Вы находитесь на странице: 1из 34

AIR MOBILITY COMMAND

FLIGHT LINE SUPPORT


FACILITIES DESIGN GUIDE
Air Mobility Commands aircraft maintenance troops do great
work in keeping the fleet ready to do its Global Reach mission.
They need help to make sure they can get spare parts quickly
and easily, and thats what this Flight Line Support Facility
Design Guide is all about.

This Guide provides the roadmap for planning, programming,


and designing projects that will give AMC the facilities it needs
to preposition parts on the flight line and put them into the
hands of maintainers when they need them. The result will be
improved morale and productivity for AMCs people and
greater mission capability for the Air Mobility Team.

The Air Mobility Team...Responsive Global Reach for America... Every Day!

i
AMC FLIGHT LINE
SUPPORT FACILITY

Table of Contents

Chapter 1 Chapter 2 Chapter 3


Introduction Program Overall Project
(Contd) Design (Contd)
A. Purpose ........................................1 E. Special Storage Functions ..............5 C. Building Design ..........................12
B. Design Guide Scope and Use .........1 1. Inside Storage 1. Organization and Circulation
1. Project Initiation 2. External Storage 2. Architectural Character,
2. Site Selection F. Space Criteria ...............................5 Materials, and Finishes
3. Design 1. Planning Considerations 3. Supervision and Security
4. Interior Finishes and Furnishings 2. Standard Facility Requirements 4. Flexibility and Expansion
C. Flight Line Support G. Site Evaluation..............................9 Potential
Facility .........................................2 1. Location 5. Disabled Access
2. Size 6. Special Considerations for
Chapter 2 Renovations
H. Special Project Considerations.....10
Program D. Building Systems.........................14
A. General.........................................3 Chapter 3 1. Structural
1. Planning and Programming Overall Project 2. Heating, Ventilating, and Air
Considerations Design Conditioning
2. Flight Line Support Facility 3. Plumbing
A. General.......................................11 4. Electrical
3. Aircraft Parts Flow Process
B. Site Design .................................11 5. Fire Protection
B. Administrative Functions ..............4
1. Selection 6. Communications
C. Support Area Functions ................4
2. Access 7. Material Handling System
D. Warehouse Functions....................4 3. Utilities
4. Landscaping

ii
AMC FLIGHT LINE
SUPPORT FACILITY

Table of Contents (Cont'd.)

Chapter 4 Chapter 4 Chapter 4


Functional Area Functional Area Functional Area
and Space Criteria and Space Criteria and Space Criteria
(Contd) (Contd)
A. General.......................................19 C. Support Areas.............................20 7. Parts Counter
B. Administration............................19 1. Design Considerations 8. Bulk Storage Area
1. Design Considerations 2. Customer Service Entrance 9. Reparable Parts/Tail Number
2. Parts and Components 3. Mechanical Room Parts/TCTO Parts
Administration 4. Electrical Room E. Special Storage Requirements ......23
3. Flight Line Support 5. Communications Room 1. Design Considerations
Administration 6. Rest Rooms 2. Avionics and Electronic
4. OICs/NCOICs Office 7. Janitors Closet Components Storage
D. Warehouse..................................21 3. Classified Storage
1. Design Considerations 4. Battery Storage
2. High-Density Parts Storage 5. Outside Storage
3. Readiness Spares Packages Pallet
Storage Space
Chapter 5
4. Readiness Spares Packages
Interior Finishes
Buildup Area
5. Readiness Spares Packages A. General.......................................25
Loading Dock B. Finish Schedule...........................25
6. Truck Loading Dock C. Furniture ....................................26

References.........................28

iii
AMC FLIGHT LINE
SUPPORT FACILITY

Table of Contents (Cont'd.)

List of Figures
Figure Number Page Number Description
Figure 1-A 2 Functional Area Relationships for the Warehouse and Support
Areas within the Flight Line Support Facility
Figure 2-A 5 Functional Area Relationships for the Flight Line Support Facility
Figure 2-B 7 Graphic Illustration of Readiness Spares Package (RSP) Pallet
Storage Space
Figure 3-A 11 Site Organization Concept for the Flight Line Support Facility
Figure 3-B 13 Site Organization Relationships for the Flight Line
Support Facility
Figure 4-A 21 Floor Plan for the Typical Flight Line Support Facility
Figure 5-A 30 Color Boards

List of Tables
Table Number Page Number Description
Table 2-A 6 Space Requirements for the Flight Line Support Facility and
Storage Areas
Table 2-B 7 RSP Space Requirements for Pallets
Table 2-C 8 Space Requirements for the Administration Areas
Table 2-D 8 Space Requirements for the Support Areas
Table 2-E 8 Space Requirements for the Warehouse Areas
Table 2-F 8 Space Requirements for the Special Storage Areas
Table 2-G 9 Space Requirements for a Typical Flight Line Support Facility
Table 5-A 26 Finish Schedule for the Flight Line Support
Facility Administration
Table 5-B 27 Finish Schedule for the Flight Line Support
Facility Support Areas
Table 5-C 27 Finish Schedule for the Flight Line Support
Facility Warehouse
Table 5-D 27 Finish Schedule for the Flight Line Support
Facility Special Storage

iv
AMC FLIGHT LINE
SUPPORT FACILITY

Chapter 1

Introduction
A. Purpose evaluation and planning, and design For guidance in evaluating sites for a
of exterior and interior areas. project, see Chapter 2, Section G, Site
This guide provides the basic criteria Evaluation.
to evaluate, plan, program, and design Use this guide to supplement other
Air Mobility Command (AMC) flight Air Force and Department of Defense 3. Design
line support facilities to sustain a sup- (DoD) policies and instructions a. The design of a project is typically
ply of parts and components to main- to identify individual construction developed in progressive phases, i.e.,
tain aircraft. This facility supports the project requirements. The Require- planning and programming, concept
following AMC aircraft: C-5, C-17, ments and Management Plan and preliminary drawings, and final
C-141, and KC-135. The C-9, C-21, (RAMP) defines the program for working drawings. Design guidance
and KC-10 are supported by Con- design of an individual Military for all of these design phases is cov-
tractor Operated and Managed Base Construction (MILCON) project. ered in Chapters 2 through 4.
Supply (COMBS), and their facility It includes functional requirements,
design criteria, and cost information. b. Chapter 2 provides basic planning
requirements are governed by govern- and programming criteria, along with
ment contracts. The material in this guide provides
the basis for preparing the RAMP. tables for determining square footage
It is intended to make commanders requirements.
and their staffs aware of important 1. Project Initiation
c. Chapter 3 presents concept and
design considerations and to aid in Information required for preparation
preliminary design considerations
project development. Planning and of the DD Form 1391, which initiates
such as the location of a facility on
programming for a flight line support project development, is found in
a site, the design of the facility and
facility should consider all aspects of Chapter 2. This includes considera-
support utilities, as well as specific
parts storage and handling necessary tions of the space criteria to deter-
technical guidance.
to support aircraft maintenance and mine overall building size, site
repair. Additionally, a quality design evaluation, and special factors to be d. Chapter 4 addresses specific design
will maximize effective use of avail- used in the cost estimates. issues concerning individual function-
able space to support an efficient air- al areas, which are important for
2. Site Selection preliminary and working drawings.
craft parts flow process.
This is generally part of the master In this chapter, illustrative designs and
B. Design Guide planning process. It is completed photographs help clarify the design
prior to preparing a DD Form 1391 guidance of the preceding chapters.
Scope and Use for an individual project. However,
This guide applies to the design of project programming requirements
all new construction and renovation developed in the DD Form 1391
projects for flight line support facili- phase may require a re-evaluation of
ties. It provides the overall criteria site selection decisions.
for determining requirements, site

1
AMC FLIGHT LINE
SUPPORT FACILITY

SPECIAL
STORAGE

WAREHOUSE

SUPPORT
AREAS

TWO ADMINISTRATION AREAS


PARTS AND COMPONENTS
ADMINISTRATION
CUSTOMER (UPPER LEVEL)
SERVICE FLIGHT LINE SUPPORT
ENTRANCE ADMINISTRATION
(LOWER LEVEL)

Figure 1-A: Functional Area Relationships for the Warehouse and Support Areas within the Flight Line Support Facility.

