Вы находитесь на странице: 1из 19

THIS SUBMISSION IS DECLARED TO BE SIGNATURE:

STRICTLY IN ACCORDANCE WITH THE PHASE - 12


REQUIREMENTS OF THE CONTRACT

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE - 12 SUBSTATIONS


PACKAGES S1, S2, S6 & S7
CONTRACT No. GTC/643A/2014

CONSULTANT:

ENERGOPROJEKT-ENTEL - QATAR Branch office


Tel : (974) 447 8571, 447 7321
Fax : (974) 447 8572

SUBSTATION NAME PROJECT DRAWING NUMBER


132/66/11kV WAKRAH SUBSTATION PH12-3A-24-22-P011

A - 03-05-2017 Issued for Construction SVM AM YAP

0 A 30.11.2016 Issued for Comments TV AM YAP


REV. STAT. DATE MODIFICATION DRAWN CHECKED APPROVED

SUBCONTRACTOR NAME CONTRACTOR NAME

SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL

MANUFACTURERS DRAWING NO.


DRAWING/DOCUMENT TITLE

SAT Forms for 160MVA Transformer

DATE NAME SIGNATURE


Differential, Restricted Earth Fault

DRAWN 03-05-2017 SVM Sensitivity & Stability

CHECKED 03-05-2017 AM SIZE REV


APPROVED 03-05-2017 YAP A4 Sheet 1 of 19 0
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

List of Content

Page
S.No Description
No

1. Purpose of Test. 2

2. Reference Drawing and Documents. 2

3. Initial Checks. 2

4. List of Schematic Drawings... 2

5. Transformer name plate details.. 3

6. Check List... 5

7. Short circuit calculation... 6

8. Setting Verification..

9. 160MVA Tx Differential Protection Sensitivity & Stability Test F871 & F872 (87T) 7

9.1. Test set up & Test procedure .... 8

9.2. Test result. 11

10. 160MVA Tx HV & LV REF Protection Sensitivity & Stability Test F 873 & F871 (87NH&87NL)

10.1. Test set up & Test procedure .... 15

10.2. Test result. 16

10.3. 160MVA Tx LV REF Protection Sensitivity and Stability Test F871. 17

11. Transformer CT Current measurement 18

12. Instruments used 18

13. Remarks 18

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:1 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

1. PURPOSE OF TEST:
These tests are intended to check the Transformer Protection Operation, Sensitivity of relay
and CT Circuit verification.

2. REFERENCE DRAWING AND DOCUMENTS :

Electrical drawing for 132kV Tx feeder, 66kV side Tx feeder.

3.INITIAL CHECKS: Checked ( )


Protection Panel Internal and External Wiring Tightness/Ferrules Checked :

Protection Panel Internal and External Wiring Checked as per approved scheme :

Confirm that Diff & REF relay final setting test completed :

While carrying out stability test there should not be any spill current :

4.LIST OF SCHEMATIC DRAWINGS:


Drawing No. Category

132/66KV 132kV Side Tx feeder RP Drawing PH12-3A-24-32-0011-RA I


132/66KV 66KV Side Tx Feeder RP Drawing PH12-3A-24-33-2018-RA I

160MVA Tx TCC Drawing PH12-3A-10-22-1015-RA I

160MVA Tx Rating plate PH12-3A-10-22-1003-RA I

132/66KV 132kV Side Tx feeder LCC Drawing PH12-3A-24-12-0011-RA I

132/66KV 66KV Side Tx Feeder LCC Drawing PH12-3A-24-13-0018-RA I

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:2 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

5. TRANSFORMER NAME PLATE DETAILS:

Serial Number :

Rating : 160MVA

Rated HV Voltage : 132000 V

Rated LV Voltage : 66000 V

Vector group : YNyn0+d1

Tap Min. : 1

Tap Max. : 17

Nominal Tap : 9

% Impedance (Z) :

Ref 96MVA 160MVA


Tap-1 14.13 23.55
Tap-9b 13.36 22.27
Tap-17 12.87 21.45

HV Rated Current : 699.8 A

LV Rated Current : 1399.6 A

HV side CT Ratio : 800/1A

LV side CT Ratio : 2000/1A

HV BAY : C11 (132kV)

LV BAY : B18 (66KV)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:3 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

