Академический Документы
Профессиональный Документы
Культура Документы
017 MAY 2017 - - 3-way light too far from stairs - x - capping not yet installed
TZA2-0463 PORTIA Herlyns x - coupling broken on service area MAY 2017 - - 3-way light too far from stairs - x - leak on gutter (corner)
TZA2-0464 PORTIA Herlyns 1 MAY 2017 MAY 2017 1 MAY 2017 MAY 2017 - x - leak on gutter
TZA2-0465 PORTIA Herlyns x - leak on GF WC elbow MAY 2017 1 no plate cover for all ACU MAY 2017 MAY 2017 - 1
TZA2-0466 PORTIA Herlyns 1 MAY 2017 MAY 2017 1 MAY 2017 MAY 2017 - x - leak on gutter
- leak on gutter
TZA2-0467 PORTIA Herlyns x - leak on joint going to 2F (from zocalo to wall panel) MAY 2017 1 MAY 2017 MAY 2017 - x - leak on ceiling (near capping)
TZA2-0468 PORTIA Herlyns 1 MAY 2017 MAY 2017 - - 1
TZA2-0469 PORTIA Herlyns 1 MAY 2017 MAY 2017 - - 1
TZA2-0470 PORTIA Herlyns 1 MAY 2017 MAY 2017 - - 1
TZA2-0471 PORTIA Herlyns 1 MAY 2017 MAY 2017 - - 1
TZA2-0462 PORTIA Herlyns 1 - - 3-way light too far from stairs - x - capping not yet installed
TZA2-0463 PORTIA Herlyns x - coupling broken on service area - - 3-way light too far from stairs - x - leak on gutter (corner)
TZA2-0464 PORTIA Herlyns 1 1 - x - leak on gutter
TZA2-0465 PORTIA Herlyns x - leak on GF WC elbow 1 no plate cover for all ACU - 1
TZA2-0467 PORTIA Herlyns x - leak on joint going to 2F (from zocalo to wall panel) 1 - x - leak on gutter
- leak on ceiling (near capping)
TZA2-0468 PORTIA Herlyns 1 - - 1
TZA2-0469 PORTIA Herlyns 1 - - 1
TZA2-0470 PORTIA Herlyns 1 - - 1
TZA2-0471 PORTIA Herlyns 1 - - 1
TZA2-0462 PORTIA Herlyns 1 - - 3-way light too far from stairs - x - capping not yet installed
TZA2-0463 PORTIA Herlyns x - coupling broken on service area - - 3-way light too far from stairs - x - leak on gutter (corner)
TZA2-0464 PORTIA Herlyns 1 1 - x - leak on gutter
TZA2-0465 PORTIA Herlyns x - leak on GF WC elbow 1 no plate cover for all ACU - 1
TZA2-0467 PORTIA Herlyns x - leak on joint going to 2F (from zocalo to wall panel) 1 - x - leak on gutter
- leak on ceiling (near capping)
TZA2-0468 PORTIA Herlyns 1 - - 1
TZA2-0469 PORTIA Herlyns 1 - - 1
TZA2-0470 PORTIA Herlyns 1 - - 1
TZA2-0471 PORTIA Herlyns 1 - - 1
CMD - Electrical, Plumbing & Sanitary Activities Monitoring Report (NOC for April 15, 2017)
AS OF: 01-Sep-17
130 TZA1-0308 PORTIA Globalaire 1 1 - 2F CR SW protruded x - 1st floor : WC & WC angle valve with leak x - leak on gutter APRIL 2017
- 2nd floor : WC & WC angle valve with leak - leak on roof capping
131 TZA1-0309 PORTIA Globalaire 1 1 x - 1st floor : WC with leak; lavatory with leak 1 APRIL 2017
- 3-way SW GF protruded - 1st floor : lavatory p-trap with leak; lavatory angle valve with leak; kitchen - leak on gutter
132 TZA1-0310 PORTIA Globalaire 1 1 - CO @ 2F BR no cover plate x x APRIL 2017
sink faucet with leak - leak on roof capping
- no receptacle @ service area
- 1st floor : WC angle valve with leak; kitchen sink faucet clogged; WC has low - leak on gutter
133 TZA1-0311 PORTIA Globalaire 1 1 x water pressure x APRIL 2017
- 2nd floor : 2-way faucet with leak - leak on downspout pipe
134 TZA1-0312 PORTIA Globalaire 1 1 - SW @ PR protruded x - no water supply on 2nd floor CR (major) - APRIL 2017
- 1st floor : lavatory p-trap with leak; kitchen p-trap with leak; leak on CR floor
135 TZA1-0313 PORTIA Globalaire 1 1 - no plate cover on 3-way GF SW x near WC (major) x - leak on gutter APRIL 2017
- 2nd floor : 2-way faucet has no water pressure
136 TZA1-0314 PORTIA Globalaire 1 1 - CO @ 2F MB protruded x - 1st floor : kitchen sink with leak; WC with leak; leak on CR floor (major) - APRIL 2017
- 1st floor : lavatory p-trap with leak; WC angle valve with leak; kitchen sink
137 TZA1-0315 PORTIA Globalaire 1 1 x faucet clogged x - leak on gutter APRIL 2017
- 2nd floor : WC angle valve with leak