4. Interior Finishes and and assemblies necessary to maintain avionics, components, spare parts,
Furnishings aircraft. Also, the readiness spares and assemblies. Parts and compo-
Chapter 5 provides recommendations packages (RSPs) are assembled and nents administration also provides
for selection of interior materials, fin- maintained in this area. visual security for the warehouse area.
ishes, and colors. Carefully selected b. This facility has four components: d. The support area includes space
interior finishes and furnishings are for electrical, communications,
Administrative Areas
essential for a quality design. mechanical, and rest rooms.
Parts and components
e. The warehouse includes space
C. Flight Line Flight line support
to store and retrieve aircraft parts.
Support Support areas Specific space requirements are
Facility Warehouse necessary for high-density storage,
See Figure 1-A for functional area Special storage
RSP pallet buildup, RSP pallet stor-
relationships of the warehouse and age, bulk storage, RSP loading dock,
c. The administrative space is truck loading dock, parts counter, and
support areas within the flight line separated into two different spaces
support facility. reparable parts, tail number parts, and
(flight line support administration, time compliance technical order
a. The flight line support facility is and parts and components administra- (TCTO) parts.
an essential element of the aircraft tion). Space requirements may
maintenance program. Its function include private supervisory offices and f. The special storage area includes
is to provide maintenance units with administrative support for ordering, avionics and electronic components,
avionics, components, spare parts, tracking, and distributing aircraft classified storage (sensitive/pilferable
materials), and battery storage.

2
AMC FLIGHT LINE
SUPPORT FACILITY

Chapter 2

Program
A. General Logistics group commander 2. Flight Line Support Facility
Support group commander a. The supply and distribution of
1. Planning and Programming stored aircraft parts and war reserve
Supply squadron commander
Considerations operating materials are managed in
a. Planning, programming, and Aircraft generation squadron this facility. Major supply functions
designing a flight line support facility commander include the following:
normally requires extensive coordina- Communications squadron
Demand processing and mission
tion. This coordination is important commander
capable stock control
because of the different organizations Transportation squadron
involved in developing facility Reparable parts processing
commander
requirements. Inventory processing
Civil engineer squadron
b. Personnel likely to have facility commander Bench stock inventory control
planning and design inputs are Fire chief Processing of readiness spares and
as follows: in-place spares packages
Security police squadron
Wing commander commander Storage and issue of stocks
Wing safety officer Re-supply of enroute system
Operations group commander Combat supply operations
3. Aircraft Parts Flow Process
a. To fully understand the functional
area relationships of this facility, it
is important to consider the various
activities and flow of parts, compo-
nents, and assemblies through the
flight line support facility.
b. There are specific requirements for
each type of aircraft when developing
a functional layout for a flight line
support facility. Investigate shipping
and receiving requirements, and tailor
them to the base supply system of
operation. In developing the require-
ments for support facilities, the prima-
ry consideration is the flow of material
into and out of the facility.
Facilities should present a cohesive architectural image as the facility above demonstrates.

3
AMC FLIGHT LINE
SUPPORT FACILITY

c. After receipt of a part, component, c. Officer-in-Charge/Noncommis- b. RSP Pallet Buildup Area - This
or assembly at the flight line support sioned Officer-in-Charge (OICs/ large open area within the warehouse
facility, the item is processed and NCOICs) Office - For management is for the buildup and maneuvering
stored in its respective storage area. functions in the facility of RSPs.
Special storage areas for specific mate-
c. RSP Pallet Storage Area - The
rial items are required as follows: C. Support Area type of aircraft and the squadron size
Aircraft Electronic Components - Functions will determine the overall size of this
An environmentally controlled area. This area is adjacent to the RSP
a. Customer Service Entrance -
area buildup area and accommodates the
Locate the entrance so that it is clear-
Batteries - A specifically designed RSP containers and cargo pallets.
ly visible for public access of visitors
battery room Position the pallets in single rows.
and customers.
Classified Storage - A secure room d. Bulk Storage - Provide an area
b. Rest Rooms - Centrally locate rest
d. The parts and components admin- for parts that are too large for high-
rooms for men and women.
istration function requisitions specific density storage. Locate these items
c. Mechanical Room - Space for on the mezzanine above the RSP pal-
parts, components, or assemblies when
heating, ventilating, and air condi- let storage area.
a minimum inventory stockage level
tioning equipment (HVAC), electri-
occurs. e. RSP Loading Dock - This area is
cal service, and fire detection and
e. Deployable units have RSP kit for 463L cargo pallets and loader
alarm equipment.
requirements. These kits are main- equipment. Provide an in-floor
d. Electrical Room - Room for prima- mounted scale that will handle cargo
tained in the RSP pallet area on cargo
ry electrical systems necessary to pallets and is capable of accurately
pallets. Flight line support is responsi-
support the entire facility. measuring cargo pallet weights of up
ble for inventorying and restocking
the kits. e. Communications Room - A loca- to 10,000 pounds. Locate the scale
tion for the building telecommunica- near the RSP dock.
B. Administrative tions systems and telephone switching f. Truck Loading Dock - A location
Functions equipment. to receive parts and components from
base supply or depots.
a. Parts and Components Admin- D. Warehouse
istration - Coordinates the requisition g. Parts Counter - An area located
Functions near the customer service entrance.
and distribution of parts, components,
and assemblies to support aircraft a. High-Density Storage - This area h. Reparable Parts/Tail Number
operations 24-hours a day, seven days consists of a number of high bay stor- Parts/TCTO Parts - An area near
a week. age racks with aisles wide enough for the truck loading dock for storage
the material handling equipment to of parts until they are picked up by
b. Flight Line Support Admin-
maneuver easily. a maintenance unit.
istration - Provides the primary
interface with the customer, and
manages the flight line support facility
24-hours a day, seven days a week.