Transformer Differential Protection Main-1 7UT613


1. RELAY DETAILS:
Make : Relay Designation :
Ordering No : Firmware Version :
Nominal Current : Product Def :
Relay Sl.No. : Auxiliary Volt. :
IP Address : Rated Frequency :

Transformer Differential Protection Main-2 P633


2. RELAY DETAILS:
Make : Relay Designation :
Ordering No : Firmware Version :
Nominal Current : Product Def :
Relay Sl.No. : Auxiliary Volt. :
IP Address : Rated Frequency :

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:4 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

6. CHECK LIST:

S.No Description Checked ( )

CT equipment signed test reports of All the CTs involved in the stability test shall be
1. :
made available at site prior to test.
Spare bushing CTs located on the top of the Transformer- CT test report, wiring
tightness on the CT JB available on the roof of the Tx. wiring between CT JB to Tx
2. :
TCC- tightness CT shorting/earthing, ferrules shall be completed as per normal
standard.
3. Single point Earthing of the stability REF/Differential circuit to be confirmed. :
Latest approved (status I) schematic shall be made available at site. All interface
points between GIS, SWGR.NCT etc. are to be physically verified for the CT polarity
4. :
marking. If any RED Mark-up in the scheme shall duly signed by Consultant Engineer
after his verification.
5. LV/HV and NCT XLPE cables termination shall be ensured. :
After Sensitivity test and before final stability test all the CT shorting combs/facilities
6. :
shall be properly completed.
7. Special care need to be taken to avoid any possible CT opening during testing. :
Any small deviation from the calculated values (differential as well REF) shall not omit
8. :
without proper technical justification.

9. Transformer name plates to be checked.(Bushing CTS shall be marked as spare) :

Neutral Cable armour shall be earthed at one end only.(other vice spare CT,S provided
10. :
in Neutral cable at transformer side will not measure properly)
LV cable chamber at both SWGR side and cable side to be permanently closed before
11. :
start injection.
Heater setting at LV cable chamber in both SWGR side and cable side to be completed
12. :
before closing the cover permanently.
Physical inspection of all stabilizing resistor, Metrosil, Terminal blocks, shorting links
13. :
etc.
At first all the relay meter reading to be taken at normal stable condition and the
14. same values to be recorded. Then start sensitivity checks, to ensure all CT circuits are :
in as per requirement. Like,

14.1. C11-HV O/C, BCU, Ammeter (with ICT), Bus bar bay unit. :

C10 -Cable feeder relays (M1&M2) and BCU, ammeter ,Bus bar bay unit(since the
14.2. :
injection is normally through cable feeder)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:5 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

7. CALCULATION

LV Short circuit Impedance voltage : Rated LV voltage * %Z (With Paralleling Two transformer)

: 7771.5 V

HV Short circuit current when 415V applied : 415 * HV Rated Current / LV short circuit Imp

voltage

: 37.36 A

CT Secondary current : HV Short circuit current when 415V applied

/ CT Ratio (1500 - 800/1A)

: 46.7 mA

LV Short circuit current when 415V applied : 415 * LV Rated Current / HV short circuit Imp

voltage

: 74.73 A

CT Secondary current : LV Short circuit current when 415V applied

/ CT Ratio (2000/1A)

: 37.36 mA

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:6 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

8. SETTING VERIFICATION:
Actual/Measured
S.No Description Final setting value Setting Verified
value

1. C11-F871-7UT61 Idiff>:

2. C11-F872-P633 Idiff>:

3. C11-F873-7SJ61 50 1Ph:

4. C11-R102-HV REF Rstab:

5. C11CT1 Core1-Diff & 800/1A


HV REF

6. C11CT2 Core2-Diff 800/1A

7. C11NCT2 HV REF 800/1A

8. B18CT1 Core1-Diff & LV 2000/1A


REF

9. B18CT2 Core2-Diff 2000/1A

10. B18NCT4 LV REF 2000/1A

Note: Setting to be confirmed as per approved final setting Document.

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:7 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

9. 160MVA TX DIFFERENTIAL PROTECTION SENSITIVITY & STABILITY TEST F871 &


F872 (87T)

9.1. TEST SETUP:

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:8 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:9 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

TEST PROCEDURE:

B50 Feeder

B501 Closed & Earth Link Isolated, B503 Closed, B500 Closed, B504 Closed.