138 TZA1-0316 PORTIA Globalaire 1 1 - SW 2F CR protruded x - 1st floor : lavatory p-trap with leak; leak on CR floor when flushing (major); - APRIL 2017
- CO @ 2F BR protruded - 2nd floor : leak on CR floor near angle valve (major)
139 TZA1-0317 PORTIA Globalaire 1 1 - CO @ kitchen protruded x - 1st floor : WC hose bibb with leak x - leak on gutters APRIL 2017
- 2nd floor : low water pressure
- 3-way SW GF protruded
140 TZA1-0318 PORTIA Globalaire 1 1 - CO @ GF GR protruded x - 1st floor : lavatory p-trap with leak - APRIL 2017
- CO @ 2F BR protruded - 1st floor : lavatory p-trap with leak, WC anglve valve with leak; kitchen sink p-
142 TZA1-0320 PORTIA Globalaire 1 1 x trap with leak - APRIL 2017
- CO @ GF GR protruded - 2nd floor : lavatory p-trap with leak
143 TZA1-0321 PORTIA Globalaire 1 1 - CO @ 2F MB no plate cover 1 x - leak on gutter APRIL 2017
- no ACU outlet @ 2F BR
- 1st floor : lavatory angle valve with leak; kitchen sink p-trap with leak; service
144 TZA1-0322 PORTIA Globalaire 1 1 - CO @ 2F BR protruded x area hose bibb hard to open; WC fittings with leak; leak on CR floor (major) - APRIL 2017
- 2nd floor : shower has low water pressure
386 TZA1-0643 TRICIA Globalaire 1 1 1 - service area hose bibb waterline clogged 1 APRIL 2017
387 TZA1-0644 TRICIA Globalaire 1 1 1 - kitchen sink p-trap with leak 1 APRIL 2017
- restroom with leak on slab
- 1st floor : leak on floor tiles near WC angle valve - leak on gutter joints
739 TZA2-0149 PORTIA Lobingco 1 1 - no utility boxes on dry wall partition x x APRIL 2017
- 2nd floor : WC and lavatory with low water pressure - leak on ceiling eaves (front near window)
- no utility boxes on dry wall partition - 1st floor : kitchen sink p-trap and pipe with leak; lavatory with leak; WC angle
740 TZA2-0150 PORTIA Lobingco 1 1 x valve with leak - APRIL 2017
- 2F MB SW protruded - 2nd floor : lavatory p-trap with leak; no water supply on 2-way faucet
741 TZA2-0151 PORTIA Lobingco 1 1 - GF SW (stairs) & SW @2F BR1 protruded - x - leak on gutter MAY 2017
- short flushing
- leak on gutter
742 TZA2-0152 PORTIA Lobingco 1 1 - living room SW protruded - x - short flushing MAY 2017
- 1st floor : leak on WC; damaged faucet; service area faucet needs adaptor
103 TZA1-0217 PORTIA GNB Builders 1 1 - no utility boxes on dry wall partition x - 2nd floor : leak on lavatory p-trap; telephone shower not yet installed x not yet requested for testing MARCH 2017
- 1st floor : leak on lavatory angle valve; leak on WC angle valve - leak on roof lapping
106 TZA1-0220 PORTIA GNB Builders 1 1 x - 2nd floor : low water supply on lavatory & 2-way faucet x - leak on gutter MARCH 2017
726 TZA2-0136 PORTIA GNB Builders 1 1 - no utility boxes on dry wall partition x - 2nd floor : toilet door locked - APRIL 2017
- 3-way 2F SW not fixed - 1st floor : lavatory with leak on threaded elbow - leak on roof lapping
728 TZA2-0138 PORTIA GNB Builders 1 1 - SW @ 2F MB not fixed x x MARCH 2017
- CO @ 2F BR not fixed - 2nd floor : no water supply - leak on gutter
869 TZA2-0333 PORTIA GNB Builders x leak on joint going to 2F CR (GF wall) - - x - leak on gutter joint (front) MAY 2017
871 TZA2-0335 PORTIA GNB Builders - - - x - leak on gutter joint (front) MAY 2017
73 TZA1-0173 PORTIA Ren-C x - leak between SF-01 (CR) & GF-02 panel - - - APRIL 2017
74 TZA1-0174 PORTIA Ren-C 1 - - - APRIL 2017
75 TZA1-0175 PORTIA Ren-C x - main supply pipe not yet fixed - - - APRIL 2017
76 TZA1-0176 PORTIA Ren-C - - - - MAY 2017
77 TZA1-0177 PORTIA Ren-C - - - - MAY 2017
- 2nd floor water closet supply hose with leak
113 TZA1-0227 PORTIA Ren-C 1 1 x - 2nd floor lavatory 2" pipe with leak 1 MARCH 2017
878 TZA2-0342 PORTIA Ren-C 1 1 - plate covers not yet fixed x - 1st floor : leak on kitchen sink p-trap; leak on lavatory p-trap; LWP on WC - APRIL 2017
- 2nd floor : leak on lavatory p-trap