.
Sewerage Manhole
Engineer
S.
Inspection for external
BalaJi,D.
HFC- waterproofing the MH:
1885 MH: 2 Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
SEW base & wall of 2,0+740.88
00 PM 00 AM Sr.
Sewerage Manhole
Engineer
S.
Inspection for external
BalaJi,D.
HFC- waterproofing the MH-3
1886 MH-3 Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 2/4/2015
SEW base & wall of (0+811.83)
00 PM 00 AM Sr.
Sewerage Manhole
Engineer

Inspection of S.
concrete encasement BalaJi,D.
HFC- From HC-03 to MH- HC-03 to
1887 for 160 mm dia upvc Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 3/18/2015
SEW 2.4 MH-2.4
House connection 00 PM 00 AM Sr.
Sewer line Engineer

Inspection of S.
concrete encasement BalaJi,D.
HFC- From HC-02 to MH- HC-02 to
1888 for 160 mm dia upvc Area 6 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, A 3/18/2015
SEW 2.1 MH-2.1
House connection 00 PM 00 AM Sr.
Sewer line Engineer

Please check & From HC-03 to MH- S.


record the and followed by Sewer Manhole MH- 2.2, HC-01 to MH- As per BalaJi,D.
HFC- As per attached
1889 mesurement of 160 concrete for the 2.1,MH-2.2,MH- 2.3, HC-02 to MH- Area 9 attached 1-Feb-15 02.30: 1-Feb-15 08.30: Suresh, AN 1/8/2015
SEW Sketch
mm dia uvc pipe & external back drop of 2.3,MH-2.4 2.4, HC-03 to MH- Sketch 00 PM 00 AM Sr.
fittings, elbow 2.4 Engineer

Inspection of shutter S.
& concrete BalaJi,D.
HFC- HC-02 to
1890 encasement for 160 From HC-02 to MH-17 Area 6 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW MH-17
mm dia upvc House 00 PM 00 AM Sr.
connection Sewer line Engineer

Inspection for S.
granular bedding, for connection portion of 500mm dia GRP MH -1.6, BalaJi,D.
HFC- of pipe laying and
0328 laying of (including st. specials Storm water liner Area 7 0+604.581 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, AN 2/4/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-1.6 7 00 PM 00 AM Sr.
measurement Engineer
Inspection for S.
granular bedding, for connection portion of 500mm dia GRP MH -1.5, BalaJi,D.
HFC- of pipe laying and
0329 laying of (including st. specials Storm water liner Area 7 0+0642.50 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, AN 2/4/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-1.5 91 00 PM 00 AM Sr.
measurement Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0330 waterproofing for the Area 8 2.2,0+030. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH 2.2
base & wall 2095 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0331 waterproofing for the Area 7 2.4,0+342. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH 2.4
base & wall 1374 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0332 waterproofing for the Area 8 2.3,0+063. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/10/2015
DR MH 2.3
base & wall 213 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0333 waterproofing for the Area 7 2.6,0+225. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/10/2015
DR MH 2.6
base & wall 6435 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC-
0334 waterproofing for the MH 2.5 Area 7 2.5,0+276. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR
base & wall 2135 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0335 waterproofing for the Area 7 2.7,0+174. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/10/2015
DR MH 2.7
wall 7024 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0336 waterproofing for the Area 7 2.8,0+127. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH 2.8
wall 98.95 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0337 waterproofing for the Area 7 2.9,0+081. 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH 2.9
wall 7331 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0338 waterproofing for the Area 7 2.10,0+034 2-Feb-15 02.30: 2-Feb-15 08.30: Suresh, AN 2/9/2015
DR MH 2.10
base & wall .4192 00 PM 00 AM Sr.
Engineer
S.
MH 2.11 , BalaJi,D.
HFC- Inspection for placing storm water drainage
0339 Area 7 0+158.096 2-Feb-15 01.30: 2-Feb-15 08.30: Suresh, AN 2/4/2015
DR & fixing base of MH-2.11
1 00 PM 00 AM Sr.
Engineer
S.
Inspection for shutter MH 2.11 , BalaJi,D.
HFC- storm water drainage
0340 & concreting for the Area 7 0+158.096 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 3/2/2015
DR MH-2.11
wall of 1 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH 2.11 , BalaJi,D.
HFC- storm water drainage
0341 waterproofing for the Area 7 0+158.096 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH-2.11
base & wall 1 00 PM 00 AM Sr.
Engineer
S.
Inspection for MH- BalaJi,D.
HFC- storm water drainage
0342 excavation & Area 7 1.3,718.08 2-Feb-15 011.30: 2-Feb-15 08.30: Suresh, C 2/9/2015
DR MH-1.3
formation for 29 00 AM 00 AM Sr.
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
MH- BalaJi,D.
HFC- Inspection for blinding storm water drainage
0343 Area 7 1.3,718.08 2-Feb-15 01.30: 2-Feb-15 08.30: Suresh, C 2/9/2015
DR concrete of MH-1.3
29 00 PM 00 AM Sr.
Engineer
S.
MH- BalaJi,D.
HFC- Inspection for placing storm water drainage
0344 Area 7 1.3,718.08 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 1/4/2015
DR & fixing base of MH-1.3 & 1.2
29 & 1.2 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH- BalaJi,D.
HFC- storm water drainage
0345 waterproofing for the Area 7 1.3,718.08 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
DR MH-1.3 & 1.2
base 29 & 1.2 00 PM 00 AM Sr.
Engineer
S.
Inspection for external BalaJi,D.
HFC- Storm water drainage
0346 waterproofing for the Area 7 MH-1.4 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/10/2015
DR MH 1.4
base 00 PM 00 AM Sr.
Engineer
S.
Inspection for external BalaJi,D.
HFC- Storm water drainage
0347 waterproofing for the Area 5 MH 3.2 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 2/9/2015
DR MH 3.2
base 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH- BalaJi,D.
HFC- Storm water drainage
0348 waterproofing for the Area 5 3.1,0+085. 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 2/9/2015
DR MH 3.1
base 8111 00 PM 00 AM Sr.
Engineer
S.
Inspection for external MH BalaJi,D.
HFC- Storm water drainage
0349 waterproofing for the Area 5 3.0,0+133. 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 2/9/2015
DR MH 3.0
base 2178 00 PM 00 AM Sr.
Engineer
Inspection for S.
excavation and BalaJi,D.
HFC- from CHainage 0+940 0+940 to
0282 prepared formation of Area 8 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, A 2/25/2015
WD to 0+960 0+960
150 mm dia GRE 00 PM 00 AM Sr.
water line Engineer
S.
inspection for 9th
BalaJi,D.
HFC- layer back filling for MH: 3 to
1891 from MH: 3 to MH: 4 Area 6 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia Upvc MH: 4
00 PM 00 AM Sr.
sewer line
Engineer
S.
inspection for 9th
200 mm dia upvc BalaJi,D.
HFC- layer back filling for MH -5 to
1892 sewer line from MH Area 6 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia Upvc MH-6
-5 to MH-6 00 PM 00 AM Sr.
sewer line
Engineer
S.
200mm dia upvc BalaJi,D.
HFC- Inspection for 8th MH: 4 to
1893 sewer line from MH-4 Area 6 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, A 2/25/2015
SEW layer back filling for MH: 5
to MH-5 00 PM 00 AM Sr.
Engineer
MH -6 ,CH S.
200 mm dia upvc 0+968.96 BalaJi,D.
HFC- Inspection for 8th
1894 sewer line from MH-6 Area 6 to MH-7, 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, A 2/25/2015
SEW layer back filling for
to NH- 7 CH 00 PM 00 AM Sr.
1+032.78 Engineer
MH -9 ,CH S.
for 200 mm dia upvc 1+150.82 BalaJi,D.
HFC- Inspection for 5th
1831A sewer line from MH Area 6 to MH-10, 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling
-9 to MH-10 CH 00 PM 00 AM Sr.
1+215.06 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