4
AMC FLIGHT LINE
SUPPORT FACILITY

E. Special Storage c. Battery Storage - A special storage requiring covered protection from the
Functions area with ventilation and special weather. Covered storage space is
exhaust for nickel cadmium battery constructed without complete side
1. Inside Storage cells. Provide a battery shop and and end walls. This space can be
a. Avionics and Electronic recharging capability within the flight included within the warehouse in cold
Components Storage - An environ- line support facility if the base does climates.
mentally controlled storage area for not have one.
avionics and other electronic F. Space Criteria
2. External Storage
components.
a. Outside Storage - A fenced, paved, 1. Planning Considerations
b. Classified Storage - An area for and lighted area for material and for a. Define the size, type, number, and
storage of sensitive or pilferable mate- operating material handling equipment. functional area relationships of spaces
rials. Enclose this room with fire-rated required to support the flight line sup-
b. Covered Storage - Space to store
walls and a vault door. port facility.
supplies, equipment, and material not
requiring closed warehouse space, but b. Development of space require-
ments should take into consideration

BATTERY
STORAGE

TWO STORAGE LEVELS HIGH-DENSITY AVIONICS


MEZZANINE BULK STORAGE AND
STORAGE AREA ELECTRONIC
(UPPER LEVEL) COMPONENTS
RSP PALLET STORAGE AREA STORAGE
(LOWER LEVEL)
MECHANICAL
ROOM

ELECTRICAL
ROOM
COMMUNICATIONS
ORDER ROOM
RSP RSP PALLET BUILDUP AREA PICKER
LOADING CLASSIFIED
RECHARGE STORAGE
DOCK
ADMINISTRATION
RSP ENTRANCE
WEIGHT
SCALES REST
AREA ROOM
TRUCK PARTS TWO ADMINISTRATION AREAS
LOADING COUNTER PARTS AND COMPONENTS
DOCK ADMINISTRATION
(UPPER LEVEL)
REPARABLE PARTS/ FLIGHT LINE SUPPORT
TAIL NUMBER/ ADMINISTRATION
TCTO PARTS CUSTOMER (LOWER LEVEL)
SERVICE OIC'S AND
ENTRANCE NCOIC'S
OFFICE

Figure 2-A: Functional Area Relationships for the Flight Line Support Facility.

5
AMC FLIGHT LINE
SUPPORT FACILITY

the existing facilities relative to cur- 2. Standard Facility footage requirements. (Figure 2-B
rent and future needs. Requirements Requirements graphically illustrates the RSP
are governed largely by the types of a. The size of the facility is detemined storage space.)
aircraft assigned to the base and the by the number of aircraft assigned b. The recommended sizes of the
number of parts and components and RSP pallet requirements. functional areas for a flight line sup-
necessary to support the overall main-
Table 2-A: Space Requirements
port facility are shown in Tables 2-C
tenance effort. Other considerations
for the Flight Line Support Facility through 2-F, and graphically illustrat-
are as follows:
and Storage Areas - Use this table to ed in Figure 2-A, page 5.
Circulation and storage of material determine space requirements and how Table 2-C: Space Requirements
handling equipment to calculate the gross square footage for for Administration Areas - Square
Sufficient space for the number of the C-5, C-17, C-141, and KC-135 footage requirements for the parts
RSPs necessary to support a 30-day flight line support facilities and open/ and components administration,
deployment covered storage. and flight support administration
Administrative areas for account- Table 2-B: RSP Space Require- open office areas are determined
ability and control of parts ments for Pallets - Use this table to from this table.
Space for receiving and shipment determine space requirements for the Table 2-D: Space Requirements
of reparable parts, components, and RSP pallet storage and buildup areas for Support Areas - This table pro-
assemblies between the facility, for the C-5, C-17, C-141, and KC-135 vides an example of areas required for
depots, and manufacturers aircraft. In addition, a formula is the flight line support facility.
included to calculate the square

Space Requirements per Assigned Aircraft Type


C-5 C-17 C-141 KC-135
Flight Line Support Facility(1) 857 SF 625 SF 546 SF 625 SF
Open Storage 396 SF 396 SF 198 SF 198 SF
Covered Storage 100 SF 100 SF 30 SF 30 SF
Gross Square Footage Calculation Example
Assume: 32 assigned C-5 aircraft
Example:
Flight Line Support Facility 32 aircraft x 857 SF = 27,424 SF 2,548 SM(2)
Open Storage 32 aircraft x 396 SF = 12,672 SF 1,177 SM(2)
Covered Storage 32 aircraft x 100 SF = 3,200 SF 297 SM(2)

Legend for Table 2-A.


SF - Square Footage (1) Square footage has been adjusted for high-density storage and storage requirements
SM - Square Meters for RSP are included (see Figure 2-B for space allocation).
(2) SM = .0929 x SF (all measurements are rounded).

Table 2-A: Space Requirements for the Flight Line Support Facility and Storage Areas.

6
AMC FLIGHT LINE
SUPPORT FACILITY

Space Requirements for RSP Pallets


Type of Storage C-5 C-17 C-141 KC-135

RSP Pallet Storage Area (per Pallet) 146.4 SF 146.4 SF 146.4 SF 146.4 SF
RSP Pallet Buildup Area (per Pallet) 32 SF 32 SF 32 SF 32 SF

Established Criteria:
A 463L cargo pallet is 108 x 88 (7.3 x 9) or 65.7 SF

Using Figure 2-B for illustration, the space required to store 25 pallets of RSP, including 5 foot aisles on all sides,
plus an additional pallet space to permit pallet movement while on the conveyor system would be:
48.8 x 75 = 3,660 SF
3,660 SF divided by 25 pallets = 146.4 SF of storage space per pallet

Example using 32 Pallets (Note that Figure 2-B does not apply):
RSP Pallet Storage Area: 32 pallets x 146.4 SF per pallet = 4,685 SF 435 SM(1)
RSP Pallet Buildup Area: 32 pallets x 32 SF per pallet = 1,024 SF 95 SM(1)

Legend for Table 2-B.


SF - Square Footage (1) SM = .0929 x SF (all measurements are rounded).
SM - Square Meters

Table 2-B: RSP Space Requirements for Pallets.

75'
AISLE

463L CARGO PALLET


5'

108" X 88"
9' 9' 9' 9' 9'
7.3'

7.3'

7.3'

7.3'

7.3'

65.7SF
1 AISLE
6 11 16 21
5'
7.3'

2 7 12 17 22
(36.5 FT. X 75 FT. = 2737.5 SF)
48.8'

36.5

AISLE
7.3'

3 8 AISLE AISLE AISLE 23 AISLE


5' 13 18
5' 5' 5' 5'
43.8'

7.3'

4 9 14 19 24
7.3'

5 10 15 20 25

EXTRA
PALLET EXTRA EXTRA EXTRA EXTRA
POSITION
FOR MO VING

(48.8 FT. X 75 FT. = 3,660 SF)

Figure 2-B: Graphic Illustration of Readiness Spares Package (RSP) Pallet Storage Space.

7
AMC FLIGHT LINE
SUPPORT FACILITY

Functional Space Requirements for Functional Space Requirements


Administration for Warehouse
Area SF SM Area SF SM
Parts and Components High-Density Storage 12,383 1,150
Administration(2) 990 92 RSP Pallet Storage Area(7) 4,685 435
Flight Line Support RSP Pallet Buildup Area(7) 1,024 95
Facility Administration(2) 990 92 RSP Loading Dock 150 14
OICs/NCOICs Office(3) 270 25 Truck Loading Dock 250 23
Net Subtotal Administration 2,250 209(1) Reparable Parts/
Tail Number Parts/
Table 2-C: Space Requirements for the Administration Areas.
TCTO Parts(3) 1,500 139
Net Subtotal Warehouse 19,992 1,856(1)
Functional Space Requirements for
Table 2-E: Space Requirements for the Warehouse Areas.
Support Areas

Area SF SM Functional Space Requirements


Customer Service 100 9 for Special Storage
Mechanical Room(4) 240 22 Area SF SM
Electrical Room 48 4
Avionics and Electronic
Communications Room 48 4 Components Storage(3) 1,000 93
Rest Rooms(5) 408 38 Classified Storage(3) 300 28
Break Room(6) 600 56 Battery Storage(3) 150 14
Janitors Closet 50 5 Net Subtotal Special
Net Subtotal Support Area 1,494 139 (1)
Storage 1,450 135(1)
Table 2-D: Space Requirements for the Support Areas. Table 2-F: Space Requirements for the Special Storage Areas.

