Академический Документы
Профессиональный Документы
Культура Документы
CONSULTANT:
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL
List of Content
Page
S.No Description
No
1. Purpose of Test. 2
3. Initial Checks. 2
6. Check List... 5
8. Setting Verification..
9. 160MVA Tx Differential Protection Sensitivity & Stability Test F871 & F872 (87T) 7
10. 160MVA Tx HV & LV REF Protection Sensitivity & Stability Test F 873 & F871 (87NH&87NL)
13. Remarks 18
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:1 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
1. PURPOSE OF TEST:
These tests are intended to check the Transformer Protection Operation, Sensitivity of relay
and CT Circuit verification.
Protection Panel Internal and External Wiring Checked as per approved scheme :
Confirm that Diff & REF relay final setting test completed :
While carrying out stability test there should not be any spill current :
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:2 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
Serial Number :
Rating : 160MVA
Tap Min. : 1
Tap Max. : 17
Nominal Tap : 9
% Impedance (Z) :
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:3 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:4 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
6. CHECK LIST:
CT equipment signed test reports of All the CTs involved in the stability test shall be
1. :
made available at site prior to test.
Spare bushing CTs located on the top of the Transformer- CT test report, wiring
tightness on the CT JB available on the roof of the Tx. wiring between CT JB to Tx
2. :
TCC- tightness CT shorting/earthing, ferrules shall be completed as per normal
standard.
3. Single point Earthing of the stability REF/Differential circuit to be confirmed. :
Latest approved (status I) schematic shall be made available at site. All interface
points between GIS, SWGR.NCT etc. are to be physically verified for the CT polarity
4. :
marking. If any RED Mark-up in the scheme shall duly signed by Consultant Engineer
after his verification.
5. LV/HV and NCT XLPE cables termination shall be ensured. :
After Sensitivity test and before final stability test all the CT shorting combs/facilities
6. :
shall be properly completed.
7. Special care need to be taken to avoid any possible CT opening during testing. :
Any small deviation from the calculated values (differential as well REF) shall not omit
8. :
without proper technical justification.
Neutral Cable armour shall be earthed at one end only.(other vice spare CT,S provided
10. :
in Neutral cable at transformer side will not measure properly)
LV cable chamber at both SWGR side and cable side to be permanently closed before
11. :
start injection.
Heater setting at LV cable chamber in both SWGR side and cable side to be completed
12. :
before closing the cover permanently.
Physical inspection of all stabilizing resistor, Metrosil, Terminal blocks, shorting links
13. :
etc.
At first all the relay meter reading to be taken at normal stable condition and the
14. same values to be recorded. Then start sensitivity checks, to ensure all CT circuits are :
in as per requirement. Like,
14.1. C11-HV O/C, BCU, Ammeter (with ICT), Bus bar bay unit. :
C10 -Cable feeder relays (M1&M2) and BCU, ammeter ,Bus bar bay unit(since the
14.2. :
injection is normally through cable feeder)
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:5 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
7. CALCULATION
LV Short circuit Impedance voltage : Rated LV voltage * %Z (With Paralleling Two transformer)
: 7771.5 V
HV Short circuit current when 415V applied : 415 * HV Rated Current / LV short circuit Imp
voltage
: 37.36 A
: 46.7 mA
LV Short circuit current when 415V applied : 415 * LV Rated Current / HV short circuit Imp
voltage
: 74.73 A
/ CT Ratio (2000/1A)
: 37.36 mA
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:6 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
8. SETTING VERIFICATION:
Actual/Measured
S.No Description Final setting value Setting Verified
value
1. C11-F871-7UT61 Idiff>:
2. C11-F872-P633 Idiff>:
3. C11-F873-7SJ61 50 1Ph:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:7 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:8 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:9 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
TEST PROCEDURE:
B50 Feeder
B501 Closed & Earth Link Isolated, B503 Closed, B500 Closed, B504 Closed.
B18 Feeder
C11 FEEDER
C21 FEEDER
B28 FEEDER
After complete the connection apply 3Ph 415V in C101 and then note down the readings.