MH -9 ,CH S.
for 200 mm dia upvc 1+150.82 BalaJi,D.
HFC- Inspection for 4th Area
1733A sewer line from MH to MH-10, 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling 6(IR-1)
-9 to MH-10 CH 00 PM 00 AM Sr.
1+215.06 Engineer
S.
Inspection of 6th layer
BalaJi,D.
HFC- back filling for 200 MH-8 to
1808A From MH-8 to MH-9 Area 6 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW mm dia upvc sewer MH-9
00 PM 00 AM Sr.
line
Engineer
S.
Inspection of 7th layer
BalaJi,D.
HFC- back filling for 200 MH-8 to
1830A From MH-8 to MH-9 Area 6 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW mm dia upvc sewer MH-9
00 PM 00 AM Sr.
line
Engineer
MH -7 ,CH S.
200 mm dia upvc 1+032.78 BalaJi,D.
HFC- Inspection for 5th
1805A sewer line from MH Area 6 to MH-8, 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling for
-7 to MH-8 CH 00 PM 00 AM Sr.
1+086.48 Engineer
MH -7 ,CH S.
200 mm dia upvc 1+032.78 BalaJi,D.
HFC- Inspection for 6th
1829A sewer line from MH Area 6 to MH-8, 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling for
-7 to MH-8 CH 00 PM 00 AM Sr.
1+086.48 Engineer
S.
Inspection of re-laying joint measurement of for 250mm dia upvc BalaJi,D.
HFC- MH-3.2 to
0350 geotextile, gravel pipe laying and Storm water line from As per new Drawing Area 5 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 2/4/2015
DR 3.3
bedding, grannular surround MH-3.2 to MH- 3.3 00 PM 00 AM Sr.
Engineer
S.
Inspection and joint
fire fighting line from 0+690 to BalaJi,D.
HFC- measurement of pipe
0278 chanaige 0+690 to Area 7 0+800 2-Feb-15 04.30: 2-Feb-15 08.30: Suresh, AN 2/11/2015
FF laying for 250 mm dia
0+800 (Line-2) (Line-2) 00 PM 00 AM Sr.
HDPE
Engineer
S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to 01.30:
1895 Area 9 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of connection line 160 2.1 (remainig portion) MH-2.1 00
00 PM Sr.
pipe laying & mm dia upvc PM
Engineer
S.
Inspection for gravel surround for HC -02 to
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -02 to MH- from HC -03 to MH- MH-2.2,HC 01.30:
1896 (remaining portion) Area 9 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of connection line 160 2.2 2.2 -03 to MH- 00
00 PM Sr.
pipe laying & mm dia upvc 2.2 PM
Engineer
S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to 01.30:
1897 (remaining portion) Area 9 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of connection line 160 2.3 MH-2.3 00
00 PM Sr.
pipe laying & mm dia upvc PM
Engineer
gravel surround for S.
Inspection for HC -02 to
sewer house BalaJi,D.
HFC- granular bedding, joint from HC -02 to MH- from HC -03 to MH- MH-2.4,HC 01.30:
1898 connection line 160 (remaining portion) Area 9 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of 2.4 2.4 -03 to MH- 00
mm dia upvc of sewer 00 PM Sr.
pipe laying & 2.4 PM
MH-2.4 Engineer
gravel surround for S.
Inspection for
sewer house BalaJi,D.
HFC- granular bedding, joint from HC -01 to MH- HC -01 to 01.30:
1899 connection line 160 (remaining portion) Area 9 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of 2.5 MH-2.5 00
mm dia upvc of sewer 00 PM Sr.
pipe laying & PM
MH-2.5 Engineer
gravel surround for HC -03 to S.
Inspection for
sewer house MH-2.6, BalaJi,D.
HFC- granular bedding, joint from HC -03 to MH- from HC -03 to end 01.30:
1900 connection line 160 AS per new drawing Area 9 HC -03 to 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 2/4/2015
SEW measurements of 2.6 cap 00
mm dia upvc of sewer end cap 00 PM Sr.
pipe laying & PM
MH-2.6 (MH-2.6) Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for shutter BalaJi,D.
HFC- Storm water drainage 01.30:
0351 & concreting for the Area 5 MH 3.2 2-Feb-15 04.30: 2-Feb-15 Suresh, A 3/25/2015
DR MH 3.2 00
wall of 00 PM Sr.
PM
Engineer
S.
Inspection for shutter MH- BalaJi,D.
HFC- Storm water drainage 01.30:
0352 & concreting for the Area 5 3.1,0+085. 2-Feb-15 04.30: 2-Feb-15 Suresh, A 3/25/2015
DR MH 3.1 00
wall of 8111 00 PM Sr.
PM
Engineer
S.
Inspection for shutter MH BalaJi,D.
HFC- Storm water drainage 01.30:
0353 & concreting for the Area 5 3.0,0+133. 2-Feb-15 04.30: 2-Feb-15 Suresh, A 3/25/2015
DR MH 3.0 00
wall of 2178 00 PM Sr.
PM
Engineer
S.
Inspection for shutter MH -1.12, BalaJi,D.
HFC- Storm water drainage 01.30:
0354 & concreting for the Area 7 0+372.381 2-Feb-15 04.30: 2-Feb-15 Suresh, A 3/24/2015
DR MH 1.12 00
wall of 8 00 PM Sr.
PM
Engineer
S.
Inspection for shutter MH BalaJi,D.
HFC- Storm water drainage 01.30:
0355 & concreting for the Area 7 1.13,0+355 2-Feb-15 04.30: 2-Feb-15 Suresh, AN 4/14/2015
DR MH 1.13 00
wall of .0432 00 PM Sr.
PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to 03.30:
0356 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 500 1.4 MH-1.4 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back filling for from MH 1.6 to MH MH 1.6 to 03.30:
0357 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 500 1.5 MH-1.5 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back fillimg for from MH 1.6 to MH MH 1.6 to 03.30:
0358 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 500 1.7 MH-1.7 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back filling for from MH 1.8 to MH MH 1.8 to 03.30:
0359 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 600 1.9 MH-1.9 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back filling for from MH 1.8 to MH MH 1.8 to 03.30:
0360 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 500 1.7 MH-1.7 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back filling for from MH 1.10 to MH MH 1.10 to 03.30:
0361 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 700 1.11 MH-1.11 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection for 3rd
BalaJi,D.
HFC- layer back fillig for from MH 1.10 to MH MH 1.10 to 03.30:
0362 Area 7 2-Feb-15 04.30: 2-Feb-15 Suresh, A 2/25/2015
DR storm water line 600 1.9 MH-1.9 00
00 PM Sr.
mm dia GRP PM
Engineer
S.
Inspection & joint
fire fighting line from 0+000 to BalaJi,D.
HFC- measurement of pipe
0279 chanaige 0+000 to Area 7 0+020 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, Revised 2/10/2015
FF laying for 250 mm dia
0+020 (Line-5) (Line-5) 00 PM 00 AM Sr.
HDPE
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