Legend for Tables 2-C Through 2-F.


SF - Square Footage
SM - Square Meters
(1) SM = .0929 x SF (all measurements are rounded). (4) Square footage is based on 8% of gross administration area.
(2) Square footage is based on 90 Net SF per person with systems furniture. (5) Square footage is based on National Plumbing Code for occupancy and
(3) Individual units may have specific requirements which drive number of fixtures for up to 100 people.
an increase or decrease in space for specific functional areas. These (6) Square footage is based on 40 seats at 15 SF per seat, plus vending area.
deviations from this standard should be fully justified and documented (7) Square footage is based on 32 pallets (see Table 2-B and Figure 2-B).
during planning and programming of the facility.

8
AMC FLIGHT LINE
SUPPORT FACILITY

Table 2-E: Space Requirements Table 2-G: Space Requirements 2. Size


for Warehouse Areas - Area for a Flight Line Support Facility - a. Site size depends upon gross building
requirements for general purpose This table provides an example of square footage; space required for
and support areas include high- the square footage requirements access, maneuvering and parking of
density storage, RSP pallets, load- for a typical facility. tra ctor trailers; and space required
ing docks, reparable parts, and for access and parking of government-
TCTO kits. G. Site Evaluation owned vehicles (GOVs) and privately
Table 2-F: Space Requirements for 1. Location owned vehicles (POVs) away from the
Special Storage Areas - Use this major roadways.
a. Locate the flight line support
table to determine square footage facility adjacent to the flight line, b. Prior to the preparation of DD
requirements for areas that have near the center of aircraft mainte- Form 1391, preliminary site design
special needs, i.e. security fencing, nance activities. should be performed to ensure the
special ventilation and exhaust, and facility, parking, loading docks, and
security/surveillance. b. Include vehicle access for parts
exterior storage can be accommodated.
delivery and pickup.
c. Include fire lanes in accordance
c. Include sufficient parking for
with local fire codes.
personnel and customers.

Gross Total Functional Space Requirements


for a Flight Line Support Facility

Area SF SM
Subtotal Administration 2,250 209
(Table 2-C)
Subtotal Support Area 1,494 139
(Table 2-D)
Subtotal Warehouse 19,992 1,856
(Table 2-E)
Subtotal Special Storage 1,450 135
(Table 2-F)
Net Total Flight Line Support Facility 25,186 2,339
15% Walls and Circulation 3,778 351
(1)
Gross Total Flight Line Support Facility 28,964 2,690
Table 2-G: Space Requirements for a Typical Flight Line Support Facility.

Legend for Table 2-G.


SF - Square Footage
SM - Square Meters
(1) SM = .0929 x SF (all measurements are rounded).

9
AMC FLIGHT LINE
SUPPORT FACILITY

H. Special Project Preliminary Soil Analysis - Mid-Level Sprinklers - Locate


Considerations Determine whether specialized in high-density rack storage and
site and foundation work will be under mezzanines in accordance
Consider special factors when estab- required. with applicable fire code
lishing initial estimates of project High-Bay Construction - Required requirements.
costs (see relevant sections of to support high-density storage Standby Power Generation -
Chapters 3 and 4). Special with 30-foot minimum clearance Install an uninterruptible power
considerations are: under the roof structure. supply for computers controlling
Weather Conditions - Evaluate Mezzanine - Design structural inventory and electrical material
local wind, snow, and seismic columns to accommodate a mezza- handling equipment.
conditions for their impact on nine at a height of 15 feet above Recessed Floor-Mounted Scale -
project costs. the floor. Provide a scale to weigh cargo
High-Density Rack Storage - pallets.
In earthquake zones, incorporate Floor Design - Floors must be
bracing. level. Design to support 500
pounds per square foot loading
for rack storage and material
handling equipment.

10
AMC FLIGHT LINE
SUPPORT FACILITY

Chapter 3

Overall Project
Design
A. General B. Site Design c. A typical site layout and the sites
organizational relationship to the
This chapter presents broad criteria 1. Selection flight line and maintenance units are
for locating a flight line support a. See Figure 3-A for the site organi- illustrated in Figure 3-B.
facility on a site, design of the facility zation concept.
and its supporting utilities, and tech- d. Building orientation should take
nical requirements. b. Facilities should comply with air- into account the following factors:
field clearance requirements for build- Protection from winds and glare
ing height and setbacks.
HANGAR

ALTERNATE TRUCK ENTRANCE

STAFF
PARKING
FLIGHT LINE
SUPPORT
A I R C R A F T PA R K I N G A P R O N

FACILITY
RSP MECHANICAL
ENTRANCE
SHIPPING

ADMINISTRATION
ENTRANCE
TRUCK
PARTS LOADING
PICKUP DOCK
PARKING
CUSTOMER
ENTRANCE CUSTOMER MAIN ENTRANCE
PARKING
SQ OPS/ AMU

OUTSIDE
STORAGE
FENCE

COVERED STORAGE

Figure 3-A: Site Organization Concept for the Flight Line Support Facility.

11
AMC FLIGHT LINE
SUPPORT FACILITY

Shade from excessive sun in 4. Landscaping f. Locate the parts and components
warm climates a. Use landscape elements to define administration office so that the staff
Orient operable windows to take the site and the main entrances. can maintain visual supervision and
advantage of summer breezes Landscaping should present an attrac- security of the warehouse.
Maximum sun exposure in cold tive image for the facility, as well as g. The rest rooms should have a cen-
climates natural screening for separation tralized, prominent location.
between parking areas.
2. Access 2. Architectural Character,
a. Locate the building on the site C. Building Materials, and Finishes
with two vehicle entrances: a conve- Design a. Integrate the architectural and
nient main entrance and an alternate interior design of the facility. The
truck entrance. 1. Organization and architectural style and form should be
b. Design a clearly identifiable access Circulation consistent with the base Architectural
route to the customer entrance from a. The main entrance should provide Compatibility Guide.
the customer parking lots. direct access to the parts counter. b. The design team should use
c. Segregate service traffic from b. Design functional spaces for maxi- comprehensive interior design services
other traffic and pedestrian access. mum flexibility to allow for efficient to ensure interior finishes and furnish-
Keep traffic control signs to a mini- storage and retrieval of aircraft parts. ings are properly coordinated, as well
mum and use them only for safe inte- The general warehouse consists of as appropriate. See Chapter 5 for
gration of vehicle traffic. large, open bay areas of bulk, bin, suggested interior finishes.
and RSP storage. The maximum c. The overall complex should pre-
3. Utilities storage height is 24 feet. sent a cohesive architectural image.
a. In accordance with local service
c. Locate the mezzanine above the d. Provide a variety of spaces and
procedures, provide:
RSP pallet storage area. This area subspaces to accommodate different
Water, sanitary sewer, and provides storage for large bulk items. size groups and activities. Use modu-
stormwater systems, plus natural
d. Maintain a large open area, adja- lar systems furniture in the parts and
gas, steam service, or fuel/oil
cent to the RSP area, for buildup and components and flight line support
systems
maneuvering of the RSP pallets. administration areas to economize on
Electric, telephone, sprinkler, fire space, to provide flexibility, and to
alarm, and communications systems e. Locate the loading dock for RSP
promote a sense of organization and
shipping on the side of the building
visual order.
nearest the flight line.

