The document outlines a proposed simplified process for obtaining construction permits for small-scale non-residential projects in Kuala Lumpur. The process involves 6 procedures that can be completed within 27 days. It applies to projects that meet 11 criteria, such as being a free-standing commercial or factory building, complying with city planning requirements, and having utilities like electricity, water, and telecommunications nearby. The procedures include gathering data, obtaining development plans, notification, final inspections, and depositing necessary certificates. The goal is to streamline the existing process to reduce time and costs for small construction projects.
The document outlines a proposed simplified process for obtaining construction permits for small-scale non-residential projects in Kuala Lumpur. The process involves 6 procedures that can be completed within 27 days. It applies to projects that meet 11 criteria, such as being a free-standing commercial or factory building, complying with city planning requirements, and having utilities like electricity, water, and telecommunications nearby. The procedures include gathering data, obtaining development plans, notification, final inspections, and depositing necessary certificates. The goal is to streamline the existing process to reduce time and costs for small construction projects.
The document outlines a proposed simplified process for obtaining construction permits for small-scale non-residential projects in Kuala Lumpur. The process involves 6 procedures that can be completed within 27 days. It applies to projects that meet 11 criteria, such as being a free-standing commercial or factory building, complying with city planning requirements, and having utilities like electricity, water, and telecommunications nearby. The procedures include gathering data, obtaining development plans, notification, final inspections, and depositing necessary certificates. The goal is to streamline the existing process to reduce time and costs for small construction projects.
working model in Dealing with Construction Permits in
Kuala Lumpur for small scale non-residential projects PROCEDURE AND PROCESSING TIME that simplify and reduces the number of existing Process 1 : Data Gathering procedures, time and cost. Process 4 : Final Inspection for connection to utilities and issuance of clearances for CCC 11 CRITERIA OF OSC 1SUBMISSION 3 Procedures - 11 days
1 Small Scale Non- 6 Not within the
Residential Project : Heritage Zone Free Standing Commercial Building : Office, Retail, Fast Development should 7 Food Outlet, Showroom not be entitle for Free Standing Factory strata Building:Factory, Warehouse Process 2 : Request and Obtain for Development Proposal Plans Terrace Building/Shop Lot : 8 Estimated water 1 Procedure - 14 days Office, Retail, Fast Food consumption not more than Outlet, Showroom 10,000 litres perday. Terrace Building/Shop Lot : Distance not more than 30m Factory Warehouse from the main supply with Tadika/Taska maximum pipe diameter of Community Building 150mm (Multi Purpose Hall) Petrol Station Estimated electricity 9 TNB Substation (Not exceeding consumption not 2 storeys) more than 1000kVA (kilo volt amps) Distance not more 2 In compliance with Kuala than 500m from power Lumpur City Plan 2020 source
Conform with the Process 5 : Deposit of CCC and G Form
3 10 Availability of public expressed conditions in sewerage line nearby 1 Procedures - 1 days the land title or provide individual septic 4 Does not require land tank (150 PE) enhance value 11 Availability of 5 Development on flat telecommunication Process 3 : Notificatio1 land (Class 1 Slope) network Procedure - 1 day