Across S.
Inspection & joint
fire fighting line (Line- from BalaJi,D.
HFC- measurement of pipe
0280 4) across from area 7 area 7 Lline-04 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, AN 2/8/2015
FF laying for 250 mm dia
to area 8 to area 00 PM 00 AM Sr.
HDPE
8 Engineer
S.
Inspection for
Irrigation line from 0+500 to BalaJi,D.
HFC- excavation and
0303 chainage 0+500 to Area 7 0+530 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/23/2015
IRR prepared formation for
0+530 (line-2) (line-2) 00 PM 00 AM Sr.
200 mm dia upvc
Engineer
S.
Inspection for
water line from 0+360 to BalaJi,D.
HFC- excavation and
0283 chanaige 0+360 to Area 7 0+410 line- 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
WD prepared formation for
0+410 line-2 2 00 PM 00 AM Sr.
150 mm dia GRE
Engineer
S.
200 mm dia upvc BalaJi,D.
HFC- Inspection for 11th MH -13 to
1901 sewer line from MH Area 6 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
SEW layer back filling for MH-12
-13 to MH-12 00 PM 00 AM Sr.
Engineer
S.
Inspection of 11th
BalaJi,D.
HFC- layer back filling for From MH-13 to MH- MH-13 to
1902 Area 6 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
Inspection of 11th
BalaJi,D.
HFC- layer back filling for From MH-15 to MH- MH-15 to
1903 Area 6 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
for 200 mm dia upvc BalaJi,D.
HFC- Inspection for 9th MH -11 to
1904 sewer line from MH Area 6 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling MH-12
-11 to MH-12 00 PM 00 AM Sr.
Engineer
S.
Inspection of 10th
BalaJi,D.
HFC- layer back filling for MH-11 to
1905 From MH-11 to MH-10 Area 6 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW 200 mm dia upvc MH-10
00 PM 00 AM Sr.
sewer line
Engineer
MH -9 ,CH S.
for 200 mm dia upvc 1+150.82 BalaJi,D.
HFC- Inspection for 6th
1906 sewer line from MH Area 6 to MH-10, 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling
-9 to MH-10 CH 00 PM 00 AM Sr.
1+215.06 Engineer
S.
Inspection and joint
BalaJi,D.
HFC- meassurement of pipe from Chainage 1+320 1+320 to
0284 Area 8 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/8/2015
WD laying of 150 mm dia to 1+380 1+380
00 PM 00 AM Sr.
GRE water line
Engineer
S.
Inspection and joint
BalaJi,D.
HFC- meassurement of pipe from Chainage 1+380 1+380 to
0285 Area 7 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/8/2015
WD laying of 150 mm dia to 1+460 1+460
00 PM 00 AM Sr.
GRE water line
Engineer
S.
Inspection for
Irrigation line from BalaJi,D.
HFC- excavation and 0+120 to
0304 chainage 0+120 to Area 4 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
IRR prepared formation for 0+170
0+170 00 PM 00 AM Sr.
150 mm dia upvc
Engineer
S.
Inspection for
Irrigation line from 0+050 to BalaJi,D.
HFC- excavation and
0305 chainage 0+050 to Area 5 0+090 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, A 2/25/2015
IRR prepared formation for
0+090 ( line-3) ( line-3) 00 PM 00 AM Sr.
250 mm dia upvc
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to
1907 remaining portion Area 8 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, AN 2/4/2015
SEW measurements of connection line 160 1.13 MH-1.13
00 PM 00 AM Sr.
pipe laying & mm dia upvc
Engineer
S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to
1908 remaining portion Area 8 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, AN 2/4/2015
SEW measurements of connection line 160 1.11 MH-1.11
00 PM 00 AM Sr.
pipe laying & mm dia upvc
Engineer
S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -01 to MH- HC -01 to
1909 remaining portion Area 8 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, AN 2/4/2015
SEW measurements of connection line 160 1.12 MH-1.12
00 PM 00 AM Sr.
pipe laying & mm dia upvc
Engineer
S.
Inspection for gravel surround for
BalaJi,D.
HFC- granular bedding, joint sewer house from HC -02 to MH- HC -02 to
1910 remaining portion Area 8 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, AN 2/4/2015
SEW measurements of connection line 160 1.10 MH-1.10
00 PM 00 AM Sr.
pipe laying & mm dia upvc
Engineer
S.
Inspection & record and followed by From HC-02 to MH-
Sewer Manhole MH- As per BalaJi,D.
HFC- the mesurement of pouring of concrete 1.10, HC-02 to MH- As per attached
1911 1.10,MH-1.11,MH- Area 8 attached 3-Feb-15 01.30: 3-Feb-15 08.30: Suresh, Revised