12
AMC FLIGHT LINE
SUPPORT FACILITY

LANDSCAPING
AS VISUAL
BUFFER
TYPICAL

AIRCRAFT MAINTENANCE
HANGAR

AIRCRAFT
PARKING
APRON
TYPICAL
FLIGHT LINE FLIGHT
SUPPORT LINE
FACILITY BUILDING

OUTSIDE COVERED
STORAGE TYPICAL
STORAGE FLIGHT
LINE
BUILDING

SQ OPS/
AMU

Figure 3-B: Site Organization Relationships for the Flight Line Support Facility.

13
AMC FLIGHT LINE
SUPPORT FACILITY

3. Supervision and Security 6. Special Considerations for Projected load requirements for the
a. The flight line support administra- Renovations facility include the following:
tive facility handles a high-value a. Two factors that may necessitate Floor slab
inventory which requires security and new construction are the availability High-bay parts storage system
supervision. of high-bay areas with a minimum loading
b. The parts and components admin- clearance of 30 feet, and the ability of Bulk storage loading
istration function should provide visual the floor to sustain 500 pounds per
square foot loadings. This may limit High-bay clear spans
supervision of the warehouse area.
the use of otherwise available b. Select and design the structural
c. Limit access to high-value storage existing space. system based on analysis of projected
areas to assigned personnel. Use card future needs to accommodate expan-
access for all access points inside and b. When retrofitting an existing
sion easily and economically; howev-
outside the facility. The access system building, select a suitable, permanent
er, do not over design the initial
should identify and record all persons structure large enough to accommo-
construction.
who enter or leave the facility. date the full range of storage func-
tions. The structural system and c. Design building structural compo-
4. Flexibility and Expansion floors should be open and relatively nents to reflect space requirements,
Potential column-free. The building layout economy, and subsystem dimensions
a. Design the warehouse site to should control customer access and (e.g., ceiling grid, masonry units, fram-
accommodate change or expansion as provide security for the warehouse. ing members, etc.).
mission or assigned aircraft change. c. Survey and analyze existing build- 2. Heating, Ventilating, and
Consider providing land adjacent to ings for energy efficiency upgrade.
the warehouse to accommodate a
Air Conditioning
100% facility expansion. a. Perform a life-cycle cost analysis
D.Building of available energy sources.
b. The large RSP buildup area is Systems
a perfect example of flexible space b. Interior design temperatures and
usage since it is used for buildup of 1. Structural relative humidity levels should con-
pallets, movement of parts, and other a. Select a cost-effective framing form to Air Force standards.
large components. system based on size, projected c. Provide mechanical air circulation
load requirements, and availability in public areas with limited or no air
5. Disabled Access of materials and local labor. conditioning.
All areas should be barrier free and
accessible to the physically disabled in d. The mechanical air system should
accordance with the Americans with introduce outside fresh air.
Disabilities Act (ADA) and Uniform
Federal Accessibility Standards.

14
AMC FLIGHT LINE
SUPPORT FACILITY

A large open area is required to build up and maneuver RSP pallets. The mezzanine area is used for bulk storage. (Grand Forks AFB, ND)

e. Design this facility to meet federal h. Provide for connection to the base 4. Electrical
energy conservation standards defined Energy Monitoring and Control a. Provide electric service, including
in 10 CFR (Code of Federal Regula- System (EMCS). distribution equipment, wiring, recep-
tions), Energy Conservation Volun- tacles and grounding, interior and
tary Performance Standards for New
3. Plumbing
exterior lighting and controls, emer-
Buildings; Mandatory for Federal a. Provide domestic hot and cold
gency lighting, telephone, and fire
Buildings. water, sanitary and storm drainage,
alarms.
plus propane or natural gas systems,
f. Provide zone controls (temperature if required. b. Provide a back-up generator for
sensors with remote adjustment 24-hour operation.
instead of thermostats) to maintain b. For general use, provide hot and
different environmental conditions cold water to all rest rooms, sinks, and c. Evaluate and include the following
in all functional areas. Some areas janitors closets. power needs to determine the total
of the facility may require operation of electric service capacity:
c. Provide shut-off valves at all
environmental systems when other plumbing fixtures. Photo card key access
areas are closed. Engine warming receptacles when
d. Provide frost-free hose bibs on all
g. Provide mechanical exhausts for exterior walls if local climate condi- needed in severe cold climates
the rest rooms. tions justify them.

15
AMC FLIGHT LINE
SUPPORT FACILITY

d. All service equipment should be k. Surveillance systems in designated Administrative Data Connections
Underwriters Laboratories-listed. areas should have at least two levels (Local Area Networks - LANs) -
As an alternative, provide of detection. Provide administrative computer
published proof from a bona fide and LAN printer connectivity.
5. Fire Protection Also provide specialized computer
independent testing laboratory. a. Facilities should be of noncom- connectivity to support the base
e. General convenience receptacles bustible construction. mission when required.
and special power outlets should be
b. Hazardous or combustible supplies Fiber Optic Connectivity - May
commercial grade. Convenience
must be contained within a fire-rated be required (internally to several
receptacles should be a maximum of
enclosure. locations and/or externally to sys-
12 feet apart. Provide special power
outlets and circuits for all computer c. Provide sprinkler coverage in the tem nodes) to support AMC com-
equipment as required. aircraft wheel and tire assemblies stor- mand, control, communications,
age area. and computer systems.
f. General lighting in office areas
Hands-Free, Two-Way Intercom
should be fluorescent with low tem- 6. Communications (Public Address System) - Provide
perature energy efficient ballasts a. The base communications throughout the facility, with wall-
and lamps. Indirect lighting systems squadron, in coordination with the mounted speaker units.
of the high-intensity discharge or system telecommunications engineer-
fluorescent types may be used where ing manager, can provide details on 7. Material Handling System
practical. communications requirements and a. The Material Handling Engineer-
g. Use of incandescent lighting design for the buildings internal and ing Branch at Wright-Patterson AFB,
should be kept to a minimum because external phone and data connectivity, OH (DSN: 787-3078), is the focal
of energy efficiency and frequency of as well as alarm system wiring. point for designing and funding
maintenance. Incandescent lighting material handling systems. The fol-
b. Incorporate requirements into lowing material handling guidance
should have an extended life of at building design specifications and
least 2,500 hours. includes recommendations that may
include connectivity to base phones, be altered after further study at
h. Lighting control systems with data infrastructure systems base level.
should include dimmers to auto- sufficient to support the maximum
matically reduce intensity levels of planned number of building occu- b. Store most parts in a high-density
artificial lighting when natural light pants. These requirements are system with a maximum storage height
is available. as follows: of 24 feet. Storage should be a combi-
nation of the following:
i. Use high-intensity discharge light Phone Connections - Provide
sources for exterior lighting of parking sufficient preinstalled connections Bins - Stored on adjustable shelv-
areas, walkways, and building to support the maximum planned ing set initially 6 inches apart.
entrances. number of people in each area. Open Shelf Storage - Wire rack
Consider future growth, modem over framework, 24 inches high
j. Install illuminated exit signs, pub- connections, and special require- and/or 30 inches deep, with
lic address systems, and battery pow- ments (pay phones, etc.). adjustable heights for maximum use.
ered emergency lighting.

