Вы находитесь на странице: 1из 3

Tel: +44 (0) 115 983 2304

Email: enquiries@hardstaffbarriers.com www.hardstaffbarriers.com

TEMPORARY
SYSTEM

Multibloc
TVCB Features & Benefits
Multibloc TVCBs are designed to deflect an T emporary system consisting of 3-metre
errant vehicle away from local hazards within long concrete barriers
or immediately adjacent to the highway which System provides N2/W3 containment
have the potential to cause danger to the
 24 threaded sockets cast into the barrier
M
occupants of an errant vehicle, the workforce, allow for a multitude of uses
or others.
S ymmetrical in cross section can be
Intermediate barriers (V28) are symmetrical in cross-section turned over for use in verge and central
and by turning them upside down can be used for either reservation applications
verge or central reserve applications.
 ighways England approved system
H
Barriers should be aligned according to the direction of tested in accordance with EN-1317-2
the traffic flow, using the directional arrow cast in the face
for orientation.

End taper units are handed, being specific to Verge


Applications (V29) or Central Reserve Applications (V30).
Specifications Customer
WIDTH
MULTIBLOC
450mm
comments
LENGTH 3000mm (effective)
The installation exceeded
HEIGHT 800mm
my expectations with
WEIGHT 2500kg good organisation and a
very professional and hard
working workforce. All these
things combined resulted in
us completing a day ahead
of schedule so well done to
everybody involved.

Simon Younge, Costain

Hardstaff Barriers are


certainly a company to be
recommended and one
I look forward to doing

About Hardstaff Barriers business with again.

John Hewitt, BT
Hardstaff Barriers has a wealth of experience combining
over 20 years worth of expertise in the supply and provision
I would like to thank all
of concrete safety barriers and associated products.
involved for what was
This expertise has been developed through working achieved yesterday.
on a range of projects across a broad raft of industries. Great communication by
Our Multibloc and Multifence systems have been used all over the course of the
effectively to meet the requirements of our customers. day from start to finish.
Job well done.
Below is a sample of some of the projects on which our barriers
have been successfully utilised: David Hughes, BBMM JV

M6 Toll Road Scheme


A2/M25 Improvement Scheme
M1 J28-31 Smart Motorways
A50 Stoke Improvements Tel: +44 (0) 115 983 2304
Email: enquiries@
A1(M) Widening Scheme hardstaffbarriers.com
www.hardstaffbarriers.com
M25 Various projects
Head Office:
A453 Widening Scheme Hardstaff Barriers Limited,
Hillside, Gotham Road, Kingston-
on-Soar, Nottingham, NG11 0DF
Rockingham Race Track
Registered Office:
Trooping the Colour 5th Floor, 10 St Bride Street,
London, EC4A 4AD

Вам также может понравиться