SEW 160 mm dia uvc pipe for the external back 1.11, HC-01 to MH- Sketch
1.12 Sketch 00 PM 00 AM Sr.
& fittings, elbow drop of 1.12
Engineer
S.
Inspection for shutter,
for air valve chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0306 for 200mm dia upvc AV-01 AV-01 3-Feb-15 04.30: 3-Feb-15 Suresh, A 2/25/2015
IRR concreting for the Area 0:00
Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for washout chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0307 for 200mm dia upvc WO-01 WO-01 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for washout chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0308 for 200mm dia upvc WO-02 WO-02 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0309 chamber for 200mm gate vlave no IV-1 IV-1 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
dia upvc Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0310 chamber for 200mm gate vlave no IV-2 IV-2 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
dia upvc Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0311 chamber for 250mm gate vlave no IV-4 IV-4 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
dia upvc Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0312 chamber for 200mm gate vlave no IV-5 IV-5 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the Area 0:00
dia upvc Irrigation line 00 PM Sr.
base of AM
Engineer
S.
Inspection for for gate valve BalaJi,D.
HFC- 011.3
0313 excavation & chamber for 150mm gate vlave no IV-8 Area 5 IV-8 3-Feb-15 04.30: 3-Feb-15 Suresh, A 2/23/2015
IRR 0:00
prepared formation dia upvc Irrigation line 00 PM Sr.
AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for for gate valve BalaJi,D.
HFC- 011.3
0314 excavation & chamber for 250mm gate vlave no IV-4 Area 5 IV-4 3-Feb-15 04.30: 3-Feb-15 Suresh, Revised 2/10/2015
IRR 0:00
prepared formation dia upvc Irrigation line 00 PM Sr.
AM
Engineer
S.
Inspection for for air valve chamber BalaJi,D.
HFC- 011.3
0315 excavation & for 250mm dia upvc AV-03 Area 5 AV-03 3-Feb-15 04.30: 3-Feb-15 Suresh, Revised 2/10/2015
IRR 0:00
prepared formation Irrigation line 00 PM Sr.
AM
Engineer
S.
Inspection of sand
BalaJi,D.
HFC- surround for 200 mm from ch 1+460 - 1+460 - 011.3
1912 Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
SEW dia HDPE Sewer 1+430 1+430 0:00
00 PM Sr.
pressure line AM
Engineer
S.
Inspection for shutter,
for air valve chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0316 for 200mm dia upvc AV-01 AV-01 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 4/14/2015
IRR concreting for the wall Area 0:00
Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for washout chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0317 for 200mm dia upvc WO-01 WO-01 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/18/2015
IRR concreting for the wall Area 0:00
Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for washout chamber BalaJi,D.
HFC- reinforcement & Yard 011.3
0318 for 200mm dia upvc WO-02 WO-02 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/18/2015
IRR concreting for the wall Area 0:00
Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0319 chamber for 200mm gate vlave no IV-1 IV-1 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the wall Area 0:00
dia upvc Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0320 chamber for 200mm gate vlave no IV-2 IV-2 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/25/2015
IRR concreting for the wall Area 0:00
dia upvc Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0321 chamber for 250mm gate vlave no IV-4 IV-4 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/18/2015
IRR concreting for the wall Area 0:00
dia upvc Irrigation line 00 PM Sr.
of AM
Engineer
S.
Inspection for shutter,
for gate valve BalaJi,D.
HFC- reinforcement & Yard 011.3
0322 chamber for 200mm gate vlave no IV-5 IV-5 3-Feb-15 04.30: 3-Feb-15 Suresh, A 3/22/2015
IRR concreting for the wall Area 0:00
dia upvc Irrigation line 00 PM Sr.
of AM
Engineer
MH-03 to
S.
from MH-03 to abutment-
HFC- Inspection of sand BalaJi,D.
abutment-1( 10+300 1( 10+300 011.3
ITS/D 0030 surround for 4WXD54 Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
to half of road to half of 0:00
IC DU Duct line 00 PM Sr.
crossing) road AM
Engineer
crossing)