16
AMC FLIGHT LINE
SUPPORT FACILITY

Pallet racks - Design for standard Parts Carousel - For small parts storing high-demand items at levels
Air Force Pallets, 40 deep x 48 Cantilever Racks - For storing below six feet will permit manual
wide (not to be confused with 463L hydraulic tubing, sheet metal, picking of many of these items with-
cargo pallets which are 108 x 88). and items too bulky for rack out the turret trucks.
Design should consider a possible storage. The length of the sup- e. In-rack sprinkler systems are
load overhang of four inches total port arms and load capacity required for racks over 12 feet high.
in either direction, a 3,000 pound must be suitable for specific
load, and adjustable vertical items to be stored. f. Use a pallet jack to move materials
spacing for maximum use. stored on the mezzanine. Equip the
c. Items that are too bulky for rack mezzanine storage areas with a 1,000-
Special Rack - For storage of tire storage can be stored on the open
and wheel assemblies. This rack pound capacity vertical reciprocating
mezzanine above the cargo pallet conveyor (VRC) for lifting and lower-
maintains the tires in an upright, storage area.
secured position to prevent them ing material to the mezzanine level.
from rolling. Because of tire weight d. Aircraft parts in the high-density The mezzanine should also have a
and size, they should be stored on system are stored and retrieved using removable section of railing for lifting
the floor or on the first level of the man-up turret trucks. Note that items too bulky for the VRC and as a
racks. backup in case of VRC malfunction.

Vertical spacing of high-density storage racks should be adjustable for maximum use. (Grand Forks AFB, ND)

17
AMC FLIGHT LINE
SUPPORT FACILITY

g. Provide floor-mounted roller con- i. The storage racks and shelves j. Provide a battery charging area
veyors for staging the cargo pallets. should be designed for rail guidance. for the turret trucks. This area should
h. Building floors should be level (The floor rail down the aisle and be large enough for two to three vehi-
within 0.125 inches in 10 feet, with curbs at the ends of the shelving, cles and permit removal of batteries
no more than 0.5 inch deviation in painted yellow in the photo below, with minimum manual effort. Provide
the entire building area used by turret prevent the turret truck from coming adequate ventilation to prevent hydro-
trucks. Aisle width between rack faces in contact with the storage racks.) gen accumulation during charging.
should be 68 inches for turret trucks The lowest level of storage must be
and 60 inches for order-picking trucks. even with or above the top of the rail.
Design the racks, shelves, and rail
guidance so that the area under the
rack or shelf is either cleanable or
sealed to prevent the accumulation of
trash or dust.

High density storage and mechanized turret trucks contribute to efficient handling of aircraft parts. (Grand Forks AFB, ND)

18
AMC FLIGHT LINE
SUPPORT FACILITY

Chapter 4
Functional Area
and Space Criteria
A. General
This chapter presents criteria for
designing a flight line support facility.
Primary design considerations include
the use, performance, organization,
character, and relationships of compo-
nent spaces. For each area, specific
criteria are provided concerning space
size and critical dimensions. These
recommendations may be modified to
reflect mission requirements. The sizes
of functional areas are specified in Tables
2-C through 2-F, page 8.

B. Administration
The parts and components administration area should overlook the entire
1. Design Considerations warehouse area. Ordering, tracking, and accounting for specific parts require
See Figure 4-A for an illustrative a well-organized computer area. (Grand Forks AFB, ND)
floor plan.
a. Use and Performance Collocate the administrative areas Provide lockable cabinets for
so that rest rooms and support func- storage of manuals.
Two administrative functions
tions can be shared. Include an area for file cabinets
are contained within a flight line
support facility: b. Space Organization and and vertical files.
Character b. Technical Requirements
Parts and components admin-
Provide a private office for the OIC Wiring for LAN computers.
istration is for ordering and
expediting parts. and NCOIC within the flight line
Provide telecommunications
support administration area.
Flight line support administra- data/computer outlets.
tion is the primary customer 2. Parts and Component
3. Flight Line Support
interface. Administration
Administration
a. Furnishings and Equipment
a. Furnishings and Equipment
Use modular systems furniture for
Use modular systems furniture for
the work stations and private
work stations.
offices.

19
AMC FLIGHT LINE
SUPPORT FACILITY

Provide lockable cabinets for Electrical Room - Location of 4. Electrical Room


storage of manuals. primary electrical systems for the a. Technical Requirements
Include an area for file cabinets building Provide for standby power
and vertical files. Communications Room - Contains generation and uninterruptible
b. Technical Requirements computer distribution equipment power supply.
Wiring for LAN computers.
and telephone service panels Locate adjacent to the computer
Rest Rooms - Locate centrally and mechanical rooms.
Provide telecommunications
within the facility.
data/computer outlets. 5. Communications Room
b. Space Organization and a. Technical Requirements
4. OICs/NCOICs Office Character
a. Furnishings and Equipment Provide for various personal
The mechanical room should have
Desks and desk chairs
computers, as required.
outside access.
Provide surge protection for all
Side chairs All mechanical, electrical, and
computer equipment.
File cabinets communications rooms should
Design for a sound transmission
Personal computers be adjacent to each other for
servicing convenience. class rating of 52.
b. Technical Requirements
2. Customer Service Entrance 6. Rest Rooms
Telecommunications data/
a. Furnishings and Equipment a. Furnishings and Equipment
computer outlets
Men: Water closets, lavatories,
Wiring for LAN computers Provide pedestrian entrance mats.
urinals, soap dispensers, paper
Security devices to control b. Technical Requirements towel dispenser and disposal units,
public access Provide easily cleaned, water- toilet paper holders, grab bars,
and mud-resistant flooring mirrors, coat hooks, and partitions
C. Support Areas materials at all entrances.
Women: Same as men, minus uri-
1. Design Considerations 3. Mechanical Room nals, plus sanitary napkin dispenser
a. Use and Performance a. Furnishings and Equipment and disposal units
The support areas should include Provide a floor-mounted b. Technical Requirements
the following: mop sink. Sound transmission class rating:
b. Technical Requirements 45 between adjacent rooms
Customer Service Entrance - Main
entrance should be easy to identify Size and critical dimensions Finish floors with non-skid
from the principal access road. will vary with building system ceramic tile.
Interior traffic areas should be logi- requirements and climate Finish walls with ceramic tile
cal, efficient, and easy to follow conditions. installed either full height or
from the main entrance. as a wainscot.
Mechanical Room - Location of Use plastic laminate for lavatory
primary equipment for HVAC, counters.
plumbing, and other building
system equipment

20
AMC FLIGHT LINE
SUPPORT FACILITY

7. Janitors Closet maintained floor material, sloped Primary areas of the warehouse
Provide a floor-mounted mop sink. to a floor drain. provide fully integrated flight line
support for aircraft maintenance.
Provide shelves and hooks for D. Warehouse
cleaning and maintenance High-Density Parts Storage - Used
equipment. 1. Design Considerations for efficient storage of a large num-
Provide a water-resistant, easily a. Use and Performance ber of small items.