B50M1, B50M2, B502 Open.

B18 Feeder

B180, B184 Closed, B181 Closed & Earth Link Isolated,

B182, B18M1 Open.

C11 FEEDER

C110, C11M1 Closed. C111 Closed & Earth Isolated,

C112, C114 Open.

C21 FEEDER

C211 Closed & Earth Link Isolated,

C214, C212, C21M1, C210 Open.

B28 FEEDER

B281 Closed & Earth Link Isolated,

B280, B284, B282, B28M1 Open.

After complete the connection apply 3Ph 415V in C101 and then note down the readings.

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:10 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

9.2. TEST RESULT:

Applied Voltage at HV Side [While LV Side Shorted] RY: YB: BR:

Measured Current: R: Y: B:

HV Diff-1
HV Side CT Polarity Reversed:

Tap position: 9 Tap position: 9 Tap position: 9


R Reverse in C11 CT1 Y Reverse in C11 CT1 B Reverse in C11 CT1
132kV CT : Reverse Box Box Box
(X610: 3 & 5) (X610: 7 & 9) (X610: 11 & 13)
66kV CT : Normal

R Y B N R Y B N R Y B N

132kV
(F871)(mA)
Secondary Q1,Q3,Q5
Current 66kV
(F871)(mA)
R1,R3,R5

Line Current
(HV) (A)

Line Current
F871 (LV) (KA)
(87T-1)
Relay
Display Differential
Current (%)

Restraining
Current (%)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:11 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

LV Side CT Polarity Reversed:


Tap position: 9 Tap position: 9 Tap position: 9
132kV CT : Normal R Reverse in B18 CT1 Y Reverse in B18 CT1 B Reverse in B18 CT1
Box Box Box
66kV CT : Reverse (X610: 3 & 4) (X610: 6 & 7) (X610: 9 & 10)
R Y B N R Y B N R Y B N
132kV
(F871)(mA)
Secondary Q1,Q3,Q5
Current 66KV
(F871)(mA)
R1,R3,R5
Line Current
(HV) (A)

F871 Line Current


(87T-1) (LV) (KA)
Relay Differential
Display Current (%)
Restraining
Current (%)

HV & LV Side CT Normal:

132kV CT : Normal Tap position: 1 Tap position: 9 Tap position: 17

66kV CT : Normal
R Y B N R Y B N R Y B N
132kV
(F871)(mA)
Secondary Q1,Q3,Q5
Current 66KV
(F871)(mA)
R1,R3,R5
Line Current
(HV) (A)
F871 Line Current
(87T-1) (LV) (KA)
Relay Differential
Display Current (%)
Restraining
Current (%)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:12 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

HV Diff-2

HV Side CT Polarity Reversed:

Tap position: 9 Tap position: 9 Tap position: 9


R Reverse in C11 CT2 Y Reverse in C11 CT2 B Reverse in C11 CT2
132kV CT : Reverse Box Box Box
(X620: 3 & 5) (X620: 7 & 9) (X620: 11 & 13)
66kV CT : Normal

R Y B N R Y B N R Y B N

132kV
(F872)(mA)
Secondary X0:11,13,15,16
Current 66kV
(F872)(mA)
X0:11,13,15,16

Line Current
(HV) (A)

Line Current
F872 (LV) (KA)
(87T-2)
Relay
Display Differential
Current (%)

Restraining
Current (%)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:13 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

LV Side CT Polarity Reversed:


Tap position: 9 Tap position: 9 Tap position: 9
132kV CT : Normal R Reverse in B18 CT2 Y Reverse in B18 CT2 B Reverse in B18 CT2
Box Box Box
66kV CT : Reverse (X620: 3 & 4) (X620: 6 & 7) (X620: 9 & 10)
R Y B N R Y B N R Y B N
132kV
(F872)(mA)
Secondary X0:11,13,15,16
Current 66kV
(F872)(mA)
X0:11,13,15,16
Line Current
(HV) (A)

F872 Line Current


(87T-2) (LV) (KA)
Relay Differential
Display Current (%)
Restraining
Current (%)

HV & LV Side CT Normal:

132kV CT : Normal Tap position: 17


Tap position: 1 Tap position: 9
66kV CT : Normal
R Y B N R Y B N R Y B N
132kV
(F872)(mA)
Secondary X0:11,13,15,16
Current 66kV
(F872)(mA)
X0:11,13,15,16
Line Current
(HV) (A)

F872 Line Current


(87T-2) (LV) (KA)
Relay Differential
Display Current (%)
Restraining
Current (%)

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:14 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

10. 160MVA TX HV & LV REF PROTECTION SENSITIVITY AND STABILITY TEST F873 &
F871 (87NH& 87NL)

10.1. TEST SETUP:

TEST PROCEDURE:
C101 Closed & Earth Isolated, C103 Closed, C100 Closed, C104 Closed.
C102, C10M2, C10M1 Open.
C110, C114 Closed.
C112, C11M1, C111 Open.
B180, B18M1 Closed.
B181, B182 & B184 Open.
Stabilizing resistor to be service condition during the measurement.
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:15 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

After complete the connection apply 1Ph 230V in C101 and then note down the readings.

10.2. TEST RESULTS: 160MVA TX HV REF PROTECTION SENSITIVITY AND STABILITY TEST F873

(Values Measured at Tap No: 17)

Neutral
Measured Current at CT Box CT at
160MVA Measured Display
Voltage across
Tx TCC current in Current
Description R Y B C11NCT F873 in F873
2 Q7&Q8 relay
RELAY Metrosil Resistor (mA) (A)
X610:3,5 X610:7,9 X610:11,13 X4:27,2
F873 (B1) (R102)
(mA) (mA) (mA) 8 (mA)
mV V V
R Phase
Reverse
Neutral Normal
R Phase
Normal
Neutral Reverse
R Phase
Normal
Neutral Normal
Y Phase
Reverse
Neutral Normal
Y Phase
Normal
Neutral Reverse
Y Phase
Normal
Neutral Normal
B Phase
Reverse
Neutral Normal
B Phase
Normal
Neutral Reverse
B Phase
Normal
Neutral Normal

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:16 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

10.3. 160MVA TX LV REF PROTECTION SENSITIVITY AND STABILITY TEST F871

Neutral
Measured Current at CT Box CT at
160MVA Measured Display
Voltage across
Tx TCC current in Current
Description R Y B B18 F871 in F871
NCT4 Q7&Q8 relay
RELAY Metrosil Resistor (mA) (A)
X610:3,4 X610:6,7 X610:9,10 X4:39,40
F871 (B1) (R102)
(mA) (mA) (mA) (mA)
mV V V
R Phase
Reverse
Neutral Normal
R Phase
Normal
Neutral Reverse
R Phase
Normal
Neutral Normal
Y Phase
Reverse
Neutral Normal
Y Phase
Normal
Neutral Reverse
Y Phase
Normal
Neutral Normal
B Phase
Reverse
Neutral Normal
B Phase
Normal
Neutral Reverse
B Phase
Normal
Neutral Normal

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:17 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 & S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

11. TRANSFORMER CT CURRENT MEASUREMENT:

Measured
CT No Core No Terminal No Phase Ref Ratio Purpose
Current
Values Measured at Tap No:9
CT1 1S1-1S3 X4-1,3 R Ph 1500/1
CT2 1S1-1S3 X4-5,7 Y Ph 1500/1
CT3 1S1-1S3 X4-12,14 B Ph 1500/1
CT4 2S1-2S2 X4-9,10 Y Ph 820/2
CT5 2S1-2S2 X4-16,17 B Ph 1560/1
CT6 S1-S2 X4-19,20 Y Ph 1470/2
CT7 1S1-1S3 X4-22,24 N 1500/1
CT8 1S1-1S3 X4-26,28 N 1500/1
CT9 1S1-1S3 X4-30,31 n 2000/1
CT10 2S1-2S2 X4-33,34 n 2000/1
CT11 S1-S2 X4-36,37 n 2000/1
CT12 S1-S2 X4-39,40 n 2000/1

12. INSTRUMENTS USED:

Equipment Calibration Calibration due


Sl.no Description Make
Sl.no date date
1 Multi meter Fluke
2 Mini Clamp Meter Fluke

13. REMARKS:

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name

Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:18 of 18