MH-03 to
S.
Visual Inspection of from MH-03 to abutment-
HFC- BalaJi,D.
1st layer back filling abutment-1( 10+300 1( 10+300 011.3
ITS/D 0031 Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
for 4WXD54 DU Duct to half of road to half of 0:00
IC 00 PM Sr.
line crossing) road AM
Engineer
crossing)

MH-03 to
S.
Visual Inspection of from MH-03 to abutment-
HFC- BalaJi,D.
2nd layer back filling abutment-1( 10+300 1( 10+300 011.3
ITS/D 0032 Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
with warning tape for to half of road to half of 0:00
IC 00 PM Sr.
4WXD54 DU Duct line crossing) road AM
Engineer
crossing)

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Irrigation road
Inspection of sand BalaJi,D.
HFC- crossing duct no IRR- Duct no- 011.3
0323 surround for Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
IRR 01 (Half portion RHS) IRR-01 0:00
1wx300mm dia upvc 00 PM Sr.
at ch 10+305.78 AM
Engineer
S.
Visual Inspection of Irrigation road
BalaJi,D.
HFC- 1st layer back filling crossing duct no IRR- Duct no- 011.3
0324 Area 1 3-Feb-15 04.30: 3-Feb-15 Suresh, AN 2/8/2015
IRR for 1wx300mm dia 01 (Half portion RHS) IRR-01 0:00
00 PM Sr.
upvc at ch 10+305.78 AM
Engineer
S.
Inspection for gravel surround for HC-01 to
BalaJi,D.
HFC- granular bedding, joint sewer house from HC-01 to MH- & HC-01 to end cap MH-8.1 &
1913 Area 6 4-Feb-15 04.30: 4-Feb-15 08.30: Suresh, AN 2/8/2015
SEW measurements of connection line 160 8.1 of (MH-8.1) HC-01 to
00 PM 00 AM Sr.
pipe laying & mm dia upvc end cap
Engineer
sewer House HC-01 to S.
Inspection for gravel surround for
connection line 160 MH-8.2 & BalaJi,D.
HFC- granular bedding, joint sewer house from HC-01 to MH- from HC-01 to HC-
1914 mm dia Upvc of Area 6 HC-01 to 4-Feb-15 04.30: 4-Feb-15 08.30: Suresh, AN 2/8/2015
SEW measurements of connection line 160 8.2 02 of MH-8.2
Sewer Manhole MH- HC-02 of 00 PM 00 AM Sr.
pipe laying & mm dia upvc
8.2 MH-8.2 Engineer
HC-01 to
sewer House S.
Inspection for gravel surround for end cap
connection line 160 BalaJi,D.
HFC- granular bedding, joint sewer house from HC-01 to end from HC-02 to end (MH-8.2)
1915 mm dia Upvc of Area 6 4-Feb-15 04.30: 4-Feb-15 08.30: Suresh, AN 2/8/2015
SEW measurements of connection line 160 cap (MH-8.2) cap (MH8.2) HC-02 to
Sewer Manhole MH- 00 PM 00 AM Sr.
pipe laying & mm dia upvc end cap
8.2 Engineer
(MH8.2)
sewer House HC-02 to S.
Inspection for gravel surround for
connection line 160 MH-8.3 & BalaJi,D.
HFC- granular bedding, joint sewer house from HC-02 to MH- & HC-01 to HC-02
1916 mm dia Upvc of Area 6 HC-01 to 4-Feb-15 04.30: 4-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW measurements of connection line 160 8.3 of (MH-8.3)
Sewer Manhole MH- HC-02 of 00 PM 00 AM Sr.
pipe laying & mm dia upvc
8.3 (MH-8.3) Engineer
HC-01 to
sewer House S.
Inspection for gravel surround for end cap
connection line 160 BalaJi,D.
HFC- granular bedding, joint sewer house from HC-01 to end from HC-02 to end (MH-8.3)
1917 mm dia Upvc of Area 6 4-Feb-15 04.30: 4-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW measurements of connection line 160 cap (MH-8.3) cap (MH-8.3) HC-02 to
Sewer Manhole MH- 00 PM 00 AM Sr.
pipe laying & mm dia upvc end cap
8.2 Engineer
(MH-8.3)
S.
Inspection for Irrigation road
BalaJi,D.
HFC- excavation and crossing duct no IRR- Duct no- 011.3
0325 Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/24/2015
IRR prepared formation for 61 (Half portion RHS) IRR-061 0:00
00 PM Sr.
1wx300mm dia upvc at ch 0+029.802 AM
Engineer
S.
Inspection and joint Irrigation road
BalaJi,D.
HFC- measurement of pipe crossing duct no IRR- Duct no- 011.3
0326 Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/8/2015
IRR laying for 1wx300mm 61 (Half portion RHS) IRR-061 0:00
00 PM Sr.
dia upvc at ch 0+029.802 AM
Engineer
S.
Inspection for Irrigation road
BalaJi,D.
HFC- excavation and crossing duct no IRR- Duct no- 011.3
0327 Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, A 3/2/2015
IRR prepared formation for 62 (Half portion RHS) IRR-062 0:00
00 PM Sr.
1wx300mm dia upvc at ch 0+005.67 AM
Engineer
S.
Inspection and joint Irrigation road
BalaJi,D.
HFC- measurement of pipe crossing duct no IRR- Duct no- 011.3
0328 Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/8/2015
IRR laying for 1wx300mm 62 (Half portion RHS) IRR-062 0:00
00 PM Sr.
dia upvc at ch 0+005.67 AM
Engineer
Inspection for S.
Electric road crossing
excavation and BalaJi,D.
HFC- duct no Ele-43 (Half Duct no- 011.3
0015 prepared formation for Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/24/2015
ED portion RHS) at ch ELE-43 0:00
4wx150mm dia upvc 00 PM Sr.
0+034.808 AM
(11kv) Engineer
S.
Inspection and joint Electric road crossing
BalaJi,D.
HFC- measurement of pipe duct no Ele-43 (Half Duct no- 011.3
0016 Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/8/2015
ED laying for 4wx150mm portion RHS) at ch ELE-43 0:00
00 PM Sr.
dia upvc (11kv) 0+034.808 AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for LV road crossing duct
Duct no- BalaJi,D.
HFC- excavation and no Ele(LV)-44 (Half 011.3
0017 Area 5 ELE(LV)- 4-Feb-15 04.30: 4-Feb-15 Suresh, A 2/24/2015
ED prepared formation for portion RHS) at ch 0:00
44 00 PM Sr.
4wx150mm dia upvc 0+028.80 AM
Engineer
S.
Inspection and joint LV road crossing duct
Duct no- BalaJi,D.
HFC- measurement of pipe no Ele(LV)-44 (Half 011.3
0018 Area 5 ELE(LV)- 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/8/2015
ED laying for 4wx150mm portion RHS) at ch 0:00
44 00 PM Sr.
dia upvc 0+028.80 AM
Engineer
S.
Inspection for
SL road crossing duct BalaJi,D.
HFC- excavation and Duct no- 011.3
001 no SL-35 (Half portion Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/24/2015
SL prepared formation for SL-35 0:00
RHS) at ch 0+035.809 00 PM Sr.
4wx100mm dia upvc AM
Engineer
S.
Inspection and joint
SL road crossing duct BalaJi,D.
HFC- measurement of pipe Duct no- 011.3
002 no SL-35 (Half portion Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/8/2015
SL laying for 4wx100mm SL-35 0:00
RHS) at ch 0+035.809 00 PM Sr.
dia upvc AM
Engineer
S.
Inspection for
SL road crossing duct BalaJi,D.
HFC- excavation and Duct no- 011.3
003 no SL-34 (Half portion Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, A 2/24/2015
SL prepared formation for SL-34 0:00
RHS) at ch 0+060.121 00 PM Sr.
4wx100mm dia upvc AM
Engineer
S.
Inspection and joint
SL road crossing duct BalaJi,D.
HFC- measurent of pipe Duct no- 011.3
004 no SL-34 (Half portion Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/11/2015
SL laying for 4wx100mm SL-34 0:00
RHS) at ch 0+060.121 00 PM Sr.
dia upvc AM
Engineer
S.
Inspection for
for Irrigation isolation BalaJi,D.
HFC- intallation of IV- 09, 011.3
0329 valve chamber no IV- Area 1 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/10/2015
IRR DN150mm dia gate 0+735.037 0:00
09 00 PM Sr.
valve AM
Engineer
S.
Inspection of
Irrigation isolation BalaJi,D.
HFC- dismantling joint for IV- 09, 011.3
0330 valve chamber no IV- Area 1 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/10/2015
IRR DN150mm dia gate 0+735.037 0:00
09 00 PM Sr.
valve for AM
Engineer
S.
Inspection for
fire fighting line from BalaJi,D.
HFC- excavation and 0+050 to 011.3
0281 chanaige 0+050 to Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, A 2/24/2015
FF prepared formation for 0+090 0:00
0+090 line-1 00 PM Sr.
250 mm dia HDPE AM
Engineer
S.
Inspection and joint
fire fighting line from BalaJi,D.
HFC- measurement of pipe 0+050 to 011.3
0282 chanaige 0+050 to Area 5 4-Feb-15 04.30: 4-Feb-15 Suresh, Revised 2/9/2015
FF laying for 250 mm dia 0+100 0:00
0+100 line-1 00 PM Sr.
HDPE AM
Engineer
S.
Inspection for fire fighting line from BalaJi,D.
HFC- 1+180 to 011.3
0283 pressure test for 250 chanaige 1+180 to Area 9 4-Feb-15 04.30: 4-Feb-15 Suresh, Revised 2/9/2015
FF 1+640 0:00
mm dia HDPE 1+640 00 PM Sr.
AM
Engineer
S.
Inspection for fire fighting line from BalaJi,D.
HFC- 3+360 to 011.3
0284 pressure test for 250 chanaige 3+360 to Area 6 4-Feb-15 04.30: 4-Feb-15 Suresh, Revised 2/9/2015
FF 3+810 0:00
mm dia HDPE 3+810 00 PM Sr.
AM
Engineer
S.
Inspection & joint
Irrigation line from 0+052 to BalaJi,D.
HFC- measurement of pipe 011.3
0331 chainage 0+052 to Area 5 0+090 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/9/2015
IRR laying for 250 mm dia 0:00
0+090 ( line-3) ( line-3) 00 PM Sr.
upvc AM
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection & joint
Irrigation line from BalaJi,D.
HFC- measurement of pipe 0+110 to 011.3
0332 chainage 0+110 to Area 4 4-Feb-15 04.30: 4-Feb-15 Suresh, AN 2/11/2015
IRR laying for 150 mm dia 0+170 0:00
0+170 00 PM Sr.
upvc AM
Engineer
0+880 to S.
Inspection & joint Irrigation line from
(recover of deduction 0+884.80 BalaJi,D.
HFC- measurement of pipe chainage 0+880 to
0295A chainage, copy Area 1 & 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/11/2015
IRR laying for 150 mm dia 0+884.80 & 0+897.55
attached) 0+897.55 00 PM 00 AM Sr.
upvc to 0+904
to 0+904 Engineer
S.
Inspection for 11th for fire fighting &
Irrigatio Irrigation BalaJi,D.
HFC- layer surrounding irrigation reservoir
0266A n pump pump 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/24/2015
IRR back filling for the and pumping station
station station 00 PM 00 AM Sr.
wall of W1 W1 (Length 32.2 m)
Engineer
S.
Inspection for shutter, of air valve chamber BalaJi,D.
HFC- Yard AV-3 & AV-
0281A reinforcement & for 250mm dia upvc AV-3 & AV-4 ` 01.30: 5-Feb-15 08.30: Suresh, A 2/25/2015
IRR Area 4
concreting for the wall Irrigation line 00 PM 00 AM Sr.
Engineer
Inspection of shutter, S.
reinforcement & BalaJi,D.
HFC- 250 mm dia HDPE fire gate valve chamber IV-16 & IV-
0285 concreting of base Area 7 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, A 3/19/2015
FF fighting line no-IV-16 & IV-18 18
for gate valve 00 PM 00 AM Sr.
chambner of Engineer
S.
Inspection and joint
fire fighting line from BalaJi,D.
HFC- measurement of pipe 1+730 to
0286 chanaige 1+730 to Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
FF laying for 250 mm dia 1+920
1+920 00 PM 00 AM Sr.
HDPE
Engineer
S.
Inspection of sand
BalaJi,D.
HFC- surround for 250 mm from ch 1+420 to 1+420 to
0287 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
FF dia HDPE fire fighting 1+940 1+940
00 PM 00 AM Sr.
line
Engineer
S.
Visual Inspection of
BalaJi,D.
HFC- 1st layer back filling from ch 1+420 to 1+420 to
0288 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
FF for 250 mm dia HDPE 1+940 1+940
00 PM 00 AM Sr.
fire fighting line
Engineer
S.
Visual Inspection of
BalaJi,D.
HFC- 2nd layer back filling from ch 1+420 to 1+420 to
0289 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
FF for 250 mm dia HDPE 1+940 1+940
00 PM 00 AM Sr.
fire fighting line
Engineer
S.
Inspection for
Irrigation line from BalaJi,D.
HFC- excavation and (recover missed 0+950 to
0333 chainage 0+950 to Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/11/2015
IRR prepared formation for chainage) 0+980
0+980 00 PM 00 AM Sr.
200 mm dia upvc
Engineer
S.
Inspection & joint
Irrigation line from BalaJi,D.
HFC- measurement of pipe (recoverof deduction 0+950 to
0334 chainage 0+950 to Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
IRR laying for 200 mm dia chainage) 0+970
0+970 00 PM 00 AM Sr.
upvc
Engineer
S.
Visual Inspection of Irrigation line from BalaJi,D.
HFC- 0+510 to
0335 1st layer back filling chainage 0+510 to Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
IRR 0+980
for 250 mm dia upvc 0+980 00 PM 00 AM Sr.
Engineer
S.
Visual Inspection of Irrigation line from BalaJi,D.
HFC- 0+510 to
0336 2nd back filling for chainage 0+510 to Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
IRR 0+980
250 mm dia upvc 0+980 00 PM 00 AM Sr.
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Visual Inspection of
BalaJi,D.
HFC- 2nd layer back filling from Chainage 2+610 2+610 to
0286 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/10/2015
WD for 100 mm dia GRE to 3+320 3+320
00 PM 00 AM Sr.
water line
Engineer
S.
200 mm dia upvc BalaJi,D.
HFC- Inspection for 12th MH -13 to
1918 sewer line from MH Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling for MH-12
-13 to MH-12 00 PM 00 AM Sr.
Engineer
S.
Inspection of 12th
BalaJi,D.
HFC- layer back filling for From MH-13 to MH- MH-13 to
1919 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
Inspection of 12th
BalaJi,D.
HFC- layer back filling for From MH-15 to MH- MH-15 to
1920 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW 200 mm dia upvc 14 MH-14
00 PM 00 AM Sr.
sewer line
Engineer
S.
inspection for 10th
BalaJi,D.
HFC- layer back filling for MH: 3 to
1921 from MH: 3 to MH: 4 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW 200 mm dia Upvc MH: 4
00 PM 00 AM Sr.
sewer line
Engineer
S.
inspection for 10th
200 mm dia upvc BalaJi,D.
HFC- layer back filling for MH -5 to
1922 sewer line from MH Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW 200 mm dia Upvc MH-6
-5 to MH-6 00 PM 00 AM Sr.
sewer line
Engineer
S.
200mm dia upvc BalaJi,D.
HFC- Inspection for 9th MH: 4 to
1923 sewer line from MH-4 Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling for MH: 5
to MH-5 00 PM 00 AM Sr.
Engineer
MH -6 ,CH S.
200 mm dia upvc 0+968.96 BalaJi,D.
HFC- Inspection for 9th
1924 sewer line from MH-6 Area 6 to MH-7, 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW layer back filling for
to NH- 7 CH 00 PM 00 AM Sr.
1+032.78 Engineer
S.
Inspection for placing
BalaJi,D.
HFC- & fixing precasted of 250 mm dia HDPE
0290 Area 6 AV-2 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (base& wall) of air fire fighting line
00 PM 00 AM Sr.
valve chamber (AV-2)
Engineer
S.
Inspection for placing of washout chamber BalaJi,D.
HFC- 2+240
0291 & fixing precasted (wo-3) for 250 mm dia Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (W0-3)
(base along with wall) HDPE fire fighting line 00 PM 00 AM Sr.
Engineer
Inspection for placing S.
& fixing precasted BalaJi,D.
HFC- of 250 mm dia HDPE 2+600
0292 (base along with Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF fire fighting line (Wo-04)
wall)of washout 00 PM 00 AM Sr.
chamber (wo-4) Engineer
S.
Inspection for placing
gate valve chamber BalaJi,D.
HFC- & fixing precasted
0293 for 250 mm dia HDPE Gate valve no IV-25 Area 6 IV-25 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (base along with
fire fighting line 00 PM 00 AM Sr.
wall)of
Engineer
S.
Inspection for placing
gate valve chamber BalaJi,D.
HFC- & fixing precasted
0294 for 250 mm dia HDPE Gate valve no IV-26 Area 6 IV-26 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (base along with
fire fighting line 00 PM 00 AM Sr.
wall)of
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for placing
gate valve chamber BalaJi,D.
HFC- & fixing precasted
0295 for 250 mm dia HDPE Gate valve no IV-27 Area 6 IV-27 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (base along with
fire fighting line 00 PM 00 AM Sr.
wall)of
Engineer
S.
Inspection for placing
gate valve chamber BalaJi,D.
HFC- & fixing precasted
0296 for 250 mm dia HDPE Gate valve no IV-28 Area 6 IV-28 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
FF (base along with
fire fighting line 00 PM 00 AM Sr.
wall)of
Engineer
S.
Irrigation road
Inspection of sand BalaJi,D.
HFC- crossing duct no IRR- Duct no-
0337 surround for Area 5 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
IRR 61 (Half portion RHS) IRR-061
1wx300mm dia upvc 00 PM 00 AM Sr.
at ch 0+029.802
Engineer
S.
Irrigation road
Inspection of sand BalaJi,D.
HFC- crossing duct no IRR- Duct no-
0338 surround for Area 5 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
IRR 62 (Half portion RHS) IRR-062
1wx300mm dia upvc 00 PM 00 AM Sr.
at ch 0+005.67
Engineer
S.
Inspection of sand SL road crossing duct BalaJi,D.
HFC- Duct no-
005 surround for no SL-35 (Half portion Area 5 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
SL SL-35
4wx100mm dia upvc RHS) at ch 0+035.809 00 PM 00 AM Sr.
Engineer
S.
Inspection of sand SL road crossing duct BalaJi,D.
HFC- Duct no-
006 surround for no SL-34 (Half portion Area 5 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/15/2015
SL SL-34
4wx100mm dia upvc RHS) at ch 0+060.121 00 PM 00 AM Sr.
Engineer
S.
Inspection of sand Electric road crossing
BalaJi,D.
HFC- surround for duct no Ele-43 (Half Duct no-
0019 Area 5 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
ED 4wx150mm dia upvc portion RHS) at ch ELE-43
00 PM 00 AM Sr.
(11kv) 0+034.808
Engineer
S.
LV road crossing duct
Inspection for sand Duct no- BalaJi,D.
HFC- no Ele(LV)-44 (Half
0020 surround for Area 5 ELE(LV)- 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 2/10/2015
ED portion RHS) at ch
4wx150mm dia upvc 44 00 PM 00 AM Sr.
0+028.80
Engineer