HIGH-DENSITY CONTROLLED
WAREHOUSE PARTS STORAGE ACCESS

BATTERY
STORAGE
TWO STORAGE LEVELS
MEZZANINE BULK
STORAGE AREA (UPPER LEVEL) AVIONICS AND
RSP PALLET STORAGE AREA (LOWER LEVEL) ELECTRONIC
COMPONENTS
STORAGE

MECHANICAL
ROOM

ELECTRICAL
LINE OF MEZZANINE ABOVE ROOM
COMMUNICATIONS
EYEWASH AND ROOM
RSP PALLET BUILDUP AREA DELUGE SHOWER
ORDER CLASSIFIED
SHIPPING AND CONTROLLED PICKER STORAGE
RSP
LOADING DOCK RECEIVING ACCESS RECHARGER ADMINISTRATION
PARTS COUNTER ENTRANCE
UP
463L REST ROOMS CONTROLLED
SCALE J ACCESS
A
N.
PARKING PARKING
CUSTOMER FLIGHT LINE
ENTRANCE SUPPORT FACILITY
REPARABLE PARTS/ ADMINISTRATION OIC'S/NCOIC'S
TAIL NUMBER PARTS/ OFFICE
TCTO PARTS WINDOWS
TRUCK OVERLOOKING
LOADING WAREHOUSE
DOCK

CUSTOMER PARTS AND COMPONENTS


PARKING ADMINISTRATION

Figure 4-A: Floor Plan for the Typical Flight Line Support Facility.

21
AMC FLIGHT LINE
SUPPORT FACILITY

RSP Pallet Storage Space - This RSP pallet storage space should be 3. Readiness Spares Packages
area includes floor-mounted rollers adjacent to the RSP buildup area. Pallet Storage Space
for storage of RSP kits. The RSP loading dock should be a. Furnishings and Equipment
RSP Pallet Buildup Area - An area adjacent to the buildup area. Provide floor-mounted roller
to assemble and maneuver RSP 2. High-Density Parts Storage conveyors sized to handle
containers. the RSP kits.
Refer to Chapter 3, paragraph D7,
RSP Loading Dock - The dock Material Handling System, for a Locate the cargo pallets in
provides a transfer area for RSP description of storage rack systems this area.
containers to and from the and equipment. b. Technical Requirements
flight line.
a. Furnishings and Equipment Ensure floors are level within
Truck Loading Dock - The dock
The high-density storage shelf 0.125 inch in 10 feet with no more
provides a transfer area to receive than 0.5 inch deviation.
system should be at least 24 feet
components from base supply,
high. 4. Readiness Spares Packages
depots, and manufacturers.
b. Technical Requirements Buildup Area
Parts Counter - Customer parts
pick-up is at this counter. Ensure that traffic aisles, storage a. Furnishings and Equipment
shelving aisles, and equipment Locate the cargo pallets in this area.
Bulk Storage Area - Parts too
can accommodate the material han-
large for high-density storage are b. Technical Requirements
dling equipment.
kept in this area. Provide natural light whenever
Arrange the area so that the
Reparable Parts/Tail Number possible, along with metal
required exits are remote from each halide lighting.
Parts/TCTO Parts - An area for
other, but within 200 feet or less of
storing parts until they are sent The floor finish should reflect light
any point within the facility.
out for repair. and be easily cleaned.
Floor finish should reflect light
b. Space Organization and 5. Readiness Spares Packages
and be easily cleaned.
Character Loading Dock
Provide high-bay construction with
Provide a large work area for pack-
30 feet minimum clearance under a. Furnishings and Equipment
ing, unpacking, and maneuvering
the roof structure. Provide dock levelers to correct the
RSP kits on cargo pallets with and
In earthquake zones, brace high-
elevation differences between the
without material handling equip-
density storage racks to resist loading dock and truck bed. Also
ment. Area should be a large, con-
earthquake forces. provide truck restraints to keep the
tiguous open space.
trailer from pulling away from the
Locate the RSP pallet storage space dock, and dock door seals for
adjacent to the dock. Provide an weather protection.
in-floor mounted scale sized to
handle cargo pallets, and capable of
accurately measuring a pallet which
weights up to 10,000 pounds.

22
AMC FLIGHT LINE
SUPPORT FACILITY

b. Technical Requirements 8. Bulk Storage Area Include a customer counter in


Use overhead rolling doors at a. Furnishings and Equipment this area.
dock openings. Provide a VRC to carry workers b. Technical Requirements
Incorporate a surveillance and warehouse items from the Install wiring for LAN computers.
system with card key to control ground floor to the mezzanine level.
access from the exterior. Include a storage system for tires
E. Special Storage
Include ramps for forklift traffic at and wheel assemblies. Requirements
loading docks. b. Technical Requirements 1. Design Considerations
6. Truck Loading Dock Design structural columns for a See Figure 4-A, page 21, for location
a. Furnishings and Equipment mezzanine at 15 feet above the of special storage areas.
Provide dock levelers to correct the
floor.
a. Use and Performance
elevation differences between the Install mid-level sprinklers under
The following are the primary
loading dock and truck bed. Also mezzanines in accordance with
areas that have specific storage
provide truck restraints to keep the applicable fire code requirements.
requirements:
trailer from pulling away from the 9. Reparable Parts/Tail
dock, and dock door seals for Avionics and Electronic
weather protection.
Number Parts/TCTO Parts Components Storage - These items
a. Furnishings and Equipment require a separate environmentally
Incorporate a surveillance system
Provide shelving and storage bins. controlled storage area to preclude
with card key to control access
from the exterior. Incorporate rollers/material damage to these sensitive parts.
conveyors.
b. Technical Requirements
Use overhead rolling doors at
the dock opening.
7. Parts Counter
a. Furnishings and Equipment
Provide a service counter to
separate warehouse workers
from customers.
Provide sufficient space to
temporarily store a small number
of items.
b. Technical Requirements
Wiring for LAN computers.

Provide telephone/computer
outlets.
Control access to the warehouse
from the parts counter area. The turret truck and vertical conveyor efficiently move material from the mezzanine
storage area to the RSP buildup and storage areas. (Grand Forks AFB, ND)

23
AMC FLIGHT LINE
SUPPORT FACILITY

Classified Storage - Requires an 2. Avionics and Electronic b. Technical Requirements


area enclosed with fire-rated walls Components Storage Allot approximately 300 square feet
and vault door. a. Furnishings and Equipment for this space.
Battery Storage - For storage of Provide a shelving system Provide fire-rated walls and ceiling.
nickel cadmium cells and refrigerat- appropriate to accommodate Install a vault door.
ed storage of individual cells the items to be stored.
Outside Storage - A large space for
4. Battery Storage
b. Technical Requirements
storage of bulk items and equip- a. Furnishings and Equipment
Provide separate environmental
ment that can be stored outdoors, Provide safety equipment and facili-
controls.
thus freeing space within the ties, e.g., eyewash, deluge shower.
Wiring for LAN computers.
warehouse. Include space to accommodate
b. Space, Organization, and Provide telephone/data refrigeration equipment.
Character communications outlets.
b. Technical Requirements
Locate battery storage away from 3. Classified Storage Use quarry tile or acid-resistant
administrative areas to facilitate the a. Furnishings and Equipment floor coating.
unobstructed exhausting of fumes. Include a shelving system Use explosion-proof receptacles.
Because of the need for security, to accommodate the items
Finish interior ceiling and walls
locate classified storage near the to be stored.
with non-combustible materials.
administrative areas.
Maintain temperatures in accord-
ance with the manufacturers
recommendations for explosion-
proof heaters.
Provide positive air ventilation
and special exhaust to conform
to established design requirements
and local building codes.
Provide sufficient electrical outlets
to accommodate charging equip-
ment and refrigeration equipment.
5. Outside Storage
a. Furnishings and Equipment
Security fencing is required.

b. Technical Requirements
Provide a controlled-access gate.