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:10 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
Measured Current: R: Y: B:
HV Diff-1
HV Side CT Polarity Reversed:
R Y B N R Y B N R Y B N
132kV
(F871)(mA)
Secondary Q1,Q3,Q5
Current 66kV
(F871)(mA)
R1,R3,R5
Line Current
(HV) (A)
Line Current
F871 (LV) (KA)
(87T-1)
Relay
Display Differential
Current (%)
Restraining
Current (%)
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:11 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
66kV CT : Normal
R Y B N R Y B N R Y B N
132kV
(F871)(mA)
Secondary Q1,Q3,Q5
Current 66KV
(F871)(mA)
R1,R3,R5
Line Current
(HV) (A)
F871 Line Current
(87T-1) (LV) (KA)
Relay Differential
Display Current (%)
Restraining
Current (%)
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:12 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
HV Diff-2
R Y B N R Y B N R Y B N
132kV
(F872)(mA)
Secondary X0:11,13,15,16
Current 66kV
(F872)(mA)
X0:11,13,15,16
Line Current
(HV) (A)
Line Current
F872 (LV) (KA)
(87T-2)
Relay
Display Differential
Current (%)
Restraining
Current (%)
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:13 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:14 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
10. 160MVA TX HV & LV REF PROTECTION SENSITIVITY AND STABILITY TEST F873 &
F871 (87NH& 87NL)
TEST PROCEDURE:
C101 Closed & Earth Isolated, C103 Closed, C100 Closed, C104 Closed.
C102, C10M2, C10M1 Open.
C110, C114 Closed.
C112, C11M1, C111 Open.
B180, B18M1 Closed.
B181, B182 & B184 Open.
Stabilizing resistor to be service condition during the measurement.
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:15 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
After complete the connection apply 1Ph 230V in C101 and then note down the readings.
10.2. TEST RESULTS: 160MVA TX HV REF PROTECTION SENSITIVITY AND STABILITY TEST F873
Neutral
Measured Current at CT Box CT at
160MVA Measured Display
Voltage across
Tx TCC current in Current
Description R Y B C11NCT F873 in F873
2 Q7&Q8 relay
RELAY Metrosil Resistor (mA) (A)
X610:3,5 X610:7,9 X610:11,13 X4:27,2
F873 (B1) (R102)
(mA) (mA) (mA) 8 (mA)
mV V V
R Phase
Reverse
Neutral Normal
R Phase
Normal
Neutral Reverse
R Phase
Normal
Neutral Normal
Y Phase
Reverse
Neutral Normal
Y Phase
Normal
Neutral Reverse
Y Phase
Normal
Neutral Normal
B Phase
Reverse
Neutral Normal
B Phase
Normal
Neutral Reverse
B Phase
Normal
Neutral Normal
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:16 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
Neutral
Measured Current at CT Box CT at
160MVA Measured Display
Voltage across
Tx TCC current in Current
Description R Y B B18 F871 in F871
NCT4 Q7&Q8 relay
RELAY Metrosil Resistor (mA) (A)
X610:3,4 X610:6,7 X610:9,10 X4:39,40
F871 (B1) (R102)
(mA) (mA) (mA) (mA)
mV V V
R Phase
Reverse
Neutral Normal
R Phase
Normal
Neutral Reverse
R Phase
Normal
Neutral Normal
Y Phase
Reverse
Neutral Normal
Y Phase
Normal
Neutral Reverse
Y Phase
Normal
Neutral Normal
B Phase
Reverse
Neutral Normal
B Phase
Normal
Neutral Reverse
B Phase
Normal
Neutral Normal
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:17 of 18
SITE ACCEPTANCE TEST FORMAT FOR 160MVA Tx DIFFERENTIAL, REF SENSITIVITY AND STABILITY
CLIENT: CONSULTANT: MAIN CONTRACTOR:
Measured
CT No Core No Terminal No Phase Ref Ratio Purpose
Current
Values Measured at Tap No:9
CT1 1S1-1S3 X4-1,3 R Ph 1500/1
CT2 1S1-1S3 X4-5,7 Y Ph 1500/1
CT3 1S1-1S3 X4-12,14 B Ph 1500/1
CT4 2S1-2S2 X4-9,10 Y Ph 820/2
CT5 2S1-2S2 X4-16,17 B Ph 1560/1
CT6 S1-S2 X4-19,20 Y Ph 1470/2
CT7 1S1-1S3 X4-22,24 N 1500/1
CT8 1S1-1S3 X4-26,28 N 1500/1
CT9 1S1-1S3 X4-30,31 n 2000/1
CT10 2S1-2S2 X4-33,34 n 2000/1
CT11 S1-S2 X4-36,37 n 2000/1
CT12 S1-S2 X4-39,40 n 2000/1
13. REMARKS:
SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature
Name Name
Date Date
Doc.No. PH12-3A-24-22-P011 Rev. A Annexure 1 Page:18 of 18