C.E.3.1 INTRODUCTION:
C.E.3.2 BACKGROUND:
C.E.3.2.2 OBJECTIVE:
Maintenance Manager
Maintenance Superintendent
Supervisor Contractor
C.E.3.3.13 I asked vendor to mobilize their team along with all tools and
tackles for further activity. Tools and tackles include welding machine,
welding electrodes, electrode Owen, grinding machine and wheel, gas
cutting set, lifting web slings, D-shackle, chain pulley block etc.
C.E.3.3.14 I prepared job safety analysis for excavation job and got
approval from senior authority for field implementation.
C.E.3.3.16 I gave tool box talk to excavation team for hazards involved
in the job on daily basis and ensured excavation to be performed in
reverse bell fashion to avoid excavation collapse.
C.E.3.3.17 Once, contractor mobilized all tools and tackles at site, I
performed joint inspection with electrical engineer for healthiness
checks of all mechanical and electrical equipments. My major concern
was valid load test certificate of all lifting tools and tackles.
C.E.3.3.18 Welders test is the first step to start the fabrication job.
Therefore, I asked vendor to perform welder test on 4 inch pipe piece
and sent to laboratory for testing.
C.E.3.3.24 Pipe end beveling machining and welding job were started.
Grinding machine was used for beveling. Before grinding of pipe
started, I inspected grinding machine for electrical department check
and grinding wheel healthiness checks by filling check sheet.
C.E.3.3.25 For pipe end root welding, tungsten inert gas welding was
performed for better joint and arc welding was performed to fill up.
C.E.3.3.26 After completion of pipe welding job, I inspected welding
joint visually and by using die penetration kit test for finding presence
of any welding crack.
C.E.3.3.28 Hydro test was also arranged after clearance received from
quality department by inspecting radiography films.
C.E.3.3.31 Also, I kept PTFE teflon sheet packing inside pipe support
clamp and PTFE teflon rod at the bottom of pipe and metal plate
support at every RCC support to prevent crevice corrosion.
C.E.3.4 SUMMARY: