11. DETAILED TASKS : 12. WORK UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE
ASSIGNED TASKS ASSIGNED.
01. Name of Assignment or Project: making the evaluation report of high speed
railway line (from Ha Noi to Ho Chi Minh city)
- Review the Highway Year: Dec.2008 – date
structure designs including: Location: Vietnam
bridges, culverts, retaining Client: VNR
structures. Main Project Features: the first high-speed railway line in Viet Nam (HSR), this project is
- Proposal necessary divided into 2 or 3 phases, in the 1st phase, the Vietnamese government will built 500km
changes in design If from hanoi to Vinh (or Hue)
needed Positions Held: specialist in railway/highway and bridge
Activities Performed: review the proposed alternative of making investment report
consultant, specially in railway, highway and bridge and relevant cost estimation. Making
the report to the main consultant (TONICHI from Japan)
02. Name of Assignment or Project: remove the Phan Thiet station from Phan
Thiet city
Year: Dec.2008 – date
Location: Vietnam
Client: VNR
Main Project Features: built the new railway line for the purpose of removing the Phan
Thiet station from Phan Thiet city
Positions Held: team leader
Activities Performed: contact to the local authorities, connect the separated group
(topography, geological, design group), review the design drawing, explain the owner’s
requirement
06. Name of Assignment or Project: Ha Noi elevated railway Ngoc Hoi – Yen Vien
Year: 01/2006 – 12/2006
Location: Vietnam
Client: VNR
Main Project Features: FS (Investment project for construction of works) – preliminary
design
Positions Held: Highway and bridge Engineer/Specialist in common work
Activities Performed: Responsibility for structural design group. Responsibility for
commentary. Receive and answer the request or Owner’s letter.
08. Name of Assignment or Project: Ha Noi elevated railway Ngoc Hoi – Yen Vien
Year: 09/2005 – 12/2005
Location: Vietnam
Client: VNR
Main Project Features: Pre Feasibility Studies – preliminary design
Positions Held: Structure engineer (Japan Transport Company (JTC) in association
with Vietnam Railway Investment and Construction Consultant Company
(VRICCC)
Activities Performed: Design and Responsible for elevated structure (including of PC
box, T beam, continued PC box, steel truss, pier, abutment, bored pile, retaining wall...).
Design the execution method.
09. Name of Assignment or Project: Yen Vien - Pha Lai - Ha Long - Cai Lan
harbour (Package2: Lim - Pha Lai)
Year: 03/2005 – 09/2005
Location: Vietnam
Client: MOT
Main Project Features: Technical design
Positions Held: Structure engineer
Activities Performed: Design and Responsible for main bridge (including of 2 continuous
steel bridge 80+80+80 and 80+100+80, pier, bored pile). Design the execution method
of main bridge
13. Name of Assignment or Project: Yen Vien - Pha Lai - Ha Long - Cai Lan
harbour (Package1:Ha Long-Cai Lan and BanCo bridge)
Year: 09/2004 – 11/2004
Location: Vietnam
Client: VNR
Main Project Features: Technical design
Positions Held: Structure engineer
Activities Performed: Design the steel arch bridge (in Ban Co bridge it’s the 1st time
using the direct fastening of rail). Design the execution method
13. CERTIFICATION
I, the undersigned, certify to the best of my knowledge and belief that
(i) this CV correctly describes my qualifications and my experience;
(ii) I am not employed by the Executing /Implementing Agency;
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs
specified for me in the Personnel Schedule in Form TECH-6 provided team mobilization takes place within the
validity of this proposal or any agreed extension thereof;
(iv) I am committed to undertake the assignment within the validity of Proposal;
(v) I am not part of the team who wrote the terms of reference for this consulting services assignment;
(vi) I am not sanctioned (ineligible for engagement) by ADB.
I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date: / 05 / 2009
Signature of expert or authorized representative of the firm Day/Month/Year