Paved surfaces are required.

Provide lighting for night-time


A typical RSP storage area beneath a mezzanine should be equipped with floor-mounted visibility and surveillance.
rollers for easy maneuverability. (Grand Forks AFB, ND)
Locate the covered storage space
in this area.

24
AMC FLIGHT LINE
SUPPORT FACILITY

Chapter 5

Interior Finishes
A. General Coordinate materials, finishes, colors, levels of activity. For example, the
and texture selections to complement warehouse areas require extremely
Finish materials and furnishings the overall building design and image. durable and easy to maintain finishes.
should be selected using professional Select colors and finishes to express
interior design services. Selections Color schemes should be predomi-
professionalism, warmth, and a strong, nantly neutral. The designer should
should be based on anticipated use, positive image.
maintenance requirements, life-cycle consider the seasonal temperature
range of the base when selecting a
cost, fire and other life safety require- B. Finish Schedule color scheme, such as cool colors
ments, as well as aesthetic qualities.
Use colors and finishes to highlight (blue, green) in hot climates and
and differentiate spaces designed to warm colors (beige, tan) in cold
accommodate different types and climates.

Furniture is an integral part of the building design and image.

25
AMC FLIGHT LINE
SUPPORT FACILITY

Permanent and semi-permanent Paint mechanical and electrical C. Furniture


surface materials, such as tile, carpet, devices to match the background sur-
and the majority of the wallcoverings, face. Room finish schedules are listed Furniture is an integral part of the
should be in neutral colors such as in Tables 5-A through 5-D. The overall building design and image.
beige, taupe, or gray tones. dashed numbers after the abbrevia- Coordinate furniture selection for
tions (e.g., P-1, VCT-2, VWC-3, etc.) consistency with finish materials, tex-
Patterned carpet (bold tweeds) can be tures, and colors of built-in
the basis for the overall color scheme, in Tables 5-A through 5-D refer to
specific material color board samples elements.
as well as mask traffic wear.
in Figure 5-A, pages 30 and 31. Choose furniture that is durable,
comfortable, modular, and flexible.
Systems furniture, which can be fund-
ed as part of a military construction
project, is recommended for all
administrative areas.

List of Abbreviations
ACT Acoustical Ceiling Tile MTL Metal
CB-E Concrete Block, Epoxy NA Not Applicable
CB-P Concrete Block, Painted PL Plastic Laminate
CONC-S Concrete, Sealed QT Quarry Tile
CPT Carpet VB Vinyl Base
CT Ceramic Tile VCT Vinyl Composition Tile
EXP-P Exposed Structure, Painted VWC Vinyl Wallcovering
GWB-P Gypsum Board, Painted

Finish Schedules

Flight Line Support Administration


Functional Area Name Floors Base Walls Ceiling
Parts and Components
Administration CPT VB VWC-3 ACT
Flight Line Support
Administration CPT VB VWC-3 ACT

Table 5-A: Finish Schedule for the Flight Line Support Facility Administration.

26
AMC FLIGHT LINE
SUPPORT FACILITY

Flight Line Support Facility-Support Areas


Functional Area Name Floors Base Walls Ceiling Laminate
Mechanical CONC-S NA CB-P-1 EXP-P-3 NA
Electrical CONC-S NA CB-P-1 EXP-P-3 NA
Communications CONC-S NA CB-P-1 EXP-P-3 NA
Rest Rooms (men) CT-1 CT-3 VWC-2/CT-3 GWB-P-3 PL-1
Rest Rooms (women) CT-2 CT-3 VWC-3/CT-3 GWB-P-3 PL-2
Janitors Closet CONC-S NA CB-P-1 EXP-P-3 NA

Table 5-B: Finish Schedule for the Flight Line Support Facility Support Areas.

Flight Line Support Facility-Warehouse


Functional Area Name Floors Base Walls Ceiling Laminate
High-Density Parts Storage CONC-S NA CB-P-2/MTL EXP-P-3 NA
RSP Pallet Storage Area CONC-S NA CB-P-2/MTL EXP-P-3 NA
RSP Buildup Storage Area CONC-S NA CB-P-2/MTL EXP-P-3 NA
RSP Loading Dock CONC-S NA CB-P-2/MTL EXP-P-3 NA
Parts Counter VCT VB CB-P-2 ACT PL-2
Bulk Storage (Mezzanine) MTL NA CB-P-2/MTL EXP-P-3 NA
Reparable Parts/Tail Number
Parts/TCTO Parts CONC-S NA CB-P-2 ACT NA

Table 5-C: Finish Schedule for the Flight Line Support Facility Warehouse.

Flight Line Support Facility-Special Storage


Functional Area Name Floors Base Walls Ceiling
Avionics and Electronic
Components Storage CONC-S NA CB-P-1 EXP-P
Classified Storage CONC-S NA CB-P-1 EXP-P
Battery Storage QT NA CB-E EXP-P

Table 5-D: Finish Schedule for the Flight Line Support Facility Special Storage.

27
AMC FLIGHT LINE
SUPPORT FACILITY

References

AFM 67-1 Mechanized Material Handling Systems and


Vol. II, Part I Storage Aids Systems
AFM 86-2(1) Standard Facility Requirements
AFM 88-3 Structural Design Criteria Loads
(2)
AFR 89-1 Design and Construction Management
(3)
AFR 125-37 Protection of USAF Resources
ADA Americans with Disabilities Act
DoD 4145.21M1 Material Handling/Storage
DoD 4270.1-M Construction Criteria Manual
FED STD. 795 Uniform Federal Accessibility Standards
MIL-HDBK 1008B Military Handbook for Fire Facilities Engineering,
Design, and Construction
MIL-HDBK 1190 Military Building Code
NFPA-231 and 231C Sprinkler Protection for Flammable Liquid Storage
NFPA-101 Life Safety Code 101
NFPA 30: 4-5.6 Flammable and Combustible Liquid Storage for General Purpose
Warehouse
AMC Commanders Guide to Facility Excellence
AMC Bases Architectural Compatibility Plans
AMC Hazardous Material Pharmacy Facility Planning and Design Guide
AMC Interior Design Guide

Legend
(1) When published, AFI 32-1024 (Standard Facility Requirements) will supersede AFM 86-2.
(2) When published, AFI 32-1023 (Design and Construction Standards and Execution of Facility Construction)
will supersede AFR 89-1.
(3) When published, AFI 31-209 (Air Force Resources Protection Program) will supersede AFR 127-37.

28
AIR MOBILITY COMMAND

GLOBAL REACH FOR AMERICA

Prepared by Directorate of Civil Engineering


and Directorate of Logistics
March 1999