HC-
01(MH-
S.
HC-01(MH-8.1),HC- 8.1),HC-1&
Inspection for blinding house connection BalaJi,D.
HFC- 1& HC-02 of (MH-8.2) HC-02 of
1925 concrete for house chambers of MH-8.1, Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, Revised 2/9/2015
SEW & HC-1& HC-02 of (MH-8.2) &
connection chambers MH-8.2 & MH-8.3 00 PM 00 AM Sr.
(MH-8.3) HC-1&
Engineer
HC-02 of
(MH-8.3)

HC-
01(MH-
S.
HC-01(MH-8.1),HC- 8.1),HC-1&
Inspection of house connection BalaJi,D.
HFC- 1& HC-02 of (MH-8.2) HC-02 of
1926 shutter ,concreting for chambers of MH- Area 6 5-Feb-15 01.30: 5-Feb-15 08.30: Suresh, AN 4/14/2015
SEW & HC-1& HC-02 of (MH-8.2) &
the base of 8.1,8.2,8.3 00 PM 00 AM Sr.
(MH-8.3) HC-1&
Engineer
HC-02 of
(MH-8.3)

sewer House S.
HC-04 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-04 to MH- from HC-02 to MH- MH-15 &
1927 excavation and mm dia Upvc of Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW 15 15 HC-02 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
MH-15
15 Engineer
sewer House S.
HC-01 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-03 to HC- HC-02 &
1928 excavation and mm dia Upvc of from HC-01 to HC-02 Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW 04 HC-03 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
HC-04
15 Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

sewer House S.
HC-01 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to end end cap &
1929 excavation and mm dia Upvc of from HC-02 to end Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW cap HC-02 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end
15 Engineer
sewer House S.
HC-03 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-03 to end end cap &
1930 excavation and mm dia Upvc of from HC-04 to end Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW cap HC-04 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end
15 Engineer
S.
sewer House HC-01,HC-
Inspection for BalaJi,D.
HFC- connection chambers HC-01,HC-02,HC- 02,HC-
1931 excavation and Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW of Sewer Manhole 03,HC-04 (MH-15) 03,HC-04
prepared formation for 00 PM 00 AM Sr.
MH-15 (MH-15)
Engineer
Inspection for S.
granular bedding, for connection portion of 700mm dia GRP MH BalaJi,D.
HFC- of pipe laying and
0363 laying of (including st. specials Storm water liner Area 5 2.1,0+000. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, Revised 2/9/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-2.1 873 00 PM 00 AM Sr.
measurement Engineer
Inspection for S.
granular bedding, for connection portion of 700mm dia GRP MH -1.10, BalaJi,D.
HFC- of pipe laying and
0364 laying of (including st. specials Storm water liner Area 7 0+488.582 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, AN 2/10/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-1.10 7 00 PM 00 AM Sr.
measurement Engineer
Inspection for S.
granular bedding, for connection portion of 315mm dia upvc MH BalaJi,D.
HFC- of pipe laying and
0365 laying of (including st. specials Storm water liner Area 5 3.0,0+133. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, AN 2/10/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-3..0 2178 00 PM 00 AM Sr.
measurement Engineer
Inspection for S.
granular bedding, for connection portion of 315mm dia upvc MH- BalaJi,D.
HFC- of pipe laying and
0366 laying of (including st. specials Storm water liner Area 5 3.1,0+085. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, AN 2/10/2015
DR gravel surrounding
geotextile,joint 2nos) line to MH-3.1 8111 00 PM 00 AM Sr.
measurement Engineer
S.
Inspection for of Storm water MH BalaJi,D.
HFC-
0367 excavation & drainage manhole Area 8 2.1,0+000. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, Revised 2/8/2015
DR
prepared formation MH-2.1 873 00 PM 00 AM Sr.
Engineer
S.
for Storm water MH BalaJi,D.
HFC- Inspection for blinding
0368 drainage manhole Area 8 2.1,0+000. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, Revised 2/8/2015
DR concrete
MH-2.1 873 00 PM 00 AM Sr.
Engineer
S.
of Storm water MH BalaJi,D.
HFC- Inspection for placing
0369 drainage manhole Area 8 2.1,0+000. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, Revised 2/9/2015
DR & fixing base of
MH-2.1 873 00 PM 00 AM Sr.
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back filling for from MH-1.5 to MH- MH-1.5 to
0370 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
DR storm water line 500 1.4 MH-1.4
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back filling for from MH 1.6 to MH MH 1.6 to
0371 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
DR storm water line 500 1.5 MH-1.5
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back fillimg for from MH 1.6 to MH MH 1.6 to
0372 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
DR storm water line 500 1.7 MH-1.7
00 PM 00 AM Sr.
mm dia GRP
Engineer

A Dutco Balfour Beatty Company WI PM 015/May 2014


PROJECT: DPDP-PR-5005 : ISLAND-2 INFRASTRUCTURE WORKS (AC7198)
INSPECTION REQUEST LOG

IR REQUESTS 0 inspection submission


IR no BOQ description of line 2 line 3 line 4 line 5 line 6 chainage BFRL date time date time originator status date received
8008

item works

S.
Inspection for 4th
BalaJi,D.
HFC- layer back filling for from MH 1.8 to MH MH 1.8 to
0373 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 3/2/2015
DR storm water line 600 1.9 MH-1.9
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back filling for from MH 1.8 to MH MH 1.8 to
0374 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
DR storm water line 500 1.7 MH-1.7
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back filling for from MH 1.10 to MH MH 1.10 to
0375 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 3/2/2015
DR storm water line 700 1.11 MH-1.11
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection for 4th
BalaJi,D.
HFC- layer back fillig for from MH 1.10 to MH MH 1.10 to
0376 Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, AN 3/2/2015
DR storm water line 600 1.9 MH-1.9
00 PM 00 AM Sr.
mm dia GRP
Engineer
S.
Inspection of shutter MH -1.7, BalaJi,D.
HFC- Storm water drainage
0377 & concreting for the Area 7 0+566.751 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 3/18/2015
DR MH 1.7
wall of 7 00 PM 00 AM Sr.
Engineer
S.
Inspection of shutter MH -1.6, BalaJi,D.
HFC- Storm water drainage
0378 & concreting for the Area 7 0+604.581 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 3/18/2015
DR MH 1.6
wall of 7 00 PM 00 AM Sr.
Engineer
S.
Inspection of shutter BalaJi,D.
HFC- Storm water drainage MH -1.8,
0379 & concreting for the Area 7 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 3/18/2015
DR MH 1.8 0+528.952
wall of 00 PM 00 AM Sr.
Engineer
S.
Inspection of shutter MH BalaJi,D.
HFC- Storm water drainage
0380 & concreting for the Area 7 2.9,0+081. 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, AN 4/14/2015
DR MH 2.9
wall of 7331 00 PM 00 AM Sr.
Engineer
sewer House S.
HC-01 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to HC-02 from HC-03 to HC- HC-02 &
1932 excavation and mm dia Upvc of Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW (MH-14) 04 (MH-14) HC-03 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
HC-04
14 Engineer
sewer House S.
HC-01 to
Inspection for connection line 160 BalaJi,D.
HFC- from HC-01 to end from HC-02 to end end cap &
1933 excavation and mm dia Upvc of Area 6 7-Feb-15 01.30: 7-Feb-15 08.30: Suresh, A 2/24/2015
SEW cap (MH-14) (MH-14) HC-02 to
prepared formation for Sewer Manhole MH- 00 PM 00 AM Sr.
end
14 Engineer
sewer House S.